Construction Report
Select Location
  
Updated: 4/25/18 7:30 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

Columbia County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from NB US-151 to EB WI-16 Minor Right shoulder closed, all lanes open 3/21/18 12:00 AM to 8/31/18 11:45 PM WisDOT Construction - C Columbus, James Street | Ush 151 Interchange Area | STH 16, Columbia County | COLUMBIA
Ramp from WB WI-16 to NB US-151 Minor Left shoulder closed, all lanes open 3/21/18 12:00 AM to 6/4/18 11:45 PM WisDOT Construction - C Columbus, James Street | Ush 151 Interchange Area | STH 16, Columbia County | COLUMBIA
Ramp from WB WI-16 to NB US-151 Minor Right shoulder closed, all lanes open 3/21/18 12:00 AM to 6/4/18 11:45 PM WisDOT Construction - C Columbus, James Street | Ush 151 Interchange Area | STH 16, Columbia County | COLUMBIA
Ramp from SB US-151 to WB WI-16 Minor Left shoulder closed, all lanes open 3/21/18 12:00 AM to 6/4/18 11:45 PM WisDOT Construction - C Columbus, James Street | Ush 151 Interchange Area | STH 16, Columbia County | COLUMBIA
Ramp from SB US-151 to WB WI-16 Minor Right shoulder closed, all lanes open 3/21/18 12:00 AM to 6/4/18 11:45 PM WisDOT Construction - C Columbus, James Street | Ush 151 Interchange Area | STH 16, Columbia County | COLUMBIA
Ramp from EB WI-16 to SB US-151 Minor Right shoulder closed, all lanes open 3/21/18 12:00 AM to 8/31/18 11:45 PM WisDOT Construction - C Columbus, James Street | Ush 151 Interchange Area | STH 16, Columbia County | COLUMBIA
SB WI-13 from WI-16 to La Crosse St Medium Left lane closed, up to one lanes open 4/9/18 6:00 AM to 5/1/18 5:00 PM WisDOT Construction - Eddy Street Traffic Signals and Underground Utilities, Wisc. Dells
EB WI-16 from WI-60 to Dix St Medium Various lanes closed 3/21/18 12:00 AM to 8/31/18 11:45 PM WisDOT Construction - C Columbus, James Street | Ush 151 Interchange Area | STH 16, Columbia County | COLUMBIA
WB WI-16 from Meister Dr (+0.1 miles) to WI-60 Medium Various lanes closed 3/21/18 12:00 AM to 8/31/18 11:45 PM WisDOT Construction - C Columbus, James Street | Ush 151 Interchange Area | STH 16, Columbia County | COLUMBIA
NB WI-78 from Kinney Rd (-0.1 miles) to I-90 Medium Right lane closed, up to one lanes open 4/23/18 12:00 AM to 5/8/18 11:45 PM WisDOT Construction - Madison - Portage | Cth Cs To Portage Interchange | IH 039, Columbia | COLUMBIA

