Cook County (Suburban) (Illinois)
NWB US-14 from Busse Hwy to Des Plaines River Rd
|
|
Medium |
Various lanes closed |
4/10/23 6:00 AM to 7/14/23 11:59 PM |
IDOT D1 |
Bridge repairs. One lane in both directions, with lane widths reduced to 9.6 feet over the bridge. Throughout construction, left turns will be prohibited at the intersection of Miner Street and River Road. In addition, right turns from northbound River Road onto Miner Street will not be allowed and access to Campground Road from Miner Street will be closed through mid-May. During that time, motorists should follow the posted detour. |
SEB US-14 from Des Plaines River Rd to Busse Hwy
|
|
Medium |
Various lanes closed |
4/10/23 6:00 AM to 7/14/23 11:59 PM |
IDOT D1 |
Bridge repairs. One lane in both directions, with lane widths reduced to 9.6 feet over the bridge. Throughout construction, left turns will be prohibited at the intersection of Miner Street and River Road. In addition, right turns from northbound River Road onto Miner Street will not be allowed and access to Campground Road from Miner Street will be closed through mid-May. During that time, motorists should follow the posted detour. |
EB US-30 from near Lincolnway Dr to Church St
|
|
Medium |
Various lanes closed |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from Church St to IL-83
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from IL-83 to Maple St
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from Maple St to Lincolnway Dr
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
EB IL-19 at Barrington Rd
|
|
Medium |
Various lanes closed |
7/8/22 7:00 AM to 7/12/23 7:00 PM |
IDOT D1 |
Intersection improvement |
WB IL-19 at Barrington Rd
|
|
Medium |
Various lanes closed |
7/8/22 7:00 AM to 7/12/23 7:00 PM |
IDOT D1 |
Intersection improvement |
NB IL-25 from I-90 to IL-72
|
|
Medium |
Various lanes closed |
3/13/23 12:00 AM to 8/31/23 11:59 PM |
IDOT D1 |
Resurfacing |
SB IL-25 from IL-72 to I-90
|
|
Medium |
Various lanes closed |
3/13/23 12:00 AM to 8/31/23 11:59 PM |
IDOT D1 |
Resurfacing |
NB IL-50 at Steger Rd
|
|
None |
All lanes and shoulders open |
4/24/23 12:00 AM to 10/31/23 11:59 PM |
IDOT D1 |
Reconstruction of existing two-way stop intersection to a signalized intersection |
SB IL-50 at Steger Rd
|
|
Minor |
All lanes and shoulders open |
4/24/23 8:00 AM to 10/31/23 5:00 PM |
IDOT D1 |
Intersection improvement. |
SB IL-50 at Steger Rd
|
|
None |
All lanes and shoulders open |
4/24/23 12:00 AM to 10/31/23 11:59 PM |
IDOT D1 |
Reconstruction of existing two-way stop intersection to a signalized intersection |
NB IL-83 from Prospect Ave to US-14
|
|
Medium |
Various lanes closed |
4/26/23 8:00 AM to 10/18/23 5:00 PM |
IDOT D1 |
Resurfacing. Intermittent daytime lane closures |
SB IL-83 from US-14 to Evergreen Ave
|
|
Medium |
Various lanes closed |
4/26/23 8:00 AM to 10/18/23 5:00 PM |
IDOT D1 |
Resurfacing. Intermittent daytime lane closures |
NB IL-171 from 47th St to Archer Rd
|
|
Medium |
Various lanes closed |
5/1/22 12:00 AM to 8/11/23 11:59 PM |
IDOT D1 |
This work shall consist of the surface preparation and application of a concrete
sealer or protective coat upon the entire top surface of the deck and the tops and inside vertical faces of the parapets of the structure(s), as outlined in the contract. |
SB IL-171 from Archer Rd to 47th St
|
|
Medium |
Various lanes closed |
5/1/22 12:00 AM to 8/11/23 11:59 PM |
IDOT D1 |
This work shall consist of the surface preparation and application of a concrete
sealer or protective coat upon the entire top surface of the deck and the tops and inside vertical faces of the parapets of the structure(s), as outlined in the contract. |
NB 86th Ave at IL-7
|
|
Minor |
Various lanes closed |
5/15/23 12:00 AM to 8/5/23 11:59 PM |
IDOT D1 |
Cleaning and painting of the bridge carrying 86th Avenue over Southwest Highway (Illinois 7) |
SB 86th Ave at IL-7
|
|
Minor |
Various lanes closed |
5/15/23 12:00 AM to 8/5/23 11:59 PM |
IDOT D1 |
Cleaning and painting of the bridge carrying 86th Avenue over Southwest Highway (Illinois 7) |
EB Algonquin Rd from IL-83 to Wolf Rd
|
|
Minor |
Various lanes closed |
4/26/23 8:00 AM to 10/18/23 5:00 PM |
IDOT D1 |
Resurfacing. Intermittent daytime lane closures |
WB Algonquin Rd from Wolf Rd to IL-83
|
|
Minor |
Various lanes closed |
4/26/23 8:00 AM to 10/18/23 5:00 PM |
IDOT D1 |
Resurfacing. Intermittent daytime lane closures |
NB Ashland Ave from Wood St to 138th St
|
|
Minor |
Various lanes closed |
6/7/23 8:00 AM to 11/1/23 5:00 PM |
IDOT D1 |
Bridge rehabilitation |
NB Ashland Ave from Wood St to 138th St
|
|
Medium |
All lanes and shoulders closed |
6/7/23 8:00 AM to 11/12/23 3:02 PM |
IDOT D1 |
Bridge rehabilitation work and is anticipated to be completed in late fall. A posted detour will direct motorists to Halsted, 147th (Sibley Boulevard) and 127th streets. |
SB Ashland Ave from 138th St to Wood St
|
|
Minor |
Various lanes closed |
6/7/23 8:00 AM to 11/1/23 5:00 PM |
IDOT D1 |
Bridge rehabilitation |
SB Ashland Ave from 138th St to Wood St
|
|
Medium |
All lanes and shoulders closed |
6/7/23 8:00 AM to 11/12/23 3:02 PM |
IDOT D1 |
Bridge rehabilitation work and is anticipated to be completed in late fall. A posted detour will direct motorists to Halsted, 147th (Sibley Boulevard) and 127th streets. |
NB Barrington Rd from Laurel Ave to Bristol Ln
|
|
Medium |
Various lanes closed |
7/18/22 12:00 AM to 8/6/23 11:59 PM |
IDOT D1 |
Intersection Improvement and Traffic Signal Modernization. |
NB Barrington Rd from Farmington Dr to Stone Canyon Way
|
|
Minor |
Various lanes closed |
4/8/23 8:00 AM to 8/20/23 6:00 PM |
IDOT D1 |
|
SB Barrington Rd from Stone Canyon Way to Farmington Dr
|
|
Minor |
