Construction Report
Select Location
  
Updated: 3/23/17 3:03 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-39 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Colley Rd to Cranston Rd (+0.4 miles) 186.3 to 185.5 Minor Left shoulder closed, all lanes open 3/23/17 8:00 AM to 4:00 PM daily until 3/27/17 WisDOT Permit - Left Shoulder Closed to park Batwing Crane to protect I-39 to pull wire part of the existing Y-32 ATC Transmission Line rebuild project
Newville Rd (-0.6 miles) to Goede Rd (+0.3 miles) 165.7 to 162.2 Medium Left lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Goede Rd (+0.3 miles) to US-51 (-0.1 miles) 162.2 to 160.2 Medium Right lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - Detour: No Detour Provided
County Road MN (+0.3 miles) to Siggelkow Rd (+0.1 miles) 145.0 to 143.8 Medium Right lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - Illinois State Line - Madison CTH AB Bridge B-13-726 | I 39 | DANE
US-51 (+0.1 miles) to WI-19 (+0.1 miles) 132.2 to 130.7 Medium 0 lanes closed, three lanes open 2/27/17 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: NO Detour route posted.
at CR-J (+0.1 miles) 115.5 Medium Right lane closed, two lanes open 3/23/17 8:30 AM to 2:30 PM WisDOT Maintenance - Beam Guard Repair

I-39 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at CR-V (-0.1 miles) 111.4 Medium Right lane closed, two lanes open 3/23/17 8:30 AM to 2:30 PM WisDOT Maintenance - Beam Guard Repair
at Kent Rd (+0.5 miles) 114.4 Medium Right lane closed, two lanes open 3/23/17 8:30 AM to 2:30 PM WisDOT Maintenance - Beam Guard Repair
WI-19 (-0.2 miles) to WI-19 (+0.3 miles) 130.2 to 130.7 Medium 0 lanes closed, three lanes open 2/27/17 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: No detour
Entrance ramp from EB WI-19 130.8 Major All lanes closed 3/1/17 12:00 AM to 6/30/17 11:45 PM WisDOT Construction - Detour: Detour route is EB STH 19 to SB US 51 to SB IH 39
Siggelkow Rd to County Road MN (-0.2 miles) 143.3 to 144.6 Medium Right lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - Illinois State Line - Madison CTH AB Bridge B-13-726 | I 39 | DANE
County Road AB (+0.3 miles) to County Road MN 144.3 to 144.9 Medium Right lane closed, one lane open 3/23/17 8:30 AM to 12:00 PM WisDOT Emergency - To repair damaged beam guard.
WI-73 (-0.1 miles) to Goede Rd (-0.2 miles) 159.4 to 161.7 Medium Right lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - Detour: No Detour Provided
Goede Rd (-0.2 miles) to Newville Rd (-0.7 miles) 161.7 to 163.9 Medium Left lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
WI-81 to Colley Rd 184.5 to 185.8 Minor Left shoulder closed, all lanes open 3/23/17 8:00 AM to 4:00 PM daily until 3/27/17 WisDOT Permit - Left Shoulder Closed to park Batwing Crane to protect I-39 to pull wire part of the existing Y-32 ATC Transmission Line rebuild project

I-69 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Indiana border going north to Calhoun County Line 0.3 to 47.1 Medium Various lanes closed 3/16/17 8:00 AM to 3/25/17 4:00 PM MDOT Expect moving closure for maintenance work on bridges.
Harvey Road to M-19 172.4 to 184.1 Minor Left or right shoulder closed, all lanes open 4/4/16 6:00 AM to 5/26/17 4:30 PM MDOT Expect intermittent shoulder closures for utility work.

I-69 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Harvey Road to M-19 184.1 to 172.4 Minor Left or right shoulder closed, all lanes open 4/4/16 6:00 AM to 5/26/17 4:30 PM MDOT Expect intermittent shoulder closures for utility work.
Exit ramp to EB Miller Rd Minor Various lanes closed 12/22/16 2:30 PM to 11/15/17 4:00 PM MDOT One of the left turn lanes to Miller Road will be closed due to the high load hit.
Indiana border going north to Calhoun County Line 47.1 to 0.3 Medium Various lanes closed 3/16/17 8:00 AM to 3/25/17 4:00 PM MDOT Expect moving closure for maintenance work on bridges.

