Construction Report
Select Location
  
Updated: 9/24/16 10:00 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

Stevenson NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
0.5 miles south of IL-171 to 0.5 miles north of IL-171 281.9 to 282.9 Minor Both shoulders closed, all lanes open 3/21/16 12:00 AM to 12/1/16 11:59 PM IDOT *** Long Term Closure ***
Exit ramp to NB IL-171 282.4 Major All lanes and shoulders closed 3/31/16 12:00 AM to 12/1/16 11:59 PM IDOT Detour posted.; *** Long Term Closure ***
Entrance ramp from NB IL-171 282.8 Major All lanes and shoulders closed 3/31/16 12:00 AM to 12/1/16 11:59 PM IDOT Long Term Closure. Detours Will Be Posted; Rehabilitation and widening of eight bridges along northbound Illinois 171 between 47th Street and 55th Street. It also will include bridge replacement of northbound Illinois 171 over Interstate 55. In addition, the improvements will feature ramp modification, wall repairs, asphalt resurfacing, pavement markings, landscaping, and replacements of signs, roadway lighting, high mast light towers and drainage structures.
Exit ramp to NB Dan Ryan Expy 291.5 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Yield to NB I-55 exit to NB I-90/94; ***Long Term Closure***

Stevenson SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from NB Lake Shore Drive (US-41) 293.9 None Partial closure 6/11/15 12:00 AM to 12/1/16 11:59 PM IDOT Lane shifted and width reduction (11') ***Long Term Closure***
Exit ramp to NB Dan Ryan Expy Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Yield to NB I-55 exit to NB I-90/94; ***Long Term Closure***
Exit ramp to NB IL-171 282.8 Major All lanes and shoulders closed 3/31/16 12:00 AM to 12/1/16 11:59 PM IDOT Detour posted.; *** Long Term Closure ***
0.5 miles north of IL-171 to 0.5 miles south of IL-171 282.9 to 281.9 Minor Both shoulders closed, all lanes open 3/21/16 12:00 AM to 12/1/16 11:59 PM IDOT *** Long Term Closure ***
Entrance ramp from NB IL-171 281.9 Major All lanes and shoulders closed 3/31/16 12:00 AM to 12/1/16 11:59 PM IDOT Detour posted.; *** Long Term Closure ***

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Sat Sep 24 2016 22:41:04 CDT