Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 159 to Jade Rd (+0.3 miles) 155.5 to 162.0 Medium Various lanes closed 4/25/16 7:00 AM to 10/5/16 10:30 AM MnDOT single line traffic alternating directions
at Hemlock Ln (-0.5 miles) Medium Various lanes closed 7/20/14 7:00 PM to 11/30/16 5:00 PM MnDOT major road construction
Pelham Blvd (-0.3 miles) to Cleveland Ave (+0.1 miles) 236.5 to 237.5 Medium Right lane closed, two or three lanes open 8/31/16 8:00 AM to 3:00 PM MnDOT reduced to three lanes
Lexington Pkwy (-0.1 miles) to Dale St (-0.1 miles) 239.4 to 240.4 Medium Various lanes closed 7/13/16 2:57 PM to 5/2/20 12:17 PM MnDOT reduced to three lanes
Entrance ramp from SB Dale St Unknown All lanes and shoulders closed 6/26/16 8:00 PM to 11/15/16 5:00 AM MnDOT entrance ramp closed
Mounds Blvd (+0.1 miles) to MN-120 243.6 to 247.7 Medium Various lanes closed 8/17/16 12:46 PM to 9/29/17 5:00 PM MnDOT major road construction
Mounds Blvd (+0.1 miles) to I-494 (-0.3 miles) 243.6 to 248.7 Medium Left lane closed, one to three lanes open 6/20/16 4:00 AM to 9/23/16 2:30 PM MnDOT left lane closed
County Road T (-0.1 miles) to County Road T (+0.1 miles) 16.5 to 16.8 Minor Left shoulder closed, all lanes open 8/31/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.1 miles) 16.5 to 16.8 Minor Right shoulder closed, all lanes open 8/31/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.1 miles) 16.5 to 16.8 Medium Various lanes closed 8/31/16 6:00 PM to 9/1/16 7:00 AM daily until 9/2/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
at County Road BB 22.5 Minor Left shoulder closed, all lanes open 8/18/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - Baldwin - Menomonie | CTH BB Bridge B-55-0265 | I 94 | ST. CROIX
at US-12 (-0.6 miles) 40.9 Medium Left lane closed, one lane open 8/31/16 6:00 AM to 11:00 AM daily until 9/1/16 WisDOT Maintenance - We will be installing piezos for the wisdot
WI-93 (+0.2 miles) to Hobbs Rd 69.0 to 71.5 Medium 0 lanes closed, two lanes open 8/31/16 6:00 PM to 9/1/16 9:00 AM WisDOT Construction - Detour: No posted detour. Follow Alternate 94.
CR-G (-0.9 miles) to WI-95 (+0.1 miles) 91.3 to 105.3 Medium One lane closed, one lane open 8/29/16 3:00 PM to 9/1/16 11:00 AM WisDOT Construction - Osseo - Black River Falls | West County Line - STH 95 eb & wb | I 94 | JACKSON
County Road O (-0.2 miles) to County Road O (+4.1 miles) 127.8 to 132.0 Medium One lane closed, one lane open 8/29/16 5:00 PM to 8/31/16 11:59 PM WisDOT Construction - Black River Falls - Tomah | CTH O - S County Line EB | I 94 | JACKSON
County Road O (+4.1 miles) to Cortland Ave (+0.1 miles) 132.0 to 137.5 Medium One lane closed, one lane open 8/29/16 5:00 PM to 8/31/16 11:59 PM WisDOT Construction - 1023-06-73 (NW Office)
Sprecher Rd (-0.1 miles) to Sprecher Rd (+0.2 miles) 240.4 to 240.8 Medium Left lane closed, two or three lanes open 8/31/16 9:00 AM to 3:00 PM daily until 9/1/16 WisDOT Construction - Sign Bridge Repair | Var Hwy | SOUTHWEST REGION WIDE
Newville Rd to Newville Rd 256.5 to 256.5 Medium Right lane closed, one lane open 8/31/16 11:00 AM to 3:00 PM WisDOT Maintenance - Beam Guard Repairs
Hillside Dr to Hillside Dr 272.7 to 272.7 Medium Right lane closed, one lane open 9/1/16 9:00 AM to 3:00 PM WisDOT Maintenance - Beam Guard Repairs
Golden Lake Rd (-0.3 miles) to Golden Lake Rd (+0.3 miles) 278.7 to 279.3 Medium Various lanes closed 4/13/16 12:00 AM to 11/24/16 11:45 PM WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Dousman Rd (-0.3 miles) to Dousman Rd (+0.2 miles) 280.7 to 281.3 Medium Various lanes closed 4/13/16 12:00 AM to 11/24/16 11:45 PM WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
CR-P (+0.2 miles) to Cushing Park Rd (+0.2 miles) 283.3 to 284.8 Medium Various lanes closed 3/10/16 12:00 AM to 9/9/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