I-80 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-88 (+0.1 miles) to US-6 (-0.3 miles) 3.6 to 8.8 Medium One lane closed, one lane open 3/1/17 12:00 AM to 11/22/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
I-88 (+0.1 miles) to US-6 (-0.3 miles) 3.6 to 8.8 Medium One lane closed, one lane open 3/13/17 12:00 AM to 10/3/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 14'.
Entrance ramp from Cleveland Rd 6.9 Medium All lanes and shoulders closed 3/20/17 12:00 AM to 10/6/17 11:59 PM IDOT Ramp closed.
Ashland Ave (+0.2 miles) to Vincennes Rd (-0.5 miles) 4.5 to 3.0 Medium Left lane closed, four lanes open 3/23/17 9:00 AM to 2:00 PM Illinois Tollway
Old Hobart Rd to Dombey Rd (+0.1 miles) 20.0 to 22.0 Minor Right shoulder closed, all lanes open 3/23/17 7:00 AM to 3:00 PM Indiana Toll Road Sign Installation
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Left lane closed, up to two lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from Houston Ave 23.6 Unknown All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Enter WB at Portage, Exit at 17 to I-65 South/15th Ave East to I-90 Ramp EB
County Road 450 W to McCool Rd (+0.4 miles) 25.3 to 26.2 Minor Right shoulder closed, all lanes open 3/20/17 7:00 AM to 3/24/17 7:00 PM Indiana Toll Road Fiber Installation - 24 Hour Continuous Closure
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-35 (+0.5 miles) to Fail Rd (-0.1 miles) 48.0 to 52.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.5 to 58.8 Medium Left lane closed, one lane open 3/2/17 7:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work/Fiber Install : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Sycamore Rd (+0.9 miles) 66.9 to 69.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Riverside Dr (-0.2 miles) to Juniper Rd (+0.3 miles) 75.6 to 78.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to SB IN-933 76.3 Major All lanes and shoulders closed 3/23/17 8:00 AM to 4/13/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at 72 - US 31, to US 12, to 933 South
Entrance ramp from WB Douglas Rd 76.3 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure - Detour is: Enter WB 77 Exit at MM 72 to 31 South/Nimtz Parkway Nimtz Parkway East to I-90 EB Entry
Beech Rd (-0.1 miles) to County Road 11 (-0.1 miles) 86.0 to 93.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 4/17/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 17 (-0.1 miles) to County Road 375 E (-0.5 miles) 96.0 to 124.0 Medium Left lane closed, one lane open 3/23/17 8:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Moving Operation
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-80 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 375 E (+0.5 miles) to County Road 17 (+0.1 miles) 124.0 to 96.0 Medium Left lane closed, one lane open 3/23/17 8:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Moving Operation
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (+0.1 miles) to Beech Rd (+0.1 miles) 93.0 to 86.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 4/17/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
IN-23 (+0.4 miles) to Ironwood Rd (-0.5 miles) 79.4 to 79.2 Minor Right shoulder closed, all lanes open 3/20/17 7:00 AM to 3/24/17 7:00 PM Indiana Toll Road Sign Installation - 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Riverside Dr (+0.2 miles) 78.0 to 75.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to SB IN-933 76.6 Major All lanes and shoulders closed 3/23/17 8:00 AM to 4/13/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at 72 - US 31, to US 12, to 933 South
Entrance ramp from WB Douglas Rd 76.6 Medium All lanes and shoulders closed 3/23/17 8:00 AM to 4/13/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Use 933 North to US 12 West, to 31 South, to 80/90
Quince Rd (+1.0 miles) to Tamarack Rd (+0.2 miles) 69.0 to 66.9 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work - 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Fail Rd (+0.1 miles) to US-35 (-0.5 miles) 52.0 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work - 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to Old Hobart Rd (+0.2 miles) 25.2 to 19.8 Medium Left lane closed, up to two lanes open 3/8/17 7:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to Willowcreek Rd 24.0 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Exit at SR 49 (exit 31) North to I-94 West to 249 South
Dombey Rd (-0.1 miles) to Old Hobart Rd 22.0 to 20.0 Minor Right shoulder closed, all lanes open 3/23/17 7:00 AM to 3:00 PM Indiana Toll Road Sign Installation
Cicero Ave (IL-50) to I-57 152.2 to 151.7 Medium Left lane and left shoulder closed, two lanes open 3/23/17 9:00 AM to 1:00 PM IDOT
US-6 (+0.2 miles) to I-88 (-0.1 miles) 1.7 to 3.6 Medium One lane closed, one lane open 3/1/17 12:00 AM to 11/22/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
US-6 (+0.2 miles) to I-88 (-0.1 miles) 1.7 to 3.5 Medium One lane closed, one lane open 3/13/17 12:00 AM to 10/3/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 14'.

