Construction Report
Select Location
  
Updated: 9/23/14 5:02 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-39 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
at 1 mile North of Rockton Rd 2.5 to 2.2 Medium Various lanes closed 4/9/14 7:00 PM to 9/30/14 11:59 PM IDOT Alternating driving and passing lane closure
Lake Drive Rd to WI-106 (-0.7 miles) 161.6 to 159.9 Medium Left lane closed, one lane open 9/23/14 9:00 PM to 9/24/14 6:00 AM WisDOT Construction - Soil Boring in the median of I-39/90.
Cottage Grove Rd (+0.5 miles) to Milwaukee St (-0.1 miles) 138.9 to 138.4 Medium Left lane closed, two lanes open 9/22/14 8:00 PM to 9/23/14 5:30 AM daily until 9/24/14 WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
Portage Rd (+0.1 miles) to Hoepker Rd (-0.2 miles) 134.3 to 133.7 Medium Right lane closed, two lanes open 9/22/14 8:00 PM to 9/23/14 6:00 AM daily until 9/26/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
CR-V (+0.4 miles) to County Road U (-0.1 miles) 111.6 to 111.3 Medium Right lane closed, two lanes open 9/23/14 9:00 AM to 3:00 PM WisDOT Maintenance - Cleaning bridge decks/inlets.
at County Road U 111.2 Medium Right lane closed, two lanes open 9/23/14 6:00 AM to 9:00 AM WisDOT Maintenance - Concrete repair

I-39 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road U (+0.1 miles) to CR-V (-0.4 miles) 111.3 to 111.6 Medium Right lane closed, two lanes open 9/23/14 9:00 AM to 3:00 PM WisDOT Maintenance - Cleaning bridge decks/inlets.
Hoepker Rd (-0.4 miles) to Hoepker Rd (+0.2 miles) 133.2 to 133.8 Medium Right lane closed, two lanes open 9/22/14 8:00 PM to 9/23/14 6:00 AM daily until 9/26/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
WI-30 to Milwaukee St (+0.1 miles) 138.0 to 138.4 Medium Right lane closed, two lanes open 9/22/14 8:00 PM to 9/23/14 5:30 AM daily until 9/24/14 WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
WI-106 to Ellendale Rd 159.2 to 163.6 Medium Right lane closed, one lane open 9/23/14 8:00 PM to 9/24/14 6:00 AM WisDOT Construction - Detour: No posted detour
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***

I-80 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kendall County Line to Lincoln Hwy (US-30) 122.6 to 137.7 Medium Left lane and left shoulder closed, one or two lanes open 9/23/14 9:30 AM to 1:30 PM IDOT Moving Operation
Kendall County Line to Tri-State Twy (I-294) 122.6 to 4.2 Minor Both shoulders closed, all lanes open with partial ramp closures 9/23/14 9:00 AM to 3:00 PM IDOT Moving Operation
Chicago St (US-52/IL-53) to 0.5 miles east of Richards St 132.8 to 133.8 Minor Left shoulder closed, all lanes open 9/23/14 9:00 AM to 3:00 PM IDOT
Exit ramp to NB Harlem Ave 148.9 Minor Partial closure 3/31/14 12:00 AM to 11/30/14 11:59 PM IDOT ***Long Term Closure***
Exit ramp to EB I-80 Minor Right shoulder closed, all lanes open 9/23/14 9:00 AM to 3:00 PM IDOT
Exit ramp to EB I-80 15.3 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/5/14 11:59 PM Indiana Toll Road 80/94 to ITR 14' Width restriction only; **Long Term**
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction until 10/15/14 **Long Term**
County Road 550 E (-0.6 miles) to Forrester Rd (-0.3 miles) 35.0 to 43.0 Medium Right lane closed, one lane open 9/23/14 12:00 PM to 3:00 PM Indiana Toll Road Moving Operation; Paint Striping
Exit ramp to NB IN-19 91.6 Medium Various lanes closed 9/22/14 12:00 PM to 9/23/14 6:00 AM Indiana Toll Road Entry and Exit ramps from Toll Plaza to SR 19 / Cassopolis. One lane will remain open on each ramp.
Exit ramp to NB IN-19 91.6 Medium Various lanes closed 9/22/14 12:00 PM to 9/23/14 6:00 AM Indiana Toll Road Entry and Exit ramps from Toll Plaza to SR 19 / Cassopolis. One lane will remain open on each ramp.
Entrance ramp from SEB Northpointe Blvd 92.0 Medium Various lanes closed 9/22/14 12:00 PM to 9/23/14 6:00 AM Indiana Toll Road Entry and Exit ramps from Toll Plaza to SR 19 / Cassopolis. One lane will remain open on each ramp.

