Construction Report
Select Location
  
Updated: 3/27/17 5:33 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

Cook County (Suburban) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB IL-7 (159th St) from Gougar Rd to Will Cook Rd Medium Various lanes closed 5/1/15 12:00 AM to 8/15/17 11:59 PM IDOT The improvement consists of roadway reconstruction and widening of IL Route 7 and roadway reconstruction and roadway widening of related cross roads. The improvement includes the installation of proposed storm sewer, pipe culverts, precast box culverts, (3) retaining walls, (2) pile-supported embankments, traffic signals, and collateral work necessary to complete the project as shown in the plans. Detour: Oak Valley Trail will be closed for approximately 15 days. A detour will be along S. Bell Rd.
SWB IL-7 (159th St) from Will Cook Rd to Gougar Rd Medium Various lanes closed 5/1/15 12:00 AM to 8/15/17 11:59 PM IDOT The improvement consists of roadway reconstruction and widening of IL Route 7 and roadway reconstruction and roadway widening of related cross roads. The improvement includes the installation of proposed storm sewer, pipe culverts, precast box culverts, (3) retaining walls, (2) pile-supported embankments, traffic signals, and collateral work necessary to complete the project as shown in the plans. Detour: Oak Valley Trail will be closed for approximately 15 days. A detour will be along S. Bell Rd.
EB IL-68 at Wilke Rd Medium Various lanes closed 2/15/16 7:00 AM to 7/31/17 11:59 PM IDOT The project will add a right turn lane from eastbound Dundee Road to N. Wilke Road and from eastbound Dundee Road to Kennicott Avenue.The overall improvements to the intersections will modernize traffic signals, improve pedestrian safety and ease traffic congestion coming off of Illinois 53.
EB IL-68 at Kennicott Ave Medium Various lanes closed 2/15/16 7:00 AM to 7/31/17 11:59 PM IDOT The project will add a right turn lane from eastbound Dundee Road to N. Wilke Road and from eastbound Dundee Road to Kennicott Avenue.The overall improvements to the intersections will modernize traffic signals, improve pedestrian safety and ease traffic congestion coming off of Illinois 53.
NEB IL-171 from Cokes Rd to State St Medium Various lanes closed 8/16/16 7:00 AM to 11/1/17 11:59 PM IDOT
SWB IL-171 from State St to Cokes Rd Medium Various lanes closed 8/16/16 7:00 AM to 11/1/17 11:59 PM IDOT
WB 115th St at Pulaski Rd None Various lanes closed 3/20/17 12:00 AM to 5/12/17 11:59 PM IDOT Pavement Trenching for electrical conduit and sewer work. Resurfacing Pavement and Upgrading Traffic Signals at all four corners of the intersection. Sidewalk improvements.
EB 159th St from Will Cook Rd to Ravinia Ave Medium Various lanes closed 4/23/15 12:00 AM to 8/15/17 11:59 PM IDOT Reconstruction and add lanes, drainage improvement, shared-use path, sidewalk, traffic signals, and other related work on 2.53 miles of US Route 6/IL Route 7 (159th St.) from Will-Cook Road to Ravinia Ave located in Orland Park and Orland Township. Detour: 104th Ave Detour: 104th Ave closed at 159th St. NB & SB 104th Ave traffic to use the following detour routes: Use 167th St west to 108th Ave; follow 108th Ave north to 159th St. Use 167th St east to US-45; follow US-45 north to 159th St.
