Construction Report
Select Location
  
Updated: 6/18/18 10:48 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Quixote Ave (+0.1 miles) to CR-F (+0.9 miles) 258.6 to 3.0 Medium 0 lanes closed, three lanes open 6/18/18 7:00 PM to 6/19/18 10:00 AM,
6/25/18 7:00 PM to 6/26/18 10:00 AM
WisDOT Construction - Hudson - Baldwin | Sth 35 North To Ush 12 | IH 094, St. Croix County | ST. CROIX
Exit ramp to NB WI-35 0.4 Major All lanes closed 6/18/18 7:00 PM to 6/19/18 10:00 AM,
6/25/18 7:00 PM to 6/26/18 10:00 AM,
7/2/18 7:00 PM to 7/3/18 10:00 AM
WisDOT Construction - Detour: EB traffic will continue east to the Carmichael Rd off-ramp, cross over I-94, and take the Carmichael Rd on-ramp to I-94 WB back to the STH 35N NB off-ramp.
Entrance ramp from SB WI-35 0.7 Major All lanes and shoulders closed 5/2/18 12:00 AM to 10/18/18 11:45 PM WisDOT Construction - Detour: STH 35N SB traffic will take the off ramp to I-94 WB, travel on I-94 WB to the off ramp at STH 95, cross under I-94, and take the STH 95 on ramp to I-94 EB
Front St to Coulee Trl Medium One lane closed, up to two lanes open 6/18/18 7:00 AM to 5:00 PM daily until 6/28/18 WisDOT Maintenance - pavement marking
US-12 (+0.2 miles) to 100th St (+0.8 miles) 4.3 to 8.9 Medium One lane closed, one or two lanes open 6/18/18 7:00 PM to 6/19/18 9:00 AM WisDOT Construction - Hudson - Baldwin | Ush 12 To Sth 65 (Eb & Wb) | IH 094, St. Croix County | ST. CROIX
250th St (-0.7 miles) to US-12 (-0.6 miles) 35.8 to 40.8 Medium One lane closed, one lane open 6/18/18 6:00 PM to 6/19/18 10:00 AM,
6/25/18 6:00 PM to 6/26/18 10:00 AM,
7/2/18 6:00 PM to 7/3/18 10:00 AM,
7/9/18 6:00 PM to 7/10/18 10:00 AM,
... more, ending on 8/28/18
WisDOT Construction - Detour: Alternate 94. Follow STH 128 to USH 12 to STH 25
at US-53 (-0.3 miles) 70.1 Minor Left shoulder closed, all lanes open 4/30/18 12:00 AM to 8/7/18 11:45 PM WisDOT Construction - Eau Claire - Osseo | 2 Br/Hobbs Rd B18-210/Cth I B18-232 | IH 094, EAU CLAIRE COUNTY | EAU CLAIRE
US-53 (-0.3 miles) to County Road HH (+0.2 miles) 70.1 to 81.2 Major All lanes closed 6/18/18 10:30 PM to 6/19/18 5:00 AM WisDOT Construction - Detour: Traffic will be detoured from Exit 70 (USH 53) to Exit 81 (CTH HH) using I-94 Alternate Route along USH 53
at Otter Creek Rd 71.9 Minor Right shoulder closed, all lanes open 4/30/18 12:00 AM to 8/7/18 11:45 PM WisDOT Construction - Eau Claire - Osseo | 2 Br/Hobbs Rd B18-210/Cth I B18-232 | IH 094, EAU CLAIRE COUNTY | EAU CLAIRE
at Otter Creek Rd 71.9 Medium One lane closed, one lane open 6/18/18 4:00 PM to 6/21/18 11:00 AM WisDOT Construction - Eau Claire - Osseo | 2 Br/Hobbs Rd B18-210/Cth I B18-232 | IH 094, EAU CLAIRE COUNTY | EAU CLAIRE
County Road U (-0.3 miles) to CR-J 110.3 to 115.0 Medium One lane closed, two lanes open 6/18/18 8:00 PM to 6/19/18 9:00 AM,
6/25/18 8:00 PM to 6/26/18 9:00 AM,
7/2/18 8:00 PM to 7/3/18 9:00 AM,
7/9/18 8:00 PM to 7/10/18 9:00 AM,
... more, ending on 8/28/18
WisDOT Construction - Madison - Portage | Cth Cs To Portage Interchange | IH 039, Columbia | COLUMBIA
