Construction Report
Select Location
  
Updated: 6/28/16 6:06 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lakeshore Dr (-1.2 miles) to Lakeshore Dr (-0.7 miles) 0.0 to 0.5 Medium Right lane closed, one lane open 4/8/16 7:00 AM to 11/15/16 10:00 PM WisDOT Construction - I-90 Mississippi River Bridge Construction
Lakeshore Dr (-1.2 miles) to US-53 (-0.2 miles) 0.0 to 2.7 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
Exit ramp to NB WI-35 2.9 Major All lanes and shoulders closed 4/4/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - Detour: EB 90 to Exit 4 USH 53/STH 157 to WB 90 to STH 35 NB @ Exit 3
US-53 to 12th Ave (+0.2 miles) 2.9 to 4.2 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
12th Ave (+0.2 miles) to US-53 (+0.2 miles) 4.2 to 4.6 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
US-53 (+0.2 miles) to WI-16 4.6 to 5.7 Medium Right lane closed, one or two lanes open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
Commercial St (+0.6 miles) to WI-16 (+0.7 miles) 20.3 to 28.8 Medium One lane closed, one lane open 6/27/16 4:00 AM to 7/1/16 12:00 PM WisDOT Construction - La Crosse - Tomah | W County Line - USH 12 | I 90 | MONROE
Hazel Ave (-0.3 miles) to US-12 34.9 to 43.2 Medium One lane closed, one lane open 6/27/16 4:00 AM to 7/1/16 12:00 PM WisDOT Construction - La Crosse - Tomah | W County Line - USH 12 | I 90 | MONROE
Church Rd (-0.3 miles) to WI-106 (-0.4 miles) 153.2 to 158.3 Minor Right shoulder closed, all lanes open 6/1/16 12:00 AM to 6/30/16 11:45 PM WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Church Rd (-0.3 miles) to WI-106 (-0.4 miles) 153.2 to 158.3 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 9:00 AM daily until 6/30/16 WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Church Rd to Maple Grove Rd 153.5 to 156.3 Medium Various lanes closed 4/4/16 8:00 PM to 10/30/16 5:00 AM WisDOT Periodic Nighttime Single lane closures
Maple Grove Rd (+0.9 miles) to Goede Rd (-0.2 miles) 157.2 to 161.7 Medium Left lane closed, one lane open 6/28/16 8:00 PM to 6/29/16 5:00 AM daily until 7/1/16 WisDOT Construction - Detour: No posted detour
Goede Rd (-0.2 miles) to Ellendale Rd (+0.5 miles) 161.7 to 163.5 Medium Left lane closed, one lane open 6/28/16 8:00 PM to 6/29/16 5:00 AM daily until 7/1/16 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
at County Road M (+0.2 miles) 166.3 Minor Right shoulder closed, all lanes open 6/28/16 8:00 AM to 5:00 PM daily until 7/1/16 WisDOT Construction - Soil borings for Design ID 1005-10-01 for I-39 Central Segment. Proposed bridge widening over WSOR.