WI-83 to Maple Ave 286.6 to 287.9 Medium Various lanes closed 3/30/16 12:00 AM to 9/14/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
WI-164 (-0.2 miles) to WI-164 (+0.1 miles) 294.0 to 294.4 Minor Right shoulder closed, all lanes open 8/25/16 12:00 AM to 9/22/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Exit ramp to SB Redford Blvd 294.9 Medium All lanes closed 8/15/16 12:00 AM to 9/19/16 11:45 PM WisDOT Construction - Detour: STH NB to Hwy 190 EB to CTH F
Entrance ramp from NB Redford Blvd 295.4 Medium All lanes closed 8/15/16 12:00 AM to 9/19/16 11:45 PM WisDOT Construction - Detour: CTH F NB to Hwy 190 WB to STH 164 SB to 94
Sunny Slope Rd (-0.1 miles) to WI-100 (-0.2 miles) 301.6 to 303.5 Medium Right lane closed, two lanes open 3/12/16 12:00 AM to 11/22/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Entrance ramp from WI-100 303.7 Minor Right lane closed, up to two lanes open 3/25/15 12:00 AM to 3/15/17 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Exit ramp to SB I-41 304.2 None All lanes open with restriction 8/5/16 12:00 AM to 11/5/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Exit ramp to NB I-41 304.3 Major All lanes closed 8/15/16 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: Take I-94 East to the STH 164/CTH J Exit; take STH 164/CTH J North to Capitol Dr/STH 190, Capitol Dr/STH 190 East to the I-41/US 45 North Entrance Ramp; OR, Take I-94 East to the Moorland Rd Exit; take Moorland Rd North to Bluemoun
Entrance ramp from SB I-41 304.7 Unknown All lanes open with restriction 7/31/16 12:00 AM to 10/10/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Exit ramp to SB 35th St 308.2 Medium All lanes closed and both shoulders open 7/25/16 8:00 AM to 9/12/16 8:00 AM WisDOT Maintenance - No southbound (right turn) access for semi trucks at exit 309A/35th Street from I-94 East.
at Canal St 310.9 Medium One lane closed, two lanes open 8/31/16 9:00 AM to 3:00 PM WisDOT Maintenance - Detour: detour EB to SB ramp traffic to Fond-du-lac Ave - exit turn left to entrance ramp to SB
Entrance ramp from WB I-794 311.1 Major All lanes closed 9/1/16 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt. Route
at 1st St 336.9 Medium Right lane closed, two lanes open 8/31/16 9:00 AM to 12:00 PM WisDOT Maintenance - Camera repair
at 38th St 341.5 Minor Right shoulder closed, all lanes open 6/17/16 12:00 AM to 10/8/16 11:45 PM WisDOT Construction - Detour: 38th Street To be Closed. Route to proceed along west frontage to Wis. 142 to CTH UE to CTH N
Touhy Ave to Wilson Ave 39.8 to 43.1 Minor Both shoulders closed, all lanes open with partial ramp closures 8/31/16 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance from SEB Kennedy Local 3.0 to 51.6 Minor Right shoulder closed, all lanes open with partial ramp closures 8/31/16 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 11/30/16 11:59 PM IDOT 11' Width; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 11/30/16 11:59 PM IDOT Shoulders closed and traffic weaved; Long Term Closure
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 12/1/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to Taylor St 51.8 None Partial closure 6/11/15 12:00 AM to 12/1/16 11:59 PM IDOT Force Merge. No turns. Ramp exit yielding to mainline exit traffic.; Long Term Closure
Harrison St to Roosevelt Rd 51.7 to 52.2 Minor Both shoulders closed, all lanes open 5/20/15 12:00 AM to 12/1/16 11:59 PM IDOT Lanes weaved ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right shoulder closed, all lanes open 7/1/16 12:00 AM to 9/1/16 11:59 PM IDOT Long Term Closure
Entrance from SB Dan Ryan Express 54.1 to 59.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 8:30 AM to 1:30 PM IDOT Moving Operation
