Construction Report
Select Location
  
Updated: 1/29/15 4:14 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Construction information transmitted by the Illinois Tollway for display on the I-94 EB and I-94 WB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

I-94 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Waukegan Plaza 4.8 to 4.9 Medium Various lanes closed 1/30/15 2:00 AM to 4:00 AM Illinois Tollway Camera Work; All ORT Lanes closed; Moving Operation
at Edens Plaza 26.4 to 26.5 Medium Various lanes closed 1/30/15 12:01 AM to 3:00 AM Illinois Tollway Camera Work; All ORT Lanes closed; Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/21/14 12:00 AM to 1/30/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width; Long Term Closure
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Garfield Blvd (55th St) to 63rd St 57.7 to 58.7 Minor Left lane and left shoulder closed, two or three lanes open 1/29/15 11:00 PM to 1/30/15 5:00 AM IDOT
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor All lanes shifted and both shoulders closed 9/9/14 12:00 AM to 1/30/15 11:59 PM IDOT Lanes narrowed and shifted to the left ***Long Term Closure***
Dan Ryan Expy (I-94) / I-57 to I-80 62.9 to 74.4 Minor Both shoulders closed, all lanes open with partial ramp closures 1/30/15 9:00 AM to 3:00 PM IDOT Moving Operation
Bishop Ford Fwy (IL-394) to IN State Line Medium Left lane or right lane and both shoulders closed with partial ramp closures 1/30/15 9:00 AM to 2:00 PM IDOT Moving Operation
Bishop Ford Fwy (IL-394) to IN State Line Minor Both shoulders closed, all lanes open with partial ramp closures 1/30/15 9:00 AM to 3:00 PM IDOT Moving Operation

I-94 Express EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Garfield Blvd (55th St) to Chicago Skwy (I-90) 57.7 to 59.1 Medium Left two lanes and left shoulder closed, one or two lanes open 1/29/15 11:00 PM to 1/30/15 1:00 AM IDOT
Garfield Blvd (55th St) to Chicago Skwy (I-90) 57.7 to 59.1 Medium Left three lanes and left shoulder closed, up to one lanes open 1/30/15 1:00 AM to 5:00 AM IDOT close express all traffic into locals.
Garfield Blvd (55th St) to Chicago Skwy (I-90) 57.7 to 59.1 Minor Left lane and left shoulder closed, two or three lanes open 1/29/15 9:00 PM to 11:00 PM IDOT

I-94 Reversible EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 1/30/15 11:30 AM to 1:30 PM IDOT

I-94 Reversible WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 1/30/15 11:30 AM to 1:30 PM IDOT

I-94 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
IN State Line to Bishop Ford Fwy (IL-394) Minor Both shoulders closed, all lanes open with partial ramp closures 1/30/15 9:00 AM to 3:00 PM IDOT Moving Operation
IN State Line to Bishop Ford Fwy (IL-394) Medium Left lane or right lane and both shoulders closed with partial ramp closures 1/30/15 9:30 AM to 2:30 PM IDOT Moving Operation
I-80 to Dan Ryan Expy (I-94) / I-57 74.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 1/30/15 9:00 AM to 3:00 PM IDOT Moving Operation
71st St to 69th St 59.8 to 59.6 Minor Right lane and right shoulder closed, one to four lanes open 1/29/15 10:00 PM to 1/30/15 5:00 AM IDOT Weave traffic from left to right in the two lane section
69th St to Chicago Skwy (I-90) 59.6 to 59.1 Minor Right lane and right shoulder closed, one lane open 1/29/15 10:00 PM to 1/30/15 5:00 AM IDOT Weave traffic from left to right in the two lane section
Harrison St to Eisenhower Expy (I-290) 51.7 to 51.7 Minor Right shoulder closed, all lanes open 10/13/14 12:00 AM to 1/31/15 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from Armitage Ave 48.5 Minor Partial closure 1/29/15 9:00 PM to 11:59 PM IDOT
at Edens Plaza 26.5 to 26.4 Medium Various lanes closed 1/30/15 1:00 AM to 3:00 AM Illinois Tollway Camera Work; All ORT Lanes closed; Moving Operation
at Waukgen Plaza 4.9 to 4.8 Medium Various lanes closed 1/30/15 3:00 AM to 5:00 AM Illinois Tollway Camera Work; All ORT Lanes closed; Moving Operation

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Thu Jan 29 16:21:45 CST 2015