I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
River Rd (+0.4 miles) to US-51 (-0.2 miles) 129.6 to 132.2 Major Right two lanes closed, one lane open 7/22/14 8:00 PM to 7/23/14 6:00 AM daily until 7/24/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
Hoepker Rd (-0.4 miles) to Hoepker Rd (+0.2 miles) 133.2 to 133.8 Medium Right lane closed, two lanes open 7/22/14 9:00 PM to 7/23/14 6:00 AM daily until 7/24/14 WisDOT Construction - MADISON - PORTAGE | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Left lane closed, two lanes open 6/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
Exit to SB US-151 135.3 Major All lanes and shoulders closed 4/1/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will exit at the USH 51 inerchange , proceed south on USH 51 to the STH 30 interchange, turn left onto STH 30, proceed east to IH 39 north, take IH39 north to the USH 151 exit and proceed north on USH 151.
Maple Ave to Grandview Blvd (-0.2 miles) 287.9 to 292.5 Medium Right lane closed, one or two lanes open 7/22/14 9:00 AM to 2:00 PM WisDOT Maintenance - pot patch
at WI-100/108th St 303.7 Major All lanes and shoulders closed 12/9/13 12:00 AM to 11/24/14 11:45 PM WisDOT Construction - Detour: Follow Signed Detour
Entrance from WI-100 303.5 Medium All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Northbound HWY 100 continue north on HWY 100, right/east on Bluemound Rd, right/south on 76th St, left/east on Kearney St, continue to IH 94 EB on ramp; Southbound HWY 100 continue to Greenfield Ave, left/east at Greenfield Ave, co
Exit to NB US-45 304.3 Major All lanes and shoulders closed 7/22/14 9:00 PM to 7/23/14 4:30 AM WisDOT Construction - Detour: 94 to Moorland to Bluemound to HWY 100 to North Ave to USH 45 NB
Exit to SB WI-181 305.1 Major Left lane closed, two lanes open 7/22/14 9:00 AM to 2:00 PM WisDOT Construction - ZOO IC, S 76TH ST BRIDGE OVER I94 | KEARNEY ST - O'CONNOR ST | LOC ST | MILWAUKEE
Entrance from S 84th St (WI-181) Medium All lanes and shoulders closed 10/12/13 12:00 AM to 7/27/14 11:45 PM WisDOT Construction - Detour: Traffic from National Ave, Greenfield Ave, and Bluemound Rd at 84th street will be redirected east to 76th St. Traffic will head towards I-94 on 76th street until reaching W Kearney Street. Traffic will head east on W Kearney St and will enter I-94 EB at the 68th Street on ramp.
Exit to WB Becher St 312.2 Medium All lanes and shoulders closed 7/22/14 7:30 PM to 7/23/14 5:00 AM daily until 7/25/14 WisDOT Construction - Detour: Use alt route (Lapham exit or Holt exit)
Exit to NWB WI-100 322.4 Major All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: IH 94 EB exit at Moorland Rd. If wanting to go SB on HWY 100 go right/south on Moorland Rd, left/east on Greenfield Ave, continue on Greenfield Ave to HWY 100. If wanting to go NB on HWY 100 go left/north on Moorland Rd, right/east on Bluemond Rd, continue on Bluemound to HWY 100.
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 11/25/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
12th St to WI-158 339.0 to 342.4 Medium Various lanes closed 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Exit to WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: Off-Ramp from 94E to 71st St to 125th Ave to STH 50.