Various lanes closed |
4/8/23 8:00 AM to 8/20/23 6:00 PM |
IDOT D1 |
|
SB Barrington Rd from Bristol Ln to Laurel Ave
|
|
Medium |
Various lanes closed |
7/18/22 12:00 AM to 8/6/23 11:59 PM |
IDOT D1 |
Intersection Improvement and Traffic Signal Modernization. |
NWB Brainard Ave from IN-312 to Muskegon Ave
|
|
Minor |
Various lanes closed |
10/11/22 7:30 AM to 6/14/23 6:00 PM |
IDOT D1 |
|
SEB Brainard Ave from Muskegon Ave to IN-312
|
|
Minor |
Various lanes closed |
10/11/22 7:30 AM to 6/14/23 6:00 PM |
IDOT D1 |
|
NB Dixie Hwy at 151st St
|
|
Minor |
Various lanes closed |
5/1/23 12:00 AM to 9/20/23 11:59 PM |
IDOT D1 |
Removal and replacement of culvert located on Dixie Highway over ditch (1 Mile N of US 6) located in the city of Harvey, Cook County. Detour: During staging, East leg and West leg of 151st street will be closed off at various times. |
SB Dixie Hwy at 151st St
|
|
Minor |
Various lanes closed |
5/1/23 12:00 AM to 9/20/23 11:59 PM |
IDOT D1 |
Removal and replacement of culvert located on Dixie Highway over ditch (1 Mile N of US 6) located in the city of Harvey, Cook County. Detour: During staging, East leg and West leg of 151st street will be closed off at various times. |
NB East Ave from Joliet Rd to 55th St
|
|
Medium |
All lanes closed and both shoulders open |
3/7/22 12:00 AM to 12/22/23 11:59 PM |
IDOT D1 |
CHANNELIZATION IMPROVEMENTS AT THE INTERSECTIONS OF EAST AVE. AT JOLIET RD. AND 55TH ST., TRAFFIC SIGNAL MODERNIZATION, DRAINAGE IMPROVEMENTS, RETAINING WALLS, CULVERT REHABILITATION, AND MODIFICATIONS TO LIGHTING IN MCCOOK, HODGKINS, AND COUNTRYSIDE. |
SB East Ave from 55th St to Joliet Rd
|
|
Medium |
All lanes closed and both shoulders open |
3/7/22 12:00 AM to 12/22/23 11:59 PM |
IDOT D1 |
CHANNELIZATION IMPROVEMENTS AT THE INTERSECTIONS OF EAST AVE. AT JOLIET RD. AND 55TH ST., TRAFFIC SIGNAL MODERNIZATION, DRAINAGE IMPROVEMENTS, RETAINING WALLS, CULVERT REHABILITATION, AND MODIFICATIONS TO LIGHTING IN MCCOOK, HODGKINS, AND COUNTRYSIDE. |
EB Golf Rd (IL 58) from College Dr to East River Rd
|
|
Major |
All lanes closed and both shoulders open |
4/6/23 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
Drainage, retaining wall, and standard overlay along Golf Road in the city of Des Plaines. Detour: Please be careful, watch for signs and barricades. |
WB Golf Rd (IL 58) from East River Rd to College Dr
|
|
Major |
All lanes closed and both shoulders open |
4/6/23 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
Drainage, retaining wall, and standard overlay along Golf Road in the city of Des Plaines. Detour: Please be careful, watch for signs and barricades. |
EB Irving Park R / IL-19 at Wise Rd
|
|
Medium |
Various lanes closed |
5/2/23 8:00 AM to 11/30/23 5:00 PM |
IDOT D1 |
Intersection improvements. |
WB Irving Park R / IL-19 at Georgetown Ave
|
|
Medium |
Various lanes closed |
5/2/23 8:00 AM to 11/30/23 5:00 PM |
IDOT D1 |
Intersection improvements. |
EB Irving Park Rd (IL-19) from Briar Ln to Kingsbury Dr
|
|
Medium |
Various lanes closed |
7/18/22 12:00 AM to 8/6/23 11:59 PM |
IDOT D1 |
Intersection Improvement and Traffic Signal Modernization. |
WB Irving Park Rd (IL-19) from Kingsbury Dr to Briar Ln
|
|
Medium |
Various lanes closed |
7/18/22 12:00 AM to 8/6/23 11:59 PM |
IDOT D1 |
Intersection Improvement and Traffic Signal Modernization. |
NEB Joliet Rd at I-294
|
|
Minor |
Various lanes closed |
3/14/22 12:00 AM to 12/31/23 11:59 PM |
Illinois Tollway |
Bridge work |
EB Joliet Rd at 1st Ave (IL-171)
|
|
Minor |
Various lanes closed |
4/4/23 12:00 AM to 8/12/23 11:59 PM |
IDOT D1 |
This is a bridge beam end repair project. The work to be performed under this contract will consist of bridge beam end repairs and all such and collateral work necessary to complete the project as shown in the plans and as described herein. |
WB Joliet Rd at 1st Ave (IL-171)
|
|
Minor |
Various lanes closed |
4/4/23 12:00 AM to 8/12/23 11:59 PM |
IDOT D1 |
This is a bridge beam end repair project. The work to be performed under this contract will consist of bridge beam end repairs and all such and collateral work necessary to complete the project as shown in the plans and as described herein. |
SWB Joliet Rd at I-294
|
|
Minor |
Various lanes closed |
3/14/22 12:00 AM to 12/31/23 11:59 PM |
Illinois Tollway |
Bridge work |
EB Lake Cook Rd from Arlington Heights Rd to Raupp Blvd
|
|
Minor |
All lanes with unknown impact |
6/1/23 7:00 AM to 11/30/23 3:00 PM |
Lake County |
|
WB Lake Cook Rd from Raupp Blvd to Arlington Heights Rd
|
|
Minor |
All lanes with unknown impact |
6/1/23 7:00 AM to 11/30/23 3:00 PM |
Lake County |
|
WB Miner St (US-14) from Busse Hwy to River Rd
|
|
Medium |
Various lanes closed |
4/10/23 12:00 AM to 6/30/23 11:59 PM |
IDOT D1 |
Bridge deck overlay and joint repair on Rte.14/Miner St. over the Des Plaines River in Des Plaines. Detour: There will be a posted detour route but it is rather long. Please be patient and allow for extra drive time. |
EB Miner St (US-14) from River Rd to Busse Hwy
|
|
Medium |
Various lanes closed |
4/10/23 12:00 AM to 6/30/23 11:59 PM |
IDOT D1 |
Bridge deck overlay and joint repair on Rte.14/Miner St. over the Des Plaines River in Des Plaines. Detour: There will be a posted detour route but it is rather long. Please be patient and allow for extra drive time. |
EB Oakton St from Des Plaines River Rd to E of Riverside Rd
|
|
Minor |
Various lanes closed |
4/3/23 12:00 AM to 11/30/23 11:59 PM |
IDOT D1 |
The Illinois Department of Transportation announced today that an improvement project on Oakton Street, from River Road to just east of Riverside Drive/Algonquin Road, in Des Plaines, will require lane closures beginning, weather permitting, Monday, April 3.