Kennedy Rd (-0.3 miles) to Milwaukee St 169.4 to 172.8 Medium Left lane closed, one lane open 6/28/16 8:00 PM to 6/29/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | CTH O - Kennedy Rd | I 39 | ROCK
at WI-11 177.1 Minor Left shoulder closed, all lanes open 6/28/16 6:00 AM to 6/29/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at WI-11 177.1 Minor Right shoulder closed, all lanes open 6/28/16 6:00 AM to 6/29/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
Woodman Rd (-0.7 miles) to Woodman Rd (-0.6 miles) 177.9 to 178.0 Medium Right lane closed, one lane open 6/28/16 9:00 AM to 3:00 PM WisDOT Maintenance - Beam Guard Repair
L-T Town Line Rd (+0.5 miles) to CR-S (-0.2 miles) 181.1 to 182.1 Medium Right lane closed, one lane open 6/28/16 8:00 PM to 6/29/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | SB Turtle Creek Bridge B-53-0042 | I 39 | ROCK
CR-S (+0.2 miles) to WI-81 (-0.5 miles) 182.5 to 184.1 Medium Right lane closed, one lane open 6/28/16 8:00 PM to 6/29/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
Hart Rd (-0.1 miles) to WI-81 (-0.5 miles) 183.1 to 184.1 Minor Right shoulder closed, all lanes open 6/26/16 12:00 AM to 7/2/16 11:00 PM WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
Exit ramp to SEB US-20 42.1 Minor Partial closure 6/6/16 7:00 AM to 7/14/16 11:59 PM Illinois Tollway Pavement Repair; Shoulder Reconstruction; Right Side of Ramp closed
Ramp from SB IL-31 to EB I-90 54.6 to 54.7 Major All lanes and shoulders closed 4/22/16 7:00 AM to 9/29/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***
Ramp from EB I-90 to IL-31 54.6 to 54.7 Major All lanes and shoulders closed 4/22/16 7:00 AM to 9/29/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closures ***
Ramp from EB I-90 to IL-59 (IL-59 Plaza 14)) 59.7 to 59.8 Medium Various lanes closed 4/29/16 12:00 AM to 7/15/16 12:00 AM Illinois Tollway Rdwy and Bridge Widening; Right IPO Lane Closed; *** Long Term Closure ***
Barrington Rd (+2.4 miles) to Roselle Rd (-0.5 miles) 64.6 to 65.1 Medium Left lane closed, two lanes open 6/28/16 11:00 AM to 2:00 PM Illinois Tollway Rdwy/Bridge Reconst
Meacham Rd (-0.9 miles) to Meacham Rd (+0.1 miles) 66.5 to 67.5 Medium Right lane closed, three lanes open 6/28/16 9:00 AM to 7:00 PM Illinois Tollway Rdwy Widening and Reconst
Exit ramp to NB IL-53 67.6 Minor Both shoulders closed, all lanes open 3/2/15 7:00 AM to 6/30/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to SB I-290 / IL-53 (I-290 / IL-53 Plaza) 67.6 None Partial closure 6/21/16 12:00 AM to 7/25/16 11:59 PM Illinois Tollway Rdwy Reconst; Right IPO lane closed
I-290 (-0.1 miles) to Arlington Heights Rd (-0.1 miles) 68.1 to 70.7 Medium Right lane closed, two lanes open 6/28/16 5:00 PM to 7:00 PM Illinois Tollway Rdwy and Bridge Widening; Moving Operation
Entrance ramp from SB IL-53 Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 6/30/16 11:59 PM IDOT ***Long Term Closure***
IL-58 (+0.1 miles) to Arlington Heights Rd (-0.5 miles) 69.5 to 70.3 Medium Right lane closed, two lanes open 6/28/16 6:00 PM to 7:00 PM Illinois Tollway Rdwy Widening and Reconst
Arlington Heights Rd (-0.1 miles) to Elmhurst Rd (-0.3 miles) 70.7 to 73.3 Medium Right lane closed, two lanes open 6/28/16 5:00 PM to 7:00 PM Illinois Tollway Rdwy and Bridge Widening; Moving Operation
River Rd to I-190 (+0.2 miles) 78.3 to 78.8 Medium Left lane closed, one or two lanes open 6/16/16 5:00 AM to 11/9/16 11:59 PM Illinois Tollway Bridge Rehabilitation; *** Long Term Closure ***
at River Rd Plaza 78.5 to 78.6 Medium Various lanes closed 6/16/16 5:00 AM to 11/9/16 11:59 PM Illinois Tollway Bridge Rehabilitation; Left ORT Lane Closed; *** Long Term Closure ***
at River Rd Plaza 78.5 to 78.6 Medium Various lanes closed 6/16/16 5:00 AM to 8/23/16 11:59 PM Illinois Tollway Bridge Rehabilitation; Left Cash, Left Center Cash & Right IPO Lanes Closed; *** Long Term Closure ***
