Cook County (Suburban) (Illinois)
EB US-30 from Lincolnway Dr (+0.2 miles) to Church St
|
|
Medium |
Various lanes closed |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from Church St to IL-83
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from IL-83 to Maple St
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from Maple St to Lincolnway Dr (-0.2 miles)
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
EB IL-19 at Barrington Rd
|
|
Medium |
Various lanes closed |
7/8/22 7:00 AM to 7/12/23 7:00 PM |
IDOT D1 |
Intersection improvement |
WB IL-19 at Barrington Rd
|
|
Medium |
Various lanes closed |
7/8/22 7:00 AM to 7/12/23 7:00 PM |
IDOT D1 |
Intersection improvement |
NB Ashland Ave from Wood St to 138th St
|
|
Minor |
Various lanes closed |
1/6/23 8:00 AM to 2/1/23 6:00 PM |
IDOT D1 |
Water main replacement project will require intermittent daytime lane closures in both directions of Wood Street/Ashland Avenue, from 138th Street, in Riverdale, to 159th Street, in Harvey |
SB Ashland Ave from 138th St to Wood St
|
|
Minor |
Various lanes closed |
1/6/23 8:00 AM to 2/1/23 6:00 PM |
IDOT D1 |
Water main replacement project will require intermittent daytime lane closures in both directions of Wood Street/Ashland Avenue, from 138th Street, in Riverdale, to 159th Street, in Harvey |
NB Barrington Rd from Laurel Ave to Bristol Ln
|
|
Medium |
Various lanes closed |
7/18/22 12:00 AM to 8/6/23 11:59 PM |
IDOT D1 |
Intersection Improvement and Traffic Signal Modernization. |
SB Barrington Rd from Bristol Ln to Laurel Ave
|
|
Medium |
Various lanes closed |
7/18/22 12:00 AM to 8/6/23 11:59 PM |
IDOT D1 |
Intersection Improvement and Traffic Signal Modernization. |
NWB Brainard Ave from IN-312 to Muskegon Ave
|
|
Minor |
Various lanes closed |
10/11/22 7:30 AM to 6/14/23 6:00 PM |
IDOT D1 |
|
SEB Brainard Ave from Muskegon Ave to IN-312
|
|
Minor |
Various lanes closed |
10/11/22 7:30 AM to 6/14/23 6:00 PM |
IDOT D1 |
|
NB East Ave from Joliet Rd to 55th St
|
|
Medium |
All lanes closed and both shoulders open |
3/7/22 12:00 AM to 12/22/23 11:59 PM |
IDOT D1 |
CHANNELIZATION IMPROVEMENTS AT THE INTERSECTIONS OF EAST AVE. AT JOLIET RD. AND 55TH ST., TRAFFIC SIGNAL MODERNIZATION, DRAINAGE IMPROVEMENTS, RETAINING WALLS, CULVERT REHABILITATION, AND MODIFICATIONS TO LIGHTING IN MCCOOK, HODGKINS, AND COUNTRYSIDE. |
SB East Ave from 55th St to Joliet Rd
|
|
Medium |
All lanes closed and both shoulders open |
3/7/22 12:00 AM to 12/22/23 11:59 PM |
IDOT D1 |
CHANNELIZATION IMPROVEMENTS AT THE INTERSECTIONS OF EAST AVE. AT JOLIET RD. AND 55TH ST., TRAFFIC SIGNAL MODERNIZATION, DRAINAGE IMPROVEMENTS, RETAINING WALLS, CULVERT REHABILITATION, AND MODIFICATIONS TO LIGHTING IN MCCOOK, HODGKINS, AND COUNTRYSIDE. |
EB Irving Park Rd (IL-19) from Briar Ln to Kingsbury Dr
|
|
Medium |
Various lanes closed |
7/18/22 12:00 AM to 8/6/23 11:59 PM |
IDOT D1 |
Intersection Improvement and Traffic Signal Modernization. |
WB Irving Park Rd (IL-19) from Kingsbury Dr to Briar Ln
|
|
Medium |
Various lanes closed |
7/18/22 12:00 AM to 8/6/23 11:59 PM |
IDOT D1 |
Intersection Improvement and Traffic Signal Modernization. |
NEB Joliet Rd at I-294
|
|
Minor |
Various lanes closed |
3/14/22 12:00 AM to 12/31/23 11:59 PM |
Illinois Tollway |
Bridge work |
SWB Joliet Rd at I-294
|
|
Minor |
Various lanes closed |
3/14/22 12:00 AM to 12/31/23 11:59 PM |
Illinois Tollway |
Bridge work |
EB Oakton St from Harlem Ave to Long Ave
|
|
Minor |
Various lanes closed |
8/22/22 12:00 AM to 6/15/23 11:59 PM |
IDOT D1 |
Designed overlay & ADA Improvements. |
WB Oakton St from Long Ave to Harlem Ave
|
|
Minor |
Various lanes closed |
8/22/22 12:00 AM to 6/15/23 11:59 PM |
IDOT D1 |
Designed overlay & ADA Improvements. |
EB Steger Rd at I-57
|
|
Minor |
Various lanes closed |
7/7/21 12:00 AM to 6/3/23 11:59 PM |
IDOT D1 |
Demolition and reconstruction of the existing bridge deck and corresponding concrete approaches, resurfacing to meet the bridge approaches, reconstruction and expansion of the outside shoulders, the removal and replacement of existing guardrail, and various drainage and grading improvements. Detour: Detour Routes effective 7/21/2021 thru 5/17/2022.
