Construction Report
Select Location
  
Updated: 9/28/16 8:36 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 159 to Jade Rd (+0.3 miles) 155.5 to 162.0 Medium Various lanes closed 4/25/16 7:00 AM to 10/5/16 10:30 AM MnDOT single line traffic alternating directions
at Hemlock Ln (-0.5 miles) Medium Various lanes closed 7/20/14 7:00 PM to 11/30/16 5:00 PM MnDOT major road construction
Lexington Pkwy (-0.1 miles) to Dale St (-0.1 miles) 239.4 to 240.4 Medium Various lanes closed 7/13/16 2:57 PM to 5/2/20 12:17 PM MnDOT reduced to three lanes
Entrance ramp from SB Dale St Unknown All lanes and shoulders closed 6/26/16 8:00 PM to 11/15/16 5:00 AM MnDOT entrance ramp closed
Mounds Blvd (+0.1 miles) to MN-120 243.6 to 247.7 Medium Various lanes closed 9/20/16 11:19 AM to 9/29/17 5:00 PM MnDOT major road construction
County Road T (-0.1 miles) to County Road T (+0.1 miles) 16.5 to 16.8 Minor Left shoulder closed, all lanes open 9/28/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.1 miles) 16.5 to 16.8 Minor Right shoulder closed, all lanes open 9/28/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.1 miles) 16.5 to 16.8 Medium Various lanes closed 9/28/16 6:00 PM to 9/29/16 7:00 AM daily until 9/30/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
at County Road BB 22.5 Minor Left shoulder closed, all lanes open 8/18/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - Baldwin - Menomonie | CTH BB Bridge B-55-0265 | I 94 | ST. CROIX
at County Road BB 22.5 Medium One lane closed, one lane open 9/27/16 7:00 PM to 9/28/16 9:00 AM WisDOT Construction - Baldwin - Menomonie | CTH BB Bridge B-55-0265 | I 94 | ST. CROIX
CR-G (-0.9 miles) to WI-95 (+0.1 miles) 91.3 to 105.3 Medium One lane closed, one lane open 9/26/16 5:00 AM to 9/30/16 11:00 AM,
10/3/16 5:00 AM to 10/7/16 11:00 AM,
10/10/16 5:00 AM to 10/14/16 11:00 AM,
10/17/16 5:00 AM to 10/21/16 11:00 AM,
... more, ending on 10/31/16
WisDOT Construction - Osseo - Black River Falls | West County Line - STH 95 eb & wb | I 94 | JACKSON
County Road F (-0.4 miles) to Old WI-54 (-0.2 miles) 112.7 to 115.6 Medium Right lane closed, one lane open 9/28/16 6:00 AM to 4:00 PM daily until 9/29/16 WisDOT Maintenance - moving operation crack filling
US-12 (-0.2 miles) to Forbes Rd (+0.2 miles) 142.6 to 145.3 Major All lanes closed 9/28/16 11:00 PM to 9/29/16 5:00 AM WisDOT Construction - Detour: A signed detour will utilize USH 12 to IH 90.