County Road U (-0.3 miles) to CR-J 110.3 to 115.0 Medium Various lanes closed 6/18/18 9:00 PM to 6/19/18 6:00 AM,
6/25/18 9:00 PM to 6/26/18 6:00 AM,
7/2/18 9:00 PM to 7/3/18 6:00 AM,
7/9/18 9:00 PM to 7/10/18 6:00 AM,
... more, ending on 8/28/18
WisDOT Construction - Madison - Portage | Cth Cs To Portage Interchange | IH 039, Columbia | COLUMBIA
County Road U to CR-J 110.6 to 115.1 Minor Right shoulder closed, all lanes open 6/17/18 10:00 PM to 6/22/18 9:00 AM,
6/24/18 10:00 PM to 6/29/18 9:00 AM,
7/1/18 10:00 PM to 7/6/18 9:00 AM,
7/8/18 10:00 PM to 7/13/18 9:00 AM,
... more, ending on 8/31/18
WisDOT Construction - Madison - Portage | Cth Cs To Portage Interchange | IH 039, Columbia | COLUMBIA
County Road U to CR-J 110.6 to 115.1 Minor Left shoulder closed, all lanes open 6/17/18 10:00 PM to 6/22/18 9:00 AM,
6/24/18 10:00 PM to 6/29/18 9:00 AM,
7/1/18 10:00 PM to 7/6/18 9:00 AM,
7/8/18 10:00 PM to 7/13/18 9:00 AM,
... more, ending on 8/31/18
WisDOT Construction - Madison - Portage | Cth Cs To Portage Interchange | IH 039, Columbia | COLUMBIA
Grandview Blvd (+0.1 miles) to WI-164 (+0.1 miles) 292.6 to 294.1 Minor Various lanes closed 6/18/18 11:00 PM to 6/19/18 5:00 AM daily until 6/29/18 WisDOT Permit - we are doing fiber work under hwy 94 and Pewaukee rd also the onramp from Pewaukee rd to 94e
at WI-164 (+0.1 miles) 294.2 Minor Right shoulder closed, all lanes open 6/18/18 10:00 AM to 6/19/18 4:00 AM daily until 6/20/18 WisDOT Permit - atc fiber work on the 94e onramp shoulder on Pewaukee rd and 94e onramp
at WI-164 (+0.1 miles) 294.2 Minor Right shoulder closed, all lanes open 6/18/18 10:00 AM to 4:00 PM daily until 6/20/18 WisDOT Permit - atc fiber work on the 94e onramp shoulder on Pewaukee rd and 94e onramp
Sunny Slope Rd (-0.1 miles) to Underwood Pkwy (-0.1 miles) 301.4 to 302.5 Minor Left shoulder closed, all lanes open 2/14/18 12:00 AM to 8/17/18 11:45 PM WisDOT Construction - Zoo Ic, Ih 94 Auxiliary Lanes | Moorland Rd To Underwood Prkwy | I 94, Waukesha County | WAUKESHA
Exit ramp to SB I-41 303.3 Major All lanes closed 6/18/18 10:30 PM to 6/19/18 4:30 AM daily until 6/20/18 WisDOT Construction - Detour: I-94 EB to WIS 100 NB to Watertown Plank Rd EB to I-41 NB;
Exit ramp to SB I-41 303.3 None All lanes and shoulders closed 10/20/17 12:00 AM to 8/30/18 11:45 PM WisDOT Construction - Detour: I-94 EB exit at HWY 100 SB to Greenfield Ave EB to I-41 SB;
Entrance ramp from SB I-41 304.9 Major All lanes closed 12/22/16 12:00 AM to 8/1/18 11:45 PM WisDOT Construction - Detour: Take I-94 East to the WIS 100 Exit Ramp; take WIS 100 South to Greenfield Ave, Greenfield Ave East to 84th St; OR, Take I-94 East to the 68th-70th St Exit; take 70th St North to OConnor St, OConnor St West to 84th St
Entrance ramp from EB WI-59 304.9 Major All lanes and shoulders closed 12/11/17 12:00 AM to 6/28/18 11:45 PM WisDOT Construction - Detour: EB Greenfield Ave to NB 84th Street to I-94 EB
