Construction Report
Select Location
  
Updated: 4/28/17 3:00 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-65 NB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
at 73rd Ave (+0.3 miles) 254.0 Medium Left lane closed, two lanes open 4/27/17 7:23 PM to 4/28/17 6:23 AM InDOT Construction work
I-80 (+0.2 miles) to 15th Ave (-0.1 miles) 260.0 to 261.2 Medium Left lane closed, one lane open 4/24/17 3:35 PM to 5/15/17 3:35 PM InDOT road construction
I-80 (+0.2 miles) to US-20 260.0 to 262.0 Medium Various lanes closed 4/17/17 7:00 AM to 5/15/17 11:59 PM InDOT Resurfacing
Exit ramp to WB 15th Ave 261.3 Medium All lanes and shoulders closed 4/4/17 7:00 AM to 5/15/17 11:59 PM InDOT Resurfacing

I-65 SB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-20 to I-80 (-0.2 miles) 262.0 to 260.0 Medium Various lanes closed 4/17/17 7:00 AM to 5/15/17 11:59 PM InDOT Resurfacing
Entrance ramp from EB 15th Ave 261.1 Medium All lanes and shoulders closed 4/4/17 7:00 AM to 5/15/17 11:59 PM InDOT Resurfacing

I-80 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Ave to I-65 3.3 to 11.7 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/18/17 5:46 AM to 5/18/17 10:11 AM InDOT Construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/26/17 7:50 AM to 5/26/17 7:50 AM InDOT Construction work
Exit ramp to WB I-90 15.3 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Right lane closed, one to five lanes open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Exit ramp to EB I-80 15.3 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-421 (-0.2 miles) to US-421 (+0.2 miles) 38.8 to 39.2 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
US-35 (+0.5 miles) to US-20 (-0.2 miles) 48.0 to 52.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.4 to 58.7 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/8/17 6:00 PM InDOT right lane closed
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.5 to 58.8 Medium Right lane closed, one lane open 3/2/17 7:00 AM to 5/8/17 7:00 PM Indiana Toll Road Bridge Work/Fiber Install : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Juniper Rd (+0.3 miles) 66.9 to 78.0 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Cleveland Rd (-0.1 miles) to Beech Rd (-0.1 miles) 82.0 to 86.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 7 to County Road 11 (-0.1 miles) 91.0 to 93.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Exit ramp to NB IN-19 91.5 Major All lanes and shoulders closed 4/25/17 8:00 AM to 5/8/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at MM 83 (331 South) to US-20 to SR-19 North to I-80/90
County Road 250 E (+0.3 miles) to US-20 (+0.1 miles) 123.3 to 156.0 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-80 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-20 (-0.1 miles) to County Road 250 E (-0.3 miles) 156.0 to 123.3 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (+0.1 miles) to County Road 7 93.0 to 91.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 11 (+0.1 miles) to Beech Rd (+0.1 miles) 93.0 to 86.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 5/1/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Beech Rd (+0.1 miles) to Cleveland Rd (+0.1 miles) 86.0 to 82.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Tamarack Rd (+0.2 miles) 78.0 to 66.9 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.7 to 58.1 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/25/17 6:00 PM InDOT right lane closed
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-20 (+0.2 miles) to US-35 (-0.5 miles) 52.6 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
Holmesville Rd to US-421 (+0.2 miles) 40.0 to 38.8 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to Old Hobart Rd (+0.2 miles) 25.2 to 19.8 Medium Right lane closed, one to 8 lanes open 3/8/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
I-65 to Kennedy Ave 11.7 to 3.3 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at I-65 (+0.2 miles) 11.5 Medium Left lane closed, three lanes open 4/26/17 10:14 AM to 5/26/17 10:14 AM InDOT Construction work

