Construction Report
Select Location
  
Updated: 7/5/15 6:04 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Mohawk Rd (-1.8 miles) to 122nd St (+0.5 miles) Medium Various lanes closed 7/6/15 9:00 AM to 3:00 PM daily until 9/4/15 WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
Exit ramp to Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St exit
Exit ramp to WB Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St or National Ave exits
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave exit
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave or Layton Ave entrances
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major Left lane closed, two lanes open 7/3/15 12:00 AM to 8/28/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***
Wisconsin State Line to Russell Rd Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
Ramp from EB IL-132 to EB I-94 8.4 to 8.5 None Right lane closed, three or four lanes open with partial ramp closures 7/6/15 7:00 AM to 7/13/15 11:59 PM Illinois Tollway Rdwy Reconst and Plaza Repairs; Right Side of Ramp Closed; *** Long Term Closure ***
at Half Day Rd Plaza (23) 21.8 to 21.9 Medium Various lanes closed 7/6/15 7:00 AM to 7/22/15 11:59 PM Illinois Tollway Rdwy Reconst and Plaza Repairs; Left IPO Lanel closed; *** Long Term Closure ***
at L:ake-Cook Rd Plaza (26) Unincorporated Lake County 25.2 to 25.3 Medium Various lanes closed 7/6/15 7:00 AM to 7/22/15 11:59 PM Illinois Tollway Rdwy Reconst and Plaza Repairs; Left IPO Lane Clsoed; ***Long Term Closure ***
Cumberland Ave (IL-171) to Eisenhower Expy (I-290) 79.6 to 51.6 Minor Right shoulder closed, all lanes open 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 7/6/15 10:00 AM to 1:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Right lane and right shoulder closed, two to four lanes open with partial ramp closures 7/6/15 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to Taylor St 51.8 None Partial closure 6/11/15 12:00 AM to 7/11/15 11:59 PM IDOT Traffic forced into one lane ***Long Term Closure***: Ramp exit yielding to mainline exit traffic
Harrison St to Roosevelt Rd 51.7 to 52.2 Minor Both shoulders closed, all lanes open 5/20/15 12:00 AM to 12/1/15 11:59 PM IDOT Lanes weaved ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 9/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
26th St to 0.5 miles north of Chicago Skwy (I-90) 54.1 to 58.3 Medium Left lane and left shoulder closed, two or three lanes open with partial ramp closures 7/6/15 9:00 AM to 1:30 PM IDOT Moving Operation
26th St to 0.5 miles north of Chicago Skwy (I-90) 54.1 to 58.3 Medium Right lane and right shoulder closed, two or three lanes open with partial ramp closures 7/6/15 9:00 AM to 1:30 PM IDOT Moving Operation
26th St to 69th St 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
63rd St to Wentworth Ave 58.7 to 58.9 Medium Left lane and left shoulder closed, one to three lanes open 3/31/15 12:00 AM to 8/31/15 11:59 PM IDOT ***Long Term Closure***
at Exit to SB Chicago Skwy 58.8 Medium Left lane and left shoulder closed, three lanes open 3/31/15 8:00 AM to 8/31/15 11:59 PM IDOT ***Long Term Closure***
at Wentworth Ave 58.9 Minor Right shoulder closed, all lanes open 3/20/15 12:00 AM to 9/1/15 11:59 PM IDOT ***Long Term Closure***
69th St to I-57 / Bishop Ford (I-94) 59.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
69th St to I-57 / Bishop Ford (I-94) 59.5 to 62.9 Medium Left lane and left shoulder closed, four lanes open with partial ramp closures 7/6/15 9:00 AM to 1:00 PM IDOT Moving Operation
69th St to I-57 / Bishop Ford (I-94) 59.5 to 62.9 Medium Right lane and right shoulder closed, four lanes open with partial ramp closures 7/6/15 9:00 AM to 1:00 PM IDOT Moving Operation
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor All lanes shifted and both shoulders closed 9/9/14 12:00 AM to 8/31/15 11:59 PM IDOT Lanes narrowed and weaved to the left ***Long Term Closure***
Dan Ryan Expy (I-94) / I-57 to SB Stony Island Feeder Entrance 62.9 to 65.6 Medium Right lane and right shoulder closed, one or two lanes open with partial ramp closures 7/6/15 9:00 AM to 11:59 AM IDOT Moving Operation
