Construction Report
Select Location
  
Updated: 2/22/18 2:45 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

Dane County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-151 from Fitchrona Rd to Raymond Rd Minor Right shoulder closed, all lanes open 11/22/17 12:00 PM to 2/28/18 12:00 PM WisDOT Construction - Mount Horeb - Madison | Cth Pd To Raymond Rd/Stg 2/Phase 2 | Project ID 1206-07-75 Midpoint | DANE
NB US-151 from Fitchrona Rd to Raymond Rd Minor Left shoulder closed, all lanes open 11/22/17 12:00 PM to 2/28/18 12:00 PM WisDOT Construction - Mount Horeb - Madison | Cth Pd To Raymond Rd/Stg 2/Phase 2 | Project ID 1206-07-75 Midpoint | DANE
SB US-151 from Raymond Rd to Fitchrona Rd Minor Left shoulder closed, all lanes open 11/22/17 12:00 PM to 2/28/18 12:00 PM WisDOT Construction - Mount Horeb - Madison | Cth Pd To Raymond Rd/Stg 2/Phase 2 | Project ID 1206-07-75 Midpoint | DANE
SB US-151 from Raymond Rd to Fitchrona Rd Minor Right shoulder closed, all lanes open 11/22/17 12:00 PM to 2/28/18 12:00 PM WisDOT Construction - Mount Horeb - Madison | Cth Pd To Raymond Rd/Stg 2/Phase 2 | Project ID 1206-07-75 Midpoint | DANE

Jackson County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WB WI-95 from Main St to Lincoln Rd Minor Right shoulder closed, all lanes open 2/22/18 7:00 AM to 5:00 PM WisDOT Permit - Vegetation management for overhead powerlines for Xcel Energy. WB and EB on Hwy 95 heading west from Hixton, WI

Juneau County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
SB WI-58 from Fairway Ln to I-90 Major All lanes closed and both shoulders open 2/23/18 7:00 AM to 5:00 PM WisDOT Construction - H&M will need a intermediate southbound lane closure to install a temporary construction entrance for the Badger Coulee Transmission Project.
EB WI-82 from County Road HH to County Road HH (+0.7 miles) Minor Right shoulder closed, all lanes open 1/8/18 12:00 AM to 11/30/18 11:45 PM WisDOT Construction - Point Bluff Bridge | Wisconsin River Bri B-29-141,-148 | STH 082, Juneau County | ADAMS
EB WI-82 from County Road HH to County Road HH (+0.7 miles) None All lanes open with restriction 2/19/18 6:00 AM to 2/23/18 12:00 PM,
2/26/18 6:00 AM to 3/2/18 12:00 PM,
3/5/18 6:00 AM to 3/9/18 12:00 PM,
3/12/18 6:00 AM to 3/16/18 12:00 PM,
... more, ending on 11/30/18
WisDOT Construction - Point Bluff Bridge | Wisconsin River Bri B-29-141,-148 | STH 082, Juneau County | ADAMS
WB WI-82 from County Road HH (-0.7 miles) to County Road HH Minor Right shoulder closed, all lanes open 1/8/18 12:00 AM to 11/30/18 11:45 PM WisDOT Construction - Point Bluff Bridge | Wisconsin River Bri B-29-141,-148 | STH 082, Juneau County | ADAMS
WB WI-82 from County Road HH (-0.7 miles) to County Road HH None All lanes open with restriction 2/19/18 6:00 AM to 2/23/18 12:00 PM,
2/26/18 6:00 AM to 3/2/18 12:00 PM,
3/5/18 6:00 AM to 3/9/18 12:00 PM,
3/12/18 6:00 AM to 3/16/18 12:00 PM,
... more, ending on 11/30/18
WisDOT Construction - Point Bluff Bridge | Wisconsin River Bri B-29-141,-148 | STH 082, Juneau County | ADAMS

Kenosha County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB WI-31 at Old Green Bay Rd (-0.5 miles) Medium Right lane closed, two lanes open 2/22/18 7:00 AM to 3:00 PM daily until 3/2/18 WisDOT Construction - 3330-00-75 Pike River Trail Shared Use Path Project Lane closure for access and material deliveries.

La Crosse County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
SB US-53 at Livingston St Medium One lane closed, one lane open 2/22/18 9:00 AM to 3:00 PM WisDOT Emergency - Sanitary repair work