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at CR-V (-0.1 miles) 111.4 Medium Right lane closed, two lanes open 3/23/17 8:30 AM to 2:30 PM WisDOT Maintenance - Beam Guard Repair
at Kent Rd (+0.5 miles) 114.4 Medium Right lane closed, two lanes open 3/23/17 8:30 AM to 2:30 PM WisDOT Maintenance - Beam Guard Repair
WI-19 (-0.2 miles) to WI-19 (+0.3 miles) 130.2 to 130.7 Medium 0 lanes closed, three lanes open 2/27/17 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: No detour
Entrance ramp from EB WI-19 130.8 Major All lanes closed 3/1/17 12:00 AM to 6/30/17 11:45 PM WisDOT Construction - Detour: Detour route is EB STH 19 to SB US 51 to SB IH 39
Siggelkow Rd to County Road MN (-0.2 miles) 143.3 to 144.6 Medium Right lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - Illinois State Line - Madison CTH AB Bridge B-13-726 | I 39 | DANE
County Road AB (+0.3 miles) to County Road MN 144.3 to 144.9 Medium Right lane closed, one lane open 3/23/17 8:30 AM to 12:00 PM WisDOT Emergency - To repair damaged beam guard.
WI-73 (-0.1 miles) to Goede Rd (-0.2 miles) 159.4 to 161.7 Medium Right lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - Detour: No Detour Provided
Goede Rd (-0.2 miles) to Newville Rd (-0.7 miles) 161.7 to 163.9 Medium Left lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
WI-81 to Colley Rd 184.5 to 185.8 Minor Left shoulder closed, all lanes open 3/23/17 8:00 AM to 4:00 PM daily until 3/27/17 WisDOT Permit - Left Shoulder Closed to park Batwing Crane to protect I-39 to pull wire part of the existing Y-32 ATC Transmission Line rebuild project
Town Hall Rd (+0.7 miles) to Stone Quarry Rd (+0.7 miles) 22.5 to 23.5 Medium Left lane closed, one lane open 3/23/17 6:00 AM to 4:00 PM Illinois Tollway DMS and ITS Installation
Harmony Rd (+0.3 miles) to IL-23 (+0.1 miles) 35.6 to 36.2 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
at Marengo Hampshire Plaza 37.8 to 37.9 Medium Various lanes closed 3/23/17 12:01 AM to 4:00 AM Illinois Tollway Moving Operation; All ORT Lanes Closed
River Rd (-0.3 miles) to Duncan Ave 55.3 to 55.8 Medium Right lane closed, three lanes open 3/23/17 9:00 AM to 5:00 PM Illinois Tollway Bridge Widening and Reconst
Roselle Rd (-0.3 miles) to Roselle Rd (+0.3 miles) 65.3 to 65.9 Medium Right lane closed, three lanes open 3/23/17 9:00 AM to 3:00 PM Illinois Tollway Rdwy Widening and Reconst
Meacham Rd (-0.3 miles) to Meacham Rd (+0.4 miles) 67.1 to 67.8 Medium Right lane closed, two or three lanes open 3/23/17 9:00 AM to 3:00 PM Illinois Tollway Rdwy Widening and Reconst (1 Right CD lane closed)
Arlington Heights Rd (+0.8 miles) to Elmhurst Rd (-0.3 miles) 71.6 to 73.3 Medium Right lane closed, two lanes open 12/24/16 12:00 AM to 4/28/17 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***
Entrance from EB I-190 2.3 to 3.0 Minor Left shoulder closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT Long Term Closure
Entrance from EB I-190 2.3 to 3.0 Minor Left lane and left shoulder closed, one lane open 3/22/17 11:00 PM to 3/23/17 5:00 AM IDOT
Entrance from SEB Kennedy Local 2.3 to 81.2 Minor Right shoulder closed, all lanes open 3/23/17 9:00 AM to 3:00 PM IDOT
Exit ramp to WB Adams St 51.3 None Partial closure 3/23/17 9:00 AM to 3:00 PM IDOT
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure
Exit to SB Dan Ryan Elevated 51.6 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Left lane closed, up to two lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Old Hobart Rd to Dombey Rd (+0.1 miles) 20.0 to 22.0 Minor Right shoulder closed, all lanes open 3/23/17 7:00 AM to 3:00 PM Indiana Toll Road Sign Installation
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from Houston Ave 23.6 Unknown All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Enter WB at Portage, Exit at 17 to I-65 South/15th Ave East to I-90 Ramp EB
County Road 450 W to McCool Rd (+0.4 miles) 25.3 to 26.2 Minor Right shoulder closed, all lanes open 3/20/17 7:00 AM to 3/24/17 7:00 PM Indiana Toll Road Fiber Installation - 24 Hour Continuous Closure
