I-39 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
at 1 mile North of Rockton Rd 2.5 to 2.2 Medium Various lanes closed 4/9/14 7:00 PM to 9/30/14 11:59 PM IDOT Alternating driving and passing lane closure
County Road Ab (-0.3 miles) to US-12 (-0.6 miles) 144.7 to 142.7 Medium Right lane closed, one lane open 7/30/14 7:00 PM to 7/31/14 5:00 AM WisDOT Construction - ILLINOIS STATE LINE - MADISON | SIGGELKOW RD BRDGS B-13-138, 727 | I 39 | DANE Stage 2 NB Outside Widening
County Road Ab (-0.3 miles) to US-12 (-0.6 miles) 144.7 to 142.7 Medium Right lane closed, one lane open 7/31/14 7:00 PM to 8/1/14 5:00 AM WisDOT Construction - ILLINOIS STATE LINE - MADISON | SIGGELKOW RD BRDGS B-13-138, 727 | I 39 | DANE Stage 2 NB Outside Widening
Cottage Grove Rd (-0.1 miles) to Milwaukee St (+0.1 miles) 139.5 to 138.3 Medium Right lane closed, two lanes open 7/30/14 8:00 PM to 7/31/14 5:30 AM daily until 8/1/14 WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
Exit to SB US-151 136.4 Medium Various lanes closed 3/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will use the northbound USH 151 exit, proceed north to CTH C interchange, exit at the CTH C ramp, make a left-turn to go over the bridge and turn left at the southbound USH 151 on-ramp and proceed south on USH 151.
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Left lane closed, two lanes open 6/9/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-51 to WI-19 (+0.2 miles) 132.4 to 130.7 Major Right two lanes closed, one lane open 7/30/14 8:00 PM to 7/31/14 6:00 AM daily until 8/1/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

I-39 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-V to Cuba Valley Rd 126.7 to 128.8 Medium Right lane closed, two lanes open 7/30/14 8:00 PM to 7/31/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
Cuba Valley Rd to WI-19 128.8 to 131.0 Major Right two lanes closed, one lane open 7/31/14 8:00 PM to 8/1/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
at Hoepker Rd 133.6 Medium Right lane closed, two lanes open 7/31/14 9:00 PM to 8/1/14 5:00 AM WisDOT Construction - MADISON - PORTAGE | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Left lane closed, two lanes open 6/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
Exit to SB US-151 135.3 Major All lanes and shoulders closed 4/1/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will exit at the USH 51 inerchange , proceed south on USH 51 to the STH 30 interchange, turn left onto STH 30, proceed east to IH 39 north, take IH39 north to the USH 151 exit and proceed north on USH 151.
at County Road T (-0.2 miles) 137.7 Medium Left lane closed, two lanes open 7/30/14 7:00 AM to 7/31/14 7:00 AM daily until 8/1/14 WisDOT Maintenance - Bridge Repair
WI-106 to Richardson Springs Rd 159.2 to 163.4 Medium Right lane closed, one lane open 7/30/14 8:00 PM to 7/31/14 6:00 AM daily until 8/1/14 WisDOT Construction - Detour: No posted detour
Newburg Rd (+0.2 miles) to Mill Rd (+0.3 miles) 17.2 to 18.0 Medium Right lane closed, one to three lanes open 7/31/14 12:01 AM to 5:00 AM Illinois Tollway Bridge Reconstruction
Newburg Rd (+0.2 miles) to Mill Rd (+0.3 miles) 17.2 to 18.0 Medium Left lane closed, one to three lanes open 7/31/14 3:00 AM to 5:00 AM Illinois Tollway Bridge Reconstruction
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
Harrison Ave to SW Junction of I-39/US-20 122.2 to 120.1 Medium Various lanes closed 7/28/14 6:15 AM to 8/8/14 11:59 AM IDOT Lane Reduction; One Lane will be closed; Max Width - 16'-0" - Effective July 28, 2014 through August 8, 2014

I-69 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Sauk River 11.7 Medium Various lanes closed 7/20/14 7:00 AM to 8/29/14 5:00 PM MDOT Bridge Repair

I-69 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Sauk River 11.7 Medium Various lanes closed 7/20/14 7:00 AM to 8/29/14 5:00 PM MDOT Bridge Repair

I-80 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-55 to Harlem Ave (IL-43) 126.2 to 148.8 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation, Mainteance
Entrance from Richards St 133.1 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Entrance from SB I-355 140.4 Minor Right lane closed, one lane open 4/17/14 7:00 AM to 8/29/14 11:59 PM Illinois Tollway Guardrail Replacement; Pavement Repair; Sewer Work; ***Long Term Closure***
Exit to NB Harlem Ave 148.9 Minor Partial closure 3/31/14 12:00 AM to 11/30/14 11:59 PM IDOT ***Long Term Closure***
Bishop Ford Fwy (IL-394) to IN State Line Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
at Clay St (+0.1 miles) 13.0 Medium Right lane closed, four lanes open 7/18/14 6:46 PM to 8/23/14 10:09 AM InDOT Construction work
at Clay St (+0.1 miles) 13.0 Medium Right lane closed, four lanes open 7/24/14 10:09 AM to 8/23/14 10:09 AM InDOT Construction work
at IN-51 15.0 Medium Various lanes closed 7/23/14 8:19 PM to 7/31/14 10:08 AM InDOT Construction work
at IN-51 15.0 Medium Various lanes closed 7/24/14 10:08 AM to 7/31/14 10:08 AM InDOT Construction work
Exit to EB I-80 15.3 Minor All lanes and shoulders open 6/30/14 7:00 AM to 8/8/14 11:59 PM Indiana Toll Road **Long Term Closure**; 80/94 to ITR 14' Width restriction only.
US-12 to Meridian Rd (+0.1 miles) 0.0 to 30.0 Medium Various lanes closed 7/29/14 8:00 PM to 7/31/14 6:00 AM Indiana Toll Road Painting; Moving Operation
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road **Long Term Closure**; 11' width & 130,000 lb weight restriction until 10/15/14.
