Construction Report
Select Location
  
Updated: 8/28/14 4:00 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Carroll County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-40 at 1.3 miles NW of Milledgeville Major All lanes and shoulders closed 4/21/14 7:00 AM to 10/3/14 11:59 PM IDOT Follow marked detour
SB IL-40 at 1.3 miles NW of Milledgeville Major All lanes and shoulders closed 4/21/14 7:00 AM to 10/3/14 11:59 PM IDOT Follow marked detour
EB IL-64 from 1.5 miles east of IL-78 to 3 miles east of IL-78 Medium Various lanes closed 3/17/14 7:00 AM to 11/26/14 11:59 PM IDOT Traffic will be reduced to one lane and regulated by temporary traffic signals. The road will be closed for two weeks, during which time, follow marked detour route; Max Width - 12'-0" - Effective 03/17/2014 through 11/26/2014; Road Closed - No Permits - Effective 07/22/2014 through 08/08/2014.
EB IL-64 at Arnolds Grove Rd Medium Various lanes closed 3/19/14 8:00 AM to 11/15/14 5:00 PM IDOT Temporary traffic signals will be installed at the bridge and traffic will be restricted to one lane while they are replaced one half at a time.
WB IL-64 from 3 miles east of IL-78 to 1.5 miles east of IL-78 Medium Various lanes closed 3/17/14 7:00 AM to 11/26/14 11:59 PM IDOT Traffic will be reduced to one lane and regulated by temporary traffic signals. The road will be closed for two weeks, during which time, follow marked detour route; Max Width - 12'-0" - Effective 03/17/2014 through 11/26/2014; Road Closed - No Permits - Effective 07/22/2014 through 08/08/2014.

Cook County (City of Chicago) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-12 from I-190 to IL-19 Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Roadway reconstruction and widening
WB US-12 from IL-19 to I-190 Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Roadway reconstruction and widening
SEB US-45 (Mannheim Rd) from IL-72 to I-190 Medium Various lanes closed 5/13/13 7:00 AM to 8/29/14 11:59 PM IDOT Roadway reconstruction, lighting, and traffic signals.
WB US-45 (Mannheim Rd) from I-190 to IL-72 Medium Various lanes closed 5/13/13 7:00 AM to 8/29/14 11:59 PM IDOT Roadway reconstruction, lighting, and traffic signals.
EB 63rd St at I-90 Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Bridge superstructure replacement
EB 79th St from IL-171 to IL-50 Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Resurfacing
NB Austin Ave from 63rd St to 59th St Medium All lanes and shoulders closed 8/1/14 9:00 AM to 9/1/14 11:59 PM Chicago DOT Detour NB Austin Ave to EB 63rd St, to NB Central Ave, to WB 59th St, and back to Austin Ave. Reverse for SB Austin Ave.
SB Austin Ave from 59th St to 63rd St Medium All lanes and shoulders closed 8/1/14 9:00 AM to 9/1/14 11:59 PM Chicago DOT Detour NB Austin Ave to EB 63rd St, to NB Central Ave, to WB 59th St, and back to Austin Ave. Reverse for SB Austin Ave.
SB Central Ave at Pratt Ave Minor Various lanes closed 8/10/14 6:00 AM to 11/30/14 11:59 PM IDOT Resurfacing, widening, signal improvements
EB Cermak Rd at Hoyne Ave Medium All lanes and shoulders closed 7/21/14 9:00 AM to 9/12/14 11:59 PM IDOT Detour: EB Cermak to SB Western Ave to NB Blue Island Ave to NB Damen Ave and back to Cermak. Reverse for WB Cermak. Additional detour info posted.
WB Cermak Rd at Hoyne Ave Medium All lanes and shoulders closed 7/21/14 9:00 AM to 9/12/14 11:59 PM IDOT Detour: EB Cermak to SB Western Ave to NB Blue Island Ave to NB Damen Ave and back to Cermak. Reverse for WB Cermak. Additional detour info posted.
SWB Harlem Ave from 63rd Pl (+0.1 miles) to I-55 Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Milling and Resurfacing
EB Harrison St at I-90 Medium All lanes and shoulders closed 3/3/14 7:00 AM to 9/1/14 11:59 PM Chicago DOT Demo & Reconstruction of Harrison and Halsted Bridges::Detour during ComED Project:EB Harrison, to NB Racine, to EB Jackson to SB Des Plaines, to EB Harrison. Detour::WB Harrison, to NB Jefferson, to WB Van Buren, to SB Racine, to WB Harrison. DETOUR after ComED: EB Harrison to NB Racine to EB Van Buren, to SB Clinton St, to EB Harrison. WB Detour remains the same.
WB Harrison St at I-90 Medium All lanes and shoulders closed 3/3/14 7:00 AM to 9/1/14 11:59 PM Chicago DOT Demo & Reconstruction of Harrison and Halsted Bridges::Detour during ComED Project:EB Harrison, to NB Racine, to EB Jackson to SB Des Plaines, to EB Harrison. Detour::WB Harrison, to NB Jefferson, to WB Van Buren, to SB Racine, to WB Harrison. DETOUR after ComED: EB Harrison to NB Racine to EB Van Buren, to SB Clinton St, to EB Harrison. WB Detour remains the same.
SB Kedzie Ave at 48th Pl Medium All lanes and shoulders closed 7/2/14 1:45 PM to 12/31/15 11:59 PM Chicago DOT Viaduct Clearance Improvement Project; Detour SB Kedzie to EB 47th St, to SB California, to WB 51st St, and back to SB Kedzie. Reverse for NB Kedzie Ave
NB Morgan St from Harrison St to Van Buren St Minor Various lanes closed 9/9/13 7:00 AM to 9/12/14 11:59 PM IDOT ***Long term closure ***::DETOUR::NB Morgan, to WB Harrison, to NB Racine, to EB Van Buren. Reverse for SB Morgan Street traffic.
SB Morgan St from Van Buren St to Harrison St Minor Various lanes closed 9/9/13 7:00 AM to 9/12/14 11:59 PM IDOT ***Long term closure ***::DETOUR::NB Morgan, to WB Harrison, to NB Racine, to EB Van Buren. Reverse for SB Morgan Street traffic.
