Construction Report
Select Location
  
Updated: 3/2/15 12:31 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-39 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Kennedy Rd (+0.5 miles) 169.7 Medium Right lane closed, one lane open 3/2/15 12:00 PM to 3:00 PM WisDOT Maintenance - Beam guard repair

I-80 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-55 to La Grange Rd (US-45) 126.2 to 145.7 Minor Both shoulders closed, all lanes open with partial ramp closures 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Larkin Ave (IL-7) to Lincoln Hwy (US-30) 130.6 to 137.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/2/15 9:30 AM to 1:30 PM IDOT Moving Operation
Chicago St (US-52/IL-53) to Richards St 132.8 to 133.3 Minor Left shoulder closed, all lanes open 3/2/15 9:00 AM to 3:00 PM IDOT
Briggs St to Cherry Hill Rd 134.9 to 135.9 Minor Left shoulder closed, all lanes open 3/2/15 9:00 AM to 3:00 PM IDOT
Gougar Rd to Lincoln Hwy (US-30) 136.8 to 137.7 Minor Left shoulder closed, all lanes open 3/2/15 9:00 AM to 3:00 PM IDOT
Lincoln Hwy (US-30) to Tri-State Twy (I-294) 137.7 to 4.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to NB Harlem Ave 148.9 Minor Partial closure 3/31/14 12:00 AM to 3/31/15 11:59 PM IDOT ***Long Term Closure***
Bishop Ford Fwy (IL-394) to IN State Line Medium Right lane and right shoulder closed, three to five lanes open with partial ramp closures 3/2/15 9:00 AM to 2:00 PM IDOT Moving Operation

I-80 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***
IN State Line to Bishop Ford Fwy (IL-394) Medium Right lane and right shoulder closed, three to five lanes open with partial ramp closures 3/2/15 9:30 AM to 2:30 PM IDOT Moving Operation
Tri-State Twy (I-294) to Lincoln Hwy (US-30) 4.5 to 137.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
La Grange Rd (US-45) to I-55 145.6 to 126.2 Minor Both shoulders closed, all lanes open with partial ramp closures 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Lincoln Hwy (US-30) to Gougar Rd 137.7 to 136.8 Minor Left shoulder closed, all lanes open 3/2/15 9:00 AM to 3:00 PM IDOT
Lincoln Hwy (US-30) to Larkin Ave (IL-7) 137.7 to 130.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/2/15 9:30 AM to 1:30 PM IDOT Moving Operation
Cherry Hill Rd to Briggs St 135.8 to 134.9 Minor Left shoulder closed, all lanes open 3/2/15 9:00 AM to 3:00 PM IDOT
Richards St to Chicago St (US-52/IL-53) 133.3 to 132.8 Minor Left shoulder closed, all lanes open 3/2/15 9:00 AM to 3:00 PM IDOT

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from Beverly Rd 58.6 Minor Partial closure 4/28/14 9:00 AM to 3/31/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***
Bartlett Rd to IL-72 (+0.3 miles) 60.4 to 61.7 Medium Right lane closed, two lanes open 3/2/15 3:00 PM to 7:00 PM Illinois Tollway Rdwy/Bridge Widening and Reconst.
Entrance ramp from NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***
Mt Prospect Rd (-0.3 miles) to IL-72 74.4 to 76.1 Medium Right lane closed, two lanes open 3/2/15 6:00 PM to 7:00 PM Illinois Tollway Moving Operation; Grading, Retaining Walls and Storm Sewer
Ramp from EB I-90 to Cumberland Ave / IL-171 79.3 Minor Partial closure 11/25/14 7:00 AM to 4/30/15 11:59 PM IDOT ***Long Term Closure***
Edens Expy (I-94) to Jackson Blvd 43.3 to 51.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***
Jackson Blvd to Edens Expy (I-94) 51.5 to 43.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to Foster Ave 83.3 Minor Partial closure 3/2/15 9:00 AM to 3:00 PM IDOT
Entrance ramp from Nagle Ave 82.0 Minor Partial closure 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from NB Cumberland Ave 79.6 Minor Partial closure 3/2/15 9:00 AM to 3:00 PM IDOT
Exit ramp to NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***
Exit ramp to Roselle Rd 66.0 Minor Partial closure 6/17/14 5:00 AM to 3/15/15 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed
at Kennedy Rd (+0.5 miles) 169.7 Medium Right lane closed, one lane open 3/2/15 12:00 PM to 3:00 PM WisDOT Maintenance - Beam guard repair