The $2.1 million project will resurface the roadway, construct new ADA-compliant sidewalk ramps, install retaining walls and build a new multi-use path on the north side of Oakton Street, between River Road and the Des Plaines River Trail.
At least one lane in each direction will remain open throughout construction, anticipated to be completed in late November.
Motorists can expect delays and should allow extra time for trips through this area. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.
|
EB Oakton St from Harlem Ave to Long Ave
|
|
Minor |
Various lanes closed |
8/22/22 12:00 AM to 6/15/23 11:59 PM |
IDOT D1 |
Designed overlay & ADA Improvements. |
WB Oakton St from Long Ave to Harlem Ave
|
|
Minor |
Various lanes closed |
8/22/22 12:00 AM to 6/15/23 11:59 PM |
IDOT D1 |
Designed overlay & ADA Improvements. |
WB Oakton St from E of Riverside Rd to Des Plaines River Rd
|
|
Minor |
Various lanes closed |
4/3/23 12:00 AM to 11/30/23 11:59 PM |
IDOT D1 |
The Illinois Department of Transportation announced today that an improvement project on Oakton Street, from River Road to just east of Riverside Drive/Algonquin Road, in Des Plaines, will require lane closures beginning, weather permitting, Monday, April 3.
The $2.1 million project will resurface the roadway, construct new ADA-compliant sidewalk ramps, install retaining walls and build a new multi-use path on the north side of Oakton Street, between River Road and the Des Plaines River Trail.
At least one lane in each direction will remain open throughout construction, anticipated to be completed in late November.
Motorists can expect delays and should allow extra time for trips through this area. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.
|
NB Old Arlington Heights Rd from Arlington Heights Rd to Dundee Rd (IL 68)
|
|
Minor |
Various lanes closed |
5/1/23 12:00 AM to 6/30/23 11:59 PM |
IDOT D1 |
Standard Overlay with ADA Improvements. |
NB Old Arlington Heights Rd from Arlington Heights Rd to IL-68
|
|
Minor |
Various lanes closed |
4/9/23 8:00 AM to 7/15/23 6:00 PM |
IDOT D1 |
|
SB Old Arlington Heights Rd from Dundee Rd (IL 68) to Arlington Heights Rd
|
|
Minor |
Various lanes closed |
5/1/23 12:00 AM to 6/30/23 11:59 PM |
IDOT D1 |
Standard Overlay with ADA Improvements. |
SB Old Arlington Heights Rd from IL-68 to Arlington Heights Rd
|
|
Minor |
Various lanes closed |
4/9/23 8:00 AM to 7/15/23 6:00 PM |
IDOT D1 |
|
EB Steger Rd from I-57 to I-57
|
|
Minor |
Various lanes closed |
4/2/23 8:00 AM to 7/15/23 6:00 PM |
IDOT D1 |
|
EB Steger Rd at I-57
|
|
Minor |
Various lanes closed |
5/2/23 8:00 AM to 7/31/23 5:00 PM |
IDOT D1 |
Cleaning and painting of the bridge that carries Steger Road over Interstate 57 |
EB Touhy Ave from River Rd to Dee Rd
|
|
Minor |
Right lane closed, one lane open |
4/3/23 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
IMPROVEMENT CONSIST OF BRIDGE BEAM REPAIRS FOR STRUCTURE LOCATED ON TOUHY AVENUE OVER DES PLAINES RIVER IN THE CITY OF PARK RIDGE, COOK COUNTY. |
EB Touhy Ave from Des Plaines River Rd to Dee Rd
|
|
Minor |
Various lanes closed |
4/3/23 8:00 AM to 8/30/23 6:00 PM |
IDOT D1 |
|
WB Touhy Ave from Dee Rd to River Rd
|
|
Minor |
Right lane closed, one lane open |
4/3/23 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
IMPROVEMENT CONSIST OF BRIDGE BEAM REPAIRS FOR STRUCTURE LOCATED ON TOUHY AVENUE OVER DES PLAINES RIVER IN THE CITY OF PARK RIDGE, COOK COUNTY. |
WB Touhy Ave from Dee Rd to Des Plaines River Rd
|
|
Minor |
Various lanes closed |
4/3/23 8:00 AM to 8/30/23 6:00 PM |
IDOT D1 |
|
EB Washington St at US-41
|
|
Minor |
Various lanes closed |
4/24/23 8:00 AM to 9/3/23 3:06 PM |
IDOT D1 |
Bridge work. Washington Street will be reduced from two to one lane in each direction over the bridges. Motorists also should expect lane shifts on both sides of Washington Street approaching the bridges. |
WB Washington St at US-41
|
|
Minor |
Various lanes closed |
4/24/23 8:00 AM to 9/3/23 3:06 PM |
IDOT D1 |
Bridge work. Washington Street will be reduced from two to one lane in each direction over the bridges. Motorists also should expect lane shifts on both sides of Washington Street approaching the bridges. |
EB Willow Rd from Landwehr Rd to IL-43
|
|
Minor |
Various lanes closed |
4/26/23 6:00 AM to 11/15/23 5:00 PM |
IDOT D1 |
Resurfacing |
WB Willow Rd from IL-43 to Shermer Rd
|
|
Minor |
Various lanes closed |
4/26/23 6:00 AM to 11/15/23 5:00 PM |
IDOT D1 |
Resurfacing |
WB Willow Rd from Shermer Rd to Landwehr Rd
|
|
Minor |
Various lanes closed |
4/26/23 6:00 AM to 11/15/23 5:00 PM |
IDOT D1 |
Resurfacing |
NB Wolf Rd from 183rd Pl to 158th St
|
|
Medium |
Various lanes closed |
5/15/23 8:00 AM to 10/8/23 5:00 PM |
IDOT D1 |
Improvement project. during the first stage of construction northbound Wolf Road will be closed, between 179th Street and U.S. 6. A detour will direct motorists to 179th Street and U.S. 6. This configuration is expected to remain in place until mid-summer, when northbound Wolf Road reopens and southbound Wolf Road closes. Access to residences and businesses within the work zone will be maintained throughout construction.
The $2 million project, which consists of resurfacing 1.2 miles of Wolf Road, constructing new ADA-compliant sidewalk ramps and culvert repairs, is expected to be completed in late fall. |
SB Wolf Rd from IL-7 to 183rd Pl
|
|
Medium |
Various lanes closed |
5/15/23 8:00 AM to 10/8/23 5:00 PM |
IDOT D1 |
Improvement project. during the first stage of construction northbound Wolf Road will be closed, between 179th Street and U.S. 6. A detour will direct motorists to 179th Street and U.S. 6. This configuration is expected to remain in place until mid-summer, when northbound Wolf Road reopens and southbound Wolf Road closes. Access to residences and businesses within the work zone will be maintained throughout construction.