Entrance from EB I-190 0.9 to 3.0 Minor Right shoulder closed, all lanes open with partial ramp closures 6/28/16 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance from EB Kennedy Local 3.0 to 54.0 Minor Both shoulders closed, all lanes open with partial ramp closures 6/28/16 9:00 AM to 3:00 PM IDOT Moving Operation
East River Rd to Cumberland Ave (IL-171) 79.1 to 79.6 Minor Right shoulder closed, all lanes open 4/26/16 12:00 AM to 10/31/16 11:59 PM IDOT RT 2 lanes narrow; Long Term Closure
Exit ramp to WB I-290 51.4 Minor All lanes and shoulders open 6/1/14 12:00 AM to 6/30/16 11:59 PM IDOT 11' Width; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 6/30/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to 26th St 51.6 to 54.0 Minor Right shoulder closed, all lanes open 6/28/16 9:00 AM to 3:00 PM IDOT
Harrison St to Roosevelt Rd 51.7 to 52.2 Minor Both shoulders closed, all lanes open 5/20/15 12:00 AM to 7/29/16 11:59 PM IDOT Lanes weaved ***Long Term Closure***
Exit ramp to Taylor St 51.8 None Partial closure 6/11/15 12:00 AM to 7/29/16 11:59 PM IDOT Force Merge. No turns. Ramp exit yielding to mainline exit traffic.; Long Term Closure
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 7/14/16 11:59 PM IDOT 11' Width; Long Term Closure
Exit to SB Dan Ryan Express 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 6/28/16 9:00 AM to 3:00 PM IDOT Moving Operation
Exit to SB Dan Ryan Local 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 6/28/16 9:00 AM to 3:00 PM IDOT Moving Operation
Exit to SB Dan Ryan Local 54.1 to 59.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/28/16 9:00 AM to 2:00 PM IDOT Moving Operation
Otis Rd (+0.1 miles) to Holmesville Rd (-0.5 miles) 38.5 to 39.5 Medium Various lanes closed 6/28/16 7:00 AM to 5:00 PM Indiana Toll Road Moving Operation; Please Note: Starting in the Driving Lane and switching over to Passing Lane mid shift
US-421 to US-31 (-0.1 miles) 39.0 to 72.0 None All lanes and shoulders open 5/31/16 8:00 PM to 6/30/16 8:00 PM Indiana Toll Road 10' Width Restriction
IN-39 (-0.3 miles) to County Road 200 E (+0.3 miles) 48.6 to 53.7 Medium Left lane closed, one lane open 5/31/16 8:00 PM to 6/28/16 8:00 PM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
County Road 850 E (+0.2 miles) to Sycamore Rd (+0.3 miles) 61.5 to 68.4 Medium Left lane closed, one lane open 6/11/16 8:00 AM to 6/28/16 8:00 AM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
Primrose Rd (+0.5 miles) to Portage Ave 71.0 to 75.0 Minor Right shoulder closed, all lanes open 6/27/16 7:00 AM to 6/30/16 7:00 AM Indiana Toll Road Install Fiber Optic

I-90 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to 69th St 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 6/28/16 9:00 AM to 3:00 PM IDOT Moving Operation

I-90 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 26th St 59.5 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 6/28/16 9:00 AM to 3:00 PM IDOT Moving Operation

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 1150 W (-0.1 miles) to County Road 9 (+0.1 miles) 109.0 to 92.0 Medium Right lane closed, one lane open 6/28/16 6:00 AM to 4:00 PM Indiana Toll Road Moving Operation; Paint Striping
US-31 (+0.1 miles) to US-421 72.0 to 39.0 None All lanes and shoulders open 5/31/16 8:00 PM to 6/30/16 8:00 PM Indiana Toll Road 10' Width Restriction
Sycamore Rd (-0.3 miles) to County Road 850 E (-0.2 miles) 68.4 to 61.5 Medium Left lane closed, one lane open 6/11/16 8:00 AM to 6/28/16 8:00 AM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
County Road 200 E (-0.3 miles) to IN-39 (+0.3 miles) 53.7 to 48.6 Medium Left lane closed, one lane open 5/31/16 8:00 PM to 6/28/16 8:00 PM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
Holmesville Rd (+0.5 miles) to Otis Rd (-0.1 miles) 39.5 to 38.5 Medium Various lanes closed 6/28/16 7:00 AM to 5:00 PM Indiana Toll Road Moving Operation; Please Note: Starting in the Driving Lane and switching over to Passing Lane mid shift
