Construction Report
Select Location
  
Updated: 5/31/16 4:47 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-39 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
500 to IL-18 (-1.0 miles) 33.3 to 40.8 Medium Various lanes closed 7/27/15 12:00 AM to 10/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 13' 6".
Perry Rd (-0.6 miles) to Baxter Rd (-0.7 miles) 93.0 to 115.0 Medium Various lanes closed 4/13/15 8:00 PM to 10/28/16 8:00 AM IDOT One lane in each direction will be closed 8:00 PM Sunday night through 8:00 AM Friday morning. All lanes will be open over the weekend. Max Width - 14'-6" - Effective April 13, 2015 through November 13, 2015
Perry Rd to Baxter Rd (+0.1 miles) 93.6 to 115.8 Medium One lane closed, one lane open 4/13/15 12:00 AM to 10/28/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
US-20 (-0.1 miles) to US-20 (-0.1 miles) 119.8 to 119.8 Major All lanes and shoulders closed 5/2/16 9:00 AM to 6/2/16 11:59 PM IDOT I-39 (NB) to US 20 (EB) ramp will be closed for Deck Patching, wearing surface, and expansion joint replacement on SN 101-0140 over Linden Road located 0.3 mile south of US 20. This ramp will be closed from 5/02/2016 to 6/02/2016.DETOUR:::traffic will be detoured west on US 20 to the IL 251 interchange where they can turn to go back east on US 20.
WI-81 (+0.5 miles) to Hart Rd (+0.1 miles) 184.6 to 183.6 Minor Right shoulder closed, all lanes open 5/29/16 12:00 AM to 6/4/16 11:00 PM WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
at WI-11 177.6 Minor Left shoulder closed, all lanes open 5/31/16 6:00 AM to 6/1/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at WI-11 177.6 Minor Right shoulder closed, all lanes open 5/31/16 6:00 AM to 6/1/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
Milwaukee St to Kennedy Rd (+0.2 miles) 173.3 to 169.9 Medium Left lane closed, one lane open 5/31/16 8:00 PM to 6/1/16 5:00 AM daily until 6/3/16 WisDOT Construction - Illinois State Line - Madison | CTH O - Kennedy Rd | I 39 | ROCK
Entrance ramp from SB WI-26 170.9 Major All lanes closed 5/31/16 9:00 PM to 6/7/16 11:00 PM WisDOT Construction - Detour: STH 26 SB to USH 14 EB to IH 39/90 NB
Ellendale Rd (-0.5 miles) to Goede Rd (+0.3 miles) 164.0 to 162.2 Medium Various lanes closed 5/31/16 8:00 PM to 6/1/16 5:00 AM daily until 6/3/16 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Maple Grove Rd to Church Rd 156.8 to 154.0 Medium Various lanes closed 4/4/16 8:00 PM to 10/30/16 5:00 AM WisDOT Periodic Nighttime Single lane closures
Exit ramp to NB US-51 156.6 Major All lanes and shoulders closed 4/18/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Detour: North on northbound IH39 to exit 147 (CTY N)
Entrance ramp from SB US-51 156.4 Major All lanes and shoulders closed 4/18/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Detour: South on I39 southbound to exit 160 (STH73)
WI-33 (-0.5 miles) to County Road O (-0.4 miles) 86.8 to 88.8 Medium Right lane closed, one lane open 5/31/16 6:00 AM to 6/3/16 12:00 PM WisDOT Maintenance - concrete repair

I-39 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road B to WI-106 (-0.4 miles) 152.4 to 158.3 Minor Right shoulder closed, all lanes open 5/1/16 12:00 AM to 5/31/16 11:45 PM WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Church Rd (-0.3 miles) to WI-106 (-0.4 miles) 153.2 to 158.3 Minor Right shoulder closed, all lanes open 6/1/16 12:00 AM to 6/30/16 11:45 PM WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Church Rd to Maple Grove Rd 153.5 to 156.3 Medium Various lanes closed 4/4/16 8:00 PM to 10/30/16 5:00 AM WisDOT Periodic Nighttime Single lane closures
Goede Rd (-0.2 miles) to Ellendale Rd (+0.2 miles) 161.7 to 163.2 Medium Various lanes closed 5/31/16 8:00 PM to 6/1/16 5:00 AM daily until 6/3/16 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Kennedy Rd (-0.3 miles) to US-14 (+0.2 miles) 169.4 to 171.6 Medium Left lane closed, one lane open 5/31/16 8:00 PM to 6/1/16 5:00 AM daily until 6/3/16 WisDOT Construction - Illinois State Line - Madison | CTH O - Kennedy Rd | I 39 | ROCK
at WI-11 177.1 Minor Left shoulder closed, all lanes open 5/31/16 6:00 AM to 6/1/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at WI-11 177.1 Minor Right shoulder closed, all lanes open 5/31/16 6:00 AM to 6/1/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
L-T Town Line Rd (+0.5 miles) to County Road S (+0.2 miles) 181.1 to 182.5 Medium Right lane closed, one lane open 5/31/16 8:00 PM to 6/1/16 5:00 AM daily until 6/3/16 WisDOT Construction - Illinois State Line - Madison | SB Turtle Creek Bridge B-53-0042 | I 39 | ROCK
Hart Rd (-0.1 miles) to WI-81 (-0.5 miles) 183.1 to 184.1 Medium Right lane closed, one lane open 5/29/16 12:00 AM to 6/4/16 11:00 PM WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
Baxter Rd (-0.1 miles) to Perry Rd 115.6 to 93.4 Medium One lane closed, one lane open 4/13/15 12:00 AM to 10/28/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
Baxter Rd (+0.5 miles) to Perry Rd (+0.4 miles) 115.0 to 93.0 Medium Various lanes closed 4/13/15 8:00 PM to 10/28/16 8:00 AM IDOT One lane in each direction will be closed 8:00 PM Sunday night through 8:00 AM Friday morning. All lanes will be open over the weekend. Max Width - 14'-6" - Effective April 13, 2015 through November 13, 2015
IL-18 (+1.0 miles) to 500 40.7 to 33.1 Medium Various lanes closed 7/27/15 12:00 AM to 10/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 13' 6".

I-69 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at I-94 38.3 Medium Various lanes closed 6/1/16 7:00 AM to 5:00 PM MDOT Bridge Repairs
Wilder Rd to Lake Pleasant Rd 159.1 to 163.1 Medium Various lanes closed 4/15/16 7:00 AM to 9/15/16 11:59 PM MDOT Single Lane Closures
M-19 to Fox Rd 184.1 to 186.2 Medium Various lanes closed 4/13/16 6:00 AM to 7/1/16 11:59 PM MDOT will replace two culverts; lane reduction
at Goodells Rd 189.3 Medium Various lanes closed 4/13/16 6:00 AM to 7/1/16 11:59 PM MDOT will replace two culverts; lane reduction
at State St 275.6 Medium Various lanes closed 6/1/16 7:00 AM to 4:00 PM,
6/2/16 7:00 AM to 4:00 PM,
6/3/16 7:00 AM to 4:00 PM,
6/4/16 7:00 AM to 4:00 PM,
... more, ending on 11/29/16
MDOT single/double lane closures beginning mid-span of the bridge and extending for approximately one-quarter mile for paint work

I-69 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Gratiot Ave 275.7 Medium Various lanes closed 6/1/16 7:00 AM to 4:00 PM,
6/2/16 7:00 AM to 4:00 PM,
6/3/16 7:00 AM to 4:00 PM,
6/4/16 7:00 AM to 4:00 PM,
... more, ending on 11/29/16
MDOT single/double lane closures beginning mid-span of the bridge and extending for approximately one-quarter mile for paint work
M-21 to Goodells Rd 193.8 to 189.3 Medium Various lanes closed 4/13/16 6:00 AM to 7/1/16 11:59 PM MDOT Culvert replacedment and lane reduction
Stapleton Rd to M-19 185.1 to 184.0 Medium Various lanes closed 4/13/16 6:00 AM to 7/1/16 11:59 PM MDOT Culvert replacedment and lane reduction
Lake Pleasant Rd to Wilder Rd 163.1 to 159.0 Medium Various lanes closed 4/15/16 7:00 AM to 9/15/16 11:59 PM MDOT Single Lane Closures
at I-94 38.2 Medium Various lanes closed 6/1/16 7:00 AM to 5:00 PM MDOT Bridge Repairs

