Construction Report
Select Location
  
Updated: 10/2/14 11:22 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at WI-100/108th St 303.7 Major All lanes and shoulders closed 12/9/13 12:00 AM to 11/24/14 11:45 PM WisDOT **Long Term Closure** Construction - Detour: Follow Signed Detour
Entrance ramp from WI-100 303.5 Medium All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Northbound HWY 100 continue north on HWY 100, right/east on Bluemound Rd, right/south on 76th St, left/east on Kearney St, continue to IH 94 EB on ramp; Southbound HWY 100 continue to Greenfield Ave, left/east at Greenfield Ave, co
Exit ramp to NB US-45 304.3 Major All lanes and shoulders closed 10/2/14 10:30 PM to 10/3/14 4:30 AM WisDOT Construction - Detour: Take the Moorland Exit NB to Bluemound Rd EB to Mayfair Rd NB to Plank Rd EB to USH 45 NB Ramp.
Entrance ramp from WB I-894 304.6 Major All lanes and shoulders closed 10/2/14 10:30 PM to 10/3/14 4:30 AM WisDOT Construction - Detour: Take the Greenfield Ave Exit EB to 84th St NB to I-94 EB Ramp
Exit ramp to SB WI-181 305.1 Major All lanes and shoulders closed 10/2/14 9:30 PM to 10/3/14 5:30 AM WisDOT Construction - Detour: Continue on I-94 EB to the 68th-70th street exit. Take a left onto 70th street. Take a left onto O'Connor street. Continue straight on O'Connor street until you arrive at 84th street.
92nd St to WI-181 (+0.1 miles) 304.8 to 305.4 Major Right two lanes closed, one lane open 10/2/14 9:30 PM to 10/3/14 5:30 AM WisDOT Construction - ZOO IC, S 76TH ST BRIDGE OVER I94 | KEARNEY ST - O'CONNOR ST | LOC ST | MILWAUKEE
Entrance ramp from NB 68th St 306.5 Medium Left lane closed, two lanes open 9/30/14 12:00 AM to 10/17/14 11:45 PM WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
Exit ramp to SB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 10/2/14 8:30 PM to 10/3/14 6:00 AM WisDOT Construction - Detour: No signed detour
Entrance ramp from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 10/2/14 8:30 PM to 10/3/14 6:00 AM WisDOT Construction - Detour: No signed detour
Exit ramp to NWB US-41 307.6 Major All lanes and shoulders closed 10/2/14 9:00 PM to 10/3/14 5:30 AM WisDOT Construction - Detour: Exit right/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit ramp to WB Becher St 312.2 Medium All lanes and shoulders closed 10/2/14 9:00 PM to 10/3/14 5:30 AM WisDOT Construction - Detour: Use alt route
Historic W Mitchell St to WI-38 312.3 to 313.1 Major Right two lanes closed, one lane open 10/2/14 9:30 PM to 10/3/14 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 10/2/14 9:00 PM to 10/3/14 5:30 AM WisDOT Construction - Detour: Use alt route
Exit ramp to NWB WI-100 322.4 Major All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: IH 94 EB exit at Moorland Rd. If wanting to go SB on HWY 100 go right/south on Moorland Rd, left/east on Greenfield Ave, continue on Greenfield Ave to HWY 100. If wanting to go NB on HWY 100 go left/north on Moorland Rd, right/east on Bluemond Rd, continue on Bluemound to HWY 100.
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 11/25/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
12th St to WI-158 339.0 to 342.4 Medium Various lanes closed 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Exit ramp to WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/2/14 11:45 PM WisDOT Construction - Detour: Off-Ramp from 94E to 71st St to 125th Ave to STH 50.
Entrance ramp from EB IL-132 8.1 Minor Partial closure 9/2/14 10:04 PM to 10/15/14 11:59 PM Illinois Tollway Left Side of Ramp Closed; **Long Term Closure**
