Construction Report
Select Location
  
Updated: 10/22/14 10:00 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Columbia County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-33 from I-90 to I-90 Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM WisDOT Maintenance - Infrared Bridge Deck Inspection
WB WI-33 from I-90 to I-90 Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM WisDOT Maintenance - Infrared Bridge Deck Inspection

Dane County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from SB John Nolen Dr to EB US-12 Medium All lanes and shoulders closed 10/22/14 8:00 PM to 10/23/14 6:00 AM daily until 10/24/14 WisDOT Construction - Detour: none.
NB US-51 from Broadway to Buckeye Rd Medium Right lane closed, two lanes open 10/22/14 7:00 PM to 10/23/14 6:00 AM WisDOT Construction - STOUGHTON - DEFOREST | BUCKEYE RD INTERSECTION | USH 51 | DANE
NB US-51 from Broadway to Buckeye Rd Medium Right lane closed, two lanes open 10/23/14 7:00 PM to 10/24/14 6:00 AM WisDOT Construction - STOUGHTON - DEFOREST | BUCKEYE RD INTERSECTION | USH 51 | DANE
SEB US-51 from Cottage Grove Rd (+0.1 miles) to Pflaum Rd Medium Right lane closed, two lanes open 10/22/14 7:00 PM to 10/23/14 6:00 AM WisDOT Construction - STOUGHTON - DEFOREST | PFLAUM RD INTERSECTION | USH 51 | DANE
SEB US-51 from Cottage Grove Rd (+0.1 miles) to Pflaum Rd Medium Right lane closed, two lanes open 10/23/14 7:00 PM to 10/24/14 6:00 AM WisDOT Construction - STOUGHTON - DEFOREST | PFLAUM RD INTERSECTION | USH 51 | DANE
NB US-151 from CR-F (-0.7 miles) to Fitchrona Rd Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM daily until 10/24/14 WisDOT Maintenance - Hot rubber bridge approaches
NB US-151/Verona Rd from Raymond Rd to US-12 Medium Various lanes closed 6/25/13 7:00 AM to 12/31/15 11:59 PM Gateway Multi-year reconstruction project to improve Verona Road (US 18/151). For more information visit: http://projects.511wi.gov/web/veronaroad-18-151#
SB US-151/Verona Rd from US-12 to Raymond Rd Medium Various lanes closed 6/25/13 7:00 AM to 12/31/15 11:59 PM Gateway Multi-year reconstruction project to improve Verona Road (US 18/151). For more information visit: http://projects.511wi.gov/web/veronaroad-18-151#
SB US-151 from Fitchrona Rd to CR-F (+0.7 miles) Medium Various lanes closed 10/23/14 7:00 AM to 3:00 PM daily until 10/24/14 WisDOT Maintenance - Hot rubber bridge approaches
NB WI-73 from WI-106 to Fadness Rd Major All lanes and shoulders closed 4/21/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - Detour: Take I39 NB to USH 12 EB.
SB WI-73 from Fadness Rd to WI-106 Major All lanes and shoulders closed 4/21/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - Detour: Take USH 12 WB to IH39 SB.
NEB Johnson St from Butler St to Baldwin St Medium Various lanes closed 6/20/14 7:00 AM to 11/3/14 7:00 PM Gateway Please visit project website for more information: http://www.cityofmadison.com/engineering/EJohnson/
NEB Johnson St from Hamilton St to Baldwin St Minor Various lanes closed 3/31/14 7:00 AM to 11/1/14 11:59 PM Gateway Reconstruction project::Project Website
EB Milwaukee St from I-39 to Rustic Dr Medium All lanes and shoulders closed 9/23/14 7:00 AM to 11/1/14 11:59 PM Gateway Utilities work; new intersection construction
WB Milwaukee St from Rustic Dr to I-39 Medium All lanes and shoulders closed 9/23/14 7:00 AM to 11/1/14 11:59 PM Gateway Utilities work; new intersection construction
NB Point Rd from Valley View Rd to Harvest Moon Ln Medium All lanes and shoulders closed 7/14/14 7:00 AM to 10/31/14 11:59 PM Gateway Additional information on the project can be found at: http://www.cityofmadison.com/business/PW/contracts/details.cfm?ContractNumber=7251
SB Point Rd from Harvest Moon Ln to Valley View Rd Medium All lanes and shoulders closed 7/14/14 7:00 AM to 10/31/14 11:59 PM Gateway Additional information on the project can be found at: http://www.cityofmadison.com/business/PW/contracts/details.cfm?ContractNumber=7251