Timothy Rd to Timothy Rd (+0.3 miles) 62.8 to 63.1 Medium Right lane closed, one lane open 7/31/14 8:00 PM to 8/1/14 2:00 PM Indiana Toll Road Mill and Fill
at Ramp to US-31 (Nimitz Pkwy) 72.0 Medium Right lane closed, one lane open 7/31/14 8:00 PM to 8/1/14 2:00 PM Indiana Toll Road Mill and Fill
575 (-0.1 miles) to 750 (+0.3 miles) 126.4 to 129.7 Medium Left lane closed, one lane open 7/30/14 6:00 AM to 7/31/14 3:00 PM Indiana Toll Road Deep Patching

I-80 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-31 (-0.8 miles) to Olive Rd (+0.3 miles) 72.9 to 71.4 Medium Right lane closed, one lane open 7/30/14 6:00 PM to 7/31/14 6:00 AM Indiana Toll Road Mill and Fill
Meridian Rd (-0.1 miles) to US-12 (+0.1 miles) 30.0 to 0.0 Medium Various lanes closed 7/29/14 8:00 PM to 7/31/14 6:00 AM Indiana Toll Road Painting; Moving Operation
Meridian Rd (-0.1 miles) to Old Hobart Rd 30.0 to 20.0 Medium Right lane closed, one lane open 7/31/14 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Boom Mowing
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road **Long Term Closure**; 11' width & 130,000 lb weight restriction until 10/15/14.
Exit to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 8/8/14 11:59 PM Indiana Toll Road Lake Station exit ramp closed for reconstruction until Spring 2015.
Entrance from EB I-90 15.3 Major All lanes and shoulders closed 6/5/14 6:00 AM to 11/26/14 11:59 PM Indiana Toll Road *** Long Term Closure ***; Ramp Closed through 11/26/14; Detour in place; Demo Rebuild
IN State Line to Bishop Ford Fwy (IL-394) Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
IL-394 (+0.2 miles) to IL-1 (-0.5 miles) 0.1 to 2.2 Medium Right lane closed, three or four lanes open 7/30/14 8:00 PM to 7/31/14 5:00 AM Illinois Tollway Bridge Repairs
Harlem Ave (IL-43) to I-55 148.8 to 126.2 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit to Richards St 133.4 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Cleveland Rd to I-88 7.0 to 3.4 Medium Various lanes closed 7/21/14 7:00 AM to 7/31/14 11:59 PM IDOT Max Width - 16'-0" - Effective 07/21/2014 through 0731/2014

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-V to Cuba Valley Rd 126.7 to 128.8 Medium Right lane closed, two lanes open 7/30/14 8:00 PM to 7/31/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
Cuba Valley Rd to WI-19 128.8 to 131.0 Major Right two lanes closed, one lane open 7/31/14 8:00 PM to 8/1/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
at Hoepker Rd 133.6 Medium Right lane closed, two lanes open 7/31/14 9:00 PM to 8/1/14 5:00 AM WisDOT Construction - MADISON - PORTAGE | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Left lane closed, two lanes open 6/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
Exit to SB US-151 135.3 Major All lanes and shoulders closed 4/1/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will exit at the USH 51 inerchange , proceed south on USH 51 to the STH 30 interchange, turn left onto STH 30, proceed east to IH 39 north, take IH39 north to the USH 151 exit and proceed north on USH 151.
at County Road T (-0.2 miles) 137.7 Medium Left lane closed, two lanes open 7/30/14 7:00 AM to 7/31/14 7:00 AM daily until 8/1/14 WisDOT Maintenance - Bridge Repair
WI-106 to Richardson Springs Rd 159.2 to 163.4 Medium Right lane closed, one lane open 7/30/14 8:00 PM to 7/31/14 6:00 AM daily until 8/1/14 WisDOT Construction - Detour: No posted detour
Newburg Rd (+0.2 miles) to Mill Rd (+0.3 miles) 17.2 to 18.0 Medium Right lane closed, one to three lanes open 7/31/14 12:01 AM to 5:00 AM Illinois Tollway Bridge Reconstruction
Newburg Rd (+0.2 miles) to Mill Rd (+0.3 miles) 17.2 to 18.0 Medium Left lane closed, one to three lanes open 7/31/14 3:00 AM to 5:00 AM Illinois Tollway Bridge Reconstruction
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
US-20 Bypass (+0.2 miles) to Town Hall Rd (+0.2 miles) 20.0 to 22.0 Medium Right lane closed, one lane open 7/31/14 7:00 AM to 2:00 PM Illinois Tollway Pavement Widening and Reconstruction
Getty Rd to Marengo-Hampshire Plaza 37.5 to 38.2 Medium Left lane and both shoulders closed, two or three lanes open 11/15/13 12:00 AM to 10/31/14 12:00 AM Illinois Tollway Pavement Widening; ***Long Term Closure***
at Marengo-Hampshire Plaza 37.8 Medium Various lanes closed 5/7/14 7:00 AM to 10/31/14 11:59 PM Illinois Tollway Left ORT Lane Closed; ***Long Term Closure***
Getty Rd (+0.3 miles) to Getty Rd (+0.4 miles) 37.8 to 37.9 None All lanes and shoulders open 4/9/14 9:00 AM to 10/31/14 11:59 PM Illinois Tollway Rdwy Widening and Reconst.
