NOTE: You may place the mouse over a location to see its municipality and county,
or click on the location to see a map of the event.
| Chicago (Illinois) |
| US-41 ( Lincoln Ave) from Catalpa Ave to Hollywood
|
|
Medium |
Right lane closed, one lane open |
06/22/10 07:00 AM |
12/31/10 11:59 AM |
Chicago DOT |
Median landscape improvements. One lane in each direction maintained at all times. Two NB lanes maintained during rush hour. |
| IL-19 (Irving Park Rd) at Ravenswood Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Repairs |
| IL-50 (Cicero Ave) from 46th St to Marquette (67th St)
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Resurfacing, pavement striping |
| WB IL-72 ( Higgins Ave) at I-90 Eb IL-43 Exit
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Bridge deck overlay and joint repair |
| NB & Sb Laramie Ave from Roosevelt Rd to Lexington St
|
|
Medium |
All lanes and shoulders closed |
04/19/10 09:00 AM |
10/31/11 04:00 PM |
Chicago DOT |
REDIRECT ALL TRUCK AND VEHICULAR TRAFFIC VIA LARAMIE,
CENTRAL, HARRISON AND BACK TO LARAMIE. |
| 111th St at I-57
|
|
Medium |
All lanes and shoulders closed |
04/01/10 09:00 AM |
10/31/10 04:00 PM |
Chicago DOT |
Detour: 111th - Haltsed - 115th - Vincennes - 111th |
| 26th St at Bridge Over Franklin Connector
|
|
Medium |
All lanes and shoulders closed |
05/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Removal and replacement of bridge carrying 26th St and I-55 Frontafge Road B over Franklin Connector |
| Addison St at Bosworth
|
|
Medium |
All lanes and shoulders closed |
01/19/10 07:00 AM |
09/30/10 11:59 PM |
ComCenter |
Detour Addison-Clark-Irving Park-Ashland-Addison |
| Ashland Ave from Lake St to Fullerton Ave
|
|
Medium |
Various lanes closed |
05/24/10 07:00 PM |
09/30/10 11:59 PM |
Other |
Traffic signal interconnect |
| Balmoral Ave at Ravenswood Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks stored behind barricades for Metra RR Bridge work, maintian two lanes 4p-8a |
| Balmoral Ave from Winchester Ave to Wolcott Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Repairs |
| Bryn Mawr Ave at Talcott Ave
|
|
Medium |
Right shoulder closed, all lanes open |
04/01/10 06:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Barricade for new construction on Sayre/I-90 bridge |
| SB Canal St from 300 to 360 N Canal
|
|
Medium |
All lanes and shoulders closed |
09/06/10 07:00 PM |
09/20/10 06:00 AM |
Chicago DOT |
DETOUR: SB CANAL TO KINZIE TO CLINTON TO FULTON TO CANAL.
NB CANAL TO FULTON TO CLINTON TO KINZIE. |
| Central Ave from 63rd St to 47th St
|
|
Medium |
Various lanes closed |
08/18/10 06:00 AM |
10/10/10 11:59 PM |
IDOT |
Resurfacing |
| SB Cicero Ave At at 4600 To 4699 S. Cicero Ave
|
|
Medium |
Various lanes closed |
06/01/10 06:00 AM |
11/19/10 11:59 PM |
Chicago DOT |
WILL MAINTAIN AT LEAST TWO LANES OF NORTHBOUND TRAFFIC
FROM 6 AM TO 9 AM AND AT LEAST TWO LANES OF SOUTHBOUND
TRAFFIC FROM 3 PM TO 9 PM.