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-35 (+0.5 miles) to Fail Rd (-0.1 miles) 48.0 to 52.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.5 to 58.8 Medium Left lane closed, one lane open 3/2/17 7:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work/Fiber Install : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Sycamore Rd (+0.9 miles) 66.9 to 69.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Riverside Dr (-0.2 miles) to Juniper Rd (+0.3 miles) 75.6 to 78.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to SB IN-933 76.3 Major All lanes and shoulders closed 3/23/17 8:00 AM to 4/13/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at 72 - US 31, to US 12, to 933 South
Entrance ramp from WB Douglas Rd 76.3 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure - Detour is: Enter WB 77 Exit at MM 72 to 31 South/Nimtz Parkway Nimtz Parkway East to I-90 EB Entry
Beech Rd (-0.1 miles) to County Road 11 (-0.1 miles) 86.0 to 93.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 4/17/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 17 (-0.1 miles) to County Road 375 E (-0.5 miles) 96.0 to 124.0 Medium Left lane closed, one lane open 3/23/17 8:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Moving Operation
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-90 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 3/23/17 11:30 AM to 1:30 PM IDOT
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 3/22/17 9:00 PM to 3/23/17 5:00 AM IDOT Outbound until 5AM

I-90 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 3/23/17 11:30 AM to 1:30 PM IDOT
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 3/22/17 9:00 PM to 3/23/17 5:00 AM IDOT Outbound until 5AM

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 375 E (+0.5 miles) to County Road 17 (+0.1 miles) 124.0 to 96.0 Medium Left lane closed, one lane open 3/23/17 8:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Moving Operation
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (+0.1 miles) to Beech Rd (+0.1 miles) 93.0 to 86.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 4/17/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
IN-23 (+0.4 miles) to Ironwood Rd (-0.5 miles) 79.4 to 79.2 Minor Right shoulder closed, all lanes open 3/20/17 7:00 AM to 3/24/17 7:00 PM Indiana Toll Road Sign Installation - 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Riverside Dr (+0.2 miles) 78.0 to 75.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to SB IN-933 76.6 Major All lanes and shoulders closed 3/23/17 8:00 AM to 4/13/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at 72 - US 31, to US 12, to 933 South
Entrance ramp from WB Douglas Rd 76.6 Medium All lanes and shoulders closed 3/23/17 8:00 AM to 4/13/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Use 933 North to US 12 West, to 31 South, to 80/90
Quince Rd (+1.0 miles) to Tamarack Rd (+0.2 miles) 69.0 to 66.9 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work - 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Fail Rd (+0.1 miles) to US-35 (-0.5 miles) 52.0 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work - 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to Old Hobart Rd (+0.2 miles) 25.2 to 19.8 Medium Left lane closed, up to two lanes open 3/8/17 7:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to Willowcreek Rd 24.0 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Exit at SR 49 (exit 31) North to I-94 West to 249 South
Dombey Rd (-0.1 miles) to Old Hobart Rd 22.0 to 20.0 Minor Right shoulder closed, all lanes open 3/23/17 7:00 AM to 3:00 PM Indiana Toll Road Sign Installation
Entrance from NB Dan Ryan Local 59.6 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 3/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to EB I-290 52.3 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Jackson Blvd to Division St 51.5 to 49.4 Medium Left three lanes and left shoulder closed, up to two lanes open 3/22/17 11:59 PM to 3/23/17 5:00 AM IDOT
Jackson Blvd to Division St 51.5 to 49.4 Medium Left two lanes and left shoulder closed, one to three lanes open 3/22/17 10:00 PM to 3/23/17 5:00 AM IDOT