I-80 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-88 to US-6 3.4 to 9.1 Medium Various lanes closed 4/14/16 7:00 AM to 11/18/16 11:59 PM IDOT Traffic restricted to one lane each direction.; Max Width 14 ft
1900th Ave (-1.0 miles) to IL-81 (+0.9 miles) 10.1 to 25.0 Medium Various lanes closed 4/4/16 6:00 AM to 9/9/16 11:59 PM IDOT Oversize Vehicle Permit Restrictions: 14 Ft, 6 in.
1300th St (+0.2 miles) to 2900th St (+0.2 miles) 18.0 to 35.0 Medium Various lanes closed 3/14/16 6:00 AM to 11/23/16 11:59 PM IDOT Oversize Vehicle Permit Restrictions: 14ft 6 in
Shepley Rd to River Rd 123.4 to 125.2 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Houbolt Rd / Hollywood Rd to Larkin Ave (IL-7) 127.8 to 130.6 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Larkin Ave (IL-7) to Lincoln Hwy (US-30) 130.6 to 137.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 9:30 AM to 1:30 PM IDOT Moving Operation
Wheeler Ave to Meadow Ave / Center St 131.6 to 131.8 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Richards St to Rowell Ave 133.3 to 133.9 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Briggs St to Cherry Hill Rd 134.9 to 135.8 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Gougar Rd to Lincoln Hwy (US-30) 136.8 to 137.7 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Bishop Ford Fwy (IL-394) to IN State Line Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 9:00 AM to 2:00 PM IDOT Moving Operation
IN-39 (-0.3 miles) to County Road 200 E (+0.3 miles) 48.6 to 53.7 Medium Right lane closed, one lane open 6/1/16 7:00 AM to 6/13/16 7:00 AM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
County Road 850 E (+0.2 miles) to Sycamore Rd (+0.3 miles) 61.5 to 68.4 Medium Right lane closed, one lane open 5/31/16 8:00 PM to 6/13/16 8:00 PM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
Beech Rd (+0.1 miles) to Beech Rd (+0.8 miles) 86.2 to 86.9 Minor Right shoulder closed, all lanes open 6/1/16 7:00 AM to 6/2/16 7:00 AM Indiana Toll Road Install Fiber Optic
Exit ramp to NB IN-15 100.9 Unknown Both shoulders closed, all lanes open 6/1/16 7:00 AM to 12:00 PM Indiana Toll Road Mill & Fill-Overpass Approach
Entrance ramp from NB IN-15 100.9 Unknown Both shoulders closed, all lanes open 6/1/16 7:00 AM to 12:00 PM Indiana Toll Road Mill & Fill-Overpass Approach
Entrance ramp from NB IN-15 100.9 Unknown Both shoulders closed, all lanes open 6/1/16 7:00 AM to 12:00 PM Indiana Toll Road Mill & Fill-Overpass Approach
IN-9 (-0.7 miles) to County Road 100 E (+0.3 miles) 120.0 to 122.0 Medium Right lane closed, one lane open 6/1/16 9:00 AM to 8:00 PM Indiana Toll Road Mill & Fill

I-80 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 800 W to County Road 900 W 112.5 to 111.5 Medium Right lane closed, one lane open 6/1/16 9:00 AM to 8:00 PM Illinois Tollway Mill & Fill
Exit ramp to NB IN-15 101.5 Unknown Both shoulders closed, all lanes open 6/1/16 7:00 AM to 12:00 PM Indiana Toll Road Mill & Fill-Overpass Approach
Entrance ramp from NB IN-15 101.5 Unknown Both shoulders closed, all lanes open 6/1/16 7:00 AM to 12:00 PM Indiana Toll Road Mill & Fill-Overpass Approach
US-31 (+0.1 miles) to US-421 72.0 to 39.0 Minor Right shoulder closed, all lanes open 5/20/16 7:00 AM to 6/13/16 7:00 PM Indiana Toll Road Portable Plant Ramp
Sycamore Rd (-0.3 miles) to County Road 850 E (-0.2 miles) 68.4 to 61.5 Medium Right lane closed, one lane open 6/1/16 7:00 AM to 6/13/16 7:00 AM Illinois Tollway HMA Paving; 24 Hour Continuous Closure
County Road 200 E (-0.3 miles) to IN-39 (+0.3 miles) 53.7 to 48.6 Medium Right lane closed, one lane open 5/31/16 8:00 PM to 6/13/16 8:00 PM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
IN State Line to Bishop Ford Fwy (IL-394) Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 9:30 AM to 2:30 PM IDOT Moving Operation
IL-394 (+0.2 miles) to Park Ave 0.1 to 1.2 Major Left two lanes closed, three lanes open 5/31/16 8:00 PM to 6/1/16 5:00 AM Illinois Tollway
Lincoln Hwy (US-30) to Gougar Rd 137.7 to 136.8 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Lincoln Hwy (US-30) to Larkin Ave (IL-7) 137.7 to 130.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 9:30 AM to 1:30 PM IDOT Moving Operation
Cherry Hill Rd to Briggs St 135.8 to 134.9 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Rowell Ave to Richards St 133.9 to 133.3 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Meadow Ave / Center St to Wheeler Ave 131.8 to 131.6 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Larkin Ave (IL-7) to Houbolt Rd / Hollywood Rd 130.6 to 127.8 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
River Rd to Shepley Rd 125.2 to 123.4 Minor Left shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
2900th St (-0.2 miles) to 1300th St (-0.2 miles) 35.0 to 18.0 Medium Various lanes closed 3/14/16 6:00 AM to 11/23/16 11:59 PM IDOT Oversize Vehicle Permit Restrictions: 14ft 6 in
US-6 to I-88 13.0 to 3.4 Medium Various lanes closed 4/14/16 7:00 AM to 11/18/16 11:59 PM IDOT Traffic restricted to one lane each direction.; Max Width 14 ft

