Construction Report
Select Location
  
Updated: 8/16/17 6:25 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Front St (-0.1 miles) to Front St (-0.1 miles) 0.6 to 0.6 Medium Left two lanes closed, one lane open 8/16/17 9:00 PM to 8/17/17 5:00 AM WisDOT Maintenance - Bridge Deck repair on I-93 Eastbound over STH 35
130th St (+0.5 miles) to 140th St (+0.4 miles) 12.0 to 13.0 Minor Right shoulder closed, all lanes open 4/17/17 7:00 AM to 8/31/17 6:00 PM WisDOT Construction - Hudson - Baldwin Highland Dr Bridge B-55-0258 | I 94 St Croix County | ST. CROIX
at WI-128 28.5 Minor Left shoulder closed, all lanes open 4/11/17 12:00 AM to 11/13/17 11:45 PM WisDOT Construction - Baldwin - Menomonie STH 128 Bridge B-55-0266 | I 94 St Croix County | ST. CROIX
at WI-128 28.3 Medium One lane closed, one lane open 8/17/17 5:00 AM to 10:00 AM WisDOT Construction - Baldwin - Menomonie STH 128 Bridge B-55-0266 | I 94 St Croix County | ST. CROIX
at WI-128 28.3 Medium One lane closed, one lane open 8/16/17 5:00 PM to 11:00 PM WisDOT Construction - Baldwin - Menomonie STH 128 Bridge B-55-0266 | I 94 St Croix County | ST. CROIX
at WI-128 28.3 Minor Right shoulder closed, all lanes open 8/3/17 12:00 AM to 8/31/17 11:45 PM WisDOT Construction - Baldwin - Menomonie STH 128 Bridge B-55-0266 | I 94 St Croix County | ST. CROIX
County Road H to US-12 (+0.6 miles) 54.6 to 85.9 Medium Various lanes closed 8/16/17 9:00 PM to 8/17/17 8:00 AM daily until 8/29/17 WisDOT Construction - Tomah - Portage Camp Douglas - STH 33 | I 90 Juneau, Sauk, Columbia County | JUNEAU
WI-80 (-0.1 miles) to WI-80 (+0.1 miles) 61.2 to 61.5 Minor Right shoulder closed, all lanes open 8/11/17 12:00 PM to 9/1/17 8:00 AM WisDOT Construction - Mauston - New Lisbon STH 80 Overhead & Approaches | I 90 Juneau County | JUNEAU
WI-80 (-0.1 miles) to WI-80 (+0.1 miles) 61.2 to 61.5 Medium Right lane closed, one lane open 8/16/17 9:00 PM to 8/17/17 8:00 AM daily until 8/18/17 WisDOT Construction - Mauston - New Lisbon STH 80 Overhead & Approaches | I 90 Juneau County | JUNEAU
US-12 (+0.6 miles) to mile marker 104.3 85.9 to 104.3 Medium Various lanes closed 8/16/17 9:00 PM to 8/17/17 8:00 AM daily until 8/29/17 WisDOT Construction - Tomah - Portage Camp Douglas - STH 33 | I 90 Juneau, Sauk, Columbia County | JUNEAU
WI-33 (-0.3 miles) to I-39 (-0.1 miles) 105.3 to 108.5 Medium 0 lanes closed, two lanes open 8/16/17 7:00 PM to 8/17/17 9:00 AM,
8/23/17 7:00 PM to 8/24/17 9:00 AM,
8/30/17 7:00 PM to 8/31/17 9:00 AM
WisDOT Construction - Madison - Portage, CTH CS - Portage Interchange | I 39 Columbia County | COLUMBIA
Exit ramp to SB WI-78 107.5 Major All lanes closed 8/16/17 11:00 PM to 8/17/17 7:00 AM WisDOT Construction - Detour: I-90/94 EB traffic should utilize Exit 106 to STH 33 EB and proceed to I-39 NB & SB.