I-80 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 1050 (-0.3 miles) to County Road 1050 (+0.4 miles) 132.0 to 131.3 Medium Right lane closed, one lane open 9/15/14 7:00 AM to 9/24/14 4:00 PM Indiana Toll Road Bridge Deck Repair; Overnight, Continuous; **Long Term Closure**
County Road 9 (-0.3 miles) to County Road 7 (+0.2 miles) 92.4 to 90.8 Medium Left lane closed, one lane open 9/23/14 12:00 PM to 9/24/14 6:00 AM Indiana Toll Road Mill and Fill
Exit ramp to NB IN-19 92.2 Medium Various lanes closed 9/22/14 12:00 PM to 9/23/14 6:00 AM Indiana Toll Road Entry and Exit ramps from Toll Plaza to SR 19 / Cassopolis. One lane will remain open on each ramp.
Entrance ramp from SEB Northpointe Blvd 91.8 Medium Various lanes closed 9/22/14 12:00 PM to 9/23/14 6:00 AM Indiana Toll Road Entry and Exit ramps from Toll Plaza to SR 19 / Cassopolis. One lane will remain open on each ramp.
Exit ramp to WB Nimtz Pky 72.7 Major All lanes and shoulders closed 9/23/14 7:00 AM to 8:00 PM Indiana Toll Road Milling and Paving
Entrance ramp from NB US-31 72.4 Major All lanes and shoulders closed 9/23/14 7:00 AM to 8:00 PM Indiana Toll Road Milling and Paving
County Road 150 N to Swanson Rd (-0.2 miles) 45.0 to 23.0 Medium Right lane closed, one lane open 9/23/14 9:00 AM to 12:00 PM Indiana Toll Road Paint Striping; Moving Operation
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction until 10/15/14 **Long Term**
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/31/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015.
Entrance ramp from EB I-90 15.3 Major All lanes and shoulders closed 6/5/14 6:00 AM to 11/26/14 11:59 PM Indiana Toll Road *** Long Term Closure ***; Ramp to I-94 closed through 11/26/14; Ramp Demo/Rebuild.; Detour in place.
at Torrence Ave (IL-83) Minor Right shoulder closed, all lanes open 9/23/14 9:00 AM to 1:30 PM IDOT
Tri-State Twy (I-294) to Kendall County Line 4.5 to 122.6 Minor Both shoulders closed, all lanes open with partial ramp closures 9/23/14 9:00 AM to 3:00 PM IDOT Moving Operation
Lincoln Hwy (US-30) to Kendall County Line 137.7 to 122.6 Medium Left lane and left shoulder closed, one or two lanes open 9/23/14 9:30 AM to 1:30 PM IDOT Moving Operation
0.5 miles east of Richards St to Chicago St (US-52/IL-53) 133.8 to 132.8 Minor Left shoulder closed, all lanes open 9/23/14 9:00 AM to 3:00 PM IDOT

