Construction Report
Select Location
  
Updated: 10/31/14 1:44 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Eisenhower EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Jane Addams Twy (I-90) to IL-83 0.0 to 10.7 Minor Both shoulders closed, all lanes open 10/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
IL-83 to Wells St 10.7 to 30.5 Minor Right shoulder closed, all lanes open with partial ramp closures 10/31/14 10:00 AM to 3:00 PM IDOT Moving Operation
York Rd to 1.5 miles east of York Rd 12.5 to 14.0 Minor Right shoulder closed, all lanes open 10/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to SB I-294 15.2 Major All lanes and shoulders closed 10/30/14 9:00 PM to 10/31/14 5:00 AM Illinois Tollway Pavement, Drainage, Guardrail and Structural Repairs
Racine Ave to Morgan St 29.3 to 29.5 Medium Right two lanes and right shoulder closed, two lanes open 10/31/14 1:00 AM to 5:00 AM IDOT
at Morgan St 29.5 Minor All lanes shifted and both shoulders closed 10/17/13 7:00 AM to 12/1/14 11:59 PM IDOT Narrow Lanes; Weave Traffic to Left; ***Long Term Closure***
Morgan St to Halsted St 29.5 to 29.8 Minor Both shoulders closed, all lanes open 6/21/14 12:00 AM to 12/1/14 11:59 PM IDOT Lane assignments: Congress (2 lanes), NB I-90/94 (1 lane), SB I-90/94 (1 lane); ***Long Term Closure***
Morgan St to Kennedy / Dan Ryan Expy (I-90/94) 29.5 to 29.9 Minor Right lane and right shoulder closed, two or three lanes open 10/31/14 1:00 AM to 5:00 AM IDOT
Exit ramp to WB I-90/94 29.7 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT 11 ' Width; ***Long Term Closure***
Exit ramp to EB I-90/94 29.7 Major All lanes and shoulders closed 10/31/14 1:00 AM to 5:00 AM IDOT
Exit ramp to EB I-90/94 29.7 Minor Right lane and both shoulders closed, up to two lanes open 6/21/14 12:00 AM to 12/1/14 11:59 PM IDOT 11' Width; ***Long Term Closure***

Eisenhower WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wells St to IL-83 30.5 to 10.7 Minor Right shoulder closed, all lanes open with partial ramp closures 10/31/14 9:00 AM to 2:30 PM IDOT Moving Operation
Canal St to Morgan St 30.2 to 29.5 Medium Left lane and left shoulder closed, two or three lanes shifted 10/16/13 12:00 AM to 12/1/14 11:59 PM IDOT Weave Traffic Left to Right; ***Long Term Closure***
Exit ramp to EB I-90 30.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT 11' Width; ***Long Term Closure***
Entrance ramp from EB Kennedy Local 29.7 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT 11' Width; ***Long Term Closure***
Exit ramp to Morgan St 29.7 Medium All lanes and shoulders closed 9/11/13 7:00 AM to 12/1/14 11:59 PM IDOT Detour Posted; ***Long Term Closure***
Entrance ramp from NWB US-20 13.9 None Partial closure 10/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to York Rd 12.4 Minor Partial closure 10/31/14 9:00 AM to 3:00 PM IDOT Moving Operation
York Rd to 1.5 miles west of York Rd 12.5 to 11.0 Minor Right shoulder closed, all lanes open 10/31/14 9:00 AM to 3:00 PM IDOT Moving Operation

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Fri Oct 31 01:52:06 CDT 2014