I-90 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Right lane closed, one to five lanes open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from WB I-94 20.9 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-421 (-0.2 miles) to US-421 (+0.2 miles) 38.8 to 39.2 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
US-35 (+0.5 miles) to US-20 (-0.2 miles) 48.0 to 52.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.4 to 58.7 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/8/17 6:00 PM InDOT right lane closed
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.5 to 58.8 Medium Right lane closed, one lane open 3/2/17 7:00 AM to 5/8/17 7:00 PM Indiana Toll Road Bridge Work/Fiber Install : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Juniper Rd (+0.3 miles) 66.9 to 78.0 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Cleveland Rd (-0.1 miles) to Beech Rd (-0.1 miles) 82.0 to 86.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 7 to County Road 11 (-0.1 miles) 91.0 to 93.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Exit ramp to NB IN-19 91.5 Major All lanes and shoulders closed 4/25/17 8:00 AM to 5/8/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at MM 83 (331 South) to US-20 to SR-19 North to I-80/90
County Road 250 E (+0.3 miles) to US-20 (+0.1 miles) 123.3 to 156.0 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-90 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-20 (-0.1 miles) to County Road 250 E (-0.3 miles) 156.0 to 123.3 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (+0.1 miles) to County Road 7 93.0 to 91.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 11 (+0.1 miles) to Beech Rd (+0.1 miles) 93.0 to 86.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 5/1/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Beech Rd (+0.1 miles) to Cleveland Rd (+0.1 miles) 86.0 to 82.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Tamarack Rd (+0.2 miles) 78.0 to 66.9 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.7 to 58.1 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/25/17 6:00 PM InDOT right lane closed
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-20 (+0.2 miles) to US-35 (-0.5 miles) 52.6 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
Holmesville Rd to US-421 (+0.2 miles) 40.0 to 38.8 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to Old Hobart Rd (+0.2 miles) 25.2 to 19.8 Medium Right lane closed, one to 8 lanes open 3/8/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
Entrance ramp from WB I-94 20.4 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
Tennessee St (-0.2 miles) to Bridge St (-0.3 miles) 15.5 to 13.0 Major Left two lanes closed, one lane open 4/27/17 9:00 AM to 4/28/17 5:00 AM,
5/28/17 6:00 AM to 5:00 PM
Indiana Toll Road Joint repair

I-94 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Ave to I-65 3.3 to 11.7 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/18/17 5:46 AM to 5/18/17 10:11 AM InDOT Construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/26/17 7:50 AM to 5/26/17 7:50 AM InDOT Construction work
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 4/26/17 9:15 AM to 5/26/17 9:15 AM InDOT Construction work
I-80 (-0.2 miles) to US-20 (-0.1 miles) 15.8 to 16.3 Medium Various lanes closed 4/17/17 7:00 AM to 11/15/17 11:59 PM InDOT Replace Bridge Deck
at I-80 16.0 Minor Left or right shoulder closed, all lanes open 3/21/17 5:00 AM to 5/26/17 11:00 AM InDOT shoulder closed
Exit ramp to EB US-20 39.4 Major All lanes and shoulders closed 4/3/17 7:00 AM to 7/3/17 11:59 PM InDOT
US-20 (-0.3 miles) to County Road 1000 N (+0.9 miles) 39.4 to 45.6 Minor Left shoulder closed, all lanes open 4/25/17 8:00 PM to 6/22/17 4:29 AM InDOT left shoulder closed

I-94 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 1000 N (-0.9 miles) to US-20 (+0.3 miles) 45.6 to 39.4 Minor Left shoulder closed, all lanes open 4/25/17 8:00 PM to 6/22/17 4:29 AM InDOT left shoulder closed
IN-249 to I-80 (+0.5 miles) 18.8 to 15.5 Medium Left lane closed, two lanes open 4/19/17 11:00 PM to 5/17/17 11:00 PM InDOT construction work
US-20 (+0.1 miles) to I-80 (+0.2 miles) 16.3 to 15.8 Medium Various lanes closed 4/17/17 7:00 AM to 11/15/17 11:59 PM InDOT Replace Bridge Deck
at I-80 16.0 Minor Left or right shoulder closed, all lanes open 3/21/17 5:00 AM to 5/26/17 11:00 AM InDOT shoulder closed
at I-80 (+0.1 miles) 15.8 Medium Various lanes closed 4/26/17 10:17 AM to 5/26/17 10:17 AM InDOT Construction work
Exit ramp to EB I-80 15.8 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
Exit ramp to WB I-90 15.8 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
at I-80 (+0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
I-65 to Kennedy Ave 11.7 to 3.3 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at I-65 (+0.2 miles) 11.5 Medium Left lane closed, three lanes open 4/26/17 10:14 AM to 5/26/17 10:14 AM InDOT Construction work

US-20 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-33 to County Road 17 Medium Various lanes closed 3/20/17 8:00 PM to 10/31/17 5:00 AM InDOT bridge maintenance operations
County Road 18 to County Road 19 Medium Various lanes closed 3/20/17 6:00 AM to 10/31/17 3:00 PM InDOT bridge maintenance operations