26th St to Marquette Rd (67th St) 54.1 to 59.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 9:00 AM to 2:00 PM IDOT Moving Operation
Dan Ryan Expy (I-94) / I-57 to SB Stony Island Feeder Entrance 62.9 to 65.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 9:00 AM to 11:59 AM IDOT Moving Operation
Exit to SB Bishop Ford 65.6 to 74.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 8:30 AM to 12:30 PM IDOT Moving Operation
at I-80 (-0.2 miles) 15.8 Medium Left lane closed, two lanes open 8/29/16 7:53 AM to 9/5/16 7:53 AM InDOT Construction work
Entrance ramp from EB I-90 15.8 Major All lanes and shoulders closed 7/11/16 7:00 AM to 11/18/16 11:59 PM Indiana Toll Road Bridge Work- 24 Hour Continuous Closure. Detours are in place
Entrance ramp from WB I-80 15.8 Major All lanes and shoulders closed 7/11/16 7:00 AM to 11/18/16 11:59 PM Indiana Toll Road Bridge Work- 24 Hour Continuous Closure. Detours are in place
at US-20 39.8 Medium Right lane closed, two lanes open 4/1/16 7:00 AM to 10/31/16 11:59 PM InDOT Bridge Work
Entrance ramp from WB US-20 / US-35 40.1 Major All lanes and shoulders closed 6/13/16 7:00 AM to 9/17/16 11:59 AM InDOT Detour: westbound U.S. 20 / northbound U.S. 35 will be detoured via the cloverleaf on-ramp to westbound I-94, continue on westbound I-94 until the southbound U.S. 421 interchange (Exit 34A). Continue over the Bridge and take the eastbound I-94 cloverleaf. Continue under the bridge on eastbound I-94 and follow eastbound I-94.
Entrance ramp from WB US-20 40.1 Major All lanes and shoulders closed 6/13/16 8:00 PM to 9/17/16 11:59 AM InDOT Resurfacing and restoration. Detour: westbound U.S. 20 will be detoured via the cloverleaf on-ramp to westbound I-94, continue on westbound I-94 to the southbound U.S. 421 interchange (Exit 34A). Continue over the Bridge and take the eastbound I-94 cloverleaf. Continue under the bridge on eastbound I-94 and follow eastbound I-94.
Red Arrow Hwy to Puetz Rd (+0.2 miles) 15.5 to 22.6 Medium Various lanes closed 3/14/16 7:00 AM to 10/21/16 11:59 PM MDOT Bridge repairs, median cable barrier, guardrail, culvert, freeway signing and right-of-way fence. Repairs on the I-94 bridges over Lost Dunes Drive in Bridgman, and over Puetz Road east of Stevensville.; Daily single-lane and nighttime double-lane closures on I-94 during construction. Puetz Road will be closed with a detour posted. There also will be temporary ramp closures at Red Arrow Highway Exit 16 and Grand Mere Road Exit 22.
MM 16 to MM 23 16.0 to 23.0 Medium 0 lanes closed, three lanes open 3/13/16 11:00 PM to 10/20/16 11:00 PM MDOT Expect single-lane closures for road work.
MM 16 to MM 24 16.0 to 24.0 Medium Various lanes closed 3/14/16 7:00 PM to 10/21/16 9:00 AM MDOT Expect nightly intermittent double-lane closures for road work.
Co Rd 687 (64th St) to M-51 45.8 to 56.3 Medium One lane closed, one lane open 8/15/16 6:00 PM to 9/19/16 6:00 AM MDOT Expect a single-lane closure for centerline joint paving.
Mile Marker 66 to Mile Marker 92 66.1 to 91.9 Minor Left or right shoulder closed, all lanes open 7/11/16 6:00 AM to 11/6/16 4:00 PM MDOT Expect moving shoulder closures for intermittent daytime sign replacement. Expect intermittent nighttime single lane closures for sign replacement.
Exit ramp to WB Michigan Ave 87.8 Medium All lanes and shoulders closed 4/18/16 7:00 AM to 9/16/16 11:59 PM MDOT
at exit 88 (40th St) near Galesburg 87.0 to 88.3 Medium 0 lanes closed, two lanes open 4/18/16 8:00 PM to 9/23/16 5:00 AM MDOT Expect nightly single lane closures for road work.
at Michigan Ave (+0.2 miles) 87.9 Medium Various lanes closed 4/18/16 7:00 AM to 9/30/16 11:59 PM MDOT Lane shifts and nighttime single-lane closures
Exit 92 to Exit 124 92.1 to 124.0 Medium Various lanes closed 4/18/16 6:00 AM to 10/28/16 4:00 PM MDOT Expect moving shoulder closures for sign replacement.