Jefferson County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB WI-26 from Pond Rd to Whitetail Ln Medium Right lane closed, one lane open 10/20/14 6:00 AM to 10/24/14 5:00 PM WisDOT Construction - JANESVILLE - FORT ATKINSON RD | CTH N - S FORT INTERCHANGE | STH 26 | JEFFERSON

Kenosha County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-50 from 69th Ave to 57th Ave Medium Left lane closed, one lane open 10/7/14 12:00 AM to 10/31/14 11:45 PM WisDOT Permit - Median improvements for Meijer development
WB WI-50 from 57th Ave to 70th Ave Medium Left lane closed, one lane open 10/7/14 12:00 AM to 10/31/14 11:45 PM WisDOT Permit - Median improvements for Meijer development
EB WI-158 from 104th Ave to WI-31 Major All lanes and shoulders closed 10/23/14 8:00 PM to 10/24/14 5:00 AM daily until 10/25/14 WisDOT Construction - Detour: STH 158 to 104th St., S to CTH K, E to STH 31, N to STH 158
WB WI-158 from WI-31 to 104th Ave Major All lanes and shoulders closed 10/23/14 8:00 PM to 10/24/14 5:00 AM daily until 10/25/14 WisDOT Construction - Detour: WB on STH 158 to STH 31, S to CTH K, W to 104th Ave., N to STH 158. CTH H, NB or SB to CTH K, NB or SB to CTH K, for EB STH 158, E on CTH K to STH 31, N to STH 158, for WB STH 158, W on CTH K to 104th Ave., N to STH 158
SB 120th Ave at WI-142 Medium All lanes and shoulders closed 4/16/14 12:00 AM to 11/14/14 11:45 PM WisDOT Construction - Detour: Use EFR or WFR north to CTH E. Use CTH E to IH94 EB.