US-20 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 19 to County Road 18 Medium Various lanes closed 3/20/17 6:00 AM to 10/31/17 3:00 PM InDOT bridge maintenance operations
County Road 17 to US-33 Medium Various lanes closed 3/20/17 8:00 PM to 10/31/17 5:00 AM InDOT bridge maintenance operations

Borman EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Ave to I-65 3.3 to 11.7 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/18/17 5:46 AM to 5/18/17 10:11 AM InDOT Construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/26/17 7:50 AM to 5/26/17 7:50 AM InDOT Construction work
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 4/26/17 9:15 AM to 5/26/17 9:15 AM InDOT Construction work
I-80 (-0.2 miles) to US-20 (-0.1 miles) 15.8 to 16.3 Medium Various lanes closed 4/17/17 7:00 AM to 11/15/17 11:59 PM InDOT Replace Bridge Deck
at I-80 16.0 Minor Left or right shoulder closed, all lanes open 3/21/17 5:00 AM to 5/26/17 11:00 AM InDOT shoulder closed

Borman WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-20 (+0.1 miles) to I-80 (+0.2 miles) 16.3 to 15.8 Medium Various lanes closed 4/17/17 7:00 AM to 11/15/17 11:59 PM InDOT Replace Bridge Deck
IN-249 to I-80 (+0.5 miles) 18.8 to 15.5 Medium Left lane closed, two lanes open 4/19/17 11:00 PM to 5/17/17 11:00 PM InDOT construction work
at I-80 16.0 Minor Left or right shoulder closed, all lanes open 3/21/17 5:00 AM to 5/26/17 11:00 AM InDOT shoulder closed
at I-80 (+0.1 miles) 15.8 Medium Various lanes closed 4/26/17 10:17 AM to 5/26/17 10:17 AM InDOT Construction work
Exit ramp to EB I-80 15.8 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
Exit ramp to WB I-90 15.8 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
at I-80 (+0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
I-65 to Kennedy Ave 11.7 to 3.3 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at I-65 (+0.2 miles) 11.5 Medium Left lane closed, three lanes open 4/26/17 10:14 AM to 5/26/17 10:14 AM InDOT Construction work

Indiana Toll Road (East-West) EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Right lane closed, one to five lanes open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from WB I-94 20.9 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-421 (-0.2 miles) to US-421 (+0.2 miles) 38.8 to 39.2 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
US-35 (+0.5 miles) to US-20 (-0.2 miles) 48.0 to 52.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.4 to 58.7 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/8/17 6:00 PM InDOT right lane closed
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.5 to 58.8 Medium Right lane closed, one lane open 3/2/17 7:00 AM to 5/8/17 7:00 PM Indiana Toll Road Bridge Work/Fiber Install : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Juniper Rd (+0.3 miles) 66.9 to 78.0 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Cleveland Rd (-0.1 miles) to Beech Rd (-0.1 miles) 82.0 to 86.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 7 to County Road 11 (-0.1 miles) 91.0 to 93.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Exit ramp to NB IN-19 91.5 Major All lanes and shoulders closed 4/25/17 8:00 AM to 5/8/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at MM 83 (331 South) to US-20 to SR-19 North to I-80/90
County Road 250 E (+0.3 miles) to US-20 (+0.1 miles) 123.3 to 156.0 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

Indiana Toll Road (East-West) WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-20 (-0.1 miles) to County Road 250 E (-0.3 miles) 156.0 to 123.3 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (+0.1 miles) to County Road 7 93.0 to 91.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 11 (+0.1 miles) to Beech Rd (+0.1 miles) 93.0 to 86.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 5/1/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Beech Rd (+0.1 miles) to Cleveland Rd (+0.1 miles) 86.0 to 82.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Tamarack Rd (+0.2 miles) 78.0 to 66.9 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.7 to 58.1 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/25/17 6:00 PM InDOT right lane closed
US-20 (+0.2 miles) to US-35 (-0.5 miles) 52.6 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
Holmesville Rd to US-421 (+0.2 miles) 40.0 to 38.8 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to Old Hobart Rd (+0.2 miles) 25.2 to 19.8 Medium Right lane closed, one to 8 lanes open 3/8/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
Entrance ramp from WB I-94 20.4 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
Tennessee St (-0.2 miles) to Bridge St (-0.3 miles) 15.5 to 13.0 Major Left two lanes closed, one lane open 4/27/17 9:00 AM to 4/28/17 5:00 AM,
5/28/17 6:00 AM to 5:00 PM
Indiana Toll Road Joint repair

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Fri Apr 28 2017 03:21:36 CDT