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road U (+0.1 miles) to CR-V (-0.4 miles) 111.3 to 111.6 Medium Right lane closed, two lanes open 9/23/14 9:00 AM to 3:00 PM WisDOT Maintenance - Cleaning bridge decks/inlets.
Hoepker Rd (-0.4 miles) to Hoepker Rd (+0.2 miles) 133.2 to 133.8 Medium Right lane closed, two lanes open 9/22/14 8:00 PM to 9/23/14 6:00 AM daily until 9/26/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
WI-30 to Milwaukee St (+0.1 miles) 138.0 to 138.4 Medium Right lane closed, two lanes open 9/22/14 8:00 PM to 9/23/14 5:30 AM daily until 9/24/14 WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
WI-106 to Ellendale Rd 159.2 to 163.6 Medium Right lane closed, one lane open 9/23/14 8:00 PM to 9/24/14 6:00 AM WisDOT Construction - Detour: No posted detour
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
at Marengo-Hampshire Plaza 37.8 Medium Various lanes closed 5/7/14 7:00 AM to 10/31/14 11:59 PM Illinois Tollway Left ORT Lane Closed; ***Long Term Closure***
at Marengo-Hampshire Plaza 37.8 to 37.9 Minor Various lanes closed 4/9/14 9:00 AM to 10/31/14 11:59 PM Illinois Tollway Rdwy Widening and Reconst; ***Long Term Closure***; Left ORT Lane Closed
Harmony Rd (-0.3 miles) to Harmony Rd (+0.8 miles) 40.5 to 41.6 Medium Left lane closed, one lane open 9/23/14 6:00 PM to 7:00 PM Illinois Tollway Rdwy Widening and Reconst.
Beverly Rd to Canadian National RR 57.8 to 58.6 Minor All lanes shifted 4/24/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway ***Long Term Closure***; All Lanes Shifted Left.
Entrance ramp from Beverly Rd 58.6 Minor Partial closure 4/28/14 9:00 AM to 3/31/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; *** Long Term Closure***
Entrance ramp from NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/6/14 12:00 AM to 10/30/14 11:59 PM Illinois Tollway **Long Term Closure**; Detour Posted; Pavement Reconstruction.
Wolf Rd (-0.2 miles) to IL-72 75.1 to 76.1 Medium Left lane closed, two lanes open 9/23/14 5:00 PM to 7:00 PM Illinois Tollway Bridge and Ramp Reconstruction
Entrance ramp from SB Lee St Minor All lanes shifted 8/18/14 12:00 AM to 10/17/14 11:59 PM Illinois Tollway All Lanes Shifted Left; *** Long Term ***
Entrance ramp from NB Lee St 76.4 Minor Partial closure 4/26/14 6:00 AM to 9/30/14 11:59 PM Illinois Tollway Ramp Open - Right Turn Lane Closed; *** Long Term Closure ***
Exit ramp to O'Hare West (O'Hare West Plaza) Minor Various lanes closed 7/30/14 12:00 AM to 9/26/14 11:59 PM Illinois Tollway Right Cash Lane Closed; Ramp Reconstruction; **Long Term Closure**
Cumberland Ave (IL-171) to Canfield Ave 79.6 to 80.3 Minor Right shoulder closed, all lanes open 8/18/14 12:00 AM to 10/31/14 11:59 PM IDOT *** Long Term Closure ***
Harlem Ave (IL-43) to Eisenhower Expy (I-290) 81.2 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 9/23/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to EB Ohio St 50.1 Minor Partial closure 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** Left and Right Shoulders Closed
Ogden Ave to Grand Ave 50.1 to 50.5 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***; Right shoulder closed between EB I-90 entrance to EB Ohio and WB Ohio entrance to EB I-90 for remainder of project.
at Ohio Feeder 50.3 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from WB Ohio St 50.1 Minor Partial closure 9/6/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT 11' Width; *** Long Term Closure ***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane closed, up to two lanes open 6/21/14 12:00 AM to 12/1/14 11:59 PM IDOT *** Long Term Closure ***; 11' Width
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT *** Long Term Closure ***; 11' Width
43rd St to Marquette Rd (67th St) 56.1 to 59.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 9:00 AM to 2:00 PM IDOT Moving Operation
112th St to Hoffman St 1.5 to 5.7 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction until 10/15/14; **Long Term**
at 112th St 2.1 Medium Left lane closed, two lanes open 6/30/14 7:00 AM to 10/5/14 11:59 PM Indiana Toll Road **Long Term Closure**; Bridge Reconstruction.
Knights Of Columbus Dr (-0.2 miles) to US-20 (+0.4 miles) 6.3 to 7.4 Medium Right lane closed, one lane open 9/23/14 6:00 AM to 2:00 PM Indiana Toll Road Guardrail Repair
Exit ramp to EB I-94 20.4 Major All lanes and shoulders closed 6/5/14 6:00 AM to 11/26/14 11:59 PM Indiana Toll Road *** Long Term Closure ***; Ramp to I-94 closed through 11/26/14; Ramp Demo/Rebuild.; Detour in place.
Entrance ramp from EB I-80 20.9 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/5/14 11:59 PM Indiana Toll Road 80/94 to ITR 14' Width restriction only; **Long Term**
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction until 10/15/14 **Long Term**
County Road 550 E (-0.6 miles) to Forrester Rd (-0.3 miles) 35.0 to 43.0 Medium Right lane closed, one lane open 9/23/14 12:00 PM to 3:00 PM Indiana Toll Road Moving Operation; Paint Striping
Exit ramp to NB IN-19 91.6 Medium Various lanes closed 9/22/14 12:00 PM to 9/23/14 6:00 AM Indiana Toll Road Entry and Exit ramps from Toll Plaza to SR 19 / Cassopolis. One lane will remain open on each ramp.
Exit ramp to NB IN-19 91.6 Medium Various lanes closed 9/22/14 12:00 PM to 9/23/14 6:00 AM Indiana Toll Road Entry and Exit ramps from Toll Plaza to SR 19 / Cassopolis. One lane will remain open on each ramp.
Entrance ramp from SEB Northpointe Blvd 92.0 Medium Various lanes closed 9/22/14 12:00 PM to 9/23/14 6:00 AM Indiana Toll Road Entry and Exit ramps from Toll Plaza to SR 19 / Cassopolis. One lane will remain open on each ramp.