The $2 million project, which consists of resurfacing 1.2 miles of Wolf Road, constructing new ADA-compliant sidewalk ramps and culvert repairs, is expected to be completed in late fall. |
Effingham County (Illinois)
EB US-40 from near Country Club Rd to near Country Club Rd
|
|
Medium |
Various lanes closed |
5/18/23 6:00 AM to 7/22/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 13' 9". |
EB US-40 from Raney St to Walnut St
|
|
Medium |
Various lanes closed |
6/5/23 6:00 AM to 7/2/25 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 10'. |
EB US-40 from Crawford Ave to Grove Ave
|
|
Medium |
Various lanes closed |
5/8/23 6:00 AM to 6/22/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
EB US-40 from Oak St to Walnut St
|
|
Medium |
Various lanes closed |
6/5/23 6:00 AM to 7/2/25 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 10'. |
WB US-40 from Walnut St to Raney St
|
|
Medium |
Various lanes closed |
6/5/23 6:00 AM to 7/2/25 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 10'. |
WB US-40 from Walnut St to near Oak St
|
|
Medium |
Various lanes closed |
6/5/23 6:00 AM to 7/2/25 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 10'. |
WB US-40 from Country Club Rd to Country Club Rd
|
|
Medium |
Various lanes closed |
5/18/23 6:00 AM to 7/22/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 13' 9". |
NB US-45 from US-40 to I-57
|
|
Medium |
Various lanes closed |
7/6/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
NB US-45 from US-40 to I-57
|
|
Medium |
Various lanes closed |
8/1/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'. |
NB US-45 from US-40 to I-57
|
|
Medium |
Various lanes closed |
8/1/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'. |
NB US-45 from US-40 to I-57
|
|
Medium |
Various lanes closed |
7/6/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
SB US-45 from I-57 to US-40
|
|
Medium |
Various lanes closed |
7/6/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
SB US-45 from I-57 to US-40
|
|
Medium |
Various lanes closed |
7/6/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
SB US-45 from I-57 to US-40
|
|
Medium |
Various lanes closed |
8/1/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'. |
SB US-45 from I-57 to US-40
|
|
Medium |
Various lanes closed |
8/1/22 6:00 AM to 7/10/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'. |
EB Fayette Ave from Outer Belt West to Raney St
|
|
Minor |
Various lanes closed |
5/8/23 6:00 AM to 6/22/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
WB Fayette Ave from Raney St to Outer Belt West
|
|
Minor |
Various lanes closed |
5/8/23 6:00 AM to 6/22/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
Lake County (Illinois)
EB IL-22 from IL-21 to near IL-21
|
|
Major |
All lanes and shoulders open |
6/7/23 8:00 AM to 6/14/23 5:00 PM |
IDOT D1 |
Railroad crossing repairs. |
EB IL-22 at IL-43
|
|
Major |
All lanes closed |
6/7/23 7:00 AM to 6/14/23 7:00 PM |
Lake County |
|
NB IL-22 from near IL-21 to IL-43
|
|
Major |
All lanes and shoulders open |
6/7/23 8:00 AM to 6/14/23 5:00 PM |
IDOT D1 |
Railroad crossing repairs. |
WB IL-22 at IL-43
|
|
Major |
All lanes closed |
6/7/23 7:00 AM to 6/14/23 7:00 PM |
Lake County |
|
WB IL-22 from IL-43 to IL-21
|
|
Major |
All lanes and shoulders closed |
6/7/23 8:00 AM to 6/14/23 5:00 PM |
IDOT D1 |
Railroad crossing repairs. |
NB IL-43 from Deerfield Rd to North Ave
|
|
Minor |
All lanes with unknown impact |
4/5/23 7:00 AM to 9/15/23 3:00 PM |
Lake County |
Water Main Replacement |
SB IL-43 from North Ave to Deerfield Rd
|
|
Minor |
All lanes with unknown impact |
4/5/23 7:00 AM to 9/15/23 3:00 PM |
Lake County |
Water Main Replacement |
NB IL-83 from Bank Ln to Buffalo Grove Rd
|
|
Medium |
Various lanes closed |
4/10/23 8:00 AM to 8/31/23 5:00 PM |
IDOT D1 |
Resurfacing of McHenry Road |
NB IL-83 from Bank Ln to Buffalo Grove Rd
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 8/31/23 3:00 PM |
Lake County |
Resurfacing |
NB IL-83 from Lake St to Hook Dr
|
|
Minor |
All lanes with unknown impact |
5/1/23 7:00 AM to 7/31/23 3:00 PM |
Lake County |
|
NB IL-83 from Lake Ave to Hook Dr
|
|
Medium |
Various lanes closed |
5/1/23 12:00 AM to 9/1/23 11:59 PM |
IDOT D1 |
SMART Overlay and ADA Improvements. |
NB IL-83 from Hook Dr to Lake Ave
|
|
Medium |
Various lanes closed |
4/19/23 6:00 AM to 7/15/23 11:59 PM |
IDOT D1 |
Resurfacing. Intermittent daytime lane closures |
SB IL-83 from Hook Dr to Lake Ave
|
|
Medium |
Various lanes closed |
5/1/23 12:00 AM to 9/1/23 11:59 PM |
IDOT D1 |
SMART Overlay and ADA Improvements. |
SB IL-83 from Lake Ave to Hook Dr
|
|
Medium |
Various lanes closed |
4/19/23 6:00 AM to 7/15/23 11:59 PM |
IDOT D1 |
Resurfacing. Intermittent daytime lane closures |
SB IL-83 from Hook Dr to Lake St
|
|
Minor |
All lanes with unknown impact |
5/1/23 7:00 AM to 7/31/23 3:00 PM |
Lake County |
|
SB IL-83 from Buffalo Grove Rd to Bank Ln
|
|
Medium |
Various lanes closed |
4/10/23 8:00 AM to 8/31/23 5:00 PM |
IDOT D1 |
Resurfacing of McHenry Road |
SB IL-83 from Buffalo Grove Rd to Bank Ln
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 8/31/23 3:00 PM |
Lake County |
Resurfacing |
EB IL-120 from IL-60 to Alleghany Rd
|
|
Minor |
All lanes with unknown impact |
4/24/23 7:00 AM to 8/4/23 3:00 PM |
Lake County |
|
EB IL-120 from O'Plaine Rd to US-41
|
|
Minor |
All lanes with unknown impact |
10/5/22 7:00 AM to 6/30/23 3:00 PM |
Lake County |
Roadway lighting improvement. |
WB IL-120 from US-41 to O'Plaine Rd
|
|
Minor |
All lanes with unknown impact |
10/5/22 7:00 AM to 6/30/23 3:00 PM |
Lake County |
Roadway lighting improvement. |
WB IL-120 from Alleghany Rd to IL-60
|
|
Minor |
All lanes with unknown impact |
4/24/23 7:00 AM to 8/4/23 3:00 PM |
Lake County |
|
EB IL-132 at Cedar Lake Rd (N)
|
|
Minor |
All lanes with unknown impact |
3/1/23 7:00 AM to 10/31/24 3:00 PM |
Lake County |
Roadway Improvements |
EB IL-132 at Cedar Lake Rd (N)
|
|
Minor |