EB Steger Road traffic to be rerouted along Northbound Ridgeland Ave., Eastbound Sauk Trail, Southbound Cicero Ave to Steger Rd. NB Cicero Ave traffic trying to use Westbound Steger Rd. will be rerouted along Northbound Cicero Ave, Westbound Sauk Trail, Southbound Ridgeland Ave to Steger Rd. SB Cicero Ave traffic will be routed along Westbound Sauk Trail, Southbound Ridgeland Ave to Steger Rd. |
NB Western Ave at 139th St
|
|
Minor |
Various lanes closed |
10/17/22 12:00 AM to 4/30/23 11:59 PM |
IDOT D1 |
Upgrade traffic signals; Constructing new ADA-compliant sidewalk ramps |
SB Western Ave at 139th St
|
|
Minor |
Various lanes closed |
10/17/22 12:00 AM to 4/30/23 11:59 PM |
IDOT D1 |
Upgrade traffic signals; Constructing new ADA-compliant sidewalk ramps |
NB Wood St from 158th St to Thornton Rd
|
|
Minor |
Various lanes closed |
1/6/23 8:00 AM to 2/1/23 6:00 PM |
IDOT D1 |
Water main replacement project will require intermittent daytime lane closures in both directions of Wood Street/Ashland Avenue, from 138th Street, in Riverdale, to 159th Street, in Harvey |
SB Wood St from Thornton Rd to 158th St
|
|
Minor |
Various lanes closed |
1/6/23 8:00 AM to 2/1/23 6:00 PM |
IDOT D1 |
Water main replacement project will require intermittent daytime lane closures in both directions of Wood Street/Ashland Avenue, from 138th Street, in Riverdale, to 159th Street, in Harvey |
Effingham County (Illinois)
NB US-45 from US-40 to I-57
|
|
Medium |
Various lanes closed |
7/6/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
NB US-45 from US-40 to I-57
|
|
Medium |
Various lanes closed |
8/1/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'. |
NB US-45 from US-40 to I-57
|
|
Medium |
Various lanes closed |
8/1/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'. |
NB US-45 from US-40 to I-57
|
|
Medium |
Various lanes closed |
7/6/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
SB US-45 from I-57 to US-40
|
|
Medium |
Various lanes closed |
7/6/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
SB US-45 from I-57 to US-40
|
|
Medium |
Various lanes closed |
7/6/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
SB US-45 from I-57 to US-40
|
|
Medium |
Various lanes closed |
8/1/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'. |
SB US-45 from I-57 to US-40
|
|
Medium |
Various lanes closed |
8/1/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'. |
Kane County (Illinois)
NB IL-47 at Main St
|
|
Medium |
Various lanes closed |
6/29/20 12:00 AM to 5/31/23 11:59 PM |
IDOT D1 |
Intersection Improvement, Traffic Signal Installation, Bridge Replacement. |
SB IL-47 at Main St
|
|
Medium |
Various lanes closed |
6/29/20 12:00 AM to 5/31/23 11:59 PM |
IDOT D1 |
Intersection Improvement, Traffic Signal Installation, Bridge Replacement. |
EB IL-72 from Schmidt Dr to Warner St
|
|
Medium |
Various lanes closed |
3/1/22 12:00 AM to 5/31/23 11:59 PM |
IDOT D1 |
IL Rt 72 will be reduced to 11 foot lanes with the left turn lane beind closed at State St. States St will be closed for a 75 calendar days for the construction of the box culvert on State St. Getzelman road will be closed for 3 weeks for construction after State Street is reopened. Barrier Wall will be used in drop off areas. Traffic Signal and Lighting installation occurring during the winter months and planting of trees in the spring. Detour: State Street/Getzelman Road closures will have a detour route in either direction (West Bound or East Bound).
