Construction information transmitted by the Illinois Tollway for display on the Jane Addams Memorial (Northwest) EB and Jane Addams Memorial (Northwest) WB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

Jane Addams Memorial (Northwest) EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB Belvidere Oasis 24.0 None Partial closure 9/22/16 7:00 AM to 10/31/16 11:59 PM Illinois Tollway Right Side of Ramp Closed; *** Long Term Closure ***
Entrance ramp from EB Belvidere Oasis 24.4 None Partial closure 9/22/16 7:00 AM to 10/31/16 11:59 PM Illinois Tollway Right Side of Ramp Closed; *** Long Term Closure ***
Exit ramp to SEB US-20 42.1 Minor Partial closure 6/6/16 7:00 AM to 10/12/16 11:59 PM Illinois Tollway Pavement Repair; Shoulder Reconstruction; Right Side of Ramp closed
Ramp from EB I-90 to Randall Rd 52.1 to 52.2 None Partial closure 8/10/16 7:00 AM to 10/1/16 11:59 PM Illinois Tollway Rdwy and Bridge Reconst; Right Side of Ramp Closure; *** Long Term Closure ***
at Elgin Plaza 53.8 to 53.9 Medium Various lanes closed 9/6/16 7:00 AM to 10/28/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; Left Cash & Left Center Cash Lanes Closed*** Long Term Closure ***
Sleepy Hollow Rd (+0.5 miles) to IL-31 (+0.5 miles) 53.8 to 55.1 Medium Left lane and both shoulders closed, two or three lanes open 9/9/16 12:00 AM to 10/28/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***
Ramp from SB IL-31 to EB I-90 54.6 to 54.7 Major All lanes and shoulders closed 4/22/16 7:00 AM to 9/29/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***
Exit ramp to NB IL-31 54.7 Major All lanes and shoulders closed 4/22/16 7:00 AM to 9/29/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closures ***
Beverly Rd (+0.4 miles) to IL-72 (-0.4 miles) 58.6 to 60.9 Medium Left lane closed, two lanes open 9/26/16 9:00 AM to 7:00 PM Illinois Tollway Rdwy/Bridge Widening and Reconst
Ramp from EB I-90 to IL-59 (IL-59 Plaza 14)) 59.7 to 59.8 Medium Various lanes closed 4/29/16 12:00 AM to 9/30/16 11:59 PM Illinois Tollway Rdwy and Bridge Widening; Left Side of Ramp Closed Closed; *** Long Term Closure ***
Roselle Rd (-0.1 miles) to Roselle Rd (+0.7 miles) 65.5 to 66.3 Medium Right lane closed, two or three lanes open 9/26/16 9:00 AM to 7:00 PM Illinois Tollway Rdwy Widening and Reconst
Meacham Rd (-0.1 miles) to I-290 67.3 to 68.2 Medium Left lane closed, two or three lanes open 9/26/16 9:00 AM to 2:00 PM Illinois Tollway Rdwy Reconst
Exit ramp to NB IL-53 Local Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Exit ramp to NB IL-53 Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Exit ramp to SB I-290 / IL-53 (I-290 / IL-53 Plaza) 67.6 None Partial closure 6/21/16 12:00 AM to 9/30/16 11:59 PM Illinois Tollway Rdwy Reconst; Right IPO lane closed; *** Long Term Closure ***
Ramp from EB I-90 to SB I-290/IL-53(I-290/IL-53) Plaza 68.2 to 68.3 Medium Various lanes closed 9/23/16 7:00 AM to 10/10/16 11:59 PM Illinois Tollway Rdwy Recons; Left Cash Lane Closed; *** Long Term Clsoure ***
Entrance ramp from SB IL-53 Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
IL-72 (-0.1 miles) to I-190 (-0.1 miles) 76.1 to 78.5 Medium Left two lanes closed, one lane open 9/26/16 12:01 AM to 5:00 AM Illinois Tollway Rdwy/Bridge Reconst
IL-72 (-0.1 miles) to I-190 (-0.1 miles) 76.1 to 78.5 Minor Left lane closed, two lanes open 9/25/16 10:00 PM to 9/26/16 12:01 AM Illinois Tollway Rdwy/Bridge Reconst
Exit ramp to NB I-294 77.9 None Partial closure 9/26/16 7:00 AM to 5:00 PM Illinois Tollway Rdwy/Bridge Reconst; Right Side of Ramp closed
River Rd to I-190 (+0.2 miles) 78.3 to 78.8 Medium Left lane closed, one or two lanes open 6/16/16 5:00 AM to 11/9/16 11:59 PM Illinois Tollway Bridge Rehabilitation; *** Long Term Closure ***
at River Rd Plaza 78.5 to 78.6 Medium Various lanes closed 6/16/16 5:00 AM to 11/9/16 11:59 PM Illinois Tollway Bridge Rehabilitation; Left ORT Lane Closed; *** Long Term Closure ***
at River Rd Plaza 78.5 to 78.6 Medium Various lanes closed 8/27/16 5:00 AM to 11/9/16 11:59 PM Illinois Tollway Bridge Rehabilitation; Right Cash, Right Center Cash & Right IPO Lanes Closed; *** Long Term Closure ***