Russell Rd (+0.4 miles) to IL-173 (+0.4 miles) 0.9 to 2.8 Minor Various lanes closed 4/8/13 7:00 AM to 8/29/14 3:00 PM Lake County Interstate Reconstruction
Exit to WB IL-132 8.1 Major All lanes and shoulders closed 7/11/14 5:00 AM to 9/3/14 11:59 PM Illinois Tollway *** Long Term Closure ***
Ramp from EB IL-132 to EB I-94 8.4 to 8.5 Minor Partial closure 7/14/14 5:00 AM to 7/31/14 11:59 PM Illinois Tollway Left Side of Ramp Closed; *** Long Term Closure ***
Clavey Rd to Willow Rd 25.3 to 32.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 7/22/14 10:00 AM to 2:00 PM IDOT Moving Operation
0.5 miles south of Willow Rd to Winnetka Ave 33.4 to 33.4 Minor Right shoulder closed, all lanes open 5/3/14 7:00 AM to 8/31/14 11:59 PM IDOT ***Long Term Closure***
Winnetka Ave to Kennedy Junction 33.4 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 7/22/14 10:00 AM to 2:00 PM IDOT Moving Operation
Oakton St to Kennedy Junction 38.4 to 43.5 Minor Right shoulder closed, all lanes open with partial ramp closures 7/22/14 9:00 AM to 3:00 PM IDOT Moving Operation
Touhy Ave to Kennedy Junction 39.8 to 43.5 Minor Both shoulders closed, all lanes open with partial ramp closures 7/22/14 9:00 AM to 3:00 PM IDOT Moving Operation
Avondale Ave to Montrose Ave 82.5 to 43.5 Minor Right shoulder closed, all lanes open 7/22/14 9:00 AM to 3:00 PM IDOT
Montrose Ave to Ogden Ave 43.5 to 50.1 Medium Right lane and right shoulder closed, three or four lanes open with partial ramp closures 7/22/14 10:00 AM to 1:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane and left shoulder closed, three or four lanes open with partial ramp closures 7/22/14 10:00 AM to 1:00 PM IDOT Moving Operation, Street Light Maintenance
Kostner Ave to Diversey Ave 43.8 to 46.7 Minor Right shoulder closed, all lanes open 7/22/14 9:00 AM to 3:00 PM IDOT
Exit to EB Ohio St 50.1 Minor Partial closure 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** Left and Right Shoulders Closed
Ogden Ave to Grand Ave 50.1 to 50.5 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent shoulder closure for remainder of project between EB I-90 entrance to EB Ohio and WB Ohio entrance to EB I-90.
at Ohio Feeder 50.3 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 7/22/14 10:30 AM to 2:00 PM IDOT Moving Operation
Entrance from WB Ohio St 50.1 Minor Partial closure 9/6/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Grand Ave to Eisenhower Expy (I-290) 50.5 to 51.6 Medium Right lane and right shoulder closed, two to four lanes open with partial ramp closures 7/22/14 10:30 AM to 2:00 PM IDOT Moving Operation
Entrance from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/21/14 12:00 AM to 9/1/14 11:59 PM IDOT *** Long Term Closure ***
Exit to 103rd St 64.2 Medium All lanes and shoulders closed 4/5/14 8:00 AM to 9/15/14 11:59 PM IDOT All traffic will detour to I-94 SB & 111th street overpass. *** Long Term Closure ***
Exit to NB Stony Island Feeder 64.2 Medium All lanes and shoulders closed 4/5/14 8:00 AM to 9/15/14 11:59 PM IDOT All traffic for NB Stony Island will detour to I-94 & 111th street overpass. *** Long Term Closure ***
Cottage Grove Ave to SB Stony Island Feeder Entrance 64.2 to 65.6 Medium Left lane and left shoulder closed, one lane open 7/22/14 9:00 AM to 11:59 AM IDOT Moving Operation
Cottage Grove Ave to I-80 64.2 to 74.4 Minor Right shoulder closed, all lanes open with partial ramp closures 7/22/14 9:00 AM to 2:30 PM IDOT Moving Operation
SB Stony Island Feeder Entrance to I-80 65.6 to 74.4 Medium Left lane and left shoulder closed, one to three lanes open 7/22/14 9:00 AM to 12:30 PM IDOT Moving Operation
Bishop Ford Fwy (IL-394) to IN State Line Minor Both shoulders closed, all lanes open with partial ramp closures 7/22/14 9:00 AM to 2:30 PM IDOT Moving Operation
at Clay St (+0.1 miles) 13.0 Medium Right lane closed, four lanes open 7/18/14 6:46 PM to 7/25/14 6:46 PM InDOT Construction work
at Wilson Rd 1.0 Medium Various lanes closed 7/22/14 7:00 AM to 7/23/14 11:59 PM MDOT Installation of Traffic Sensors
at Glenlord Rd (-0.3 miles) 24.3 Medium Various lanes closed 5/27/14 7:00 AM to 8/29/14 5:00 PM MDOT Rebuild Hickory Creek bridge.

