I-65 NB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
at US-30 (-0.5 miles) 252.2 Medium Right lane closed, two lanes open 6/28/16 9:43 PM to 6/29/16 5:43 AM InDOT Construction work
Entrance ramp from EB US-30 252.7 Major All lanes and shoulders closed 6/5/16 7:00 AM to 6/30/16 11:59 PM InDOT Concrete Work; Eastbound U.S. 30 traffic wishing to access I-65 will be detoured north on SR 53/Broadway, east on I-80/94 and back to the I-65.

I-65 SB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB US-30 252.8 Major All lanes and shoulders closed 6/19/16 7:00 AM to 6/30/16 11:59 PM InDOT Removal of concrete and replacing it as part of an I-65 concrete restoration project. Westbound U.S. 30 traffic wishing to access I-65 will be detoured south on SR 53/Broadway, east on U.S. 231 and back to the I-65.

I-69 NB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB I-80 355.7 Minor Various lanes closed 6/29/16 8:00 AM to 8:30 AM Indiana Toll Road Moving Operation; RPM Placement
Entrance ramp from WB I-80 356.0 Minor Various lanes closed 6/29/16 7:00 AM to 8:00 AM Indiana Toll Road Moving Operation; RPM Placement
Entrance ramp from EB I-80 356.0 Minor Various lanes closed 6/29/16 7:00 AM to 8:00 AM Indiana Toll Road Moving Operation; RPM Placement
state line to Mile Marker 22 357.8 to 22.0 Medium Various lanes closed 4/18/16 6:00 PM to 10/28/16 4:00 PM MDOT Expect moving shoulder closures for sign replacement

I-69 SB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
state line to Mile Marker 22 22.0 to 357.8 Medium Various lanes closed 4/18/16 6:00 PM to 10/28/16 4:00 PM MDOT Expect moving shoulder closures for sign replacement
Entrance ramp from WB I-80 355.7 Minor Various lanes closed 6/29/16 7:00 AM to 8:00 AM Indiana Toll Road Moving Operation; RPM Placement
Entrance ramp from EB I-80 355.7 Minor Various lanes closed 6/29/16 7:00 AM to 8:00 AM Indiana Toll Road Moving Operation; RPM Placement

I-80 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 200 W (-0.4 miles) to County Road 200 W (+0.2 miles) 27.5 to 28.1 Medium Right lane closed, one lane open 6/29/16 7:00 AM to 4:00 PM Indiana Toll Road Guardrail Repair
US-421 to US-31 (-0.1 miles) 39.0 to 72.0 None All lanes and shoulders open 5/31/16 8:00 PM to 6/30/16 8:00 PM Indiana Toll Road 10' Width Restriction
IN-39 (-0.3 miles) to County Road 200 E (+0.3 miles) 48.6 to 53.7 Medium Left lane closed, one lane open 5/31/16 8:00 PM to 6/29/16 5:00 AM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
County Road 100 W (-0.5 miles) to County Road 100 W (+0.3 miles) 49.5 to 50.3 Medium Left lane closed, one lane open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Testing
Primrose Rd (+0.5 miles) to Portage Ave 71.0 to 75.0 Minor Right shoulder closed, all lanes open 6/27/16 7:00 AM to 6/30/16 7:00 AM Indiana Toll Road Install Fiber Optic
County Road 21 (-0.5 miles) to County Road 21 (+0.5 miles) 98.0 to 99.0 Medium Left lane closed, one lane open 6/29/16 6:00 AM to 7:00 AM Indiana Toll Road Moving Operation; RPM Placement
County Road 21 (-0.6 miles) to County Road 40 (+0.1 miles) 98.0 to 155.5 Medium Right lane closed, up to one lanes open 6/29/16 7:00 AM to 12:00 PM Indiana Toll Road Moving Operation; RPM Placement
at County Road 475 E (+0.5 miles) 126.0 Minor Right shoulder closed, all lanes open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Foundation Excavation
Exit ramp to NB I-69 143.8 Minor Various lanes closed 6/29/16 8:00 AM to 8:30 AM Indiana Toll Road Moving Operation; RPM Placement
Exit ramp to SB I-69 143.8 Minor Various lanes closed 6/29/16 7:00 AM to 8:00 AM Indiana Toll Road Moving Operation; RPM Placement
Entrance ramp from IN-120 144.2 Minor Various lanes closed 6/29/16 8:30 AM to 9:00 AM Indiana Toll Road Moving Operation; RPM Placement