Dane County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-151 from Fitchrona Rd to Raymond Rd Minor Left shoulder closed, all lanes open 3/1/18 12:00 PM to 11/30/18 12:00 PM WisDOT Construction - Mount Horeb - Madison | Cth Pd To Raymond Rd/Stg 2/Phase 2 | Project ID 1206-07-75 Midpoint | DANE
NB US-151 from Fitchrona Rd to Raymond Rd Minor Right shoulder closed, all lanes open 3/1/18 12:00 PM to 11/30/18 12:00 PM WisDOT Construction - Mount Horeb - Madison | Cth Pd To Raymond Rd/Stg 2/Phase 2 | Project ID 1206-07-75 Midpoint | DANE
NB US-151 from Fitchrona Rd to Raymond Rd Medium One lane closed, one or two lanes open 4/25/18 8:00 PM to 4/26/18 5:00 AM daily until 4/27/18 WisDOT Construction - Mount Horeb - Madison | Cth Pd To Raymond Rd/Stg 2/Phase 2 | Project ID 1206-07-75 Midpoint | DANE
Ramp from SB American Pkwy to SB US-151 Medium All lanes closed 4/25/18 6:00 AM to 11:00 PM daily until 5/30/18 WisDOT Maintenance - 1111-02-63, Dual Ramp Bridges Stage 1
SB US-151 from Raymond Rd to Fitchrona Rd Minor Left shoulder closed, all lanes open 3/1/18 12:00 PM to 11/30/18 12:00 PM WisDOT Construction - Mount Horeb - Madison | Cth Pd To Raymond Rd/Stg 2/Phase 2 | Project ID 1206-07-75 Midpoint | DANE
SB US-151 from Raymond Rd to Fitchrona Rd Minor Right shoulder closed, all lanes open 3/1/18 12:00 PM to 11/30/18 12:00 PM WisDOT Construction - Mount Horeb - Madison | Cth Pd To Raymond Rd/Stg 2/Phase 2 | Project ID 1206-07-75 Midpoint | DANE
SB US-151 from Raymond Rd to Fitchrona Rd Medium One lane closed, one or two lanes open 4/25/18 8:00 PM to 4/26/18 5:00 AM daily until 4/27/18 WisDOT Construction - Mount Horeb - Madison | Cth Pd To Raymond Rd/Stg 2/Phase 2 | Project ID 1206-07-75 Midpoint | DANE
EB WI-19 from Schumacher Rd to River Rd None All lanes open with restriction 4/16/18 12:00 AM to 10/1/18 11:45 PM WisDOT Construction - Mazomanie - Sun Prairie | Sth 113(S) Intersection | STH 019, DANE COUNTY | DANE
EB WI-19 from Liuna Way to I-39 Medium One lane closed, up to one lanes open 3/9/18 7:00 AM to 4/30/18 5:00 PM WisDOT Construction - Detour: No detour
WB WI-19 from River Rd to Schumacher Rd None All lanes open with restriction 4/16/18 12:00 AM to 10/1/18 11:45 PM WisDOT Construction - Mazomanie - Sun Prairie | Sth 113(S) Intersection | STH 019, DANE COUNTY | DANE
NB WI-113 from River Rd to Schumacher Rd None All lanes open with restriction 4/16/18 12:00 AM to 10/1/18 11:45 PM WisDOT Construction - Mazomanie - Sun Prairie | Sth 113(S) Intersection | STH 019, DANE COUNTY | DANE
SEB WI-113 from Schumacher Rd to Kennedy Dr None All lanes open with restriction 4/16/18 12:00 AM to 10/1/18 11:45 PM WisDOT Construction - Mazomanie - Sun Prairie | Sth 113(S) Intersection | STH 019, DANE COUNTY | DANE

Eau Claire County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-12 from American Blvd to Stein Blvd Medium Right lane closed, two lanes open 4/23/18 6:00 AM to 4/27/18 6:00 PM WisDOT Construction - Nwregion,Var Sgnlized Intersections | Var Hwy & Location/Sgnl Head Per Ln | Midpoint | NORTHWEST REGION WIDE
WB US-12 from University Dr (+0.3 miles) to American Blvd Medium Right lane closed, two lanes open 4/23/18 6:00 AM to 4/27/18 6:00 PM WisDOT Construction - Nwregion,Var Sgnlized Intersections | Var Hwy & Location/Sgnl Head Per Ln | Midpoint | NORTHWEST REGION WIDE
NB WI-93 from Friedeck Rd to I-94 (-0.1 miles) Medium Right lane closed, one lane open 4/25/18 8:00 AM to 4:00 PM daily until 5/4/18 WisDOT Construction - Nwregion,Var Sgnlized Intersections | Var Hwy & Location/Sgnl Head Per Ln | Midpoint | NORTHWEST REGION WIDE
SB WI-93 from I-94 (+0.1 miles) to Arndt Ln Medium Right lane closed, one lane open 4/25/18 8:00 AM to 4:00 PM daily until 5/4/18 WisDOT Construction - Nwregion,Var Sgnlized Intersections | Var Hwy & Location/Sgnl Head Per Ln | Midpoint | NORTHWEST REGION WIDE

Jackson County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-95 from Main St to State St None All lanes open with restriction 4/25/18 6:00 AM to 5/18/18 6:00 PM WisDOT Construction - V Hixton, South State Street | Trempealeau River Bridge B-27-0160 | STH 095, Jackson County | JACKSON
WB WI-95 from Hoffman St to Main St None All lanes open with restriction 4/25/18 6:00 AM to 5/18/18 6:00 PM WisDOT Construction - V Hixton, South State Street | Trempealeau River Bridge B-27-0160 | STH 095, Jackson County | JACKSON