East Bound to State Street will be IL Rt 72 to IL Rt 47, north to US 20, West to Allen Road (West), south on State Street.
West bound to State Street wil be IL Rt 72 to Walker Road, North to Allen Road (East), South on State Street. |
WB IL-72 from Warner St to Schmidt Dr
|
|
Medium |
Various lanes closed |
3/1/22 12:00 AM to 5/31/23 11:59 PM |
IDOT D1 |
IL Rt 72 will be reduced to 11 foot lanes with the left turn lane beind closed at State St. States St will be closed for a 75 calendar days for the construction of the box culvert on State St. Getzelman road will be closed for 3 weeks for construction after State Street is reopened. Barrier Wall will be used in drop off areas. Traffic Signal and Lighting installation occurring during the winter months and planting of trees in the spring. Detour: State Street/Getzelman Road closures will have a detour route in either direction (West Bound or East Bound).
East Bound to State Street will be IL Rt 72 to IL Rt 47, north to US 20, West to Allen Road (West), south on State Street.
West bound to State Street wil be IL Rt 72 to Walker Road, North to Allen Road (East), South on State Street. |
WB Keslinger Rd from Fisher Dr (+0.2 miles) to Peck Rd
|
|
Minor |
Various lanes closed |
10/17/22 7:00 AM to 12/18/23 5:00 PM |
IDOT D1 |
Repair and reconstruction work on portions of the north side of Keslinger Road from Peck Road to a half mile east of Peck Road |
EB Lincoln Hwy (IL-38) from IL-47 to IL-31
|
|
Medium |
Various lanes closed |
9/12/22 12:00 AM to 5/31/23 11:59 PM |
IDOT D1 |
Moving daily lane closures controlled by flaggers for crack sealing and striping. |
WB Lincoln Hwy (IL-38) from IL-31 to IL-47
|
|
Medium |
Various lanes closed |
9/12/22 12:00 AM to 5/31/23 11:59 PM |
IDOT D1 |
Moving daily lane closures controlled by flaggers for crack sealing and striping. |
EB Ogden Ave (US-34) from Ogden Falls Blvd to Pointe Blvd
|
|
Medium |
Right lane closed, up to two lanes open |
1/18/23 9:00 AM to 1/31/23 11:59 PM |
IDOT D1 |
Utility line clearance tree trimming. Alternating EB and WB closures. |
WB Ogden Ave (US-34) from Pointe Blvd to Ogden Falls Blvd
|
|
Medium |
Right lane closed, up to two lanes open |
1/18/23 9:00 AM to 1/31/23 11:59 PM |
IDOT D1 |
Utility line clearance tree trimming. Alternating EB and WB closures. |
Lake County (Illinois)
EB IL-120 from O'Plaine Rd to US-41
|
|
Minor |
All lanes with unknown impact |
10/5/22 7:00 AM to 6/30/23 3:00 PM |
Lake County |
Roadway lighting improvement. |
WB IL-120 from US-41 to O'Plaine Rd
|
|
Minor |
All lanes with unknown impact |
10/5/22 7:00 AM to 6/30/23 3:00 PM |
Lake County |
Roadway lighting improvement. |
EB IL-132 at IL-83
|
|
Minor |
All lanes with unknown impact |
3/1/22 7:00 AM to 11/1/23 3:00 PM |
Lake County |
|
EB IL-132 from Sheehan Dr to Munn Rd
|
|
Medium |
Various lanes closed |
11/1/21 12:00 AM to 6/1/24 11:59 PM |
IDOT D1 |
Dry land bridge replacement, box culvert replacement, roadway reconstruction, roadway widening, water and sanitary line relocation and resurfacing on IL 132 from Sheehan Drive to Munn Rd. |
WB IL-132 from Munn Rd to Sheehan Dr
|
|
Medium |
Various lanes closed |
11/1/21 12:00 AM to 6/1/24 11:59 PM |
IDOT D1 |
Dry land bridge replacement, box culvert replacement, roadway reconstruction, roadway widening, water and sanitary line relocation and resurfacing on IL 132 from Sheehan Drive to Munn Rd. |
WB IL-132 at IL-83
|
|
Minor |
All lanes with unknown impact |
3/1/22 7:00 AM to 11/1/23 3:00 PM |
Lake County |
|
EB IL-173 at Lake Ave
|
|
Medium |
Various lanes closed |
3/15/22 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
Traffic Signal Installation and Channelization of IL 173 at North Lake Ave. |
WB IL-173 at Lake Ave
|
|
Medium |
Various lanes closed |
3/15/22 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