Patton Rd (+0.8 miles) to CR-DM (+0.2 miles) 123.0 to 124.2 Medium One lane closed, two lanes open 8/13/17 9:00 PM to 8/18/17 11:00 AM,
8/20/17 9:00 PM to 8/25/17 11:00 AM,
8/27/17 9:00 PM to 8/31/17 11:59 PM
WisDOT Construction - Madison - Portage | CTH DM Bridge B-13-0648 | IH 39, Dane County | DANE
Patton Rd (+0.8 miles) to CR-DM (+0.2 miles) 123.0 to 124.2 Minor Various lanes closed 8/16/17 10:00 PM to 8/17/17 5:00 AM daily until 8/18/17 WisDOT Construction - Madison - Portage | CTH DM Bridge B-13-0648 | IH 39, Dane County | DANE
CR-DM to CR-DM (+0.2 miles) 124.0 to 124.2 Minor Left shoulder closed, all lanes open 6/5/17 12:00 AM to 10/13/17 11:45 PM WisDOT Construction - Madison - Portage | CTH DM Bridge B-13-0648 | IH 39, Dane County | DANE
CR-DM to CR-DM (+0.2 miles) 124.0 to 124.2 Minor Right shoulder closed, all lanes open 6/5/17 12:00 AM to 10/13/17 11:45 PM WisDOT Construction - Madison - Portage | CTH DM Bridge B-13-0648 | IH 39, Dane County | DANE
Cuba Valley Rd (+0.2 miles) to River Rd (+0.2 miles) 128.4 to 128.8 Minor Left shoulder closed, all lanes open 8/7/17 12:00 AM to 10/13/17 11:45 PM WisDOT Construction - Madison - Portage | River Road Bridge B-13-0089 | IH 039, Dane County | DANE
Cuba Valley Rd (+0.2 miles) to River Rd (+0.2 miles) 128.4 to 128.8 Minor Right shoulder closed, all lanes open 8/7/17 12:00 AM to 10/13/17 11:45 PM WisDOT Construction - Madison - Portage | River Road Bridge B-13-0089 | IH 039, Dane County | DANE
Cuba Valley Rd (+0.2 miles) to River Rd (+0.2 miles) 128.4 to 128.8 Medium One lane closed, two lanes open 8/13/17 9:00 PM to 8/18/17 11:00 AM,
8/20/17 9:00 PM to 8/25/17 11:00 AM,
8/27/17 9:00 PM to 8/31/17 11:59 PM
WisDOT Construction - Madison - Portage | River Road Bridge B-13-0089 | IH 039, Dane County | DANE
Entrance ramp from SB I-41 304.4 Unknown All lanes open with restriction 6/3/17 12:00 AM to 11/15/17 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Watertown Plank Rd-West Exit; take Watertown Plank Rd West to Mayfair Rd/Hwy 100; OR, Take I-41/US 45 South to the Bluemound Rd Exit; take Bluemound Rd West to Mayfair Rd/Hwy 100; OR, Take I-41/US 45 Sou
Exit ramp to SB WI-181 304.8 Major All lanes closed 12/22/16 12:00 AM to 11/22/17 11:45 PM WisDOT Construction - Detour: Take I-94 East to the WIS 100 Exit Ramp; take WIS 100 South to Greenfield Ave, Greenfield Ave East to 84th St; OR, Take I-94 East to the 68th-70th St Exit; take 70th St North to OConnor St, OConnor St West to 84th St
at Rawson Ave 319.6 Minor Right shoulder closed, all lanes open 8/17/17 10:00 AM to 2:00 PM daily until 8/18/17 WisDOT Permit - Right shoulder closed for safety. Work beyond shoulder in Right of Way.
Exit ramp to WB 1st St 336.6 Medium All lanes closed 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: Ramp will be open for traffic. There will also be work on CTH KR.
Entrance ramp from EB 1st St 336.6 Medium All lanes closed 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: Ramp will be open for traffic. There will also be work on CTH KR.
Entrance ramp from EB 12th St 338.6 Medium All lanes closed 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: Ramp will be open for traffic. There will also be work on CTH E.
Exit ramp to WB WI-142 340.4 Major All lanes closed 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: There is no detour route because this is a moving lane closure done at night.
Entrance ramp from EB WI-142 341.0 Major All lanes closed 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: There is no detour route because this is a moving lane closure done at night.
Exit ramp to WB 71st St 343.4 Minor One lane closed, one lane open 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: There is no detour route because this is a moving lane closure done at night.
Entrance ramp from EB WI-50 344.4 Major All lanes closed 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: There is no detour route because this is a moving lane closure done at night.

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB WI-50 344.3 Minor One lane closed, one lane open 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: There is no detour route because this is a moving lane closure done at night.
Exit ramp to EB Burlington Rd 341.0 Medium All lanes closed 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: There is no detour route because this is a moving lane closure done at night.
Exit ramp to EB 12th St 339.3 Medium All lanes closed 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: Ramp will be open for traffic. There will also be work on CTH E.
Entrance ramp from WB 12th St 339.3 Medium All lanes closed 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: Ramp will be open for traffic. There will also be work on CTH E.