IL-31 to Duncan Ave 54.6 to 55.8 None All lanes shifted 7/15/14 12:00 AM to 9/21/14 11:59 PM Illinois Tollway All Lanes Shifted Right; *** Long Term Closure ***
Entrance from Beverly Rd 58.6 Minor Partial closure 4/28/14 9:00 AM to 3/31/15 11:59 PM Illinois Tollway Right Side Ramp Closed; *** Long Term Closure***
Meacham Rd (-0.4 miles) to Meacham Rd (+0.1 miles) 67.0 to 67.5 Medium Left three lanes closed, one lane open 7/30/14 11:00 PM to 7/31/14 5:00 AM Illinois Tollway Bride Reconstruction, Retaining Walls, Roadway Reconstruction; Four (4) 15 min EB FULL CLOSURES with Trooper Assistance at 12:00 AM, 1:00 AM, 1:30 AM & 2:00 AM
Ramp from EB I-90 to NB IL-53 68.2 Medium Various lanes closed 7/17/14 12:00 AM to 8/8/14 11:59 PM Illinois Tollway IPO Lanes Closed; *** Long Term Closure ***
I-290 (+0.3 miles) to IL-58 (-0.5 miles) 68.5 to 68.9 Medium Right lane closed, two or three lanes open 7/14/14 12:00 AM to 8/11/14 12:00 AM Illinois Tollway *** Long Term Closure ***
Mt Prospect Rd (-0.5 miles) to Mt Prospect Rd (-0.2 miles) 74.2 to 74.5 Medium Left two lanes closed, one lane open 7/31/14 12:01 AM to 2:30 AM Illinois Tollway Bridge Demolition and Grading
Mt Prospect Rd (-0.5 miles) to Mt Prospect Rd (-0.2 miles) 74.2 to 74.5 Medium Right two lanes closed, one lane open 7/31/14 2:30 AM to 5:00 AM Illinois Tollway Bridge Demolition and Grading
Entrance from SB Lee St Minor All lanes shifted 6/24/14 7:00 AM to 8/8/14 11:59 PM Illinois Tollway All Lanes Shifted Right; *** Long Term Closure
Entrance from NB Lee St 76.4 Minor Various lanes closed 6/24/14 7:00 AM to 8/8/14 11:59 PM Illinois Tollway All Lanes Shifted Right on ramp from NB Lee St; Right Turn Lane closed on ramp from SB Lee St; *** Long Term Closure ***
at River Rd Plaza 78.5 to 78.6 Medium Various lanes closed 7/31/14 1:00 AM to 5:00 AM Illinois Tollway All ORT Lanes Closed
Exit to SB Cumberland Ave (IL-171) Minor Partial closure 4/3/14 7:00 AM to 8/29/14 11:59 PM IDOT Maximum Width 9' 6" *** Long Term Closure ***
Harlem Ave (IL-43) to Addison St 81.2 to 45.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Montrose Ave to Ogden Ave 43.5 to 50.1 Medium Right lane and right shoulder closed, three or four lanes open with partial ramp closures 7/31/14 10:00 AM to 1:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane and left shoulder closed, three or four lanes open with partial ramp closures 7/31/14 10:00 AM to 1:00 PM IDOT Moving Operation
North Ave (IL-64) to Eisenhower Expy (I-290) 48.9 to 51.6 Minor Right shoulder closed, all lanes open 7/31/14 9:00 AM to 3:00 PM IDOT
Chicago Ave to Grand Ave 50.0 to 50.5 Medium Left lane and left shoulder closed, three or four lanes open 7/30/14 9:00 PM to 7/31/14 5:00 AM IDOT
Exit to EB Ohio St 50.1 Minor Partial closure 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** Left and Right Shoulders Closed
Ogden Ave to Grand Ave 50.1 to 50.5 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent shoulder closure for remainder of project between EB I-90 entrance to EB Ohio and WB Ohio entrance to EB I-90.
at Ohio Feeder 50.3 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Entrance from WB Ohio St 50.1 Minor Partial closure 9/6/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Washington Blvd to Eisenhower Expy (I-290) 51.1 to 51.6 Medium Right lane and right shoulder closed, two to four lanes open 7/31/14 1:00 AM to 5:00 AM IDOT
Exit to WB I-290 51.4 Major All lanes and shoulders closed 7/31/14 1:00 AM to 5:00 AM IDOT Detour to Taylor and return
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit to Taylor St 51.8 Medium All lanes and shoulders closed 7/30/14 10:00 PM to 7/31/14 5:00 AM IDOT Detour to 18th St and return
Entrance from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/21/14 12:00 AM to 9/1/14 11:59 PM IDOT *** Long Term Closure ***
26th St to 69th St 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
31st St to 69th St 54.6 to 59.5 Minor Right shoulder closed, all lanes open 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
US-12 to Meridian Rd (+0.1 miles) 0.0 to 30.0 Medium Various lanes closed 7/29/14 8:00 PM to 7/31/14 6:00 AM Indiana Toll Road Painting; Moving Operation
112th St to Hoffman St 1.5 to 5.7 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road **Long Term Closure**; 11' width & 130,000 lb weight restriction until 10/15/14.
at 112th St 2.1 Medium Left lane closed, two lanes open 6/30/14 7:00 AM to 8/30/14 11:59 PM Indiana Toll Road **Long Term Closure**; Bridge Reconstruction. Closed through 8/30/14.
at 112th St (+1.3 miles) 2.1 Medium Right lane closed, two lanes open 7/30/14 6:00 PM to 7/31/14 6:00 AM Indiana Toll Road Switch MOT to Stage 3
at Sheffield Ave 3.5 Medium Left lane closed, one lane open 7/30/14 8:00 PM to 7/31/14 2:00 PM,
7/31/14 8:00 PM to 8/1/14 1:00 PM
Indiana Toll Road Joint Sealant Replacement Punchlist
at Taylor Rd (Lake Station) 16.0 Medium Various lanes closed 7/28/14 11:00 PM to 8/1/14 5:00 AM Indiana Toll Road Rolling 20-minute rolling closures of Ramp B for pulling beams & concrete deck slabs
Exit to EB I-94 20.4 Major All lanes and shoulders closed 6/5/14 6:00 AM to 11/26/14 11:59 PM Indiana Toll Road *** Long Term Closure ***; Ramp Closed through 11/26/14; Detour in place; Demo Rebuild
Entrance from EB I-80 20.9 Minor All lanes and shoulders open 6/30/14 7:00 AM to 8/8/14 11:59 PM Indiana Toll Road **Long Term Closure**; 80/94 to ITR 14' Width restriction only.
