Construction Report
Select Location
  
Updated: 7/29/14 1:00 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Dane County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-14 from Wayside Rd to Pleasant View Rd Medium Various lanes closed 7/29/14 9:00 AM to 3:00 PM daily until 8/1/14 WisDOT Permit - Equipment for boring operation will be positioned in east bound lane
SEB US-14 at US-151 (+0.1 miles) Major All lanes and shoulders closed 7/9/14 12:00 AM to 8/4/14 11:45 PM WisDOT Construction - Detour: Continue south on USH 14, exit at McCoy Road and turn left, turn left to get back onto USH 14, to return to eastbound USH 12 (beltline).
NB US-51 from Commercial Ave to US-151 Major Left lane closed, two lanes open 7/29/14 9:00 AM to 1:00 PM WisDOT Maintenance - To repair a damaged inlet.
SEB US-51 from Cottage Grove Rd (+0.1 miles) to Cottage Grove Rd (+0.1 miles) Major Left lane closed, two lanes open 7/29/14 12:00 PM to 2:00 PM WisDOT Emergency - To repair damaged beam guard.
NB US-151/Verona Rd from Raymond Rd to US-12 Medium Various lanes closed 6/25/13 7:00 AM to 12/31/15 11:59 PM Gateway Multi-year reconstruction project to improve Verona Road (US 18/151). For more information visit: http://projects.511wi.gov/web/veronaroad-18-151#
SB US-151/Verona Rd from US-12 to Raymond Rd Medium Various lanes closed 6/25/13 7:00 AM to 12/31/15 11:59 PM Gateway Multi-year reconstruction project to improve Verona Road (US 18/151). For more information visit: http://projects.511wi.gov/web/veronaroad-18-151#
NB WI-73 from WI-106 to Fadness Rd Major All lanes and shoulders closed 4/21/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - Detour: Take I39 NB to USH 12 EB.
SB WI-73 from Fadness Rd to WI-106 Major All lanes and shoulders closed 4/21/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - Detour: Take USH 12 WB to IH39 SB.
SB Agriculture Dr from Pflaum Rd to World Dairy Dr Minor Various lanes closed 6/16/14 7:00 AM to 8/8/14 7:00 PM Gateway Installing storm sewer
EB Commercial Ave from Packers Ave to North St Minor Various lanes closed 5/12/14 8:00 AM to 10/17/14 11:59 PM Gateway
WB Commercial Ave from North St to WI-113 Minor Various lanes closed 5/12/14 8:00 AM to 10/17/14 11:59 PM Gateway
NEB Commonwealth Ave from Monroe St to Allen St Medium All lanes and shoulders closed 5/19/14 7:00 AM to 10/17/14 5:00 AM Gateway Replacing the sanitary and storm sewer, water main, curb and gutter and asphalt pavement
SWB Commonwealth Ave from Allen St to Monroe St Medium All lanes and shoulders closed 5/19/14 7:00 AM to 10/17/14 5:00 AM Gateway Replacing the sanitary and storm sewer, water main, curb and gutter and asphalt pavement
NB Gilbert Rd from Hammersley Rd to Whitney Way Minor Various lanes closed 7/8/14 7:00 AM to 8/29/14 11:59 PM Gateway Closed to through traffic for the installation of the water main, storm sewer and table top. More information on project .
SB Gilbert Rd from Whitney Way to Hammersley Rd Minor Various lanes closed 7/8/14 7:00 AM to 8/29/14 11:59 PM Gateway Closed to through traffic for the installation of the water main, storm sewer and table top. More information on project .
NEB Johnson St from Butler St to Baldwin St Minor Various lanes closed 6/20/14 7:00 AM to 5/30/15 7:00 PM Gateway