at County Road K 120.6 Minor Right shoulder closed, all lanes open 9/28/16 6:00 AM to 4:00 PM daily until 9/29/16 WisDOT Maintenance - shoulder closure
Exit ramp to WB WI-19 130.2 Major All lanes closed 9/26/16 6:00 AM to 10/10/16 11:00 PM WisDOT Construction - Detour: Detour is South to US 51, north on US 51 and back to STH 19
WI-19 (-0.2 miles) to WI-19 (+0.3 miles) 130.2 to 130.7 Medium One lane closed, two lanes open 9/28/16 5:00 AM to 11:00 AM daily until 9/30/16 WisDOT Construction - Detour: no detour
High Crossing Blvd (+0.2 miles) to Lien Rd 135.6 to 136.3 Major Left lane closed, two lanes open 9/28/16 7:00 PM to 9/29/16 6:00 AM WisDOT Maintenance - Detour: no detour required
High Crossing Blvd (+0.2 miles) to Lien Rd 135.6 to 136.3 Major Left two lanes closed, one lane open 9/28/16 10:00 PM to 9/29/16 6:00 AM WisDOT Maintenance - Detour: no detour required
at County Road O 253.7 Minor Left shoulder closed, all lanes open 9/28/16 7:00 AM to 5:00 PM WisDOT Maintenance - Bridge Maintenance
Golden Lake Rd (-0.3 miles) to Golden Lake Rd (+0.3 miles) 278.7 to 279.3 Medium Various lanes closed 4/13/16 12:00 AM to 11/24/16 11:45 PM WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Dousman Rd (-0.3 miles) to Dousman Rd (+0.2 miles) 280.7 to 281.3 Medium Various lanes closed 4/13/16 12:00 AM to 11/24/16 11:45 PM WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
WI-83 (-0.1 miles) to Maple Ave 286.5 to 287.9 Medium Left lane closed, one lane open 9/28/16 7:00 PM to 9/29/16 6:00 AM daily until 10/1/16 WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
WI-164 (-0.2 miles) to WI-164 (+0.1 miles) 294.0 to 294.4 Minor Right shoulder closed, all lanes open 8/25/16 12:00 AM to 9/28/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Exit ramp to SB Redford Blvd 294.9 Medium All lanes closed and both shoulders open 9/16/16 12:00 AM to 10/17/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Entrance ramp from NB Redford Blvd 295.4 Medium All lanes closed and both shoulders open 9/19/16 12:00 AM to 10/17/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Exit ramp to WB US-18 296.8 Major All lanes and shoulders closed 9/27/16 8:00 AM to 10/6/16 8:00 AM WisDOT The closure only impacts the ramp to US 18 with the circle ramp remaining open to County JJ Bluemound Road. Motorists can use that roadway to access US 18.
Exit ramp to SEB Bluemound Rd 296.8 Medium All lanes closed 9/27/16 6:00 AM to 10/7/16 7:00 PM WisDOT Construction - Detour: Use OFF RAMP; to CTH JJ; to EB CTH JJ; to WB USH 18.
Sunny Slope Rd (-0.1 miles) to WI-100 (-0.2 miles) 301.6 to 303.5 Medium Right lane closed, two lanes open 3/12/16 12:00 AM to 11/22/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Entrance ramp from WI-100 303.7 Minor Right lane closed, up to two lanes open 3/25/15 12:00 AM to 3/15/17 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Exit ramp to SB I-41 304.2 None All lanes open with restriction 8/5/16 12:00 AM to 11/5/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Exit ramp to NB I-41 304.3 Major All lanes closed 8/15/16 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: Take I-94 East to the STH 164/CTH J Exit; take STH 164/CTH J North to Capitol Dr/STH 190, Capitol Dr/STH 190 East to the I-41/US 45 North Entrance Ramp; OR, Take I-94 East to the Moorland Rd Exit; take Moorland Rd North to Bluemoun
Entrance ramp from SB I-41 304.7 Unknown All lanes open with restriction 7/31/16 12:00 AM to 10/1/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Canal St to WI-59 (+0.1 miles) 310.9 to 311.6 Medium One lane closed, two lanes open 9/28/16 9:00 AM to 2:00 PM WisDOT Maintenance - I-94 Menomonee Valley bridge inspection over the CP Railroad
WI-38 to WI-38 (+0.1 miles) 311.7 to 311.9 Medium Right lane closed, two lanes open 9/28/16 9:30 PM to 9/29/16 5:30 AM WisDOT Construction - Sign Bridge Repair & Replace Fy16 | Var Hwy | SOUTHEAST REGION WIDE
WI-38 to WI-38 (+0.1 miles) 311.7 to 311.9 Minor Right shoulder closed, all lanes open 9/28/16 9:30 PM to 9/29/16 5:30 AM WisDOT Construction - Sign Bridge Repair & Replace Fy16 | Var Hwy | SOUTHEAST REGION WIDE