I-80 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 40 (-0.1 miles) to County Road 21 (+0.6 miles) 155.5 to 98.0 Medium Right lane closed, one or two lanes open 6/29/16 7:00 AM to 12:00 PM Indiana Toll Road Moving Operation; RPM Placement
County Road 40 (-0.1 miles) to County Road 700 E (-0.3 miles) 155.5 to 153.0 Medium Right lane closed, one or two lanes open 6/29/16 11:30 AM to 12:00 PM Indiana Toll Road Moving Operation; RPM Placement
Exit ramp to NB I-69 144.4 Minor Various lanes closed 6/29/16 8:00 AM to 8:30 AM Indiana Toll Road Moving Operation; RPM Placement
Exit ramp to SB I-69 144.4 Minor Various lanes closed 6/29/16 7:00 AM to 8:00 AM Indiana Toll Road Moving Operation; RPM Placement
Entrance ramp from IN-120 144.0 Minor Various lanes closed 6/29/16 8:30 AM to 9:00 AM Indiana Toll Road Moving Operation; RPM Placement
at County Road 475 E (-0.5 miles) 126.0 Minor Right shoulder closed, all lanes open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Foundation Excavation
US-31 (+0.1 miles) to US-421 72.0 to 39.0 None All lanes and shoulders open 5/31/16 8:00 PM to 6/30/16 8:00 PM Indiana Toll Road 10' Width Restriction
County Road 100 W (-0.2 miles) to County Road 100 W (+0.5 miles) 50.3 to 49.5 Medium Left lane closed, one lane open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Testing
County Road 250 E (-0.2 miles) to County Road 200 E 32.7 to 31.9 Medium Left lane closed, one lane open 6/24/16 8:00 PM to 7/1/16 3:00 PM Indiana Toll Road Concrete approach pavement

I-90 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 200 W (-0.4 miles) to County Road 200 W (+0.2 miles) 27.5 to 28.1 Medium Right lane closed, one lane open 6/29/16 7:00 AM to 4:00 PM Indiana Toll Road Guardrail Repair
US-421 to US-31 (-0.1 miles) 39.0 to 72.0 None All lanes and shoulders open 5/31/16 8:00 PM to 6/30/16 8:00 PM Indiana Toll Road 10' Width Restriction
IN-39 (-0.3 miles) to County Road 200 E (+0.3 miles) 48.6 to 53.7 Medium Left lane closed, one lane open 5/31/16 8:00 PM to 6/29/16 5:00 AM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
County Road 100 W (-0.5 miles) to County Road 100 W (+0.3 miles) 49.5 to 50.3 Medium Left lane closed, one lane open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Testing
Primrose Rd (+0.5 miles) to Portage Ave 71.0 to 75.0 Minor Right shoulder closed, all lanes open 6/27/16 7:00 AM to 6/30/16 7:00 AM Indiana Toll Road Install Fiber Optic
County Road 21 (-0.6 miles) to County Road 40 (+0.1 miles) 98.0 to 155.5 Medium Right lane closed, up to one lanes open 6/29/16 7:00 AM to 12:00 PM Indiana Toll Road Moving Operation; RPM Placement
County Road 21 (-0.5 miles) to County Road 21 (+0.5 miles) 98.0 to 99.0 Medium Left lane closed, one lane open 6/29/16 6:00 AM to 7:00 AM Indiana Toll Road Moving Operation; RPM Placement
at County Road 475 E (+0.5 miles) 126.0 Minor Right shoulder closed, all lanes open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Foundation Excavation
Exit ramp to NB I-69 143.8 Minor Various lanes closed 6/29/16 8:00 AM to 8:30 AM Indiana Toll Road Moving Operation; RPM Placement
Exit ramp to SB I-69 143.8 Minor Various lanes closed 6/29/16 7:00 AM to 8:00 AM Indiana Toll Road Moving Operation; RPM Placement
Entrance ramp from IN-120 144.2 Minor Various lanes closed 6/29/16 8:30 AM to 9:00 AM Indiana Toll Road Moving Operation; RPM Placement