Milwaukee County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-18 from 97th St to 95th St Major All lanes and shoulders closed 10/16/14 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take 108th st SB to Greenfield, Greenfield EB to 84th st, 84th NB to Kearney, Kearney EB to 76th st, 76th NB to Bluemound.
WB US-18 from 95th St to 97th St Major All lanes and shoulders closed 10/16/14 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take 84th st NB to WTP, WTP WB to 108th st, 108th st SB to Bluemound.
NB US-45 from Drexel Ave to Rawson Ave Major Left two lanes closed, one lane open 10/23/14 9:00 AM to 2:00 PM WisDOT Maintenance - Pavement Repair
NB WI-38 from Oakwood Rd to Joseph M Hutsteiner Dr Medium Various lanes closed 10/22/14 12:00 AM to 10/23/14 12:00 AM daily until 11/30/14 WisDOT Construction - Detour: For nighttime ramp work by the airport TBD.
SB WI-38 from Joseph M Hutsteiner Dr to Oakwood Rd Medium Various lanes closed 10/22/14 12:00 AM to 10/23/14 12:00 AM daily until 11/30/14 WisDOT Construction - Detour: For nighttime ramp work by the airport TBD
EB WI-59 at 92nd St Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
EB WI-59 at 92nd St Medium Various lanes closed 10/22/14 9:00 PM to 10/23/14 6:00 AM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
EB WI-59 at WI-181 Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
EB WI-59 at WI-181 Medium Various lanes closed 10/22/14 9:00 PM to 10/23/14 6:00 AM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
WB WI-59 at WI-181 Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
WB WI-59 at WI-181 Medium Various lanes closed 10/22/14 9:00 PM to 10/23/14 6:00 AM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
WB WI-59 at 92nd St Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
WB WI-59 at 92nd St Medium Various lanes closed 10/22/14 9:00 PM to 10/23/14 6:00 AM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NB WI-100 from Burleigh St to WI-190 Major Left lane closed, two lanes open 9/25/14 12:00 AM to 10/24/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
NB WI-100 from WI-190 to Silver Spring Dr Major Left two lanes closed, one lane open 9/25/14 12:00 AM to 10/24/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
NWB WI-100 from WI-38 to WI-241 Major Left two lanes closed, one lane open 7/9/14 8:00 AM to 11/28/14 8:00 PM WisDOT Construction - RYAN RD | 27TH ST - STH 38 | STH 100 | MILWAUKEE
NWB WI-100 at Theodore Trecker Way Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM daily until 11/7/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NWB WI-100 at Theodore Trecker Way Medium Various lanes closed 10/22/14 9:00 PM to 10/23/14 6:00 AM daily until 11/7/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NWB WI-100 from Theodore Trecker Way to I-94 Medium Right lane closed, two lanes open 3/4/14 12:00 AM to 12/5/14 11:45 PM WisDOT Construction - ZOO IC, UPRR & STH 100 BRIDGES OVR I 94 | TERMINAL, CONST/BRIDGE REPLACEMENT | STH 100 | MILWAUKEE
SEB WI-100 from US-45 to WI-190 Major Left two lanes closed, one lane open 9/26/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
SEB WI-100 from WI-190 to Burleigh St Major Left lane closed, two lanes open 9/26/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
SEB WI-100 at Watertown Plank Rd Major Left lane closed, two lanes open 1/5/14 12:00 AM to 11/1/14 11:45 PM WisDOT Median turn lane closed; Construction - ZOO IC, WATERTOWN PLANK INTERCHANGE | WISCONSIN AVE - UNDERWOOD PKWY | USH 45 | MILWAUKEE
SEB WI-100 at Theodore Trecker Way Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM daily until 11/7/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
SEB WI-100 at Theodore Trecker Way Medium Various lanes closed 10/22/14 9:00 PM to 10/23/14 6:00 AM daily until 11/7/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
SEB WI-100 from WI-241 to WI-38 Major Left two lanes closed, one lane open 6/30/14 4:00 PM to 11/28/14 8:00 PM WisDOT Construction - RYAN RD | 27TH ST - STH 38 | STH 100 | MILWAUKEE
NB WI-181 from WI-59 to Washington St Major Left lane closed, two lanes open 10/21/14 9:00 AM to 10/31/14 3:00 PM WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NB WI-181 at WI-59 Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NB WI-181 at WI-59 Medium Various lanes closed 10/22/14 9:00 PM to 10/23/14 6:00 AM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NB WI-181 at Schlinger Ave Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM daily until 11/21/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NB WI-181 at Schlinger Ave Medium Various lanes closed 10/22/14 9:00 PM to 10/23/14 6:00 AM daily until 11/21/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NB WI-181 from Oconnor St to Honey Creek Pky Major All lanes and shoulders closed 10/13/14 12:00 AM to 12/1/14 11:45 PM WisDOT Construction - Detour: Take Kearney to 76th st, 76th st NB to Bluemound, Bluemound WB to 84th st.
NB WI-181 at Silver Spring Dr Major Left lane closed, two lanes open 10/23/14 7:00 AM to 5:00 PM daily until 10/27/14 WisDOT Permit - Gas Main Replacement
NB WI-181 from Thurston Cir to Florist Ave Medium Right lane closed, two lanes open 10/23/14 7:00 AM to 5:00 PM daily until 12/8/14 WisDOT Permit - Gas Main Replacement
SB WI-181 at Florist Ave Medium Right lane closed, two lanes open 10/23/14 7:00 AM to 5:00 PM daily until 10/27/14 WisDOT Permit - Gas Main Replacement
SB WI-181 from Florist Ave to Thurston Cir Major Right two lanes closed, one lane open 10/23/14 7:00 AM to 5:00 PM daily until 12/8/14 WisDOT Permit - Gas Main Replacement
SB WI-181 at Bobolink Pl Major Left lane closed, two lanes open 10/23/14 7:00 AM to 5:00 PM daily until 10/27/14 WisDOT Permit - Gas Main Replacement
SB WI-181 from Carmen Ave to Silver Spring Dr Major Right two lanes closed, one lane open 10/7/14 12:00 AM to 10/27/14 11:45 PM WisDOT Permit - Gas Main Replacement
SB WI-181 from Honey Creek Pky to I-94 Major All lanes and shoulders closed 10/13/14 12:00 AM to 12/1/14 11:45 PM WisDOT Construction - Detour: Take Bluemound EB, 76th st SB, Kearney EB, 70th SB, Greenfield West to 84th st.
SB WI-181 at Schlinger Ave Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM daily until 11/21/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
SB WI-181 at Schlinger Ave Medium Various lanes closed 10/22/14 9:00 PM to 10/23/14 6:00 AM daily until 11/21/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
SB WI-181 from Washington St to WI-59 Major Left lane closed, two lanes open 10/21/14 9:00 AM to 10/31/14 3:00 PM WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
SB WI-181 at WI-59 Medium Various lanes closed 10/23/14 9:00 AM to 3:00 PM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
SB WI-181 at WI-59 Medium Various lanes closed 10/22/14 9:00 PM to 10/23/14 6:00 AM daily until 10/31/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
EB WI-190 from 102nd St to 100th St Major Left lane closed, two lanes open 9/3/14 12:00 AM to 10/24/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
WB WI-190 from WI-100 to 110th St Medium Right lane closed, two lanes open 9/26/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - MAYFAIR RD, CITY WAUWATOSA, MILW | BURLEIGH ST - SILVER SPRING DR | STH 100 | MILWAUKEE
NB WI-241 from Bolivar Ave to Cleveland Ave Major Left two lanes closed, one lane open 3/31/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - S 27TH ST | W HOWARD AVE - UP RR | STH 241 | MILWAUKEE
SB WI-241 from Cleveland Ave to Cold Spring Rd Major Right two lanes closed, one lane open 3/31/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - S 27TH ST | W HOWARD AVE - UP RR | STH 241 | MILWAUKEE
Ramp from WB Burleigh St to EB Burleigh St Medium All lanes and shoulders closed 10/23/14 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt Route

