Construction Report
Select Location
  
Updated: 9/26/16 12:02 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

Construction information transmitted by the Illinois Tollway for display on the I-94 EB and I-94 WB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

I-94 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
O'Plaine Rd (-0.1 miles) to IL-176 (-0.3 miles) 11.9 to 15.8 Minor Right lane closed, three lanes open 9/26/16 4:00 AM to 5:00 AM Illinois Tollway Pavement Marking
O'Plaine Rd (-0.1 miles) to IL-176 (-0.3 miles) 11.9 to 15.8 Medium Right two lanes closed, two lanes open 9/25/16 10:00 PM to 9/26/16 4:00 AM Illinois Tollway Pavement Marking
Entrance from SEB Kennedy Local 3.0 to 50.1 Minor Right shoulder closed, all lanes open with partial ramp closures 9/26/16 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor All lanes and shoulders open 6/1/14 12:00 AM to 11/30/16 11:59 PM IDOT 11' Width; *** Long Term Closure ***
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 11/30/16 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 12/1/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Exit ramp to Taylor St 51.8 None Partial closure 6/11/15 12:00 AM to 12/1/16 11:59 PM IDOT Force Merge. No turns. Ramp exit yielding to mainline exit traffic.; *** Long Term Closure ***
Harrison St to Roosevelt Rd 51.7 to 52.2 Minor Both shoulders closed, all lanes open 5/20/15 12:00 AM to 12/1/16 11:59 PM IDOT Lanes weaved ***Long Term Closure***
Entrance from SB Dan Ryan Express 54.1 to 59.5 Minor Right shoulder closed, all lanes open with partial ramp closures 9/26/16 9:00 AM to 3:00 PM IDOT Moving Operation
31st St to Cottage Grove Ave 54.6 to 64.2 Minor Right shoulder closed, all lanes open with partial ramp closures 9/26/16 9:00 AM to 3:00 PM IDOT Moving Operation
95th St (US-12/20) to Dr Martin L King Jr Dr 62.8 to 63.7 Medium Left lane and left shoulder closed, one to four lanes open 9/25/16 11:59 PM to 9/26/16 6:00 AM IDOT

I-94 Express EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to 69th St 54.1 to 59.5 Minor Right shoulder closed, all lanes open with partial ramp closures 9/26/16 9:00 AM to 3:00 PM IDOT Moving Operation

I-94 Express WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 26th St 59.5 to 54.1 Minor Right shoulder closed, all lanes open with partial ramp closures 9/26/16 9:00 AM to 3:00 PM IDOT Moving Operation

I-94 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Cottage Grove Ave to 31st St 64.2 to 54.7 Minor Right shoulder closed, all lanes open with partial ramp closures 9/26/16 9:00 AM to 3:00 PM IDOT Moving Operation
Dr Martin L King Jr Dr to State St 63.7 to 63.2 Minor Right lane and right shoulder closed, one lane open 9/25/16 11:00 PM to 9/26/16 5:00 AM IDOT
I-57 / Bishop Ford (I-94) to 95th St (US-12/20) 62.9 to 62.8 Medium Left lane and left shoulder closed, four lanes open 9/6/16 12:00 AM to 11/23/16 11:59 PM IDOT *** Long Term Closure ***
Entrance from NB Dan Ryan Express 59.5 to 54.1 Minor Right shoulder closed, all lanes open with partial ramp closures 9/26/16 9:00 AM to 3:00 PM IDOT Moving Operation
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Yield to NB I-55 exit to NB I-90/94; ***Long Term Closure***
Exit ramp to WB I-290 Minor All lanes and shoulders open 6/1/14 12:00 AM to 11/30/16 11:59 PM IDOT 11' Width; *** Long Term Closure ***
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 12/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/18 11:59 PM IDOT ***Long Term Closure***
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 12/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 12/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 12/1/16 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Exit to NWB Kennedy Local 50.1 to 79.1 Minor Right shoulder closed, all lanes open with partial ramp closures 9/26/16 9:00 AM to 3:00 PM IDOT Moving Operation

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Mon Sep 26 2016 00:19:21 CDT