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lakeshore Dr (-1.2 miles) to Lakeshore Dr (-0.7 miles) 0.0 to 0.5 Medium Right lane closed, one lane open 4/8/16 7:00 AM to 11/15/16 10:00 PM WisDOT Construction - I-90 Mississippi River Bridge Construction
Lakeshore Dr (-1.2 miles) to US-53 (-0.2 miles) 0.0 to 2.7 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
Exit ramp to NB WI-35 2.9 Major All lanes and shoulders closed 4/4/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - Detour: EB 90 to Exit 4 USH 53/STH 157 to WB 90 to STH 35 NB @ Exit 3
US-53 to 12th Ave (+0.2 miles) 2.9 to 4.2 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
12th Ave (+0.2 miles) to US-53 (+0.2 miles) 4.2 to 4.6 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
US-53 (+0.2 miles) to WI-16 4.6 to 5.7 Medium Right lane closed, one or two lanes open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
Entrance ramp from WB WI-157 4.7 Major All lanes and shoulders closed 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - Detour: STH 157 to USH 16 to I 90 EB
13th Ave (+4.0 miles) to US-12 (+0.2 miles) 33.9 to 43.5 Medium Right lane closed, one lane open 6/1/16 5:00 AM to 12:00 PM daily until 6/3/16 WisDOT Construction - La Crosse - Tomah | W County Line - USH 12 | I 90 | MONROE
County Highway M (-0.7 miles) to US-12 38.9 to 43.2 Medium One lane closed, one lane open 5/31/16 6:00 AM to 6/3/16 12:00 PM WisDOT Construction - La Crosse - Tomah | W County Line - USH 12 | I 90 | MONROE
County Road B to WI-106 (-0.4 miles) 152.4 to 158.3 Minor Right shoulder closed, all lanes open 5/1/16 12:00 AM to 5/31/16 11:45 PM WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Church Rd (-0.3 miles) to WI-106 (-0.4 miles) 153.2 to 158.3 Minor Right shoulder closed, all lanes open 6/1/16 12:00 AM to 6/30/16 11:45 PM WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Church Rd to Maple Grove Rd 153.5 to 156.3 Medium Various lanes closed 4/4/16 8:00 PM to 10/30/16 5:00 AM WisDOT Periodic Nighttime Single lane closures
Goede Rd (-0.2 miles) to Ellendale Rd (+0.2 miles) 161.7 to 163.2 Medium Various lanes closed 5/31/16 8:00 PM to 6/1/16 5:00 AM daily until 6/3/16 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Kennedy Rd (-0.3 miles) to US-14 (+0.2 miles) 169.4 to 171.6 Medium Left lane closed, one lane open 5/31/16 8:00 PM to 6/1/16 5:00 AM daily until 6/3/16 WisDOT Construction - Illinois State Line - Madison | CTH O - Kennedy Rd | I 39 | ROCK
at WI-11 177.1 Minor Left shoulder closed, all lanes open 5/31/16 6:00 AM to 6/1/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at WI-11 177.1 Minor Right shoulder closed, all lanes open 5/31/16 6:00 AM to 6/1/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
L-T Town Line Rd (+0.5 miles) to County Road S (+0.2 miles) 181.1 to 182.5 Medium Right lane closed, one lane open 5/31/16 8:00 PM to 6/1/16 5:00 AM daily until 6/3/16 WisDOT Construction - Illinois State Line - Madison | SB Turtle Creek Bridge B-53-0042 | I 39 | ROCK
Hart Rd (-0.1 miles) to WI-81 (-0.5 miles) 183.1 to 184.1 Medium Right lane closed, one lane open 5/29/16 12:00 AM to 6/4/16 11:00 PM WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
Exit ramp to NWB US-20 42.1 None All lanes and shoulders open 5/31/16 7:00 AM to 7/14/16 11:59 PM Illinois Tollway Rdwy and Bridge Reconst; Right Side of Ramp Closed: *** Long Term Closure ***
Ramp from SB IL-31 to EB I-90 54.6 to 54.7 Major All lanes and shoulders closed 4/22/16 7:00 AM to 9/29/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***
Ramp from EB I-90 to IL-31 54.6 to 54.7 Major All lanes and shoulders closed 4/22/16 7:00 AM to 9/29/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closures ***
Duncan Ave to IL-25 (+0.4 miles) 55.8 to 56.5 Medium Left lane closed, two lanes open 6/1/16 9:00 AM to 1:00 PM Illinois Tollway Bridge and Ramp Reconst
Beverly Rd (-0.7 miles) to Bartlett Rd 57.5 to 60.4 Medium Right lane closed, two lanes open 6/1/16 9:00 AM to 4:00 PM Illinois Tollway Rdwy and Bridge Widening
Ramp from EB I-90 to IL-59 (IL-59 Plaza 14)) 59.7 to 59.8 Medium Various lanes closed 4/29/16 12:00 AM to 6/10/16 12:00 AM Illinois Tollway Rdwy and Bridge Widening; Right IPO Lane Closed; *** Long Term Closure ***
IL-59 to Bartlett Rd (+0.4 miles) 59.7 to 60.8 Medium Left lane closed, two lanes open 5/31/16 9:00 AM to 7:00 PM Illinois Tollway Rdwy/Bridge Widening and Reconst
Roselle Rd to I-290 65.6 to 68.2 Medium Right lane closed, two or three lanes open 4/1/16 7:00 AM to 6/1/16 11:59 PM Illinois Tollway *** Long Term Clsoures ***
Exit ramp to NB IL-53 Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 6/9/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to SEB I-290 (Left Lane of CD Ramp Closed) 67.6 Minor Left lane closed, up to two lanes open 4/1/16 7:00 AM to 6/1/16 11:59 PM Illinois Tollway *** Long Term Closure ***
Exit ramp to NB IL-53 67.6 Minor Various lanes closed 4/1/16 7:00 AM to 6/1/16 11:59 PM Illinois Tollway Right Cash Lane Closed; *** Long Term Clsoure ***
Entrance ramp from WB I-90 67.6 Minor Left lane closed, one lane open 2/1/16 7:00 AM to 6/1/16 11:59 PM Illinois Tollway (Left Lane of CD Ramp Closed); *** Long Term Closure ***
Entrance ramp from WB I-90 68.8 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 6/9/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB IL-53 Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 6/9/16 11:59 PM IDOT ***Long Term Closure***
Mt Prospect Rd (-0.1 miles) to Mt Prospect Rd (+0.3 miles) 74.6 to 75.0 Medium Left lane closed, two lanes open 5/31/16 8:00 PM to 6/1/16 5:00 AM Illinois Tollway Rdwy/Bridge Reconst
River Rd to I-190 (+0.2 miles) 78.3 to 78.8 Medium Right lane closed, one or two lanes open 2/19/16 7:00 AM to 6/6/16 11:59 PM Illinois Tollway Bridge Rehabilitation; *** Long Term Closure ***
at River Rd Plaza 78.5 to 78.6 Medium Various lanes closed 2/18/16 7:00 AM to 6/6/16 11:59 PM Illinois Tollway Bridge Rehabilitation; Left IPO , Right ORT Lanes Closed; *** Long Term Closure ***
Entrance from EB I-190 2.3 to 3.0 Minor Right lane and right shoulder closed, one lane open 5/31/16 11:00 PM to 6/1/16 5:00 AM IDOT
Entrance from EB Kennedy Local 3.0 to 79.6 Minor Right shoulder closed, all lanes open 4/26/16 12:00 AM to 10/31/16 11:59 PM IDOT Long Term Closure
Entrance from EB Kennedy Local 3.0 to 79.6 Medium Right two lanes and right shoulder closed, up to two lanes open 5/31/16 11:59 PM to 6/1/16 5:00 AM IDOT Vacate LN 3 on Tollway
Lawrence Ave to Cicero Ave (IL-50) 84.1 to 43.2 Minor Right shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/30/16 11:59 PM IDOT 11' Width; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 6/30/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Exit to SB Dan Ryan Elevated 51.6 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation
Harrison St to Roosevelt Rd 51.7 to 52.2 Minor Both shoulders closed, all lanes open 5/20/15 12:00 AM to 7/29/16 11:59 PM IDOT Lanes weaved ***Long Term Closure***
Exit ramp to Taylor St 51.8 None Partial closure 6/11/15 12:00 AM to 7/29/16 11:59 PM IDOT Force Merge. No turns. Ramp exit yielding to mainline exit traffic.; Long Term Closure
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/17/16 11:59 PM IDOT 11' Width; Long Term Closure
Entrance ramp from WB Eisenhower / I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/10/16 11:59 PM IDOT 11' Width; Long Term Closure
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 6/10/16 11:59 PM IDOT 11' Width ***Long Term Closure***
Exit to SB Dan Ryan Express 54.1 to 59.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 8:30 AM to 1:30 PM IDOT Moving Operation
Exit to SB Dan Ryan Express 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation
Exit to SB Dan Ryan Local 54.1 to 59.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 9:00 AM to 2:00 PM IDOT Moving Operation
IN-39 (-0.3 miles) to County Road 200 E (+0.3 miles) 48.6 to 53.7 Medium Right lane closed, one lane open 6/1/16 7:00 AM to 6/13/16 7:00 AM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
County Road 850 E (+0.2 miles) to Sycamore Rd (+0.3 miles) 61.5 to 68.4 Medium Right lane closed, one lane open 5/31/16 8:00 PM to 6/13/16 8:00 PM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
Beech Rd (+0.1 miles) to Beech Rd (+0.8 miles) 86.2 to 86.9 Minor Right shoulder closed, all lanes open 6/1/16 7:00 AM to 6/2/16 7:00 AM Indiana Toll Road Install Fiber Optic
Exit ramp to NB IN-15 100.9 Unknown Both shoulders closed, all lanes open 6/1/16 7:00 AM to 12:00 PM Indiana Toll Road Mill & Fill-Overpass Approach
Entrance ramp from NB IN-15 100.9 Unknown Both shoulders closed, all lanes open 6/1/16 7:00 AM to 12:00 PM Indiana Toll Road Mill & Fill-Overpass Approach
Entrance ramp from NB IN-15 100.9 Unknown Both shoulders closed, all lanes open 6/1/16 7:00 AM to 12:00 PM Indiana Toll Road Mill & Fill-Overpass Approach
IN-9 (-0.7 miles) to County Road 100 E (+0.3 miles) 120.0 to 122.0 Medium Right lane closed, one lane open 6/1/16 9:00 AM to 8:00 PM Indiana Toll Road Mill & Fill