EB Roosevelt Rd from Laramie Ave to Pulaski Rd Minor Various lanes closed 8/10/14 6:00 AM to 10/31/14 11:59 PM IDOT Resurfacing
NB Stony Island Ext from Bishop Ford to 95th (US-12/20) Minor Both shoulders closed, all lanes open 3/31/14 8:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** Reduced Lane Widths.
NB Stony Island Ext from Bishop Ford to 103rd St Minor Right shoulder closed, all lanes open 8/28/14 9:00 AM to 3:00 PM IDOT Moving Operation
SB Stony Island Feeder from 95th (US-12/20) to Bishop Ford Minor Left lane and both shoulders closed, up to two lanes open 3/31/14 8:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** Reduced Lane Widths.
Ramp from NB Stony Island Feeder to 103rd St None Partial closure 8/28/14 9:00 AM to 3:00 PM IDOT
NB Western Ave from Columbus Ave to 34th St Minor Various lanes closed 5/2/14 9:00 AM to 9/1/14 5:00 PM Chicago DOT Street reconstruction or resurfacing.
SB Western Ave from 34th St to Columbus Ave Minor Various lanes closed 5/2/14 9:00 AM to 9/1/14 5:00 PM Chicago DOT Street reconstruction or resurfacing.
SB Western Blvd from Archer Ave to Archer Ave Minor Various lanes closed 4/3/14 7:00 AM to 9/30/14 11:59 PM Chicago DOT Sewer Main Installation; SB Archer Ave to SB Western Ave Left turn movement will be prohibited during Stage 1. NB Archer Ave to NB Western Blvd Detour as follows: Detour NB Archer to NB Western Ave, to EB 35th St, to NB Western Blvd. Detour SB Archer to SB Western as follows: SB Archer, to WB 35th St, to SB Western Ave/Blvd.

Cook County (Suburban) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-6 at IL-83 Medium Various lanes closed 7/7/14 8:00 AM to 11/15/14 5:00 PM IDOT Drivers are urged to pay close attention to the signs in the work zones, obey the posted speed limits, be on the alert for workers and equipment, expect delays and be prepared to stop. Watch for flaggers directing semi-trucks entering and leaving 159th St. and Torrence Ave.
WB US-6 at IL-83 Medium Various lanes closed 7/7/14 8:00 AM to 11/15/14 5:00 PM IDOT Drivers are urged to pay close attention to the signs in the work zones, obey the posted speed limits, be on the alert for workers and equipment, expect delays and be prepared to stop. Watch for flaggers directing semi-trucks entering and leaving 159th St. and Torrence Ave.
EB US-12 from I-190 to IL-19 Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Roadway reconstruction and widening
NWB US-12 at Joliet Rd Medium Various lanes closed 8/10/14 6:01 AM to 11/30/14 11:59 PM IDOT Resurfacing
SEB US-12 at Joliet Rd Medium Various lanes closed 8/10/14 6:01 AM to 11/30/14 11:59 PM IDOT Resurfacing
WB US-12 from IL-19 to I-190 Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Roadway reconstruction and widening
NWB US-14 at Palatine Rd Medium Various lanes closed 4/7/14 7:00 AM to 9/19/14 11:59 PM IDOT Modernization of Traffic Signals and Replacement of Brick Sidewalks
NWB US-14 at Hicks Rd Medium Various lanes closed 4/7/14 7:00 AM to 9/19/14 11:59 PM IDOT Modernization of Traffic Signals and Replacement of Brick Sidewalks
NWB US-14 at Benton St Medium Various lanes closed 4/7/14 7:00 AM to 9/19/14 11:59 PM IDOT Modernization of Traffic Signals and Replacement of Brick Sidewalks
NWB US-14 at Plum Grove Rd Medium Various lanes closed 4/7/14 7:00 AM to 9/19/14 11:59 PM IDOT Modernization of Traffic Signals and Replacement of Brick Sidewalks
NWB US-14 at Smith St Medium Various lanes closed 4/7/14 7:00 AM to 9/19/14 11:59 PM IDOT Modernization of Traffic Signals and Replacement of Brick Sidewalks
SEB US-14 at Smith St Medium Various lanes closed 4/7/14 7:00 AM to 9/19/14 11:59 PM IDOT Modernization of Traffic Signals and Replacement of Brick Sidewalks
SEB US-14 at Plum Grove Rd Medium Various lanes closed 4/7/14 7:00 AM to 9/19/14 11:59 PM IDOT Modernization of Traffic Signals and Replacement of Brick Sidewalks
SEB US-14 at Benton St Medium Various lanes closed 4/7/14 7:00 AM to 9/19/14 11:59 PM IDOT Modernization of Traffic Signals and Replacement of Brick Sidewalks
SEB US-14 at Hicks Rd Medium Various lanes closed 4/7/14 7:00 AM to 9/19/14 11:59 PM IDOT Modernization of Traffic Signals and Replacement of Brick Sidewalks
SEB US-14 at Palatine Rd Medium Various lanes closed 4/7/14 7:00 AM to 9/19/14 11:59 PM IDOT Modernization of Traffic Signals and Replacement of Brick Sidewalks
NWB US-20 from Park Ave to Oak Ave Medium Various lanes closed 3/17/14 7:00 AM to 11/1/14 11:59 AM IDOT Reduction of one lane in each direction; Widening, resurfacing, shoulder work, traffic signal modernization, improvements to storm sewers, curb and gutters, sidewalks, landscaping, bituminous removal, pavement marking;
NWB US-20 from Park Ave to Oak Ave Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Widening, and traffic signal modernization
NWB US-20 from Park Ave to Oak Ave Medium Various lanes closed 3/17/14 7:00 AM to 8/29/14 11:59 PM IDOT widening/traffic signal modernization project
SEB US-20 from Oak Ave to Park Ave Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Widening, and traffic signal modernization
SEB US-20 from Oak Ave to Park Ave Medium Various lanes closed 3/17/14 7:00 AM to 8/29/14 11:59 PM IDOT widening/traffic signal modernization project
SEB US-20 from Oak Ave to Park Ave Medium Various lanes closed 3/17/14 7:00 AM to 11/1/14 11:59 AM IDOT Reduction of one lane in each direction; Widening, resurfacing, shoulder work, traffic signal modernization, improvements to storm sewers, curb and gutters, sidewalks, landscaping, bituminous removal, pavement marking;
EB US-30 at Western Ave Medium All lanes and shoulders open 4/14/14 7:00 AM to 9/30/14 11:59 PM IDOT intersection improvement project
EB US-30 at Western Ave Medium Various lanes closed 4/14/14 8:00 AM to 9/30/14 5:00 PM IDOT Intersection Improvement; Expect delays, watch for flaggers and signing. Obey posted speed limits and be on alert for workers and equipment.