NEB Johnson St from Hamilton St to Baldwin St Minor Various lanes closed 3/31/14 7:00 AM to 11/1/14 11:59 PM Gateway Reconstruction project::Project Website
NWB Junction Rd from Valley View Rd to Junction Rd Medium Various lanes closed 9/1/13 7:00 AM to 7/31/14 11:59 PM Gateway North Junction Road will be CLOSED Tuesday night 9/17 from 11PM-6AM for water main work. Contingency will be Wednesday night 9/18 (11PM-6AM)
SB Junction Rd at Mineral Point Rd Medium Various lanes closed 8/16/13 9:00 AM to 8/31/14 3:00 PM Gateway Road Construction
SEB Junction Rd from Mineral Point Rd to Valley View Rd Medium Various lanes closed 9/1/13 7:00 AM to 7/31/14 11:59 PM Gateway North Junction Road will be CLOSED Tuesday night 9/17 from 11PM-6AM for water main work. Contingency will be Wednesday night 9/18 (11PM-6AM)
EB Mineral Point Rd from Pleasant View Rd to Beltline Medium Various lanes closed 9/1/13 7:00 AM to 9/1/14 11:59 PM Gateway
WB Mineral Point Rd from Beltline to Pleasant View Rd Medium Various lanes closed 9/1/13 7:00 AM to 9/1/14 11:59 PM Gateway
NB North St from Washington Ave (US-151) to Commercial Ave Medium All lanes and shoulders closed 6/16/14 8:00 AM to 9/22/14 11:59 PM Gateway Construction; Local traffic will be maintained.
SB North St from Commercial Ave to Washington Ave (US-151) Medium All lanes and shoulders closed 6/16/14 8:00 AM to 9/22/14 11:59 PM Gateway Construction; Local traffic will be maintained.
NB Park St from University Ave to Langdon St Medium All lanes and shoulders closed 6/16/14 8:00 AM to 8/22/14 11:59 PM WisDOT Water main and sewer reconstruction
NB Park St from Bascom Mall to Langdon St Medium All lanes and shoulders closed 6/16/14 10:32 AM to 8/22/14 10:32 AM Gateway State St is open to pedestrian traffic. Visit the Project Website.
SB Park St from Langdon St to Bascom Mall Medium All lanes and shoulders closed 6/16/14 10:32 AM to 8/22/14 10:32 AM Gateway State St is open to pedestrian traffic. Visit the Project Website.
SB Park St from Langdon St to University Ave Medium All lanes and shoulders closed 6/16/14 8:00 AM to 8/22/14 11:59 PM WisDOT Water main and sewer reconstruction
EB Pflaum Rd from US-51 to Agriculture Dr Minor Various lanes closed 6/16/14 7:00 AM to 8/8/14 7:00 PM Gateway Installing storm sewer
NB Point Rd from Valley View Rd to Harvest Moon Ln Medium All lanes and shoulders closed 7/14/14 7:00 AM to 10/31/14 11:59 PM Gateway Additional information on the project can be found at: http://www.cityofmadison.com/business/PW/contracts/details.cfm?ContractNumber=7251
SB Point Rd from Harvest Moon Ln to Valley View Rd Medium All lanes and shoulders closed 7/14/14 7:00 AM to 10/31/14 11:59 PM Gateway Additional information on the project can be found at: http://www.cityofmadison.com/business/PW/contracts/details.cfm?ContractNumber=7251
EB State St from 800 to 700 blockt Minor Various lanes closed 3/15/14 10:32 AM to 9/1/14 11:59 PM Gateway Removing existing facilities and is replacing water main, storm sewer and sanitary sewer.
WB State St from 700 to 800 block Minor Various lanes closed 3/15/14 10:32 AM to 9/1/14 11:59 PM Gateway Removing existing facilities and is replacing water main, storm sewer and sanitary sewer.
EB World Dairy Dr from Agriculture Dr to Fen Oak Ct Minor Various lanes closed 6/16/14 7:00 AM to 8/8/14 7:00 PM Gateway Installing storm sewer