WI-175 to 44th St (+0.1 miles) 307.6 to 307.7 Minor Right shoulder closed, all lanes open 6/19/18 9:00 AM to 3:30 PM WisDOT Construction - Bridge Inspections
at 44th St (+0.1 miles) 307.7 Major All lanes closed 6/19/18 9:00 AM to 3:30 PM WisDOT Construction - Detour: No detour provided
at 13th St 309.7 Major All lanes and shoulders closed 3/9/18 12:00 AM to 7/27/18 11:45 PM WisDOT Construction - Detour: Follow posted detour
US-18 to Washington St (-0.1 miles) 72.4 to 311.6 Medium 0 lanes closed, two or three lanes open 3/7/18 12:00 AM to 8/29/18 11:45 PM WisDOT Construction - Valley Bridge Ih43/Ih94 | Virginia St-1500ft N(Menomonee River) | IH 043, Milwaukee County | MILWAUKEE
Entrance ramp from WB I-794 311.1 Major All lanes closed 3/8/18 12:00 AM to 6/24/18 11:45 PM WisDOT Construction - Detour: Follow posted detour
Entrance ramp from EB I-894 317.1 None All lanes and shoulders open 10/20/17 12:00 AM to 8/30/18 11:45 PM WisDOT Construction - Detour: I-41 SB to Bluemound Rd WB to Moorland Rd SB to I-94 WB;
Puetz Rd to WI-100 (+0.2 miles) 321.7 to 322.9 Minor Right shoulder closed, all lanes open 11/22/17 12:00 AM to 9/21/18 11:45 PM WisDOT Construction - N-S Freeway, Ryan Road Interchange | Ryan Rd, Bridge & Ramps | IH 94 Milwaukee County | MILWAUKEE
WI-100 (-0.2 miles) to WI-100 (+0.2 miles) 322.4 to 322.9 Major All lanes closed 6/18/18 10:00 PM to 6/19/18 5:00 AM daily until 6/20/18 WisDOT Construction - Detour: Continue to WIS 100 exit. Enter I-41 from WIS 100 entrance ramp
7 Mile Rd (+0.2 miles) to WI-142 (-0.4 miles) 326.1 to 340.2 Medium Left lane closed, two or three lanes open 3/30/18 12:00 AM to 6/30/18 11:45 PM WisDOT Construction - N-S Freeway, Ken&Rac Work Zone Prep | Sth 142 To Cth G | IH 041 | RACINE

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-142 (+0.3 miles) to 1st St 340.4 to 336.9 Minor Left shoulder closed, all lanes open 3/13/18 12:00 AM to 6/30/18 11:45 PM WisDOT Construction - N-S Freeway, Ken&Rac Work Zone Prep | Sth 142 To Cth G | IH 041 | RACINE
1st St to County Road G (+0.2 miles) 336.9 to 327.1 Minor Left shoulder closed, all lanes open 3/13/18 12:00 AM to 6/30/18 11:45 PM WisDOT Construction - N-S Freeway, Ken&Rac Work Zone Prep | Sth 142 To Cth G | IH 041 | RACINE
Spring St (-0.3 miles) to Golf Rd (-0.1 miles) 332.8 to 330.4 Minor Right shoulder closed, all lanes open 3/7/18 9:30 PM to 6/30/18 9:30 PM WisDOT Construction - N-S Freeway, Ken&Rac Work Zone Prep | Sth 142 To Cth G | IH 041 | RACINE
at 7 Mile Rd (+1.0 miles) 324.9 Medium Various lanes closed 6/18/18 6:00 PM to 6/19/18 12:00 AM daily until 10/8/18 WisDOT Construction - W Oklahoma Avenue | S 60th Street To S 49th Street | Loc Str, Milwaukee County | MILWAUKEE
7 Mile Rd (+1.0 miles) to Oakwood Rd 324.8 to 323.7 Medium Right lane closed, two lanes open 6/18/18 9:00 AM to 2:00 PM WisDOT Maintenance - Asphalt repair
WI-100 (-0.3 miles) to WI-100 (+0.2 miles) 323.0 to 322.4 Major All lanes closed 6/18/18 10:00 PM to 6/19/18 5:00 AM WisDOT Construction - Detour: Continue north on off ramp to WIS 100. Enter I-41 from WIS 100 entrance ramp.