7 Mile Rd (-0.7 miles) to County Road G 325.2 to 327.4 Major Left two lanes closed, one lane open 9/28/16 9:30 PM to 9/29/16 5:30 AM WisDOT Construction - North South Freeway | S Racine County Line - Rawson Rd | I 94 | RACINE
Spring St to 58th Rd 332.5 to 334.9 Minor Right shoulder closed, all lanes open 9/13/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Spring St to 58th Rd 332.5 to 334.9 Minor Left shoulder closed, all lanes open 9/13/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Unknown Various lanes closed 9/13/16 7:00 AM to 9/30/16 11:59 PM WisDOT
Entrance ramp from EB WI-20 333.5 Major All lanes closed 9/13/16 12:00 AM to 9/28/16 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to Sylvania to WIS 11 to I-41/94 SB(EB)
Entrance ramp from WB WI-20 333.5 Unknown All lanes and shoulders closed 9/13/16 7:00 AM to 9/30/16 11:59 PM WisDOT
at 38th St 341.5 Minor Right shoulder closed, all lanes open 6/17/16 12:00 AM to 10/8/16 11:45 PM WisDOT Construction - Detour: 38th Street To be Closed. Route to proceed along west frontage to Wis. 142 to CTH UE to CTH N
at WI-165 347.0 Medium Right lane closed, three lanes open 9/6/16 7:00 AM to 10/15/16 5:00 PM WisDOT Construction - Lane and Shoulder closure for installation of fiber optic in East Frontage Road ROW
Ramp from IL-120 to EB I-94 11.2 to 11.3 None All lanes and shoulders open with partial ramp closures 9/28/16 9:00 AM to 2:00 PM Illinois Tollway Left Side of Ramp Closed
Entrance from SEB Kennedy Local 79.6 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/28/16 11:00 AM to 2:00 PM IDOT Moving Operation
Entrance from SEB Kennedy Local 84.1 to 43.7 Minor Right shoulder closed, all lanes open 9/28/16 9:00 AM to 3:00 PM IDOT
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/28/16 10:00 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/28/16 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor All lanes and shoulders open 6/1/14 12:00 AM to 11/30/16 11:59 PM IDOT 11' Width; *** Long Term Closure ***
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT 11' Width; ***Long Term Closure***
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 11/30/16 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 12/1/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Exit ramp to Taylor St 51.8 None Partial closure 6/11/15 12:00 AM to 12/1/16 11:59 PM IDOT Force Merge. No turns. Ramp exit yielding to mainline exit traffic.; *** Long Term Closure ***
Harrison St to Roosevelt Rd 51.7 to 52.2 Minor Both shoulders closed, all lanes open 5/20/15 12:00 AM to 12/1/16 11:59 PM IDOT Lanes weaved ***Long Term Closure***
Exit to SB Bishop Ford 64.2 to 74.4 Minor Right shoulder closed, all lanes open with partial ramp closures 9/28/16 9:00 AM to 3:00 PM IDOT Moving Operation
at 130th St 68.5 Minor Right shoulder closed, all lanes open 9/28/16 9:00 AM to 3:00 PM IDOT
at I-80 (-0.4 miles) 15.6 Medium Left lane closed, two lanes open 9/26/16 8:04 AM to 10/3/16 8:04 AM InDOT Construction work
Entrance ramp from EB I-90 15.8 Major All lanes and shoulders closed 7/11/16 7:00 AM to 11/18/16 11:59 PM Indiana Toll Road Bridge Work - 24 Hour Continuous Closure. Detours are in place
Entrance ramp from WB I-80 15.8 Major All lanes and shoulders closed 7/11/16 7:00 AM to 11/18/16 11:59 PM Indiana Toll Road Bridge Work - 24 Hour Continuous Closure. Detours are in place
at US-20 39.8 Medium Right lane closed, two lanes open 4/1/16 7:00 AM to 10/31/16 11:59 PM InDOT Bridge Work
Red Arrow Hwy to Puetz Rd (+0.2 miles) 15.5 to 22.6 Medium Various lanes closed 3/14/16 7:00 AM to 10/21/16 11:59 PM MDOT Bridge repairs, median cable barrier, guardrail, culvert, freeway signing and right-of-way fence. Repairs on the I-94 bridges over Lost Dunes Drive in Bridgman, and over Puetz Road east of Stevensville.; Daily single-lane and nighttime double-lane closures on I-94 during construction. Puetz Road will be closed with a detour posted. There also will be temporary ramp closures at Red Arrow Highway Exit 16 and Grand Mere Road Exit 22.
MM 16 to MM 23 16.0 to 23.0 Medium 0 lanes closed, three lanes open 3/13/16 11:00 PM to 10/20/16 11:00 PM MDOT Expect single-lane closures for road work.