Entrance ramp from EB Jackson Blvd 51.4 Medium All lanes and shoulders closed 3/22/17 9:00 PM to 3/23/17 5:00 AM IDOT
Entrance ramp from WB Adams St 51.3 Medium All lanes and shoulders closed 3/22/17 9:00 PM to 3/23/17 5:00 AM IDOT
Entrance ramp from WB Randolph St 50.9 Medium All lanes and shoulders closed 3/22/17 9:00 PM to 3/23/17 5:00 AM IDOT
Grand Ave to Division St 50.5 to 49.4 Medium Left four lanes and left shoulder closed, up to one lanes open 3/23/17 1:00 AM to 5:00 AM IDOT
Ohio Feeder to Kostner Ave 50.4 to 43.8 Medium Right lane and right shoulder closed, three to five lanes open 3/23/17 11:00 AM to 2:00 PM IDOT Moving Operation
Exit ramp to North Ave 49.1 None Partial closure 3/23/17 9:00 AM to 3:00 PM IDOT
Exit to NB Edens Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/23/17 9:30 AM to 1:30 PM IDOT Moving Operation
Ramp from WB I-90 to NB I-294 78.0 to 77.9 None All lanes and shoulders open with partial ramp closures 3/23/17 9:00 AM to 1:30 PM Illinois Tollway Left Side of Ramp Closed
IL-72 (-0.1 miles) to Roselle Rd (+0.1 miles) 76.2 to 65.5 Medium Right two lanes closed, one or two lanes open 3/22/17 9:00 PM to 3/23/17 5:00 AM Illinois Tollway ITS; Moving Operation
Meacham Rd (-0.2 miles) to Meacham Rd (+0.3 miles) 67.6 to 67.1 Medium Right lane closed, three lanes open 3/23/17 7:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst
Meacham Rd (-0.1 miles) to Roselle Rd (-0.6 miles) 67.5 to 66.2 Medium Right lane closed, three lanes open 3/23/17 7:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst (1 Right CD lane closed)
Barrington Rd (-0.8 miles) to Barrington Rd (+0.2 miles) 63.0 to 62.0 Medium Right three lanes closed, one lane open 3/22/17 11:30 PM to 3/23/17 5:00 AM Illinois Tollway Pedestrian Overpass
IL-59 (-0.3 miles) to IL-59 (+0.5 miles) 60.0 to 59.2 Medium Right lane closed, three lanes open 3/23/17 6:00 AM to 3:00 PM Illinois Tollway Rdwy and Bridge Widening
IL-23 (-0.4 miles) to IL-23 (+0.1 miles) 36.5 to 36.0 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Shattuck Rd (+0.6 miles) to Spring Center Rd (+0.6 miles) 28.2 to 27.3 Medium Left lane closed, one lane open 3/23/17 6:00 AM to 4:00 PM Illinois Tollway DMS and ITS Installation
Colley Rd to Cranston Rd (+0.4 miles) 186.3 to 185.5 Minor Left shoulder closed, all lanes open 3/23/17 8:00 AM to 4:00 PM daily until 3/27/17 WisDOT Permit - Left Shoulder Closed to park Batwing Crane to protect I-39 to pull wire part of the existing Y-32 ATC Transmission Line rebuild project
Newville Rd (-0.6 miles) to Goede Rd (+0.3 miles) 165.7 to 162.2 Medium Left lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Goede Rd (+0.3 miles) to US-51 (-0.1 miles) 162.2 to 160.2 Medium Right lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - Detour: No Detour Provided
County Road MN (+0.3 miles) to Siggelkow Rd (+0.1 miles) 145.0 to 143.8 Medium Right lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 5:00 AM daily until 3/24/17 WisDOT Construction - Illinois State Line - Madison CTH AB Bridge B-13-726 | I 39 | DANE
US-51 (+0.1 miles) to WI-19 (+0.1 miles) 132.2 to 130.7 Medium 0 lanes closed, three lanes open 2/27/17 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: NO Detour route posted.
at CR-J (+0.1 miles) 115.5 Medium Right lane closed, two lanes open 3/23/17 8:30 AM to 2:30 PM WisDOT Maintenance - Beam Guard Repair

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Xerxes Ave to 49th Ave 33.7 to 226.5 Medium Various lanes closed 3/19/17 5:00 PM to 6/27/17 6:00 PM MnDOT reduced to two lanes
Xerxes Ave to I-35W 33.7 to 233.1 Medium Various lanes closed 3/20/17 5:00 AM to 10/20/17 6:00 PM MnDOT major road construction
Shingle Creek Pkwy to Nicollet Ave 34.3 to 232.6 Medium Various lanes closed 3/20/17 7:00 AM to 6/30/17 6:00 PM MnDOT On Monday, lane restrictions are planned on eastbound I-94 from west of Shingle Creek Parkway to Highway 252, weather permitting. The interstate will be reduced to two lanes. Other ramp and lane closures are expected to start by the end of the month.
