Construction Report
Select Location
  
Updated: 3/27/17 5:33 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lakeshore Dr (-1.2 miles) to Lakeshore Dr 0.0 to 1.3 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 7:00 PM daily until 4/15/17 WisDOT Construction - Dresbach Bridge Replacement Project
at Icebox Rd (-1.1 miles) 22.2 Minor Right shoulder closed, all lanes open 3/27/17 7:00 AM to 3/31/17 5:00 PM WisDOT Construction - La Crosse - Tomah Rd | Sparta Safety & Weight Enforcement Facility #54 | I 90 | MONROE
WI-19 (-0.2 miles) to WI-19 (+0.3 miles) 130.2 to 130.7 Medium 0 lanes closed, three lanes open 2/27/17 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: No detour
Entrance ramp from EB WI-19 130.8 Major All lanes closed 3/1/17 12:00 AM to 6/30/17 11:45 PM WisDOT Construction - Detour: Detour route is EB STH 19 to SB US 51 to SB IH 39
Siggelkow Rd to County Road MN (-0.2 miles) 143.3 to 144.6 Medium Right lane closed, one lane open 3/27/17 8:00 PM to 3/28/17 5:00 AM daily until 3/30/17 WisDOT Construction - Illinois State Line - Madison CTH AB Bridge B-13-726 | I 39 | DANE
County Road B to Goede Rd (-0.2 miles) 152.4 to 161.7 Medium Right lane closed, one lane open 3/27/17 8:00 PM to 3/28/17 5:00 AM daily until 3/31/17 WisDOT Construction - Detour: No detour posted.
Goede Rd (-0.2 miles) to Newville Rd (-0.7 miles) 161.7 to 163.9 Medium Left lane closed, one lane open 3/27/17 8:00 PM to 3/28/17 5:00 AM daily until 3/31/17 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
WI-81 to Colley Rd 184.5 to 185.8 Minor Left shoulder closed, all lanes open 3/27/17 8:00 AM to 4:00 PM WisDOT Permit - Left Shoulder Closed to park Batwing Crane to protect I-39 to pull wire part of the existing Y-32 ATC Transmission Line rebuild project
Harmony Rd (+0.3 miles) to IL-23 (+0.1 miles) 35.6 to 36.2 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Roselle Rd (-0.4 miles) to Roselle Rd (+0.2 miles) 65.2 to 65.8 Medium Right lane closed, three lanes open 3/27/17 9:00 AM to 4:00 PM Illinois Tollway Rdwy Widening and Reconst
Arlington Heights Rd (+0.8 miles) to Elmhurst Rd (-0.3 miles) 71.6 to 73.3 Medium Right lane closed, two lanes open 12/24/16 12:00 AM to 4/28/17 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***
Entrance from EB I-190 2.3 to 3.0 Minor Left shoulder closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT Long Term Closure
Entrance from SEB Kennedy Local 2.3 to 79.6 Minor Right shoulder closed, all lanes open 3/27/17 9:00 AM to 3:00 PM IDOT
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure
Exit to SB Dan Ryan Elevated 51.6 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/27/17 9:00 AM to 3:00 PM IDOT Moving Operation
US-41 (-0.2 miles) to Huehn St 4.0 to 5.0 Medium Left lane closed, one lane open 3/27/17 6:00 AM to 2:00 PM Indiana Toll Road Drainage Structure Cleaning
US-41 (-0.2 miles) to Huehn St 4.0 to 5.0 Minor Left shoulder closed, all lanes open 3/27/17 2:00 PM to 3/28/17 12:00 AM Indiana Toll Road Drainage Structure Cleaning
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Left lane closed, up to two lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Exit ramp to NB Willowcreek Rd 23.6 Medium All lanes and shoulders closed 3/27/17 12:00 AM to 4/10/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure ; Detour: Exit at 17 (I-65 South) , to 94 East. to 249 South, to I-80/90
Entrance ramp from Houston Ave 23.6 Unknown All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Enter WB at Portage, Exit at 17 to I-65 South/15th Ave East to I-90 Ramp EB
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-35 (+0.5 miles) to Fail Rd (-0.1 miles) 48.0 to 52.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.5 to 58.8 Medium Left lane closed, one lane open 3/2/17 7:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work/Fiber Install : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Sycamore Rd (+0.9 miles) 66.9 to 69.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 3/27/17 6:00 AM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Juniper Rd (+0.3 miles) 66.9 to 78.0 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Riverside Dr (-0.2 miles) to Juniper Rd (+0.3 miles) 75.6 to 78.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 3/27/17 6:00 AM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to SB IN-933 76.3 Major All lanes and shoulders closed 3/23/17 8:00 AM to 4/13/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at 72 - US 31, to US 12, to 933 South
Entrance ramp from WB Douglas Rd 76.3 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure - Detour is: Enter WB 77 Exit at MM 72 to 31 South/Nimtz Parkway Nimtz Parkway East to I-90 EB Entry Ramp