Milwaukee County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-45 from Phyllis Ln (+0.1 miles) to WI-24 Minor Right shoulder closed, all lanes open 2/22/18 6:30 AM to 4:30 PM daily until 3/30/18 WisDOT Permit - Request temporary shoulder close on WIS 100 NB in order to relocate We Energies Facilites. Pieperline to continue to utilize existing traffic control signage/ barrels already on site associated with the relocation of other We Energies facilities
NB US-45 from Whitnall Edge Rd to Kay Pkwy Medium Right lane closed, two lanes open 2/22/18 9:00 AM to 4:00 PM daily until 3/9/18 WisDOT Permit - utility construction for road project
NB US-45 at Grange Ave Medium Right lane closed, two lanes open 2/19/18 12:00 AM to 3/31/18 11:45 PM WisDOT Permit - GAS MAIN INSTALLATION
SB US-45 at Copeland Ave Medium Right lane closed, two lanes open 2/19/18 12:00 AM to 3/31/18 11:45 PM WisDOT Permit - GAS MAIN INSTALLATION
SB US-45 from WI-24 to Rawson Ave (-0.2 miles) Minor Right shoulder closed, all lanes open 2/22/18 6:30 AM to 4:30 PM daily until 3/30/18 WisDOT Permit - Request temporary shoulder close on WIS 100 SB in order to relocate We Energies Facilites. Pieperline to continue to utilize existing traffic control signage/ barrels already on site associated with the relocation of other We Energies facilities
SB US-45 from WI-24 to Rawson Ave (-0.2 miles) Minor Right shoulder closed, all lanes open 2/22/18 6:30 AM to 3:30 PM daily until 3/30/18 WisDOT Permit - Request temporary shoulder close on WIS 100 SB in order to relocate We Energies Facilites. Pieperline to continue to utilize existing traffic control signage/ barrels already on site associated with the relocation of other We Energies facilities
SB US-45 at WI-24 Medium Right lane closed, one lane open 2/19/18 12:00 AM to 3/31/18 11:45 PM WisDOT Permit - gas main installation
SB US-45 at Forest Home Ave Medium Right lane closed, one lane open 2/19/18 12:00 AM to 3/31/18 11:45 PM WisDOT Permit - Gas Main Installation
SB US-45 from Kay Pkwy to Whitnall Edge Rd Medium Right lane closed, two lanes open 2/22/18 9:00 AM to 4:00 PM daily until 3/9/18 WisDOT Permit - utility construction for road project
EB WI-100 from I-41 to I-41 Medium Various lanes closed 10/25/17 7:00 AM to 9/22/18 11:59 PM WisDOT Reconstructing the Ryan Road overpass bridges, the entrance and exit ramps to and from I-94, and adjacent retaining walls and sign structures. It also includes three culvert extensions along I-94 at Puetz Road and Drexel Avenue.
NB WI-100 from Watertown Plank Rd to North Ave Medium 0 lanes closed, three lanes open 2/22/18 8:00 AM to 3:30 PM daily until 3/2/18 WisDOT Permit - STARTING WEEK OF THE 19TH THROUGH THE 23RD OF FEBRUARY AT THE INTERSECTION OF WATERTOWN PLANK RD & MAYFAIR RD AT THE NE CORNER THE NB LANE ON THE E SIDE OF MAYFAIR RD WILL BE EFFECTED. THE ENIRE WORK SPAN IS FROM WATERTOWN PLANK RD TO NORTH AVE
WB WI-100 from I-41 to I-41 Medium Various lanes closed 10/25/17 7:00 AM to 9/22/18 11:59 PM WisDOT Reconstructing the Ryan Road overpass bridges, the entrance and exit ramps to and from I-94, and adjacent retaining walls and sign structures. It also includes three culvert extensions along I-94 at Puetz Road and Drexel Avenue.

Monroe County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
SB WI-27 from Montgomery St to Avon Rd Minor Right shoulder closed, all lanes open 2/22/18 5:00 AM to 5:00 PM daily until 3/3/18 WisDOT Construction - Shoulder/parking lane closure for gas main replacement.

Racine County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
SB US-45 from WI-20 to 7th Ave Medium Various lanes closed 6/5/17 7:15 AM to 9/21/18 11:59 PM WisDOT Removing the old roadway, grading the roadway and ditches, replacing culverts, paving a new roadway and replacing the signalized intersection at County C with a roundabout. The project is scheduled to last two construction seasons.
EB WI-11 at Sylvania Ave Minor Right shoulder closed, all lanes open 2/19/18 7:00 AM to 2/23/18 7:00 PM,
2/26/18 7:00 AM to 3/2/18 7:00 PM,
3/5/18 7:00 AM to 3/9/18 7:00 PM,
3/12/18 7:00 AM to 3/16/18 7:00 PM,
... more, ending on 5/1/18
WisDOT Permit - GAS MAIN INSTALLATION WR4046437
EB WI-20 from WI-75 to Dogwood Ct None All lanes open with restriction 2/22/18 7:30 AM to 3:00 PM daily until 3/2/18 WisDOT Maintenance - Crackfilling
EB WI-38 at County Road MM Minor Right shoulder closed, all lanes open 2/19/18 6:00 AM to 2/23/18 7:00 PM,
2/26/18 6:00 AM to 3/2/18 7:00 PM,
3/5/18 6:00 AM to 3/9/18 7:00 PM,
3/12/18 6:00 AM to 3/16/18 7:00 PM,
... more, ending on 3/30/18
WisDOT Permit - GAS MAIN INSTALLATION
EB CR-K from 27th St (-0.2 miles) to Adams Rd (+0.1 miles) Minor Various lanes closed 7/17/17 7:00 AM to 5/1/18 11:59 PM WisDOT
WB CR-K from Adams Rd (-0.1 miles) to 27th St (+0.2 miles) Minor Various lanes closed 7/17/17 7:00 AM to 5/1/18 11:59 PM WisDOT

Sauk County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB WI-78 at Eagle View Ct None All lanes open with restriction 2/22/18 9:00 AM to 3:00 PM WisDOT Construction - Soil Borings
SWB WI-78 from Sunset Dr to Eagle View Ct None All lanes open with restriction 2/22/18 9:00 AM to 3:00 PM WisDOT Construction - Soil Borings

St. Croix County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WB US-12 from 120th St to Kelly Rd None All lanes open with restriction 2/22/18 6:00 AM to 5:00 PM daily until 2/23/18 WisDOT Construction - SUBSURFACE INVESTIGATIONS FOR DESIGN ID 8949-02-31

Waukesha County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB WI-67 at Delafield Rd Medium One lane closed, one lane open 2/22/18 7:00 AM to 5:00 PM daily until 3/23/18 WisDOT Permit - Fiber Optic Cable on CTH-DR
SB WI-67 at Delafield Rd Medium One lane closed, one lane open 2/22/18 7:00 AM to 5:00 PM daily until 3/23/18 WisDOT Permit - Install fiber optic cable along CTH-DR

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Thu Feb 22 2018 14:46:44 CST