Construction Report
Select Location
  
Updated: 8/14/18 6:31 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

Construction information transmitted by the Illinois Tollway for display on the Tri-State NB/WB and Tri-State SB/EB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

Tri-State NB/WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-80 (+0.1 miles) to US-6 (+0.1 miles) 6.2 to 7.5 Medium Right lane closed, three lanes open 5/3/18 3:00 AM to 8/21/18 11:59 PM Illinois Tollway ***Long Term Closure***
Entrance ramp from EB US-6 7.0 Major All lanes and shoulders closed 5/24/18 7:00 AM to 8/21/18 11:59 PM Illinois Tollway ***Long Term Construction***
at 83rd St Plaza 19.3 to 19.4 Medium Various lanes closed 6/26/18 12:00 AM to 9/28/18 11:59 PM Illinois Tollway Rdwy Rehab/Widening - Left Cash lane closed; ***Long Term Closure***
at 83rd St Plaza 19.3 to 19.4 Medium Various lanes closed 8/15/18 12:01 AM to 2:00 AM Illinois Tollway Moving Operation; All ORT Lanes Closed
IL-171 to 5th Ave (-0.1 miles) 20.3 to 22.4 Medium Right lane closed, three lanes open 8/15/18 6:30 PM to 7:00 PM Illinois Tollway Brdg Deck Patching
at Cermak Plaza 29.9 to 30.0 Medium Various lanes closed 8/13/18 12:00 AM to 9/13/18 11:59 PM Illinois Tollway Tollbooth Work - Center and Left Center Cash lanes closed
Exit ramp to EB I-90 None Partial closure 8/15/18 6:00 AM to 4:00 PM Illinois Tollway Grading / Landscaping Improvs - Left Side of Ramp closed
Balmoral Ave (+0.2 miles) to IL-58 (-0.2 miles) 40.0 to 45.0 Medium Left lane closed, two to four lanes open 8/15/18 5:00 AM to 6:00 AM Illinois Tollway Pvmt/Struct Preserv and Repair
Exit ramp to EB IL-137 14.1 None Partial closure 8/15/18 7:00 AM to 8/27/18 11:59 PM Illinois Tollway Right Side of Ramp Closed
Entrance ramp from WB IL-137 13.4 None Partial closure 8/15/18 7:00 AM to 8/27/18 11:59 PM Illinois Tollway Left Side of Ramp Closed
Exit ramp to WB IL-132 8.4 None Partial closure 8/13/18 12:00 AM to 8/22/18 11:59 PM Illinois Tollway Ramp Rehab - Right Side of Ramp closed *** Long-Term Closure ***
IL-132 to Russell Rd (+0.3 miles) 8.4 to 0.2 Minor Right lane closed, two to four lanes with unknown impact 5/14/18 7:00 PM to 8/31/18 6:00 AM Lake County Pavement Repair

Tri-State SB/EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Russell Rd (-0.3 miles) to IL-132 0.2 to 8.4 Minor Right lane closed, two or three lanes with unknown impact 5/14/18 7:00 PM to 8/31/18 6:00 AM Lake County Pavement Repair
Exit ramp to WB IL-132 8.0 None Partial closure 8/13/18 12:00 AM to 8/22/18 11:59 PM Illinois Tollway Ramp Rehab; Right Side of Ramp closed ***Long Term Closure***
Entrance ramp from EB IL-137 14.1 None Partial closure 8/15/18 7:00 AM to 8/27/18 11:59 PM Illinois Tollway Left Side of Ramp Closed
at Lake Cook Rd Exit 24.8 Medium All lanes with unknown impact 7/30/18 7:00 AM to 12/31/20 3:00 PM Lake County Road Reconstruction
Exit ramp to EB I-90 41.1 None Partial closure 8/15/18 6:00 AM to 4:00 PM Illinois Tollway Grading / Landscaping Improvs - Left Side of Ramp closed
5th Ave (+0.2 miles) to US-12 (-0.1 miles) 22.4 to 21.0 Medium Right lane closed, three lanes open 8/14/18 7:00 PM to 8:00 PM Illinois Tollway Brdg Deck Patching
5th Ave (+0.2 miles) to US-12 (-0.1 miles) 22.4 to 21.0 Major Right two lanes closed, two lanes open 8/14/18 8:00 PM to 8/15/18 5:00 AM Illinois Tollway Brdg Deck Patching
5th Ave (+0.2 miles) to US-12 (-0.1 miles) 22.4 to 21.0 Major Right two lanes closed, two lanes open 8/15/18 5:00 AM to 6:00 AM Illinois Tollway Brdg Deck Patching
5th Ave (+0.2 miles) to US-12 (-0.1 miles) 22.4 to 21.0 Medium Right lane closed, three lanes open 8/15/18 6:00 AM to 7:00 AM Illinois Tollway Brdg Deck Patching
at 82nd St Plaza 19.8 to 19.7 Medium Various lanes closed 8/15/18 2:00 AM to 4:00 AM Illinois Tollway Moving Operation; All ORT Lanes Closed
Exit ramp to EB US-6 6.9 Major All lanes and shoulders closed 5/9/18 7:00 AM to 8/21/18 11:59 PM Illinois Tollway ***Long Term Closure***
US-6 (-0.1 miles) to US-6 (+0.2 miles) 6.5 to 6.2 Medium Right lane closed, three lanes open 5/3/18 12:00 AM to 8/21/18 11:59 PM Illinois Tollway Brdg/Ramp Reconst; ***Long Term Closure***

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Tue Aug 14 2018 18:52:49 CDT