Traffic Signal Installation and Channelization of IL 173 at North Lake Ave. |
EB Aptakisic Rd from IL-83 to Buffalo Grove Rd
|
|
Minor |
All lanes with unknown impact |
1/30/23 7:00 AM to 2/13/23 3:00 PM |
Lake County |
|
WB Aptakisic Rd from Buffalo Grove Rd to IL-83
|
|
Minor |
All lanes with unknown impact |
1/30/23 7:00 AM to 2/13/23 3:00 PM |
Lake County |
|
EB Belvidere Rd (IL-120) from O'Plaine Rd to Skokie Hwy (US-41)
|
|
Medium |
Various lanes closed |
10/3/22 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
Roadway lighting improvement. Light tower and foundation removal. Install new light poles, foundations, LED luminaires, controllers, conduits and cables, excavations and site restorations. |
WB Belvidere Rd (IL-120) from Skokie Hwy (US-41) to O'Plaine Rd
|
|
Medium |
Various lanes closed |
10/3/22 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
Roadway lighting improvement. Light tower and foundation removal. Install new light poles, foundations, LED luminaires, controllers, conduits and cables, excavations and site restorations. |
EB Deerpath Rd from Chiltern Dr to Golf Ln
|
|
Minor |
Various lanes closed |
11/30/20 12:00 AM to 5/31/23 11:59 PM |
IDOT D1 |
US 41@Deerpath Rd-PS #38. new pump station #38 in the SE quadrant of Deerpath Rd @ Ahwahnee Lane, decommissioning existing pump station at bridge abutment (SN 049-0033). 2 detention ponds in Lake Forest golf course, 2 new retention walls, resurfacing, drainage repairs. |
WB Deerpath Rd from Golf Ln to Chiltern Dr
|
|
Minor |
Various lanes closed |
11/30/20 12:00 AM to 5/31/23 11:59 PM |
IDOT D1 |
US 41@Deerpath Rd-PS #38. new pump station #38 in the SE quadrant of Deerpath Rd @ Ahwahnee Lane, decommissioning existing pump station at bridge abutment (SN 049-0033). 2 detention ponds in Lake Forest golf course, 2 new retention walls, resurfacing, drainage repairs. |
Massac County (Illinois)
NB US-45 from 2nd St (-0.2 miles) to 2nd St
|
|
Medium |
Various lanes closed |
1/31/13 6:00 AM to 1/1/51 5:59 AM |
IDOT D1 |
Bridge is restricted to mostly passanger vehicles. Width, Height, and Weight is restricted to less than legal. Vehicle height restricted to 9' 6", width to 8', weight to 30 tons. |
NB US-45 from 2nd St (-0.2 miles) to 2nd St
|
|
Medium |
Various lanes closed |
1/31/13 6:00 AM to 1/1/51 5:59 AM |
IDOT D1 |
Bridge is restricted to mostly passanger vehicles. Width, Height, and Weight is restricted to less than legal. Vehicle height restricted to 9' 6", width to 8', weight to 30 tons. |
SB US-45 from 2nd St to 2nd St (+0.2 miles)
|
|
Medium |
Various lanes closed |
1/31/13 6:00 AM to 1/1/51 5:59 AM |
IDOT D1 |
Bridge is restricted to mostly passanger vehicles. Width, Height, and Weight is restricted to less than legal. Vehicle height restricted to 9' 6", width to 8', weight to 30 tons. |
SB US-45 from 2nd St to 2nd St (+0.2 miles)
|
|
Medium |
Various lanes closed |
1/31/13 6:00 AM to 1/1/51 5:59 AM |
IDOT D1 |
Bridge is restricted to mostly passanger vehicles. Width, Height, and Weight is restricted to less than legal. Vehicle height restricted to 9' 6", width to 8', weight to 30 tons. |
Moultrie County (Illinois)
WB US-36 from 000 to IL-32
|
|
Medium |
Various lanes closed |
9/12/22 6:00 AM to 12/2/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6". |
WB US-36 from 000 to IL-32
|
|
Medium |
Various lanes closed |
9/12/22 6:00 AM to 12/2/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
WB US-36 from IL-32 to Airport Rd
|
|
Medium |
Various lanes closed |
8/22/22 6:00 AM to 7/22/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 15'. |
WB US-36 from IL-32 to Airport Rd
|
|
Medium |
Various lanes closed |
8/22/22 6:00 AM to 7/22/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 15'. |
NB IL-32 from IL-121 to IL-133
|
|
Medium |
Various lanes closed |