I-90 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to 69th St 54.1 to 59.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 8:30 AM to 1:30 PM IDOT Moving Operation
26th St to 69th St 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation

I-90 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 26th St 59.5 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation
69th St to 26th St 59.5 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 10:00 AM to 3:00 PM IDOT Moving Operation

I-90 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 6/1/16 11:30 AM to 1:30 PM IDOT

I-90 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 6/1/16 11:30 AM to 1:30 PM IDOT

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 800 W to County Road 900 W 112.5 to 111.5 Medium Right lane closed, one lane open 6/1/16 9:00 AM to 8:00 PM Illinois Tollway Mill & Fill
Exit ramp to NB IN-15 101.5 Unknown Both shoulders closed, all lanes open 6/1/16 7:00 AM to 12:00 PM Indiana Toll Road Mill & Fill-Overpass Approach
Entrance ramp from NB IN-15 101.5 Unknown Both shoulders closed, all lanes open 6/1/16 7:00 AM to 12:00 PM Indiana Toll Road Mill & Fill-Overpass Approach
US-31 (+0.1 miles) to US-421 72.0 to 39.0 Minor Right shoulder closed, all lanes open 5/20/16 7:00 AM to 6/13/16 7:00 PM Indiana Toll Road Portable Plant Ramp
Sycamore Rd (-0.3 miles) to County Road 850 E (-0.2 miles) 68.4 to 61.5 Medium Right lane closed, one lane open 6/1/16 7:00 AM to 6/13/16 7:00 AM Illinois Tollway HMA Paving; 24 Hour Continuous Closure
County Road 200 E (-0.3 miles) to IN-39 (+0.3 miles) 53.7 to 48.6 Medium Right lane closed, one lane open 5/31/16 8:00 PM to 6/13/16 8:00 PM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
IN-53 to Bridge St (-0.3 miles) 14.5 to 13.0 Major Left two lanes closed, one or two lanes open 6/1/16 9:00 AM to 6/2/16 5:00 AM Indiana Toll Road Joint Repairs
Entrance from NB Dan Ryan Local 59.3 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 10:00 AM to 3:00 PM IDOT Moving Operation
Entrance from NB Dan Ryan Local 59.6 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance from NB Dan Ryan Express 59.5 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance from NB Dan Ryan Express 59.5 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 10:00 AM to 3:00 PM IDOT Moving Operation
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Yield to NB I-55 exit to NB I-90/94; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/30/16 11:59 PM IDOT 11' Width; Long Term Closure
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/18 11:59 PM IDOT ***Long Term Closure***
Roosevelt Rd to Taylor St 52.2 to 52.1 Minor Left lane and left shoulder closed, three lanes open 5/31/16 9:00 PM to 6/1/16 5:00 AM IDOT
Roosevelt Rd to Taylor St 52.2 to 52.1 Medium Left two lanes and left shoulder closed, two lanes open 5/31/16 11:59 PM to 6/1/16 5:00 AM IDOT
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 12/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 12/1/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/17/16 11:59 PM IDOT 11' Width; Long Term Closure
Entrance ramp from WB Eisenhower / I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/10/16 11:59 PM IDOT 11' Width; Long Term Closure
Entrance ramp from EB Eisenhower / I-290 51.4 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 6/10/16 11:59 PM IDOT 11' Width ***Long Term Closure***
0.5 miles east of Fullerton Ave to Kimball Ave 48.0 to 45.6 Minor Right shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
at Montrose Ave 43.5 Minor Right shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Exit to NB Edens 43.5 to 42.9 Minor Right shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Exit ramp to Higgins Rd 80.6 Unknown Partial closure 6/1/16 1:00 PM to 3:00 PM IDOT
Canfield Ave to Cumberland Ave (IL-171) 80.3 to 79.7 Minor Right shoulder closed, all lanes open 6/1/16 10:00 AM to 3:00 PM IDOT
Canfield Ave to Cumberland Ave (IL-171) 80.3 to 79.7 Medium Left two lanes and left shoulder closed, one or two lanes open 5/31/16 11:59 PM to 6/1/16 5:00 AM IDOT Weave right to left.; 15 min full stops w/ ISP assist 1AM to 5AM
Entrance ramp from NB Cumberland Ave 79.6 Major All lanes and shoulders closed 5/31/16 9:00 PM to 6/1/16 5:00 AM IDOT
Cumberland Ave (IL-171) to East River Rd 79.7 to 79.1 Minor Right shoulder closed, all lanes open 4/26/16 12:00 AM to 10/31/16 11:59 PM IDOT Long Term Closure
Exit to WB I-190 79.1 to 77.4 Minor Right shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
IL-72 (+0.1 miles) to IL-72 (+0.3 miles) 77.3 to 77.1 Medium Right lane closed, two or three lanes open 5/31/16 8:00 PM to 10:00 PM Illinois Tollway Rdwy/Bridge Reconst
IL-72 (+0.1 miles) to IL-72 (+0.3 miles) 77.3 to 77.1 Medium Right two lanes closed, one or two lanes open 5/31/16 11:00 PM to 6/1/16 12:01 AM Illinois Tollway Rdwy/Bridge Reconst
IL-72 (+0.1 miles) to IL-72 (+0.3 miles) 77.3 to 77.1 Medium Right three lanes closed, up to one lanes open 6/1/16 12:01 AM to 5:00 AM Illinois Tollway Rdwy/Bridge Reconst; THREE (3) 15 minute WB FULL CLOSURES with Ttooper Assistance @ 12:30 AM, 1:00 AM & 1:30 AM
at Devon Plaza 77.2 to 77.1 Medium Various lanes closed 4/22/15 7:00 AM to 8/31/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; Right Cash Departure Lane Closed; *** Long Term Closure ***
Wolf Rd (+0.3 miles) to Mt Prospect Rd (+0.1 miles) 75.0 to 74.6 Medium Left lane closed, two lanes open 5/31/16 8:00 PM to 6/1/16 5:00 AM Illinois Tollway Rdwy/Bridge Reconst
Ramp from WB I-90 to Arlington Hts Rd (Various Turn Lanes Closed/Open) 70.8 to 70.7 Medium Various lanes closed 6/1/16 9:00 AM to 7:00 PM Illinois Tollway Rdwy Widening and Reconst; Moivng Operation