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road **Long Term Closure**; 11' width & 130,000 lb weight restriction until 10/15/14.
Timothy Rd to Timothy Rd (+0.3 miles) 62.8 to 63.1 Medium Right lane closed, one lane open 7/31/14 8:00 PM to 8/1/14 2:00 PM Indiana Toll Road Mill and Fill
at Ramp to US-31 (Nimitz Pkwy) 72.0 Medium Right lane closed, one lane open 7/31/14 8:00 PM to 8/1/14 2:00 PM Indiana Toll Road Mill and Fill
575 (-0.1 miles) to 750 (+0.3 miles) 126.4 to 129.7 Medium Left lane closed, one lane open 7/30/14 6:00 AM to 7/31/14 3:00 PM Indiana Toll Road Deep Patching

I-90 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 7/30/14 9:00 PM to 7/31/14 5:00 AM IDOT

I-90 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 7/30/14 9:00 PM to 7/31/14 5:00 AM IDOT

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-31 (-0.8 miles) to Olive Rd (+0.3 miles) 72.9 to 71.4 Medium Right lane closed, one lane open 7/30/14 6:00 PM to 7/31/14 6:00 AM Indiana Toll Road Mill and Fill
Meridian Rd (-0.1 miles) to Old Hobart Rd 30.0 to 20.0 Medium Right lane closed, one lane open 7/31/14 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Boom Mowing
Meridian Rd (-0.1 miles) to US-12 (+0.1 miles) 30.0 to 0.0 Medium Various lanes closed 7/29/14 8:00 PM to 7/31/14 6:00 AM Indiana Toll Road Painting; Moving Operation
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road **Long Term Closure**; 11' width & 130,000 lb weight restriction until 10/15/14.
Exit to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 8/8/14 11:59 PM Indiana Toll Road Lake Station exit ramp closed for reconstruction until Spring 2015.
Hoffman St to 112th St 5.7 to 1.5 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road **Long Term Closure**; 11' width & 130,000 lb weight restriction until 10/15/14.
at Sheffield Ave 3.5 Medium Left lane closed, one lane open 7/30/14 6:00 PM to 7/31/14 6:00 AM daily until 8/1/14 Indiana Toll Road Joint Sealant Replacement Punchlist
at 112th St 2.1 Medium Left lane closed, two lanes open 6/30/14 7:00 AM to 8/30/14 11:59 PM Indiana Toll Road **Long Term Closure**; Bridge Reconstruction. Closed through 8/30/14.
at 112th St (-1.3 miles) 2.1 Medium Right lane closed, two lanes open 7/30/14 6:00 PM to 7/31/14 6:00 AM Indiana Toll Road Switch MOT to Stage 3
69th St to 26th St 59.6 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
26th St to Eisenhower Expy (I-290) 54.1 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to North Ave (IL-64) 51.7 to 48.9 Minor Right shoulder closed, all lanes open 7/31/14 9:00 AM to 3:00 PM IDOT
Jackson Blvd to Ogden Ave 51.5 to 50.1 Medium Left lane and left shoulder closed, two to four lanes open 7/30/14 9:00 PM to 7/31/14 5:00 AM IDOT
Entrance from EB Jackson Blvd 51.4 Medium All lanes and shoulders closed 7/30/14 9:00 PM to 7/31/14 5:00 AM IDOT
Grand Ave to Ogden Ave 50.5 to 50.1 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent right shoulder closure for remainder of project starting 6/18/2014. Attenuator and barrier wall to be installed.
at Ohio Feeder 50.4 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane and left shoulder closed, three to five lanes open with partial ramp closures 7/31/14 11:00 AM to 2:00 PM IDOT Moving Operation
Entrance from WB Ohio Feeder 50.3 Minor Partial closure 9/3/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ogden Ave to Montrose Ave 50.1 to 43.5 Medium Right lane and right shoulder closed, three to five lanes open with partial ramp closures 7/31/14 11:00 AM to 2:00 PM IDOT Moving Operation
Addison St to Harlem Ave (IL-43) 45.1 to 81.2 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Canfield Ave to Cumberland Ave (IL-171) 80.3 to 79.7 Minor Right shoulder closed, all lanes open 7/11/14 12:00 AM to 8/29/14 11:59 PM IDOT ***Long Term Closure***
Canfield Ave to East River Rd 80.3 to 79.1 Minor Right shoulder closed, all lanes open 7/31/14 9:00 AM to 3:00 PM IDOT
Cumberland Ave (IL-171) to I-190 79.7 to 79.1 Minor Both shoulders closed, all lanes open 5/18/14 12:00 AM to 11/21/14 11:59 PM IDOT ***Long Term Closure*** Lanes weaved to the right and reassigned. LN3 & LN4 Exit Only to WB I-190.