All lanes with unknown impact |
4/3/23 7:00 AM to 10/31/24 3:00 PM |
Lake County |
Bridge Reconstruction |
EB IL-132 at IL-83
|
|
Minor |
All lanes with unknown impact |
3/1/22 7:00 AM to 11/1/23 3:00 PM |
Lake County |
|
EB IL-132 from Sheehan Dr to Munn Rd
|
|
Medium |
Various lanes closed |
11/1/21 12:00 AM to 6/1/24 11:59 PM |
IDOT D1 |
Dry land bridge replacement, box culvert replacement, roadway reconstruction, roadway widening, water and sanitary line relocation and resurfacing on IL 132 from Sheehan Drive to Munn Rd. |
WB IL-132 from Munn Rd to Sheehan Dr
|
|
Medium |
Various lanes closed |
11/1/21 12:00 AM to 6/1/24 11:59 PM |
IDOT D1 |
Dry land bridge replacement, box culvert replacement, roadway reconstruction, roadway widening, water and sanitary line relocation and resurfacing on IL 132 from Sheehan Drive to Munn Rd. |
WB IL-132 at IL-83
|
|
Minor |
All lanes with unknown impact |
3/1/22 7:00 AM to 11/1/23 3:00 PM |
Lake County |
|
WB IL-132 at Cedar Lake Rd (N)
|
|
Minor |
All lanes with unknown impact |
3/1/23 7:00 AM to 10/31/24 3:00 PM |
Lake County |
Roadway Improvements |
WB IL-132 at Cedar Lake Rd (N)
|
|
Minor |
All lanes with unknown impact |
4/3/23 7:00 AM to 10/31/24 3:00 PM |
Lake County |
Bridge Reconstruction |
EB IL-173 at Lake Ave
|
|
Medium |
Various lanes closed |
3/15/22 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
Traffic Signal Installation and Channelization of IL 173 at North Lake Ave. |
EB IL-173 from Deep Lake Rd to Hunt Club Rd
|
|
Minor |
All lanes with unknown impact |
5/15/23 7:00 AM to 9/29/23 3:00 PM |
Lake County |
|
WB IL-173 from Hunt Club Rd to Deep Lake Rd
|
|
Minor |
All lanes with unknown impact |
5/15/23 7:00 AM to 9/29/23 3:00 PM |
Lake County |
|
WB IL-173 at Lake Ave
|
|
Medium |
Various lanes closed |
3/15/22 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
Traffic Signal Installation and Channelization of IL 173 at North Lake Ave. |
EB 21st St at DELANY RD
|
|
Minor |
All lanes with unknown impact |
5/22/23 7:00 AM to 8/4/23 3:00 PM |
Lake County |
|
EB 21st St at DELANY RD
|
|
Minor |
All lanes with unknown impact |
6/5/23 7:00 AM to 8/31/23 3:00 PM |
Lake County |
|
WB 21st St at DELANY RD
|
|
Minor |
All lanes with unknown impact |
5/22/23 7:00 AM to 8/4/23 3:00 PM |
Lake County |
|
WB 21st St at DELANY RD
|
|
Minor |
All lanes with unknown impact |
6/5/23 7:00 AM to 8/31/23 3:00 PM |
Lake County |
|
EB Aptakisic Rd from IL-83 to Buffalo Grove Rd
|
|
Minor |
All lanes with unknown impact |
3/16/23 7:00 AM to 4/30/24 3:00 PM |
Lake County |
Reconstruct and widen to 4 lanes. |
WB Aptakisic Rd from Buffalo Grove Rd to IL-83
|
|
Minor |
All lanes with unknown impact |
3/16/23 7:00 AM to 4/30/24 3:00 PM |
Lake County |
Reconstruct and widen to 4 lanes. |
EB Belvidere Rd (IL-120) from O'Plaine Rd to Skokie Hwy (US-41)
|
|
Medium |
Various lanes closed |
10/3/22 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
Roadway lighting improvement. Light tower and foundation removal. Install new light poles, foundations, LED luminaires, controllers, conduits and cables, excavations and site restorations. |
WB Belvidere Rd (IL-120) from Skokie Hwy (US-41) to O'Plaine Rd
|
|
Medium |
Various lanes closed |
10/3/22 12:00 AM to 7/31/23 11:59 PM |
IDOT D1 |
Roadway lighting improvement. Light tower and foundation removal. Install new light poles, foundations, LED luminaires, controllers, conduits and cables, excavations and site restorations. |
NB Darrell Rd at CASE RD
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 4/30/24 3:00 PM |
Lake County |
Intersection Improvement. |
SB Darrell Rd at CASE RD
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 4/30/24 3:00 PM |
Lake County |
Intersection Improvement. |
NB Ela Rd at LONG GROVE RD
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 10/31/23 3:00 PM |
Lake County |
Intersection Improvements |
SB Ela Rd at LONG GROVE RD
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 10/31/23 3:00 PM |
Lake County |
Intersection Improvements |
NB Fairfield Rd from Old McHenry Rd to Milton Rd
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 3/1/24 3:00 PM |
Lake County |
Resurfacing |
SB Fairfield Rd from Milton Rd to Old McHenry Rd
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 3/1/24 3:00 PM |
Lake County |
Resurfacing |
SEB Gilmer Rd at FAIRFIELD RD
|
|
Minor |
All lanes with unknown impact |
3/31/23 7:00 AM to 3/31/24 3:00 PM |
Lake County |
|
SEB Gilmer Rd at FAIRFIELD RD
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 3/31/24 3:00 PM, 4/10/23 7:00 AM to 3/1/24 3:00 PM |
Lake County |
Resurfacing |
NWB Gilmer Rd from IL-176 to IL-120
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 3/1/24 3:00 PM |
Lake County |
Resurfacing |
SEB Gilmer Rd from IL-120 to IL-176
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 3/1/24 3:00 PM |
Lake County |
Resurfacing |
NWB Gilmer Rd at FAIRFIELD RD
|
|
Minor |
All lanes with unknown impact |
3/31/23 7:00 AM to 3/31/24 3:00 PM |
Lake County |
|
NWB Gilmer Rd at FAIRFIELD RD
|
|
Minor |
All lanes with unknown impact |
4/10/23 7:00 AM to 3/31/24 3:00 PM, 4/10/23 7:00 AM to 3/1/24 3:00 PM |
Lake County |
Resurfacing |
NB Hunt Club Rd from IL-173 to 136th Ave
|
|
Minor |
All lanes with unknown impact |
5/1/23 7:00 AM to 8/31/23 3:00 PM |
Lake County |
|
SB Hunt Club Rd from 136th Ave to IL-173
|
|
Minor |
All lanes with unknown impact |
5/1/23 7:00 AM to 8/31/23 3:00 PM |
Lake County |
|
EB IL 120 (IL-120) from IL 60 (IL-60) to Alleghany Rd
|
|
Medium |
Various lanes closed |
4/17/23 12:00 AM to 8/4/23 11:59 PM |
IDOT D1 |
This project consists of SMART resurfacing the existing HMA pavement, thermoplastic pavement markings, making existing curb ramps ADA compliant, and collateral work necessary to complete the work shown on the plans and described herein. |
WB IL 120 (IL-120) from Alleghany Rd to IL 60 (IL-60)
|
|
Medium |
Various lanes closed |
4/17/23 12:00 AM to 8/4/23 11:59 PM |
IDOT D1 |