WB US-30 at Western Ave Medium All lanes and shoulders open 4/14/14 7:00 AM to 9/30/14 11:59 PM IDOT intersection improvement project
NB US-45 from 179th St to 175th St Medium Various lanes closed 8/23/13 7:00 AM to 12/31/14 11:59 PM IDOT Ending July 31, 2015----Roadway widening and reconstruction in order to provide three lanes in each direction separated by a landscaped median::Traffic lanes may be reduced during construction activities,*** except between the hours of 2:30 p.m. and 6:30 p.m***::watch out for flaggers.
NB US-45 from 175th St to 131st St Medium Various lanes closed 8/23/13 7:00 AM to 12/31/14 11:59 PM IDOT Ending July 31, 2015----Roadway widening and reconstruction in order to provide three lanes in each direction separated by a landscaped median::Traffic lanes may be reduced during construction activities,*** except between the hours of 2:30 p.m. and 6:30 p.m***::watch out for flaggers.
SB US-45 from 131st St to 179th St Medium Various lanes closed 8/23/13 7:00 AM to 12/31/14 11:59 PM IDOT Ending July 31, 2015----Roadway widening and reconstruction in order to provide three lanes in each direction separated by a landscaped median::Traffic lanes may be reduced during construction activities,*** except between the hours of 2:30 p.m. and 6:30 p.m***::watch out for flaggers.
WB US-45 (Mannheim Rd) from I-190 to IL-72 Medium Various lanes closed 5/13/13 7:00 AM to 8/29/14 11:59 PM IDOT Roadway reconstruction, lighting, and traffic signals.
SB IL-43 from I-55 to 63rd Pl (+0.1 miles) Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Milling and Resurfacing
SB IL-59 at Metra Railroad Medium Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Bridge repairs
SEB IL-62(Algonquin Rd) from Penny Rd to Roselle Rd Medium Various lanes closed 5/19/14 6:00 AM to 10/31/14 11:59 PM IDOT pavement patching project
EB IL-64 from Railroad Ave to Lavergne Ave Medium Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Sidewalk, curb and gutter, drainage and landscaping
EB IL-64 from Lavergne Ave to Roy Ave Medium Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Resurfacing, sewer, and landscaping
EB IL-64 at Thatcher Ave Major All lanes and shoulders closed 6/23/14 7:00 AM to 12/31/14 12:00 AM IDOT Bridge Reconstruction Project; A detour route will be posted to access southbound Thatcher Avenue at Chicago Avenue and to access northbound Thatcher at Fullerton Avenue.
WB IL-64 at Thatcher Ave Major All lanes and shoulders closed 6/23/14 7:00 AM to 12/31/14 12:00 AM IDOT Bridge Reconstruction Project; A detour route will be posted to access southbound Thatcher Avenue at Chicago Avenue and to access northbound Thatcher at Fullerton Avenue.
WB IL-64 from Roy Ave to Lavergne Ave Medium Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Resurfacing, sewer, and landscaping
WB IL-64 from Lavergne Ave to Railroad Ave Medium Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Sidewalk, curb and gutter, drainage and landscaping
NB IL-171 at Willow Springs Rd Medium Various lanes closed 8/10/14 6:00 AM to 6/30/15 11:59 PM IDOT
NB IL-171 at US-34 Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Traffic Signal Modernization
NB IL-171 at Ridgewood Rd Medium Various lanes closed 8/10/14 6:00 AM to 6/30/15 11:59 PM IDOT Traffic Signal Modernization
SB IL-171 at Ridgewood Rd Medium Various lanes closed 8/10/14 6:00 AM to 6/30/15 11:59 PM IDOT Traffic Signal Modernization
SB IL-171 at US-34 Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Traffic Signal Modernization
EB 79th St from IL-171 to IL-50 Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Resurfacing
EB 79th St at State Rd Minor Various lanes closed 8/10/14 6:00 AM to 12/31/14 11:59 PM IDOT Traffic Signal Modernization
WB 79th St at State Rd Minor Various lanes closed 8/10/14 6:00 AM to 12/31/14 11:59 PM IDOT Traffic Signal Modernization
EB Algonquin Rd from Campground Rd to Oakton St Medium All lanes and shoulders closed 8/25/14 6:00 AM to 9/22/14 11:59 PM IDOT Painting of I-294 bridge over Algonquin Rd::DETOUR:: NB traffic to proceed west on Oakton st north on River Rd back to Algonquin Rd::EB traffic proceed south on Des Plaines River Rd east on Oakton St back on Algonquin Rd
More information
WB Algonquin Rd from Oakton St to Campground Rd Medium All lanes and shoulders closed 8/25/14 6:00 AM to 9/22/14 11:59 PM IDOT Painting of I-294 bridge over Algonquin Rd::DETOUR:: NB traffic to proceed west on Oakton st north on River Rd back to Algonquin Rd::EB traffic proceed south on Des Plaines River Rd east on Oakton St back on Algonquin Rd
More information
SEB Bridge St from Mccormick Blvd to Brown Ave Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Bridge repair/widening and resurfacing, and drainage.
EB Church St at Crawford Ave Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Roadway reconstruction
WB Church St at Crawford Ave Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Roadway reconstruction
NB Cornell Ave from IL-64 to Armitage Ave Minor Various lanes closed 8/10/14 6:00 AM to 12/31/14 11:59 PM IDOT Reconstruction, storm sewers, curb and gutter, sidewalk, sod and pavement markings
SB Cornell Ave from Armitage Ave to North Ave Minor Various lanes closed 8/10/14 6:00 AM to 12/31/14 11:59 PM IDOT Reconstruction, storm sewers, curb and gutter, sidewalk, sod and pavement markings
NB Des Plaines Ave from 26th St to 22nd St Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Crack control treatment, sewer structure, detector loops.