MM 16 to MM 24 16.0 to 24.0 Medium Various lanes closed 3/14/16 7:00 PM to 10/21/16 9:00 AM MDOT Expect nightly intermittent double-lane closures for road work.
Sprinkle Rd (-0.2 miles) to Michigan Ave (+0.5 miles) 79.4 to 88.1 Medium One lane closed, one lane open 9/26/16 7:00 PM to 11/15/16 5:00 AM MDOT Expect single lane closure for milling and paving.
at Michigan Ave (+0.2 miles) 87.9 Medium Various lanes closed 4/18/16 7:00 AM to 9/30/16 11:59 PM MDOT Lane shifts and nighttime single-lane closures
Exit 92 to Exit 124 92.1 to 124.0 Medium Various lanes closed 4/18/16 6:00 AM to 10/28/16 4:00 PM MDOT Expect moving shoulder closures for sign replacement.
M-99 (-0.5 miles) to Airport Rd 123.4 to 137.1 Medium Various lanes closed 5/9/16 9:00 PM to 11/4/16 11:59 PM MDOT Repair Bridges; There will be single-lane closures on I-94, with local roads closed and traffic detoured. Starting May 9, there will be nighttime single-lane closures on I-94 between 9 p.m. and 5 a.m. for shoulder upgrades in preparation of the bridge work, which is expected to start after the Memorial Day holiday.
Concord Rd to Parma Rd 126.9 to 129.6 Medium One lane closed, one lane open 9/6/16 5:00 AM to 11/4/16 8:00 PM MDOT Single Lane Closure on I-94 between Concord Road and Parma Road
Sandstone Rd to Sandstone Rd 133.8 to 133.8 Medium One lane closed, one lane open 8/23/16 5:00 AM to 9/29/16 8:00 PM MDOT Single Lane Closure due to bridge repair under Sandstone Road
Blackman Rd (-0.2 miles) to Blackman Rd (+0.1 miles) 135.4 to 135.7 Medium One lane closed, one lane open 7/28/16 5:00 AM to 9/29/16 8:00 PM MDOT Single Lane Closure for work on the underside of the bridge
Airport Rd (-0.1 miles) to Airport Rd (+0.1 miles) 137.0 to 137.2 Medium One lane closed, one lane open 8/11/16 8:00 PM to 9/29/16 5:00 AM MDOT Single-lane closures nightly for bridge repairs.
at Jackson Ave Exit 172 171.5 to 172.6 Medium One lane closed, one lane open 9/28/16 9:00 AM to 1:00 PM MDOT Expect a single-lane closure for guardrail repairs.
Exit ramp to SB Middlebelt Rd 197.5 Minor Various lanes closed 9/26/16 4:00 AM to 9/30/16 7:00 PM MDOT The ramp is closed for pavement repairs.
Entrance ramp from SB Middlebelt Rd 197.5 Minor Various lanes closed 9/26/16 4:00 AM to 9/30/16 7:00 PM MDOT The ramp is closed for pavement repairs.
14th St to M-10 214.3 to 215.0 Minor Left or right shoulder closed, all lanes open 7/24/16 4:00 AM to 10/3/16 4:00 AM MDOT The right shoulder is closed for bridge work at Trumbull.
Exit ramp to SEB Trumbull St 214.5 Minor Various lanes closed 3/18/16 6:00 PM to 10/3/16 4:00 AM MDOT The ramp is closed for bridge replacement at Trumbull. The eastbound I-94 service drive is also closed at Commonwealth Street for this work. Local access to businesses and residences is maintained.
at State St 275.6 Medium Various lanes closed 9/28/16 7:00 AM to 4:00 PM,
9/29/16 7:00 AM to 4:00 PM,
9/30/16 7:00 AM to 4:00 PM,
10/1/16 7:00 AM to 4:00 PM,
... more, ending on 11/29/16
MDOT single/double lane closures beginning mid-span of the bridge and extending for approximately one-quarter mile for paint work

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Gratiot Ave 275.7 Medium Various lanes closed 9/28/16 7:00 AM to 4:00 PM,
9/29/16 7:00 AM to 4:00 PM,
9/30/16 7:00 AM to 4:00 PM,
10/1/16 7:00 AM to 4:00 PM,
... more, ending on 11/29/16
MDOT single/double lane closures beginning mid-span of the bridge and extending for approximately one-quarter mile for paint work
14th St to M-10 214.9 to 214.2 Minor Left or right shoulder closed, all lanes open 7/24/16 4:00 AM to 10/3/16 4:00 AM MDOT The right shoulder is closed for bridge work at Trumbull.