Soo Line Railroad to IL-72 77.0 to 76.1 Medium Left two lanes closed, two to six lanes open 7/31/14 12:01 AM to 5:00 AM Illinois Tollway Bridge and Ramp Reconstruction; Five (5) 15 minute WB FULL CLOSURES with Trooper Assistance at 12:15 AM, 1:15 AM, 2:15 AM, 3:15 AM & 4:00 AM
Ramp from WB I-90 to Lee St 76.2 Minor All lanes shifted 4/26/14 12:00 AM to 8/8/14 11:59 PM Illinois Tollway All Lanes Shifted Right; *** Long Term Closure ***
IL-72 (-0.1 miles) to IL-72 76.2 to 76.1 Medium Right lane closed, three or four lanes open 4/26/14 12:00 AM to 8/8/14 12:00 AM Illinois Tollway Bridge and Ramp Reconstruction
Mt Prospect Rd (+0.2 miles) to Mt Prospect Rd (+0.5 miles) 74.5 to 74.2 Medium Left two lanes closed, one lane open 7/31/14 12:01 AM to 3:00 AM Illinois Tollway Bridge Demolition and Grading
Mt Prospect Rd (+0.2 miles) to Mt Prospect Rd (+0.5 miles) 74.5 to 74.2 Medium Right two lanes closed, one lane open 7/31/14 3:00 AM to 5:00 AM Illinois Tollway Bridge Demolition and Grading
Exit to Roselle Rd 66.0 Minor Various lanes closed 6/17/14 5:00 AM to 10/31/14 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed
Duncan Ave to IL-31 55.8 to 54.6 None All lanes shifted 7/11/14 12:00 AM to 9/21/14 11:59 PM Illinois Tollway All Lanes Shifted Right; *** Long Term Closure ***
Bypass US-20 to Kishwaukee River 19.8 to 18.4 Medium Left lane and both shoulders closed, one lane shifted 4/2/14 9:00 AM to 10/31/14 11:59 PM Illinois Tollway Pavement Widening; ***Long Term Closure***
Kishwaukee River to Mill Rd 18.4 to 17.7 Medium Left lane and both shoulders closed, one lane open 4/1/14 7:00 AM to 10/31/14 11:59 PM Illinois Tollway Pavement Widening; *** Long Term Closure ***
US-20 Bypass (+1.5 miles) to Mill Rd (+0.1 miles) 18.3 to 17.5 Medium Right lane closed, one lane open 7/31/14 12:01 AM to 5:00 AM Illinois Tollway Bridge Reconstruction
US-20 Bypass (+1.5 miles) to Mill Rd (+0.1 miles) 18.3 to 17.5 Medium All lanes and shoulders open 7/31/14 5:00 AM to 7:00 AM Illinois Tollway Bridge Reconstruction
US-20 Bypass (+1.5 miles) to Mill Rd (+0.1 miles) 18.3 to 17.5 Medium Left lane closed, one lane open 7/31/14 7:00 PM to 8/1/14 12:01 AM Illinois Tollway Bridge Reconstruction
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
at 1 mile North of Rockton Rd 2.5 to 2.2 Medium Various lanes closed 4/9/14 7:00 PM to 9/30/14 11:59 PM IDOT Alternating driving and passing lane closure
County Road Ab (-0.3 miles) to US-12 (-0.6 miles) 144.7 to 142.7 Medium Right lane closed, one lane open 7/30/14 7:00 PM to 7/31/14 5:00 AM WisDOT Construction - ILLINOIS STATE LINE - MADISON | SIGGELKOW RD BRDGS B-13-138, 727 | I 39 | DANE Stage 2 NB Outside Widening
County Road Ab (-0.3 miles) to US-12 (-0.6 miles) 144.7 to 142.7 Medium Right lane closed, one lane open 7/31/14 7:00 PM to 8/1/14 5:00 AM WisDOT Construction - ILLINOIS STATE LINE - MADISON | SIGGELKOW RD BRDGS B-13-138, 727 | I 39 | DANE Stage 2 NB Outside Widening
Cottage Grove Rd (-0.1 miles) to Milwaukee St (+0.1 miles) 139.5 to 138.3 Medium Right lane closed, two lanes open 7/30/14 8:00 PM to 7/31/14 5:30 AM daily until 8/1/14 WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
Exit to SB US-151 136.4 Medium Various lanes closed 3/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will use the northbound USH 151 exit, proceed north to CTH C interchange, exit at the CTH C ramp, make a left-turn to go over the bridge and turn left at the southbound USH 151 on-ramp and proceed south on USH 151.
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Left lane closed, two lanes open 6/9/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-51 to WI-19 (+0.2 miles) 132.4 to 130.7 Major Right two lanes closed, one lane open 7/30/14 8:00 PM to 7/31/14 6:00 AM daily until 8/1/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-V to Cuba Valley Rd 126.7 to 128.8 Medium Right lane closed, two lanes open 7/30/14 8:00 PM to 7/31/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
Cuba Valley Rd to WI-19 128.8 to 131.0 Major Right two lanes closed, one lane open 7/31/14 8:00 PM to 8/1/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
at Hoepker Rd 133.6 Medium Right lane closed, two lanes open 7/31/14 9:00 PM to 8/1/14 5:00 AM WisDOT Construction - MADISON - PORTAGE | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Left lane closed, two lanes open 6/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
Exit to SB US-151 135.3 Major All lanes and shoulders closed 4/1/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will exit at the USH 51 inerchange , proceed south on USH 51 to the STH 30 interchange, turn left onto STH 30, proceed east to IH 39 north, take IH39 north to the USH 151 exit and proceed north on USH 151.
