Construction Report
Select Location
  
Updated: 5/4/15 10:01 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Left two lanes closed, one lane open 4/28/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
Entrance ramp from SB US-151 136.2 Major Various lanes closed 5/4/15 7:00 PM to 5/5/15 6:00 AM daily until 5/22/15 WisDOT Construction - Detour: USH 151S, Exit 97B N/W IH39/90/94, Exit 132 USH 51S, On Ramp S/E IH 39/90/94
Canal St to National/WI-59 310.9 to 311.5 Minor Right shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Ramp from SB I-43 to National Ave 311.3 Minor Left shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Entrance ramp from SEB WI-100 323.1 Major All lanes and shoulders closed 3/23/15 12:00 AM to 5/9/15 11:45 PM WisDOT Construction - Detour: Take HWY 100 South to Greenfield to I-894/US45 North to 94 East. OR Take HWY 100 North to Watertown Plank to Glenview to I-94 East
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 7/2/15 11:45 PM WisDOT Construction - Detour: Use I-94 EB (SB) to County K to West Frontage Road to WIS 20; *** Long Term Closure ***
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***
122nd St (+0.5 miles) to IL-21 349.0 to 7.6 Medium Various lanes closed 5/3/15 7:00 AM to 10/31/15 3:00 PM Lake County Resurfacing

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
IL-21 to 122nd St (-0.5 miles) 7.6 to 349.0 Medium Various lanes closed 5/3/15 7:00 AM to 10/31/15 3:00 PM Lake County Resurfacing
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
50th Rd to 7 Mile Rd (+1.0 miles) 331.9 to 324.9 Medium Left lane closed, two lanes open 5/4/15 7:30 AM to 3:00 PM daily until 5/8/15 WisDOT Maintenance - pavement sweeping
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Exit ramp to WB Oconnor St 305.5 Medium All lanes and shoulders closed 10/13/14 12:00 AM to 6/15/15 11:45 PM WisDOT Construction - Detour: Take 68th-70th st exit, continue W on O'Conner, North on 76th st, West on Bluemound to 84th st (North 84th st Detour). Take 68th-70th exit, Continue West, South on 70th, West on Greenfield to 84th st. (South 84th st Detour).
Exit ramp to NB US-45 304.6 Major All lanes and shoulders closed 5/4/15 11:00 PM to 5/5/15 4:30 AM daily until 5/6/15 WisDOT Construction - Detour: Take 68th st to 76th st to Bluemound to Glenview to Watertown Plank Rd to the US45 North Ramp. OR Take the HWY 100 exit to HWY100 to North Ave to the US45 North ramp
Exit ramp to EB I-894 304.6 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
at WI-26 (+0.1 miles) 266.3 Medium Right lane closed, one lane open 5/5/15 9:00 AM to 12:00 PM WisDOT Maintenance - Beam Guard Repair
Richards Rd to Richards Rd (+0.6 miles) 118.4 to 117.8 Medium Right lane closed, two lanes open 5/4/15 7:30 AM to 3:30 PM WisDOT Maintenance - Beam Guard Repair
CR-J (-0.1 miles) to Kent Rd 115.7 to 114.3 Major Left two lanes closed, one lane open 4/28/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Mon May 04 2015 10:02:43 CDT