Construction Report
Select Location
  
Updated: 4/29/17 10:03 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-39 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from WB I-90 to E Riverside 12.4 to 12.3 Medium All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left IPO Lane Closed; Left Side of Ramp Closed; *** Long Term Closure ***
Ramp from E Riverside to WB I90 12.4 to 12.3 None All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left Side of Ramp Closed; *** Long Term Closure ***

I-39 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Colley Rd (+0.3 miles) to Stateline Rd Minor Left shoulder closed, all lanes open 4/18/17 12:00 AM to 8/20/17 11:45 PM WisDOT Construction - Illinois State Line - Madison | Stateline Rd Bridge B-53-0325 | I 39 | ROCK
Colley Rd (+0.3 miles) to Stateline Rd Medium Left lane closed, one lane open 4/29/17 9:00 PM to 4/30/17 7:00 AM WisDOT Construction - Illinois State Line - Madison | Stateline Rd Bridge B-53-0325 | I 39 | ROCK
Colley Rd (+0.3 miles) to Stateline Rd Minor Left lane closed, one lane open 4/30/17 10:00 PM to 5/1/17 5:00 AM WisDOT Construction - Illinois State Line - Madison | Stateline Rd Bridge B-53-0325 | I 39 | ROCK
Ramp from E Riverside to EB I-90 12.3 to 12.4 Medium All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left IPO Lane Closed, Left Side of Ramp Closed***Long Term Closure ***
Ramp from EB I-90 to E Riverside 12.3 to 12.4 None All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left Side of Ramp Closed; *** Long Term Closure ***
Exit ramp to WB I-88 97.8 Major All lanes closed 4/10/17 12:00 AM to 5/30/17 11:59 PM IDOT Ramp closed. Detour using 3 ramps

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Sat Apr 29 2017 22:17:41 CDT