SB Des Plaines Ave from 22nd St to 26th St Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Crack control treatment, sewer structure, detector loops.
NB Golf View Rd at 31st St Medium Various lanes closed 8/10/14 6:00 AM to 10/31/14 11:59 PM IDOT Intersection Reconstruction
SB Golf View Rd at 31st St Medium Various lanes closed 8/10/14 6:00 AM to 10/31/14 11:59 PM IDOT Intersection Reconstruction
EB Grand Ave from County Line Rd to Northwest Ave Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Traffic signal modernization
SWB Harlem Ave from 63rd Pl (+0.1 miles) to I-55 Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Milling and Resurfacing
EB Jeffery Ave at Wolf Rd Minor Various lanes closed 8/10/14 6:00 AM to 11/30/14 11:59 PM IDOT New bridge
WB Jeffery Ave at Wolf Rd Minor Various lanes closed 8/10/14 6:00 AM to 11/30/14 11:59 PM IDOT New bridge
NEB Joliet Rd at Wolf Rd Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Traffic Signal Modernization
SWB Joliet Rd at Wolf Rd Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Traffic Signal Modernization
EB Kensington Rd from Forest Ave to IL-83 Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT
EB Lake Ave from Pfingsten Rd to North Lake Terrace Minor Various lanes closed 8/10/14 6:00 AM to 10/31/14 11:59 PM IDOT Roadway widening, intersection channelization, traffic signals.
SEB Lawndale Ave from Joliet Rd to Des Plaines River Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Resurfacing
EB Main St from Lincoln Ave to US-41 Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Resurfacing, detector loops, and markings.
WB Main St from US-41 to Latrobe Ave Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Resurfacing, detector loops, and markings.
WB Main St from Latrobe Ave to Lincoln Ave Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Resurfacing, detector loops, and markings.
EB Mccarthy Rd at Walker Rd Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Channelization and traffic signal modernization
WB Mccarthy Rd at Walker Rd Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Channelization and traffic signal modernization
NB Park Blvd from Millers Xing to Devon Ave Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Resurfacing, parkway restoration, curb and gutter.
EB Roosevelt Rd from Laramie Ave to Pulaski Rd Minor Various lanes closed 8/10/14 6:00 AM to 10/31/14 11:59 PM IDOT Resurfacing
WB Roosevelt Rd from 17th Ave to 23rd Ave Minor Various lanes closed 8/10/14 6:00 AM to 1/31/15 11:59 PM IDOT Storm sewers, street lights, landscaping.
EB Schaumburg Rd at Barrington Rd Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Street and traffic signals, storm sewers, and resurfacing
WB Schaumburg Rd at Barrington Rd Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Street and traffic signals, storm sewers, and resurfacing
EB Willow Rd from Waukegan Rd (IL-43) to I-94 Minor Various lanes closed 4/1/13 7:00 AM to 10/31/14 11:59 PM IDOT Roadway reconstruction, adding lanes, bridge, lighting and drainage. Max width 9 feet 6 inches.
WB Willow Rd from I-94 to Waukegan Rd (IL-43) Minor Various lanes closed 4/1/13 7:00 AM to 10/31/14 11:59 PM IDOT Roadway reconstruction, adding lanes, bridge, lighting and drainage. Max width 9 feet 6 inches.

DuPage County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-34 from Long Grove Dr to Meadow Lakes Blvd Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Beam and bearing fabrication for proposed overpass
EB US-34 at IL-59 Medium Various lanes closed 8/10/14 6:00 AM to 10/31/14 11:59 PM IDOT Traffic signal modernization
WB US-34 at IL-59 Medium Various lanes closed 8/10/14 6:00 AM to 10/31/14 11:59 PM IDOT Traffic signal modernization
EB IL-19 at York Rd Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Grade separation and erosion control
WB IL-19 at York Rd Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Grade separation and erosion control
EB IL-38 at Kautz Rd Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Roadway reconstruction
NB IL-53 from Army Trail Blvd to IL-390 Medium Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Roadway reconstruction, additional lanes, dry land bridge and traffic signals.
SB IL-53 from IL-390 to Army Trail Blvd Medium Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Roadway reconstruction, additional lanes, dry land bridge and traffic signals.
EB IL-56 at I-355 Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Traffic signal modernization
WB IL-56 at I-355 Medium Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Traffic signal modernization
NB IL-59 at at BNSF Railroad viaduct Medium Various lanes closed 4/21/14 7:00 AM to 9/30/14 11:59 PM IDOT 1.57 miles of roadway reconstruction, resurfacing, retaining walls, noise abatement walls, lighting, traffic signals and other work
NB IL-59 from Aurora Rd to Diehl Rd Medium Various lanes closed 8/10/14 6:00 AM to 8/31/15 11:59 PM IDOT Traffic signals, reconstruction
SB IL-59 from Ferry Rd to New York St Medium Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Construction of 5 retaining walls
SB IL-59 from Diehl Rd to Aurora Rd Medium Various lanes closed 8/10/14 6:00 AM to 8/31/15 11:59 PM IDOT Traffic signals, reconstruction
SB IL-59 from Aurora Rd to New York St Medium Various lanes closed 8/10/14 6:00 AM to 10/31/14 11:59 PM IDOT Roadway reconstruction, traffic signals and lighting
SB IL-59 at at BNSF Railroad viaduct Medium Various lanes closed 4/21/14 7:00 AM to 9/30/14 11:59 PM IDOT 1.57 miles of roadway reconstruction, resurfacing, retaining walls, noise abatement walls, lighting, traffic signals and other work
EB IL-64 from Swift Rd to I-355 Medium Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Bridge replacement
WB IL-64 from I-355 to Swift Rd Medium Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Bridge replacement
NB IL-83 from 3rd Ave to Mark St Medium Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Traffic signal modernization
NWB IL-83 at S&S/I&M Canal Medium Various lanes closed 5/14/14 7:00 AM to 9/12/14 11:59 PM IDOT Bridge Painting
SEB IL-83 at S&S/I&M Canal Medium Various lanes closed 5/14/14 7:00 AM to 9/12/14 11:59 PM IDOT Bridge Painting
NB CR-13 at Mack Rd Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Signals/lighting and/or advanced warning signs/and flashers.
SB CR-13 at Mack Rd Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Signals/lighting and/or advanced warning signs/and flashers.