M-99 (-0.5 miles) to Airport Rd 123.4 to 137.1 Medium Various lanes closed 5/9/16 9:00 PM to 11/4/16 11:59 PM MDOT Repair Bridges; There will be single-lane closures on I-94, with local roads closed and traffic detoured. Starting May 9, there will be nighttime single-lane closures on I-94 between 9 p.m. and 5 a.m. for shoulder upgrades in preparation of the bridge work, which is expected to start after the Memorial Day holiday.
Parma Rd (-0.3 miles) to Parma Rd (+0.5 miles) 129.3 to 130.1 Minor Left or right shoulder closed, all lanes open 5/18/16 8:00 PM to 9/10/16 4:00 AM MDOT Full time shoulder closure
Sandstone Rd to Sandstone Rd 133.8 to 133.8 Medium One lane closed, one lane open 8/23/16 5:00 AM to 9/29/16 8:00 PM MDOT Single Lane Closure due to bridge repair under Sandstone Road
Blackman Rd (-0.2 miles) to Blackman Rd (+0.1 miles) 135.4 to 135.7 Medium One lane closed, one lane open 7/28/16 5:00 AM to 9/29/16 8:00 PM MDOT Single Lane Closure for work on the underside of the bridge
Blackman Rd (-0.2 miles) to M-60 (-0.1 miles) 135.4 to 135.8 Medium Various lanes closed 6/26/16 9:00 AM to 9/29/16 11:00 PM MDOT Dual lane shift on I-94 to complete bridge repairs
Airport Rd (-0.2 miles) to Airport Rd (+0.2 miles) 137.0 to 137.3 Medium Various lanes closed 6/26/16 9:00 AM to 9/29/16 11:00 PM MDOT Dual lane shift on I-94 to complete bridge repair work.
Airport Rd (-0.1 miles) to Airport Rd (+0.1 miles) 137.0 to 137.2 Medium One lane closed, one lane open 8/11/16 8:00 PM to 9/29/16 5:00 AM MDOT Single-lane closures nightly for bridge repairs.
Lansing Ave (-0.2 miles) to Lansing Ave (+0.1 miles) 138.9 to 139.2 Minor Left or right shoulder closed, all lanes open 6/16/16 5:00 AM to 9/1/16 4:00 AM MDOT Expect shoulder closures for bridge work.
Harris Rd (-0.1 miles) to Rawsonville Rd 185.0 to 187.3 Medium Various lanes closed 5/11/16 9:00 AM to 8/31/16 11:59 PM MDOT Pavement patching and repair; During construction, there will be nighttime double-lane closures and weekend single-lane closures on I-94. Starting Wednesday, May 11, there will be double-lane closures overnight between 9 p.m. and 5 a.m. the following morning. From 9 p.m. Friday, May 13, through 5 a.m. Monday, May 16, there will be a continuous single-lane closure on I-94, with double-lane closures overnight.
Wayne Road to Beech Daly Road 195.6 to 201.2 Medium One lane closed, two or three lanes open 8/29/16 7:00 PM to 9/2/16 4:00 AM MDOT The right two lanes are closed for pavement repairs. The left lane is open.
Exit ramp to SB Vining Rd 196.1 Minor Various lanes closed 8/29/16 7:00 PM to 9/2/16 4:00 AM MDOT The ramp is closed for pavement repairs.
Entrance ramp from NB Vining Rd 197.0 Minor Various lanes closed 8/29/16 7:00 PM to 9/2/16 4:00 AM MDOT The ramp is closed for paving.
Entrance ramp from SB Vining Rd 197.0 Minor Various lanes closed 8/29/16 7:00 PM to 9/2/16 4:00 AM MDOT The ramp is closed for pavement repairs.
Exit ramp to EB Ecorse Rd 200.3 Minor Various lanes closed 8/29/16 7:00 PM to 9/2/16 4:00 AM MDOT The ramp is closed for pavement repairs.
Entrance ramp from EB Ecorse Rd 200.5 Minor Various lanes closed 8/29/16 7:00 PM to 9/2/16 4:00 AM MDOT The ramp is closed for pavement repairs.
14th St to M-10 214.3 to 215.0 Minor Left or right shoulder closed, all lanes open 7/24/16 4:00 AM to 10/3/16 4:00 AM MDOT The right shoulder is closed for bridge work at Trumbull.