I-90 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 40 (-0.1 miles) to County Road 21 (+0.6 miles) 155.5 to 98.0 Medium Right lane closed, one or two lanes open 6/29/16 7:00 AM to 12:00 PM Indiana Toll Road Moving Operation; RPM Placement
County Road 40 (-0.1 miles) to County Road 700 E (-0.3 miles) 155.5 to 153.0 Medium Right lane closed, one or two lanes open 6/29/16 11:30 AM to 12:00 PM Indiana Toll Road Moving Operation; RPM Placement
Exit ramp to NB I-69 144.4 Minor Various lanes closed 6/29/16 8:00 AM to 8:30 AM Indiana Toll Road Moving Operation; RPM Placement
Exit ramp to SB I-69 144.4 Minor Various lanes closed 6/29/16 7:00 AM to 8:00 AM Indiana Toll Road Moving Operation; RPM Placement
Entrance ramp from IN-120 144.0 Minor Various lanes closed 6/29/16 8:30 AM to 9:00 AM Indiana Toll Road Moving Operation; RPM Placement
at County Road 475 E (-0.5 miles) 126.0 Minor Right shoulder closed, all lanes open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Foundation Excavation
US-31 (+0.1 miles) to US-421 72.0 to 39.0 None All lanes and shoulders open 5/31/16 8:00 PM to 6/30/16 8:00 PM Indiana Toll Road 10' Width Restriction
County Road 100 W (-0.2 miles) to County Road 100 W (+0.5 miles) 50.3 to 49.5 Medium Left lane closed, one lane open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Testing
County Road 250 E (-0.2 miles) to County Road 200 E 32.7 to 31.9 Medium Left lane closed, one lane open 6/24/16 8:00 PM to 7/1/16 3:00 PM Indiana Toll Road Concrete approach pavement
Tennessee St (-0.2 miles) to Buchanan St (+0.2 miles) 15.5 to 13.5 Major Left two lanes closed, one or two lanes open 6/29/16 12:00 AM to 5:00 AM Indiana Toll Road Joint Repair

I-94 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
IN-49 (+0.1 miles) to US-20 (+0.1 miles) 26.0 to 40.0 Medium Right lane closed, two or three lanes open 5/14/16 7:00 AM to 7/16/16 12:59 PM InDOT
Exit ramp to SB US-421 34.2 Major All lanes and shoulders closed 5/20/16 7:00 AM to 6/30/16 11:59 PM InDOT
More information
at US-20 39.8 Medium Right lane closed, two lanes open 4/1/16 7:00 AM to 10/31/16 11:59 PM InDOT Bridge Work
Entrance ramp from WB US-20 40.1 Major All lanes and shoulders closed 6/13/16 8:00 PM to 9/17/16 11:59 AM InDOT Resurfacing and restoration. Detour: westbound U.S. 20 will be detoured via the cloverleaf on-ramp to westbound I-94, continue on westbound I-94 to the southbound U.S. 421 interchange (Exit 34A). Continue over the Bridge and take the eastbound I-94 cloverleaf. Continue under the bridge on eastbound I-94 and follow eastbound I-94.
Entrance ramp from WB US-20 / US-35 40.1 Major All lanes and shoulders closed 6/13/16 7:00 AM to 9/17/16 11:59 AM InDOT Detour: westbound U.S. 20 / northbound U.S. 35 will be detoured via the cloverleaf on-ramp to westbound I-94, continue on westbound I-94 until the southbound U.S. 421 interchange (Exit 34A). Continue over the Bridge and take the eastbound I-94 cloverleaf. Continue under the bridge on eastbound I-94 and follow eastbound I-94.

