Construction Report
Select Location
  
Updated: 8/16/17 6:35 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-55 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
at I-255 10.0 Medium Various lanes closed 8/16/17 6:00 AM to 11:59 PM,
8/17/17 6:00 AM to 11:59 PM,
8/18/17 6:00 AM to 11:59 PM,
8/21/17 6:00 AM to 11:59 PM,
... more, ending on 8/25/17
IDOT The lane closures are necessary to paint two bridges carrying Interstate 255 traffic over Interstate 55/70 and to perform pavement repairs. Two lanes will remain open during weekdays, as well as the ramp to Interstate 255.
n/o Adlai Stevenson Dr (+0.4 miles) to n/o I-72 (+0.5 miles) 94.8 to 98.0 Medium Various lanes closed 4/26/17 7:00 PM to 10/1/17 6:00 AM IDOT Pavement patching and resurfacing project. Work will take place during nighttime hours from 7 p.m. to 6 a.m. Mondays through Thursdays. Construction will begin in the southbound lanes. One lane will be closed at a time. Once southbound lanes are completed, work will begin on the northbound lanes. Expected to be completed by early fall.
Reed Rd to I-355 233.5 to 269.4 Minor Both shoulders closed, all lanes open with partial ramp closures 8/17/17 9:00 AM to 3:00 PM IDOT Moving Operation
IL-129 to Lorenzo Rd 238.4 to 240.5 Minor Left shoulder closed, all lanes open 8/17/17 9:00 AM to 3:00 PM IDOT
Weber Rd to 0.5 miles north of Willow Springs Rd 263.5 to 278.4 Minor Both shoulders closed, all lanes open 4/17/17 12:00 AM to 10/1/17 11:59 PM IDOT Various locations rough grooved surface, work zone speed limit 55mph. Daily night time lane closures.; Long Term Closure
County Line Rd to Lake Shore Dr (US-41) 276.4 to 293.7 Minor Both shoulders closed, all lanes open with partial ramp closures 8/17/17 9:00 AM to 3:00 PM IDOT Moving Operation

I-55 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake Shore Dr (US-41) to County Line Rd 293.8 to 276.4 Minor Both shoulders closed, all lanes open with partial ramp closures 8/17/17 9:00 AM to 3:00 PM IDOT Moving Operation
at IL-171 282.4 Minor Right shoulder closed, all lanes open 8/17/17 9:00 AM to 3:00 PM IDOT
at La Grange Rd (US-12/20/45) 278.9 Minor Right shoulder closed, all lanes open 8/17/17 9:00 AM to 3:00 PM IDOT
Wolf Rd to Weber Rd 277.4 to 263.5 Minor Both shoulders closed, all lanes open 4/17/17 12:00 AM to 10/1/17 11:59 PM IDOT Various locations rough grooved surface, work zone speed limit 55mph. Daily night time lane closures.; Long Term Closure
I-355 to Reed Rd 269.4 to 233.6 Minor Both shoulders closed, all lanes open with partial ramp closures 8/17/17 9:00 AM to 3:00 PM IDOT Moving Operation
0.5 miles north of Eames St (US-6) to 0.5 miles south of Eames St (US-6) 248.7 to 247.7 Minor Right shoulder closed, all lanes open 8/17/17 9:00 AM to 3:00 PM IDOT
Exit ramp to WB US-6 248.3 Major All lanes and shoulders closed 4/11/17 12:00 AM to 9/1/17 11:59 PM IDOT I 55 SB exit ramp will be reduced to 11'-6" width. Detour: None
Lorenzo Rd to IL-129 240.5 to 238.5 Minor Left shoulder closed, all lanes open 8/17/17 9:00 AM to 3:00 PM IDOT
n/o I-72 (-0.5 miles) to n/o Adlai Stevenson Dr (-0.4 miles) 98.0 to 94.8 Medium Various lanes closed 4/26/17 7:00 PM to 10/1/17 6:00 AM IDOT Pavement patching and resurfacing project. Work will take place during nighttime hours from 7 p.m. to 6 a.m. Mondays through Thursdays. Construction will begin in the southbound lanes. One lane will be closed at a time. Once southbound lanes are completed, work will begin on the northbound lanes. Expected to be completed by early fall.
at I-255 9.8 Medium Various lanes closed 8/16/17 6:00 AM to 11:59 PM,
8/17/17 6:00 AM to 11:59 PM,
8/18/17 6:00 AM to 11:59 PM,
8/21/17 6:00 AM to 11:59 PM,
... more, ending on 8/25/17
IDOT The lane closures are necessary to paint two bridges carrying Interstate 255 traffic over Interstate 55/70 and to perform pavement repairs. Two lanes will remain open during weekdays, as well as the ramp to Interstate 255.
3rd St to Tudor St 1.8 to 0.8 Medium Various lanes closed 4/19/17 9:15 AM to 8/31/17 7:00 PM IDOT Traffic will be switched from the left two lanes to the right two lanes. One lane will remain open at all times during this transition. The two right lanes are anticipated to be open by 7:00 PM. The lane closures are expected to continue through the summer.
River Park Dr to Trendley Ave (+0.1 miles) 1.5 to 0.8 Major Left two lanes closed, up to one lanes open 4/20/17 7:00 AM to 8/31/17 6:00 PM IDOT

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Wed Aug 16 2017 18:49:28 CDT