I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SWB WI-67 281.2 Major All lanes and shoulders closed 8/31/15 12:00 AM to 10/2/15 11:00 PM WisDOT Construction - Detour: Continue East on IH 94 to the CTH P exit. Exit at CTH P and turn right at the first roundabout to head south on CTH P. Turn right at the second round about to head West on CTH DR. Continue west on CTH DR back to STH 67.
Sawyer Rd to Sawyer Rd 283.1 to 283.1 Medium Right lane closed, one lane open 9/3/15 9:00 AM to 2:00 PM WisDOT Maintenance - Deck sealing
Entrance ramp from SB US-45 304.7 Major All lanes and shoulders closed 9/3/15 11:00 PM to 9/4/15 4:30 AM WisDOT Construction - Detour: Take I-894/US45 North to the Greenfield Exit, take Greenfield East to 84th St, take 84th St North to Kearney to the I-94 East Ramp. OR Take I-894/US45 North to the Watertown Plank Exit, take Watertown Plank East to Glenview, take G
Exit ramp to Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St exit
Exit ramp to WB Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St or National Ave exits
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave exit
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave or Layton Ave entrances
Entrance ramp from SEB WI-100 323.1 Major All lanes and shoulders closed 9/3/15 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt. Route
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Major Right two lanes closed, one lane open 9/3/15 5:30 PM to 9/4/15 9:30 AM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major Left lane closed, two lanes open 7/3/15 12:00 AM to 9/3/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major All lanes and shoulders closed 9/3/15 9:30 PM to 9/4/15 5:30 AM WisDOT Construction - Detour: Use County K to West Frontage Road to WIS 20
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***
Wilmot Rd to Wilmot Rd 345.6 to 345.6 Medium Various lanes closed 9/3/15 9:30 PM to 9/4/15 5:30 AM WisDOT Maintenance - Bridge Deck Coring
Entrance from EB Kennedy Local 79.6 to 43.5 Minor Both shoulders closed, all lanes open with partial ramp closures 9/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Chicago Ave to Ohio Feeder 50.0 to 50.3 Minor Right shoulder closed, all lanes open 9/3/15 9:00 AM to 3:00 PM IDOT
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 9/14/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 9/30/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Harrison St to Roosevelt Rd 51.7 to 52.2 Minor Both shoulders closed, all lanes open 5/20/15 12:00 AM to 12/1/15 11:59 PM IDOT Lanes weaved ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Exit ramp to SB Sprinkle Rd 79.2 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Exit ramp to SB Sprinkle Rd 79.2 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
Entrance ramp from SB Sprinkle Rd 79.5 Medium All lanes and shoulders open 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
Entrance ramp from NB Sprinkle Rd 79.8 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
Entrance ramp from NB Sprinkle Rd 79.8 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
at Cork St 79.9 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Climax And Battle Creek Rd (-0.1 miles) to I-69 92.0 to 108.2 Medium Various lanes closed 3/20/15 1:00 PM to 11/28/15 1:00 PM MDOT

I-94 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from NB Chicago Skwy Major All lanes and shoulders closed 4/15/15 12:00 AM to 10/31/15 11:59 PM IDOT ***Long Term Closure***

