NOTE: You may place the mouse over a location to see its municipality and county,
or click on the location to see a map of the event.
Construction information transmitted by the Illinois Tollway for display on the Veterans (North-South) NB and Veterans (North-South) SB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.
Veterans (North-South) SB (Illinois)
| at Army Trail Rd
|
29.8 |
Minor |
Left shoulder closed, all lanes open |
05/21/13 07:00 AM to 06/24/13 11:59 PM |
IDOT |
***Long term closure*** |
| 22nd St to Butterfield Rd
|
23.1 to 22.0 |
Medium |
Left lane closed, two lanes open |
05/16/13 05:00 AM to 06/24/13 11:59 PM |
Illinois Tollway |
Left Lane of CD Road to Butterfield Rd Closed; Pavement Repair; ***Long Term Closure*** |
| Boughton Plaza to I-55
|
14.3 to 12.4 |
Medium |
Left lane and left shoulder closed, two to 8 lanes open |
05/14/13 05:00 AM to 06/24/13 11:59 PM |
Illinois Tollway |
Pavement Repair: ***Long Term Closure*** |
| Exit to NB I-55
|
13.2 |
Minor |
Ramp work, possible width reduction |
05/24/13 06:00 AM to 07/12/13 11:59 PM |
IDOT |
Right Side Ramp Closed; Pavement Striping; Traffic Control; ***Long Term Closure*** |
| Exit to SB I-55
|
12.8 |
Minor |
Ramp work, possible width reduction |
05/13/13 05:00 AM to 06/24/13 11:59 PM |
IDOT |
Right Side of Ramp Closed; Pavement Repair; Pavement Striping; Traffic Control;***Long Term Closure*** |