Construction Report
Select Location
  
Updated: 4/23/14 3:00 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Construction information transmitted by the Illinois Tollway for display on the I-355 NB and I-355 SB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

I-355 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance from EB I-80 0.0 Minor Right shoulder closed, all lanes open 4/23/14 9:00 AM to 3:00 PM IDOT
Internationale Pky to 83rd St 11.6 to 14.5 Minor Left lane closed, two to 8 lanes open 4/23/14 12:00 AM to 5:00 AM Illinois Tollway Pavement Striping
Entrance from Boughton Rd 13.4 Minor Various lanes closed 4/22/14 8:00 PM to 4/23/14 5:00 AM Illinois Tollway Pavement Striping; Left Side Ramp Closed
at Boughton Plaza 14.4 Medium Various lanes closed 4/22/14 8:00 PM to 4/23/14 5:00 AM Illinois Tollway Pavement Striping; IPO lanes (IPO Approach/Departure Lanes Closed; Cash Approach/Departure Lanes Open)
at Boughton Plaza 14.4 Minor Various lanes closed 4/22/14 8:00 PM to 4/23/14 5:00 AM Illinois Tollway Pavement Striping; Center, Right Cash lanes closed
at Boughton Plaza 14.4 to 14.5 Medium Various lanes closed 4/23/14 12:00 AM to 5:00 AM Illinois Tollway Pavement Striping; Left ORT lane closed
Maple Ave to Ogden Av 18.0 to 19.5 Major Right two lanes closed, one or two lanes open 4/22/14 8:00 PM to 4/23/14 5:00 AM Illinois Tollway Reflector Installation/Repair

I-355 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Army Trail Rd to North Ave 29.8 to 28.0 Medium Left lane closed, two to 8 lanes open 4/23/14 9:00 AM to 2:00 PM Illinois Tollway Moving Operation; Light Pole Work
Hitchcock Ave to 75th St 18.6 to 15.0 Medium Right three lanes closed, up to three lanes open 4/22/14 11:00 PM to 4/23/14 5:00 AM Illinois Tollway Reflector Installation/Repair
75th St to I-55 15.3 to 12.7 Minor Right lane closed, two to 8 lanes open 4/22/14 9:00 PM to 4/23/14 5:00 AM Illinois Tollway Pavement Striping
at Boughton Plaza 14.5 to 14.4 Medium Various lanes closed 4/23/14 12:00 AM to 5:00 AM Illinois Tollway Pavement Striping; Center, Right Cash Lanes closed
at Boughton Plaza 14.4 Medium Various lanes closed 4/22/14 8:00 PM to 4/23/14 5:00 AM Illinois Tollway Pavement Striping; IPO lanes closed (IPO Approach/Departure Lanes Closed; Cash Approach/Departure Lanes Open)
at Boughton Plaza 14.4 Medium Various lanes closed 4/22/14 9:00 PM to 4/23/14 5:00 AM Illinois Tollway Pavement Striping; Right ORT lane closed
Entrance from SB I-55 11.7 Minor Right lane closed, up to two lanes open 4/22/14 9:00 PM to 4/23/14 4:00 AM Illinois Tollway Pavement Striping
New Ave to 135th St 9.8 to 8.0 Medium Left lane closed, two lanes open 4/23/14 9:00 AM to 2:00 PM Illinois Tollway Moving Operation; Crack Sealing
Cedar Rd to I-80 0.4 to 0.2 Medium Left lane closed, one lane open 4/17/14 7:00 AM to 5/12/14 11:59 PM Illinois Tollway Guardrail Replacement; Pavement Repair; Sewer Work; ***Long Term Closure***
Exit to EB I-80 0.2 Minor Left lane closed, one lane open 4/17/14 7:00 AM to 5/12/14 11:59 PM Illinois Tollway Guardrail Replacement; Pavement Repair; Sewer Work; ***Long Term Closure***

Site Contributors | Requirements | Policies | Disclaimer | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
This site is best viewed in Internet Explorer 7.0+ or Firefox 3.0+ with cookies and JavaScript enabled.
Wed Apr 23 03:18:47 CDT 2014