Exit ramp to SB IL-53 Local 68.8 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 6/9/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to SEB I-290 68.8 Minor Left lane closed, one lane open 2/1/16 7:00 AM to 6/1/16 11:59 PM Illinois Tollway (Left Lane of CD Ramp Closed); *** Long Term Closure ***
I-290 (-0.3 miles) to Meacham Rd (-0.3 miles) 68.5 to 67.7 Medium Right lane closed, two lanes open 10/23/15 12:00 AM to 6/1/16 11:59 PM Illinois Tollway Rdwy Widening and Reconst; *** Long Term Closure ***
Entrance ramp from EB I-90 68.8 Minor Various lanes closed 4/1/16 7:00 AM to 6/1/16 11:59 PM Illinois Tollway Right Cash Lane Closed; *** Long Term Clsoure ***
Entrance ramp from EB I-90-Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 6/9/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB IL-53 67.6 None Partial closure 4/1/16 7:00 AM to 6/1/16 11:59 PM Illinois Tollway Left Side of Ramp Closed; *** Long Term Closure ***
Entrance ramp from SB IL-53 Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 6/9/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to Roselle Rd 66.0 None Partial closure 4/1/16 7:00 AM to 6/1/16 11:59 PM Illinois Tollway Right Side of Ramp Closed; *** Long Term Closure ***
Roselle Rd (-0.4 miles) to Roselle Rd (+0.6 miles) 66.0 to 65.0 Medium Right lane closed, two or three lanes open 6/1/16 6:00 AM to 1:00 PM Illinois Tollway Rdwy Widening and Reconst
Exit ramp to Barrington Rd 62.8 Minor Left lane closed, one lane open 12/21/15 8:00 PM to 11/30/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; ***Long Term Closure***
Ramp from WB I-90 to NB/SB Barrington Rd 62.3 to 62.2 Medium Left lane closed, two lanes open 10/22/15 7:00 AM to 11/30/16 11:59 PM Illinois Tollway Ramp Reconst; ** Long Term Closure ***
Bartlett Rd (-0.4 miles) to Beverly Rd (+0.7 miles) 60.8 to 57.5 Medium Right lane closed, two lanes open 6/1/16 5:00 AM to 1:00 PM Illinois Tollway Rdwy and Bridge Widening
Ramp from WB I-90 to IL-59 (IL-59 Plaza 16A) 59.8 to 59.7 Medium Various lanes closed 5/2/16 12:00 AM to 6/10/16 12:00 AM Illinois Tollway Rdwy and Bridge Widening; Left Cash Approach Lane Closed; *** Long Term Closure ***
Ramp from WB I-90 to Beverly Rd 58.2 to 58.1 None All lanes and shoulders open with partial ramp closures 5/2/16 12:00 AM to 6/10/16 12:00 AM Illinois Tollway Rdwy and Bridge Widening; Left Side of Ramp Closed; *** Long Term Closure ***
IL-25 (-0.4 miles) to Duncan Ave 56.5 to 55.8 Medium Left lane closed, two lanes open 6/1/16 7:00 AM to 1:00 PM Illinois Tollway Bridge and Ramp Reconst
Exit ramp to NWB US-20 42.1 None All lanes and shoulders open 5/31/16 7:00 AM to 7/14/16 11:59 PM Illinois Tollway Rdwy and Bridge Reconst; Right Side of Ramp Closed: *** Long Term Closure ***
Entrance ramp from SEB US-20 42.1 None All lanes and shoulders open 5/31/16 7:00 AM to 7/14/16 11:59 PM Illinois Tollway Rdwy and Bridge Reconst; Right Side of Ramp Closed: *** Long Term Closure ***
Genoa Rd to Genoa Rd (+0.6 miles) 25.0 to 24.4 Medium Left lane closed, two lanes open 5/31/16 9:00 AM to 5:00 PM Illinois Tollway Rdwy Widening and Reconst
WI-81 (+0.5 miles) to Hart Rd (+0.1 miles) 184.6 to 183.6 Minor Right shoulder closed, all lanes open 5/29/16 12:00 AM to 6/4/16 11:00 PM WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
at WI-11 177.6 Minor Left shoulder closed, all lanes open 5/31/16 6:00 AM to 6/1/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at WI-11 177.6 Minor Right shoulder closed, all lanes open 5/31/16 6:00 AM to 6/1/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
Milwaukee St to Kennedy Rd (+0.2 miles) 173.3 to 169.9 Medium Left lane closed, one lane open 5/31/16 8:00 PM to 6/1/16 5:00 AM daily until 6/3/16 WisDOT Construction - Illinois State Line - Madison | CTH O - Kennedy Rd | I 39 | ROCK
Entrance ramp from SB WI-26 170.9 Major All lanes closed 5/31/16 9:00 PM to 6/7/16 11:00 PM WisDOT Construction - Detour: STH 26 SB to USH 14 EB to IH 39/90 NB
Ellendale Rd (-0.5 miles) to Goede Rd (+0.3 miles) 164.0 to 162.2 Medium Various lanes closed 5/31/16 8:00 PM to 6/1/16 5:00 AM daily until 6/3/16 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Maple Grove Rd to Church Rd 156.8 to 154.0 Medium Various lanes closed 4/4/16 8:00 PM to 10/30/16 5:00 AM WisDOT Periodic Nighttime Single lane closures
Exit ramp to NB US-51 156.6 Major All lanes and shoulders closed 4/18/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Detour: North on northbound IH39 to exit 147 (CTY N)
Entrance ramp from SB US-51 156.4 Major All lanes and shoulders closed 4/18/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Detour: South on I39 southbound to exit 160 (STH73)
US-12 (+0.4 miles) to Hazel Ave (+0.4 miles) 42.9 to 34.8 Medium One lane closed, one lane open 5/31/16 6:00 AM to 6/3/16 12:00 PM WisDOT Construction - La Crosse - Tomah | W County Line - USH 12 | I 90 | MONROE
WI-16 (-1.0 miles) to WI-16 6.7 to 5.8 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
WI-16 to US-53 (-0.1 miles) 5.8 to 4.5 Medium Right lane closed, one or two lanes open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
US-53 (-0.1 miles) to 12th Ave (-0.2 miles) 4.5 to 4.2 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
12th Ave (-0.2 miles) to Oak Ave (+0.1 miles) 4.2 to 3.2 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
US-53 to Lakeshore Dr (+1.2 miles) Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
Lakeshore Dr (+0.8 miles) to Lakeshore Dr (+1.2 miles) Medium Right lane closed, one lane open 5/31/16 7:00 PM to 10:00 PM daily until 11/15/16 WisDOT Construction - I-90 Mississippi River Bridge Crossing