Racine County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-20 from Downy Dr to Britton Rd Major All lanes and shoulders closed 8/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - Detour: From STH 20EB: Turn Right/South onto County N. Go to County A and turn Left/East. Go to US45 and turn Left/North. Complete detour by turning Right/East onto STH 20 EB.
WB WI-20 from Britton Rd to Downy Dr Major All lanes and shoulders closed 8/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - Detour: Turn Right/South onto US45. Go to County A and turn Right/West. Go to County N and turn Right/North. Turn Left/West onto STH 20 to finish detour.
NB WI-31 at WI-38 Major Left lane closed, two lanes open 10/21/14 8:00 AM to 10/24/14 12:00 PM WisDOT Maintenance - Pavement Repair
NB WI-38 from Memorial Dr to Maple Grove Ave Major Right two lanes closed, one lane open 9/15/14 12:00 AM to 11/15/14 11:45 PM WisDOT Permit - Detour: Northbound traffic will use N Memorial Drive to Rapids Drive and then rejoin WIS 38. Eastbound traffic will still use WIS 38.
NB WI-75 from Plank Rd to WI-20 Major All lanes and shoulders closed 8/8/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - Detour: For STH20 WB Traffic: Turn Left/West onto County A. Go to County N and turn Right/North. Turn Left/West onto STH 20WB to end detour. For STH 20EB Traffic: Turn Right/East onto County A. Go to US 45 and turn Left/North. Go to STH 20EB and turn Right/East to finish detour.
SB WI-75 from WI-20 to Plank Rd Major All lanes and shoulders closed 8/8/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - Detour: STH 75SB traffic from STH20EB: Turn Right/South onto County N. Go to County A and turn Left/East. Go to STH 75 and turn Right/South to complete detour. Traffic from STH 20 WB: Turn Left/South onto US45. Go to County A and turn Right/West. Follow to STH 75 and turn Left/South to complete the detour.