5/16/22 6:00 AM to 6/1/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6". |
NB IL-32 from IL-121 to IL-133
|
|
Medium |
Various lanes closed |
5/16/22 6:00 AM to 6/1/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6". |
SB IL-32 from IL-133 to IL-121
|
|
Medium |
Various lanes closed |
5/16/22 6:00 AM to 6/1/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6". |
SB IL-32 from IL-133 to IL-121
|
|
Medium |
Various lanes closed |
5/16/22 6:00 AM to 6/1/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6". |
Will County (Illinois)
EB US-30 from I-80 to Church St
|
|
Medium |
Various lanes closed |
10/20/22 7:00 AM to 6/20/23 5:00 PM |
IDOT D1 |
|
EB US-30 from I-80 to Lincolnway Dr (+0.2 miles)
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
EB US-30 from Lincolnway Dr (+0.2 miles) to Church St
|
|
Medium |
Various lanes closed |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from Maple St to Lincolnway Dr (-0.2 miles)
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from Lincolnway Dr (-0.2 miles) to I-80
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from Church St to I-80
|
|
Medium |
Various lanes closed |
10/20/22 7:00 AM to 6/20/23 5:00 PM |
IDOT D1 |
|
WB Steger Rd at I-57
|
|
Minor |
Various lanes closed |
7/7/21 12:00 AM to 6/3/23 11:59 PM |
IDOT D1 |
Demolition and reconstruction of the existing bridge deck and corresponding concrete approaches, resurfacing to meet the bridge approaches, reconstruction and expansion of the outside shoulders, the removal and replacement of existing guardrail, and various drainage and grading improvements. Detour: Detour Routes effective 7/21/2021 thru 5/17/2022.
EB Steger Road traffic to be rerouted along Northbound Ridgeland Ave., Eastbound Sauk Trail, Southbound Cicero Ave to Steger Rd. NB Cicero Ave traffic trying to use Westbound Steger Rd. will be rerouted along Northbound Cicero Ave, Westbound Sauk Trail, Southbound Ridgeland Ave to Steger Rd. SB Cicero Ave traffic will be routed along Westbound Sauk Trail, Southbound Ridgeland Ave to Steger Rd. |
NB Wolf Rd from 187th St to 183rd St
|
|
Medium |
All lanes and shoulders closed |
7/25/22 12:00 AM to 9/9/23 11:59 PM |
IDOT D1 |
The proposed improvement consists of removal of the existing superstructure of the two lane structure over I-80, widening the piers and abutments to accommodate a new 2 lane superstructure with shoulders and a 10 foot wide Multi-use path, milling and resurfacing the existing PCC pavement with PCC patching as required, construction of a 10 foot wide PCC Multi-use path, embankment widening, drainage work, landscaping; and collateral work necessary to complete the improvement. Detour: For motorists traveling North on Wolf Road the detour route will be 191st Street EB to LaGrange Road NB to 179th Street WB Road to Wolf Road. For motorists traveling Southbound on Wolf Road the detour will be 179th Street East to Old LaGrange Road SB to 191st Street WB to Wolf Road. |
SB Wolf Rd from 183rd St to 187th St
|
|
Medium |
All lanes and shoulders closed |
7/25/22 12:00 AM to 9/9/23 11:59 PM |
IDOT D1 |
The proposed improvement consists of removal of the existing superstructure of the two lane structure over I-80, widening the piers and abutments to accommodate a new 2 lane superstructure with shoulders and a 10 foot wide Multi-use path, milling and resurfacing the existing PCC pavement with PCC patching as required, construction of a 10 foot wide PCC Multi-use path, embankment widening, drainage work, landscaping; and collateral work necessary to complete the improvement. Detour: For motorists traveling North on Wolf Road the detour route will be 191st Street EB to LaGrange Road NB to 179th Street WB Road to Wolf Road. For motorists traveling Southbound on Wolf Road the detour will be 179th Street East to Old LaGrange Road SB to 191st Street WB to Wolf Road. |