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SB US-52 242.6 Major All lanes and shoulders closed 4/18/16 7:00 AM to 6/15/16 6:00 PM MnDOT Road resurfacing project.
County Road T (-0.1 miles) to County Road T (+0.1 miles) 16.5 to 16.8 Minor Left shoulder closed, all lanes open 5/31/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.1 miles) 16.5 to 16.8 Minor Right shoulder closed, all lanes open 5/31/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road O (-0.2 miles) to County Road O (+4.1 miles) 127.8 to 132.0 Medium One lane closed, one lane open 6/1/16 12:00 AM to 6/2/16 12:00 PM,
6/6/16 5:00 PM to 6/9/16 12:00 PM,
6/13/16 5:00 PM to 6/16/16 12:00 PM,
6/20/16 5:00 PM to 6/23/16 12:00 PM,
... more, ending on 8/31/16
WisDOT Construction - Black River Falls - Tomah | CTH O - S County Line EB | I 94 | JACKSON
County Road O (+4.1 miles) to Cortland Ave (+0.1 miles) 132.0 to 137.5 Medium One lane closed, one lane open 6/1/16 12:00 AM to 6/2/16 12:00 PM,
6/6/16 5:00 PM to 6/9/16 12:00 PM,
6/13/16 5:00 PM to 6/16/16 12:00 PM,
6/20/16 5:00 PM to 6/23/16 12:00 PM,
... more, ending on 8/31/16
WisDOT Construction - 1023-06-73 (NW Office)
Golden Lake Rd (-0.3 miles) to Golden Lake Rd (+0.3 miles) 278.7 to 279.3 Medium Various lanes closed 4/13/16 12:00 AM to 11/24/16 11:45 PM WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Dousman Rd (-0.3 miles) to Dousman Rd (+0.2 miles) 280.7 to 281.3 Medium Various lanes closed 5/31/16 12:00 AM to 11:45 PM daily until 11/25/16 WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Dousman Rd (+0.2 miles) to WI-67 (+0.2 miles) 281.3 to 281.7 Minor Left shoulder closed, all lanes open 5/28/15 12:00 AM to 7/1/16 11:45 PM WisDOT Construction - East-West Freeway | Sth 67 Nb & Sb Bridge | I 94 | WAUKESHA
Dousman Rd (+0.2 miles) to WI-67 (+0.2 miles) 281.3 to 281.7 Minor Right shoulder closed, all lanes open 5/28/15 12:00 AM to 7/1/16 11:45 PM WisDOT Construction - East-West Freeway | Sth 67 Nb & Sb Bridge | I 94 | WAUKESHA
CR-P (+0.2 miles) to Cushing Park Rd (+0.2 miles) 283.3 to 284.8 Medium Various lanes closed 3/10/16 12:00 AM to 6/15/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
WI-83 to Maple Ave 286.6 to 287.9 Medium Various lanes closed 3/30/16 12:00 AM to 6/15/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Maple Ave to Maple Ave 287.9 to 287.9 Medium Left lane closed, one lane open 5/31/16 7:00 PM to 6/1/16 6:00 AM daily until 6/4/16 WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Exit ramp to SB Pewaukee Rd 293.9 Minor Left lane closed, one lane open 4/22/16 12:00 AM to 6/12/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
WI-164 (+0.1 miles) to Springdale Rd (+0.1 miles) 294.4 to 296.4 Minor Left shoulder closed, all lanes open 3/21/16 12:00 AM to 6/6/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Redford Blvd (-0.2 miles) to Redford Blvd (+0.1 miles) 294.9 to 295.2 Medium Right lane closed, two lanes open 5/31/16 10:00 PM to 6/1/16 6:00 AM daily until 6/2/16 WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Redford Blvd (-0.2 miles) to Springdale Rd (+0.1 miles) 294.9 to 296.4 Medium Right two lanes closed, one lane open 5/31/16 9:30 PM to 6/1/16 12:30 AM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Redford Blvd (-0.2 miles) to Springdale Rd (+0.1 miles) 294.9 to 296.4 Major Left two lanes closed, one lane open 6/1/16 12:30 AM to 5:30 AM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Redford Blvd (+0.1 miles) to Springdale Rd (+0.1 miles) 295.2 to 296.4 Minor Right shoulder closed, all lanes open 3/21/16 12:00 AM to 6/6/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Entrance ramp from NB Redford Blvd 295.4 Medium All lanes closed 5/31/16 9:30 PM to 6/1/16 5:30 AM WisDOT Construction - Detour: Take CTH F/ Redford Blvd South to Bluemound Rd, Bluemound Rd East USH 18/Bluemound Rd, USH 18/Bluemound Rd East to Barker Rd, Barker Rd South to Swenson Dr., Swenson Dr. West to the I-94 East Entrance Ramp
Sunny Slope Rd (-0.1 miles) to WI-100 (-0.2 miles) 301.6 to 303.5 Medium Right lane closed, two lanes open 3/12/16 12:00 AM to 9/5/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Entrance ramp from SB US-45 304.7 Minor Various lanes closed 7/20/15 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Exit ramp to SB WI-181 305.1 Minor Various lanes closed 7/24/15 12:00 AM to 6/30/16 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Ramp from SB 84th ST to EB I-94 305.3 Major All lanes and shoulders closed 12/10/15 12:00 AM to 6/18/16 11:45 PM WisDOT Construction - Detour: Take Kearney East to the 68th/70th St on ramp to IH-94 East
Willow Rd to Oakton St 32.9 to 38.4 Medium Right lane and right shoulder closed, two lanes open 6/1/16 10:00 AM to 1:00 PM IDOT Moving Operation
Entrance ramp from EB Peterson Ave 41.5 None Partial closure 6/1/16 9:00 AM to 3:00 PM IDOT
Entrance from EB Kennedy Local 84.1 to 43.2 Minor Right shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/30/16 11:59 PM IDOT 11' Width; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 6/30/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to I-57 / Bishop Ford (I-94) 51.6 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to Taylor St 51.8 None Partial closure 6/11/15 12:00 AM to 7/29/16 11:59 PM IDOT Force Merge. No turns. Ramp exit yielding to mainline exit traffic.; Long Term Closure
Harrison St to Roosevelt Rd 51.7 to 52.2 Minor Both shoulders closed, all lanes open 5/20/15 12:00 AM to 7/29/16 11:59 PM IDOT Lanes weaved ***Long Term Closure***
Entrance ramp from WB Eisenhower / I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/10/16 11:59 PM IDOT 11' Width; Long Term Closure
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 6/10/16 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/17/16 11:59 PM IDOT 11' Width; Long Term Closure
Entrance from SB Dan Ryan Express 54.1 to 59.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 8:30 AM to 1:30 PM IDOT Moving Operation
Entrance from SB Dan Ryan Express 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation
26th St to Marquette Rd (67th St) 54.1 to 59.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 9:00 AM to 2:00 PM IDOT Moving Operation
69th St to I-57 / Bishop Ford (I-94) 59.5 to 62.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 9:00 AM to 2:00 PM IDOT Moving Operation
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor Right shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Dan Ryan Expy (I-94) / I-57 to SB Stony Island Feeder Entrance 62.9 to 65.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 9:00 AM to 11:59 AM IDOT Moving Operation
Exit to SB Bishop Ford 65.6 to 74.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 8:30 AM to 12:30 PM IDOT Moving Operation
Entrance from EB Kingery Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 9:00 AM to 2:00 PM IDOT Moving Operation
at I-80 (-0.2 miles) 15.8 Medium Right lane closed, two lanes open 5/31/16 8:57 AM to 6/7/16 8:57 AM InDOT Construction work
IN-49 (+0.1 miles) to US-20 (+0.1 miles) 26.0 to 40.0 Medium Right lane closed, two or three lanes open 5/14/16 7:00 AM to 7/16/16 12:59 PM InDOT
Exit ramp to SB US-421 34.2 Major All lanes and shoulders closed 5/20/16 7:00 AM to 6/30/16 11:59 PM InDOT
More information
Exit ramp to SB US-421 34.2 Major All lanes and shoulders closed 4/4/16 7:00 AM to 5/31/16 11:59 PM InDOT Crews will close both ramps completely to resurface the roadway. During the closure, traffic will be detoured to the looping ramps in the cloverleaf to gain access to their desired direction
Entrance ramp from NB US-421 34.7 Major All lanes and shoulders closed 4/4/16 7:00 AM to 5/31/16 11:59 PM InDOT Crews will close both ramps completely to resurface the roadway. During the closure, traffic will be detoured to the looping ramps in the cloverleaf to gain access to their desired direction
at US-20 39.8 Medium Right lane closed, two lanes open 4/1/16 7:00 AM to 10/31/16 11:59 PM InDOT Bridge Work
Red Arrow Hwy to Puetz Rd (+0.2 miles) 15.5 to 22.6 Medium Various lanes closed 3/14/16 7:00 AM to 10/21/16 11:59 PM MDOT Bridge repairs, median cable barrier, guardrail, culvert, freeway signing and right-of-way fence. Repairs on the I-94 bridges over Lost Dunes Drive in Bridgman, and over Puetz Road east of Stevensville.; Daily single-lane and nighttime double-lane closures on I-94 during construction. Puetz Road will be closed with a detour posted. There also will be temporary ramp closures at Red Arrow Highway Exit 16 and Grand Mere Road Exit 22.
Exit ramp to WB Michigan Ave 87.8 Medium All lanes and shoulders closed 4/18/16 7:00 AM to 9/16/16 11:59 PM MDOT
at Michigan Ave (+0.2 miles) 87.9 Medium Various lanes closed 4/18/16 7:00 AM to 9/30/16 11:59 PM MDOT Lane shifts and nighttime single-lane closures
Entrance ramp from EB Michigan Ave 87.8 Medium All lanes and shoulders closed 4/29/16 7:00 AM to 7/21/16 11:59 PM MDOT
M-99 (-0.5 miles) to Airport Rd 123.4 to 137.1 Medium Various lanes closed 5/9/16 9:00 PM to 11/4/16 11:59 PM MDOT Repair Bridges; There will be single-lane closures on I-94, with local roads closed and traffic detoured. Starting May 9, there will be nighttime single-lane closures on I-94 between 9 p.m. and 5 a.m. for shoulder upgrades in preparation of the bridge work, which is expected to start after the Memorial Day holiday.
Harris Rd (-0.1 miles) to Rawsonville Rd 185.0 to 187.3 Medium Various lanes closed 5/11/16 9:00 AM to 8/31/16 11:59 PM MDOT Pavement patching and repair; During construction, there will be nighttime double-lane closures and weekend single-lane closures on I-94. Starting Wednesday, May 11, there will be double-lane closures overnight between 9 p.m. and 5 a.m. the following morning. From 9 p.m. Friday, May 13, through 5 a.m. Monday, May 16, there will be a continuous single-lane closure on I-94, with double-lane closures overnight.
12th St to Trumbull St 214.4 to 214.7 Medium Various lanes closed 4/22/16 7:00 PM to 6/30/16 5:00 AM MDOT various lanes closed and traffic shift
at State St 275.6 Medium Various lanes closed 6/1/16 7:00 AM to 4:00 PM,
6/2/16 7:00 AM to 4:00 PM,
6/3/16 7:00 AM to 4:00 PM,
6/4/16 7:00 AM to 4:00 PM,
... more, ending on 11/29/16
MDOT single/double lane closures beginning mid-span of the bridge and extending for approximately one-quarter mile for paint work