Curtis Rd to WI-100 (+0.1 miles) 302.9 to 303.8 Major Right two lanes closed, one lane open 7/30/14 9:30 PM to 7/31/14 5:30 AM WisDOT Construction - ZOO IC, UPRR & STH 100 BRIDGES OVR I 94 | TERMINAL, CONST/BRIDGE REPLACEMENT | STH 100 | MILWAUKEE
at WI-100/108th St 303.7 Major All lanes and shoulders closed 12/9/13 12:00 AM to 11/24/14 11:45 PM WisDOT Construction - Detour: Follow Signed Detour
Entrance from WI-100 303.5 Medium All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Northbound HWY 100 continue north on HWY 100, right/east on Bluemound Rd, right/south on 76th St, left/east on Kearney St, continue to IH 94 EB on ramp; Southbound HWY 100 continue to Greenfield Ave, left/east at Greenfield Ave, co
Exit to SB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 7/28/14 12:00 AM to 8/5/14 5:30 AM WisDOT Construction - Detour: No signed detour
General Mitchell Blvd to US-41 307.3 to 307.7 Medium Left lane closed, two lanes open 7/30/14 9:30 PM to 7/31/14 5:30 AM WisDOT Construction - STADIUM FREEWAY | BREWER STADIUM - STATE ST | USH 41 | MILWAUKEE
Entrance from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 7/28/14 12:00 AM to 8/5/14 5:30 AM WisDOT Construction - Detour: No signed detour
Exit to NWB US-41 307.6 Major All lanes and shoulders closed 7/27/14 9:00 PM to 8/5/14 5:30 AM WisDOT Construction - Detour: Exit right/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit to WB Becher St 312.2 Medium All lanes and shoulders closed 7/30/14 7:30 PM to 7/31/14 5:00 AM daily until 8/1/14 WisDOT Construction - Detour: Use alt route (Lapham exit or Holt exit)
Entrance from EB Becher St 312.2 Medium All lanes and shoulders closed 7/30/14 8:30 PM to 7/31/14 5:30 AM daily until 8/1/14 WisDOT Construction - Detour: Use alt route (Holt entrance ramp)
Drexel Ave (-0.4 miles) to Drexel Ave (+0.4 miles) 320.2 to 321.0 Medium Right lane closed, two lanes open 7/30/14 9:30 PM to 7/31/14 5:30 AM WisDOT Construction - N-S FREEWAY | S RACINE CO LINE - RAWSON AVE | I 94 | RACINE
Exit to NWB WI-100 322.4 Major All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: IH 94 EB exit at Moorland Rd. If wanting to go SB on HWY 100 go right/south on Moorland Rd, left/east on Greenfield Ave, continue on Greenfield Ave to HWY 100. If wanting to go NB on HWY 100 go left/north on Moorland Rd, right/east on Bluemond Rd, continue on Bluemound to HWY 100.
CR-G (+1.0 miles) to CR-K (-0.3 miles) 328.4 to 329.1 Major Left two lanes closed, one lane open 7/30/14 9:30 PM to 7/31/14 5:30 AM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
CR-K (-0.3 miles) to WI-20 (+0.2 miles) 329.1 to 333.3 Major All lanes and shoulders closed 7/30/14 10:00 PM to 7/31/14 5:00 AM WisDOT Construction - Detour: Use I-94 EAST (SB) to County K to West Frontage Road to WIS 20 to I-94 EAST (SB)
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 11/25/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to Spring St (+0.2 miles) 331.9 to 332.7 Major Left two lanes closed, one lane open 7/30/14 9:30 PM to 7/31/14 5:30 AM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
12th St to WI-158 339.0 to 342.4 Medium Various lanes closed 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Exit to WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: Off-Ramp from 94E to 71st St to 125th Ave to STH 50.
Wisconsin-Illinois State Line to Edens Expy 0.0 to 52.7 Minor Right lane closed, two to five lanes open 7/30/14 11:00 PM to 7/31/14 4:30 AM Illinois Tollway Pavement Testing:: Moving Operation
Russell Rd (+0.4 miles) to IL-173 (+0.4 miles) 0.9 to 2.8 Minor Various lanes closed 4/8/13 7:00 AM to 8/29/14 3:00 PM Lake County Interstate Reconstruction
Exit to WB IL-132 8.1 Major All lanes and shoulders closed 7/30/14 8:00 AM to 9/3/14 5:00 PM Illinois Tollway *** Long Term Closure ***
Exit to WB IL-132 8.1 Major All lanes and shoulders closed 7/11/14 5:00 AM to 9/3/14 11:59 PM Illinois Tollway *** Long Term Closure ***
Ramp from EB IL-132 to EB I-94 8.4 to 8.5 Minor Partial closure 7/14/14 5:00 AM to 7/31/14 11:59 PM Illinois Tollway Left Side of Ramp Closed; *** Long Term Closure ***
Clavey Rd to Willow Rd 25.3 to 32.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 7/31/14 10:00 AM to 2:00 PM IDOT Moving Operation
0.5 miles south of Willow Rd to Winnetka Ave 33.4 to 33.4 Minor Right shoulder closed, all lanes open 5/3/14 7:00 AM to 8/31/14 11:59 PM IDOT ***Long Term Closure***
Winnetka Ave to Kennedy Junction 33.4 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 7/31/14 10:00 AM to 2:00 PM IDOT Moving Operation
Harlem Ave (IL-43) to Addison St 81.2 to 45.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Montrose Ave to Ogden Ave 43.5 to 50.1 Medium Right lane and right shoulder closed, three or four lanes open with partial ramp closures 7/31/14 10:00 AM to 1:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane and left shoulder closed, three or four lanes open with partial ramp closures 7/31/14 10:00 AM to 1:00 PM IDOT Moving Operation
North Ave (IL-64) to Eisenhower Expy (I-290) 48.9 to 51.6 Minor Right shoulder closed, all lanes open 7/31/14 9:00 AM to 3:00 PM IDOT
Chicago Ave to Grand Ave 50.0 to 50.5 Medium Left lane and left shoulder closed, three or four lanes open 7/30/14 9:00 PM to 7/31/14 5:00 AM IDOT
Exit to EB Ohio St 50.1 Minor Partial closure 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** Left and Right Shoulders Closed
Ogden Ave to Grand Ave 50.1 to 50.5 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent shoulder closure for remainder of project between EB I-90 entrance to EB Ohio and WB Ohio entrance to EB I-90.