Park Ave to Willow Rd 23.1 to 32.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/2/14 10:00 AM to 2:00 PM IDOT Moving Operation
Winnetka Ave to Kennedy Junction 33.4 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/2/14 10:00 AM to 2:00 PM IDOT Moving Operation
0.5 miles east of Canfield Ave to Montrose Ave 80.8 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/2/14 11:00 AM to 2:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane and left shoulder closed, three or four lanes open with partial ramp closures 10/2/14 10:00 AM to 1:00 PM IDOT Moving Operation
0.5 miles east of East River Rd to Eisenhower Expy (I-290) 79.6 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 10/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to EB Ohio St 50.1 Minor Partial closure 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** Left and Right Shoulders Closed
Ogden Ave to Grand Ave 50.1 to 50.5 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** Lanes narrowed and weaved to the Left.
at Ohio Feeder 50.3 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from WB Ohio St 50.1 Minor Partial closure 9/6/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Grand Ave to Eisenhower Expy (I-290) 50.5 to 51.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/2/14 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT 11' Width; *** Long Term Closure ***
Eisenhower Expy ( I-290) to I-57 / Bishop Ford (I-94) 51.7 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 10/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/21/14 12:00 AM to 12/1/14 11:59 PM IDOT ***Long Term Closure***; 11' Width
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT ***Long Term Closure***; 11' Width
0.5 miles north of 95th St (US-12/20) to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor Right shoulder closed, all lanes open 8/20/14 12:00 AM to 11/25/14 11:59 PM IDOT ***Long Term Closure***
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor All lanes shifted and both shoulders closed 9/9/14 12:00 AM to 11/21/14 11:59 PM IDOT ***Long-term Closure***; Lanes narrowed and shifted to the left.
Dan Ryan Expy (I-94) / I-57 to I-80 62.9 to 74.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/2/14 9:00 AM to 11:59 AM IDOT Moving Operation
Dan Ryan Expy (I-94) / I-57 to I-80 62.9 to 74.4 Minor Both shoulders closed, all lanes open with partial ramp closures 10/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to 103rd St 64.2 Medium All lanes and shoulders closed 4/5/14 8:00 AM to 11/17/14 11:59 PM IDOT ***Long Term Closure***; All traffic will detour to I-94 SB & 111th street overpass.
Exit ramp to NB Stony Island Feeder 64.2 Medium All lanes and shoulders closed 4/5/14 8:00 AM to 11/17/14 11:59 PM IDOT All traffic for NB Stony Island will detour to I-94 & 111th street overpass. ***Long Term Closure***
Bishop Ford Fwy (IL-394) to IN State Line Minor Both shoulders closed, all lanes open with partial ramp closures 10/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit 40( US-20/ US-35) to the end of I-94 (19 miles east of Chesterton) 40.3 to 0.0 Medium Various lanes closed 9/3/14 6:00 AM to 4/30/15 11:59 PM InDOT Bridge Demolition: Expect lane restrictions and traffic shifts
Three Oaks Rd to I-196 10.3 to 34.1 Medium Various lanes closed 8/18/14 6:00 PM to 10/31/14 11:59 PM MDOT Nighttime lane closures for resurfacing; Watch for workers and equipment.