Exit ramp to SEB Trumbull St 214.5 Minor Various lanes closed 3/18/16 6:00 PM to 10/3/16 4:00 AM MDOT The ramp is closed for bridge replacement at Trumbull. The eastbound I-94 service drive is also closed at Commonwealth Street for this work. Local access to businesses and residences is maintained.
at State St 275.6 Medium Various lanes closed 8/31/16 7:00 AM to 4:00 PM,
9/1/16 7:00 AM to 4:00 PM,
9/2/16 7:00 AM to 4:00 PM,
9/3/16 7:00 AM to 4:00 PM,
... more, ending on 11/29/16
MDOT single/double lane closures beginning mid-span of the bridge and extending for approximately one-quarter mile for paint work

I-94 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to 69th St 54.1 to 59.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 8:30 AM to 1:30 PM IDOT Moving Operation

I-94 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Marquette Rd (67th St) to 26th St 59.3 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 10:00 AM to 3:00 PM IDOT Moving Operation

I-94 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 8/31/16 11:30 AM to 1:30 PM IDOT

I-94 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 8/31/16 11:30 AM to 1:30 PM IDOT

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Gratiot Ave 275.7 Medium Various lanes closed 8/31/16 7:00 AM to 4:00 PM,
9/1/16 7:00 AM to 4:00 PM,
9/2/16 7:00 AM to 4:00 PM,
9/3/16 7:00 AM to 4:00 PM,
... more, ending on 11/29/16
MDOT single/double lane closures beginning mid-span of the bridge and extending for approximately one-quarter mile for paint work
14th St to M-10 214.9 to 214.2 Minor Left or right shoulder closed, all lanes open 7/24/16 4:00 AM to 10/3/16 4:00 AM MDOT The right shoulder is closed for bridge work at Trumbull.
Entrance ramp from SEB Trumbull St 214.5 Minor Various lanes closed 3/18/16 6:00 AM to 10/3/16 4:00 PM MDOT The ramp is closed for bridge work.
Rawsonville Rd to Harris Rd (+0.1 miles) 187.3 to 185.0 Medium Various lanes closed 5/11/16 9:00 AM to 8/31/16 11:59 PM MDOT Pavement patching and repair; During construction, there will be nighttime double-lane closures and weekend single-lane closures on I-94. Starting Wednesday, May 11, there will be double-lane closures overnight between 9 p.m. and 5 a.m. the following morning. From 9 p.m. Friday, May 13, through 5 a.m. Monday, May 16, there will be a continuous single-lane closure on I-94, with double-lane closures overnight.
Lansing Ave (-0.1 miles) to Lansing Ave (+0.2 miles) 139.2 to 138.9 Minor Left or right shoulder closed, all lanes open 6/16/16 5:00 AM to 9/1/16 4:00 AM MDOT Expect shoulder closures for bridge work.
Airport Rd (-0.2 miles) to Airport Rd (+0.2 miles) 137.4 to 137.0 Medium Various lanes closed 6/26/16 9:00 AM to 9/29/16 11:00 PM MDOT Dual lane shift on I-94 to complete bridge repair work.
Airport Rd (-0.1 miles) to Airport Rd (+0.1 miles) 137.2 to 137.0 Medium One lane closed, one lane open 8/11/16 8:00 PM to 9/29/16 5:00 AM MDOT Single-lane closures nightly for bridge repairs.
Airport Rd to M-99 (+0.5 miles) 137.1 to 123.4 Medium Various lanes closed 5/9/16 9:00 PM to 11/4/16 11:59 PM MDOT Repair Bridges; There will be single-lane closures on I-94, with local roads closed and traffic detoured. Starting May 9, there will be nighttime single-lane closures on I-94 between 9 p.m. and 5 a.m. for shoulder upgrades in preparation of the bridge work, which is expected to start after the Memorial Day holiday.
M-60 (+0.1 miles) to Blackman Rd (+0.2 miles) 135.8 to 135.4 Medium Various lanes closed 6/26/16 9:00 AM to 9/29/16 11:00 PM MDOT Dual lane shift on I-94 to complete bridge repairs
Blackman Rd (-0.1 miles) to Blackman Rd (+0.2 miles) 135.7 to 135.4 Medium One lane closed, one lane open 7/28/16 5:00 AM to 9/29/16 8:00 PM MDOT Single Lane Closure for work on the underside of the bridge
Sandstone Rd to Sandstone Rd 133.8 to 133.8 Medium One lane closed, one lane open 8/23/16 5:00 AM to 9/29/16 8:00 PM MDOT Single Lane Closure due to bridge repair under Sandstone Road
Dearing Rd (+2.7 miles) to Parma Rd (+0.3 miles) 130.1 to 129.3 Minor Left or right shoulder closed, all lanes open 5/18/16 8:00 PM to 9/10/16 4:00 AM MDOT Full time shoulder closure
Exit 92 to Exit 124 124.0 to 92.1 Medium Various lanes closed 4/18/16 6:00 AM to 10/28/16 4:00 PM MDOT Expect moving shoulder closures for sign replacement.
