Construction Report
Select Location
  
Updated: 5/1/16 12:02 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-55 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
4th St to Missouri Ave (+0.3 miles) 1.4 to 2.1 Medium One lane closed, one or two lanes open 6/10/15 12:00 AM to 12/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6".
IL-203 to IL-111 (-0.3 miles) 4.1 to 6.1 Medium Right lane closed, two lanes open 4/22/16 3:00 PM to 5/27/16 3:00 PM IDOT
at Sand Prairie Rd (+0.7 miles) 8.6 Medium Various lanes closed 4/18/16 6:00 AM to 6/30/16 11:59 PM IDOT All EASTBOUND lanes will remain open to traffic from 3:00 PM to 6:00 PM, and all WESTBOUND lanes will remain open to traffic from 6:00 AM to 9:00 AM. Word required to paint bridges.
IL-10 (+0.2 miles) to US-136 (-0.6 miles) 126.1 to 144.0 Medium One lane closed, one to three lanes open 11/17/14 12:00 AM to 11/1/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
Reed Rd to Lorenzo Rd 233.5 to 240.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/2/16 8:30 AM to 3:00 PM IDOT Moving Operation
Reed Rd to I-355 233.5 to 269.4 Minor Both shoulders closed, all lanes open with partial ramp closures 5/2/16 9:00 AM to 3:00 PM IDOT Moving Operation
Lorenzo Rd to I-80 240.5 to 250.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/2/16 9:00 AM to 2:00 PM IDOT Moving Operation
1.0 miles south of Arsenal Rd to Arsenal Rd 244.6 to 245.6 Minor Right shoulder closed, all lanes open 5/2/16 9:00 AM to 3:00 PM IDOT
0.5 miles south of Eames St (US-6) to 0.5 miles north of Eames St (US-6) 247.7 to 248.7 Minor Both shoulders closed, all lanes open 11/2/15 12:00 AM to 6/30/16 11:59 PM IDOT Long Term Closure
Entrance ramp from EB I-80 250.2 Minor Right shoulder closed, all lanes open 5/2/16 9:00 AM to 3:00 PM IDOT
I-80 to Weber Rd 250.3 to 263.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/2/16 9:30 AM to 2:30 PM IDOT Moving Operation
at Lincoln Hwy (US-30) 257.5 Minor Right shoulder closed, all lanes open 5/2/16 9:00 AM to 3:00 PM IDOT
Weber Rd to 1.0 miles north of Weber Rd 263.5 to 264.5 Minor Right shoulder closed, all lanes open 5/2/16 9:00 AM to 3:00 PM IDOT
Weber Rd to Dan Ryan Expy (I-94) 263.5 to 292.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/2/16 10:00 AM to 2:00 PM IDOT Moving Operation
County Line Rd to Lake Shore Dr (US-41) 276.4 to 293.8 Minor Both shoulders closed, all lanes open with partial ramp closures 5/2/16 9:00 AM to 3:00 PM IDOT Moving Operation
0.5 miles south of IL-171 to 0.5 miles north of IL-171 281.9 to 282.9 Minor Both shoulders closed, all lanes open 3/21/16 12:00 AM to 12/1/16 11:59 PM IDOT Long Term Closure
Exit ramp to NB IL-171 282.4 Major All lanes and shoulders closed 3/31/16 12:00 AM to 12/1/16 11:59 PM IDOT Detour posted.; Long Term Closure
Entrance ramp from NB IL-171 282.8 Major All lanes and shoulders closed 3/31/16 12:00 AM to 12/1/16 11:59 PM IDOT Long Term Closure. Detours Will Be Posted; Rehabilitation and widening of eight bridges along northbound Illinois 171 between 47th Street and 55th Street. It also will include bridge replacement of northbound Illinois 171 over Interstate 55. In addition, the improvements will feature ramp modification, wall repairs, asphalt resurfacing, pavement markings, landscaping, and replacements of signs, roadway lighting, high mast light towers and drainage structures.
Entrance ramp from Cicero Ave 286.4 None Partial closure 5/2/16 9:00 AM to 3:00 PM IDOT
Exit ramp to NB Dan Ryan Expy 291.5 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Dan Ryan Expy (I-94) to Canal St 292.4 to 292.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/2/16 10:00 AM to 2:30 PM IDOT Moving Operation
Canal St to Lake Shore Dr (US-41) 292.6 to 293.8 Medium Right lane and right shoulder closed, two or three lanes open 10/22/15 12:00 AM to 8/31/16 11:59 PM IDOT Traffic lanes weaved; Long Term Closure
Exit ramp to NB Lake Shore Dr 293.8 None Partial closure 10/22/15 12:00 AM to 8/31/16 11:59 PM IDOT Shoulders closed. Lanes reduced.; Long Term Closure
Exit ramp to SB Lake Shore Dr 293.8 None Partial closure 10/22/15 12:00 AM to 8/31/16 11:59 PM IDOT Shoulders closed. 11' width restriction.; Long Term Closure