Jefferson County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
SEB US-12 from Buckingham Rd to Warner Rd (-0.2 miles) Major All lanes closed 4/12/18 12:00 AM to 7/18/18 11:45 PM WisDOT Construction - Detour: FT. Atkinson -> Milton -> Whitewater by means of STH 26 and STH 59
SEB US-12 Br from Warner Rd (+0.2 miles) to Twinkling Star Rd Major All lanes closed 4/12/18 12:00 AM to 7/18/18 11:45 PM WisDOT Construction - Detour: Whitewater -> Milton -> Ft. Atkinson via STH 59 & STH 26

Juneau County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-82 from County Road HH to County Road HH (+0.7 miles) Minor Right shoulder closed, all lanes open 1/8/18 12:00 AM to 11/30/18 11:45 PM WisDOT Construction - Point Bluff Bridge | Wisconsin River Bri B-29-141,-148 | STH 082, Juneau County | ADAMS
EB WI-82 from County Road HH to County Road HH (+0.7 miles) None All lanes open with restriction 4/23/18 6:00 AM to 4/27/18 12:00 PM,
4/30/18 6:00 AM to 5/4/18 12:00 PM,
5/7/18 6:00 AM to 5/11/18 12:00 PM,
5/14/18 6:00 AM to 5/18/18 12:00 PM,
... more, ending on 11/30/18
WisDOT Construction - Point Bluff Bridge | Wisconsin River Bri B-29-141,-148 | STH 082, Juneau County | ADAMS
WB WI-82 from County Road HH (-0.7 miles) to County Road HH Minor Right shoulder closed, all lanes open 1/8/18 12:00 AM to 11/30/18 11:45 PM WisDOT Construction - Point Bluff Bridge | Wisconsin River Bri B-29-141,-148 | STH 082, Juneau County | ADAMS
WB WI-82 from County Road HH (-0.7 miles) to County Road HH None All lanes open with restriction 4/23/18 6:00 AM to 4/27/18 12:00 PM,
4/30/18 6:00 AM to 5/4/18 12:00 PM,
5/7/18 6:00 AM to 5/11/18 12:00 PM,
5/14/18 6:00 AM to 5/18/18 12:00 PM,
... more, ending on 11/30/18
WisDOT Construction - Point Bluff Bridge | Wisconsin River Bri B-29-141,-148 | STH 082, Juneau County | ADAMS

Kenosha County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB WI-31 at Old Green Bay Rd Medium Right lane closed, one lane open 3/26/18 12:00 AM to 5/25/18 11:45 PM WisDOT Construction - 3330-00-75 Kenosha County Pike River Trail and Signal Improvement Project
NB WI-31 from Old Green Bay Rd (+0.3 miles) to Old Green Bay Rd (+0.3 miles) Minor Right shoulder closed, all lanes open 3/26/18 12:00 AM to 5/25/18 11:45 PM WisDOT Construction - 3330-00-75 Kenosha County Pike River Trail & Signal Improvement Project
NB WI-31 from Old Green Bay Rd (+0.3 miles) to Old Green Bay Rd (+0.3 miles) Medium Right lane closed, one lane open 4/25/18 9:00 AM to 3:00 PM daily until 5/4/18 WisDOT Construction - 3330-00-75 Kenosha County Pike River Trail & Signal Improvement Project
NB WI-31 at 1st St Medium Right lane closed, one lane open 3/26/18 12:00 AM to 5/25/18 11:45 PM WisDOT Construction - 3330-00-75 Kenosha County Pike River Trail and Signal Improvement Project

La Crosse County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
SB US-53 from 3A (+0.2 miles) to Livingston St Medium One lane closed, one lane open 4/25/18 7:00 AM to 5:00 PM daily until 5/7/18 WisDOT Construction - La Crosse - Galesville Livingston St - W George St | USH 53 La Crosse County | LA CROSSE
NB WI-35 from Livingston St to 3A Medium One lane closed, up to one lanes open 4/26/18 7:00 AM to 5:00 PM daily until 5/24/18 WisDOT Construction - La Crosse - Galesville Livingston St - W George St | USH 53 La Crosse County | LA CROSSE
NB WI-35 from 3A (-0.3 miles) to George St (+0.2 miles) Medium One lane closed, one lane open 4/26/18 7:00 AM to 5:00 PM daily until 5/24/18 WisDOT Construction - La Crosse - Galesville Livingston St - W George St | USH 53 La Crosse County | LA CROSSE
SB WI-35 from George St (-0.1 miles) to Campbell St Medium 0 lanes closed, one or two lanes open 4/25/18 7:00 AM to 5:00 PM daily until 5/24/18 WisDOT Construction - La Crosse - Galesville Livingston St - W George St | USH 53 La Crosse County | LA CROSSE