This project consists of SMART resurfacing the existing HMA pavement, thermoplastic pavement markings, making existing curb ramps ADA compliant, and collateral work necessary to complete the work shown on the plans and described herein. |
NB Kilbourne Rd from Wadsworth Rd to IL-173
|
|
Minor |
All lanes with unknown impact |
4/1/23 7:00 AM to 11/30/23 3:00 PM |
Lake County |
Intersection improvements. |
SB Kilbourne Rd from IL-173 to Wadsworth Rd
|
|
Minor |
All lanes with unknown impact |
4/1/23 7:00 AM to 11/30/23 3:00 PM |
Lake County |
Intersection improvements. |
EB Lake Cook Rd from Arlington Heights Rd to Raupp Blvd
|
|
Minor |
All lanes with unknown impact |
6/1/23 7:00 AM to 11/30/23 3:00 PM |
Lake County |
|
NB Lakeview Pkwy from IL-60 to Hawthorn Pkwy
|
|
Minor |
All lanes with unknown impact |
5/1/23 7:00 AM to 12/31/23 3:00 PM |
Lake County |
|
SB Lakeview Pkwy from Hawthorn Village Commons to IL-60
|
|
Minor |
All lanes with unknown impact |
5/1/23 7:00 AM to 12/31/23 3:00 PM |
Lake County |
|
EB Miller Rd at US-12
|
|
Minor |
All lanes with unknown impact |
6/1/23 7:00 AM to 4/30/24 3:00 PM |
Lake County |
Intersection Improvements |
WB Miller Rd at US-12
|
|
Minor |
All lanes with unknown impact |
6/1/23 7:00 AM to 4/30/24 3:00 PM |
Lake County |
Intersection Improvements |
WB Miner St (US-14) from Busse Hwy to River Rd
|
|
Medium |
Various lanes closed |
4/10/23 12:00 AM to 6/30/23 11:59 PM |
IDOT D1 |
Bridge deck overlay and joint repair on Rte.14/Miner St. over the Des Plaines River in Des Plaines. Detour: There will be a posted detour route but it is rather long. Please be patient and allow for extra drive time. |
EB Miner St (US-14) from River Rd to Busse Hwy
|
|
Medium |
Various lanes closed |
4/10/23 12:00 AM to 6/30/23 11:59 PM |
IDOT D1 |
Bridge deck overlay and joint repair on Rte.14/Miner St. over the Des Plaines River in Des Plaines. Detour: There will be a posted detour route but it is rather long. Please be patient and allow for extra drive time. |
SEB Old McHenry Rd at QUENTIN RD
|
|
Minor |
All lanes with unknown impact |
4/17/23 7:00 AM to 6/30/23 3:00 PM |
Lake County |
|
NWB Old McHenry Rd at QUENTIN RD
|
|
Minor |
All lanes with unknown impact |
4/17/23 7:00 AM to 6/30/23 3:00 PM |
Lake County |
|
EB Stearns School Rd at HUTCHINS RD
|
|
Minor |
All lanes with unknown impact |
4/17/23 7:00 AM to 9/25/23 3:00 PM |
Lake County |
Culvert Replacement |
WB Stearns School Rd at HUTCHINS RD
|
|
Minor |
All lanes with unknown impact |
4/17/23 7:00 AM to 9/25/23 3:00 PM |
Lake County |
Culvert Replacement |
NB Telegraph Rd from North Ave to IL-22
|
|
Minor |
All lanes with unknown impact |
5/1/23 7:00 AM to 9/30/23 3:00 PM |
Lake County |
|
NB Telegraph Rd from North Ave to IL-22
|
|
Minor |
All lanes with unknown impact |
6/6/23 7:00 AM to 5/17/24 3:00 PM |
Lake County |
Resurfacing |
SB Telegraph Rd from IL-22 to North Ave
|
|
Minor |
All lanes with unknown impact |
5/1/23 7:00 AM to 9/30/23 3:00 PM |
Lake County |
|
SB Telegraph Rd from IL-22 to North Ave
|
|
Minor |
All lanes with unknown impact |
6/6/23 7:00 AM to 5/17/24 3:00 PM |
Lake County |
Resurfacing |
EB Washington St at US-41
|
|
Minor |
Various lanes closed |
4/11/23 9:00 AM to 11/15/23 3:00 PM |
Lake County |
Removal & construction of bridge deck. |
WB Washington St at US-41
|
|
Minor |
Various lanes closed |
4/11/23 9:00 AM to 11/15/23 3:00 PM |
Lake County |
Removal & construction of bridge deck. |
EB Winchester Rd from IL-83 to IL-21
|
|
Minor |
All lanes with unknown impact |
5/1/23 7:00 AM to 5/31/24 3:00 PM |
Lake County |
|
WB Winchester Rd from IL-21 to IL-83
|
|
Minor |
All lanes with unknown impact |
5/1/23 7:00 AM to 5/31/24 3:00 PM |
Lake County |
|
Peoria County (Illinois)
EB US-150 from Rock Island Ave to IL-29 (+1.2 miles)
|
|
Medium |
All lanes and shoulders open |
11/20/19 6:00 AM to 7/31/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
EB US-150 from Rock Island Ave to IL-29 (+1.2 miles)
|
|
Medium |
All lanes and shoulders open |
11/20/19 6:00 AM to 7/31/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
EB US-150 from IL-29 to Marina Ln
|
|
Medium |
Various lanes closed |
7/22/22 6:00 AM to 7/31/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'. |
EB IL-8 from near IL-78 to McClellan Rd
|
|
Medium |
Various lanes closed |
5/11/23 6:00 AM to 10/31/23 5:59 AM |
IDOT D1 |
Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 14'. |
EB IL-8 from near IL-78 to McClellan Rd
|
|
Medium |
Various lanes closed |
5/1/23 6:00 AM to 10/31/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
EB IL-8 from Kickapoo Edwards Rd to Heinz Ln
|
|
Major |
All lanes and shoulders closed |
5/1/23 7:00 AM to 11/15/23 11:59 PM |
IDOT D4 |
Construction of a new road and overpass. |
WB IL-8 from Heinz Ln to Kickapoo Edwards Rd
|
|
Major |
All lanes and shoulders closed |
5/1/23 7:00 AM to 11/15/23 11:59 PM |
IDOT D4 |
Construction of a new road and overpass. |
WB IL-8 from near McClellan Rd to IL-78
|
|
Medium |
Various lanes closed |
5/11/23 6:00 AM to 10/31/23 5:59 AM |
IDOT D1 |
Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 14'. |
WB IL-8 from near McClellan Rd to IL-78
|
|
Medium |
Various lanes closed |
5/1/23 6:00 AM to 10/31/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
EB IL-9 from Cargill Rd to Front St
|
|
Medium |
Various lanes closed |
6/5/23 8:00 AM to 6/19/23 6:00 PM |
IDOT D4 |
Bridge inspections. Use of alternate routes should be considered. |
WB IL-9 from near Front St to Cargill Rd
|
|
Medium |
Various lanes closed |
6/5/23 8:00 AM to 6/19/23 6:00 PM |
IDOT D4 |
Bridge inspections. Use of alternate routes should be considered. |
NB IL-29 from near Lorentz Ave to Gardner Ln
|
|
Medium |
Various lanes closed |
4/3/23 12:00 AM to 7/3/23 11:59 PM |
IDOT D1 |
The Illinois Department of Transportation announced that daytime lane closures along Illinois 29 between Gardner Lane and Lorentz Avenue, north of U.S. 150 (War Memorial Drive) in Peoria, begin April 3.