MM 110 to MM 112 in right lane only 112.0 to 110.0 Medium 0 lanes closed, two lanes open 8/25/16 6:00 PM to 9/9/16 5:00 AM MDOT Expect a single lane closure for pavement repairs. Legal loads only.
Mile Marker 66 to Mile Marker 92 91.9 to 66.1 Minor Left or right shoulder closed, all lanes open 7/11/16 6:00 AM to 11/6/16 4:00 PM MDOT Expect moving shoulder closures for intermittent daytime sign replacement. Expect intermittent nighttime single lane closures for sign replacement.
at exit 88 (40th St) near Galesburg 88.4 to 87.0 Medium 0 lanes closed, two lanes open 4/18/16 8:00 PM to 9/23/16 5:00 AM MDOT Expect nightly single lane closures for road work.
at Michigan Ave (-0.2 miles) 87.9 Medium Various lanes closed 4/18/16 7:00 AM to 9/30/16 11:59 PM MDOT Lane shifts and nighttime single-lane closures
Entrance ramp from SB 40th St 88.1 Medium All lanes and shoulders closed 4/18/16 7:00 AM to 9/16/16 11:59 PM MDOT
MM 16 to MM 24 24.0 to 16.0 Medium Various lanes closed 3/14/16 7:00 PM to 10/21/16 9:00 AM MDOT Expect nightly intermittent double-lane closures for road work.
MM 16 to MM 23 23.0 to 16.0 Medium 0 lanes closed, three lanes open 3/13/16 11:00 PM to 10/20/16 11:00 PM MDOT Expect single-lane closures for road work.
Puetz Rd (-0.2 miles) to Red Arrow Hwy 22.6 to 15.5 Medium Various lanes closed 3/14/16 7:00 AM to 10/21/16 11:59 PM MDOT Bridge repairs, median cable barrier, guardrail, culvert, freeway signing and right-of-way fence. Repairs on the I-94 bridges over Lost Dunes Drive in Bridgman, and over Puetz Road east of Stevensville.; Daily single-lane and nighttime double-lane closures on I-94 during construction. Puetz Road will be closed with a detour posted. There also will be temporary ramp closures at Red Arrow Highway Exit 16 and Grand Mere Road Exit 22.
Exit ramp to EB John Beers Rd 21.7 Minor Various lanes closed 8/18/16 5:00 AM to 9/9/16 4:00 PM MDOT Total closure for paving.
Entrance ramp from SWB Red Arrow Hwy 15.5 Medium All lanes and shoulders closed 5/9/16 7:00 AM to 9/30/16 11:59 PM MDOT Repaving
Entrance ramp from SWB Red Arrow Hwy 15.5 Medium All lanes and shoulders closed 5/9/16 7:00 AM to 9/30/16 11:59 PM MDOT Repaving
Entrance ramp from SWB Red Arrow Hwy 15.5 Minor Various lanes closed 5/8/16 11:00 PM to 9/29/16 11:00 PM MDOT The ramp is closed for repaving and work on I-94.
Exit ramp to EB US-20 39.8 Major All lanes and shoulders closed 6/6/16 7:00 AM to 9/17/16 5:00 PM InDOT During the closure, drivers traveling westbound on I-94 wishing to exit east on US 20/35 will be detoured via the westbound US 20/35 Dog Leg Ramp to the US 212 interchange, where they will follow the ramps to gain access to eastbound US 20/35.
Exit ramp to EB US-20 / 35 39.8 Major All lanes and shoulders closed 6/6/16 8:00 PM to 9/17/16 5:00 PM InDOT Detour: Take WB I-94 to WB U.S. 20 Dog Leg Ramp and follow detour signs to the U.S. 212 interchange (Gary). Go under the bridge and take the clover leaf and follow US 20 WB. Continue over the bridge and take the ramp to U.S. 20 EB/ U.S. 35 SB.