EB CR-17 at Burr Oak Rd Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Signals/lighting and/or advanced warning signs/and flashers.
WB CR-17 at Burr Oak Rd Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Signals/lighting and/or advanced warning signs/and flashers.
NB CR-23 at Travis Pky Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Traffic signal, highway lighting
SB CR-23 at Travis Pky Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Traffic signal, highway lighting
EB 22nd St at I-88 Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Installation of bridge fence railing
EB 75th St from Adams St to Plainfield Rd Minor Various lanes closed 8/10/14 6:00 AM to 11/30/14 11:59 PM IDOT Bike path, traffic signals, sewers and drainage structures, and curb and gutter
WB 75th St from Plainfield Rd to Adams St Minor Various lanes closed 8/10/14 6:00 AM to 11/30/14 11:59 PM IDOT Bike path, traffic signals, sewers and drainage structures, and curb and gutter
EB Fabyan Pky from Main St (+0.2 miles) to Louis Bork Dr (+0.1 miles) Minor Various lanes closed 8/28/14 6:00 AM to 6:00 PM,
8/29/14 6:00 AM to 6:00 PM,
8/30/14 6:00 AM to 6:00 PM,
9/1/14 6:00 AM to 6:00 PM,
... more, ending on 9/8/14
Gateway Annual Resurfacing:: watch out for flaggers, expect delays.
SB Lively Blvd from Thorndale Ave to Thorndale Ave Medium All lanes and shoulders closed 8/1/14 7:00 AM to 8/30/14 11:59 PM Illinois Tollway Road realignment
NB Madison St from 91st St to 79th St Minor Various lanes closed 8/10/14 6:00 AM to 12/31/14 11:59 PM IDOT Resurfacing, widening and shoulder repair.
SB Madison St from 79th St to 91st St Minor Various lanes closed 8/10/14 6:00 AM to 12/31/14 11:59 PM IDOT Resurfacing, widening and shoulder repair.
EB Main St at Washington St Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Traffic signal modernization and sidewalk.
WB Main St at Washington St Minor Various lanes closed 8/10/14 6:00 AM to 8/31/14 11:59 PM IDOT Traffic signal modernization and sidewalk.
NB Maple St at IL-19 Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Parkway restoration, storm sewer, bridge replacement.
SB Maple St at IL-19 Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Parkway restoration, storm sewer, bridge replacement.
EB Norwood Ave at IL-53 Medium All lanes and shoulders closed 8/18/14 6:00 AM to 11/30/14 11:59 PM Illinois Tollway Intersection Reconstruction
WB Norwood Ave at IL-53 Medium All lanes and shoulders closed 8/18/14 6:00 AM to 11/30/14 11:59 PM Illinois Tollway Intersection Reconstruction
NB Park Blvd from Clover Ridge Ln to Willow St Medium All lanes and shoulders closed 8/4/14 6:00 AM to 8/31/14 11:59 PM Illinois Tollway Ramp construction work
NB Park Blvd from Millers Xing to Devon Ave Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Resurfacing, parkway restoration, curb and gutter.
SB Park Blvd from Devon Ave to Millers Xing Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Resurfacing, parkway restoration, curb and gutter.
SB Park Blvd from Willow St to Clover Ridge Ln Medium All lanes and shoulders closed 8/4/14 6:00 AM to 8/31/14 11:59 PM Illinois Tollway Ramp construction work
NB Pasquinelli Dr at US-34 Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Addition of turn lanes and traffic signals
SB Pasquinelli Dr at US-34 Minor Various lanes closed 8/10/14 6:00 AM to 9/30/14 11:59 PM IDOT Addition of turn lanes and traffic signals
NB Pleasant Hill Rd from Geneva Rd to St Charles Rd Minor Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Milling and resurfacing
SB Pleasant Hill Rd from St Charles Rd to Geneva Rd Minor Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Milling and resurfacing
NB Swift Rd from Army Trail Rd to US-20 Minor Various lanes closed 8/10/14 6:00 AM to 11/30/14 11:59 PM IDOT Resurfacing and drainage.
SB Swift Rd from US-20 to Army Trail Rd Minor Various lanes closed 8/10/14 6:00 AM to 11/30/14 11:59 PM IDOT Resurfacing and drainage.

Henry County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-6 from Green River Rd to Edwards Rd Medium All lanes and shoulders closed 4/28/14 7:00 AM to 9/26/14 11:59 PM IDOT Road will be closed to through traffic; Follow marked detour; No Permits - Effective 04/28/2014 through 09/12/2014
WB US-6 from Edwards Rd to Green River Rd Medium All lanes and shoulders closed 4/28/14 7:00 AM to 9/26/14 11:59 PM IDOT Road will be closed to through traffic; Follow marked detour; No Permits - Effective 04/28/2014 through 09/12/2014
NB IL-78 at Railroad Crossing Major All lanes and shoulders closed 7/21/14 7:00 AM to 8/28/14 11:59 PM IDOT The road will be closed to all traffic. Follow marked detour.
SB IL-78 at Railroad Crossing Major All lanes and shoulders closed 7/21/14 7:00 AM to 8/28/14 11:59 PM IDOT The road will be closed to all traffic. Follow marked detour.

Jo Daviess County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-78 from Chelsea Rd to Mahoney Rd Minor Various lanes closed 5/12/14 7:00 AM to 9/19/14 11:59 PM IDOT Use alternate route; IL-78 will be reduced to one lane and regulated with temporary traffic signals. 11'-6" -Max Width effective 06/05/2014 through 09/19/2014
SB IL-78 from Mahoney Rd to Chelsea Rd Minor Various lanes closed 5/12/14 7:00 AM to 9/19/14 11:59 PM IDOT Use alternate route; IL-78 will be reduced to one lane and regulated with temporary traffic signals. 11'-6" -Max Width effective 06/05/2014 through 09/19/2014

Kane County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB US-20 from IL-31 (+0.2 miles) to Randall Rd (-0.5 miles) Medium Various lanes closed 2/25/13 7:00 AM to 8/30/14 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NWB US-20 from Higgins Rd to Dietrich Rd Medium Various lanes closed 11/13/13 7:00 AM to 9/1/14 11:59 PM IDOT Roadway improvement
SEB US-20 from Dietrich Rd to Higgins Rd Medium Various lanes closed 11/13/13 7:00 AM to 9/1/14 11:59 PM IDOT Roadway improvement
SEB US-20 from Randall Rd (+0.5 miles) to IL-31 (-0.2 miles) Medium Various lanes closed 2/25/13 7:00 AM to 8/30/14 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB US-30 from Orchard Rd to US-34 Medium Various lanes closed 4/24/13 7:00 AM to 8/31/14 11:59 PM IDOT Roadway reconstruction, adding lanes, bridge replacement and signals. Max width 9 feet 6 inches.