WI-100 (-0.3 miles) to Puetz Rd 323.0 to 321.6 Minor Right shoulder closed, all lanes open 11/22/17 12:00 AM to 9/21/18 11:45 PM WisDOT Construction - N-S Freeway, Ryan Road Interchange | Ryan Rd, Bridge & Ramps | IH 94 Milwaukee County | MILWAUKEE
Entrance ramp from NB I-41 316.1 None All lanes and shoulders closed 10/20/17 12:00 AM to 8/30/18 11:45 PM WisDOT Construction - Detour: I-94 EB: Greenfield Ave EB to 84th St NB to I-94 EB;
Exit to NB I-43 (North-South Fwy) 311.9 to 72.2 Medium 0 lanes closed, two to four lanes open 3/2/18 12:00 AM to 8/29/18 11:45 PM WisDOT Construction - Valley Bridge Ih43/Ih94 | Virginia St-1500ft N(Menomonee River) | IH 043, Milwaukee County | MILWAUKEE
at Canal St 310.8 Major All lanes closed 5/4/18 12:00 AM to 6/19/18 11:45 PM WisDOT Construction - Detour: Multiple signed detours available: 1) Use NB National Ave exit to 9th & Walker, proceed north on 9th to National, and follow signs west on National to Miller Park Way. 2) Continue north on I-43 to McKinley exit, turn left and re-e
Exit ramp to NB I-41 305.8 Major All lanes closed 6/18/18 10:30 PM to 6/19/18 4:30 AM daily until 6/20/18 WisDOT Construction - Detour: I-94 WB to 84th/Glenview Ave NB to Watertown Plank Rd WB to I-41 NB;
Exit ramp to SB I-41 305.0 Major All lanes and shoulders closed 10/16/17 12:00 AM to 6/28/18 11:45 PM WisDOT Construction - Detour: WB I-94 to SB 84th St to WB Greenfield Ave to SB I-41/894
Entrance ramp from NB I-41 304.0 None All lanes open with restriction 10/20/17 12:00 AM to 8/30/18 11:45 PM WisDOT Construction - Detour: I-41 NB to WB Greenfield Ave to NB Moorland Rd to I-94 WB;
Underwood Pkwy to Sunny Slope Rd 303.1 to 302.1 Minor Left shoulder closed, all lanes open 2/12/18 12:00 AM to 8/17/18 11:45 PM WisDOT Construction - Zoo Ic, Ih 94 Auxiliary Lanes | Moorland Rd To Underwood Prkwy | I 94, Waukesha County | WAUKESHA
Elm Grove Rd to Moorland Rd 302.6 to 301.1 Major Right two lanes closed, one lane open 6/18/18 9:30 PM to 6/19/18 5:30 AM daily until 6/20/18 WisDOT Construction - Zoo Ic, Ih 94 Auxiliary Lanes | Moorland Rd To Underwood Prkwy | I 94, Waukesha County | WAUKESHA
Exit ramp to NB Moorland Rd 301.3 Medium All lanes closed 6/18/18 9:30 PM to 6/19/18 5:30 AM daily until 6/20/18 WisDOT Construction - Detour: WB I-94 Exit at SB Moorland Rd, make a legal U-Turn
at WI-164 (-0.2 miles) 294.8 Minor Right shoulder closed, all lanes open 6/18/18 10:00 AM to 2:00 PM daily until 6/20/18 WisDOT Permit - restoration to be performed on previous excavation
at US-151 (-0.1 miles) 135.7 Minor Right shoulder closed, all lanes open 6/18/18 7:00 AM to 7:00 PM daily until 6/29/18 WisDOT Permit - Shoulder closure on ramp of Interstate 39 by High crossing blvd
Smokey Hollow Rd to County Road U (+0.1 miles) 116.6 to 111.1 Medium One lane closed, two lanes open 6/18/18 6:00 PM to 6/19/18 8:00 AM,
