Cook County (Suburban) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-12 from Ela Rd to Lake Cook Rd Medium Various lanes closed 4/1/15 7:00 AM to 7/31/15 3:00 PM Lake County Pavement Resurfacing
NWB US-12 from Lake Cook Rd to Ela Rd Medium Various lanes closed 4/1/15 7:00 AM to 7/31/15 3:00 PM Lake County Pavement Resurfacing
NWB US-12 from Lake Cook Rd to Wooded Ridge Dr (+0.1 miles) Medium Various lanes closed 10/2/14 8:00 AM to 6/15/15 5:00 PM IDOT Resurfacing; Traffic will be reduced to one lane in each direction with flaggers at various locations in the work zone. The anticipated completion date is June 15.
SEB US-12 from Ela Rd to Lake Cook Rd Medium Various lanes closed 10/2/14 8:00 AM to 6/15/15 5:00 PM IDOT Resurfacing; Traffic will be reduced to one lane in each direction with flaggers at various locations in the work zone. The anticipated completion date is June 15.
NB IL-1 from Union Ave to Joe Orr Rd Medium Various lanes closed 3/16/15 7:00 AM to 8/31/15 7:00 PM IDOT Resurfacing
NB IL-1 from 31st Pl to 25th St Medium Various lanes closed 4/27/15 7:00 AM to 9/15/15 7:00 PM IDOT Traffic Signal Modernization Project
SB IL-1 from Joe Orr Rd to Union Ave Medium Various lanes closed 3/16/15 7:00 AM to 8/31/15 7:00 PM IDOT Resurfacing
SB IL-1 from 25th St to 31st Pl Medium Various lanes closed 4/27/15 7:00 AM to 9/15/15 7:00 PM IDOT Traffic Signal Modernization Project
NB IL-21/Milwaukee Ave from Touhy Ave to Glenview Rd Minor All lanes and shoulders open 4/20/15 7:00 AM to 8/31/15 7:00 PM IDOT Lane Reductions
NB IL-21 from Dearlove Rd to Zenith Dr Medium Various lanes closed 4/27/15 7:00 AM to 5/31/15 11:59 PM IDOT Bridge Joint Repair; Lane Reduction
SB IL-21 from Zenith Dr to Dearlove Rd Medium Various lanes closed 4/27/15 7:00 AM to 5/31/15 11:59 PM IDOT Bridge Joint Repair; Lane Reduction
SB IL-21/Milwaukee Ave from Glenview Rd to Touhy Ave Minor All lanes and shoulders open 4/20/15 7:00 AM to 8/31/15 7:00 PM IDOT Lane Reductions
EB IL-58 from Potter Rd to Lincoln St Medium Various lanes closed 3/30/15 7:00 AM to 8/31/15 11:59 PM IDOT Pavement patching, roadway milling and resurfacing; ***Long Term Closure***
WB IL-58 from Lincoln St to Potter Rd Medium Various lanes closed 3/30/15 7:00 AM to 8/31/15 11:59 PM IDOT Pavement patching, roadway milling and resurfacing; ***Long Term Closure***
EB IL-64 from Lavergne Ave to Roy Ave Medium Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Resurfacing, sewer, and landscaping
WB IL-64 from Roy Ave to Lavergne Ave Medium Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Resurfacing, sewer, and landscaping
EB IL-68 from Il-59 (Hawthorne Rd) to Rand Rd (US-12) Medium Various lanes closed 3/30/15 7:00 AM to 7/31/15 5:00 PM IDOT Resurfacing; Traffic reduced to one lane. Watch for flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.