Dan Ryan Expy (I-94) / I-57 to SB Stony Island Feeder Entrance 62.9 to 65.6 Medium Left lane and left shoulder closed, one or two lanes open with partial ramp closures 7/6/15 9:00 AM to 11:59 AM IDOT Moving Operation
Dan Ryan Expy (I-94) / I-57 to I-80 62.9 to 74.4 Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
SB Stony Island Feeder Entrance to I-80 65.6 to 74.4 Medium Left lane and left shoulder closed, one to three lanes open with partial ramp closures 7/6/15 8:30 AM to 12:30 PM IDOT Moving Operation
SB Stony Island Feeder Entrance to I-80 65.6 to 74.4 Medium Right lane and right shoulder closed, one to three lanes open with partial ramp closures 7/6/15 8:30 AM to 12:30 PM IDOT Moving Operation
Bishop Ford Fwy (IL-394) to Torrence Ave (IL-83) Minor Left shoulder closed, all lanes open 7/6/15 9:00 AM to 3:00 PM IDOT
at Glenlord Rd (-0.3 miles) 24.2 Major All lanes and shoulders closed 5/27/15 7:00 AM to 8/29/15 11:59 PM MDOT Bridge Replacement; Eastbound I-94 traffic will be crossed over onto westbound lanes during construction. Two lanes of traffic will be open in each direction during most of construction, with some intermittent nighttime double-lane closures.
at over Paw Paw River 59.3 Medium Various lanes closed 4/6/15 7:00 AM to 8/28/15 11:59 PM MDOT Bridge Repairs; Intermittent single-lane closures
Exit ramp to SB Sprinkle Rd 79.2 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Exit ramp to SB Sprinkle Rd 79.2 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
Entrance ramp from SB Sprinkle Rd 79.5 Medium All lanes and shoulders open 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
Entrance ramp from NB Sprinkle Rd 79.8 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
Entrance ramp from NB Sprinkle Rd 79.8 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
at Cork St 79.9 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Climax And Battle Creek Rd (-0.1 miles) to I-69 92.0 to 108.2 Medium Various lanes closed 3/20/15 1:00 PM to 11/28/15 1:00 PM MDOT

I-94 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to 69th St 54.1 to 59.5 Medium Right lane and right shoulder closed, one to three lanes open with partial ramp closures 7/6/15 9:00 AM to 1:00 PM IDOT Moving Operation
26th St to 69th St 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
26th St to 69th St 54.1 to 59.5 Medium Left lane and left shoulder closed, one to three lanes open with partial ramp closures 7/6/15 9:00 AM to 1:00 PM IDOT Moving Operation

I-94 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 26th St 59.5 to 54.1 Medium Right lane and right shoulder closed, one to three lanes open with partial ramp closures 7/6/15 10:00 AM to 3:00 PM IDOT Moving Operation
69th St to 26th St 59.5 to 54.1 Medium Left lane and left shoulder closed, one to three lanes open with partial ramp closures 7/6/15 10:00 AM to 3:00 PM IDOT Moving Operation
69th St to 26th St 59.5 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
at Entrance from NB Chicago Skywy (I-90) 58.9 Major All lanes and shoulders closed 4/15/15 12:00 AM to 10/31/15 11:59 PM IDOT ***Long Term Closure***

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-69 to Climax And Battle Creek Rd (+0.1 miles) 108.2 to 92.0 Medium Various lanes closed 3/20/15 1:00 PM to 11/28/15 1:00 PM MDOT
Exit ramp to EB Cork St 80.0 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
Exit ramp to Cork St 80.0 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
at Cork St 79.9 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from NB Sprinkle Rd 79.7 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from NB Sprinkle Rd 79.7 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
Entrance ramp from SB Sprinkle Rd 79.4 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from SB Sprinkle Rd 79.4 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
at over Paw Paw River 59.3 Medium Various lanes closed 4/6/15 7:00 AM to 8/28/15 11:59 PM MDOT Bridge Repairs; Intermittent single-lane closures
M-51 to County Road 687 56.3 to 45.8 Medium Various lanes closed 5/18/15 7:00 AM to 9/18/15 11:59 PM MDOT Single-lane closures. Construction includes culvert replacement, ramp resurfacing, pavement reconstruction under five bridges, and guardrail replacement.
