Construction Report
My Travel Preferences
Entire Region
collapse Regional Regional
I-39
I-69
I-80
I-90
I-94
collapse Illinois Illinois
I-39
I-55
Stevenson
I-57
I-74
I-80
Kingery
I-88
Reagan Memorial
I-90
Jane Addams Memorial (Northwest)
Kennedy
Dan Ryan
Chicago Skyway
I-94
Tri-State
Edens Spur
Edens
Kennedy
Dan Ryan
Bishop Ford
Kingery
I-180
I-190
I-280
I-290
Eisenhower
I-294
Tri-State
I-355
Veterans Memorial (North-South)
US-41
IL-53
IL-394
Bishop Ford
Elgin O'Hare
Lake Shore Drive
expand Illinois Arterials Illinois Arterials
collapse Indiana Indiana
Borman Expressway
I-65
I-69
I-80
I-90
I-94
Indiana Toll Road (East-West)
US-20
US-31
expand Indiana Arterials Indiana Arterials
collapse Michigan Michigan
I-69
I-94
I-96
I-196
US-131
US-31
expand Michigan Arterials Michigan Arterials
collapse Wisconsin Wisconsin
I-39
I-43
I-90
I-94
I-794
I-894
Miller Park Way
US-12
US-41
US-45
WI-119
WI-16
expand Wisconsin Arterials Wisconsin Arterials
Updated: 05/23/13 08:15 PM Reports Help

Use the links below to view other reports for the selected location:
travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-165 to WI-158 346.6 to 342.3 Medium Various lanes closed 04/06/13 12:00 AM to 07/20/13 11:45 PM WisDOT Construction - N-S FREEWAY, STH 50 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Exit to WI-50 344.4 Major All lanes and shoulders closed 05/23/13 09:30 PM to 05/24/13 05:30 AM WisDOT Construction - Detour: Exit at CTH C. Turn right on CTH C. Take CTH C to EFR. Turn left on EFR. Use EFR to STH 50.
Entrance from WI-50 343.0 Medium All lanes and shoulders closed 04/06/13 12:00 AM to 07/15/13 11:45 PM WisDOT Construction - Detour: Take STH 50 to 125th Street. Turn left on 125th Street. Continue to 77th Street. Turn left on 77th Street. Continue to WFR. Turn right on WFR. Continue to CTH C. Turn left on CTH C. Continue to CTH C SE ramp.
Exit to WI-158 343.0 Major All lanes and shoulders closed 04/06/13 12:00 AM to 07/15/13 11:45 PM WisDOT Construction - Detour: Continue to 142 SE ramp. Take 142 SE ramp. Turn left onto STH 142. Continue to WFR. Take WFR to STH 158. Turn left onto STH 158.
WI-158 to 12th St 342.3 to 339.2 Medium Various lanes closed 04/06/13 12:00 AM to 07/15/13 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
CR-N to WI-142 341.5 to 340.7 Medium Left lane closed, two lanes open 03/23/13 08:00 AM to 09/30/13 11:59 AM WisDOT
at WI-142 340.7 Medium Left lane closed, two lanes open 03/22/13 09:30 PM to 10/31/13 11:00 PM WisDOT ***Long Term Closure***; Two lanes will be open to traffic in this section through the year.
Entrance from CR-BB 319.0 Medium All lanes and shoulders closed 03/11/13 12:00 AM to 10/31/13 11:45 PM WisDOT Construction - Detour: NB loop ramp is closed. Detour will be provided
Entrance from Rawson AVE 319.0 Medium All lanes and shoulders closed 05/13/13 12:00 AM to 09/20/13 11:45 PM WisDOT Construction - Detour: Signed detour will be posted
Exit to Layton AVE 317.2 Medium All lanes and shoulders closed 05/24/13 09:00 AM to 12:00 PM WisDOT Maintenance - Detour: Use alternate route
Howard Ave to Canal St 315.0 to 310.9 Medium Various lanes closed 02/12/13 12:00 AM to 06/26/13 11:45 PM WisDOT Single Lane Closure
Entrance from Holt Ave 313.0 Medium All lanes and shoulders closed 02/12/13 12:00 AM to 06/26/13 11:45 PM WisDOT Construction - Detour: EB Holt to NB Chase to NB 1st St to WB Lincoln Ave to NB 4th St to B 43 via Becher St entrance ramp.

US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-18 to WI-38 72.2 to 311.9 Major Right two lanes closed, up to one lanes open 05/23/13 09:30 PM to 05/24/13 05:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Canal St to Lapham Blvd Medium Right lane closed, two lanes open 05/08/13 12:00 AM to 08/27/13 11:45 PM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
WI-38 to Howard Ave 311.9 to 314.9 Major Left two lanes closed, one lane open 05/23/13 09:30 PM to 05/24/13 05:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Lapham Blvd to Howard Ave 312.2 to 314.9 Medium Various lanes closed 02/14/13 12:00 AM to 06/26/13 11:45 PM WisDOT Single Lane Closure
Exit to Holt Ave 314.0 Medium All lanes and shoulders closed 02/15/13 12:00 AM to 06/26/13 11:45 PM WisDOT Construction - Detour: Continue south on I-43 to Howard Ave exit. Exit to EB Howard Ave. East on Howard to Howell St, north on Howell St to Holt.
Entrance from National/6th St Medium All lanes and shoulders closed 05/06/13 12:00 AM to 08/27/13 11:45 PM WisDOT Construction - Detour: Use south 6th St to freeway entrance via 5th St
I-94 EB to I-43 SB/I-94 EB 316.3 Medium Right lane closed, one lane open 05/05/13 12:00 AM to 08/27/13 11:45 PM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit to Rawson AVE 319.3 Minor Left two lanes closed, one lane open 03/07/13 12:00 AM to 06/23/13 11:45 PM WisDOT Construction - Detour: Left turn from off ramp to EB Rawson will be closed. EB Rawson detour will use WB Rawson to SB 27th St to EB Drexel, to NB Howell Ave
Entrance from Rawson Ave 320.2 Medium All lanes and shoulders closed 03/11/13 12:00 AM to 10/31/13 11:45 PM WisDOT Construction - Detour: Interchange detours will be using 27th St, Howell Ave, College Ave, and Drexel Ave
7 Mile Rd to 1st St 324.9 to 337.0 Minor Left shoulder closed, all lanes open 05/24/13 09:00 AM to 02:00 PM WisDOT Moving lane closure; Maintenance - Barrier Wall/Inlet Cleaning - only working along left shoulder
12th St to WI-158 339.0 to 342.2 Medium Various lanes closed 04/06/13 12:00 AM to 07/15/13 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
WI-142 to CR-N 340.7 to 341.5 Medium Left lane closed, two lanes open 03/24/13 08:00 AM to 09/30/13 11:59 PM WisDOT
WI-142 to CR-N 340.7 to 341.5 Major Left two lanes closed, one lane open 03/24/13 08:00 AM to 09/30/13 11:59 PM WisDOT
WI-158 to Wilmot Rd 342.2 to 344.9 Major Left two lanes closed, one lane open 03/23/13 12:00 AM to 07/15/13 11:45 PM WisDOT Construction - N-S FREEWAY, STH 50 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA

Site Contributors | Requirements | Policies | Disclaimer | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
This site is best viewed in Internet Explorer 7.0+ or Firefox 3.0+ with cookies and JavaScript enabled.
Thu May 23 20:16:09 CDT 2013