EB IL-83/Sibley Blvd from Dixie Highway to Torrence Ave Medium Various lanes closed 4/13/15 7:00 AM to 8/31/15 11:59 PM IDOT resurfacing of roadway; flagging operation; expect delays
NB IL-83 from Cal-Sag Channel to Archer Ave Medium Various lanes closed 5/11/15 7:00 AM to 8/31/15 11:59 PM IDOT bridge painting
NWB IL-83 from Cal-Sag Channel to US-45 Medium Various lanes closed 5/4/15 7:00 PM to 7/15/15 11:59 PM IDOT drainage and resurfacing project:::reduced to one open lane with flaggers at different locations each day
SB IL-83 from Archer Ave to Cal-Sag Channel Medium Various lanes closed 5/11/15 7:00 AM to 8/31/15 11:59 PM IDOT bridge painting
SEB IL-83 from US-45 to Cal-Sag Channel Medium Various lanes closed 5/4/15 7:00 PM to 7/15/15 11:59 PM IDOT drainage and resurfacing project:::reduced to one open lane with flaggers at different locations each day
WB IL-83/Sibley Blvd from Torrence Ave to Dixie Highway Medium Various lanes closed 4/13/15 7:00 AM to 8/31/15 11:59 PM IDOT resurfacing of roadway; flagging operation; expect delays
NB IL-171 at Willow Springs Rd Medium Various lanes closed 8/10/14 6:00 AM to 6/30/15 11:59 PM IDOT
NB IL-171 at Ridgewood Rd Medium Various lanes closed 8/10/14 6:00 AM to 6/30/15 11:59 PM IDOT Traffic Signal Modernization
NB IL-171 at Main St Major All lanes and shoulders closed 4/20/15 7:00 AM to 6/1/15 11:59 PM IDOT Storm sewer and manhole reconstruction; DETOUR: Southbound IL 171 traffic will be directed right (west) onto Lake Street, then left (south) on 5th Avenue, then left (east) on Madison Street, and then back to southbound IL 171. Northbound IL 171 traffic will be directed left (west) onto Madison Street, then right (north) on 5th Avenue, then right (east) on Lake Street, and then back to Northbound IL 171.
SB IL-171 at Main St Major All lanes and shoulders closed 4/20/15 7:00 AM to 6/1/15 11:59 PM IDOT Storm sewer and manhole reconstruction; DETOUR: Southbound IL 171 traffic will be directed right (west) onto Lake Street, then left (south) on 5th Avenue, then left (east) on Madison Street, and then back to southbound IL 171. Northbound IL 171 traffic will be directed left (west) onto Madison Street, then right (north) on 5th Avenue, then right (east) on Lake Street, and then back to Northbound IL 171.
SB IL-171 at Ridgewood Rd Medium Various lanes closed 8/10/14 6:00 AM to 6/30/15 11:59 PM IDOT Traffic Signal Modernization
SB IL-171 at 47th St Medium Various lanes closed 3/2/15 7:00 AM to 10/31/15 7:00 PM IDOT Bridge Reconstruction
NB Arlington Heights Rd at I-90 Minor Left lane closed, two lanes open 5/18/15 7:00 AM to 7/31/15 11:59 PM Illinois Tollway rebuild the bridge carrying the Jane Addams Memorial Tollway (I-90) over the local road. This work is part of the I-90 Rebuilding and Widening Project scheduled to be complete in 2016.
NB Arlington Heights Rd from Lake Cook Rd to IL-83 Minor Various lanes closed 5/18/15 6:00 AM to 9/18/15 11:50 AM Lake County HMA Patching::Arlington Heights Rd - between Lake Cook Rd and IL Rte 83 is reduced to one lane in each direction due to roadwork.
SB Arlington Heights Rd from IL-83 to Lake Cook Rd Minor Various lanes closed 5/18/15 6:00 AM to 9/18/15 11:50 AM Lake County HMA Patching::Arlington Heights Rd - between Lake Cook Rd and IL Rte 83 is reduced to one lane in each direction due to roadwork.