Walworth County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from SEB US-12 to SWB I-43 Major All lanes and shoulders closed 10/22/14 8:00 PM to 10/23/14 5:00 AM WisDOT Construction - Detour: Exit from WB US 12 onto NB IH 43. Exit at STH 11. Left/west on STH 11. Left/south onto IH 43 SB.
Ramp from SEB US-12 to SWB I-43 Major All lanes and shoulders closed 10/22/14 8:00 PM to 10/23/14 5:00 AM WisDOT Construction - Detour: US 12 EB exit at CTH NN. Right/east on CTH NN. Right/south onto US 12 WB. Exit onto IH 43 NB.
Ramp from EB US-12 to WB WI-50 Major All lanes and shoulders closed 6/27/14 12:00 AM to 10/31/14 11:45 PM WisDOT **Long Term Closure** Construction - Detour: For traffic that wants to exit EB USH12 to head EB STH50 the loop ramp is closed. The traffic signal on the existing offramp to WB50 (north of B-64-29) has been temporarily reconfigured to allow a left turn to access WB50 when the loop ramp is being reconstructed.
NWB US-12 from Townline Rd to Sheridan Springs Rd Medium Left lane closed, one lane open 6/27/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - LAKE GENEVA - ELKHORN | STH 50 INTERCHANGE | USH 12 | WALWORTH
SEB US-12 from WI-120 to Townline Rd Medium Right lane closed, one lane open 6/27/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - LAKE GENEVA - ELKHORN | STH 50 INTERCHANGE | USH 12 | WALWORTH
Ramp from SEB US-12 to NB WI-120 Major All lanes and shoulders closed 6/27/14 12:00 AM to 10/31/14 11:45 PM WisDOT **Long Term Closure** Construction - Detour: For traffic that wants to exit EB USH12 to head EB STH50 the loop ramp is closed. The traffic signal on the existing offramp to WB50 (north of B-64-29) has been temporarily reconfigured to allow a left turn to access WB50 when the loop ramp is being reconstructed.
EB WI-20 from I-43 to I-43 (+0.1 miles) Medium Right lane closed, one lane open 6/3/14 12:00 AM to 11/7/14 11:45 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
WB WI-20 from I-43 (-0.1 miles) to I-43 (+0.1 miles) Medium Right lane closed, one lane open 6/3/14 12:00 AM to 11/7/14 11:45 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
WB WI-50 from Grand Geneva Way (+0.1 miles) to US-12 Medium Left lane closed, one lane open 7/31/14 12:00 PM to 10/31/14 5:00 PM WisDOT Construction - LAKE GENEVA - ELKHORN | STH 50 INTERCHANGE | USH 12 | WALWORTH

Washington County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-28 from Forest Ave to WI-144 Major All lanes and shoulders closed 3/24/14 12:00 AM to 11/11/14 11:45 PM WisDOT Construction - Detour: USH 45 - CTH H - STH 144
WB WI-28 from WI-144 to Forest Ave Major All lanes and shoulders closed 3/24/14 12:00 AM to 11/12/14 11:45 PM WisDOT Construction - Detour: STH 144 - CTH H - USH 45

Waukesha County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-59 from Johnson Rd to Calhoun Rd Major Left lane closed, two lanes open 10/23/14 6:00 AM to 6:00 PM daily until 10/31/14 WisDOT Permit - DOT duct installation in center median between Moorland and Barker Rd
WB WI-59 from Calhoun Rd to Barker Rd Major Left lane closed, two lanes open 10/23/14 6:00 AM to 6:00 PM daily until 10/31/14 WisDOT Permit - DOT duct in center median from Moorland Rd to Barker Rd
NB WI-83 from Perkins Rd to Glacier Pass Medium Various lanes closed 4/30/14 12:00 AM to 12/12/14 11:45 PM WisDOT Construction - WALES RD | PERKINS RD - GLACIER PASS, N OF USH 18 | STH 83 | WAUKESHA:flagging operation Schd::LongTerm
SB WI-83 from Glacier Pass to Perkins Rd Medium Various lanes closed 4/30/14 12:00 AM to 12/12/14 11:45 PM WisDOT Construction - WALES RD | PERKINS RD - GLACIER PASS, N OF USH 18 | STH 83 | WAUKESHA::flagging operation::LongTerm

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Wed Oct 22 22:01:21 CDT 2014