Green County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-11 at CR-KK Medium Right lane closed, one lane open 7/28/14 9:00 PM to 7/29/14 5:00 AM WisDOT Construction - SW REGION PVMT MARKING EASTERN CTYS | STN LOCATIONS PER ANNUAL PLAN | VAR HWY | SOUTHWEST REGION WIDE
WB WI-11 from CR-KK to WI-59 (+0.2 miles) Medium Right lane closed, one lane open 7/28/14 9:00 PM to 7/29/14 5:00 AM WisDOT Construction - SW REGION PVMT MARKING EASTERN CTYS | STN LOCATIONS PER ANNUAL PLAN | VAR HWY | SOUTHWEST REGION WIDE

Jefferson County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB WI-26 from CR-N to Schwemmer Ln Major All lanes closed and both shoulders open 4/15/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - JANESVILLE - FORT ATKINSON RD | CTH N - S FORT INTERCHANGE | STH 26 | JEFFERSON
SWB WI-26 from Schwemmer Ln to Old WI-26 Minor Right lane closed, one lane open 4/15/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - JANESVILLE - FORT ATKINSON RD | CTH N - S FORT INTERCHANGE | STH 26 | JEFFERSON

Kenosha County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB WI-31 from 79th St to WI-50 Medium Left lane closed, two lanes open 6/24/14 12:00 AM to 8/9/14 11:45 PM WisDOT Permit - Intersection Modifications for Meijer development
SB WI-31 from WI-50 to 79th St Medium Left lane closed, one or two lanes open 6/24/14 12:00 AM to 8/9/14 11:45 PM WisDOT Permit - Intersection Modifications for Meijer development
SB 120th Ave at WI-142 Medium All lanes and shoulders closed 4/16/14 12:00 AM to 11/14/14 11:45 PM WisDOT Construction - Detour: Use EFR or WFR north to CTH E. Use CTH E to IH94 EB.

Milwaukee County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-45 from Cortez Cir to Speedway Dr Major Right two lanes closed, one lane open 7/29/14 9:00 AM to 2:00 PM WisDOT Maintenance - Pavement Repair
EB WI-24 from 122nd St (-0.1 miles) to US-45 Medium Right lane closed, two lanes open 7/22/14 12:00 AM to 9/30/14 11:45 PM WisDOT Construction - JANESVILLE RD | WAUKESHA COUNTY LINE - 108TH ST | STH 24 | MILWAUKEE
WB WI-24 from US-45 to Lowell Pl (-0.2 miles) Medium Right lane closed, two lanes open 7/22/14 12:00 AM to 9/30/14 11:45 PM WisDOT Construction - JANESVILLE RD | WAUKESHA COUNTY LINE - 108TH ST | STH 24 | MILWAUKEE
NB WI-38 from Oakwood Rd to Joseph M Hutsteiner Dr Medium Various lanes closed 7/29/14 12:00 AM to 7/30/14 12:00 AM daily until 11/30/14 WisDOT Construction - Detour: For nighttime ramp work by the airport TBD.
SB WI-38 from Joseph M Hutsteiner Dr to Oakwood Rd Medium Various lanes closed 7/29/14 12:00 AM to 7/30/14 12:00 AM daily until 11/30/14 WisDOT Construction - Detour: For nighttime ramp work by the airport TBD
NB WI-100 from Burleigh St to WI-190 Medium Right lane closed, two lanes open 6/26/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
NB WI-100 from WI-190 to Courtland Ave Major Right two lanes closed, one lane open 6/26/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
NB WI-100 from Hampton Ave to Silver Spring Dr Major Left two lanes closed, one lane open 6/26/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
NWB WI-100 from WI-38 to WI-241 Major Left two lanes closed, one lane open 7/9/14 8:00 AM to 8/29/14 8:00 PM WisDOT Construction - RYAN RD | 27TH ST - STH 38 | STH 100 | MILWAUKEE
NWB WI-100 from Theodore Trecker Way to I-94 Medium Right lane closed, two lanes open 3/4/14 12:00 AM to 10/1/14 11:45 PM WisDOT Construction - ZOO IC, UPRR & STH 100 BRIDGES OVR I 94 | TERMINAL, CONST/BRIDGE REPLACEMENT | STH 100 | MILWAUKEE
SB WI-100 from Courtland Ave to WI-190 Major Right two lanes closed, one lane open 6/25/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
SEB WI-100 from Silver Spring Dr to Hampton Ave Major Left two lanes closed, one lane open 6/25/14 12:00 AM to 8/8/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
SEB WI-100 from WI-190 to Burleigh St Medium Right lane closed, two lanes open 6/25/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
SEB WI-100 from WI-241 to WI-38 Major Left two lanes closed, one lane open 6/30/14 4:00 PM to 8/29/14 8:00 PM WisDOT Construction - RYAN RD | 27TH ST - STH 38 | STH 100 | MILWAUKEE
NB WI-181 from Carmen Ave to Florist Ave Major Left two lanes closed, one lane open 7/29/14 9:00 AM to 2:00 PM daily until 7/30/14 WisDOT Maintenance - Pavement Repair
EB WI-190 from WI-100 (-0.1 miles) to WI-100 Medium Right lane closed, two lanes open 6/30/14 12:00 AM to 8/8/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
NB WI-241 from Bolivar Ave to Cleveland Ave Major Left two lanes closed, one lane open 3/31/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - S 27TH ST | W HOWARD AVE - UP RR | STH 241 | MILWAUKEE
SB WI-241 from Cleveland Ave to Cold Spring Rd Major Right two lanes closed, one lane open 3/31/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - S 27TH ST | W HOWARD AVE - UP RR | STH 241 | MILWAUKEE
NB Alois St at State St Medium All lanes and shoulders closed 7/28/14 8:00 PM to 7/29/14 6:00 AM WisDOT Construction - Detour: No signed detour
Ramp from Lapham Blvd to SB I-43 Medium All lanes and shoulders closed 5/19/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Continue on exit ramp to Becher St. Cross Becher St to entrance ramp to SB 43
WB O Connor St at 70th St Medium All lanes and shoulders closed 7/28/14 9:30 PM to 7/29/14 5:30 AM WisDOT Construction - Detour: Continue west on O'Connor street. You can enter I-94 WB at 84th and O'Connor.

