Construction Report
Select Location
  
Updated: 4/21/15 8:03 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/23/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
Entrance ramp from SB US-151 136.2 Major Various lanes closed 4/21/15 7:00 PM to 4/22/15 6:00 AM daily until 5/22/15 WisDOT Construction - Detour: USH 151S, Exit 97B N/W IH39/90/94, Exit 132 USH 51S, On Ramp S/E IH 39/90/94
IL-23 (+0.1 miles) to Getty Rd (+0.3 miles) 36.2 to 37.8 Medium Right lane closed, one to three lanes open 4/21/15 6:00 AM to 7:00 PM Illinois Tollway Rdwy Widening and Reconst
at Marengo Plaza 37.8 to 37.9 Medium Various lanes closed 4/21/15 6:00 AM to 7:00 PM Illinois Tollway Rdwy Widening and Reconst; Right ORT Lane Closed
Getty Rd (+0.3 miles) to Getty Rd (+1.3 miles) 37.8 to 38.8 Medium Right lane closed, one to three lanes open 4/21/15 6:00 AM to 7:00 PM Illinois Tollway Rdwy Widening and Reconst
Sleepy Hollow Rd (+0.4 miles) to River Rd (-0.1 miles) 53.7 to 55.5 Medium Left lane closed, two to 7 lanes open 4/21/15 9:00 AM to 7:00 PM Illinois Tollway Rdwy Widening and Reconst
Entrance ramp from NB IL-53 Local 68.8 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 11/20/15 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 6/30/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***
Ramp from EB I-90 to Cumberland Ave / IL-171 79.3 Minor Partial closure 11/25/14 7:00 AM to 4/30/15 11:59 PM IDOT ***Long Term Closure***
0.5 miles east of East River Rd to Eisenhower Expy (I-290) 79.6 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 4/21/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
63rd St to Wentworth Ave 58.7 to 58.9 Medium Left lane and left shoulder closed, one to three lanes open 3/31/15 12:00 AM to 8/31/15 11:59 PM IDOT ***Long Term Closure***
at Exit to SB Chicago Skwy 58.8 Medium Left lane and left shoulder closed, three lanes open 3/31/15 8:00 AM to 8/31/15 11:59 PM IDOT ***Long Term Closure***
at 112th St (+1.3 miles) 2.1 Medium Various lanes closed 4/21/15 8:00 PM to 4/22/15 1:00 PM Indiana Toll Road Diamond Grinding; Start with passing lane and switch over to driving lane
Gostlin St to Columbia Ave (+0.1 miles) 5.2 to 5.4 Medium Various lanes closed 4/20/15 8:00 PM to 4/21/15 1:00 PM Indiana Toll Road Diamond Grinding; Start with passing lane and switch over to driving lane
150th St to US-20 6.0 to 7.0 None All lanes and shoulders open 4/9/15 7:00 AM to 11/18/15 11:59 PM Indiana Toll Road Maximum Width of 11 ft. and Maximum Weight of 120,000 lbs.
at Knights Of Columbus Dr 6.5 Medium Right lane closed, one lane open 4/11/15 12:00 AM to 6/1/15 11:59 PM Indiana Toll Road Bridge Rehabilitation
at Knights Of Columbus Dr 6.5 Medium Left lane closed, one lane open 4/21/15 12:00 AM to 1:00 PM,
4/21/15 8:00 PM to 4/22/15 12:00 AM
Indiana Toll Road MOT Installation and Asphalt
at IN-912 (+0.5 miles) 10.0 Medium Various lanes closed 4/21/15 8:00 PM to 4/22/15 1:00 PM Indiana Toll Road Diamond Grinding; Start with passing lane and switch over to driving lane
Old Hobart Rd to Meridian Rd (+0.1 miles) 20.0 to 30.0 Medium Left lane closed, one lane open 4/21/15 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Crack Sealing
Meridian Rd (+0.1 miles) to County Line Rd (+0.2 miles) 30.0 to 62.0 Medium Right lane closed, one lane open 4/21/15 7:00 AM to 3:00 PM Indiana Toll Road Crack Sealing; Moving Operation
Fir Rd (+0.2 miles) to Cleveland Rd (+0.1 miles) 81.7 to 82.2 Minor Both shoulders closed, all lanes open 4/21/15 7:30 AM to 6:00 PM Indiana Toll Road Bridge Testing
IN-13 (-0.4 miles) to IN-13 (+0.1 miles) 106.9 to 107.4 Minor Both shoulders closed, all lanes open 4/21/15 7:30 AM to 6:00 PM Indiana Toll Road Bridge Testing