I-90 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
43rd St to 69th St 56.2 to 59.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 8:30 AM to 1:30 PM IDOT Moving Operation

I-90 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 43rd St 59.5 to 56.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 10:00 AM to 3:00 PM IDOT Moving Operation

I-90 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 9/23/14 11:30 AM to 1:30 PM IDOT

I-90 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 9/23/14 11:30 AM to 1:30 PM IDOT

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 1050 (-0.3 miles) to County Road 1050 (+0.4 miles) 132.0 to 131.3 Medium Right lane closed, one lane open 9/15/14 7:00 AM to 9/24/14 4:00 PM Indiana Toll Road Bridge Deck Repair; Overnight, Continuous; **Long Term Closure**
County Road 9 (-0.3 miles) to County Road 7 (+0.2 miles) 92.4 to 90.8 Medium Left lane closed, one lane open 9/23/14 12:00 PM to 9/24/14 6:00 AM Indiana Toll Road Mill and Fill
Exit ramp to NB IN-19 92.2 Medium Various lanes closed 9/22/14 12:00 PM to 9/23/14 6:00 AM Indiana Toll Road Entry and Exit ramps from Toll Plaza to SR 19 / Cassopolis. One lane will remain open on each ramp.
Entrance ramp from SEB Northpointe Blvd 91.8 Medium Various lanes closed 9/22/14 12:00 PM to 9/23/14 6:00 AM Indiana Toll Road Entry and Exit ramps from Toll Plaza to SR 19 / Cassopolis. One lane will remain open on each ramp.
Exit ramp to WB Nimtz Pky 72.7 Major All lanes and shoulders closed 9/23/14 7:00 AM to 8:00 PM Indiana Toll Road Milling and Paving
Entrance ramp from NB US-31 72.4 Major All lanes and shoulders closed 9/23/14 7:00 AM to 8:00 PM Indiana Toll Road Milling and Paving
County Road 150 N to Swanson Rd (-0.2 miles) 45.0 to 23.0 Medium Right lane closed, one lane open 9/23/14 9:00 AM to 12:00 PM Indiana Toll Road Paint Striping; Moving Operation
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction until 10/15/14 **Long Term**
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/31/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015.
Hoffman St to 112th St 5.7 to 1.5 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction until 10/15/14; **Long Term**
at Columbia Ave 5.3 Medium Left lane closed, one lane open 9/23/14 10:00 AM to 9/24/14 5:00 AM Indiana Toll Road Joint Replacement
at 112th St 2.1 Medium Left lane closed, two lanes open 6/30/14 7:00 AM to 10/5/14 11:59 PM Indiana Toll Road **Long Term Closure**; Bridge Reconstruction.
Marquette Rd (67th St) to 43rd St 59.3 to 56.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 10:00 AM to 3:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to Harlem Ave (IL-43) 51.7 to 81.2 Minor Both shoulders closed, all lanes open with partial ramp closures 9/23/14 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB Eisenhower/I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT *** Long Term Closure ***; 11 ' Width
Exit ramp to EB Ohio Feeder 50.5 Minor Partial closure 9/10/14 12:00 AM to 10/31/14 11:59 PM IDOT
Grand Ave to Ogden Ave 50.5 to 50.1 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent right shoulder closure for remainder of project. Attenuator and barrier wall to be installed.