WB 159th St from Ravinia Ave to Will Cook Rd Medium Various lanes closed 4/23/15 12:00 AM to 8/15/17 11:59 PM IDOT Reconstruction and add lanes, drainage improvement, shared-use path, sidewalk, traffic signals, and other related work on 2.53 miles of US Route 6/IL Route 7 (159th St.) from Will-Cook Road to Ravinia Ave located in Orland Park and Orland Township. Detour: 104th Ave Detour: 104th Ave closed at 159th St. NB & SB 104th Ave traffic to use the following detour routes: Use 167th St west to 108th Ave; follow 108th Ave north to 159th St. Use 167th St east to US-45; follow US-45 north to 159th St.
NB 25th Ave from St Charles Rd to Lake St Medium All lanes and shoulders closed 1/1/15 7:18 AM to 5/31/17 7:18 AM Gateway 25th Ave over the RR tracks; Long term closure.
SB 25th Ave from Lake St to St Charles Rd Medium All lanes and shoulders closed 1/1/15 7:18 AM to 5/31/17 7:18 AM Gateway 25th Ave over the RR tracks; Long term closure.
EB Dundee Rd (IL-68) at Buffalo Grove Rd Medium Various lanes closed 3/13/17 12:00 AM to 9/4/17 11:59 PM IDOT Intersection Improvement on Illinois Route 68 (Dundee Road) at Buffalo Grove Road in the Village of Buffalo Grove.
EB Dundee Rd (IL-68) at McHenry / Wheeling Rd Medium Various lanes closed 8/22/16 12:00 AM to 6/20/17 11:59 PM IDOT Intersection improvement on Illinois Route 68 (Dundee Road) at McHenry/Wheeling Rd in the Village of Wheeling. Adding turn lanes WB IL 68 and SB McHenry Rd. Sidewalk construction,traffic signal and storm water drainage improvements at intersection.
WB Dundee Rd (IL-68) at McHenry / Wheeling Rd Medium Various lanes closed 8/22/16 12:00 AM to 6/20/17 11:59 PM IDOT Intersection improvement on Illinois Route 68 (Dundee Road) at McHenry/Wheeling Rd in the Village of Wheeling. Adding turn lanes WB IL 68 and SB McHenry Rd. Sidewalk construction,traffic signal and storm water drainage improvements at intersection.
WB Dundee Rd (IL-68) at Buffalo Grove Rd Medium Various lanes closed 3/13/17 12:00 AM to 9/4/17 11:59 PM IDOT Intersection Improvement on Illinois Route 68 (Dundee Road) at Buffalo Grove Road in the Village of Buffalo Grove.
EB Higgins Rd (IL-72) from Lexington Dr to I-290 Expressway (I-290) Medium Various lanes closed 7/22/16 12:00 AM to 6/30/17 11:59 PM IDOT Intersection Improvement and traffic signal modernization on IL-72 from Lexington Dr. to I-290 east ramps in Schaumburg.
WB Higgins Rd (IL-72) from I-290 Expressway (I-290) to Lexington Dr Medium Various lanes closed 7/22/16 12:00 AM to 6/30/17 11:59 PM IDOT Intersection Improvement and traffic signal modernization on IL-72 from Lexington Dr. to I-290 east ramps in Schaumburg.
EB Hinsdale Oasis from Plainfield Rd to Plainfield Rd (+0.1 miles) Minor Left lane closed, two lanes open 3/27/17 9:00 AM to 10:30 AM Illinois Tollway Left Side of Ramp closed
NB Torrence Ave from 139th St to 136th St Medium All lanes and shoulders closed 11/30/15 12:00 AM to 8/25/17 11:59 PM IDOT This project consists of the bridge replacement at Torrence Avenue over the Grand Calument River, roadway widening, construction of storm sewer and drainage structures, retaining walls, street lighting and landscaping. Detour: S. Brainard Ave., to Burnham Ave., to Sibley Blvd.
SB Torrence Ave from 136th St to 139th St Medium All lanes and shoulders closed 11/30/15 12:00 AM to 8/25/17 11:59 PM IDOT This project consists of the bridge replacement at Torrence Avenue over the Grand Calument River, roadway widening, construction of storm sewer and drainage structures, retaining walls, street lighting and landscaping. Detour: S. Brainard Ave., to Burnham Ave., to Sibley Blvd.

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Mon Mar 27 2017 05:40:32 CDT