at US-20 39.8 Medium Right lane closed, two lanes open 4/1/16 7:00 AM to 10/31/16 11:59 PM InDOT Bridge Work
Entrance ramp from EB I-90 15.3 Major All lanes and shoulders closed 7/11/16 7:00 AM to 11/18/16 11:59 PM Indiana Toll Road Bridge Work- 24 Hour Continuous Closure. Detours are in place
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 7/11/16 7:00 AM to 11/18/16 11:59 PM Indiana Toll Road Bridge Work- 24 Hour Continuous Closure. Detours are in place
Entrance from NB Bishop Ford 74.5 to 65.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 10:00 AM to 2:00 PM IDOT Moving Operation
NB Stony Island Feeder Exit to Dan Ryan Expy (I-94) / I-57 65.7 to 62.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 10:30 AM to 1:00 PM IDOT Moving Operation
I-57 / Bishop Ford (I-94) to 87th St 62.9 to 61.8 Minor Right shoulder closed, all lanes open 8/31/16 9:00 AM to 3:00 PM IDOT
Marquette Rd (67th St) to 26th St 59.3 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 10:00 AM to 3:00 PM IDOT Moving Operation
Entrance from NB Dan Ryan Express 59.3 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 10:00 AM to 3:00 PM IDOT Moving Operation
26th St to Eisenhower Expy (I-290) 54.1 to 51.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 8/31/16 10:00 AM to 1:00 PM IDOT Moving Operation
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Yield to NB I-55 exit to NB I-90/94; ***Long Term Closure***
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 11/30/16 11:59 PM IDOT 11' Width; Long Term Closure
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/18 11:59 PM IDOT ***Long Term Closure***
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 12/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 12/1/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 51.4 Minor Right shoulder closed, all lanes open 7/1/16 12:00 AM to 9/1/16 11:59 PM IDOT Long Term Closure
Exit to NWB Kennedy Local 50.1 to 79.1 Minor Right shoulder closed, all lanes open with partial ramp closures 8/31/16 9:00 AM to 3:00 PM IDOT Moving Operation
Kennedy Junction to Touhy Ave 43.5 to 39.8 Minor Both shoulders closed, all lanes open with partial ramp closures 8/31/16 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to WB Lake Ave 34.5 None Partial closure 8/10/16 12:00 AM to 9/21/16 11:59 PM IDOT Long Term Closure
Duffy Ln (+0.2 miles) to IL-22 (-0.2 miles) 55.6 to 56.1 Medium Right lane closed, four lanes open 8/31/16 9:00 AM to 3:00 PM Illinois Tollway Rdwy Reconst and Plaza Repairs
Entrance ramp from WB County Road G 326.9 Minor Left shoulder closed, all lanes open 9/1/16 9:00 AM to 12:00 PM WisDOT Maintenance - Guard Rail Repair
Exit ramp to EB WI-100 322.9 Major All lanes closed 11/30/15 12:00 AM to 11/15/17 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 84th St Exit; take 84th St South to Greenfield Ave, Greenfield Ave West to Hwy 100; OR, Take I-94 West to the Moorland Rd-South Exit; take Moorland Rd South to Greenfield Ave, Greenfield Ave East to Hwy 100
Entrance from NB I-43 316.4 Minor Right shoulder closed, all lanes open 8/31/16 9:00 AM to 3:00 PM daily until 9/2/16 WisDOT Construction - Mitchel Tunnel Lighting; I-43 NB/ I-94 WB (W-N)
Canal St (-0.2 miles) to Canal St (-0.1 miles) 311.1 to 311.0 Medium One lane closed, three lanes open 8/31/16 9:00 AM to 3:00 PM WisDOT Maintenance - This will be a single lane and shoulder closure to do bridge inspection between 9AM and 3PM
Exit ramp to SB I-41 305.0 Major All lanes closed 3/9/15 12:00 AM to 5/6/18 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 84th St Exit; take 84th St South to Greenfield Ave, Greenfield Ave West to the I-41/894/US 45 South Entrance Ramp; OR, Take I-94 West to the Moorland Rd-South Exit Ramp; take Moorland Rd South to Greenfield Ave
Entrance ramp from WI-100 303.8 Minor Right lane closed, up to two lanes open 3/25/15 12:00 AM to 3/15/17 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Exit ramp to NB Redford Blvd 295.7 Medium All lanes closed 8/15/16 12:00 AM to 9/19/16 11:45 PM WisDOT Construction - Detour: 94 WB to STH 164 to STH 190 to CTH F