Racine County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-11 from WI-75 to I-94 Medium Various lanes closed 7/29/14 8:00 AM to 3:00 PM daily until 8/1/14 WisDOT Maintenance - Pavement Repair
WB WI-11 from I-94 to WI-75 Medium Various lanes closed 7/29/14 8:00 AM to 3:00 PM daily until 8/1/14 WisDOT Maintenance - Pavement Repair
NB WI-31 from Indian Hills Dr to WI-38 Medium Right lane closed, two lanes open 7/29/14 7:00 AM to 6:00 PM daily until 8/1/14 WisDOT Permit - Lining of sewer laterals for 9 homes along STH 31
SEB WI-38 from Newman Rd to WI-31 Medium Right lane closed, two lanes open 7/29/14 7:00 AM to 6:00 PM daily until 8/1/14 WisDOT Permit - Lining of sewer laterals for 7 homes along STH 38
EB CR-C from I-94 to I-94 Medium All lanes and shoulders closed 6/8/14 12:00 AM to 9/1/14 11:45 PM WisDOT
WB CR-C from I-94 to I-94 Medium All lanes and shoulders closed 6/8/14 12:00 AM to 9/1/14 11:45 PM WisDOT
SB 27th St at 7 Mile Rd Medium All lanes and shoulders closed 7/28/14 9:00 PM to 7/29/14 6:00 AM WisDOT Construction - Detour: Use CTH G
SB 27th St at CR-G Medium All lanes and shoulders closed 7/28/14 9:30 PM to 7/29/14 5:30 AM WisDOT Construction - Detour: Use County G to West Frontage Road to Wis 20 to I-94 EAST (SB)
SB 27th St at CR-G Medium All lanes and shoulders closed 7/29/14 9:30 PM to 7/30/14 5:30 AM WisDOT Construction - Detour: Use County G to West Frontage Road to WIS 20 to I-94 EAST (SB)
SB 27th St at CR-K Medium All lanes and shoulders closed 7/28/14 9:30 PM to 7/29/14 5:30 AM WisDOT Construction - Detour: Use County K to West Frontage Road to WIS 20 to I-94 EAST (SB)
SB 27th St at CR-K Medium All lanes and shoulders closed 7/29/14 9:30 PM to 7/30/14 5:30 AM WisDOT Construction - Detour: Use County K to West Frontage Road to WIS 20 to I-94 EAST (SB)

Rock County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB WI-26 from CR-N to Schwemmer Ln Major All lanes closed and both shoulders open 4/15/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - JANESVILLE - FORT ATKINSON RD | CTH N - S FORT INTERCHANGE | STH 26 | JEFFERSON