I-90 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 4/21/15 11:30 AM to 1:30 PM IDOT

I-90 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 4/21/15 11:30 AM to 1:30 PM IDOT

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
IN-13 (-0.4 miles) to IN-13 (+0.1 miles) 107.7 to 107.2 Minor Both shoulders closed, all lanes open 4/21/15 7:30 AM to 6:00 PM Indiana Toll Road Bridge Testing
IN-331 (+0.2 miles) to Cleveland Rd (+0.1 miles) 82.5 to 82.0 Minor Both shoulders closed, all lanes open 4/21/15 7:30 AM to 6:00 PM Indiana Toll Road Bridge Testing
Meridian Rd (-0.1 miles) to Old Hobart Rd 30.0 to 20.0 Medium Left lane closed, one lane open 4/21/15 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Crack Sealing
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 3/18/15 7:00 AM to 11/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild ***Long Term***
Entrance ramp from I-80/I-94 20.4 Major All lanes and shoulders closed 3/18/15 8:00 AM to 6/29/15 11:59 PM Indiana Toll Road Lake Station entrance ramp closed for Bridge Demo/Rebuild for 13 weeks ***Long Term Closure***
US-20 to 150th St 7.0 to 6.0 None All lanes and shoulders open 4/9/15 7:00 AM to 11/18/15 11:59 PM Indiana Toll Road Maximum Width of 11 ft. and Maximum Weight of 120,000 lbs.
Knights Of Columbus Dr to Columbia Ave 6.6 to 5.3 Medium Left lane closed, one lane open 4/21/15 7:00 AM to 9:00 AM Indiana Toll Road Moving Operation; Emergency Pot Hole Patching
at Knights Of Columbus Dr (+0.1 miles) 6.5 Medium Left lane closed, one lane open 4/21/15 10:00 AM to 4/22/15 12:00 AM Indiana Toll Road MOT Installation and Asphalt
at 112th St (-1.3 miles) 2.1 Medium Various lanes closed 4/21/15 6:00 PM to 4/22/15 6:00 AM Indiana Toll Road Diamond Grinding; Start with passing lane and switch over to driving lane
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to EB I-290 52.4 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to WB I-290 52.4 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 6/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from Taylor St 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to I-190 51.7 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 4/21/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 6/30/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***
Entrance ramp from SB Arlington Heights Rd 70.2 Minor Various lanes closed 3/23/15 7:00 AM to 11/20/15 11:59 PM Illinois Tollway Rdwy Widening and Reconst;Right IPO Lane Closed; Right Side of Ramp Closed; ***Long Term Closure***
I-290 (-0.3 miles) to Meacham Rd (-0.1 miles) 68.5 to 67.5 Medium Left lane closed, two or three lanes open 3/17/15 7:00 AM to 8/1/15 11:59 PM Illinois Tollway Rdwy Widening and Reconst; (Left lane of CD road to IL-290 / IL-53 closed); *** Long Term Closure ***
Ramp from SB IL-53 to WB I-90 68.3 to 68.2 None Partial closure 4/17/15 7:00 AM to 8/1/15 11:59 PM Illinois Tollway Rdwy Widening and Reconst; Right Side of Ramp Closed; *** Long Term Closure ***
Entrance ramp from SB IL-53 67.6 Minor Partial closure 4/3/15 12:00 AM to 8/1/15 12:00 AM Illinois Tollway Rdwy Widening and Reconst; Right Side Ramp closed; ***Long Term Closure***
Exit ramp to Roselle Rd 66.0 Minor Partial closure 6/17/14 5:00 AM to 6/6/15 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed
Exit ramp to NB Roselle Rd 66.0 None Partial closure 4/17/15 7:00 AM to 8/1/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; *** Long Term Closure ***
Getty Rd (-0.5 miles) to Getty Rd 38.0 to 37.5 Medium Left lane closed, two lanes open 4/21/15 6:00 AM to 7:00 PM Illinois Tollway Rdwy Widening and Reconst
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/23/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Tue Apr 21 2015 08:08:18 CDT