Construction Report
Select Location
  
Updated: 1/20/17 3:34 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-78 to I-39 (-0.3 miles) 108.1 to 108.5 Minor Right shoulder closed, all lanes open 1/20/17 9:00 AM to 3:00 PM daily until 1/27/17 WisDOT Construction - High Voltage Power Line Work
Exit ramp to NB IL-53 Local Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Exit ramp to NB IL-53 Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
IL-53 to I-290 / IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 1/20/17 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from SB IL-53 Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
I-290 / IL-53 to IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 1/20/17 9:00 AM to 3:00 PM IDOT Moving Operation
Arlington Heights Rd (+0.8 miles) to Elmhurst Rd (-0.3 miles) 71.6 to 73.3 Medium Right lane closed, two lanes open 12/24/16 12:00 AM to 2/24/17 11:59 PM Illinois Tollway Rdwy/Bridge Reconst
Entrance from EB I-190 2.3 to 3.0 Minor Left shoulder closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT Long Term Closure
Entrance from EB I-190 2.3 to 79.6 Minor Right shoulder closed, all lanes open 1/20/17 9:00 AM to 3:00 PM IDOT
Chicago Ave to Eisenhower Expy (I-290) 50.0 to 51.6 Minor Left lane and left shoulder closed, two to four lanes open 1/19/17 10:00 PM to 1/20/17 5:00 AM IDOT
Chicago Ave to Eisenhower Expy (I-290) 50.0 to 51.6 Medium Left two lanes and left shoulder closed, one to three lanes open 1/19/17 11:59 PM to 1/20/17 5:00 AM IDOT
Entrance ramp from Lake St 51.0 Medium All lanes and shoulders closed 1/19/17 10:00 PM to 1/20/17 5:00 AM IDOT
Entrance ramp from WB Randolph St 51.1 Medium All lanes and shoulders closed 1/19/17 10:00 PM to 1/20/17 5:00 AM IDOT
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure
IN-912 to Durbin St (-0.6 miles) 9.5 to 10.6 Medium Right lane closed, one or two lanes open 1/20/17 5:00 AM to 2:00 PM Indiana Toll Road Guardrail Removal and Replacement
County Road 200 W (+0.1 miles) to County Road 200 E 28.0 to 32.0 Minor Right shoulder closed, all lanes open 1/4/17 6:00 AM to 1/20/17 6:00 PM Indiana Toll Road Fiber Install : 24 Hour Continuous Closure
IN-39 (+0.3 miles) to IN-39 (+0.5 miles) 49.2 to 49.4 Minor Both shoulders closed, all lanes open 1/10/17 6:00 AM to 1/20/17 6:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Riverside Dr (+0.4 miles) to IN-933 (+0.4 miles) 76.2 to 77.2 Medium Right lane closed, one lane open 1/4/17 6:00 AM to 1/21/17 6:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 7 (-0.5 miles) to IN-19 (-0.2 miles) 90.5 to 91.5 Medium Left lane closed, one lane open 1/19/17 6:00 AM to 1/20/17 6:00 PM Indiana Toll Road Bridge Inspections - 24 Hour Continuous Closure
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-90 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 1/19/17 9:00 PM to 1/20/17 5:00 AM IDOT
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 1/19/17 9:00 PM to 1/20/17 5:00 AM IDOT

I-90 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 1/19/17 9:00 PM to 1/20/17 5:00 AM IDOT
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 1/19/17 9:00 PM to 1/20/17 5:00 AM IDOT

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
IN-19 (+0.2 miles) to County Road 7 (+0.5 miles) 91.5 to 90.5 Medium Left lane closed, one lane open 1/19/17 6:00 AM to 1/20/17 6:00 PM Indiana Toll Road Bridge Inspections - 24 Hour Continuous Closure
Juniper Rd (+0.2 miles) to McCombs St (+0.2 miles) 77.5 to 76.5 Medium Right lane closed, one lane open 1/4/17 6:00 AM to 1/21/17 6:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 8/12/16 12:00 AM to 10/31/18 11:59 PM IDOT Work includes bridge demolition, bridge construction, pavement, roadway lighting, pavement marking and signage. Detour: Exit northbound I90/94 at Roosevelt Rd., right on Roosevelt Rd to State St
Exit ramp to EB I-290 52.3 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Higgins Rd Exit to Cumberland Ave (IL-171) 80.6 to 79.7 Minor Right shoulder closed, all lanes open 1/20/17 9:00 AM to 3:00 PM IDOT
Exit ramp to SB IL-53 Local 68.8 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Exit ramp to NB IL-53 Local 68.8 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
I-290 / IL-53 to IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 1/20/17 9:00 AM to 3:00 PM IDOT Moving Operation
IL-53 to I-290 / IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 1/20/17 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB I-90-Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB IL-53 Local 68.8 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB IL-53 Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Duncan Ave to Airport Rd (+0.3 miles) 55.8 to 55.3 Major Left three lanes closed, one lane open 1/19/17 10:00 PM to 1/20/17 6:00 AM Illinois Tollway Bridge Widening and Reconst
Exit to NB I-39 109.0 to 108.7 Medium Right lane closed, one lane open 1/20/17 9:00 AM to 3:00 PM daily until 1/27/17 WisDOT Construction - High Voltage power line work
I-39 to WI-78 109.0 to 108.5 Medium Right lane closed, two lanes open 1/20/17 9:00 AM to 3:00 PM daily until 1/27/17 WisDOT Construction - High Voltage Power Line work
I-39 to WI-78 109.0 to 108.5 Minor Left shoulder closed, all lanes open 1/20/17 9:00 AM to 3:00 PM daily until 1/27/17 WisDOT Construction - High Voltage Power Line Work
Theater Rd to US-53 (-0.2 miles) 5.1 to 4.7 Minor Left shoulder closed, all lanes open 1/20/17 7:30 AM to 5:00 PM WisDOT Permit - Dairyland Power Coop. Transmission line rebuild using the west bound middle median shoulder.

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Fri Jan 20 2017 03:51:29 CST