Construction Report
Select Location
  
Updated: 2/20/17 8:30 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

Construction information transmitted by the Illinois Tollway for display on the I-90 EB and I-90 WB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

I-90 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Harmony Rd (+0.3 miles) to IL-23 (+0.1 miles) 35.6 to 36.2 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
IL-53 to I-290 / IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 2/21/17 9:00 AM to 3:00 PM IDOT Moving Operation
I-290 / IL-53 to IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 2/21/17 9:00 AM to 3:00 PM IDOT Moving Operation
Arlington Heights Rd (+0.8 miles) to Elmhurst Rd (-0.3 miles) 71.6 to 73.3 Medium Right lane closed, two lanes open 12/24/16 12:00 AM to 2/24/17 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***
Entrance from EB I-190 2.3 to 3.0 Minor Left shoulder closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT Long Term Closure
Entrance from SEB Kennedy Local 2.3 to 79.6 Minor Right shoulder closed, all lanes open 2/21/17 9:00 AM to 3:00 PM IDOT
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure

I-90 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 8/12/16 12:00 AM to 10/31/18 11:59 PM IDOT Work includes bridge demolition, bridge construction, pavement, roadway lighting, pavement marking and signage. Detour: Exit northbound I90/94 at Roosevelt Rd., right on Roosevelt Rd to State St
Exit ramp to EB I-290 52.3 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Traffic weaved ***Long Term Closure***
IL-53 to I-290 / IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 2/21/17 9:00 AM to 3:00 PM IDOT Moving Operation
I-290 / IL-53 to IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 2/21/17 9:00 AM to 3:00 PM IDOT Moving Operation
IL-23 (-0.4 miles) to IL-23 (+0.1 miles) 36.5 to 36.0 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Mon Feb 20 2017 20:53:25 CST