Entrance ramp from SEB Trumbull St 214.5 Minor Various lanes closed 3/18/16 6:00 AM to 10/3/16 4:00 PM MDOT The ramp is closed for bridge work.
Airport Rd (-0.1 miles) to Airport Rd (+0.1 miles) 137.2 to 137.0 Medium One lane closed, one lane open 8/11/16 8:00 PM to 9/29/16 5:00 AM MDOT Single-lane closures nightly for bridge repairs.
Airport Rd to M-99 (+0.5 miles) 137.1 to 123.4 Medium Various lanes closed 5/9/16 9:00 PM to 11/4/16 11:59 PM MDOT Repair Bridges; There will be single-lane closures on I-94, with local roads closed and traffic detoured. Starting May 9, there will be nighttime single-lane closures on I-94 between 9 p.m. and 5 a.m. for shoulder upgrades in preparation of the bridge work, which is expected to start after the Memorial Day holiday.
Blackman Rd (-0.1 miles) to Blackman Rd (+0.2 miles) 135.7 to 135.4 Medium One lane closed, one lane open 7/28/16 5:00 AM to 9/29/16 8:00 PM MDOT Single Lane Closure for work on the underside of the bridge
Sandstone Rd to Sandstone Rd 133.8 to 133.8 Medium One lane closed, one lane open 8/23/16 5:00 AM to 9/29/16 8:00 PM MDOT Single Lane Closure due to bridge repair under Sandstone Road
Parma Rd to Concord Rd 129.6 to 127.0 Medium One lane closed, one lane open 9/6/16 5:00 AM to 11/4/16 8:00 PM MDOT Single Lane Closure on I-94 between Concord Road and Parma Road
Exit 92 to Exit 124 124.0 to 92.1 Medium Various lanes closed 4/18/16 6:00 AM to 10/28/16 4:00 PM MDOT Expect moving shoulder closures for sign replacement.
Michigan Ave (-0.5 miles) to Sprinkle Rd (+0.2 miles) 88.1 to 79.4 Medium One lane closed, one lane open 9/26/16 7:00 PM to 11/15/16 5:00 AM MDOT Expect single lane closure for milling and paving.
at Michigan Ave (-0.2 miles) 87.9 Medium Various lanes closed 4/18/16 7:00 AM to 9/30/16 11:59 PM MDOT Lane shifts and nighttime single-lane closures
MM 16 to MM 24 24.0 to 16.0 Medium Various lanes closed 3/14/16 7:00 PM to 10/21/16 9:00 AM MDOT Expect nightly intermittent double-lane closures for road work.
MM 16 to MM 23 23.0 to 16.0 Medium 0 lanes closed, three lanes open 3/13/16 11:00 PM to 10/20/16 11:00 PM MDOT Expect single-lane closures for road work.
Puetz Rd (-0.2 miles) to Red Arrow Hwy 22.6 to 15.5 Medium Various lanes closed 3/14/16 7:00 AM to 10/21/16 11:59 PM MDOT Bridge repairs, median cable barrier, guardrail, culvert, freeway signing and right-of-way fence. Repairs on the I-94 bridges over Lost Dunes Drive in Bridgman, and over Puetz Road east of Stevensville.; Daily single-lane and nighttime double-lane closures on I-94 during construction. Puetz Road will be closed with a detour posted. There also will be temporary ramp closures at Red Arrow Highway Exit 16 and Grand Mere Road Exit 22.