at Ohio Feeder 50.3 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Entrance from WB Ohio St 50.1 Minor Partial closure 9/6/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Washington Blvd to Eisenhower Expy (I-290) 51.1 to 51.6 Medium Right lane and right shoulder closed, two to four lanes open 7/31/14 1:00 AM to 5:00 AM IDOT
Exit to WB I-290 51.4 Major All lanes and shoulders closed 7/31/14 1:00 AM to 5:00 AM IDOT Detour to Taylor and return
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit to Taylor St 51.8 Medium All lanes and shoulders closed 7/30/14 10:00 PM to 7/31/14 5:00 AM IDOT Detour to 18th St and return
Entrance from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/21/14 12:00 AM to 9/1/14 11:59 PM IDOT *** Long Term Closure ***
26th St to 69th St 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
31st St to 69th St 54.6 to 59.5 Minor Right shoulder closed, all lanes open 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
69th St to 95th St (US-12/20) 59.5 to 62.8 Minor Right shoulder closed, all lanes open 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
69th St to I-57 / Bishop Ford (I-94) 59.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Dan Ryan Expy (I-94) / I-57 to I-80 62.9 to 74.4 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit to 103rd St 64.2 Medium All lanes and shoulders closed 4/5/14 8:00 AM to 9/15/14 11:59 PM IDOT All traffic will detour to I-94 SB & 111th street overpass. *** Long Term Closure ***
Exit to NB Stony Island Feeder 64.2 Medium All lanes and shoulders closed 4/5/14 8:00 AM to 9/15/14 11:59 PM IDOT All traffic for NB Stony Island will detour to I-94 & 111th street overpass. *** Long Term Closure ***
111th St to 0.5 miles south of 130th St 66.1 to 69.0 Minor Right shoulder closed, all lanes open 7/31/14 9:00 AM to 3:00 PM IDOT
Exit to EB 115th St 66.4 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Exit to WB 115th St 66.4 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Entrance from WB 115th St 66.4 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Entrance from EB 115th St 66.4 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Exit to WB 130th St 68.4 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Entrance from WB 130th St 68.6 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Exit to EB 130th St 68.6 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Entrance from EB 130th St 68.7 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Bishop Ford Fwy (IL-394) to IN State Line Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
at Clay St (+0.1 miles) 13.0 Medium Right lane closed, four lanes open 7/18/14 6:46 PM to 8/23/14 10:09 AM InDOT Construction work
at Clay St (+0.1 miles) 13.0 Medium Right lane closed, four lanes open 7/24/14 10:09 AM to 8/23/14 10:09 AM InDOT Construction work
at IN-51 15.0 Medium Various lanes closed 7/23/14 8:19 PM to 7/31/14 10:08 AM InDOT Construction work
at IN-51 15.0 Medium Various lanes closed 7/24/14 10:08 AM to 7/31/14 10:08 AM InDOT Construction work
at Glenlord Rd (-0.3 miles) 24.3 Medium Various lanes closed 5/27/14 7:00 AM to 8/29/14 5:00 PM MDOT Rebuild Hickory Creek bridge.

I-94 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Montrose Ave to Ogden Ave Major All lanes and shoulders closed 7/30/14 9:00 PM to 7/31/14 5:00 AM IDOT

I-94 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 7/30/14 9:00 PM to 7/31/14 5:00 AM IDOT

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Glenlord Rd (+0.3 miles) 24.3 Medium Various lanes closed 5/27/14 7:00 AM to 8/29/14 5:00 PM MDOT Rebuild Hickory Creek bridge.
Exit to EB I-80 Minor All lanes and shoulders open 6/30/14 7:00 AM to 8/8/14 11:59 PM Indiana Toll Road **Long Term Closure**; 80/94 to ITR 14' Width restriction only.
Entrance from WB I-80 15.3 Major All lanes and shoulders closed 6/30/14 7:00 AM to 8/8/14 11:59 PM Indiana Toll Road Lake Station exit ramp closed for reconstruction until Spring 2015.
Entrance from EB I-90 15.3 Major All lanes and shoulders closed 6/5/14 6:00 AM to 11/26/14 11:59 PM Indiana Toll Road *** Long Term Closure ***; Ramp Closed through 11/26/14; Detour in place; Demo Rebuild
IN State Line to Bishop Ford Fwy (IL-394) Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
I-80 to Dan Ryan Expy (I-94) / I-57 74.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit to EB 130th St 68.8 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Entrance from EB 130th St 68.7 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Exit to WB 130th St 68.6 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
130th St to 0.5 miles north of 111th St 68.6 to 65.7 Minor Right shoulder closed, all lanes open 7/31/14 9:00 AM to 3:00 PM IDOT
Entrance from WB 130th St 68.8 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
Exit to 115th St 66.8 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
at 115th St 66.6 Medium Right lane and right shoulder closed, two lanes open 7/31/14 9:00 AM to 2:00 PM IDOT
Entrance from 115th St 66.8 Minor Partial closure 7/31/14 9:00 AM to 3:00 PM IDOT
NB Stony Island Feeder Exit to SB Stony Island Feeder Entrance 65.7 to 64.4 Medium Left lane and left shoulder closed, one lane open 7/30/14 11:00 PM to 7/31/14 5:00 AM IDOT Weave Right to Left
I-57 / Bishop Ford (I-94) to 69th St 62.9 to 59.6 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
69th St to 26th St 59.6 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
26th St to Eisenhower Expy (I-290) 54.1 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to North Ave (IL-64) 51.7 to 48.9 Minor Right shoulder closed, all lanes open 7/31/14 9:00 AM to 3:00 PM IDOT
Jackson Blvd to Ogden Ave 51.5 to 50.1 Medium Left lane and left shoulder closed, two to four lanes open 7/30/14 9:00 PM to 7/31/14 5:00 AM IDOT
Entrance from EB Jackson Blvd 51.4 Medium All lanes and shoulders closed 7/30/14 9:00 PM to 7/31/14 5:00 AM IDOT
Grand Ave to Ogden Ave 50.5 to 50.1 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent right shoulder closure for remainder of project starting 6/18/2014. Attenuator and barrier wall to be installed.