WI-164 (-0.2 miles) to WI-164 (+0.2 miles) 294.8 to 294.5 Minor Right shoulder closed, all lanes open 8/12/16 12:00 AM to 9/26/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Maple Ave to WI-83 (+0.3 miles) 288.3 to 286.8 None All lanes open with restriction 5/3/16 12:00 AM to 9/9/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Genesee St (+0.1 miles) to CR-P (-0.2 miles) 285.4 to 283.7 None All lanes open with restriction 5/3/16 12:00 AM to 9/9/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
WI-67 (-0.2 miles) to WI-67 (+0.2 miles) 282.1 to 281.7 Minor Right shoulder closed, all lanes open 5/28/15 12:00 AM to 9/9/16 11:45 PM WisDOT Construction - East-West Freeway | Sth 67 Nb & Sb Bridge | I 94 | WAUKESHA
WI-67 (+0.2 miles) to Dousman Rd (+0.3 miles) 281.7 to 281.1 Medium Various lanes closed 3/15/16 12:00 AM to 11/24/16 11:45 PM WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Golden Lake Rd (-0.3 miles) to Golden Lake Rd (+0.3 miles) 279.7 to 279.1 Medium Various lanes closed 3/15/16 12:00 AM to 11/24/16 11:45 PM WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Cortland Ave (-0.1 miles) to Aspen Ave (+1.7 miles) 137.7 to 132.2 Medium One lane closed, one lane open 8/29/16 5:00 PM to 8/31/16 11:59 PM WisDOT Construction - 1023-06-75 (NW Project ID)
Aspen Ave (+1.7 miles) to County Road O (+0.2 miles) 132.2 to 127.9 Medium One lane closed, one lane open 8/29/16 5:00 PM to 8/31/16 11:59 PM WisDOT Construction - Black River Falls - Tomah | CTH O - S County Line WB | I 94 | JACKSON
WI-95 to CR-G (+0.8 miles) 105.3 to 91.4 Medium One lane closed, one lane open 8/29/16 7:00 PM to 9/1/16 1:00 PM WisDOT Construction - Osseo - Black River Falls | West County Line - STH 95 eb & wb | I 94 | JACKSON
Hobbs Rd to US-53 (+0.7 miles) 71.6 to 69.9 Medium 0 lanes closed, two lanes open 8/31/16 6:00 PM to 9/1/16 11:00 AM WisDOT Construction - Detour: No posted detour. Permanent Alternate 94 routes are set up if needed.
at County Road BB 22.4 Minor Left shoulder closed, all lanes open 7/12/16 12:00 AM to 11/25/16 11:45 PM WisDOT Construction - Baldwin - Menomonie | CTH BB Bridge B-55-0265 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.2 miles) 16.7 to 16.4 Minor Left shoulder closed, all lanes open 8/31/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.2 miles) 16.7 to 16.4 Minor Right shoulder closed, all lanes open 8/31/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.2 miles) 16.7 to 16.4 Medium Various lanes closed 8/31/16 6:00 PM to 9/1/16 7:00 AM daily until 9/2/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
MN-120 to Mounds Blvd (-0.1 miles) 247.8 to 243.7 Medium Various lanes closed 8/17/16 12:46 PM to 9/29/17 5:00 PM MnDOT major road construction
Marion St to Lexington Pkwy 241.4 to 239.6 Major All lanes and shoulders closed 8/31/16 11:00 PM to 9/1/16 5:00 AM MnDOT Motorist should follow the posted detours using I-35E, Highway 36 and Highway 280 to bypass the closure
Entrance ramp from WB St Anthony Ave 240.2 Unknown All lanes and shoulders open 6/26/16 8:00 PM to 11/15/16 5:00 AM MnDOT entrance ramp closed
Victoria St (-0.1 miles) to Lexington Pkwy (+0.1 miles) 240.2 to 239.5 Medium Left lane closed, three lanes open 8/31/16 6:00 PM to 11:00 PM MnDOT left lane closed
Victoria St (-0.1 miles) to Lexington Pkwy (+0.1 miles) 240.2 to 239.5 Major All lanes and shoulders closed 8/31/16 11:00 PM to 9/1/16 5:00 AM MnDOT closed
Cleveland Ave (+0.1 miles) to Pelham Blvd 237.5 to 236.9 Medium Right lane closed, three lanes open 8/31/16 9:00 AM to 4:00 PM MnDOT right lane closed
Hemlock Ln to Hemlock Ln (+0.4 miles) Medium Left lane closed, two lanes open 4/18/16 12:00 AM to 11/30/16 11:59 PM MnDOT left lane closed
Jade Rd (-0.3 miles) to County Road 159 162.0 to 155.5 Medium Various lanes closed 4/25/16 7:00 AM to 10/5/16 10:30 AM MnDOT single line traffic alternating directions

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Wed Aug 31 2016 11:01:14 CDT