SUNDAY THRU THURSDAY NIGHT, 9:00 PM TO 6:00 AM,
FRIDAY NIGHT FROM 10:00 PM TO 8:00 AM
SATURDAY NIGHT FROM 7:00 PM TO 8:00 AM,
|
| WB Congress Pky from State St to Wells St
|
|
Medium |
Various lanes closed |
06/22/10 06:00 AM |
10/21/10 06:00 AM |
Chicago DOT |
|
| Ramp from EB Congress Pky to Franklin St
|
|
Medium |
All lanes and shoulders closed |
06/18/10 09:00 PM |
10/31/12 11:59 PM |
IDOT |
*Long Term Closure until 10/31/12* |
| Cottage Grove Ave from 92nd St to 83rd St
|
|
Medium |
Various lanes closed |
06/25/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Expect lane restrictions for patching, milling and resurfacing. One lane closed. |
| Devon Ave from US-14 (Caldwell Ave0 to Central Ave
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Patching and resurfacing |
| Eb/wb 130th St at Indiana Ave
|
|
Minor |
All lanes and shoulders open |
06/11/10 07:00 AM |
12/31/11 11:59 PM |
IDOT |
13 Ft - 6 In Max wid, legal length loads only |
| Eb/wb IL-19 (Irving Park Rd) from Ravenswood Ave to US-41 (Nb Lake Shore Dr)
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing |
| Eb/wb Lawrence Ave from Ravenswood Ave to Hermitage Ave
|
|
Medium |
Various lanes closed |
06/25/10 06:00 AM |
09/30/10 06:00 AM |
Chicago DOT |
EB Curb and traffic lanes closed, one lane in each direction maintained at all times. |
| Foster Ave at Wolcott Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Work |
| Franklin St from Harrison St to Van Buren St
|
|
Medium |
All lanes and shoulders closed |
06/18/10 12:01 AM |
12/31/11 11:59 PM |
Chicago OEMC |
Wacker Interchange Project |
| Grace St at Ravenswood Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Work |
| NB Hermitage Ave from 4459 to 4499 N Hermitage Ave
|
|
Medium |
Various lanes closed |
07/29/10 06:00 AM |
09/30/10 11:59 PM |
Chicago DOT |
One NB Lane will be open during non-work hours |
| Jackson Blvd at Canal St
|
|
Medium |
Various lanes closed |
08/26/10 06:00 AM |
09/24/10 07:00 PM |
Chicago DOT |
On lane EB and one lane NB maintained during sewer work |
| Kimball Ave from Argyle St to Ainslie St
|
|
Medium |
All lanes and shoulders closed |
09/09/10 07:00 AM |
09/09/10 03:30 PM |
Chicago DOT |
Sewer construction. Full closure during work hours. |
| Lake St from Elizabeth St to Ashland Ave
|
|
Medium |
All lanes and shoulders closed |
01/27/10 07:00 AM |
12/31/10 11:59 PM |
Chicago DOT |
EB Detour Lake - Ashland - Washington - Halsted, WB Detour - Lake - Halsted - Randolph - Ashland. WB Detour stays in place for duration of project.-9/2011 |
| Lake St from Halsted St to Ashland Ave
|
|
Medium |
Various lanes closed |
07/05/10 07:00 AM |
12/31/10 11:59 PM |
Chicago DOT |
WB Lake St Closed. One EB lane maintained at all times. |
| Lawrence Ave at I-90
|
|
Medium |
Various lanes closed |
04/01/10 09:00 AM |
10/31/10 04:00 PM |
Chicago DOT |
Reconstruction of Lawrence Ave bridge over I-90. One lane of traffic open in each direction. More information |
| Lawrence Ave at Winchester Ave
|
|
Minor |
All lanes and shoulders closed |
09/09/10 09:00 AM |
09/09/10 04:00 PM |
Chicago DOT |
Bridge rebuilding activities daily. Detour: EB Lawrence-Damen-Wilson-Ashland-Lawrence, WB Lawrence-Ashland-Wilson-Damen-Lawrence |
| Leland Ave at Ravenswood Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Repairs |
| Loomis St from Lake St to Ogden Ave
|
|
Medium |
All lanes and shoulders closed |
01/27/10 07:00 AM |
12/31/10 11:59 PM |
Chicago DOT |
|
| NB Lower Wacker Dr from Van Buren St to Lake St
|
|
Medium |
All lanes and shoulders closed |
04/05/10 06:00 AM |
11/01/10 11:59 PM |
IDOT |
Closed to Thru traffic |
| SB Lower Wacker Dr from Lake St to Van Buren St
|
|
Medium |
All lanes and shoulders closed |
04/05/10 07:00 AM |
11/01/10 11:59 PM |
IDOT |
Long term closure until 11/1/10 |
| Marquette Dr from Stony Island Ave to Richards Dr
|