at IN-49 (-0.2 miles) 26.1 Medium Left lane closed, two lanes open 6/24/15 6:37 AM to 7/8/15 9:31 AM InDOT Construction work
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 3/18/15 7:00 AM to 11/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild ***Long Term***
Exit ramp to SB IL-394 None Partial closure 6/5/15 7:00 AM to 8/31/15 11:59 PM Illinois Tollway Pavement, Ramp, Bridge Repairs and Parking Lot Rehab; Right Side of Ramp Closed; *** Long Term Clsoure ***
I-80 to NB Stony Island Feeder Exit 74.5 to 65.7 Medium Left lane and left shoulder closed, one or two lanes open with partial ramp closures 7/6/15 10:00 AM to 2:00 PM IDOT Moving Operation
I-80 to NB Stony Island Feeder Exit 74.5 to 65.7 Medium Right lane and right shoulder closed, one or two lanes open with partial ramp closures 7/6/15 10:00 AM to 2:00 PM IDOT Moving Operation
I-80 to Dan Ryan Expy (I-94) / I-57 74.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
NB Stony Island Feeder Exit to Dan Ryan Expy (I-94) / I-57 65.7 to 62.9 Medium Right lane and right shoulder closed, one or two lanes open with partial ramp closures 7/6/15 10:30 AM to 1:00 PM IDOT Moving Operation
NB Stony Island Feeder Exit to Dan Ryan Expy (I-94) / I-57 65.7 to 62.9 Medium Left lane and left shoulder closed, one or two lanes open with partial ramp closures 7/6/15 10:30 AM to 1:00 PM IDOT Moving Operation
I-57 / Bishop Ford (I-94) to 69th St 62.9 to 59.6 Medium Right lane and right shoulder closed, one to four lanes open with partial ramp closures 7/6/15 10:00 AM to 2:00 PM IDOT Moving Operation
I-57 / Bishop Ford (I-94) to 69th St 62.9 to 59.6 Medium Left lane and left shoulder closed, one to four lanes open with partial ramp closures 7/6/15 10:00 AM to 2:00 PM IDOT Moving Operation
I-57 / Bishop Ford (I-94) to 69th St 62.9 to 59.6 Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
69th St to 26th St 59.6 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
Marquette Rd (67th St) to Chicago Skwy (I-90) 59.3 to 59.1 Minor Left shoulder closed, all lanes open 4/1/15 12:00 AM to 8/31/15 11:59 PM IDOT ***Long Term Closure***
Marquette Rd (67th St) to 26th St 59.3 to 54.1 Medium Left lane and left shoulder closed, one to three lanes open with partial ramp closures 7/6/15 10:00 AM to 3:00 PM IDOT Moving Operation
Chicago Skwy (I-90) to 26th St 59.1 to 54.1 Medium Right lane and right shoulder closed, one to three lanes open with partial ramp closures 7/6/15 10:00 AM to 3:00 PM IDOT Moving Operation
26th St to Stevenson Expy (I-55) 54.1 to 53.7 Medium Left lane and left shoulder closed, three lanes open with partial ramp closures 7/6/15 10:00 AM to 1:00 PM IDOT Moving Operation
26th St to Stevenson Expy (I-55) 54.1 to 53.7 Medium Right lane and right shoulder closed, three lanes open with partial ramp closures 7/6/15 10:00 AM to 1:00 PM IDOT Moving Operation
26th St to Eisenhower Expy (I-290) 54.1 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure*** ; Yield to NB I-55 exit to NB I-90/94
Exit ramp to EB I-290 52.4 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to WB I-290 52.4 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 6/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from Taylor St 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
0.5 miles south of Tower Rd to 0.5 miles north of Tower Rd 32.3 to 31.3 Minor Right shoulder closed, all lanes open 7/2/15 9:00 AM to 7/31/15 3:00 PM IDOT ***Long Term Closure***
at Half Day Rd Plaza (23) 21.9 to 21.8 Medium Various lanes closed 6/15/15 7:00 AM to 7/22/15 11:59 PM Illinois Tollway Rdwy Reconst and Plaza Repairs; Left IPO lane closed *** Long Term Closure ***
Russell Rd to Wisconsin State Line Minor Both shoulders closed, all lanes open with partial ramp closures 7/6/15 9:00 AM to 3:00 PM IDOT Moving Operation
122nd St to Mohawk Rd (+1.8 miles) Medium Various lanes closed 7/6/15 9:00 AM to 3:00 PM daily until 9/4/15 WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Exit ramp to EB I-894 304.6 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Sun Jul 05 2015 18:15:22 CDT