Construction Report
Select Location
  
Updated: 9/30/14 6:54 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Eisenhower EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
IL-83 to Wells St 10.7 to 30.5 Minor Right shoulder closed, all lanes open with partial ramp closures 10/1/14 10:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from SB I-294 15.5 Minor Partial closure 10/1/14 7:00 AM to 11:00 AM Illinois Tollway Pavement, Drainage, Guardrail and Structural Repairs; Right Side Ramp closed
Entrance ramp from SB I-294 15.5 Minor Partial closure 10/1/14 11:00 AM to 3:00 PM Illinois Tollway Pavement, Drainage, Guardrail and Structural Repairs; Left Side Ramp Closed
at Morgan St 29.5 Minor Both shoulders closed, all lanes open 10/17/13 7:00 AM to 10/1/14 11:59 PM IDOT ***Long Term Closure*** Narrow Lanes; Weave Traffic to Left.
Morgan St to Halsted St 29.5 to 29.8 Minor Both shoulders closed, all lanes open 6/21/14 12:00 AM to 12/1/14 11:59 PM IDOT ***Long Term Closure***; Lane assignments: Congress (2 lanes), NB I-90/94 (1 lane), SB I-90/94 (1 lane).
Exit ramp to EB I-90/94 29.7 Minor Right lane and both shoulders closed, up to two lanes open 6/21/14 12:00 AM to 12/1/14 11:59 PM IDOT ***Long Term Closure***; 11' Width
Exit ramp to WB I-90/94 29.7 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT ***Long Term Closure***; 11 ' Width

Eisenhower WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wells St to IL-83 30.5 to 10.7 Minor Right shoulder closed, all lanes open with partial ramp closures 10/1/14 9:00 AM to 2:30 PM IDOT Moving Operation
Canal St to Morgan St 30.2 to 29.5 Medium Left lane and left shoulder closed, two or three lanes open 10/16/13 12:00 AM to 10/1/14 11:59 PM IDOT Weave Traffic Left to Right; ***Long Term Closure***
Exit ramp to EB I-90 30.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT ***Long Term Closure***; 11' Width
Entrance ramp from EB Kennedy Local 29.7 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT 11' Width; *** Long Term Closure ***
Exit ramp to Morgan St 29.7 Medium All lanes and shoulders closed 9/11/13 12:00 AM to 12/1/14 11:59 PM IDOT Bridge Reconstruction
Exit ramp to Morgan St 29.7 Medium All lanes and shoulders closed 9/11/13 7:00 AM to 10/1/14 11:59 PM IDOT Detour Posted; ***Long Term Closure***
Entrance ramp from 17th Ave 18.8 Minor Partial closure 10/1/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to NB I-294 15.8 Minor Left shoulder closed, all lanes open 9/11/14 7:00 AM to 10/2/14 11:59 PM IDOT *** Long Term Closure ***

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Tue Sep 30 18:56:10 CDT 2014