EB US-30 from IL-31 to Railroad St Medium Various lanes closed 4/1/13 7:00 AM to 10/31/14 11:59 PM IDOT Roadway reconstruction, widening, bridge rehabilitation, and traffic signals.
WB US-30 from US-34 to Orchard Rd Medium Various lanes closed 4/24/13 7:00 AM to 8/31/14 11:59 PM IDOT Roadway reconstruction, adding lanes, bridge replacement and signals. Max width 9 feet 6 inches.
WB US-30 from Railroad St to IL-31 Medium Various lanes closed 4/1/13 7:00 AM to 10/31/14 11:59 PM IDOT Roadway reconstruction, widening, bridge rehabilitation, and traffic signals.
NB IL-25 from Gilbert St to Dunham Rd Medium Various lanes closed 4/1/14 7:00 AM to 8/31/14 11:59 PM IDOT Reconstruction; Flagging Operation
SB CR-19 from IL-25 to Stearns Rd Medium Various lanes closed 4/1/14 7:00 AM to 8/31/14 11:59 PM IDOT Reconstruction; Flagging Operation
NWB Burlington Rd from Mcdonald Rd to Ellithorpe Rd Medium All lanes and shoulders closed 8/18/14 7:00 AM to 9/30/14 11:59 PM Gateway Detour route will direct traffic around the road closure using IL-47 and Plato Roads.
SEB Burlington Rd from Ellithorpe Rd to Mcdonald Rd Medium All lanes and shoulders closed 8/18/14 7:00 AM to 9/30/14 11:59 PM Gateway Detour route will direct traffic around the road closure using IL-47 and Plato Roads.
NB Church Rd Bridge at I-88 Medium All lanes and shoulders closed 8/18/14 6:00 AM to 12/31/14 11:59 PM Illinois Tollway Bridge Reconstruction
SB Church Rd Bridge at I-88 Medium All lanes and shoulders closed 8/18/14 6:00 AM to 12/31/14 11:59 PM Illinois Tollway Bridge Reconstruction
EB Fabyan Pky from Main St (+0.2 miles) to Louis Bork Dr (+0.1 miles) Minor Various lanes closed 8/28/14 6:00 AM to 6:00 PM,
8/29/14 6:00 AM to 6:00 PM,
8/30/14 6:00 AM to 6:00 PM,
9/1/14 6:00 AM to 6:00 PM,
... more, ending on 9/8/14
Gateway Annual Resurfacing:: watch out for flaggers, expect delays.
WB Fabyan Pky from Louis Bork Dr to Main St (-0.3 miles) Minor Various lanes closed 8/28/14 6:00 AM to 6:00 PM,
8/29/14 6:00 AM to 6:00 PM,
8/30/14 6:00 AM to 6:00 PM,
9/1/14 6:00 AM to 6:00 PM,
... more, ending on 9/8/14
Gateway Annual Resurfacing:: watch out for flaggers, expect delays.
NB French Rd from Lenschow Rd to IL-72 Minor Various lanes closed 7/23/14 8:00 AM to 11/23/14 5:00 PM Gateway Bridge replacement. Traffic reduced to 1 lane directed with temporary traffic signals. Reduced speed limit posted. Watch for workers and equipment in work zones.
SB French Rd from IL-72 to Lenschow Rd Minor Various lanes closed 7/23/14 8:00 AM to 11/23/14 5:00 PM Gateway Bridge replacement. Traffic reduced to 1 lane directed with temporary traffic signals. Reduced speed limit posted. Watch for workers and equipment in work zones.
NB Harmony Rd at over I-90 Medium All lanes and shoulders closed 3/10/14 7:00 AM to 8/29/14 11:59 PM Gateway Bridge replacement work::: Big Timber Road will be used as part of the detour routes.
SB Harmony Rd at over I-90 Medium All lanes and shoulders closed 3/10/14 7:00 AM to 8/29/14 11:59 PM Gateway Bridge replacement work::: Big Timber Road will be used as part of the detour routes.
NB Hennig Rd at over I-90 Medium All lanes and shoulders closed 3/10/14 7:00 AM to 8/29/14 11:59 PM Gateway Bridge replacement work::: Big Timber Road will be used as part of the detour routes.
SB Hennig Rd at over I-90 Medium All lanes and shoulders closed 3/10/14 7:00 AM to 8/29/14 11:59 PM Gateway Bridge replacement work::: Big Timber Road will be used as part of the detour routes.
EB Keslinger Rd from Brundige Dr to Randall Rd Minor Various lanes closed 8/11/14 6:00 AM to 8/31/14 6:00 PM Gateway Milling and Paving; Temporary daily lane closures Monday through Saturday; Please watch for fresh oil signs, flaggers and reduce speed while traveling through construction zone.
WB Keslinger Rd from Randall Rd to Brundige Dr Minor Various lanes closed 8/11/14 6:00 AM to 8/31/14 6:00 PM Gateway Milling and Paving; Temporary daily lane closures Monday through Saturday; Please watch for fresh oil signs, flaggers and reduce speed while traveling through construction zone.
NB La Fox Rd from IL-38 to Campton Hills Dr Medium Various lanes closed 8/13/14 7:00 AM to 9/30/14 11:59 PM Gateway Bridge and Culvert Replacement:::More information
SB La Fox Rd from Campton Hills Dr to IL-38 Medium Various lanes closed 8/13/14 7:00 AM to 9/30/14 11:59 PM Gateway Bridge and Culvert Replacement:::More information
NB LaFox Rd from IL-38 to Campton Hills Dr Minor Various lanes closed 5/11/14 9:00 AM to 9/11/14 11:59 PM IDOT Bridge work at Mill Creek; Temporary signals to maintain 1 open lane of traffic; Expect delays. Be alert for workers and equipment entering and exiting the construction zone.