49th Ave to Plymouth Ave 226.5 to 230.2 Major Right two lanes closed, two or three lanes open 3/21/17 10:00 AM to 3/23/17 7:00 PM MnDOT two right lanes blocked
at Prior Ave 237.7 Major All lanes and shoulders closed 1/28/17 2:36 PM to 11/17/20 11:56 AM MnDOT closed to traffic
Lexington Pkwy (-0.1 miles) to Dale St (-0.1 miles) 239.4 to 240.4 Medium Various lanes closed 7/13/16 2:57 PM to 5/2/20 12:17 PM MnDOT reduced to three lanes
Mounds Blvd (+0.1 miles) to MN-120 243.6 to 247.7 Medium Various lanes closed 10/7/16 10:41 AM to 9/29/17 5:00 PM MnDOT major road construction
WI-25 to Stokke Pkwy (-0.9 miles) 41.8 to 43.5 Minor Right shoulder closed, all lanes open 3/23/17 8:00 AM to 4:00 PM daily until 4/24/17 WisDOT Permit - Shoulder Closure on I-94 EB
at CR-V (-0.1 miles) 111.4 Medium Right lane closed, two lanes open 3/23/17 8:30 AM to 2:30 PM WisDOT Maintenance - Beam Guard Repair
at Kent Rd (+0.5 miles) 114.4 Medium Right lane closed, two lanes open 3/23/17 8:30 AM to 2:30 PM WisDOT Maintenance - Beam Guard Repair
WI-19 (-0.2 miles) to WI-19 (+0.3 miles) 130.2 to 130.7 Medium 0 lanes closed, three lanes open 2/27/17 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: No detour
Entrance ramp from EB WI-19 130.8 Major All lanes closed 3/1/17 12:00 AM to 6/30/17 11:45 PM WisDOT Construction - Detour: Detour route is EB STH 19 to SB US 51 to SB IH 39
Meadowbrook Rd to Grandview Blvd (+0.1 miles) 291.1 to 292.7 Medium Right lane closed, two lanes open 3/23/17 9:00 AM to 3:00 PM WisDOT Maintenance - Patch Pot Holes Lane 3
Exit ramp to SB I-41 304.2 Major All lanes closed 3/22/17 10:00 PM to 3/23/17 5:00 AM WisDOT Construction - Detour: Take I-94 East to the Mayfair Rd/Hwy 100 Exit; take Hwy 100 South to Cleveland Ave, Cleveland Ave East to National Ave, National Ave Northeast to the I-41/894/US 45 South Entrance Ramp; OR, Take I-94 East to the 84th St Exit; take 8
Exit ramp to NB I-41 304.3 Major All lanes closed 8/15/16 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: Take I-94 East to the STH 164/CTH J Exit; take STH 164/CTH J North to Capitol Dr/STH 190, Capitol Dr/STH 190 East to the I-41/US 45 North Entrance Ramp; OR, Take I-94 East to the Moorland Rd Exit; take Moorland Rd North to Bluemoun
Entrance ramp from SB I-41 304.7 Unknown All lanes closed 10/1/16 12:00 AM to 6/6/17 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Watertown Plank Rd Exit; take Watertown Plank Rd East to Glenview Ave, Glenview Ave South to Kearney St, Kearney St East to the I-94 East Entrance Ramp; OR, Take I-41/US 45 South to the Bluemound Rd Exit
Exit ramp to SB WI-181 305.1 Major All lanes closed 12/22/16 12:00 AM to 11/22/17 11:45 PM WisDOT Construction - Detour: Take I-94 East to the WIS 100 Exit Ramp; take WIS 100 South to Greenfield Ave, Greenfield Ave East to 84th St; OR, Take I-94 East to the 68th-70th St Exit; take 70th St North to OConnor St, OConnor St West to 84th St
Wisconsin State Line to Russell Rd Minor Both shoulders closed, all lanes open with partial ramp closures 3/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
IL-21 (-0.1 miles) to IL-176 (-0.1 miles) 10.1 to 16.0 Medium Left lane closed, three lanes open 3/23/17 9:30 AM to 2:00 PM Illinois Tollway Moving Operation
Entrance from SB Edens 28.4 to 43.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/23/17 10:00 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB Adams St 51.3 None Partial closure 3/23/17 9:00 AM to 3:00 PM IDOT
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure
Eisenhower Expy (I-290) to 69th St 51.6 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
69th St to I-57 / Bishop Ford (I-94) 59.5 to 62.9 Minor Left shoulder closed, all lanes open with partial ramp closures 3/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
87th St to I-57 / Bishop Ford (I-94) 61.8 to 62.9 Major Left two lanes and left shoulder closed, three lanes open 3/22/17 11:59 PM to 3/23/17 6:00 AM IDOT
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor Left shoulder closed, all lanes open 9/6/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 foot wide lanes; Long Term Closure
111th St to 115th St 66.1 to 66.6 Major Right two lanes and right shoulder closed, one lane open 3/22/17 11:59 PM to 3/23/17 6:00 AM IDOT
111th St to 115th St 66.1 to 66.6 Medium Right lane and right shoulder closed, two lanes open 3/22/17 10:00 PM to 3/23/17 7:00 AM IDOT
at 115th St 66.6 Minor Right shoulder closed, all lanes open 3/23/17 9:00 AM to 3:00 PM IDOT
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
Red Arrow Hwy to Grand Mere Rd 15.5 to 21.5 Medium Various lanes closed 3/23/17 6:00 AM to 5:00 PM daily until 3/31/17 MDOT Expect a shoulder closure for tree work.