at Ohio Feeder 50.4 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane and left shoulder closed, three to five lanes open with partial ramp closures 7/31/14 11:00 AM to 2:00 PM IDOT Moving Operation
Entrance from WB Ohio Feeder 50.3 Minor Partial closure 9/3/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ogden Ave to Montrose Ave 50.1 to 43.5 Medium Right lane and right shoulder closed, three to five lanes open with partial ramp closures 7/31/14 11:00 AM to 2:00 PM IDOT Moving Operation
Addison St to Harlem Ave (IL-43) 45.1 to 81.2 Minor Both shoulders closed, all lanes open with partial ramp closures 7/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Kennedy Junction to Winnetka Ave 43.5 to 33.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 7/31/14 9:30 AM to 1:30 PM IDOT Moving Operation
Winnetka Ave to Willow Rd 33.5 to 32.9 Minor Right shoulder closed, all lanes open 5/3/14 7:00 AM to 8/31/14 11:59 PM IDOT *** Long Term Closure ***
Willow Rd to Clavey Rd 32.9 to 25.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 7/31/14 9:30 AM to 1:30 PM IDOT Moving Operation
Edens Expy to Wisconsin-Illinois State Line 52.7 to 0.0 Minor Right lane closed, two to five lanes open 7/30/14 11:00 PM to 7/31/14 4:30 AM Illinois Tollway Pavement Testing:: Moving Operation
IL-173 (-0.4 miles) to Russell Rd (-0.4 miles) 2.8 to 0.9 Minor Various lanes closed 4/8/13 7:00 AM to 8/29/14 3:00 PM Lake County Interstate Reconstruction
Entrance from WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: 118th Ave to 71st St to 94W On-Ramp.
60th St to 12th St 342.7 to 339.2 Major Left two lanes closed, one lane open 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Old Highway 11 to WI-20 (-0.6 miles) 334.9 to 333.6 Major Right two lanes closed, one lane open 7/30/14 9:30 PM to 7/31/14 5:30 AM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Old Highway 11 to 50th Rd 334.9 to 331.9 Major Right two lanes closed, one lane open 7/30/14 9:30 PM to 7/31/14 5:30 AM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
WI-20 (-0.6 miles) to CR-K (+0.2 miles) 333.6 to 329.2 Major All lanes and shoulders closed 7/30/14 10:00 PM to 7/31/14 5:00 AM WisDOT Construction - Detour: Use I-94 WEST (NB) to WIS 20 to East Frontage Road to County K to I-94 WEST (NB)
Entrance from WB WI-20 333.7 Major All lanes and shoulders closed 5/15/14 12:00 AM to 8/6/14 11:45 PM WisDOT Construction - Detour: Use STH 20 - East Frontage Road - CTH K - I-94 WEST (NB)
7 Mile Rd (+1.0 miles) to 7 Mile Rd (+1.1 miles) 324.9 to 324.8 Medium Right lane closed, two lanes open 7/31/14 9:00 AM to 2:00 PM WisDOT Maintenance - Pavement repair
Puetz Rd (+0.3 miles) to Rawson Ave 321.3 to 319.7 Medium Right lane closed, two lanes open 7/30/14 9:30 PM to 7/31/14 5:30 AM WisDOT Construction - N-S FREEWAY | S RACINE CO LINE - RAWSON AVE | I 94 | RACINE
Rawson Ave to College Ave (-0.2 miles) 319.7 to 318.9 Major Right two lanes closed, one lane open 7/30/14 9:30 PM to 7/31/14 5:30 AM WisDOT Construction - N-S FREEWAY | S RACINE CO LINE - RAWSON AVE | I 94 | RACINE
Entrance from WB Rawson Ave 319.3 Medium All lanes and shoulders closed 7/30/14 9:00 PM to 7/31/14 6:00 AM WisDOT Construction - Detour: Use College Ave.
Exit to NB Plankinton Ave 311.1 Medium All lanes and shoulders closed 7/30/14 10:00 PM to 7/31/14 5:00 AM WisDOT Construction - Detour: Detour to Jackson/Van Buren Exit.
Exit to EB Michigan St 311.1 Medium All lanes and shoulders closed 7/31/14 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt. Route
44th St (-0.2 miles) to 44th St 308.0 to 307.8 Medium Right lane closed, three lanes open 7/31/14 10:00 AM to 2:00 PM WisDOT Maintenance - Guard Rail repair
64th St to 68th St 306.6 to 306.3 Medium Left lane closed, two lanes open 7/30/14 9:30 PM to 7/31/14 5:30 AM WisDOT Construction - Soil boring for Zoo Interchange design team; I-94 Westbound, left lane closure between S. 64th St and S. 68th St.
Entrance from SB US-45 304.2 Major All lanes and shoulders closed 7/30/14 11:00 PM to 7/31/14 4:30 AM WisDOT Construction - Detour: US45 SB to Wisconsin to Bluemound to Moorland to I-94 WB
I-894 (+0.2 miles) to Curtis Rd 304.1 to 302.9 Major All lanes and shoulders closed 7/30/14 11:00 PM to 7/31/14 4:30 AM WisDOT Construction - Detour: I-94 WB to US45 NB to Bluemound to Moorland to I-94 WB
Exit to NB WI-100 303.8 Major All lanes and shoulders closed 12/6/13 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, continue to HWY 100; Westbound IH 94 take US 45 north system ramp, Exit at Bluemound Rd, right/west on Bluemound Rd, continue to HWY 100;
Exit to SB WI-100 303.7 Major All lanes and shoulders closed 12/6/13 12:00 AM to 8/14/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, left/south on HWY 100; Westbound IH 94 exit at 84th St, left/south on 84th St, right/west on Greenfield Ave, continue to HWY 100;
Entrance from WI-100 303.4 Minor All lanes and shoulders closed 4/27/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: STH 100 NB Traffic: Left/West on Bluemound Rd, Left/South on Moorland Rd, Right/West at IH-94 WB Entrance Ramp; STH 100 SB Traffic: Right/West on Greenfield Ave, Right/North on Moorland Rd, Left/West at IH-94 WB Entrance Ramp;
Exit to SB US-151 136.4 Medium Various lanes closed 3/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will use the northbound USH 151 exit, proceed north to CTH C interchange, exit at the CTH C ramp, make a left-turn to go over the bridge and turn left at the southbound USH 151 on-ramp and proceed south on USH 151.
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Left lane closed, two lanes open 6/9/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-51 to WI-19 (+0.2 miles) 132.4 to 130.7 Major Right two lanes closed, one lane open 7/30/14 8:00 PM to 7/31/14 6:00 AM daily until 8/1/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Thu Jul 31 02:22:34 CDT 2014