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SWB I-94-Br 112.1 Minor Various lanes closed 8/24/15 7:00 AM to 9/4/15 11:59 PM MDOT Resurfacing
Entrance ramp from SWB Partello Rd 111.8 Minor Various lanes closed 8/24/15 7:00 AM to 9/4/15 11:59 PM MDOT Resurfacing
I-69 to Climax And Battle Creek Rd (+0.1 miles) 108.2 to 92.0 Medium Various lanes closed 3/20/15 1:00 PM to 11/28/15 1:00 PM MDOT
Exit ramp to EB Cork St 80.0 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
Exit ramp to Cork St 80.0 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
at Cork St 79.9 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from NB Sprinkle Rd 79.7 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from NB Sprinkle Rd 79.7 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
Entrance ramp from SB Sprinkle Rd 79.4 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from SB Sprinkle Rd 79.4 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
M-51 to County Road 687 56.3 to 45.8 Medium Various lanes closed 5/18/15 7:00 AM to 9/18/15 11:59 PM MDOT Single-lane closures. Construction includes culvert replacement, ramp resurfacing, pavement reconstruction under five bridges, and guardrail replacement.
63rd St to 31st St 58.7 to 54.7 Minor Right shoulder closed, all lanes open 9/3/15 9:00 AM to 3:00 PM IDOT
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT Yield to NB I-55 exit to NB I-90/94 ***Long Term Closure***
Exit ramp to EB I-290 52.4 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to WB I-290 52.4 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 6/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 9/30/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Exit to WB Kennedy Local 43.5 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 9/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit to WB Kennedy Local 43.5 to 79.1 Medium Right lane and right shoulder closed, two or three lanes open 9/3/15 10:00 AM to 1:00 PM IDOT Moving Operation
Exit to WB Kennedy Local 43.5 to 83.6 Minor Right shoulder closed, all lanes open 9/3/15 9:00 AM to 3:00 PM IDOT
Ramp from WB I-94 to Deerfield Rd 24.3 to 24.2 None All lanes and shoulders open with partial ramp closures 9/3/15 9:00 AM to 1:30 PM Illinois Tollway Left Side of Ramp Closed
Deerfield Rd (+0.3 miles) to Deerfield Rd (+0.6 miles) 24.0 to 23.7 Medium Right lane closed, three lanes open 9/3/15 8:30 AM to 2:30 PM Illinois Tollway Rdwy Reconst and Plaza Repairs
Exit ramp to EB IL-132 8.8 Minor Right lane closed, one lane open 9/3/15 6:00 AM to 4:00 PM Illinois Tollway Rdwy Reconst and Plaza Repairs
Exit ramp to EB WI-20 333.7 Major All lanes and shoulders closed 9/3/15 9:30 PM to 9/4/15 5:30 AM WisDOT Construction - Detour: Use WIS 11 to East Frontage Road to WIS 20
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
Entrance ramp from SB Stanley Rd 325.6 Unknown All lanes and shoulders closed 9/3/15 11:00 PM to 9/4/15 5:00 AM WisDOT Construction - Detour: Take US41 North to the Wisconsin Exit, Take Wisconsin West to Glenview, South to Bluemound, West to HWY 100, South to the I-94 West Ramp.
Exit ramp to EB Howard Ave 315.2 Medium Left lane closed, two lanes open 8/25/15 12:00 AM to 10/15/15 11:45 PM WisDOT Construction - Detour: Left turn lane closed; left turn prohibited. Turn right and continue east to Howell Ave and find a suitable location to turn around. OR, do not use this exit, and instead follow posted detour to the Holt exit ramp, and follow detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Exit ramp to SEB I-794 Major All lanes and shoulders closed 9/3/15 10:00 PM to 9/4/15 5:00 AM WisDOT Construction - Detour: Detour Plankinton to Michigan to Water/1st St. to Becher St. to Carferry to 794.
Hawley Rd to I-894 306.8 to 304.3 Major All lanes and shoulders closed 9/3/15 11:00 PM to 9/4/15 4:30 AM WisDOT Construction - Detour: Take I-94 West to the Hawley Exit, North to Bluemound, West to HWY 100, South to the I-94 West Ramp.
Entrance ramp from SB Hawley Rd 306.8 Medium All lanes and shoulders closed 9/3/15 10:00 PM to 9/4/15 5:30 AM WisDOT Construction - Detour: Take Hawley to Bluemound to HWY 100 to the I-94 West Ramp
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
68th St (-0.1 miles) to US-45 306.4 to 304.5 Medium Left lane closed, one or two lanes open 8/1/15 12:00 AM to 12/16/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Exit ramp to EB I-894 304.6 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
Exit ramp to NB WI-100 303.8 Major All lanes and shoulders closed 8/1/15 12:00 AM to 11/30/15 11:45 PM WisDOT Construction - Detour: Take I-94 to the 84th St Exit, 84th St North to Bluemound, Bluemound West to HWY 100 OR Take I-94 to the Moorland Exit, Moorland North to Bluemound, Bluemound East to HWY 100.
Exit ramp to SEB WI-100 303.7 Major All lanes and shoulders closed 8/1/15 12:00 AM to 11/28/15 11:45 PM WisDOT Construction - Detour: Take the 84th St exit North to Bluemound, Bluemound West to HWY 100. OR Take the US45 North Ramp North to the Watertown Plank Exit, Watertown Plank West to HWY 100. OR Take the Moorland exit to Bluemound or Greenfield, Bluemound or
Exit ramp to SEB WI-100 303.7 Major All lanes and shoulders closed 8/1/15 12:00 AM to 11/30/15 11:45 PM WisDOT Construction - Detour: Take I-94 to the 84th St Exit, 84th St South to Greenfield, Greenfield West to HWY 100 OR Take I-94 to the Moorland Exit, Moorland South to Greenfield, Greenfield East to HWY 100.
Exit ramp to SB Moorland Rd 300.5 Medium All lanes and shoulders closed 9/3/15 9:00 PM to 9/4/15 4:30 AM WisDOT Maintenance - Detour: Exit at NB ramp to Moorland Rd
Moorland Rd to Moorland Rd 300.6 to 300.6 Medium Right lane closed, two lanes open 9/3/15 9:00 PM to 9/4/15 4:30 PM WisDOT Maintenance - Deck sealing
Sawyer Rd (-0.1 miles) to Sawyer Rd 283.2 to 283.1 Medium Right lane closed, one lane open 9/3/15 9:00 AM to 2:00 PM WisDOT Maintenance - Deck sealing

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Thu Sep 03 2015 05:51:01 CDT