County Road 250 E (-0.2 miles) to County Road 200 E 32.7 to 31.9 Medium Left lane closed, one lane open 6/24/16 8:00 PM to 7/1/16 3:00 PM Indiana Toll Road Concrete approach pavement
Tennessee St (-0.2 miles) to Buchanan St (+0.2 miles) 15.5 to 13.5 Major Left two lanes closed, one or two lanes open 6/28/16 9:00 AM to 6/29/16 12:00 AM Indiana Toll Road Joint Repair
Entrance from NB Dan Ryan Local 59.3 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/28/16 10:00 AM to 3:00 PM IDOT Moving Operation
Entrance from WB Kennedy Local 59.6 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 6/28/16 9:00 AM to 3:00 PM IDOT Moving Operation
31st St to 26th St 54.7 to 54.1 Minor Right shoulder closed, all lanes open with partial ramp closures 6/28/16 9:00 AM to 3:00 PM IDOT
Entrance from NB Dan Ryan Express 59.5 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 6/28/16 9:00 AM to 3:00 PM IDOT Moving Operation
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Yield to NB I-55 exit to NB I-90/94; Long Term Closure
Exit ramp to WB I-290 Minor All lanes and shoulders open 6/1/14 12:00 AM to 6/30/16 11:59 PM IDOT 11' Width; Long Term Closure
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/18 11:59 PM IDOT ***Long Term Closure***
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 12/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 12/1/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 7/14/16 11:59 PM IDOT 11' Width; Long Term Closure
Natoma Ave to Sayre Ave 81.9 to 81.5 Minor Right shoulder closed, all lanes open 6/28/16 9:00 AM to 3:00 PM IDOT
Exit ramp to Bryn Mawr Ave 81.5 None Partial closure 6/28/16 9:00 AM to 2:30 PM IDOT
0.5 miles east of Canfield Ave to Cumberland Ave (IL-171) 80.8 to 79.7 Minor Right shoulder closed, all lanes open 6/28/16 9:00 AM to 3:00 PM IDOT
Cumberland Ave (IL-171) to East River Rd 79.7 to 79.1 Minor Right shoulder closed, all lanes open 6/3/16 12:00 AM to 7/15/16 11:59 PM IDOT Long Term Closure
Exit to WB I-190 79.1 to 77.0 Minor Right shoulder closed, all lanes open with partial ramp closures 6/28/16 9:00 AM to 3:00 PM IDOT Moving Operation
at Devon Plaza 77.2 to 77.1 Medium Various lanes closed 4/22/15 7:00 AM to 8/31/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; Right Cash Departure Lane Closed; *** Long Term Closure ***
Exit ramp to SB IL-53 Local 68.8 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 6/30/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to NB IL-53 Local 68.8 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 6/30/16 11:59 PM IDOT ***Long Term Closure***
I-290 (+0.1 miles) to Roselle Rd (+0.1 miles) 68.1 to 65.5 Medium Left lane closed, two or three lanes open 6/28/16 5:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst
Entrance ramp from NB IL-53 Local 68.8 Minor Both shoulders closed, all lanes open 3/2/15 7:00 AM to 6/30/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB IL-53 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 6/30/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from EB I-90 68.8 Minor Both shoulders closed, all lanes open 3/2/15 7:00 AM to 6/30/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to NB Barrington Rd 62.8 Minor Left lane closed, up to three lanes open 12/21/15 8:00 PM to 11/30/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; ***Long Term Closure***
Ramp from WB I-90 to NB/SB Barrington Rd 62.3 to 62.2 Medium Left lane closed, two lanes open 10/22/15 7:00 AM to 11/30/16 11:59 PM Illinois Tollway Ramp Reconst; ** Long Term Closure ***
Barrington Rd (+0.4 miles) to Bartlett Rd (-0.4 miles) 61.8 to 60.8 Medium Right lane closed, two lanes open 6/28/16 5:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst
Bartlett Rd (-0.4 miles) to IL-25 (-0.9 miles) 60.8 to 57.0 Medium Right lane closed, two lanes open 6/28/16 5:00 AM to 2:00 PM Illinois Tollway Rdwy and Bridge Widening
Ramp from WB I-90 to IL-59 (IL-59 Plaza 16A) 59.8 to 59.7 Medium Various lanes closed 5/2/16 12:00 AM to 7/15/16 11:59 PM Illinois Tollway Rdwy and Bridge Widening; Left Cash Approach Lane Closed; *** Long Term Closure ***