Jane Addams Memorial (Northwest) WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SB IL-53 Local 68.8 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Exit ramp to NB IL-53 Local 68.8 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Ramp from SB IL-53 to WB I-90 68.3 to 68.2 None Partial closure 9/9/16 3:00 PM to 9/26/16 11:59 PM Illinois Tollway Rdwy Reconst; Right Side of Ramp Closed; *** Long Term Closure ***
I-290 (-0.1 miles) to Meacham Rd (+0.8 miles) 68.3 to 66.6 Medium Right lane closed, two or three lanes open 7/1/16 12:00 AM to 10/1/16 11:59 PM Illinois Tollway Rdwy Reconst
Entrance ramp from EB I-90-Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB IL-53 Local 68.8 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB IL-53 Local 67.6 Minor Both shoulders closed, all lanes open 3/2/15 12:00 AM to 2/1/17 11:59 PM IDOT ***Long Term Closure***
Meacham Rd (+0.6 miles) to Roselle Rd (-0.2 miles) 66.8 to 65.8 Medium Right lane closed, two or three lanes open 9/26/16 6:00 AM to 12:01 PM Illinois Tollway Rdwy Widening and Reconst (1 Right CD Lane closed )
Meacham Rd (+0.6 miles) to Roselle Rd (+0.1 miles) 66.8 to 65.5 Medium Left lane closed, two or three lanes open 9/26/16 9:00 AM to 2:00 PM Illinois Tollway Rdwy Reconst
Exit ramp to NB Barrington Rd 62.8 Minor Left lane closed, up to three lanes open 12/21/15 8:00 PM to 11/30/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; ***Long Term Closure***
Ramp from WB I-90 to NB/SB Barrington Rd 62.3 to 62.2 Medium Left lane closed, two lanes open 10/22/15 7:00 AM to 11/30/16 11:59 PM Illinois Tollway Ramp Reconst; ** Long Term Closure ***
Ramp from WB I-90 to NB/SB Barrington Rd (Plaza 10) 62.3 to 62.2 Medium Various lanes closed 8/5/16 12:00 AM to 10/28/16 11:59 PM Illinois Tollway Ramp Reconst; Left IPO Lane Closed; ** Long Term Closure ***
Ramp from WB I-90 to IL-59 (IL-59 Plaza 16A) 59.8 to 59.7 Medium Various lanes closed 5/2/16 12:00 AM to 9/30/16 11:59 PM Illinois Tollway Rdwy and Bridge Widening; Left Cash Approach Lane Closed; *** Long Term Closure ***
IL-59 to Beverly Rd (+0.1 miles) 59.7 to 58.1 Medium Right lane closed, two lanes open 9/26/16 5:00 AM to 2:00 PM Illinois Tollway Rdwy and Bridge Widening
Ramp from WB I-90 to Beverly Rd 58.2 to 58.1 None Partial closure 5/2/16 12:00 AM to 9/30/16 11:59 PM Illinois Tollway Rdwy and Bridge Widening; Left Side of Ramp Closed; *** Long Term Closure ***
IL-25 (+0.1 miles) to Airport Rd (+0.1 miles) 56.0 to 55.5 Medium Right lane closed, two lanes open 9/26/16 6:00 AM to 2:00 PM Illinois Tollway Bridge Widening and Reconst
at Elgin Plaza 53.9 to 53.8 Medium Various lanes closed 9/6/16 12:00 AM to 10/28/16 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; Left Cash & Left Center Cash Lanes Closed*** Long Term Closure ***
Ramp from WB I-90 to Randall Rd 52.2 to 52.1 None Partial closure 8/10/16 12:00 AM to 10/1/16 11:59 PM Illinois Tollway Rdwy and Bridge Reconst; Left Side of Ramp Closed; *** Long Term Closure ***
Entrance ramp from Randall Rd 52.5 Minor Partial closure 8/12/16 7:00 AM to 10/1/16 11:59 PM Illinois Tollway Rdwy and Bridge Reconst; Left Side of Ramp closed; *** Long Term Closure ***
Exit ramp to SEB US-20 42.1 Minor Partial closure 6/6/16 7:00 AM to 10/12/16 11:59 PM Illinois Tollway Pavement Repair; Shoulder Reconstruction; Right Side of Ramp closed
Entrance ramp from SEB US-20 42.1 Minor Partial closure 6/6/16 7:00 AM to 10/12/16 11:59 PM Illinois Tollway Pavement Repair; Shoulder Reconstruction; Right Side of Ramp closed
Exit ramp to EB Belvidere Oasis 24.4 None Partial closure 9/22/16 7:00 AM to 10/31/16 11:59 PM Illinois Tollway Rdwy and Bridge Reconst; Right Side of Ramp Clsoed; *** Long Term Clsoure ***
Entrance ramp from EB Belvidere Oasis 24.0 None Partial closure 9/22/16 7:00 AM to 10/31/16 11:59 PM Illinois Tollway Rdwy and Bridge Reconst; Right Side of Ramp Clsoed; *** Long Term Clsoure ***

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Sun Sep 25 2016 10:39:18 CDT