I-94 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to 69th St 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 10/2/14 9:00 AM to 3:00 PM IDOT Moving Operation

I-94 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 26th St 59.5 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 10/2/14 9:00 AM to 3:00 PM IDOT Moving Operation

I-94 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 10/2/14 11:30 AM to 1:30 PM IDOT Street Light Maintenance

I-94 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 10/2/14 11:30 AM to 1:30 PM IDOT Street Light Maintenance

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-196 to Three Oaks Rd 34.1 to 10.3 Medium All lanes and shoulders open 8/18/14 6:00 PM to 10/31/14 11:59 PM MDOT Nighttime lane closures for resurfacing; Watch for workers and equipment.
Exit ramp to EB I-80 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/12/14 11:59 PM Indiana Toll Road 80/94 to ITR 14' Width restriction only; **Long Term**
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/31/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015.
Entrance ramp from EB I-90 15.3 Major All lanes and shoulders closed 6/5/14 6:00 AM to 11/26/14 11:59 PM Indiana Toll Road *** Long Term Closure ***; Ramp to I-94 closed through 11/26/14; Ramp Demo/Rebuild.; Detour in place.
IN State Line to Bishop Ford Fwy (IL-394) Minor Both shoulders closed, all lanes open with partial ramp closures 10/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
I-80 to Dan Ryan Expy (I-94) / I-57 74.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 10/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
I-80 to Dan Ryan Expy (I-94) / I-57 74.5 to 62.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/2/14 10:30 AM to 1:00 PM IDOT Moving Operation
Entrance ramp from SB Stony Island Feeder 64.4 Minor Partial closure 10/2/14 9:00 AM to 3:00 PM IDOT
I-57 / Bishop Ford (I-94) to 0.5 miles north of 95th St (US-12/20) 62.9 to 62.3 Minor Right shoulder closed, all lanes open 8/20/14 12:00 AM to 11/25/14 11:59 PM IDOT ***Long Term Closure***
I-57 / Bishop Ford (I-94) to Eisenhower (I-290) 62.9 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 10/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
at 91st St 62.3 Minor Left shoulder closed, all lanes open 8/29/14 12:00 AM to 10/3/14 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Grand Ave 51.7 to 50.5 Medium Right lane and right shoulder closed, two to four lanes open with partial ramp closures 10/2/14 9:30 AM to 1:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 10/2/14 9:30 AM to 1:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to I-190 51.7 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 10/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB Eisenhower/I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT ***Long Term Closure***; 11 ' Width
Exit ramp to EB Ohio Feeder 50.5 Minor Partial closure 9/10/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Approx. 300' of shoulder closed
Grand Ave to Ogden Ave 50.5 to 50.1 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent right shoulder closure for remainder of project. Attenuator and barrier wall to be installed.
at Ohio Feeder 50.4 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane and left shoulder closed, three to five lanes open with partial ramp closures 10/2/14 11:00 AM to 2:00 PM IDOT Moving Operation
Entrance ramp from WB Ohio Feeder 50.3 Minor Partial closure 9/3/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ogden Ave to Montrose Ave 50.1 to 43.5 Medium Right lane and right shoulder closed, three to five lanes open with partial ramp closures 10/2/14 11:00 AM to 2:00 PM IDOT Moving Operation
Ogden Ave to I-190 50.1 to 79.1 Minor Right shoulder closed, all lanes open with partial ramp closures 10/2/14 9:00 AM to 2:30 PM IDOT Moving Operation
Kennedy Junction to Winnetka Ave 43.5 to 33.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/2/14 9:30 AM to 1:30 PM IDOT Moving Operation
Willow Rd to Clavey Rd 32.9 to 25.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/2/14 9:30 AM to 1:30 PM IDOT Moving Operation
Entrance ramp from WB IL-132 8.8 Major All lanes and shoulders closed 9/28/14 8:00 AM to 11/15/14 5:00 PM Illinois Tollway Ramp Construction; *** Long Term Closure ***
Entrance ramp from WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/2/14 11:45 PM WisDOT Construction - Detour: 118th Ave to 71st St to 94W On-Ramp.
60th St to 12th St 342.7 to 339.2 Major Left two lanes closed, one lane open 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
1st St to 1st St (+0.3 miles) 336.9 to 336.6 Medium Left lane closed, two lanes open 10/2/14 9:00 AM to 2:00 PM WisDOT Maintenance - Inlet Repair
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 10/2/14 9:00 PM to 10/3/14 5:30 PM WisDOT Construction - Detour: Use alt route
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 10/2/14 9:00 PM to 10/3/14 5:30 PM WisDOT Construction - Detour: Use alt route
Exit ramp to NB 9th St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Use Becher St exit and follow 4th St detour signs.
Entrance ramp from EB Walker St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Follow posted detour to EB National Ave and SB 6th St. Use entrance ramp at 6th & Mineral St.
Entrance ramp from EB Greenfield Ave Medium All lanes and shoulders closed 10/2/14 10:30 PM to 10/3/14 4:30 AM WisDOT Construction - Detour: Greenfield EB to HWY 100 NB to North Ave WB to USH45 NB Ramp.
Exit ramp to NWB US-41 307.9 Major All lanes and shoulders closed 10/2/14 9:00 PM to 10/3/14 5:30 AM WisDOT Construction - Detour: Exit left/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit ramp to NB General Mitchell Blvd 307.5 Medium All lanes and shoulders closed 10/2/14 8:30 PM to 10/3/14 6:00 AM WisDOT Construction - Detour: No signed detour
Exit ramp to NB US-45 304.6 Major All lanes and shoulders closed 10/2/14 10:30 PM to 10/3/14 4:30 AM WisDOT Construction - Detour: Take the 84th St NB to Bluemound Rd WB to Mayfair Rd NB to North Ave WB to USH 45 NB Ramp
Exit ramp to NB WI-100 303.8 Major All lanes and shoulders closed 12/6/13 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, continue to HWY 100; Westbound IH 94 take US 45 north system ramp, Exit at Bluemound Rd, right/west on Bluemound Rd, continue to HWY 100;
Exit ramp to SEB WI-100 303.7 Major All lanes and shoulders closed 12/6/13 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, left/south on HWY 100; Westbound IH 94 exit at 84th St, left/south on 84th St, right/west on Greenfield Ave, continue to HWY 100;
Entrance ramp from WI-100 303.4 Minor All lanes and shoulders closed 4/27/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: STH 100 NB Traffic: Left/West on Bluemound Rd, Left/South on Moorland Rd, Right/West at IH-94 WB Entrance Ramp; STH 100 SB Traffic: Right/West on Greenfield Ave, Right/North on Moorland Rd, Left/West at IH-94 WB Entrance Ramp;

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Thu Oct 02 11:29:09 CDT 2014