I-94 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to 69th St 54.1 to 59.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 8:30 AM to 1:30 PM IDOT Moving Operation
26th St to 69th St 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation

I-94 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 26th St 59.5 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation
69th St to 26th St 59.5 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 10:00 AM to 3:00 PM IDOT Moving Operation

I-94 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 6/1/16 11:30 AM to 1:30 PM IDOT

I-94 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 6/1/16 11:30 AM to 1:30 PM IDOT

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Gratiot Ave 275.7 Medium Various lanes closed 6/1/16 7:00 AM to 4:00 PM,
6/2/16 7:00 AM to 4:00 PM,
6/3/16 7:00 AM to 4:00 PM,
6/4/16 7:00 AM to 4:00 PM,
... more, ending on 11/29/16
MDOT single/double lane closures beginning mid-span of the bridge and extending for approximately one-quarter mile for paint work
M-10 to Trumbull St 214.9 to 214.6 Medium Various lanes closed 4/22/16 7:00 PM to 6/30/16 5:00 AM MDOT various lanes closed and traffic shift
Entrance ramp from SB M-10 214.7 Major All lanes and shoulders closed 4/22/16 7:00 AM to 6/24/16 11:59 PM MDOT center pier construction for the new Trumbull Avenue overpass above I-94:::Detour::SB I-75 ti wb I-96 to WB I-94.
Entrance ramp from NB M-10 214.7 Major All lanes and shoulders closed 4/22/16 7:00 PM to 6/30/16 5:00 AM MDOT
Entrance ramp from SB M-10 214.7 Major All lanes and shoulders closed 4/22/16 7:00 PM to 6/30/16 5:00 AM MDOT
Entrance ramp from NB M-10 214.7 Major All lanes and shoulders closed 4/22/16 7:00 AM to 6/24/16 11:59 PM MDOT center pier construction for the new Trumbull Avenue overpass above I-94:::Detour::SB I-75 ti wb I-96 to WB I-94.
Rawsonville Rd to Harris Rd (+0.1 miles) 187.3 to 185.0 Medium Various lanes closed 5/11/16 9:00 AM to 8/31/16 11:59 PM MDOT Pavement patching and repair; During construction, there will be nighttime double-lane closures and weekend single-lane closures on I-94. Starting Wednesday, May 11, there will be double-lane closures overnight between 9 p.m. and 5 a.m. the following morning. From 9 p.m. Friday, May 13, through 5 a.m. Monday, May 16, there will be a continuous single-lane closure on I-94, with double-lane closures overnight.
Airport Rd to M-99 (+0.5 miles) 137.1 to 123.4 Medium Various lanes closed 5/9/16 9:00 PM to 11/4/16 11:59 PM MDOT Repair Bridges; There will be single-lane closures on I-94, with local roads closed and traffic detoured. Starting May 9, there will be nighttime single-lane closures on I-94 between 9 p.m. and 5 a.m. for shoulder upgrades in preparation of the bridge work, which is expected to start after the Memorial Day holiday.
Exit ramp to NB 40th St 88.1 Medium All lanes and shoulders closed 4/29/16 7:00 AM to 7/21/16 11:59 PM MDOT
at Michigan Ave (-0.2 miles) 87.9 Medium Various lanes closed 4/18/16 7:00 AM to 9/30/16 11:59 PM MDOT Lane shifts and nighttime single-lane closures
Entrance ramp from SB 40th St 88.1 Medium All lanes and shoulders closed 4/18/16 7:00 AM to 9/16/16 11:59 PM MDOT
Puetz Rd (-0.2 miles) to Red Arrow Hwy 22.6 to 15.5 Medium Various lanes closed 3/14/16 7:00 AM to 10/21/16 11:59 PM MDOT Bridge repairs, median cable barrier, guardrail, culvert, freeway signing and right-of-way fence. Repairs on the I-94 bridges over Lost Dunes Drive in Bridgman, and over Puetz Road east of Stevensville.; Daily single-lane and nighttime double-lane closures on I-94 during construction. Puetz Road will be closed with a detour posted. There also will be temporary ramp closures at Red Arrow Highway Exit 16 and Grand Mere Road Exit 22.
Entrance ramp from SWB Red Arrow Hwy 15.5 Medium All lanes and shoulders closed 5/9/16 7:00 AM to 9/30/16 11:59 PM MDOT Repaving
Entrance ramp from SWB Red Arrow Hwy 15.5 Medium All lanes and shoulders closed 5/9/16 7:00 AM to 9/30/16 11:59 PM MDOT Repaving
at Kruger Rd 4.7 Medium Various lanes closed 5/9/16 7:00 AM to 6/13/16 11:59 PM MDOT single-lane closures
at US-20 39.8 Medium Right lane closed, two lanes open 4/1/16 7:00 AM to 10/31/16 11:59 PM InDOT Bridge Work
Exit ramp to NB US-421 34.8 Major All lanes and shoulders closed 5/20/16 7:00 AM to 6/30/16 11:59 PM InDOT
More information
Entrance ramp from NB US-421 34.5 Major All lanes and shoulders closed 5/20/16 7:00 AM to 6/30/16 11:59 PM InDOT
More information
Exit to WB Kingery Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 9:30 AM to 2:30 PM IDOT Moving Operation
Entrance from NB Bishop Ford 74.5 to 65.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 10:00 AM to 2:00 PM IDOT Moving Operation
NB Stony Island Feeder Exit to Dan Ryan Expy (I-94) / I-57 65.7 to 62.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 10:30 AM to 1:00 PM IDOT Moving Operation
I-57 / Bishop Ford (I-94) to 91st St 62.9 to 62.3 Minor Right shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
I-57 / Bishop Ford (I-94) to 69th St 62.9 to 59.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 10:00 AM to 3:00 PM IDOT Moving Operation
I-57 / Bishop Ford (I-94) to Eisenhower Expy (I-290) 62.9 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance from NB Dan Ryan Express 59.5 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 6/1/16 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance from NB Dan Ryan Express 59.5 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 10:00 AM to 3:00 PM IDOT Moving Operation
Marquette Rd (67th St) to 26th St 59.3 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 6/1/16 10:00 AM to 3:00 PM IDOT Moving Operation
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Yield to NB I-55 exit to NB I-90/94; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/30/16 11:59 PM IDOT 11' Width; Long Term Closure
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/18 11:59 PM IDOT ***Long Term Closure***
Roosevelt Rd to Taylor St 52.2 to 52.1 Minor Left lane and left shoulder closed, three lanes open 5/31/16 9:00 PM to 6/1/16 5:00 AM IDOT
Roosevelt Rd to Taylor St 52.2 to 52.1 Medium Left two lanes and left shoulder closed, two lanes open 5/31/16 11:59 PM to 6/1/16 5:00 AM IDOT