Entrance ramp from SWB Red Arrow Hwy 15.5 Medium All lanes and shoulders closed 5/9/16 7:00 AM to 9/30/16 11:59 PM MDOT Repaving
Entrance ramp from SWB Red Arrow Hwy 15.5 Medium All lanes and shoulders closed 5/9/16 7:00 AM to 9/30/16 11:59 PM MDOT Repaving
Entrance ramp from SWB Red Arrow Hwy 15.5 Minor Various lanes closed 5/8/16 11:00 PM to 9/29/16 11:00 PM MDOT The ramp is closed for repaving and work on I-94.
at US-20 39.8 Medium Right lane closed, two lanes open 4/1/16 7:00 AM to 10/31/16 11:59 PM InDOT Bridge Work
Entrance ramp from EB I-90 15.3 Major All lanes and shoulders closed 7/11/16 7:00 AM to 11/18/16 11:59 PM Indiana Toll Road Bridge Work - 24 Hour Continuous Closure. Detours are in place
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 7/11/16 7:00 AM to 11/18/16 11:59 PM Indiana Toll Road Bridge Work - 24 Hour Continuous Closure. Detours are in place
Entrance from NB Bishop Ford 74.5 to 64.2 Minor Right shoulder closed, all lanes open with partial ramp closures 9/28/16 9:00 AM to 3:00 PM IDOT Moving Operation
I-57 / Bishop Ford (I-94) to 95th St (US-12/20) 62.9 to 62.8 Medium Left lane and left shoulder closed, four lanes open 9/6/16 12:00 AM to 11/23/16 11:59 PM IDOT *** Long Term Closure ***
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Yield to NB I-55 exit to NB I-90/94; ***Long Term Closure***
Exit ramp to WB I-290 Minor All lanes and shoulders open 6/1/14 12:00 AM to 11/30/16 11:59 PM IDOT 11' Width; *** Long Term Closure ***
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT 11' Width; ***Long Term Closure***
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/18 11:59 PM IDOT ***Long Term Closure***
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 12/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 12/1/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/28/16 9:30 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/28/16 11:00 AM to 2:00 PM IDOT Moving Operation
0.5 miles northwest of Fullerton Ave to 0.5 miles northwest of Belmont Ave / Kedzie Ave 47.0 to 45.4 Minor Right shoulder closed, all lanes open 9/28/16 9:00 AM to 3:00 PM IDOT
Exit to NWB Kennedy Local 43.5 to 79.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/28/16 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to WB Lake Ave 34.5 None Partial closure 8/10/16 12:00 AM to 10/22/16 11:59 PM IDOT Long Term Closure
at WI-20 333.1 Unknown Various lanes closed 9/13/16 7:00 AM to 9/30/16 11:59 PM WisDOT
Exit ramp to EB WI-100 322.9 Major All lanes closed 11/30/15 12:00 AM to 11/15/17 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 84th St Exit; take 84th St South to Greenfield Ave, Greenfield Ave West to Hwy 100; OR, Take I-94 West to the Moorland Rd-South Exit; take Moorland Rd South to Greenfield Ave, Greenfield Ave East to Hwy 100
Exit ramp to EB I-794 311.1 Major All lanes closed 9/28/16 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt Route
Exit ramp to SB I-41 305.0 Major All lanes closed 3/9/15 12:00 AM to 5/6/18 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 84th St Exit; take 84th St South to Greenfield Ave, Greenfield Ave West to the I-41/894/US 45 South Entrance Ramp; OR, Take I-94 West to the Moorland Rd-South Exit Ramp; take Moorland Rd South to Greenfield Ave
Entrance ramp from WI-100 303.8 Minor Right lane closed, up to two lanes open 3/25/15 12:00 AM to 3/15/17 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Exit ramp to NB Redford Blvd 295.7 Medium All lanes closed and both shoulders open 9/19/16 12:00 AM to 10/17/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Maple Ave to WI-83 (+0.3 miles) 288.3 to 286.8 Medium Left lane closed, one lane open 9/28/16 7:00 PM to 9/29/16 6:30 AM daily until 10/1/16 WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
WI-67 (+0.2 miles) to Dousman Rd (+0.3 miles) 281.7 to 281.1 Medium Various lanes closed 3/15/16 12:00 AM to 11/24/16 11:45 PM WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Golden Lake Rd (-0.3 miles) to Golden Lake Rd (+0.3 miles) 279.7 to 279.1 Medium Various lanes closed 3/15/16 12:00 AM to 11/24/16 11:45 PM WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
at County Road O 254.1 Minor Left shoulder closed, all lanes open 9/28/16 7:00 AM to 5:00 PM WisDOT Maintenance - Bridge Maintenance
US-51 (-0.1 miles) to WI-19 (+0.1 miles) 132.4 to 130.7 Medium One lane closed, two lanes open 9/28/16 6:00 AM to 11:00 AM daily until 9/30/16 WisDOT Construction - Detour: No detour
at County Road K 121.1 Minor Right shoulder closed, all lanes open 9/28/16 6:30 AM to 4:00 PM daily until 9/29/16 WisDOT Maintenance - shoulder closed
Smokey Hollow Rd (-0.4 miles) to Smokey Hollow Rd 117.0 to 116.6 Medium Right lane closed, two lanes open 9/29/16 6:30 AM to 3:30 PM WisDOT Maintenance - guard rail repair. accident
at Black Rd 113.5 Minor Right shoulder closed, all lanes open 9/28/16 8:00 AM to 4:00 PM daily until 9/29/16 WisDOT Permit - close on ramp to I-39 shoulder for loading and unloading.
