Construction Report
Select Location
  
Updated: 2/23/17 7:49 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at County Highway M 39.6 Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 4:00 PM daily until 2/24/17 WisDOT Construction - Soil Borings in ROW but off of Roadway
Goede Rd (-0.2 miles) to Newville Rd (-0.7 miles) 161.7 to 163.9 Medium Left lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 5:00 AM WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Harmony Rd (+0.3 miles) to IL-23 (+0.1 miles) 35.6 to 36.2 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Arlington Heights Rd (+0.8 miles) to Elmhurst Rd (-0.3 miles) 71.6 to 73.3 Medium Right lane closed, two lanes open 12/24/16 12:00 AM to 4/28/17 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***
Entrance from EB I-190 2.3 to 3.0 Minor Left shoulder closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT Long Term Closure
Entrance from SEB Kennedy Local 2.3 to 79.6 Minor Right shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Left lane closed, up to two lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from Houston Ave 23.6 Unknown All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Enter WB at Portage, Exit at 17 to I-65 South/15th Ave East to I-90 Ramp EB
IN-149 (+0.2 miles) to Meridian Rd (-0.1 miles) 27.0 to 29.8 Minor Right shoulder closed, all lanes open 2/22/17 12:00 AM to 2/24/17 6:00 PM Indiana Toll Road Fiber Install : 24 Hour Continuous Closure
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-35 (+0.5 miles) to Fail Rd (-0.1 miles) 48.0 to 52.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.4 miles) to County Road 600 E (+0.2 miles) 58.2 to 58.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Sycamore Rd (+0.9 miles) 66.9 to 69.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Primrose Rd (+0.5 miles) to Olive Rd (-0.5 miles) 71.0 to 71.2 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Riverside Dr (-0.2 miles) to Juniper Rd (+0.3 miles) 75.6 to 78.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Entrance ramp from WB Douglas Rd 76.3 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure - Detour is: Enter WB 77 Exit at MM 72 to 31 South/Nimtz Parkway Nimtz Parkway East to I-90 EB Entry
County Road 7 (-0.2 miles) to County Road 11 (+0.1 miles) 90.8 to 93.2 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 375 E (-0.5 miles) to County Road 935 E (+0.4 miles) 124.0 to 156.9 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 935 E (-0.4 miles) to County Road 375 E (+0.5 miles) 156.9 to 124.0 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (-0.1 miles) to County Road 7 (+0.2 miles) 93.2 to 90.8 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Riverside Dr (+0.2 miles) 78.0 to 75.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Bendix Dr (+0.9 miles) to US-31 (-0.5 miles) 73.8 to 72.6 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Quince Rd (+1.0 miles) to Tamarack Rd (+0.2 miles) 69.0 to 66.9 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Fail Rd (+0.1 miles) to US-35 (-0.5 miles) 52.0 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to IN-51 (-0.4 miles) 25.2 to 20.8 Medium Left lane closed, up to one lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to Willowcreek Rd 24.0 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Exit at SR 49 (exit 31) North to I-94 West to 249 South
26th St to Eisenhower Expy (I-290) 54.1 to 51.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 8/12/16 12:00 AM to 10/31/18 11:59 PM IDOT Work includes bridge demolition, bridge construction, pavement, roadway lighting, pavement marking and signage. Detour: Exit northbound I90/94 at Roosevelt Rd., right on Roosevelt Rd to State St
Exit ramp to EB I-290 52.3 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 11:00 AM to 2:00 PM IDOT Moving Operation
Exit to NB Edens Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation
Barrington Rd (+0.4 miles) to IL-72 61.8 to 61.3 Medium Right lane closed, three lanes open 2/23/17 7:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst
IL-23 (-0.4 miles) to IL-23 (+0.1 miles) 36.5 to 36.0 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
at L-T Town Line Rd 181.1 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 5:00 PM daily until 3/10/17 WisDOT Construction - Soil boring for new location for sign structure S-53-115 at Station 464+20, northbound I-39.
Newville Rd (-0.6 miles) to Goede Rd (+0.3 miles) 165.7 to 162.2 Medium Left lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 5:00 AM WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Schepp Rd (-2.0 miles) to County Road A (+0.7 miles) 101.8 to 93.9 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 2:30 PM daily until 3/31/17 WisDOT Maintenance - brushing from Columbia/sauk line w/b to mile marker 94 w/b right side. this will be a moving operation on a day to day basis between the dates indicated.
Xanadu Rd (-0.3 miles) to US-12 (-0.6 miles) 90.9 to 86.5 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 2:30 PM daily until 3/31/17 WisDOT Maintenance - brushing between 91.0 w/b to sauk co./Juneau co. line right shoulder. this will be a moving operation on a day to day basis between the dates indicated.
County Highway M to County Highway M 39.6 to 39.6 Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 4:00 PM daily until 2/24/17 WisDOT Construction - Soil Borings in ROW but off of Roadway

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Thu Feb 23 2017 07:53:08 CST