I-55 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from NB Lake Shore Dr 293.9 None Partial closure 6/11/15 12:00 AM to 5/31/16 11:59 PM IDOT Lane shifted and width reduction (11') ***Long Term Closure***
Entrance ramp from SB Lake Shore Dr 293.9 Minor Left lane closed, one lane open 6/11/15 7:00 AM to 8/26/16 11:59 PM IDOT *** Long Term Closure ***
Lake Shore Dr (US-41) to Dan Ryan Expy (I-90/94) 293.9 to 292.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/2/16 9:00 AM to 2:00 PM IDOT Moving Operation
Lake Shore Dr (US-41) to County Line Rd 293.9 to 276.4 Minor Both shoulders closed, all lanes open with partial ramp closures 5/2/16 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to NB Dan Ryan Expy 292.9 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT Yield to NB I-55 exit to NB I-90/94 ***Long Term Closure***
Dan Ryan Expy (I-90/94) to Weber Rd 292.4 to 263.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/2/16 9:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to NB IL-171 282.8 Major All lanes and shoulders closed 3/31/16 12:00 AM to 12/1/16 11:59 PM IDOT Detour posted.; Long Term Closure
0.5 miles north of IL-171 to 0.5 miles south of IL-171 282.9 to 281.9 Minor Both shoulders closed, all lanes open 3/21/16 12:00 AM to 12/1/16 11:59 PM IDOT Long Term Closure
Entrance ramp from NB IL-171 281.9 Major All lanes and shoulders closed 3/31/16 12:00 AM to 12/1/16 11:59 PM IDOT Detour posted.; Long Term Closure
I-355 to Reed Rd 269.4 to 233.6 Minor Both shoulders closed, all lanes open with partial ramp closures 5/2/16 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from SB I-355 268.5 Minor Right shoulder closed, all lanes open 5/2/16 9:00 AM to 3:00 PM IDOT
Weber Rd to I-80 263.5 to 250.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/2/16 10:00 AM to 2:00 PM IDOT Moving Operation
Exit ramp to US-30 257.7 None Partial closure 6/29/15 12:00 AM to 6/30/17 11:59 PM IDOT 2nd Right turn lane closed ***Long Term Closure***
I-80 to Lorenzo Rd 250.3 to 240.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/2/16 8:30 AM to 1:30 PM IDOT Moving Operation
0.5 miles north of Eames St (US-6) to 0.5 miles south of Eames St (US-6) 248.7 to 247.7 Minor Both shoulders closed, all lanes open 11/2/15 12:00 AM to 6/30/16 11:59 PM IDOT Long Term Closure
Lorenzo Rd to Reed Rd 240.5 to 233.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/2/16 8:30 AM to 3:00 PM IDOT Moving Operation
US-136 (+0.6 miles) to IL-10 (-0.2 miles) 144.2 to 126.0 Medium Right lane closed, one or two lanes open 11/17/14 12:00 AM to 11/1/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
at Sand Prairie Rd (-0.7 miles) 8.5 Medium Various lanes closed 4/18/16 6:00 AM to 6/30/16 11:59 PM IDOT All EASTBOUND lanes will remain open to traffic from 3:00 PM to 6:00 PM, and all WESTBOUND lanes will remain open to traffic from 6:00 AM to 9:00 AM. Word required to paint bridges.
Dr Martin Luther King Jr Mem Brg (-0.3 miles) to 4th St 1.9 to 1.2 Medium One lane closed, one or two lanes open 6/10/15 12:00 AM to 12/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6".
3rd St to Tudor Ave 1.4 to 0.8 Medium Various lanes closed 2/29/16 7:00 AM to 3/21/17 11:59 PM IDOT One lane of traffic will be closed at all times. The initial stage of work will require a closure of the right lane through November of 2016 and will be followed immediately by the next stage of work, which will require a closure of the left lane until Spring of 2017. Motorists are urged to plan accordingly and use alternate routes including the I-70 Stan Musial Veterans Memorial Bridge or the Martin Luther King Bridge.

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Sun May 01 2016 14:19:50 CDT