Milwaukee County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-45 from College Ave to Edgerton Ave Medium Various lanes closed 3/5/18 7:00 AM to 9/21/19 11:59 PM WisDOT
SB US-45 from Edgerton Ave to College Ave Medium Various lanes closed 3/5/18 7:00 AM to 9/21/19 11:59 PM WisDOT
EB WI-24 from 112th St to US-45 Medium Left lane closed, up to one lanes open 4/9/18 6:00 AM to 5/1/18 11:45 PM WisDOT Construction - 108th Street (Hales Corners) | College Ave - Layton Ave | USH 045, Milwaukee County | MILWAUKEE
NB WI-32 from Puetz Rd to Forest Hill Ave None All lanes open with restriction 4/23/18 7:00 AM to 5/16/18 3:00 PM WisDOT Construction - STH 32 | Puetz Road To Forest Hill Avenue | STH 032, Milwaukee County | MILWAUKEE
SB WI-32 from Forest Hill Ave to Puetz Rd None All lanes open with restriction 4/23/18 7:00 AM to 5/16/18 3:00 PM WisDOT Construction - STH 32 | Puetz Road To Forest Hill Avenue | STH 032, Milwaukee County | MILWAUKEE
EB WI-100 from I-41 to I-41 Medium Various lanes closed 10/25/17 7:00 AM to 9/22/18 11:59 PM WisDOT Reconstructing the Ryan Road overpass bridges, the entrance and exit ramps to and from I-94, and adjacent retaining walls and sign structures. It also includes three culvert extensions along I-94 at Puetz Road and Drexel Avenue.
NB WI-100 from Cortez Cir (+0.1 miles) to I-43 Medium One lane closed, one to three lanes open 3/15/18 12:00 AM to 11/16/18 11:45 PM WisDOT Construction - 108th Street (Hales Corners) | College Ave - Layton Ave | USH 045, Milwaukee County | MILWAUKEE
NB WI-100 from Layton Ave to Cold Spring Rd Medium Right lane closed, two lanes open 4/25/18 9:00 AM to 2:00 PM WisDOT Maintenance - Inlet Repair
NB WI-100 from Walker St to I-94 (+0.2 miles) Medium One lane closed, two or three lanes open 4/11/18 12:00 AM to 8/24/18 11:45 PM WisDOT Construction - 108th St, City Of West Allis | Hank Aaron State Trail, B40-107/108 | STH 100, Milwaukee County | MILWAUKEE
NB WI-100 at Watertown Plank Rd Medium Left lane closed, two lanes open 2/26/18 7:00 AM to 10/21/18 5:00 PM WisDOT Construction - Watertown Plank Rd, City Wauwatosa | Underwood Creek Strs B-40-0470/0471 | Loc Str, Milwaukee County | MILWAUKEE
NB WI-100 from Center St to Burleigh St Medium Left lane closed, two lanes open 4/25/18 9:00 AM to 4:00 PM daily until 4/26/18 WisDOT Construction - AT&T to place new fiber cable through existing duct from ATT manhole to 3077 N Mayfair Rd
NWB WI-100 from 68th St to 76th St Minor Right shoulder closed, all lanes open 4/11/18 12:00 AM to 4/30/18 11:45 PM WisDOT Permit - installing gas main extension on north side of w ryan rd (wi-100)
SB WI-100 from Mt Vernon Ave to Theodore Trecker Way (-0.2 miles) Medium One lane closed, two or three lanes open 4/11/18 12:00 AM to 8/24/18 11:45 PM WisDOT Construction - 108th St, City Of West Allis | Hank Aaron State Trail, B40-107/108 | STH 100, Milwaukee County | MILWAUKEE
SB WI-100 from I-43 to Speedway Dr Medium One lane closed, one or two lanes open 3/15/18 12:00 AM to 11/16/18 11:45 PM WisDOT Construction - 108th Street (Hales Corners) | College Ave - Layton Ave | USH 045, Milwaukee County | MILWAUKEE
SB WI-100 from I-43 to Edgerton Ave Medium Right lane closed, one or two lanes open 4/25/18 9:30 AM to 2:00 PM WisDOT Construction - 108th Street (Hales Corners) | College Ave - Layton Ave | USH 045, Milwaukee County | MILWAUKEE
WB WI-100 from I-41 to I-41 Medium Various lanes closed 10/25/17 7:00 AM to 9/22/18 11:59 PM WisDOT Reconstructing the Ryan Road overpass bridges, the entrance and exit ramps to and from I-94, and adjacent retaining walls and sign structures. It also includes three culvert extensions along I-94 at Puetz Road and Drexel Avenue.
NB WI-181 from 5th St to Kearney St (-0.1 miles) Medium Left lane closed, one lane open 4/25/18 9:00 AM to 2:00 PM WisDOT Maintenance - Left lane closed, WIS 181 (84th Street) NB, south of I-94, for sign repair.
NB WI-181 from Good Hope Rd to Clinton Ave Medium One lane closed, two lanes open 4/17/18 12:00 AM to 5/4/18 11:45 PM WisDOT Construction - Median turn lane modifications
SB WI-181 from Clinton Ave to Good Hope Rd Medium One lane closed, two lanes open 4/17/18 12:00 AM to 5/4/18 11:45 PM WisDOT Construction - Median turn lane modifications
SB WI-241 from Minnesota Ave to Minnesota Ave Medium One lane closed, one lane open 4/2/18 6:00 AM to 6/30/18 12:00 PM WisDOT Permit - Storm Sewer Grading Access Management
SB 6th St at WI-59 Medium All lanes closed 3/2/18 12:00 AM to 8/29/18 11:45 PM WisDOT Construction - Detour: Follow posted detour