SB LaFox Rd from Campton Hills Dr to IL-38 Minor Various lanes closed 5/11/14 9:00 AM to 9/11/14 11:59 PM IDOT Bridge work at Mill Creek; Temporary signals to maintain 1 open lane of traffic; Expect delays. Be alert for workers and equipment entering and exiting the construction zone.
NB Randall Rd at Tyler Creek Bridge Minor Various lanes closed 6/2/14 8:00 AM to 10/26/14 5:00 PM IDOT Bridge Reconstruction; Temporary lane reductions, 2 lanes of traffic will be maintained in each direction. Expect delays.
SB Randall Rd at Tyler Creek Bridge Minor Various lanes closed 6/2/14 8:00 AM to 10/26/14 5:00 PM IDOT Bridge Reconstruction; Temporary lane reductions, 2 lanes of traffic will be maintained in each direction. Expect delays.
EB Tanner Rd from Norris Rd to Deerpath Rd Medium All lanes and shoulders closed 8/18/14 7:00 AM to 11/30/14 11:59 PM Gateway Project improvements include removal of existing structure, construction of new reinforced concrete slab structure and bridge approaches, pavement removal, roadway reconstruction and resurfacing; Detour: A posted detour route will direct traffic around the closure using Orchard Road, Randall Road, Main Street and Bliss Road.
WB Tanner Rd from Deerpath Rd to Norris Rd Medium All lanes and shoulders closed 8/18/14 7:00 AM to 11/30/14 11:59 PM Gateway Project improvements include removal of existing structure, construction of new reinforced concrete slab structure and bridge approaches, pavement removal, roadway reconstruction and resurfacing; Detour: A posted detour route will direct traffic around the closure using Orchard Road, Randall Road, Main Street and Bliss Road.
EB Thatcher Rd from Mcnulty Rd to Beith Rd Medium All lanes and shoulders closed 5/19/14 7:00 AM to 9/30/14 11:59 PM Gateway A posted detour route will direct traffic around the closure using Meredith Road, IL Route 38 and County Line Road. The public is advised to follow the posted detour route around the project and to expect increased travel times.
WB Thatcher Rd from Beith Rd to Mcnulty Rd Medium All lanes and shoulders closed 5/19/14 7:00 AM to 9/30/14 11:59 PM Gateway A posted detour route will direct traffic around the closure using Meredith Road, IL Route 38 and County Line Road. The public is advised to follow the posted detour route around the project and to expect increased travel times.
NB Tyrrell Rd at I-90 Minor Various lanes closed 8/4/14 7:00 AM to 11/20/14 11:59 PM Gateway Lanes reduced due to Illinois Tollway Bridge Replacement/Reconstruction project
SB Tyrrell Rd at I-90 Minor Various lanes closed 8/4/14 7:00 AM to 11/20/14 11:59 PM Gateway Lanes reduced due to Illinois Tollway Bridge Replacement/Reconstruction project

Kendall County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-30 from Orchard Rd to US-34 Medium Various lanes closed 4/24/13 7:00 AM to 8/31/14 11:59 PM IDOT Roadway reconstruction, adding lanes, bridge replacement and signals. Max width 9 feet 6 inches.
EB US-30 from Briarcliff Rd to US-34 Major All lanes and shoulders closed 2/22/14 6:00 AM to 8/31/14 11:59 PM IDOT Stage change; Watch for flaggers and signing in work zones, obey posted speed limits and be alert for workers and equipment.
WB US-30 from US-34 to Orchard Rd Medium Various lanes closed 4/24/13 7:00 AM to 8/31/14 11:59 PM IDOT Roadway reconstruction, adding lanes, bridge replacement and signals. Max width 9 feet 6 inches.
WB US-30 from US-34 to Briarcliff Rd Major All lanes and shoulders closed 2/22/14 6:00 AM to 8/31/14 11:59 PM IDOT Stage change; Watch for flaggers and signing in work zones, obey posted speed limits and be alert for workers and equipment.
EB US-34 from Game Farm Rd to Market Place Dr Medium Various lanes closed 3/12/12 7:00 AM to 12/31/14 11:59 PM IDOT Milling and resurfacing. One lane closed.
WB US-34 from Market Place Dr to Game Farm Rd Medium Various lanes closed 3/12/12 7:00 AM to 12/31/14 11:59 PM IDOT Milling and resurfacing. One lane closed.
NB IL-47 from IL-71 to US-34 Medium Various lanes closed 11/6/12 7:00 AM to 12/31/14 11:59 PM IDOT Milling and Resurfacing; Watch for flaggers; Permit: Max width 9 feet 4 inches.
SB IL-47 from US-34 to IL-71 Medium Various lanes closed 11/6/12 7:00 AM to 12/31/14 11:59 PM IDOT Milling and Resurfacing; Watch for flaggers; Permit: Max width 9 feet 4 inches.

Lake County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-22 from IL-59 to US-12 Medium Various lanes closed 6/16/14 7:00 AM to 9/30/14 3:00 PM Lake County Pavement Resurfacing
WB IL-22 from US-12 to IL-59 Medium Various lanes closed 6/16/14 7:00 AM to 9/30/14 3:00 PM Lake County Pavement Resurfacing
EB IL-173 from Madison Ave (-0.1 miles) to Deep Lake Rd Medium Various lanes closed 8/4/14 7:00 AM to 8/29/14 3:00 PM Lake County Pavement Patching
WB IL-173 from Deep Lake Rd to Madison Ave (+0.1 miles) Medium Various lanes closed 8/4/14 7:00 AM to 8/29/14 3:00 PM Lake County Pavement Patching
EB IL-176 at Fairfield Rd Medium Various lanes closed 4/3/13 7:33 AM to 8/29/14 3:00 PM Lake County Intersection Improvement
WB IL-176 at Fairfield Rd Medium Various lanes closed 4/3/13 7:33 AM to 8/29/14 3:00 PM Lake County Intersection Improvement
NB CR-4 from Kelsey Rd (CR-30) Ct to Roberts Rd Major All lanes and shoulders closed 8/11/14 6:00 AM to 12/12/14 11:59 AM Lake County ***Long Term Closure***; DETOUR: Roberts Road, Lake County Route V-45, to U.S. Route 59 to Kelsey Road, Lake County Route V-49. Local traffic will have access to residences and businesses, from the south, within the closure area.