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
M-140 (-0.2 miles) to Hennesey Rd (-0.2 miles) 41.0 to 40.0 Medium Various lanes closed 7/22/14 7:00 AM to 7/24/14 11:59 PM MDOT Single Lane Closures; Concrete Replacement
at Glenlord Rd (+0.3 miles) 24.3 Medium Various lanes closed 5/27/14 7:00 AM to 8/29/14 5:00 PM MDOT Rebuild Hickory Creek bridge.
Exit to EB I-80 Minor All lanes and shoulders open 6/30/14 7:00 AM to 8/3/14 11:59 PM Indiana Toll Road **Long Term Closure**; 80/94 to ITR 14' Width restriction only.
Entrance from WB I-80 15.3 Major All lanes and shoulders closed 6/30/14 7:00 AM to 8/3/14 11:59 PM Indiana Toll Road Lake Station exit ramp closed for reconstruction until Spring 2015.
Entrance from EB I-90 15.3 Major All lanes and shoulders closed 6/5/14 6:00 AM to 11/26/14 11:59 PM Indiana Toll Road *** Long Term Closure ***; Ramp Closed through 11/26/14; Detour in place; Demo Rebuild
IN State Line to Bishop Ford Fwy (IL-394) Minor Both shoulders closed, all lanes open with partial ramp closures 7/22/14 10:00 AM to 3:00 PM IDOT Moving Operation
I-80 to NB Stony Island Feeder Exit 74.5 to 65.7 Medium Left lane and left shoulder closed, one or two lanes open 7/22/14 10:30 AM to 2:00 PM IDOT Moving Operation
I-80 to Cottage Grove Ave 74.5 to 64.2 Minor Right shoulder closed, all lanes open with partial ramp closures 7/22/14 10:00 AM to 3:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to Grand Ave 51.7 to 50.5 Medium Right lane and right shoulder closed, two to four lanes open with partial ramp closures 7/22/14 9:30 AM to 1:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 7/22/14 9:30 AM to 1:00 PM IDOT Moving Operation
Grand Ave to Ogden Ave 50.5 to 50.1 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent right shoulder closure for remainder of project starting 6/18/2014. Attenuator and barrier wall to be installed.
at Ohio Feeder 50.4 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane and left shoulder closed, three to five lanes open with partial ramp closures 7/22/14 11:00 AM to 2:00 PM IDOT Moving Operation
Entrance from WB Ohio Feeder 50.3 Minor Partial closure 9/3/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ogden Ave to Montrose Ave 50.1 to 43.5 Medium Right lane and right shoulder closed, three to five lanes open with partial ramp closures 7/22/14 11:00 AM to 2:00 PM IDOT Moving Operation
Armitage Ave to Sacramento Ave 48.3 to 46.2 Minor Right shoulder closed, all lanes open 7/22/14 9:00 AM to 3:00 PM IDOT
Belmont Ave / Kedzie Ave to Edens Expy (I-94) 45.9 to 43.5 Minor Right shoulder closed, all lanes open 7/22/14 9:00 AM to 3:00 PM IDOT
Irving Park Rd (IL-19) to Montrose Ave 44.3 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 7/22/14 11:00 AM to 2:00 PM IDOT Moving Operation
Kennedy Junction to Touhy Ave 43.5 to 39.8 Minor Both shoulders closed, all lanes open with partial ramp closures 7/22/14 9:00 AM to 3:00 PM IDOT Moving Operation
Kennedy Junction to Oakton St 43.5 to 38.4 Minor Right shoulder closed, all lanes open with partial ramp closures 7/22/14 9:00 AM to 3:00 PM IDOT Moving Operation
Kennedy Junction to Winnetka Ave 43.5 to 33.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 7/22/14 9:30 AM to 1:30 PM IDOT Moving Operation
Winnetka Ave to Willow Rd 33.5 to 32.9 Minor Right shoulder closed, all lanes open 5/3/14 7:00 AM to 8/31/14 11:59 PM IDOT *** Long Term Closure ***
Willow Rd to Clavey Rd 32.9 to 25.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 7/22/14 9:30 AM to 1:30 PM IDOT Moving Operation
IL-173 (-0.4 miles) to Russell Rd (-0.4 miles) 2.8 to 0.9 Minor Various lanes closed 4/8/13 7:00 AM to 8/29/14 3:00 PM Lake County Interstate Reconstruction
Entrance from WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: 118th Ave to 71st St to 94W On-Ramp.