Monroe County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-16 at WI-27 Medium One lane closed, one lane open 4/24/18 6:00 AM to 5/4/18 6:00 PM WisDOT Construction - Ih 90-Sth 16//City Of Sparta | River Road To Sth 16 | STH 27 Monroe County | MONROE
WB WI-16 at WI-27 Medium One lane closed, one lane open 4/24/18 6:00 AM to 5/4/18 6:00 PM WisDOT Construction - Ih 90-Sth 16//City Of Sparta | River Road To Sth 16 | STH 27 Monroe County | MONROE
NB WI-27 at WI-16 Medium One lane closed, one lane open 4/24/18 6:00 AM to 5/4/18 5:00 PM WisDOT Construction - Ih 90-Sth 16//City Of Sparta | River Road To Sth 16 | STH 27 Monroe County | MONROE
SB WI-27 at Austin St Major All lanes closed 4/24/18 6:00 AM to 5/4/18 6:00 PM WisDOT Construction - Ih 90-Sth 16//City Of Sparta | River Road To Sth 16 | STH 27 Monroe County | MONROE

Racine County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
SB US-45 from WI-20 to Church Rd Major All lanes closed 3/12/18 12:00 AM to 8/26/18 11:45 PM WisDOT Construction - Detour: WIS 20 to WIS 75 to WIS 11.
SB US-45 from WI-20 to 7th Ave Medium Various lanes closed 6/5/17 7:15 AM to 9/21/18 11:59 PM WisDOT Removing the old roadway, grading the roadway and ditches, replacing culverts, paving a new roadway and replacing the signalized intersection at County C with a roundabout. The project is scheduled to last two construction seasons.
EB WI-20 from Buena Park Dr to River Moor Rd Minor Right shoulder closed, all lanes open 4/23/18 12:00 AM to 7/31/18 11:45 PM WisDOT Permit - relocating gas main and services for road project
EB WI-20 from Water St to River St Minor Right shoulder closed, all lanes open 4/23/18 12:00 AM to 7/31/18 11:45 PM WisDOT Permit - relocating gas main and services for road project
EB WI-20 from Spring St to Greenmonte Dr Medium Left lane closed, one lane open 3/30/18 6:00 AM to 6/29/18 6:00 AM WisDOT Construction - Sth 20 | Intersection With Cth C | STH 020, Racine County | RACINE
EB WI-20 from I-41 to Frontage Rd Medium Right lane closed, one lane open 4/25/18 6:00 PM to 4/26/18 6:00 AM WisDOT Construction - Washington Ave, V Mount Pleasant | Ih 94 To Cth H | STH 020, Racine County | RACINE
EB WI-20 from Frontage Rd to Wisconsin St (-0.1 miles) Medium Right lane closed, one lane open 4/25/18 9:00 AM to 4/26/18 6:00 AM WisDOT Construction - Washington Ave, V Mount Pleasant | Ih 94 To Cth H | STH 020, Racine County | RACINE
EB WI-20 from Village Center Dr to Sycamore Ave Medium Various lanes closed 4/9/18 12:00 AM to 5/18/18 11:45 PM WisDOT Construction - Green Bay Road | STH 20 to CTH MM | STH 031, Racine County | RACINE
WB WI-20 from Perry Ave to Village Center Dr Medium Various lanes closed 4/9/18 12:00 AM to 5/18/18 11:45 PM WisDOT Construction - Green Bay Road | STH 20 to CTH MM | STH 031, Racine County | RACINE
WB WI-20 from Hastings Ct (+0.1 miles) to Frontage Rd Medium Left lane closed, one lane open 4/25/18 12:00 AM to 3:00 PM WisDOT Construction - Washington Ave, V Mount Pleasant | Ih 94 To Cth H | STH 020, Racine County | RACINE
WB WI-20 from Hastings Ct (+0.1 miles) to Frontage Rd Medium Left lane closed, one lane open 4/26/18 12:00 AM to 3:00 PM WisDOT Construction - Washington Ave, V Mount Pleasant | Ih 94 To Cth H | STH 020, Racine County | RACINE
WB WI-20 at Renaissance Blvd Medium Left lane closed, one lane open 4/13/18 12:00 AM to 6/1/18 11:45 PM WisDOT Construction - Cth H, V Sturtevant/Mt Pleasant | Cth Kr To Sth 20 | CTH H | RACINE
WB WI-20 from Frontage Rd to I-41 Medium Left lane closed, one lane open 4/25/18 6:00 PM to 4/26/18 6:00 AM WisDOT Construction - Washington Ave, V Mount Pleasant | Ih 94 To Cth H | STH 020, Racine County | RACINE
