Construction Report
Select Location
  
Updated: 3/5/15 12:15 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Indiana Toll Road (East-West) EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-12 to Virginia St (+0.1 miles) 0.0 to 15.0 Medium Right lane closed, one to three lanes open 3/5/15 7:00 AM to 9:00 AM Indiana Toll Road Emergency Pothole Patching; Moving Operation
County Road 9 (-0.1 miles) to 375 (-0.5 miles) 92.0 to 124.0 Medium Left lane closed, one lane open 3/5/15 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Pothole Patching

Indiana Toll Road (East-West) WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
475 East (+0.5 miles) to 250 125.0 to 123.2 Medium Right lane closed, one lane open 3/5/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair
375 (+0.5 miles) to County Road 9 (+0.1 miles) 124.0 to 92.0 Medium Left lane closed, one lane open 3/5/15 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Pothole Patching
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***
Virginia St (-0.1 miles) to US-12 (+0.1 miles) 15.0 to 0.0 Medium Right lane closed, one to three lanes open 3/5/15 9:00 AM to 3:00 PM Indiana Toll Road Emergency Pothole Patching; Moving Operation

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Thu Mar 05 00:28:00 CST 2015