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-100 to WI-100 (+0.1 miles) 303.7 to 303.8 Medium Left two lanes closed, one lane open 3/2/15 10:00 PM to 3/3/15 5:00 AM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 3/2/15 9:00 PM to 3/3/15 5:30 AM daily until 3/5/15 WisDOT Construction - Detour: Use alt route (Howard Ave entrance ramp)
Oklahoma Ave (+0.1 miles) to Howard Ave 314.3 to 315.0 Major Left two lanes closed, one lane open 3/2/15 9:30 PM to 3/3/15 5:30 AM daily until 3/5/15 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from EB Holt Ave 314.2 Medium All lanes and shoulders closed 3/2/15 9:00 PM to 3/3/15 5:30 AM daily until 3/5/15 WisDOT Construction - Detour: Use alt route (Howard Ave entrance ramp)
Edens Expy Spur (I-94) to Kennedy Junction 29.7 to 43.5 Minor Both shoulders closed, all lanes open 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Edens Expy (I-94) to Jackson Blvd 43.3 to 51.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor All lanes shifted and both shoulders closed 9/9/14 12:00 AM to 3/31/15 11:59 PM IDOT Lanes narrowed and shifted to the left ***Long Term Closure***
Dan Ryan Expy (I-94) / I-57 to I-80 62.9 to 74.4 Minor Both shoulders closed, all lanes open with partial ramp closures 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Bishop Ford Fwy (IL-394) to IN State Line Medium Right lane and right shoulder closed, three to five lanes open with partial ramp closures 3/2/15 9:00 AM to 2:00 PM IDOT Moving Operation

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***
IN State Line to Bishop Ford Fwy (IL-394) Medium Right lane and right shoulder closed, three to five lanes open with partial ramp closures 3/2/15 9:30 AM to 2:30 PM IDOT Moving Operation
I-80 to NB Stony Island Feeder Exit 74.5 to 65.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/2/15 10:00 AM to 2:00 PM IDOT Moving Operation
I-80 to Dan Ryan Expy (I-94) / I-57 74.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
NB Stony Island Feeder Exit to Dan Ryan Expy (I-94) / I-57 65.7 to 62.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/2/15 10:30 AM to 1:00 PM IDOT Moving Operation
Jackson Blvd to Edens Expy (I-94) 51.5 to 43.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Kennedy Junction to Edens Expy Spur (I-94) 43.5 to 29.9 Minor Both shoulders closed, all lanes open 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from NB Skokie Rd 33.9 Minor Partial closure 3/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB IL-132 8.6 Major All lanes and shoulders closed 2/27/15 7:00 AM to 5/19/15 11:59 PM Illinois Tollway Entrance Ramp Closed; *** Long Term Closure ***
13th St (+0.1 miles) to Howard Ave (-0.1 miles) 315.9 to 315.1 Medium Left lane closed, two lanes open 3/2/15 9:00 AM to 2:00 PM WisDOT Maintenance - Lighting repair
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Lincoln Ave to Greenfield Ave 312.9 to 312.0 Major Right two lanes closed, one or two lanes open 3/2/15 9:30 PM to 3/3/15 5:30 AM daily until 3/4/15 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/2/15 9:00 PM to 3/3/15 5:30 AM daily until 3/4/15 WisDOT Construction - Detour: Use alt route (6th & Mineral entrance)
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/2/15 9:00 PM to 3/3/15 5:30 AM daily until 3/4/15 WisDOT Construction - Detour: Use alt route (6th & Mineral entrance)
Entrance ramp from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 3/2/15 10:00 PM to 3/3/15 5:00 AM WisDOT Construction - Detour: Take Bluemound to 70th to Greenfield to HWY 100 to the I-94 West Ramp
Entrance ramp from SB Hawley Rd 306.8 Medium All lanes and shoulders closed 3/2/15 10:00 PM to 3/3/15 5:00 AM WisDOT Construction - Detour: Take Hawley to Greenfield to HWY 100 to the I-94 West Ramp
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
68th St (-0.1 miles) to WI-100 (+0.2 miles) 306.4 to 303.5 Major All lanes and shoulders closed 3/2/15 10:00 PM to 3/3/15 5:00 AM WisDOT Construction - Detour: I-94 WB to 70th to Greenfield to I-894/US 45 South or to HWY 100 to I-94 West. And I-94 WB to OÔ┐┐Connor to 76th to Bluemound to Glenview to Watertown Plank to US45 North.
Exit ramp to WB Oconnor St 305.5 Medium All lanes and shoulders closed 10/13/14 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take 68th-70th st exit, continue W on O'Conner, North on 76th st, West on Bluemound to 84th st (North 84th st Detour). Take 68th-70th exit, Continue West, South on 70th, West on Greenfield to 84th st. (South 84th st Detour).
Entrance ramp from SB US-45 304.2 Major All lanes and shoulders closed 3/2/15 10:00 PM to 3/3/15 5:00 AM WisDOT Construction - Detour: Take US45 South to Watertown Plank to HWY 100 to the I-94 West Ramp. OR US45 South to Greenfield to HWY 100 to the I94 West Ramp.

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Mon Mar 02 12:58:48 CST 2015