1/2 mile west of Hennessey Rd to 1/4 Mile east of the Berrien/Van Buren County Line 39.7 to 42.8 Minor Left or right shoulder closed, all lanes open 3/6/17 6:00 AM to 3/31/17 4:00 PM MDOT Expect shoulder closure for tree work
at Concord Rd 126.5 to 127.3 Medium One lane closed, one lane open 3/23/17 8:00 AM to 2:00 PM MDOT The right lane is closed for environmental cleanup.

I-94 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 3/23/17 11:30 AM to 1:30 PM IDOT
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 3/22/17 9:00 PM to 3/23/17 5:00 AM IDOT Outbound until 5AM

I-94 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 3/23/17 11:30 AM to 1:30 PM IDOT
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 3/22/17 9:00 PM to 3/23/17 5:00 AM IDOT Outbound until 5AM

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Kilgore Road 78.1 to 77.9 Medium One lane closed, one lane open 3/22/17 8:00 PM to 3/23/17 11:00 PM MDOT Expect nightly single lane closure for concrete repairs
at mile marker 72 72.1 to 71.8 Medium One lane closed, one lane open 3/23/17 8:00 PM to 3/24/17 4:00 AM MDOT Expect nighttime single lane closure for concrete repairs.
Grand Mere Rd to Red Arrow Hwy 21.5 to 15.5 Medium Various lanes closed 3/23/17 6:00 AM to 5:00 PM daily until 3/31/17 MDOT Expect a shoulder closure for tree work.
at I-80 (+0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
at 115th St 66.6 Minor Right shoulder closed, all lanes open 3/23/17 9:00 AM to 3:00 PM IDOT
Michigan Ave to Dan Ryan Expy (I-94) / I-57 63.4 to 62.9 Minor Right lane and right shoulder closed, one lane open 3/22/17 11:00 PM to 3/23/17 5:00 AM IDOT Weave left lane Ford to Dan Ryan Lane 3
Entrance ramp from Michigan Ave 63.1 Medium All lanes and shoulders closed 3/22/17 11:00 PM to 3/23/17 5:00 AM IDOT
I-57 / Bishop Ford (I-94) to 91st St 62.9 to 62.3 Medium Left lane and left shoulder closed, four lanes open 3/19/17 12:00 AM to 11/22/17 11:59 PM IDOT Narrow Lanes; Long Term Closure
I-57 / Bishop Ford (I-94) to 87th St 62.9 to 61.8 Medium Right two lanes and right shoulder closed, three lanes open 3/22/17 11:00 PM to 3/23/17 5:00 AM IDOT
I-57 / Bishop Ford (I-94) to Eisenhower Expy (I-290) 62.9 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 3/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to EB I-290 52.3 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Jackson Blvd to Division St 51.5 to 49.4 Medium Left three lanes and left shoulder closed, up to two lanes open 3/22/17 11:59 PM to 3/23/17 5:00 AM IDOT
Jackson Blvd to Division St 51.5 to 49.4 Medium Left two lanes and left shoulder closed, one to three lanes open 3/22/17 10:00 PM to 3/23/17 5:00 AM IDOT
Entrance ramp from EB Jackson Blvd 51.4 Medium All lanes and shoulders closed 3/22/17 9:00 PM to 3/23/17 5:00 AM IDOT
Entrance ramp from WB Adams St 51.3 Medium All lanes and shoulders closed 3/22/17 9:00 PM to 3/23/17 5:00 AM IDOT
Entrance ramp from WB Randolph St 50.9 Medium All lanes and shoulders closed 3/22/17 9:00 PM to 3/23/17 5:00 AM IDOT
Grand Ave to Division St 50.5 to 49.4 Medium Left four lanes and left shoulder closed, up to one lanes open 3/23/17 1:00 AM to 5:00 AM IDOT
Ohio Feeder to Kostner Ave 50.4 to 43.8 Medium Right lane and right shoulder closed, three to five lanes open 3/23/17 11:00 AM to 2:00 PM IDOT Moving Operation
