Construction Report
Select Location
  
Updated: 4/28/17 7:02 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

Construction information transmitted by the Illinois Tollway for display on the Jane Addams Memorial (Northwest) EB and Jane Addams Memorial (Northwest) WB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

Jane Addams Memorial (Northwest) EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from E Riverside to EB I-90 12.3 to 12.4 Medium All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left IPO Lane Closed, Left Side of Ramp Closed***Long Term Closure ***
Ramp from EB I-90 to E Riverside 12.3 to 12.4 None All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left Side of Ramp Closed; *** Long Term Closure ***
Newburg Rd (+0.3 miles) to Mill Rd (+1.0 miles) 17.3 to 18.7 Medium Right lane closed, one or two lanes open 4/28/17 9:00 AM to 2:00 PM Illinois Tollway
Harmony Rd (+0.3 miles) to IL-23 (+0.1 miles) 35.6 to 36.2 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Arlington Heights Rd (+0.8 miles) to Elmhurst Rd (-0.3 miles) 71.6 to 73.3 Medium Right lane closed, two lanes open 12/24/16 12:00 AM to 8/1/17 12:00 AM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***

Jane Addams Memorial (Northwest) WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Meacham Rd (-0.4 miles) to Meacham Rd (+0.1 miles) 67.8 to 67.3 Medium Right lane closed, two or three lanes open 4/28/17 9:00 AM to 12:01 PM Illinois Tollway Rdwy Widening and Reconst
Roselle Rd (-0.1 miles) to Roselle Rd (+0.4 miles) 65.7 to 65.2 Medium Right lane closed, three lanes open 4/28/17 6:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst
Roselle Rd to Roselle Rd (+0.1 miles) 65.6 to 65.5 Medium Right lane closed, three lanes open 4/28/17 9:00 AM to 3:00 PM Illinois Tollway Bridge Reconst
IL-25 (+0.1 miles) to Airport Rd (+0.3 miles) 56.0 to 55.3 Medium Right lane closed, three lanes open 4/28/17 6:00 AM to 2:00 PM Illinois Tollway Bridge Widening and Reconst
IL-23 (-0.4 miles) to IL-23 (+0.1 miles) 36.5 to 36.0 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Ramp from WB I-90 to E Riverside 12.4 to 12.3 Medium All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left IPO Lane Closed; Left Side of Ramp Closed; *** Long Term Closure ***
Ramp from E Riverside to WB I90 12.4 to 12.3 None All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left Side of Ramp Closed; *** Long Term Closure ***

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Fri Apr 28 2017 07:03:48 CDT