Ramp from WB I-90 to Beverly Rd 58.2 to 58.1 None Partial closure 5/2/16 12:00 AM to 7/15/16 11:59 PM Illinois Tollway Rdwy and Bridge Widening; Left Side of Ramp Closed; *** Long Term Closure ***
Exit ramp to SEB US-20 42.1 Minor Partial closure 6/6/16 7:00 AM to 7/14/16 11:59 PM Illinois Tollway Pavement Repair; Shoulder Reconstruction; Right Side of Ramp closed
Entrance ramp from SEB US-20 42.1 Minor Partial closure 6/6/16 7:00 AM to 7/14/16 11:59 PM Illinois Tollway Pavement Repair; Shoulder Reconstruction; Right Side of Ramp closed
Mill Rd (+0.1 miles) to Mill Rd (+0.1 miles) 17.5 to 17.4 Medium Right lane closed, two lanes open 6/28/16 8:00 AM to 1:00 PM Illinois Tollway
WI-81 (+0.2 miles) to Hart Rd (+0.1 miles) 184.8 to 183.6 Medium Right lane closed, one lane open 6/28/16 8:00 PM to 6/29/16 5:00 AM WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
WI-81 (+0.5 miles) to Hart Rd (+0.1 miles) 184.6 to 183.6 Minor Right shoulder closed, all lanes open 6/26/16 12:00 AM to 7/2/16 11:00 PM WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
at WI-11 177.6 Minor Left shoulder closed, all lanes open 6/28/16 6:00 AM to 6/29/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at WI-11 177.6 Minor Right shoulder closed, all lanes open 6/28/16 6:00 AM to 6/29/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at County Road M (-0.2 miles) 166.8 Minor Right shoulder closed, all lanes open 6/28/16 8:00 AM to 5:00 PM daily until 7/1/16 WisDOT Construction - Soil borings for Design ID 1005-10-01 for I-39 Central Segment.
Ellendale Rd (-0.5 miles) to Goede Rd (+0.3 miles) 164.0 to 162.2 Medium Left lane closed, one lane open 6/28/16 8:00 PM to 6/29/16 5:00 AM daily until 7/1/16 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
WI-106 (+0.5 miles) to Maple Grove Rd (-0.9 miles) 158.7 to 157.7 Medium Left lane closed, one lane open 6/28/16 8:00 PM to 6/29/16 5:00 AM daily until 7/1/16 WisDOT Construction - Detour: No posted detour
WI-106 (+0.5 miles) to Church Rd (+0.2 miles) 158.7 to 153.8 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 9:00 AM daily until 6/30/16 WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Maple Grove Rd to Church Rd 156.8 to 154.0 Medium Various lanes closed 4/4/16 8:00 PM to 10/30/16 5:00 AM WisDOT Periodic Nighttime Single lane closures
Exit ramp to NB US-51 156.6 Major All lanes and shoulders closed 4/18/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Detour: North on northbound IH39 to exit 147 (CTY N)
Entrance ramp from SB US-51 156.4 Major All lanes and shoulders closed 4/18/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Detour: South on I39 southbound to exit 160 (STH73)
US-12 to Hazel Ave (+0.4 miles) 43.2 to 34.8 Medium One lane closed, one lane open 6/27/16 4:00 AM to 7/1/16 12:00 PM WisDOT Construction - La Crosse - Tomah | W County Line - USH 12 | I 90 | MONROE
WI-16 (-0.7 miles) to Commercial St (-0.6 miles) 28.8 to 20.3 Medium One lane closed, one lane open 6/27/16 4:00 AM to 7/1/16 12:00 PM WisDOT Construction - La Crosse - Tomah | W County Line - USH 12 | I 90 | MONROE
WI-16 (-1.0 miles) to WI-16 6.7 to 5.8 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
WI-16 to US-53 (-0.1 miles) 5.8 to 4.5 Medium Right lane closed, one or two lanes open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
US-53 (-0.1 miles) to 12th Ave (-0.2 miles) 4.5 to 4.2 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
12th Ave (-0.2 miles) to Oak Ave (+0.1 miles) 4.2 to 3.2 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
US-53 to Lakeshore Dr (+1.2 miles) Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
Lakeshore Dr (+0.8 miles) to Lakeshore Dr (+1.2 miles) Medium Right lane closed, one lane open 6/28/16 7:00 PM to 10:00 PM daily until 11/15/16 WisDOT Construction - I-90 Mississippi River Bridge Crossing

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Tue Jun 28 2016 06:21:21 CDT