at Ohio Feeder 50.4 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from WB Ohio Feeder 50.3 Minor Partial closure 9/3/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Canfield Ave to Cumberland Ave (IL-171) 80.3 to 79.7 Minor Right shoulder closed, all lanes open 8/18/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Cumberland Ave (IL-171) to I-190 79.7 to 79.1 Minor All lanes shifted and both shoulders closed 5/18/14 12:00 AM to 11/21/14 11:59 PM IDOT ***Long Term Closure*** Lanes weaved to the right and reassigned. Lane 3 & Lane 4 exit only to WB I-190.
Ramp from WB I-90 (Jane Addams Memorial Tollway) to Des Plaines Oasis 76.1 Minor All lanes shifted 8/26/14 12:01 AM to 10/17/14 11:59 PM Illinois Tollway All Lanes Shifted Left; **Long Term Closure**
Exit ramp to NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/6/14 12:00 AM to 10/30/14 11:59 PM Illinois Tollway **Long Term Closure**; Detour Posted; Pavement Reconstruction.
Exit ramp to Arlington Heights Rd 71.1 Minor Right lane closed, one lane open 8/7/14 7:00 PM to 10/8/14 11:59 PM Illinois Tollway *** Long Term Closure ***; Retaining wall construction
at Arlington Heights Plaza 70.8 to 70.7 Medium Various lanes closed 9/6/14 12:00 AM to 10/3/14 11:59 PM Illinois Tollway Center Cash Lane Closed; **Long Term Closure**; Toll Plaza Maintenance.
IL-58 (+0.6 miles) to I-290 (-0.3 miles) 68.9 to 68.5 Medium Right lane closed, two or three lanes open 9/23/14 6:00 AM to 4:00 PM Illinois Tollway Retaining Wall, Noise Wall and Draining Improvements; (Right lane of CD road to I-290 / IL-53 closed)
Exit ramp to Roselle Rd 66.0 Minor Partial closure 6/17/14 5:00 AM to 10/31/14 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed
Exit ramp to SB Barrington Rd 62.8 Medium Various lanes closed 8/4/14 12:00 AM to 9/26/14 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed.
Exit ramp to NB Barrington Rd 62.8 Medium Various lanes closed 8/4/14 12:00 AM to 9/26/14 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed.
Bypass US-20 to Kishwaukee River 19.8 to 18.4 Medium Left lane and both shoulders closed, one lane shifted 4/2/14 9:00 AM to 10/31/14 11:59 PM Illinois Tollway Pavement Widening; ***Long Term Closure***
Kishwaukee River to Mill Rd 18.4 to 17.7 Medium Left lane and both shoulders closed, one lane open 4/1/14 7:00 AM to 10/31/14 11:59 PM Illinois Tollway Pavement Widening; *** Long Term Closure ***
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
at 1 mile North of Rockton Rd 2.5 to 2.2 Medium Various lanes closed 4/9/14 7:00 PM to 9/30/14 11:59 PM IDOT Alternating driving and passing lane closure
Lake Drive Rd to WI-106 (-0.7 miles) 161.6 to 159.9 Medium Left lane closed, one lane open 9/23/14 9:00 PM to 9/24/14 6:00 AM WisDOT Construction - Soil Boring in the median of I-39/90.
Cottage Grove Rd (+0.5 miles) to Milwaukee St (-0.1 miles) 138.9 to 138.4 Medium Left lane closed, two lanes open 9/22/14 8:00 PM to 9/23/14 5:30 AM daily until 9/24/14 WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
Portage Rd (+0.1 miles) to Hoepker Rd (-0.2 miles) 134.3 to 133.7 Medium Right lane closed, two lanes open 9/22/14 8:00 PM to 9/23/14 6:00 AM daily until 9/26/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
CR-V (+0.4 miles) to County Road U (-0.1 miles) 111.6 to 111.3 Medium Right lane closed, two lanes open 9/23/14 9:00 AM to 3:00 PM WisDOT Maintenance - Cleaning bridge decks/inlets.
at County Road U 111.2 Medium Right lane closed, two lanes open 9/23/14 6:00 AM to 9:00 AM WisDOT Maintenance - Concrete repair