WB WI-20 at Beaumont Ave (-0.1 miles) Major All lanes closed and both shoulders open 3/30/18 6:00 AM to 6/29/18 6:00 AM WisDOT Construction - Sth 20 | Intersection With Cth C | STH 020, Racine County | RACINE
WB WI-20 from River St to Rivermoor Dr Minor Right shoulder closed, all lanes open 4/23/18 12:00 AM to 7/31/18 11:45 PM WisDOT Permit - relocating gas main for road project
NB WI-31 from WI-20 (-0.1 miles) to Newman Rd Medium Various lanes closed 4/9/18 12:00 AM to 5/18/18 11:45 PM WisDOT Construction - Green Bay Road | STH 20 to CTH MM | STH 031, Racine County | RACINE
NB WI-31 from Shirley Ave to Spring St Medium Various lanes closed 4/9/18 12:00 AM to 5/18/18 11:45 PM WisDOT Construction - Green Bay Road | STH 20 to CTH MM | STH 031, Racine County | RACINE
NB WI-31 from 6 Mile Rd to 6 Mile Rd (+0.1 miles) Major All lanes closed 4/16/18 6:00 AM to 5/3/18 6:00 PM WisDOT Permit - Detour: STH 31 NB traffic will turn west on 6 Mile Road to STH 38. Follow STH 38 to 7 Mile Road. Turn east on 7 Mile and follow back to STH 32.
SB WI-31 from WI-32 to 6 Mile Rd Major All lanes closed 4/16/18 6:00 AM to 5/3/18 6:00 PM WisDOT Permit - Detour: STH 32/31 SB will turn west on 7 Mile Road and follow to STH 38. Follow STH 38 until it turns into CTH G/6 Mile Road. Follow CTH G/6 Mile Road easterly back to STH 31
SB WI-31 at Kingdom Ct Major All lanes closed and both shoulders open 4/23/18 6:00 AM to 4/30/18 6:00 AM WisDOT Permit - Advanced utility work for DOT Project No. 2350-09-71
SB WI-31 from Spring St to Sunnyside Ave Medium Various lanes closed 4/9/18 12:00 AM to 5/18/18 11:45 PM WisDOT Construction - Green Bay Road | STH 20 to CTH MM | STH 031, Racine County | RACINE
SB WI-31 from Newman Rd to WI-20 (+0.1 miles) Medium Various lanes closed 4/9/18 12:00 AM to 5/18/18 11:45 PM WisDOT Construction - Green Bay Road | STH 20 to CTH MM | STH 031, Racine County | RACINE
SB WI-31 at 1st St Medium Right lane closed, one lane open 3/26/18 12:00 AM to 5/25/18 11:45 PM WisDOT Construction - 3330-00-75 Kenosha County Pike River Trail and Signal Improvement Project
NB WI-32 from 7th St to Goold St Major All lanes closed 4/4/18 12:00 AM to 11/15/18 11:45 PM WisDOT Construction - Detour: Take N Main St North to Goold St and go West on Goold St to connect back to WIS 32.
NB WI-32 at Matthew Dr Major All lanes closed and both shoulders open 3/27/18 12:00 AM to 5/31/18 11:45 PM WisDOT Permit - relocating gas main along WI-32
NB WI-32 from Edgar Ter to 6 Mile Rd Major All lanes closed and both shoulders open 3/27/18 12:00 AM to 5/31/18 11:45 PM WisDOT Permit - relocating gas main along wi-32
NB WI-32 at 6 Mile Rd Major All lanes closed 4/16/18 6:00 AM to 5/3/18 5:00 PM WisDOT Permit - Detour: STH 32 NB traffic to take 6 Mile Road west to STH 38. Follow STH 38 to 7 Mile Road. 7 Mile Road east to STH 32.
SB WI-32 from 7 Mile Rd to 6 Mile Rd Major All lanes closed 4/16/18 6:00 AM to 5/3/18 6:00 PM WisDOT Permit - Detour: STH 32 SB traffic will turn west on 7 Mile Road. Follow 7 Mile Road to STH 38. Follow STH 38 to where it turns into CTH G/Six Mile Road and follow that easterly back to STH 32.
EB WI-38 from Miller Ln to County Road MM (+0.2 miles) Medium Left lane closed, up to one lanes open 4/11/18 6:00 AM to 4/30/18 6:00 AM WisDOT Construction - Northwestern Ave, V Mt Pleasant | Intersection Of Cth Mm | STH 038, Racine County | RACINE
WB WI-38 from Rapids Dr to Miller Ln Medium Left lane closed, one lane open 4/11/18 6:00 AM to 4/30/18 6:00 AM WisDOT Construction - Northwestern Ave, V Mt Pleasant | Intersection Of Cth Mm | STH 038, Racine County | RACINE
EB CR-K from 27th St (-0.2 miles) to Adams Rd (+0.1 miles) Minor Various lanes closed 7/17/17 7:00 AM to 5/1/18 11:59 PM WisDOT
WB CR-K from Adams Rd (-0.1 miles) to 27th St (+0.2 miles) Minor Various lanes closed 7/17/17 7:00 AM to 5/1/18 11:59 PM WisDOT