I-94 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB US-20 39.8 Major All lanes and shoulders closed 6/6/16 7:00 AM to 9/17/16 5:00 PM InDOT During the closure, drivers traveling westbound on I-94 wishing to exit east on US 20/35 will be detoured via the westbound US 20/35 Dog Leg Ramp to the US 212 interchange, where they will follow the ramps to gain access to eastbound US 20/35.
Exit ramp to EB US-20 / 35 39.8 Major All lanes and shoulders closed 6/6/16 8:00 PM to 9/17/16 5:00 PM InDOT Detour: Take WB I-94 to WB U.S. 20 Dog Leg Ramp and follow detour signs to the U.S. 212 interchange (Gary). Go under the bridge and take the clover leaf and follow US 20 WB. Continue over the bridge and take the ramp to U.S. 20 EB/ U.S. 35 SB.
at US-20 39.8 Medium Right lane closed, two lanes open 4/1/16 7:00 AM to 10/31/16 11:59 PM InDOT Bridge Work
Exit ramp to NB US-421 34.8 Major All lanes and shoulders closed 5/20/16 7:00 AM to 6/30/16 11:59 PM InDOT
More information
Entrance ramp from NB US-421 34.5 Major All lanes and shoulders closed 5/20/16 7:00 AM to 6/30/16 11:59 PM InDOT
More information
Entrance ramp from SB US-421 34.2 Major All lanes and shoulders closed 6/18/16 7:00 AM to 7/31/16 11:59 AM InDOT Resurfacing and ramp upgrades. Detour will be following three loop ramps at the interchange in the following order SB US-421 to EB I-94, then EB I-94 to NB-US-421, then finally NB US-421 to WB-I-94. The 1.5-mile detour will add approximately 1.0 mile in distance traveled compared to the closed 0.5-mile ramp.

US-20 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB IN-2 Major All lanes and shoulders closed 6/13/16 7:00 AM to 6/30/16 6:00 PM InDOT Bridge Maintenance / Detoure SB U.S. 20/35 to the Mayflower interchange, exit NB on Mayflower Road, end detour when Mayflower Road intersects with Western Avenue/SR 2

US-31 NB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB IN-2 Major All lanes and shoulders closed 6/13/16 7:00 AM to 6/30/16 6:00 PM InDOT Bridge Maintenance / Detoure SB U.S. 20/35 to the Mayflower interchange, exit NB on Mayflower Road, end detour when Mayflower Road intersects with Western Avenue/SR 2
Exit ramp to WB US-20 Major All lanes and shoulders open 3/28/16 7:00 AM to 10/15/16 11:59 PM InDOT Southbound U.S. 31/20 Bypass traffic will be shifted into northbound lane at the bridge and there will only be one lane in both directions at the bridge. Traffic will be detoured around the ramp closures by utilizing the interchanges at the U.S. 31/20 Bypass and Nimtz Road and the U.S. 31/20 Bypass and State Road 2.

