Construction Report
Select Location
  
Updated: 7/22/14 8:30 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-39 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
at 1 mile North of Rockton Rd 2.5 to 2.2 Medium Various lanes closed 4/9/14 7:00 PM to 9/30/14 11:59 PM IDOT Alternating driving and passing lane closure
Kennedy Rd to Ellendale Rd (-0.1 miles) 170.2 to 163.6 Medium Left lane closed, one lane open 7/23/14 7:00 PM to 7/24/14 5:00 AM WisDOT Construction - Detour: No posted detour
Manogue Rd to Ellendale Rd (-0.1 miles) 167.6 to 163.6 Medium Right lane closed, one lane open 7/22/14 7:00 PM to 7/23/14 5:00 AM WisDOT Construction - Detour: No posted detour
County Road Ab (-0.3 miles) to US-12 (-0.6 miles) 144.7 to 142.7 Medium Right lane closed, one lane open 7/23/14 7:00 PM to 7/24/14 5:00 AM WisDOT Construction - ILLINOIS STATE LINE - MADISON | SIGGELKOW RD BRDGS B-13-138, 727 | I 39 | DANE Stage 2 NB Outside Widening
Exit to SB US-151 136.4 Medium Various lanes closed 3/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will use the northbound USH 151 exit, proceed north to CTH C interchange, exit at the CTH C ramp, make a left-turn to go over the bridge and turn left at the southbound USH 151 on-ramp and proceed south on USH 151.
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Left lane closed, two lanes open 6/9/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Left lane closed, two lanes open 7/22/14 10:00 PM to 7/23/14 7:00 AM daily until 7/31/14 WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
WI-19 (+0.8 miles) to CR-V (-0.2 miles) 130.0 to 126.9 Major Right two lanes closed, one lane open 7/22/14 8:00 PM to 7/23/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
River Rd to CR-V (-0.2 miles) 129.2 to 126.9 Major Right two lanes closed, one lane open 7/23/14 8:00 PM to 7/24/14 6:00 AM daily until 7/25/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

I-39 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
River Rd (+0.4 miles) to US-51 (-0.2 miles) 129.6 to 132.2 Major Right two lanes closed, one lane open 7/22/14 8:00 PM to 7/23/14 6:00 AM daily until 7/24/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
Exit to WB WI-19 130.7 Major All lanes and shoulders closed 7/23/14 8:00 PM to 7/24/14 6:00 AM WisDOT Construction - Detour: no posted detour
Entrance from EB WI-19 130.7 Major All lanes and shoulders closed 7/23/14 8:00 PM to 7/24/14 6:00 AM WisDOT Construction - Detour: no posted detour
Hoepker Rd (-0.4 miles) to Hoepker Rd (+0.2 miles) 133.2 to 133.8 Medium Right lane closed, two lanes open 7/22/14 9:00 PM to 7/23/14 6:00 AM daily until 7/24/14 WisDOT Construction - MADISON - PORTAGE | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Left lane closed, two lanes open 6/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
Exit to SB US-151 135.3 Major All lanes and shoulders closed 4/1/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will exit at the USH 51 inerchange , proceed south on USH 51 to the STH 30 interchange, turn left onto STH 30, proceed east to IH 39 north, take IH39 north to the USH 151 exit and proceed north on USH 151.
WI-106 to Richardson Springs Rd 159.2 to 163.4 Medium Left lane closed, one lane open 7/22/14 8:00 PM to 7/23/14 6:00 AM daily until 7/25/14 WisDOT Construction - Detour: No posted detour
at West of Rockton Rd 2.5 to 2.9 Medium Right lane closed, one or two lanes open 7/23/14 7:00 AM to 12:00 PM Illinois Tollway Guardrail Repair
McCurry Rd (+1.1 miles) to Elevator Rd (+0.4 miles) 4.8 to 5.2 Medium Right lane closed, two lanes open 7/23/14 8:00 AM to 3:00 PM Illinois Tollway Ramp Reconst., Mainline Routing and Sealing Improvements
E. Riverside Rd (+0.5 miles) to E. Riverside Rd (+0.9 miles) 12.8 to 13.2 Medium Right lane closed, two lanes open 7/23/14 9:00 AM to 5:00 PM Illinois Tollway Ramp Reconst., Mainline Routing and Sealing Improvements
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Tue Jul 22 20:38:40 CDT 2014