Rock County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
SEB US-12 Br from Warner Rd (+0.2 miles) to Twinkling Star Rd Major All lanes closed 4/12/18 12:00 AM to 7/18/18 11:45 PM WisDOT Construction - Detour: Whitewater -> Milton -> Ft. Atkinson via STH 59 & STH 26

Sauk County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB WI-23 at Dewey Ave Major All lanes closed 3/26/18 6:00 AM to 6/23/18 6:00 AM WisDOT Construction - Detour: South Dewey Avenue will be detoured along Lucky Street to the West, south along Pine Street, to Division Street. Traffic then will proceed along Division Street where it will continue southeast to South Dewey Avenue south of the pr
EB WI-60 from US-14 to Fox Rd None All lanes open with restriction 4/25/18 7:30 AM to 4:30 PM daily until 4/26/18 WisDOT Maintenance - Roadway Borings
WB WI-60 from Fox Rd to US-14 None All lanes open with restriction 4/25/18 7:30 AM to 4:30 PM daily until 4/26/18 WisDOT Maintenance - Roadway Borings
EB WI-136 at Pine St Medium Left lane closed, one lane open 4/24/18 7:00 AM to 5/31/18 5:00 PM WisDOT Construction - Lake Delton - Sauk City | Cth W To Sth 159 | USH 12, Sauk County | SAUK
WB WI-136 at Pine St Medium Left lane closed, one lane open 4/24/18 7:00 AM to 5/31/18 5:00 PM WisDOT Construction - Lake Delton - Sauk City | Cth W To Sth 159 | USH 12, Sauk County | SAUK
NEB WI-154 at WI-130 Major All lanes closed 4/23/18 12:00 AM to 5/25/18 11:45 PM WisDOT Construction - Detour: From the intersection of STH 154 EB and STH 130, take STH 130 SB to USH 14 EB in Lone Rock to STH 23 NB in Spring Green to STH 154 EB in Loganville.
SWB WI-154 from WI-23 to WI-130 Major All lanes closed 4/23/18 12:00 AM to 5/25/18 11:45 PM WisDOT Construction - Detour: From the intersection of STH 154 WB and STH 23 in Loganville, take STH 23 SB to USH 14 WB in Spring Green to STH 130 NB in Lone Rock to the intersection of STH 154 WB.

