Construction Report
Select Location
  
Updated: 4/24/14 9:30 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-39 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
IL-64 to IL-72 104.7 to 111.2 Medium Various lanes closed 4/8/14 7:00 AM to 5/23/14 11:59 PM IDOT One lane will be closed in each direction and separated from the work by barrier wall; Max Width 11'-6" - Effective 04/08/2014 through 05/23/2014
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
at 1 mile North of Rockton Rd 2.5 to 2.2 Medium Various lanes closed 4/9/14 7:00 PM to 9/30/14 11:59 PM IDOT Alternating driving and passing lane closure
CR-O to Palmer Dr 175.5 to 174.6 Medium Right lane closed, one lane open 4/24/14 8:00 PM to 4/25/14 5:00 AM daily until 4/30/14 WisDOT Construction - Detour: No Detour Needed
CR-AB to US-12 144.7 to 142.7 Medium Left lane closed, one lane open 4/24/14 7:00 PM to 4/25/14 5:00 AM WisDOT Construction - ILLINOIS STATE LINE - MADISON | SIGGELKOW RD BRDGS B-13-138, 727 | I 39 | DANE
Exit to SB US-151 136.4 Medium Various lanes closed 3/30/14 12:00 AM to 5/21/14 11:45 PM WisDOT Construction - Detour: Vehicles will use the northbound USH 151 exit, proceed north to CTH C interchange, exit at the CTH C ramp, make a left-turn to go over the bridge and turn left at the southbound USH 151 on-ramp and proceed south on USH 151.
US-151 to Portage Rd 135.6 to 134.7 Medium Various lanes closed 3/31/14 12:00 AM to 5/21/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
WI-19 to CR-V 131.2 to 126.9 Major Right two lanes closed, one lane open 4/24/14 8:00 PM to 4/25/14 5:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

I-39 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-V to WI-19 126.9 to 131.0 Major Left two lanes closed, one lane open 4/24/14 8:00 PM to 4/25/14 5:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
Portage Rd to Lien Rd 134.8 to 136.8 Medium Various lanes closed 4/2/14 12:00 AM to 5/21/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
Exit to SB US-151 135.3 Major All lanes and shoulders closed 4/1/14 12:00 AM to 5/21/14 11:45 PM WisDOT Construction - Detour: Vehicles will exit at the USH 51 inerchange , proceed south on USH 51 to the STH 30 interchange, turn left onto STH 30, proceed east to IH 39 north, take IH39 north to the USH 151 exit and proceed north on USH 151.
US-12 to CR-AB 142.8 to 144.8 Medium Left lane closed, one lane open 4/24/14 7:00 PM to 4/25/14 5:00 AM WisDOT Construction - ILLINOIS STATE LINE - MADISON | SIGGELKOW RD BRDGS B-13-138, 727 | I 39 | DANE
Palmer Dr to CR-O 174.7 to 175.5 Medium Right lane closed, one lane open 4/24/14 8:00 PM to 4/25/14 5:00 AM daily until 4/30/14 WisDOT Construction - Detour: No Detour Needed.
at CR-O 175.5 Medium Right lane closed, one lane open 4/24/14 8:00 PM to 4/25/14 5:00 AM daily until 5/3/14 WisDOT Construction - I-39 South Segment Design Project ID 1003-10-01.
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***

Site Contributors | Requirements | Policies | Disclaimer | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
This site is best viewed in Internet Explorer 7.0+ or Firefox 3.0+ with cookies and JavaScript enabled.
Thu Apr 24 09:31:28 CDT 2014