The lane closures are necessary for crews to perform soil borings as part of the future rehabilitation of Illinois 29 in that area and will begin after 8:30 a.m. each day, lasting for about three months.
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment. |
SB IL-29 from Gardner Ln to Lorentz Ave
|
|
Medium |
Various lanes closed |
4/3/23 6:00 AM to 7/16/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 16'. |
SB IL-29 from Gardner Ln to Terrace View Ln
|
|
Medium |
Various lanes closed |
4/3/23 12:00 AM to 7/3/23 11:59 PM |
IDOT D1 |
The Illinois Department of Transportation announced that daytime lane closures along Illinois 29 between Gardner Lane and Lorentz Avenue, north of U.S. 150 (War Memorial Drive) in Peoria, begin April 3.
The lane closures are necessary for crews to perform soil borings as part of the future rehabilitation of Illinois 29 in that area and will begin after 8:30 a.m. each day, lasting for about three months.
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment. |
SB IL-29 from Terrace View Ln to Lorentz Ave
|
|
Medium |
Various lanes closed |
4/3/23 12:00 AM to 7/3/23 11:59 PM |
IDOT D1 |
The Illinois Department of Transportation announced that daytime lane closures along Illinois 29 between Gardner Lane and Lorentz Avenue, north of U.S. 150 (War Memorial Drive) in Peoria, begin April 3.
The lane closures are necessary for crews to perform soil borings as part of the future rehabilitation of Illinois 29 in that area and will begin after 8:30 a.m. each day, lasting for about three months.
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment. |
EB IL-116 from I-474 to near I-474
|
|
Medium |
Various lanes closed |
4/5/23 6:00 AM to 11/16/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
EB IL-116 at I-474
|
|
Medium |
Various lanes closed |
4/3/23 12:00 AM to 11/15/23 11:59 PM |
IDOT D4 |
Bridge replacements, drainage improvements and other tasks. |
WB IL-116 from I-474 to near I-474
|
|
Medium |
Various lanes closed |
4/5/23 6:00 AM to 11/16/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. |
WB IL-116 at I-474
|
|
Medium |
Various lanes closed |
4/3/23 12:00 AM to 11/15/23 11:59 PM |
IDOT D4 |
Bridge replacements, drainage improvements and other tasks. |
Will County (Illinois)
EB US-30 from I-80 to Church St
|
|
Medium |
Various lanes closed |
10/20/22 7:00 AM to 6/20/23 5:00 PM |
IDOT D1 |
|
EB US-30 from I-80 to near Lincolnway Dr
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
EB US-30 from near Lincolnway Dr to Church St
|
|
Medium |
Various lanes closed |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from Maple St to Lincolnway Dr
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from Lincolnway Dr to I-80
|
|
Medium |
All lanes and shoulders open |
10/20/22 12:12 PM to 7/1/23 12:12 PM |
IDOT D1 |
Resurfacing of U.S. 30 (Lincoln Highway), from east of Interstate 80 to Church Street, in New Lenox |
WB US-30 from Church St to I-80
|
|
Medium |
Various lanes closed |
10/20/22 7:00 AM to 6/20/23 5:00 PM |
IDOT D1 |
|
NWB US-52 from McDonald Ave to Frontage Rd
|
|
Medium |
Various lanes closed |
5/15/23 7:00 AM to 11/15/23 6:00 PM |
IDOT D1 |
|
SEB US-52 from Frontage Rd to McDonald Ave
|
|
Medium |
Various lanes closed |
5/15/23 7:00 AM to 11/15/23 6:00 PM |
IDOT D1 |
|
NEB IL-7 from Canal St to Read St
|
|
Medium |
Various lanes closed |
4/24/23 8:00 PM to 7/31/23 5:00 PM |
IDOT D1 |
Resurfacing the 1.52-mile stretch of Illinois 7, constructing new ADA-compliant sidewalk ramps and replacing deteriorated curbs, is expected to be completed in July.
Access to residences and businesses within the work zone will be maintained throughout construction. |
SWB IL-7 from Loch Ln to Canal St
|
|
Medium |
Various lanes closed |
4/24/23 8:00 PM to 7/31/23 5:00 PM |
IDOT D1 |
Resurfacing the 1.52-mile stretch of Illinois 7, constructing new ADA-compliant sidewalk ramps and replacing deteriorated curbs, is expected to be completed in July.