Exit ramp to EB 1st St 337.2 Medium All lanes closed 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: Ramp will be open for traffic. There will also be work on CTH KR.
Entrance ramp from WB 1st St 337.2 Medium All lanes closed 8/16/17 8:00 PM to 8/17/17 5:00 AM daily until 8/19/17 WisDOT Construction - Detour: Ramp will be open for traffic. There will also be work on CTH KR.
Exit ramp to EB WI-100 322.9 Major All lanes closed 11/30/15 12:00 AM to 11/15/17 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 84th St Exit; take 84th St South to Greenfield Ave, Greenfield Ave West to Hwy 100; OR, Take I-94 West to the Moorland Rd-South Exit; take Moorland Rd South to Greenfield Ave, Greenfield Ave East to Hwy 100
Entrance ramp from SB WI-181 305.4 Major All lanes closed 5/9/17 12:00 AM to 12/15/17 11:45 PM WisDOT Construction - Detour: To go West: Take 84th St North to Bluemound Rd, Bluemound Rd West to Moorland Rd, Moorland Rd South to the I-94 West Entrance Ramp; To go North: Take 84th St North to Watertown Plank Rd, Watertown Plank Rd West to the I-41/US 45 No
Exit ramp to NB I-41 305.0 None All lanes open with restriction 5/9/17 12:00 AM to 12/15/17 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Entrance ramp from SB I-41 304.2 Unknown All lanes open with restriction 6/3/17 12:00 AM to 11/15/17 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Watertown Plank Rd-West Exit; take Watertown Plank Rd West to Mayfair Rd/Hwy 100; OR, Take I-41/US 45 South to the Bluemound Rd Exit; take Bluemound Rd West to Mayfair Rd/Hwy 100; OR, Take I-41/US 45 Sou
River Rd (-0.4 miles) to River Rd 129.6 to 129.2 Minor Left shoulder closed, all lanes open 8/7/17 12:00 AM to 10/13/17 11:45 PM WisDOT Construction - Madison - Portage | River Road Bridge B-13-0089 | IH 039, Dane County | DANE
River Rd (-0.4 miles) to River Rd 129.6 to 129.2 Minor Right shoulder closed, all lanes open 8/7/17 12:00 AM to 10/13/17 11:45 PM WisDOT Construction - Madison - Portage | River Road Bridge B-13-0089 | IH 039, Dane County | DANE
River Rd (-0.4 miles) to River Rd 129.6 to 129.2 Medium One lane closed, two lanes open 8/13/17 9:00 PM to 8/17/17 11:00 AM,
8/20/17 9:00 PM to 8/24/17 11:00 AM,
8/27/17 9:00 PM to 8/31/17 11:00 AM
WisDOT Construction - Madison - Portage | River Road Bridge B-13-0089 | IH 039, Dane County | DANE
River Rd (-0.4 miles) to River Rd 129.6 to 129.2 Medium One lane closed, two lanes open 8/17/17 6:00 PM to 8/18/17 9:00 AM,
8/24/17 6:00 PM to 8/25/17 9:00 AM
WisDOT Construction - Madison - Portage | River Road Bridge B-13-0089 | IH 039, Dane County | DANE
County Road I (+0.2 miles) to CR-DM 125.8 to 124.6 Medium One lane closed, two lanes open 8/13/17 9:00 PM to 8/17/17 11:00 AM,
8/20/17 9:00 PM to 8/24/17 11:00 AM,
8/27/17 9:00 PM to 8/31/17 11:00 AM
WisDOT Construction - Madison - Portage | CTH DM Bridge B-13-0648 | IH 39, Dane County | DANE
County Road I (+0.2 miles) to CR-DM 125.8 to 124.6 Medium One lane closed, two lanes open 8/17/17 6:00 PM to 8/18/17 9:00 AM,
8/24/17 6:00 PM to 8/25/17 9:00 AM
WisDOT Construction - Madison - Portage | CTH DM Bridge B-13-0648 | IH 39, Dane County | DANE
County Road I (+0.2 miles) to CR-DM 125.8 to 124.6 Minor Various lanes closed 8/16/17 10:00 PM to 8/17/17 5:00 AM daily until 8/18/17 WisDOT Construction - Madison - Portage | CTH DM Bridge B-13-0648 | IH 39, Dane County | DANE