at Black Rd 113.5 Minor Right shoulder closed, all lanes open 9/28/16 8:00 AM to 4:00 PM WisDOT Permit - close shoulder of on ramp from rest area to I-39 north bound for loading/unloading of equipment.
Old Hwy 54 (+0.2 miles) to County Road F (+0.4 miles) 115.7 to 112.7 Medium Right lane closed, one lane open 9/28/16 6:00 AM to 4:00 PM daily until 9/29/16 WisDOT Maintenance - moving operation crack filling
WI-95 to CR-G (+0.8 miles) 105.3 to 91.4 Medium One lane closed, one lane open 9/26/16 5:00 AM to 9/30/16 12:00 PM,
10/3/16 5:00 AM to 10/7/16 12:00 PM,
10/10/16 5:00 AM to 10/14/16 12:00 PM,
10/17/16 5:00 AM to 10/21/16 12:00 PM,
... more, ending on 10/31/16
WisDOT Construction - Osseo - Black River Falls | West County Line - STH 95 eb & wb | I 94 | JACKSON
at US-12 (+0.6 miles) 41.0 Medium Left lane closed, one lane open 9/26/16 7:00 AM to 9/29/16 12:00 PM WisDOT Maintenance - Bridge deck repair
at County Road BB 22.4 Minor Left shoulder closed, all lanes open 7/12/16 12:00 AM to 11/25/16 11:45 PM WisDOT Construction - Baldwin - Menomonie | CTH BB Bridge B-55-0265 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.2 miles) 16.7 to 16.4 Minor Left shoulder closed, all lanes open 9/28/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.2 miles) 16.7 to 16.4 Minor Right shoulder closed, all lanes open 9/28/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.2 miles) 16.7 to 16.4 Medium Various lanes closed 9/28/16 6:00 PM to 9/29/16 7:00 AM daily until 9/30/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
Exit ramp to NB McKnight Rd 247.7 Medium All lanes and shoulders closed 9/23/16 7:00 AM to 11/23/16 11:59 PM MnDOT Resurfacing
MN-120 to Mounds Blvd (-0.1 miles) 247.8 to 243.7 Medium Various lanes closed 9/20/16 11:19 AM to 9/29/17 5:00 PM MnDOT major road construction
Entrance ramp from WB Hudson Rd 247.2 Unknown All lanes and shoulders closed 9/23/16 7:00 AM to 11/23/16 11:59 PM MnDOT Resurfacing
Exit ramp to NB US-61 243.9 Major All lanes and shoulders closed 9/23/16 7:00 AM to 11/23/16 11:59 PM MnDOT Resurfacing
Entrance ramp from WB St Anthony Ave 240.2 Unknown All lanes and shoulders open 6/26/16 8:00 PM to 11/15/16 5:00 AM MnDOT entrance ramp closed
at 49th Ave 226.6 Medium Right lane closed, three lanes open 9/29/16 6:00 AM to 9/30/16 3:00 PM MnDOT right lane closed
Hemlock Ln to Hemlock Ln (+0.4 miles) Medium Left lane closed, two lanes open 4/18/16 12:00 AM to 11/30/16 11:59 PM MnDOT left lane closed
Jade Rd (-0.3 miles) to County Road 159 162.0 to 155.5 Medium Various lanes closed 4/25/16 7:00 AM to 10/5/16 10:30 AM MnDOT single line traffic alternating directions

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Wed Sep 28 2016 08:37:49 CDT