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road U (+0.1 miles) to CR-V (-0.4 miles) 111.3 to 111.6 Medium Right lane closed, two lanes open 9/23/14 9:00 AM to 3:00 PM WisDOT Maintenance - Cleaning bridge decks/inlets.
Hoepker Rd (-0.4 miles) to Hoepker Rd (+0.2 miles) 133.2 to 133.8 Medium Right lane closed, two lanes open 9/22/14 8:00 PM to 9/23/14 6:00 AM daily until 9/26/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
Moorland Rd to WI-100 (+0.1 miles) 300.5 to 303.8 Major All lanes and shoulders closed 9/23/14 11:00 PM to 9/24/14 4:30 AM WisDOT Construction - Detour: I-94 EB to Moorland to Greenfield to I-894/US45 NB to I-94 EB
Entrance ramp from SB Moorland Rd 300.6 Medium All lanes and shoulders closed 9/23/14 11:00 PM to 9/24/14 4:30 AM WisDOT Construction - Detour: SB Moorland Traffic: Continue to Greenfield to I-894/US45 NB to I-94 EB; NB Moorland Traffic: Continue to Bluemound to 68th St to IH-94 EB;
Entrance ramp from SB Moorland Rd 300.6 Minor Various lanes closed 9/23/14 9:00 AM to 3:00 PM WisDOT Maintenance - Deck sealing
Underwood Pky (-0.1 miles) to WI-100 (+0.1 miles) 302.6 to 303.8 Major Right two lanes closed, one lane open 9/22/14 9:30 PM to 9/23/14 5:30 AM WisDOT Construction - ZOO IC, UPRR & STH 100 BRIDGES OVR I 94 | TERMINAL, CONST/BRIDGE REPLACEMENT | STH 100 | MILWAUKEE
at WI-100/108th St 303.7 Major All lanes and shoulders closed 12/9/13 12:00 AM to 11/24/14 11:45 PM WisDOT **Long Term Closure** Construction - Detour: Follow Signed Detour
Entrance ramp from WI-100 303.5 Medium All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Northbound HWY 100 continue north on HWY 100, right/east on Bluemound Rd, right/south on 76th St, left/east on Kearney St, continue to IH 94 EB on ramp; Southbound HWY 100 continue to Greenfield Ave, left/east at Greenfield Ave, co
Exit ramp to NB US-45 304.3 Major All lanes and shoulders closed 9/23/14 8:00 PM to 9/24/14 5:00 AM daily until 9/26/14 WisDOT Construction - Detour: I-94 EB to 84th to Bluemound to USH 45 NB
Exit ramp to SB Hawley Rd 306.7 Minor Right lane closed, two lanes open 9/23/14 9:00 AM to 2:00 PM WisDOT Maintenance - Tree removal
Entrance ramp from NB 68th St 306.5 Minor Various lanes closed 9/23/14 6:00 AM to 6:00 PM daily until 9/26/14 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
Exit ramp to SB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 9/22/14 8:30 PM to 9/23/14 6:00 AM WisDOT Construction - Detour: No signed detour
Exit ramp to SB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 9/23/14 8:30 PM to 9/24/14 6:00 AM WisDOT Construction - Detour: No signed detour
Entrance ramp from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 9/22/14 8:30 PM to 9/23/14 6:00 AM WisDOT Construction - Detour: No signed detour
Entrance ramp from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 9/23/14 8:30 PM to 9/24/14 6:00 AM WisDOT Construction - Detour: No signed detour
Exit ramp to NWB US-41 307.6 Major All lanes and shoulders closed 9/22/14 9:00 PM to 9/23/14 5:30 AM WisDOT Construction - Detour: Exit right/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit ramp to NWB US-41 307.6 Major All lanes and shoulders closed 9/23/14 9:00 PM to 9/24/14 5:30 AM WisDOT Construction - Detour: Exit right/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Entrance ramp from SB US-41 308.0 Major All lanes and shoulders closed 9/22/14 9:00 PM to 9/23/14 5:30 AM WisDOT Construction - Detour: Continue straight to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward I-94 EB.
Exit ramp to WB Becher St 312.2 Medium All lanes and shoulders closed 9/22/14 9:00 PM to 9/23/14 5:30 AM WisDOT Construction - Detour: Use alt route (Lapham Blvd)
Exit ramp to NWB WI-100 322.4 Major All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: IH 94 EB exit at Moorland Rd. If wanting to go SB on HWY 100 go right/south on Moorland Rd, left/east on Greenfield Ave, continue on Greenfield Ave to HWY 100. If wanting to go NB on HWY 100 go left/north on Moorland Rd, right/east on Bluemond Rd, continue on Bluemound to HWY 100.
