Construction Report
Select Location
  
Updated: 10/31/14 5:40 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Construction information transmitted by the Illinois Tollway for display on the I-294 NB and I-294 SB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

I-294 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Santa Fe Dr to 5th Ave (-0.3 miles) 21.7 to 22.2 Medium Right lane closed, three lanes open 11/1/14 8:00 AM to 11:00 AM Illinois Tollway Pavement, Drainage, Guardrail and Structural Repairs

I-294 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to WB O'Hare West Plaza (I-190) 40.8 Minor Various lanes closed 9/23/14 7:00 AM to 11/3/14 11:59 PM Illinois Tollway Left Cash Lane Closed; ***Long Term Closure***
at O'Hare West Plaza 40.4 to 40.3 Medium Various lanes closed 10/17/14 7:00 PM to 11/3/14 5:00 AM Illinois Tollway Road Reconstruction and Tollway Plaza Repairs; Left Cash Lane Closed
Santa Fe Dr (-0.3 miles) to IL-171 (+0.1 miles) 22.0 to 20.2 Medium Right lane closed, three or four lanes open 10/31/14 8:00 PM to 9:00 PM Illinois Tollway Pavement, Drainage, Guardrail and Structural Repairs
Santa Fe Dr (-0.3 miles) to IL-171 (+0.1 miles) 22.0 to 20.2 Medium Right two lanes closed, two or three lanes open 10/31/14 9:00 PM to 11/1/14 5:00 AM Illinois Tollway Pavement, Drainage, Guardrail and Structural Repairs
Santa Fe Dr (-0.3 miles) to IL-171 (+0.1 miles) 22.0 to 20.2 Medium Right lane closed, three or four lanes open 11/1/14 2:00 PM to 7:00 PM Illinois Tollway Pavement, Drainage, Guardrail and Structural Repairs
Santa Fe Dr (-0.3 miles) to IL-171 (+0.1 miles) 22.0 to 20.2 Major Right two lanes closed, two or three lanes open 11/1/14 5:00 AM to 2:00 PM Illinois Tollway Pavement, Drainage, Guardrail and Structural Repairs
107th St to 107th St (+0.2 miles) 15.7 to 15.5 Medium Right two lanes closed, two lanes open 10/31/14 9:00 PM to 11/1/14 4:00 AM Illinois Tollway Pavement, Drainage, Guardrail and Structural Repairs
Entrance ramp from WB 159th St 6.4 Minor Partial closure 7/21/14 12:00 AM to 11/22/14 12:00 AM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***
Entrance ramp from EB 159th St 6.1 Minor Partial closure 7/21/14 12:00 AM to 11/22/14 12:00 AM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Fri Oct 31 17:45:31 CDT 2014