Access to residences and businesses within the work zone will be maintained throughout construction. |
NB IL-50 at Steger Rd
|
|
Minor |
All lanes and shoulders open |
4/24/23 8:00 AM to 10/31/23 5:00 PM |
IDOT D1 |
Intersection improvement. |
NWB IL-102 from near River St to 7000W Rd
|
|
Medium |
Various lanes closed |
3/2/23 6:00 AM to 7/24/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'. |
SEB IL-102 from 7000W Rd to River St
|
|
Medium |
Various lanes closed |
3/2/23 6:00 AM to 7/24/23 5:59 AM |
IDOT D1 |
Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'. |
EB 159th St (IL-7) from Canal St to Read St
|
|
Medium |
Various lanes closed |
4/17/23 12:00 AM to 6/30/23 11:59 PM |
IDOT D1 |
Smart Overlay and ADA Improvements. Detour: N/A |
WB 159th St (IL-7) from Read St to Canal St
|
|
Medium |
Various lanes closed |
4/17/23 12:00 AM to 6/30/23 11:59 PM |
IDOT D1 |
Smart Overlay and ADA Improvements. Detour: N/A |
EB Arsenal Rd at Stephan Rd
|
|
None |
All lanes and shoulders open |
5/15/23 12:00 AM to 7/15/23 11:59 PM |
IDOT D1 |
Bridge Joint Repairs |
NB Brandon Rd at US-6
|
|
Medium |
All lanes and shoulders closed |
6/10/23 6:00 AM to 6/12/23 6:00 PM, 8/15/23 6:00 AM to 6:00 PM, 8/22/23 6:00 AM to 6:00 PM, 8/23/23 6:00 AM to 6:00 PM, ... more, ending on 9/24/23 |
IDOT D1 |
Bridge repairs |
SB Brandon Rd at near US-6
|
|
Medium |
All lanes and shoulders closed |
6/10/23 6:00 AM to 6/12/23 6:00 PM, 8/15/23 6:00 AM to 6:00 PM, 8/22/23 6:00 AM to 6:00 PM, 8/23/23 6:00 AM to 6:00 PM, ... more, ending on 9/24/23 |
IDOT D1 |
Bridge repairs |
WB Crete-Monee Rd at near Western Ave
|
|
Minor |
Various lanes closed |
4/24/23 8:00 AM to 10/31/23 5:00 PM |
IDOT D1 |
Intersection improvement. |
NEB Joliet Rd from Sherman Rd to I-55
|
|
Minor |
Various lanes closed |
4/3/23 12:00 AM to 10/31/23 11:59 PM |
IDOT D1 |
CHICAGO – The Illinois Department of Transportation announced today that a patching and resurfacing of Joliet Road, from Interstate 55, in Bolingbrook, to Sherman Road, in Romeoville, passing through Woodridge, will require intermittent daytime lane closures beginning, weather permitting, Monday, April 3.
The $2.3 million project, which also includes constructing new shoulders and replacing deteriorated curbs, is expected to be completed in October.
Motorists can expect delays and should allow extra time for trips through this area. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.
|
SWB Joliet Rd from I-55 to Sherman Rd
|
|
Minor |
Various lanes closed |
4/3/23 12:00 AM to 10/31/23 11:59 PM |
IDOT D1 |
CHICAGO – The Illinois Department of Transportation announced today that a patching and resurfacing of Joliet Road, from Interstate 55, in Bolingbrook, to Sherman Road, in Romeoville, passing through Woodridge, will require intermittent daytime lane closures beginning, weather permitting, Monday, April 3.
The $2.3 million project, which also includes constructing new shoulders and replacing deteriorated curbs, is expected to be completed in October.
Motorists can expect delays and should allow extra time for trips through this area. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.
|
EB Shepley Rd from Frontage Rd to Ingolsby Rd
|
|
Medium |
All lanes and shoulders closed |
4/17/23 8:00 AM to 11/30/23 4:00 PM |
IDOT D3 |
Bridge replacement |
WB Shepley Rd from Ingolsby Rd to W Frontage Rd
|
|
Medium |
All lanes and shoulders closed |
4/17/23 8:00 AM to 11/30/23 4:00 PM |
IDOT D3 |
Bridge replacement |
WB Steger Rd from I-57 to I-57
|
|
Minor |
Various lanes closed |
4/2/23 8:00 AM to 7/15/23 6:00 PM |
IDOT D1 |
|
WB Steger Rd at I-57
|
|
Minor |
Various lanes closed |
5/2/23 8:00 AM to 7/31/23 5:00 PM |
IDOT D1 |
Cleaning and painting of the bridge that carries Steger Road over Interstate 57 |
NB Wolf Rd from 187th St to 183rd St
|
|
Medium |
All lanes and shoulders closed |
3/29/23 12:00 AM to 8/31/23 11:59 PM |
IDOT D1 |
The proposed improvement consists of removal of the existing superstructure of the two lane structure over I-80, widening the piers and abutments to accommodate a new 2 lane superstructure with shoulders and a 10 foot wide Multi-use path, milling and resurfacing the existing PCC pavement with PCC patching as required, construction of a 10 foot wide PCC Multi-use path, embankment widening, drainage work, landscaping; and collateral work necessary to complete the improvement. Detour: For motorists traveling North on Wolf Road the detour route will be 191st Street EB to LaGrange Road NB to 179th Street WB Road to Wolf Road. For motorists traveling Southbound on Wolf Road the detour will be 179th Street East to Old LaGrange Road SB to 191st Street WB to Wolf Road. |
NB Wolf Rd from 183rd Pl to 158th St
|
|
Medium |
Various lanes closed |
5/15/23 8:00 AM to 10/8/23 5:00 PM |
IDOT D1 |
Improvement project. during the first stage of construction northbound Wolf Road will be closed, between 179th Street and U.S. 6. A detour will direct motorists to 179th Street and U.S. 6. This configuration is expected to remain in place until mid-summer, when northbound Wolf Road reopens and southbound Wolf Road closes. Access to residences and businesses within the work zone will be maintained throughout construction.
The $2 million project, which consists of resurfacing 1.2 miles of Wolf Road, constructing new ADA-compliant sidewalk ramps and culvert repairs, is expected to be completed in late fall. |
SB Wolf Rd from IL-7 to 183rd Pl
|
|
Medium |
Various lanes closed |
5/15/23 8:00 AM to 10/8/23 5:00 PM |
IDOT D1 |
Improvement project. during the first stage of construction northbound Wolf Road will be closed, between 179th Street and U.S. 6. A detour will direct motorists to 179th Street and U.S. 6. This configuration is expected to remain in place until mid-summer, when northbound Wolf Road reopens and southbound Wolf Road closes. Access to residences and businesses within the work zone will be maintained throughout construction.
The $2 million project, which consists of resurfacing 1.2 miles of Wolf Road, constructing new ADA-compliant sidewalk ramps and culvert repairs, is expected to be completed in late fall. |
SB Wolf Rd from 183rd St to 187th St
|
|
Medium |
All lanes and shoulders closed |
3/29/23 12:00 AM to 8/31/23 11:59 PM |
IDOT D1 |
The proposed improvement consists of removal of the existing superstructure of the two lane structure over I-80, widening the piers and abutments to accommodate a new 2 lane superstructure with shoulders and a 10 foot wide Multi-use path, milling and resurfacing the existing PCC pavement with PCC patching as required, construction of a 10 foot wide PCC Multi-use path, embankment widening, drainage work, landscaping; and collateral work necessary to complete the improvement. Detour: For motorists traveling North on Wolf Road the detour route will be 191st Street EB to LaGrange Road NB to 179th Street WB Road to Wolf Road. For motorists traveling Southbound on Wolf Road the detour will be 179th Street East to Old LaGrange Road SB to 191st Street WB to Wolf Road. |