6/25/18 6:00 PM to 6/26/18 8:00 AM,
7/2/18 6:00 PM to 7/3/18 8:00 AM,
7/9/18 6:00 PM to 7/10/18 8:00 AM,
... more, ending on 8/28/18
WisDOT Construction - Madison - Portage | Cth Cs To Portage Interchange | IH 039, Columbia | COLUMBIA
CR-J (-0.1 miles) to County Road U (+0.1 miles) 115.7 to 111.1 Minor Left shoulder closed, all lanes open 6/17/18 8:00 PM to 6/22/18 7:00 AM,
6/24/18 8:00 PM to 6/29/18 7:00 AM,
7/1/18 8:00 PM to 7/6/18 7:00 AM,
7/8/18 8:00 PM to 7/13/18 7:00 AM,
... more, ending on 8/31/18
WisDOT Construction - Madison - Portage | Cth Cs To Portage Interchange | IH 039, Columbia | COLUMBIA
CR-J (-0.1 miles) to County Road U (+0.1 miles) 115.7 to 111.1 Minor Right shoulder closed, all lanes open 6/17/18 8:00 PM to 6/22/18 7:00 AM,
6/24/18 8:00 PM to 6/29/18 7:00 AM,
7/1/18 8:00 PM to 7/6/18 7:00 AM,
7/8/18 8:00 PM to 7/13/18 7:00 AM,
... more, ending on 8/31/18
WisDOT Construction - Madison - Portage | Cth Cs To Portage Interchange | IH 039, Columbia | COLUMBIA
Welch Prairie Rd to Welch Prairie Rd (+1.0 miles) 64.1 to 63.1 Medium Right lane closed, one lane open 6/19/18 7:00 AM to 3:00 PM WisDOT Maintenance - Beam Guard
Exit ramp to WB County Highway Ew 135.2 Minor Right shoulder closed, all lanes open 6/18/18 7:00 AM to 6:00 PM daily until 6/22/18 WisDOT Construction - High Voltage Power Line Work along I-94 WB
Exit ramp to WB County Highway Ew 135.2 Minor Left shoulder closed, all lanes open 6/18/18 7:00 AM to 6:00 PM daily until 6/22/18 WisDOT Construction - High Voltage Power Line Work Along I-94 WB
Entrance ramp from WB County Highway Ew 134.9 Minor Right shoulder closed, all lanes open 6/18/18 7:00 AM to 6:00 PM daily until 6/22/18 WisDOT Construction - High Voltage Power Line Work Along I-94 WB
Aspen Ave (+1.7 miles) to County Road O (-0.2 miles) 131.8 to 127.9 Minor Right shoulder closed, all lanes open 6/18/18 7:00 AM to 6:00 PM daily until 6/22/18 WisDOT Construction - Setting High Voltage Towers Along I94 WB
at County Road O (+2.4 miles) 125.3 Minor Right shoulder closed, all lanes open 6/18/18 7:00 AM to 5:00 PM daily until 6/23/18 WisDOT Construction - H&M will need a right shoulder closure while we install foundations for the Badger Coulee Transmission Line Project.
at Lambert Rd (+2.8 miles) 120.4 Minor Right shoulder closed, all lanes open 6/18/18 7:00 AM to 5:00 PM daily until 6/23/18 WisDOT Construction - H&M will need a right shoulder closure while we install foundations for the Badger Coulee Transmission Line Project.
at WI-54 (-0.3 miles) 116.4 Minor Right shoulder closed, all lanes open 6/18/18 7:00 AM to 5:00 PM daily until 6/23/18 WisDOT Construction - H&M will need a right shoulder closure while we install foundations for the Badger Coulee Transmission Line Project.
