Construction Report
Select Location
  
Updated: 3/28/15 9:11 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/28/15 10:00 PM to 3/29/15 6:00 AM daily until 4/1/15 WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
WI-100 (-0.2 miles) to I-894 303.5 to 304.3 Major All lanes and shoulders closed 3/28/15 11:00 PM to 3/29/15 7:00 AM WisDOT Construction - Detour: Take I-94 EB to HWY 100 to Greenfield to 84th to I-94 EB. OR Take I-94 EB to HWY 100 to Watertown Plank to US45 NB.
Canal St to National/WI-59 310.9 to 311.5 Minor Right shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Ramp from SB I-43 to National Ave 311.3 Minor Left shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Entrance ramp from SEB WI-100 323.1 Major All lanes and shoulders closed 3/23/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take HWY 100 South to Greenfield to I-894/US45 North to 94 East. OR Take HWY 100 North to Watertown Plank to Glenview to I-94 East
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 7/2/15 11:45 PM WisDOT Construction - Detour: Use I-94 EB (SB) to County K to West Frontage Road to WIS 20; *** Long Term Closure ***
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***
Entrance ramp from EB IL-132 8.1 Minor Partial closure 3/6/15 7:00 AM to 5/1/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***
Madison St to Eisenhower Expy (I-290) 51.2 to 51.6 Medium Right lane and right shoulder closed, two to four lanes open 3/29/15 1:00 AM to 7:00 AM IDOT Weave left to right in the two lane section.
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Exit ramp to EB I-290 51.4 Major All lanes and shoulders closed 3/29/15 1:00 AM to 7:00 AM IDOT Detour to SB I-90/94 to Roosevelt to State
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Garfield Blvd (55th St) to 59th St 57.7 to 58.2 Medium Left lane and left shoulder closed, two lanes open 3/28/15 9:00 PM to 3/29/15 7:00 AM IDOT Vacate for SB Express traffic
at Wentworth Ave 58.9 Minor Right shoulder closed, all lanes open 3/20/15 12:00 AM to 6/1/15 11:59 PM IDOT ***Long Term Closure***
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor All lanes shifted and both shoulders closed 9/9/14 12:00 AM to 3/31/15 11:59 PM IDOT Lanes narrowed and shifted to the left ***Long Term Closure***
Exit ramp to SB Sprinkle Rd 79.2 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Exit ramp to SB Sprinkle Rd 79.2 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Entrance ramp from SB Sprinkle Rd 79.5 Medium All lanes and shoulders open 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Entrance ramp from NB Sprinkle Rd 79.8 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Entrance ramp from NB Sprinkle Rd 79.8 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
at Cork St 79.9 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Climax And Battle Creek Rd (-0.1 miles) to I-69 92.0 to 108.2 Medium Various lanes closed 3/20/15 1:00 PM to 11/28/15 1:00 PM MDOT

I-94 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Garfield Blvd (55th St) to Chicago Skwy (I-90) 57.7 to 59.1 Major Left three lanes and left shoulder closed, up to one lanes open 3/29/15 1:00 AM to 7:00 AM IDOT Full Express Closure.
Garfield Blvd (55th St) to Chicago Skwy (I-90) 57.7 to 59.1 Minor Left lane and left shoulder closed, two or three lanes open 3/28/15 9:00 PM to 11:59 PM IDOT
Garfield Blvd (55th St) to 69th St 57.7 to 59.5 Medium Left two lanes and left shoulder closed, one or two lanes open 3/28/15 11:59 PM to 3/29/15 1:00 AM IDOT

I-94 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 63rd St 59.5 to 58.7 Medium Left two lanes and left shoulder closed, one or two lanes open 3/28/15 11:00 PM to 11:59 PM IDOT
69th St to 63rd St 59.5 to 58.7 Major Left three lanes and left shoulder closed, up to one lanes open 3/28/15 11:59 PM to 3/29/15 7:00 AM IDOT Full Express Closure.
69th St to 63rd St 59.5 to 58.7 Medium Left lane and left shoulder closed, two or three lanes open 3/28/15 8:00 PM to 11:00 PM IDOT
at Entrance from NB Chicago Skyway 58.8 Major All lanes and shoulders closed 3/28/15 9:00 PM to 3/29/15 7:00 AM IDOT

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-69 to Climax And Battle Creek Rd (+0.1 miles) 108.2 to 92.0 Medium Various lanes closed 3/20/15 1:00 PM to 11/28/15 1:00 PM MDOT
Exit ramp to EB Cork St 80.0 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Exit ramp to Cork St 80.0 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
at Cork St 79.9 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from NB Sprinkle Rd 79.7 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from NB Sprinkle Rd 79.7 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Entrance ramp from SB Sprinkle Rd 79.4 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from SB Sprinkle Rd 79.4 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 3/18/15 7:00 AM to 4/5/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild ***Long Term***
75th St to 69th St 60.3 to 59.6 Medium Left lane and left shoulder closed, one to four lanes open 3/28/15 8:00 PM to 11:00 PM IDOT
75th St to 69th St 60.3 to 59.6 Major Left three lanes and left shoulder closed, up to two lanes open 3/28/15 11:59 PM to 3/29/15 7:00 AM IDOT Full express closure
75th St to 69th St 60.3 to 59.6 Medium Left two lanes and left shoulder closed, up to three lanes open 3/28/15 11:00 PM to 11:59 PM IDOT
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to EB I-290 52.4 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to WB I-290 52.4 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 6/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section. ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from Taylor St 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Exit ramp to EB IL-132 8.8 None Partial closure 3/20/15 7:00 AM to 5/1/15 11:59 PM Illinois Tollway Rdwy Reconst. and Plaza Repairs;Left Side of Ramp Closed; *** Long Term Closure ***
Entrance ramp from EB IL-132 8.6 Major All lanes and shoulders closed 2/27/15 7:00 AM to 5/19/15 11:59 PM Illinois Tollway Entrance Ramp Closed; *** Long Term Closure ***
Entrance ramp from WB IL-132 8.8 Minor Partial closure 3/11/15 6:00 AM to 4/17/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; *** Long Term Closure ***
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Exit ramp to WB Oconnor St 305.5 Medium All lanes and shoulders closed 10/13/14 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take 68th-70th st exit, continue W on O'Conner, North on 76th st, West on Bluemound to 84th st (North 84th st Detour). Take 68th-70th exit, Continue West, South on 70th, West on Greenfield to 84th st. (South 84th st Detour).
Exit ramp to EB I-894 304.6 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
Entrance ramp from SB US-45 304.2 Major All lanes and shoulders closed 3/25/15 10:00 PM to 4/2/15 4:30 AM WisDOT Construction - Detour: Take US45 South to Watertown Plank to HWY 100 to the I-94 West Ramp. OR US45 South to Greenfield to HWY 100 to the I94 West Ramp.
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/28/15 10:00 PM to 3/29/15 6:00 AM daily until 4/1/15 WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Sat Mar 28 2015 22:06:49 CDT