|
Minor |
Various lanes closed |
06/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Bike path paving and tree planting |
| Montrose Ave at Wolcott Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Work |
| Morgan St from Randolph St to Fulton Market
|
|
Medium |
Various lanes closed |
07/07/10 07:00 AM |
12/31/10 11:59 PM |
Chicago DOT |
One SB lane only |
| NB N Ravenswood Ave from Leland Ave to Lawrence Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction trucks/materials stored behind barricades for Metera RR bridge work. Maintain one lane NB at all times on East side. |
| SB N Ravenswood Ave at Balmoral Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks stored behind barricade on W side of tracks for Metra RR Bridge rebuild |
| NB N Ravenswood Ave at Winnemac Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks sored behind barricades on east side of tracks for Metra RR Bridge work |
| SB N Ravenswood Ave at Sunnyside Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks stored behind barricades on west side of tracks for Metra RR Bridge work |
| Nb/sb Humboldt Dr from Division St to IL-64 (North Ave)
|
|
Medium |
Left lane closed, one lane open |
08/23/10 07:00 AM |
10/23/10 11:59 PM |
Chicago DOT |
Traffic calming test. One travel lane in each direction and center pedestrian island/turn lane tested instead of two lanes in each direction |
| Nb/sb Western Ave from 87th St to 91st St
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Drainage improvements, storm sewers |
| Ogden Ave from Lake St to Lake St
|
|
Medium |
Various lanes closed |
01/27/10 07:00 AM |
12/31/10 11:59 PM |
Chicago DOT |
One lane in each direction will be maintained after March 15 |
| Pershing Rd (39th St) from Ashland Ave to Dr Martin L King Jr Dr
|
|
Medium |
Various lanes closed |
05/04/10 07:00 AM |
10/16/10 11:59 PM |
IDOT |
Expect lane restrictions for patching, milling and resurfacing. |
| SB Ravenswood Ave from Lawrence Ave to Leland Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction material/trucks stored behind barricades for Metra RR Bridge work. Maintain one lane NB at all times on West side of tracks. |
| SB S Peoria St from 76th St to 76th St
|
|
Medium |
Various lanes closed |
08/02/10 06:00 AM |
10/01/10 11:59 PM |
Chicago DOT |
PARTIAL ROAD CLOSURE FOR THE PURPOSE OF BRIDGE
STRUCTURE REPAIR WORK.
MAINTAIN 1 LANE IN EACH DIRECTION AT ALL TIMES. |
| NB S Vincennes Ave from Lowe Ave to Birkhoff Ave
|
|
Medium |
All lanes and shoulders closed |
09/07/10 06:00 AM |
09/24/10 06:00 PM |
Chicago DOT |
New sewer; Detour: Northbound Via Vincennes to halsted to 81st to vincennes and Southbound Vincennes to 81st to halsted to Summit to Vincennes. |
| Sayre Ave at I-90
|
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Bridge superstructure replacement |
| Sunnyside Ave at Winchester Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks stored behind barricades to rebuild Metra RR bridge Two way traffic maintained 4p-8a |
| Torrence Ave at Grand Calumet River
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Bridge repair |
| Ramp from EB W Congress Pky to NB S Franklin St
|
|
Medium |
All lanes and shoulders closed |
06/18/10 12:01 AM |
12/31/11 11:59 PM |
Chicago OEMC |
Wacker Inerchange Project |
| EB W Van Buren St at Clinton St
|
|
Medium |
All lanes and shoulders closed |
02/02/10 09:00 AM |
12/31/10 11:59 PM |
Chicago OEMC |
EB Van Buren closed at Clinton until further notice. |
| Washington St at Chicago River
|
|
Medium |
Various lanes closed |
08/10/10 07:00 AM |
11/30/10 11:59 PM |
Chicago DOT |
Enclosure for bridge painting, one lane and sidewalk closed. |
| Wilson Ave at Winchester Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Repair |
| Winnemac Ave at Ravenswood Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks stored behind barricade |