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 12/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 12/1/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/17/16 11:59 PM IDOT 11' Width; Long Term Closure
Entrance ramp from WB Eisenhower / I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 6/10/16 11:59 PM IDOT 11' Width; Long Term Closure
Entrance ramp from EB Eisenhower / I-290 51.4 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 6/10/16 11:59 PM IDOT 11' Width ***Long Term Closure***
0.5 miles east of Fullerton Ave to Kimball Ave 48.0 to 45.6 Minor Right shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
at Montrose Ave 43.5 Minor Right shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
Kennedy Junction to Lawrence Ave 43.5 to 42.9 Minor Right shoulder closed, all lanes open 6/1/16 9:00 AM to 3:00 PM IDOT
IL-176 (+0.3 miles) to Atkinson Rd (+0.2 miles) 15.8 to 15.0 Medium Left lane closed, three lanes open 6/1/16 9:30 AM to 1:00 PM Illinois Tollway
Entrance ramp from WB WI-100 322.3 Major All lanes closed 6/1/16 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use alternate route
Exit ramp to EB I-894 305.0 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
Exit ramp to SB WI-100 304.1 Major All lanes and shoulders closed 11/30/15 12:00 AM to 5/31/16 11:45 PM WisDOT Construction - Detour: Take I-94 to the 84th St Exit, 84th St South to Greenfield, Greenfield West to HWY 100 OR Take I-94 to the Moorland Exit, Moorland South to Greenfield, Greenfield East to HWY 100.
Exit ramp to SB WI-100 304.1 Major All lanes and shoulders closed 11/30/15 12:00 AM to 5/31/16 11:45 PM WisDOT Construction - Detour: Ramp is only accessible by taking I-41 SB to the I-94 West Ramp, HWY 100 South Exit on Right. Detours: Take I-94 to the 84th St Exit, 84th St South to Greenfield, Greenfield West to HWY 100 OR Take I-94 to the Moorland Exit, Moorla
Bluemound Rd (+0.3 miles) to Redford Blvd (-0.4 miles) 297.1 to 295.9 Minor Left shoulder closed, all lanes open 3/21/16 12:00 AM to 6/6/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Exit ramp to NB WI-164 294.9 Minor Left lane closed, one lane open 4/22/16 12:00 AM to 6/12/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Redford Blvd (+0.6 miles) to I-94 Medium Various lanes closed 4/22/16 12:00 AM to 6/12/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Maple Ave to Maple Ave 288.3 to 288.3 Medium Left lane closed, one lane open 5/31/16 7:00 PM to 6/1/16 6:00 AM daily until 6/4/16 WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Maple Ave to WI-83 (+0.3 miles) 288.3 to 286.8 None All lanes open with restriction 5/3/16 12:00 AM to 6/24/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Genesee St (+0.1 miles) to CR-P (-0.2 miles) 285.4 to 283.7 None All lanes open with restriction 5/3/16 12:00 AM to 6/24/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Exit ramp to NB WI-67 282.2 Major All lanes closed 5/16/16 12:00 AM to 6/16/16 11:45 PM WisDOT Construction - Detour: Two PCMS's and one FMS will be used for advance warning 1 week before the closure. Once the closure is set traffic will be instructed to use the CTH P exit ramp, the detour will guide motorist south on CTH P to CTH DR, then west on
WI-67 (-0.2 miles) to WI-67 (+0.2 miles) 282.1 to 281.7 Minor Right shoulder closed, all lanes open 5/28/15 12:00 AM to 7/1/16 11:45 PM WisDOT Construction - East-West Freeway | Sth 67 Nb & Sb Bridge | I 94 | WAUKESHA
WI-67 (-0.2 miles) to WI-67 (+0.2 miles) 282.1 to 281.7 Minor Left shoulder closed, all lanes open 5/28/15 12:00 AM to 7/1/16 11:45 PM WisDOT Construction - East-West Freeway | Sth 67 Nb & Sb Bridge | I 94 | WAUKESHA
WI-67 (+0.2 miles) to Dousman Rd (+0.3 miles) 281.7 to 281.1 Medium Various lanes closed 5/31/16 12:00 AM to 6/1/16 12:00 AM daily until 11/24/16 WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Golden Lake Rd (-0.3 miles) to Golden Lake Rd (+0.3 miles) 279.7 to 279.1 Medium Various lanes closed 5/31/16 12:00 AM to 6/1/16 12:00 AM daily until 11/24/16 WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Cortland Ave (-0.1 miles) to Aspen Ave (+1.7 miles) 137.7 to 132.2 Medium One lane closed, one lane open 6/1/16 12:00 AM to 6/2/16 11:00 AM,
6/6/16 5:00 PM to 6/9/16 11:00 AM,
6/13/16 5:00 PM to 6/16/16 11:00 AM,
6/20/16 5:00 PM to 6/23/16 11:00 AM,
... more, ending on 8/31/16
WisDOT Construction - 1023-06-75 (NW Project ID)
Aspen Ave (+1.7 miles) to County Road O (+0.2 miles) 132.2 to 127.9 Medium One lane closed, one lane open 6/1/16 12:00 AM to 6/2/16 11:00 AM,
6/6/16 5:00 PM to 6/9/16 11:00 AM,
6/13/16 5:00 PM to 6/16/16 11:00 AM,
6/20/16 5:00 PM to 6/23/16 11:00 AM,
... more, ending on 8/31/16
WisDOT Construction - Black River Falls - Tomah | CTH O - S County Line WB | I 94 | JACKSON
Exit ramp to NB US-53 71.0 None All lanes open with restriction 6/1/16 12:00 AM to 6/10/16 11:45 PM WisDOT Construction - Detour: No posted detour.
US-63 (-0.2 miles) to WI-65 (+0.2 miles) 19.9 to 9.9 Major All lanes closed 5/31/16 10:30 PM to 6/1/16 5:00 AM WisDOT Construction - Detour: Traffic will be detoured from exit 19 (STH 63) to exit 10 (STH 65) using the Alt. Route on USH 12
County Road T (-0.1 miles) to County Road T (+0.2 miles) 16.7 to 16.4 Minor Left shoulder closed, all lanes open 5/31/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.2 miles) 16.7 to 16.4 Minor Right shoulder closed, all lanes open 5/31/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
Century Ave to Mounds Blvd 247.8 to 243.6 Medium Various lanes closed 5/31/16 7:00 PM to 6/1/16 5:00 AM MnDOT Westbound I-94 between Century Ave and Mounds Blvd will be shifted to the outside lanes and reduced to two lanes at 7 p.m. The closures will end by 5 a.m. Wednesday, June 1 . These shifts and lane closures are needed so crews can prepare the road for the next stage of construction.
Exit ramp to NWB 5th St 234.2 Medium All lanes and shoulders closed 5/18/16 1:00 AM to 6/1/16 11:59 PM MnDOT Motorists intending to access Fifth Street from westbound I-94 will be detoured to northbound Cedar Avenue, westbound Washington Avenue and Fourth Avenue.

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Tue May 31 2016 16:49:44 CDT