Walworth County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from EB US-12 to WB WI-50 Major All lanes and shoulders closed 6/27/14 12:00 AM to 8/31/14 11:45 PM WisDOT Construction - Detour: For traffic that wants to exit EB USH12 to head EB STH50 the loop ramp is closed. The traffic signal on the existing offramp to WB50 (north of B-64-29) has been temporarily reconfigured to allow a left turn to access WB50 when the l
NWB US-12 from Townline Rd to Sheridan Springs Rd Medium Left lane closed, one lane open 6/27/14 12:00 AM to 8/31/14 11:45 PM WisDOT Construction - LAKE GENEVA - ELKHORN | STH 50 INTERCHANGE | USH 12 | WALWORTH
SEB US-12 from WI-120 to Townline Rd Medium Right lane closed, one lane open 6/27/14 12:00 AM to 8/31/14 11:45 PM WisDOT Construction - LAKE GENEVA - ELKHORN | STH 50 INTERCHANGE | USH 12 | WALWORTH
Ramp from SEB US-12 to NB WI-120 Major All lanes and shoulders closed 6/27/14 12:00 AM to 8/31/14 11:45 PM WisDOT Construction - Detour: For traffic that wants to exit EB USH12 to head EB STH50 the loop ramp is closed. The traffic signal on the existing offramp to WB50 (north of B-64-29) has been temporarily reconfigured to allow a left turn to access WB50 when the l
EB WI-11 from I-43 (-0.1 miles) to Newman Dr (-0.1 miles) Medium Left lane closed, one lane open 7/25/14 2:00 PM to 8/28/14 3:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
WB WI-11 from I-43 (-0.1 miles) to I-43 (+0.1 miles) Medium Right lane closed, one lane open 6/3/14 12:00 AM to 8/31/14 11:45 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
EB WI-20 from I-43 to I-43 (+0.1 miles) Medium Right lane closed, one lane open 6/3/14 12:00 AM to 8/31/14 11:45 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
WB WI-20 from I-43 (-0.1 miles) to I-43 (+0.1 miles) Medium Right lane closed, one lane open 6/3/14 12:00 AM to 8/31/14 11:45 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
EB WI-50 from US-12 (-0.2 miles) to Grand Geneva Way Medium Right lane closed, one lane open 7/25/14 5:00 PM to 8/11/14 5:00 PM WisDOT Construction - LAKE GENEVA - ELKHORN | STH 50 INTERCHANGE | USH 12 | WALWORTH

Washington County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-28 from Forest Ave to WI-144 Major All lanes and shoulders closed 3/24/14 12:00 AM to 11/11/14 11:45 PM WisDOT Construction - Detour: USH 45 - CTH H - STH 144
WB WI-28 from WI-144 to Forest Ave Major All lanes and shoulders closed 3/24/14 12:00 AM to 11/12/14 11:45 PM WisDOT Construction - Detour: STH 144 - CTH H - USH 45
EB WI-33 from Trenton Rd to Poplar Rd (-0.5 miles) Medium Various lanes closed 7/29/14 6:00 AM to 5:00 PM daily until 7/31/14 WisDOT Construction - WASHINGTON ST, CITY WEST BEND | TRENTON RD - 4000' E OF OAK RD | STH 33 | WASHINGTON
WB WI-33 from Poplar Rd (+0.5 miles) to Trenton Rd Medium Various lanes closed 7/29/14 6:00 AM to 5:00 PM daily until 7/31/14 WisDOT Construction - WASHINGTON ST, CITY WEST BEND | TRENTON RD - 4000' E OF OAK RD | STH 33 | WASHINGTON; Flagging operation

Waukesha County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-59 from Calhoun Rd to Moorland Rd Major Left lane closed, two lanes open 7/29/14 6:00 AM to 6:00 PM daily until 8/15/14 WisDOT Permit - DOT duct installation in center median between Moorland and Barker Rd
WB WI-59 from Moorland Rd to Calhoun Rd Major Left lane closed, two lanes open 7/29/14 6:00 AM to 6:00 PM daily until 8/15/14 WisDOT Permit - DOT duct in center median from Moorland Rd to Barker Rd
NB WI-83 from Perkins Rd to Glacier Pass Medium Various lanes closed 4/30/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - WALES RD | PERKINS RD - GLACIER PASS, N OF USH 18 | STH 83 | WAUKESHA:flagging operation Schd::LongTerm
SB WI-83 from Glacier Pass to Perkins Rd Medium Various lanes closed 4/30/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - WALES RD | PERKINS RD - GLACIER PASS, N OF USH 18 | STH 83 | WAUKESHA::flagging operation::LongTerm

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Tue Jul 29 01:38:21 CDT 2014