60th St to 12th St 342.7 to 339.2 Major Left two lanes closed, one lane open 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Exit to EB WI-20 333.7 Major All lanes and shoulders closed 5/15/14 9:30 PM to 7/30/14 12:00 AM WisDOT Construction - Detour: Use I-94 WEST (NB) - STH 11 - East Frontage Road - STH 20
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Entrance from WB WI-20 333.7 Major All lanes and shoulders closed 5/15/14 9:30 PM to 7/30/14 12:00 AM WisDOT Construction - Detour: Use STH 20 - East Frontage Road - CTH K - I-94 WEST (NB)
Exit to Lapham Blvd 313.0 Medium All lanes and shoulders closed 7/22/14 8:00 PM to 7/23/14 5:30 AM daily until 7/25/14 WisDOT Construction - Detour: Use alt route (exit to Becher St and continue north on 4th St to Lapham Blvd)
Maple St to Historic W Mitchell St 312.4 to 312.3 Medium Right lane closed, two lanes open 7/22/14 8:00 PM to 7/23/14 5:30 AM daily until 7/25/14 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance from Lapham Blvd Medium All lanes and shoulders closed 7/22/14 7:30 PM to 7/23/14 5:00 AM daily until 7/25/14 WisDOT Construction - Detour: Use alt route (Becher St entrance)
Entrance from Becher St 313.0 Medium All lanes and shoulders closed 7/22/14 8:00 PM to 7/23/14 5:30 AM daily until 7/25/14 WisDOT Construction - Detour: Use alt route (NB 4th St to Lapham Blvd entrance)
Exit to NB US-45 304.6 Major All lanes and shoulders closed 7/22/14 9:00 PM to 7/23/14 4:30 AM WisDOT Construction - Detour: 94 to 84th St to Bluemound to Hwy 100 to North to USH 45 NB
Exit to NB WI-100 303.8 Major All lanes and shoulders closed 12/6/13 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, continue to HWY 100; Westbound IH 94 take US 45 north system ramp, Exit at Bluemound Rd, right/west on Bluemound Rd, continue to HWY 100;
Exit to SB WI-100 303.7 Major All lanes and shoulders closed 12/6/13 12:00 AM to 8/14/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, left/south on HWY 100; Westbound IH 94 exit at 84th St, left/south on 84th St, right/west on Greenfield Ave, continue to HWY 100;
Entrance from WI-100 303.4 Minor All lanes and shoulders closed 4/27/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: STH 100 NB Traffic: Left/West on Bluemound Rd, Left/South on Moorland Rd, Right/West at IH-94 WB Entrance Ramp; STH 100 SB Traffic: Right/West on Greenfield Ave, Right/North on Moorland Rd, Left/West at IH-94 WB Entrance Ramp;
Exit to SB US-151 136.4 Medium Various lanes closed 3/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will use the northbound USH 151 exit, proceed north to CTH C interchange, exit at the CTH C ramp, make a left-turn to go over the bridge and turn left at the southbound USH 151 on-ramp and proceed south on USH 151.
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Left lane closed, two lanes open 6/9/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Left lane closed, two lanes open 7/21/14 10:00 PM to 7/22/14 7:00 AM daily until 7/31/14 WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
WI-19 (+0.8 miles) to CR-V (-0.2 miles) 130.0 to 126.9 Major Right two lanes closed, one lane open 7/22/14 8:00 PM to 7/23/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Tue Jul 22 06:20:51 CDT 2014