Exit ramp to North Ave 49.1 None Partial closure 3/23/17 9:00 AM to 3:00 PM IDOT
Exit to NB Edens Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/23/17 9:30 AM to 1:30 PM IDOT Moving Operation
IL-176 (+0.1 miles) to IL-21 (+0.1 miles) 16.0 to 10.1 Medium Left lane closed, three lanes open 3/23/17 9:30 AM to 2:00 PM Illinois Tollway Moving Operation
Russell Rd to Wisconsin State Line Minor Both shoulders closed, all lanes open with partial ramp closures 3/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to EB WI-100 322.9 Major All lanes closed 11/30/15 12:00 AM to 11/15/17 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 84th St Exit; take 84th St South to Greenfield Ave, Greenfield Ave West to Hwy 100; OR, Take I-94 West to the Moorland Rd-South Exit; take Moorland Rd South to Greenfield Ave, Greenfield Ave East to Hwy 100
Entrance ramp from SB WI-181 305.4 Major All lanes closed 3/22/17 10:30 PM to 3/23/17 4:30 AM WisDOT Construction - Detour: To go West: Take 84th St North to Bluemound Rd, Bluemound Rd West to Moorland Rd, Moorland Rd South to the I-94 West Entrance Ramp; To go North: Take 84th St North to Watertown Plank Rd, Watertown Plank Rd West to the I-41/US 45 No
92nd St to I-41 (-0.1 miles) 305.1 to 305.0 Major All lanes closed and both shoulders open 3/22/17 11:00 PM to 3/23/17 4:30 AM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Exit ramp to NB I-41 305.0 Major All lanes closed 3/22/17 11:00 PM to 3/23/17 4:30 AM WisDOT Construction - Detour: Take I-94 West to the 68th St Exit and proceed straight onto O'Connor St; take O'Connor St West to 84th St, 84th St North to Watertown Plank Rd; Watertown Plank Rd West to the I-41/US 45 North Entrance Ramp; OR, Take I-94 West to th
Waterville Rd to CR-P (-0.2 miles) 284.4 to 283.7 Minor Left shoulder closed, all lanes open 1/30/17 12:00 AM to 3/25/17 11:45 PM WisDOT Construction - East West Freeway | Nemahbin Lake Bridge, eb B-67-0069 | I 94 | WAUKESHA
US-51 (+0.1 miles) to WI-19 (+0.1 miles) 132.2 to 130.7 Medium 0 lanes closed, three lanes open 2/27/17 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: NO Detour route posted.
at CR-J (+0.1 miles) 115.5 Medium Right lane closed, two lanes open 3/23/17 8:30 AM to 2:30 PM WisDOT Maintenance - Beam Guard Repair
Stokke Pkwy (+0.6 miles) to US-12 (-0.1 miles) 43.9 to 41.7 Minor Right shoulder closed, all lanes open 3/23/17 8:00 AM to 4:00 PM daily until 4/24/17 WisDOT Permit - I94 WB Shoulder Closure
MN-120 to Mounds Blvd (-0.1 miles) 247.8 to 243.7 Medium Various lanes closed 10/7/16 10:41 AM to 9/29/17 5:00 PM MnDOT major road construction
Portland Ave to Xerxes Ave 233.2 to 33.7 Medium Various lanes closed 3/20/17 5:00 AM to 10/20/17 6:00 PM MnDOT major road construction
Nicollet Ave to Shingle Creek Pkwy 232.7 to 34.3 Medium Various lanes closed 3/20/17 7:00 AM to 6/30/17 6:00 PM MnDOT On Monday, lane restrictions are planned on eastbound I-94 from west of Shingle Creek Parkway to Highway 252, weather permitting. The interstate will be reduced to two lanes. Other ramp and lane closures are expected to start by the end of the month.

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Thu Mar 23 2017 03:14:50 CDT