Walworth County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WB US-12 at Sheridan Springs Rd Medium Right lane closed, one lane open 4/25/18 10:00 AM to 12:00 PM WisDOT Maintenance - B-64-31 Damage Inspection
WB US-12 at Sheridan Springs Rd Medium Left lane closed, one lane open 4/25/18 12:00 PM to 2:30 PM WisDOT Maintenance - B-64-31 Damage Inspection
EB WI-11 at Pinks Ln Major All lanes closed 4/25/18 6:00 AM to 5:00 PM daily until 4/30/18 WisDOT Permit - installing new gas service
EB WI-50 from Warren St to Broad St Major All lanes closed 3/12/18 12:00 AM to 5/25/18 11:45 PM WisDOT Permit - Detour: Reroute traffice to Geneva St (one block north of Main St) via Center St on the east end and Maxwell St on the west end
NB WI-67 from WI-50 to I-43 (-0.1 miles) Major All lanes closed 4/16/18 12:00 AM to 9/14/18 11:45 PM WisDOT Construction - Detour: WIS 67 NB to WIS 50 WB to I-43 NB to WIS 67 NB
SB WI-67 at I-43 (+0.1 miles) Major All lanes closed 4/16/18 12:00 AM to 9/14/18 11:45 PM WisDOT Construction - Detour: I-43 SB to WIS 50 EB to WIS 67
NB WI-120 from US-12 to Krueger Rd (-0.2 miles) Medium Various lanes closed 4/2/18 7:00 AM to 12/1/18 11:59 PM WisDOT Detour for WIS 120: US 12 to I-43 to WIS 11; Detour for County H: US 12 to County NN to County H
NB WI-120 from US-12 (+0.1 miles) to Madaus St (-0.2 miles) Medium Left lane closed, one lane open 4/13/18 6:00 AM to 4/30/18 6:00 AM WisDOT Construction - Lake Geneva To East Troy Road | Ush 12 To N Side Of Como Creek Brdg | STH 120, Walworth County | WALWORTH
SB WI-120 from Krueger Rd (+0.2 miles) to US-12 Medium Various lanes closed 4/2/18 7:00 AM to 12/1/18 11:59 PM WisDOT Detour for WIS 120: US 12 to I-43 to WIS 11; Detour for County H: US 12 to County NN to County H
SB WI-120 from Madaus St (+0.1 miles) to US-12 (+0.1 miles) Medium 0 lanes closed, two lanes open 4/18/18 6:00 AM to 4/30/18 6:00 AM WisDOT Construction - Lake Geneva To East Troy Road | Ush 12 To N Side Of Como Creek Brdg | STH 120, Walworth County | WALWORTH

Waukesha County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WB WI-59 at Genesee Rd Medium Left lane closed, one lane open 4/25/18 8:30 AM to 3:00 PM daily until 4/27/18 WisDOT Maintenance - Repair inlet structures
SB WI-83 at Golf Rd Medium Left lane closed, one lane open 4/25/18 8:30 AM to 3:00 PM daily until 4/27/18 WisDOT Maintenance - Repair inlet structures
SB WI-83 at Hillside Dr Medium Left lane closed, one lane open 4/25/18 8:30 AM to 3:00 PM daily until 4/27/18 WisDOT Maintenance - Repair inlet structures
NB WI-164 at Hawks Meadow Dr Medium Right lane closed, one lane open 4/25/18 8:30 AM to 3:00 PM daily until 4/27/18 WisDOT Maintenance - Repair inlet structures
SB WI-164 at I-94 Medium Right lane closed, one lane open 4/25/18 8:30 AM to 3:00 PM daily until 4/27/18 WisDOT Maintenance - Replace damaged beam guard
EB WI-190 from WI-164 to Duplainville Rd Medium Left lane closed, one lane open 3/22/18 12:00 AM to 5/4/18 11:45 PM WisDOT Construction - Capitol Drive Vil & City Pewaukee | Five Fields Road to Wethersfield Rd | CITY OF PEWAUKEE | WAUKESHA
WB WI-190 from Gumina Rd to WI-164 Medium Left lane closed, up to one lanes open 3/22/18 12:00 AM to 5/4/18 11:45 PM WisDOT Construction - Capitol Drive Vil & City Pewaukee | Five Fields Road to Wethersfield Rd | CITY OF PEWAUKEE | WAUKESHA
NWB at Pilgrim Rd Medium All lanes closed 4/25/18 8:00 AM to 3:00 PM daily until 4/27/18 WisDOT Maintenance - Detour: Use Alternate Route

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Wed Apr 25 2018 07:35:32 CDT