Indiana Toll Road (East-West) EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 200 W (-0.4 miles) to County Road 200 W (+0.2 miles) 27.5 to 28.1 Medium Right lane closed, one lane open 6/29/16 7:00 AM to 4:00 PM Indiana Toll Road Guardrail Repair
US-421 to US-31 (-0.1 miles) 39.0 to 72.0 None All lanes and shoulders open 5/31/16 8:00 PM to 6/30/16 8:00 PM Indiana Toll Road 10' Width Restriction
IN-39 (-0.3 miles) to County Road 200 E (+0.3 miles) 48.6 to 53.7 Medium Left lane closed, one lane open 5/31/16 8:00 PM to 6/29/16 5:00 AM Indiana Toll Road HMA Paving; 24 Hour Continuous Closure
County Road 100 W (-0.5 miles) to County Road 100 W (+0.3 miles) 49.5 to 50.3 Medium Left lane closed, one lane open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Testing
Primrose Rd (+0.5 miles) to Portage Ave 71.0 to 75.0 Minor Right shoulder closed, all lanes open 6/27/16 7:00 AM to 6/30/16 7:00 AM Indiana Toll Road Install Fiber Optic
County Road 21 (-0.6 miles) to County Road 40 (+0.1 miles) 98.0 to 155.5 Medium Right lane closed, up to one lanes open 6/29/16 7:00 AM to 12:00 PM Indiana Toll Road Moving Operation; RPM Placement
County Road 21 (-0.5 miles) to County Road 21 (+0.5 miles) 98.0 to 99.0 Medium Left lane closed, one lane open 6/29/16 6:00 AM to 7:00 AM Indiana Toll Road Moving Operation; RPM Placement
at County Road 475 E (+0.5 miles) 126.0 Minor Right shoulder closed, all lanes open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Foundation Excavation
Exit ramp to NB I-69 143.8 Minor Various lanes closed 6/29/16 8:00 AM to 8:30 AM Indiana Toll Road Moving Operation; RPM Placement
Exit ramp to SB I-69 143.8 Minor Various lanes closed 6/29/16 7:00 AM to 8:00 AM Indiana Toll Road Moving Operation; RPM Placement
Entrance ramp from IN-120 144.2 Minor Various lanes closed 6/29/16 8:30 AM to 9:00 AM Indiana Toll Road Moving Operation; RPM Placement

Indiana Toll Road (East-West) WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 40 (-0.1 miles) to County Road 21 (+0.6 miles) 155.5 to 98.0 Medium Right lane closed, one or two lanes open 6/29/16 7:00 AM to 12:00 PM Indiana Toll Road Moving Operation; RPM Placement
County Road 40 (-0.1 miles) to County Road 700 E (-0.3 miles) 155.5 to 153.0 Medium Right lane closed, one or two lanes open 6/29/16 11:30 AM to 12:00 PM Indiana Toll Road Moving Operation; RPM Placement
Exit ramp to NB I-69 144.4 Minor Various lanes closed 6/29/16 8:00 AM to 8:30 AM Indiana Toll Road Moving Operation; RPM Placement
Exit ramp to SB I-69 144.4 Minor Various lanes closed 6/29/16 7:00 AM to 8:00 AM Indiana Toll Road Moving Operation; RPM Placement
Entrance ramp from IN-120 144.0 Minor Various lanes closed 6/29/16 8:30 AM to 9:00 AM Indiana Toll Road Moving Operation; RPM Placement
at County Road 475 E (-0.5 miles) 126.0 Minor Right shoulder closed, all lanes open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Foundation Excavation
US-31 (+0.1 miles) to US-421 72.0 to 39.0 None All lanes and shoulders open 5/31/16 8:00 PM to 6/30/16 8:00 PM Indiana Toll Road 10' Width Restriction
County Road 100 W (-0.2 miles) to County Road 100 W (+0.5 miles) 50.3 to 49.5 Medium Left lane closed, one lane open 6/29/16 7:00 AM to 5:00 PM Indiana Toll Road Testing
County Road 250 E (-0.2 miles) to County Road 200 E 32.7 to 31.9 Medium Left lane closed, one lane open 6/24/16 8:00 PM to 7/1/16 3:00 PM Indiana Toll Road Concrete approach pavement
Tennessee St (-0.2 miles) to Buchanan St (+0.2 miles) 15.5 to 13.5 Major Left two lanes closed, one or two lanes open 6/29/16 12:00 AM to 5:00 AM Indiana Toll Road Joint Repair

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Wed Jun 29 2016 02:12:53 CDT