CR-DM (-0.2 miles) to CR-DM 124.8 to 124.6 Minor Left shoulder closed, all lanes open 6/5/17 12:00 AM to 10/13/17 11:45 PM WisDOT Construction - Madison - Portage | CTH DM Bridge B-13-0648 | IH 39, Dane County | DANE
CR-DM (-0.2 miles) to CR-DM 124.8 to 124.6 Minor Right shoulder closed, all lanes open 6/5/17 12:00 AM to 10/13/17 11:45 PM WisDOT Construction - Madison - Portage | CTH DM Bridge B-13-0648 | IH 39, Dane County | DANE
WI-33 (+0.2 miles) to US-12 (-0.6 miles) 105.9 to 86.5 Medium Various lanes closed 8/16/17 9:00 PM to 8/17/17 8:00 AM daily until 8/29/17 WisDOT Construction - Tomah - Portage Camp Douglas - STH 33 | I 90 Juneau, Sauk, Columbia County | JUNEAU
US-12 (-0.6 miles) to CR-C (-0.6 miles) 86.5 to 56.1 Medium Various lanes closed 8/16/17 9:00 PM to 8/17/17 8:00 AM daily until 8/29/17 WisDOT Construction - Tomah - Portage Camp Douglas - STH 33 | I 90 Juneau, Sauk, Columbia County | JUNEAU
WI-80 (-0.1 miles) to WI-80 (+0.1 miles) 62.0 to 61.8 Minor Right shoulder closed, all lanes open 8/11/17 12:00 PM to 9/1/17 8:00 AM WisDOT Construction - Mauston - New Lisbon STH 80 Overhead & Approaches | I 90 Juneau County | JUNEAU
WI-80 (-0.1 miles) to WI-80 (+0.1 miles) 62.0 to 61.8 Medium Right lane closed, one lane open 8/16/17 9:00 PM to 8/17/17 8:00 AM daily until 8/18/17 WisDOT Construction - Mauston - New Lisbon STH 80 Overhead & Approaches | I 90 Juneau County | JUNEAU
Castle Mound Rd to WI-54 (+0.2 miles) 117.7 to 115.9 Medium One lane closed, one lane open 8/15/17 6:00 AM to 8/17/17 11:00 AM WisDOT Construction - Detour: No posted detour. Follow alternate 94. CTH O - USH 12 - STH 54
County Road HH (+0.3 miles) to WI-93 80.8 to 68.5 Medium Left lane closed, one lane open 8/16/17 6:00 PM to 8/17/17 1:00 PM,
8/23/17 6:00 PM to 8/24/17 1:00 PM,
8/30/17 6:00 PM to 8/31/17 1:00 PM
WisDOT Construction - Chippewa Falls - Abbotsford, Cross Median Cable Guard | STH 29 NW Wide | EAU CLAIRE
at WI-128 28.5 Minor Left shoulder closed, all lanes open 4/11/17 12:00 AM to 11/13/17 11:45 PM WisDOT Construction - Baldwin - Menomonie STH 128 Bridge B-55-0266 | I 94 St Croix County | ST. CROIX
at WI-128 28.3 Medium One lane closed, one lane open 8/17/17 5:00 AM to 1:00 PM WisDOT Construction - Baldwin - Menomonie STH 128 Bridge B-55-0266 | I 94 St Croix County | ST. CROIX
at WI-128 28.3 Minor Right shoulder closed, all lanes open 8/3/17 12:00 AM to 8/31/17 11:45 PM WisDOT Construction - Baldwin - Menomonie STH 128 Bridge B-55-0266 | I 94 St Croix County | ST. CROIX
140th St (-0.4 miles) to 130th St (-0.5 miles) 13.0 to 12.0 Minor Left shoulder closed, all lanes open 4/17/17 7:00 AM to 8/31/17 6:00 PM WisDOT Construction - Hudson - Baldwin Highland Dr Bridge B-55-0258 | I 94 St Croix County | ST. CROIX
140th St (-0.4 miles) to 130th St (-0.5 miles) 13.0 to 12.0 Minor Right shoulder closed, all lanes open 4/17/17 7:00 AM to 8/31/17 6:00 PM WisDOT Construction - Hudson - Baldwin Highland Dr Bridge B-55-0258 | I 94 St Croix County | ST. CROIX
Front St (+0.1 miles) to Front St (+0.1 miles) 0.6 to 0.6 Medium Right lane closed, two lanes open 8/17/17 6:00 PM to 8/18/17 5:00 AM WisDOT Maintenance - Deck repair on I-94 Westbound Bridge over STH 35

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Wed Aug 16 2017 18:30:39 CDT