SB Arlington Heights Rd at I-90 Minor Left lane closed, two lanes open 5/18/15 7:00 AM to 7/31/15 11:59 PM Illinois Tollway rebuild the bridge carrying the Jane Addams Memorial Tollway (I-90) over the local road. This work is part of the I-90 Rebuilding and Widening Project scheduled to be complete in 2016.
NB Ashland Ave from Thornton Rd to Broadway St Minor Various lanes closed 4/13/15 7:00 AM to 7/15/15 11:59 PM IDOT
NB Ashland Ave from Wood St to Broadway St Minor Various lanes closed 4/8/15 7:00 AM to 7/15/15 11:59 PM IDOT Drainage repair and safety updates
SB Ashland Ave from Broadway St to Thornton Rd Minor Various lanes closed 4/13/15 7:00 AM to 7/15/15 11:59 PM IDOT
SB Ashland Ave from Broadway St to Wood St Minor Various lanes closed 4/8/15 7:00 AM to 7/15/15 11:59 PM IDOT Drainage repair and safety updates
NB Barrington Rd from Schaumburg Rd to IL-72 Minor Various lanes closed 10/6/14 9:00 AM to 6/30/15 11:59 PM IDOT Resurfacing; flagging operation, reduce speed, allow extra time for travel.Work will be suspended during the winter.
SB Barrington Rd from IL-72 to Schaumburg Rd Minor Various lanes closed 10/6/14 9:00 AM to 6/30/15 11:59 PM IDOT Resurfacing; flagging operation, reduce speed, allow extra time for travel.Work will be suspended during the winter.
NB East End Ave from Sauk Trl (+0.1 miles) to 25th St Minor Various lanes closed 4/27/15 7:00 AM to 9/15/15 11:59 PM IDOT Pavement patching, milling of existing surface, placement of new hot mix asphalt surface course and traffic signal modernization. Expect delays, watch for flaggers and workers, obey posted speed limit.
SB East End Ave from 25th St to Sauk Trl (-0.1 miles) Minor Various lanes closed 4/27/15 7:00 AM to 9/15/15 11:59 PM IDOT Pavement patching, milling of existing surface, placement of new hot mix asphalt surface course and traffic signal modernization. Expect delays, watch for flaggers and workers, obey posted speed limit.
NEB Frontage Rd from IL-19 to Rodenburg Rd Medium All lanes and shoulders closed 4/6/15 7:00 AM to 6/5/15 11:59 PM Illinois Tollway Pavement reconstruction as part of the IL-390 project
NB Milwaukee Ave from Touhy Ave to Glenview Rd Medium Various lanes closed 4/20/15 7:00 AM to 8/31/15 11:59 PM IDOT Resurfacing; Traffic will be reduced to one lane in each direction
SB Milwaukee Ave from Glenview Rd to Touhy Ave Medium Various lanes closed 4/20/15 7:00 AM to 8/31/15 11:59 PM IDOT Resurfacing; Traffic will be reduced to one lane in each direction
NB Oak Park Ave from IL-19 to Forest Preserve Ave Medium All lanes and shoulders closed 4/27/15 7:00 AM to 7/27/15 11:59 PM Chicago DOT Street Reconstruction and Sewer Installation; DETOUR: NB Oak Park Avenue to WB Irving Park, to NB Harlem, to EB Forest Preserve Drive, and back to NB Oak Park Avenue
NWB Rand Rd/US-12 from IL-58 to Arlington Heights Rd Medium Various lanes closed 5/4/15 7:00 AM to 8/15/15 7:00 PM IDOT Resurfacing Project
SEB Rand Rd/US-12 from Arlington Heights Rd to IL-58 Medium Various lanes closed 5/4/15 7:00 AM to 8/15/15 7:00 PM IDOT Resurfacing Project
EB Wille Rd at Elmhurst Rd (+0.1 miles) Medium All lanes and shoulders closed 10/20/14 6:00 AM to 12/31/15 11:59 PM Illinois Tollway Reconstruct Pavement

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Sun May 24 2015 03:58:25 CDT