Beech Rd (-0.1 miles) to County Road 11 (-0.1 miles) 86.0 to 93.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 4/17/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (+0.1 miles) to Beech Rd (+0.1 miles) 93.0 to 86.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 4/17/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Riverside Dr (+0.2 miles) 78.0 to 75.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 3/27/17 6:00 AM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Tamarack Rd (+0.2 miles) 78.0 to 66.9 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Exit ramp to SB IN-933 76.6 Major All lanes and shoulders closed 3/23/17 8:00 AM to 4/13/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at 72 - US 31, to US 12, to 933 South
Entrance ramp from WB Douglas Rd 76.6 Medium All lanes and shoulders closed 3/23/17 8:00 AM to 4/13/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Use 933 North to US 12 West, to 31 South, to 80/90
Quince Rd (+1.0 miles) to Tamarack Rd (+0.2 miles) 69.0 to 66.9 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 3/27/17 6:00 AM Indiana Toll Road Bridge Work - 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Fail Rd (+0.1 miles) to US-35 (-0.5 miles) 52.0 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-421 (-0.2 miles) to Otis Rd (+0.3 miles) 39.2 to 38.2 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 3/28/17 6:00 PM Indiana Toll Road Bridge Work - 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work - 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to Old Hobart Rd (+0.2 miles) 25.2 to 19.8 Medium Left lane closed, up to two lanes open 3/8/17 7:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to Willowcreek Rd 24.0 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Exit at SR 49 (exit 31) North to I-94 West to 249 South
Entrance ramp from EB Houston Ave 24.0 Major All lanes and shoulders closed 3/27/17 12:00 AM to 4/10/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: 249 North, to 94 West, to I-65 North to 80/90 West
Huehn St to US-41 (+0.2 miles) 5.0 to 4.0 Minor Left shoulder closed, all lanes open 3/27/17 6:00 AM to 9:00 AM,
3/27/17 4:00 PM to 3/28/17 12:00 AM
Indiana Toll Road Drainage Structure Cleaning
Huehn St to US-41 (+0.2 miles) 5.0 to 4.0 Medium Left lane closed, one lane open 3/27/17 9:00 AM to 4:00 PM Indiana Toll Road Drainage Structure Cleaning
Entrance from NB Dan Ryan Local 59.6 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 3/27/17 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to EB I-290 52.3 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Meacham Rd (+0.1 miles) to Roselle Rd (-0.1 miles) 67.3 to 65.7 Medium Right lane closed, two or three lanes open 3/27/17 7:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst - (1 Right CD lane closed)
Barrington Rd (-0.1 miles) to Barrington Rd 62.3 to 62.2 Medium Right lane closed, three lanes open 3/27/17 7:00 AM to 3:00 PM Illinois Tollway Rdwy Widening and Reconst
IL-23 (-0.4 miles) to IL-23 (+0.1 miles) 36.5 to 36.0 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Colley Rd to Cranston Rd (+0.4 miles) 186.3 to 185.5 Minor Left shoulder closed, all lanes open 3/27/17 8:00 AM to 4:00 PM WisDOT Permit - Left Shoulder Closed to park Batwing Crane to protect I-39 to pull wire part of the existing Y-32 ATC Transmission Line rebuild project
Newville Rd (-0.6 miles) to Goede Rd (+0.3 miles) 165.7 to 162.2 Medium Left lane closed, one lane open 3/27/17 8:00 PM to 3/28/17 5:00 AM daily until 3/31/17 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Goede Rd (+0.3 miles) to WI-73 (+0.1 miles) 162.2 to 159.9 Medium Right lane closed, one lane open 3/27/17 8:00 PM to 3/28/17 5:00 AM daily until 3/31/17 WisDOT Construction - Detour: No detour provided
Exit ramp to NB WI-73 160.5 Minor Left shoulder closed, all lanes open 3/27/17 8:00 PM to 3/28/17 5:00 AM daily until 3/31/17 WisDOT Construction - Detour: No detour posted.
Exit ramp to NB WI-73 160.5 Minor Right shoulder closed, all lanes open 3/27/17 8:00 PM to 3/28/17 5:00 AM daily until 3/31/17 WisDOT Construction - Detour: No detour posted.
County Road B to County Road B (+0.1 miles) 152.9 to 152.7 Medium Right lane closed, one lane open 3/27/17 9:00 AM to 11:00 AM WisDOT Maintenance - To repair damaged beam guard.
County Road MN (+0.3 miles) to Siggelkow Rd 145.0 to 143.8 Medium Right lane closed, one lane open 3/27/17 8:00 PM to 3/28/17 5:00 AM daily until 3/30/17 WisDOT Construction - Illinois State Line - Madison CTH AB Bridge B-13-726 | I 39 | DANE
US-51 (+0.1 miles) to WI-19 (+0.1 miles) 132.2 to 130.7 Medium 0 lanes closed, three lanes open 2/27/17 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: NO Detour route posted.
Lakeshore Dr to Lakeshore Dr (+1.2 miles) Medium Right lane closed, one lane open 3/27/17 6:00 AM to 7:00 PM daily until 4/15/17 WisDOT Construction - Dresbach Bridge Project

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Mon Mar 27 2017 05:45:06 CDT