CR-K (-0.3 miles) to CR-K 329.1 to 329.4 Medium Left lane closed, two lanes open 9/23/14 9:00 AM to 2:00 PM WisDOT Maintenance - Inlet Repair
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 11/25/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
12th St to WI-158 339.0 to 342.4 Medium Various lanes closed 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Exit ramp to WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: Off-Ramp from 94E to 71st St to 125th Ave to STH 50.
Wadsworth Rd (-1.1 miles) to Wadsworth Rd (+0.4 miles) 4.0 to 5.5 Major Left two lanes closed, two to four lanes open 9/23/14 9:00 AM to 2:00 PM Illinois Tollway
Exit ramp to WB IL-132 8.1 Major All lanes and shoulders closed 9/12/14 12:00 AM to 9/24/14 11:59 PM Illinois Tollway ***Long Term Closure***; Ramp Reconstruction
Entrance ramp from EB IL-132 8.1 Minor Partial closure 9/2/14 10:04 PM to 10/15/14 11:59 PM Illinois Tollway Left Side of Ramp Closed; **Long Term Closure**
Clavey Rd to Willow Rd 25.3 to 32.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 10:00 AM to 2:00 PM IDOT Moving Operation
Park Ave West to Kennedy Junction 23.1 to 43.5 Minor Both shoulders closed, all lanes open 9/23/14 9:00 AM to 3:00 PM IDOT Moving Operation
Winnetka Ave to Kennedy Junction 33.4 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 10:00 AM to 2:00 PM IDOT Moving Operation
Harlem Ave (IL-43) to Eisenhower Expy (I-290) 81.2 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 9/23/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to EB Ohio St 50.1 Minor Partial closure 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** Left and Right Shoulders Closed
Ogden Ave to Grand Ave 50.1 to 50.5 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***; Right shoulder closed between EB I-90 entrance to EB Ohio and WB Ohio entrance to EB I-90 for remainder of project.
at Ohio Feeder 50.3 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from WB Ohio St 50.1 Minor Partial closure 9/6/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT 11' Width; *** Long Term Closure ***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane closed, up to two lanes open 6/21/14 12:00 AM to 12/1/14 11:59 PM IDOT *** Long Term Closure ***; 11' Width
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT *** Long Term Closure ***; 11' Width
43rd St to Marquette Rd (67th St) 56.1 to 59.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 9:00 AM to 2:00 PM IDOT Moving Operation
0.5 miles north of 95th St (US-12/20) to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor Right shoulder closed, all lanes open 8/20/14 12:00 AM to 11/25/14 11:59 PM IDOT ***Long Term Closure***
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor Both shoulders closed, all lanes open 9/9/14 12:00 AM to 11/21/14 11:59 PM IDOT ***Long-term Closure***
Dan Ryan Expy (I-94) / I-57 to NB Stony Island Feeder Exit 62.9 to 64.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 9:00 AM to 11:59 AM IDOT Moving Operation
Exit ramp to 103rd St 64.2 Medium All lanes and shoulders closed 4/5/14 8:00 AM to 11/17/14 11:59 PM IDOT *** Long Term Closure ***; All traffic will detour to I-94 SB & 111th street overpass.
Exit ramp to NB Stony Island Feeder 64.2 Medium All lanes and shoulders closed 4/5/14 8:00 AM to 11/17/14 11:59 PM IDOT All traffic for NB Stony Island will detour to I-94 & 111th street overpass. *** Long Term Closure ***
SB Stony Island Feeder Entrance to I-80 65.6 to 74.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 8:30 AM to 12:30 PM IDOT Moving Operation
Entrance ramp from NB IL-394 Minor Right shoulder closed, all lanes open 9/23/14 9:00 AM to 3:00 PM IDOT
Exit 40( US-20/ US-35) to the end of I-94 (19 miles east of Chesterton) 40.3 to 0.0 Medium Various lanes closed 9/3/14 6:00 AM to 4/30/15 11:59 PM InDOT Bridge Demolition: Expect lane restrictions and traffic shifts
Three Oaks Rd to I-196 10.3 to 34.1 Medium Various lanes closed 8/18/14 6:00 PM to 10/31/14 11:59 PM MDOT Nighttime lane closures for resurfacing; Watch for workers and equipment.
at St Joseph River 27.5 Medium Various lanes closed 9/11/14 7:00 AM to 9/30/14 6:00 PM MDOT Bridge Work