at Otter Creek Rd 71.9 Minor Left shoulder closed, all lanes open 4/30/18 12:00 AM to 8/7/18 11:45 PM WisDOT Construction - Eau Claire - Osseo | 2 Br/Hobbs Rd B18-210/Cth I B18-232 | IH 094, EAU CLAIRE COUNTY | EAU CLAIRE
at Otter Creek Rd 71.9 Minor Right shoulder closed, all lanes open 4/30/18 12:00 AM to 8/7/18 11:45 PM WisDOT Construction - Eau Claire - Osseo | 2 Br/Hobbs Rd B18-210/Cth I B18-232 | IH 094, EAU CLAIRE COUNTY | EAU CLAIRE
at Otter Creek Rd 71.9 Medium One lane closed, one lane open 6/18/18 5:00 PM to 6/21/18 11:00 AM WisDOT Construction - Eau Claire - Osseo | 2 Br/Hobbs Rd B18-210/Cth I B18-232 | IH 094, EAU CLAIRE COUNTY | EAU CLAIRE
490th Ave (-0.4 miles) to 490th Ave (+0.4 miles) 56.5 to 55.7 Medium One lane closed, one lane open 6/18/18 7:00 PM to 6/19/18 10:00 AM WisDOT Construction - Menomonie - Eau Claire | 490th Av Bridg West Bound B-17-0199 | IH 094, DUNN COUNTY | DUNN
at US-12 (+0.6 miles) 40.8 Medium One lane closed, one lane open 6/18/18 6:00 PM to 6/19/18 12:00 PM,
6/25/18 6:00 PM to 6/26/18 12:00 PM,
7/2/18 6:00 PM to 7/3/18 12:00 PM,
7/9/18 6:00 PM to 7/10/18 12:00 PM,
... more, ending on 8/28/18
WisDOT Construction - Detour: Alternate 94. Follow STH 25 to USH 12 to STH 128.
US-12 (+0.6 miles) to 650th Ave 40.8 to 38.8 Minor Right shoulder closed, all lanes open 6/18/18 11:00 AM to 6:00 PM,
6/25/18 11:00 AM to 6:00 PM,
7/2/18 11:00 AM to 6:00 PM,
7/9/18 11:00 AM to 6:00 PM,
... more, ending on 7/30/18
WisDOT Construction - Detour: Alternate 94. Follow STH 25 to USH 12 to STH 128
US-12 (+0.6 miles) to 250th St (+0.7 miles) 40.8 to 35.8 Medium One lane closed, one lane open 6/17/18 9:00 PM to 6/18/18 11:00 AM,
6/24/18 9:00 PM to 6/25/18 11:00 AM,
7/1/18 9:00 PM to 7/2/18 11:00 AM,
7/8/18 9:00 PM to 7/9/18 11:00 AM,
... more, ending on 8/27/18
WisDOT Construction - Detour: Alternate 94. Follow STH 25 to USH 12 to STH 128
WI-65 (+0.2 miles) to US-12 (-0.8 miles) 9.9 to 5.0 Medium One lane closed, one lane open 6/18/18 7:00 PM to 6/19/18 5:00 AM WisDOT Construction - Hudson - Baldwin | Ush 12 To Sth 65 (Eb & Wb) | IH 094, St. Croix County | ST. CROIX
Exit ramp to SEB WI-35 3.4 Major All lanes closed 6/18/18 7:00 PM to 6/19/18 5:00 AM,
6/25/18 7:00 PM to 6/26/18 5:00 AM,
7/2/18 7:00 PM to 7/3/18 5:00 AM,
7/9/18 7:00 PM to 7/10/18 5:00 AM
WisDOT Construction - Detour: WB traffic continues west to the Carmichael Rd off-ramp, cross over I-94, and take the Carmichael Rd on-ramp to I 94 EB back to STH 35S SB.
CR-F (-1.0 miles) to Quixote Ave (-0.1 miles) 3.1 to 258.7 Medium 0 lanes closed, two or three lanes open 6/18/18 7:00 PM to 6/19/18 5:00 AM,
6/25/18 7:00 PM to 6/26/18 5:00 AM
WisDOT Construction - Hudson - Baldwin | Sth 35 North To Ush 12 | IH 094, St. Croix County | ST. CROIX
Entrance ramp from SB CR-F 1.8 Medium All lanes closed 5/8/18 12:00 AM to 10/18/18 11:45 PM WisDOT Construction - Detour: Traffic will travel east on Coulee Rd to Carmichael Rd and take the Carmichael Rd on ramp to I-94 WB.
Front St (-0.1 miles) to Buckeye St Medium One lane closed, up to two lanes open 6/18/18 7:00 AM to 5:00 PM daily until 6/28/18 WisDOT Maintenance - pavement marking

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Mon Jun 18 2018 10:55:25 CDT