I-94 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
43rd St to 69th St 56.2 to 59.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 8:30 AM to 1:30 PM IDOT Moving Operation

I-94 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 43rd St 59.5 to 56.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 10:00 AM to 3:00 PM IDOT Moving Operation

I-94 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 9/23/14 11:30 AM to 1:30 PM IDOT

I-94 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 9/23/14 11:30 AM to 1:30 PM IDOT

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-196 to Three Oaks Rd 34.1 to 10.3 Medium All lanes and shoulders open 8/18/14 6:00 PM to 10/31/14 11:59 PM MDOT Nighttime lane closures for resurfacing; Watch for workers and equipment.
at St Joseph River 27.5 Medium Various lanes closed 9/11/14 7:00 AM to 9/30/14 6:00 PM MDOT Bridge Work
Exit ramp to EB I-80 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/5/14 11:59 PM Indiana Toll Road 80/94 to ITR 14' Width restriction only; **Long Term**
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/31/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015.
Entrance ramp from EB I-90 15.3 Major All lanes and shoulders closed 6/5/14 6:00 AM to 11/26/14 11:59 PM Indiana Toll Road *** Long Term Closure ***; Ramp to I-94 closed through 11/26/14; Ramp Demo/Rebuild.; Detour in place.
I-80 to NB Stony Island Feeder Exit 74.5 to 65.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 10:00 AM to 2:00 PM IDOT Moving Operation
NB Stony Island Feeder Exit to Dan Ryan Expy (I-94) / I-57 65.7 to 62.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 10:30 AM to 1:00 PM IDOT Moving Operation
I-57 / Bishop Ford (I-94) to 0.5 miles north of 95th St (US-12/20) 62.9 to 62.3 Minor Right shoulder closed, all lanes open 8/20/14 12:00 AM to 11/25/14 11:59 PM IDOT ***Long Term Closure***
at 91st St 62.3 Minor Left shoulder closed, all lanes open 8/29/14 12:00 AM to 10/3/14 11:59 PM IDOT ***Long Term Closure***
Marquette Rd (67th St) to 43rd St 59.3 to 56.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 10:00 AM to 3:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to Harlem Ave (IL-43) 51.7 to 81.2 Minor Both shoulders closed, all lanes open with partial ramp closures 9/23/14 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB Eisenhower/I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT *** Long Term Closure ***; 11 ' Width
Exit ramp to EB Ohio Feeder 50.5 Minor Partial closure 9/10/14 12:00 AM to 10/31/14 11:59 PM IDOT
Grand Ave to Ogden Ave 50.5 to 50.1 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent right shoulder closure for remainder of project. Attenuator and barrier wall to be installed.
at Ohio Feeder 50.4 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from WB Ohio Feeder 50.3 Minor Partial closure 9/3/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Kennedy Junction to Winnetka Ave 43.5 to 33.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 9:30 AM to 1:30 PM IDOT Moving Operation
Willow Rd to Clavey Rd 32.9 to 25.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 9/23/14 9:30 AM to 1:30 PM IDOT Moving Operation
at Waukegan Plaza 4.9 to 4.8 Medium Various lanes closed 9/23/14 5:00 AM to 6:00 AM Illinois Tollway Moving Operation; All ORT lanes closed
Entrance ramp from WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: 118th Ave to 71st St to 94W On-Ramp.
60th St to 12th St 342.7 to 339.2 Major Left two lanes closed, one lane open 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to NB 9th St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Use Becher St exit and follow 4th St detour signs.
Entrance ramp from EB Walker St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Follow posted detour to EB National Ave and SB 6th St. Use entrance ramp at 6th & Mineral St.
Exit ramp to NWB US-41 307.9 Major All lanes and shoulders closed 9/22/14 9:00 PM to 9/23/14 5:30 AM WisDOT Construction - Detour: Exit left/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit ramp to NWB US-41 307.9 Major All lanes and shoulders closed 9/23/14 9:00 PM to 9/24/14 5:30 AM WisDOT Construction - Detour: Exit left/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Entrance ramp from SB US-41 307.6 Major All lanes and shoulders closed 9/22/14 9:00 PM to 9/23/14 5:30 AM WisDOT Construction - Detour: Continue straight to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward I-94WB
Exit ramp to NB General Mitchell Blvd 307.5 Medium All lanes and shoulders closed 9/22/14 8:30 PM to 9/23/14 6:00 AM WisDOT Construction - Detour: No signed detour
Exit ramp to NB General Mitchell Blvd 307.5 Medium All lanes and shoulders closed 9/23/14 8:30 PM to 9/24/14 6:00 AM WisDOT Construction - Detour: No signed detour
Exit ramp to NB WI-100 303.8 Major All lanes and shoulders closed 12/6/13 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, continue to HWY 100; Westbound IH 94 take US 45 north system ramp, Exit at Bluemound Rd, right/west on Bluemound Rd, continue to HWY 100;
Exit ramp to SEB WI-100 303.7 Major All lanes and shoulders closed 12/6/13 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, left/south on HWY 100; Westbound IH 94 exit at 84th St, left/south on 84th St, right/west on Greenfield Ave, continue to HWY 100;
Entrance ramp from WI-100 303.4 Minor All lanes and shoulders closed 4/27/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: STH 100 NB Traffic: Left/West on Bluemound Rd, Left/South on Moorland Rd, Right/West at IH-94 WB Entrance Ramp; STH 100 SB Traffic: Right/West on Greenfield Ave, Right/North on Moorland Rd, Left/West at IH-94 WB Entrance Ramp;
Portage Rd (+0.1 miles) to Hoepker Rd (-0.2 miles) 134.3 to 133.7 Medium Right lane closed, two lanes open 9/22/14 8:00 PM to 9/23/14 6:00 AM daily until 9/26/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
CR-V (+0.4 miles) to County Road U (-0.1 miles) 111.6 to 111.3 Medium Right lane closed, two lanes open 9/23/14 9:00 AM to 3:00 PM WisDOT Maintenance - Cleaning bridge decks/inlets.
at County Road U 111.2 Medium Right lane closed, two lanes open 9/23/14 6:00 AM to 9:00 AM WisDOT Maintenance - Concrete repair

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Tue Sep 23 05:21:23 CDT 2014