SB CR-4 from Roberts Rd to Kelsey Rd (CR-30) Major All lanes and shoulders closed 8/11/14 6:00 AM to 12/12/14 11:59 AM Lake County ***Long Term Closure***; DETOUR: Roberts Road, Lake County Route V-45, to U.S. Route 59 to Kelsey Road, Lake County Route V-49. Local traffic will have access to residences and businesses, from the south, within the closure area.
EB CR-20 from IL-83 to US-45 Medium Various lanes closed 3/27/14 7:00 AM to 6/5/15 3:00 PM Lake County Peterson Road Widening
WB CR-20 from US-45 to IL-83 Medium Various lanes closed 3/27/14 7:00 AM to 6/5/15 3:00 PM Lake County Peterson Road Widening
EB CR-A34 from Butterfield Rd to IL-21 Minor Various lanes closed 4/22/14 8:03 AM to 8/29/14 3:00 PM Lake County Widening and Railroad Crossing Improvement
WB CR-A34 from IL-21 to Butterfield Rd Minor Various lanes closed 4/22/14 8:03 AM to 8/29/14 3:00 PM Lake County Widening and Railroad Crossing Improvement
NB CR-28 at IL-134 Minor Various lanes closed 1/27/14 7:00 AM to 11/28/14 3:00 PM Lake County Widening and reconstruction
SB CR-28 at IL-134 Minor Various lanes closed 1/27/14 7:00 AM to 11/28/14 3:00 PM Lake County Widening and reconstruction
NB Delany Rd from Sunset Ave to Yorkhouse Rd Medium Various lanes closed 4/1/12 7:00 AM to 8/29/14 11:59 PM Lake County Reconstruct and Widen to 5 Lanes. One lane open in each direction; Expect heavy delays and watch for flaggers.
SB Delany Rd from Yorkhouse Rd to Sunset Ave Medium Various lanes closed 4/1/12 7:00 AM to 8/29/14 11:59 PM Lake County Reconstruct and Widen to 5 Lanes. One lane open in each direction; Expect heavy delays and watch for flaggers.
NB CR-15 at Wadsworth Rd (+0.2 miles) Medium Various lanes closed 5/27/14 11:00 AM to 9/5/14 3:00 PM Lake County Bridge Resurfacing
SB CR-15 at Wadsworth Rd (+0.2 miles) Medium Various lanes closed 5/27/14 11:00 AM to 9/5/14 3:00 PM Lake County Bridge Resurfacing
NWB Gilmer Rd from Midlothian Rd to Fremont Center Rd Medium Various lanes closed 10/1/13 7:00 AM to 12/31/14 11:59 PM Lake County Traffic Signal Interconnect. Intermittent Lane Closures. ***Long Term Closure***
SEB Gilmer Rd from Fremont Center Rd to Midlothian Rd Medium Various lanes closed 10/1/13 7:00 AM to 12/31/14 11:59 PM Lake County Traffic Signal Interconnect. Intermittent Lane Closures. ***Long Term Closure***
NB CR-4 at Roberts Rd Minor Various lanes closed 8/11/14 7:00 AM to 11/27/15 3:00 PM Lake County Replacing the existing signalized intersection with a multi-late roundabout
SB CR-4 at Roberts Rd Minor Various lanes closed 8/11/14 7:00 AM to 11/27/15 3:00 PM Lake County Replacing the existing signalized intersection with a multi-late roundabout
EB CR-31 at Hainesville Rd Medium Various lanes closed 8/13/13 8:00 AM to 11/1/14 3:00 PM Lake County Grade Separation of Rollins Rd under the Wisconsin Central Ltd. Railroad. Project website.
EB Wadsworth Rd at Cambridge Blvd Medium Various lanes closed 6/1/13 7:00 AM to 10/31/14 11:59 PM Lake County Reconstruction & Widening of Intersection; One Lane Open In Each Direction; ***Long Term Closure***
WB Wadsworth Rd at Cambridge Blvd Medium Various lanes closed 6/1/13 7:00 AM to 10/31/14 11:59 PM Lake County Reconstruction & Widening of Intersection; One Lane Open In Each Direction; ***Long Term Closure***

Lee County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-30 at I-39 Medium Various lanes closed 8/25/14 6:00 AM to 10/31/14 11:59 PM IDOT Road Closed - No permits - Effective September 8,2014 through September11, 2014; Max Width - 15'0" - Effective August 25, 2014 through October 31, 2014
WB US-30 at I-39 Medium Various lanes closed 8/25/14 6:00 AM to 10/31/14 11:59 PM IDOT Road Closed - No permits - Effective September 8,2014 through September11, 2014; Max Width - 15'0" - Effective August 25, 2014 through October 31, 2014

McHenry County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-31 from Trinity Dr to James R Rakow Rd Medium Various lanes closed 5/27/14 7:00 AM to 6/1/15 11:59 PM IDOT
EB IL-120 at Fox River Medium Various lanes closed 7/21/14 7:00 AM to 9/26/14 11:59 PM IDOT Bridge Repairs
WB IL-120 at Fox River Medium Various lanes closed 7/21/14 7:00 AM to 9/26/14 11:59 PM IDOT Bridge Repairs
EB IL-176 at Smith Rd Medium Various lanes closed 4/15/14 6:00 AM to 9/15/14 11:59 PM IDOT Traffic will be reduced to one lane with flaggers
WB IL-176 at Smith Rd Medium Various lanes closed 4/15/14 6:00 AM to 9/15/14 11:59 PM IDOT Traffic will be reduced to one lane with flaggers

Ogle County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB IL-2 at Over Mud Creek Minor Various lanes closed 8/18/14 7:00 AM to 9/5/14 11:59 PM IDOT Traffic will be shifted away from the work area. Occassional lane closure with flaggers
SWB IL-2 at Over Mud Creek Minor Various lanes closed 8/18/14 7:00 AM to 9/5/14 11:59 PM IDOT Traffic will be shifted away from the work area. Occassional lane closure with flaggers

Rock Island County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-67 at Over Mississippi River Medium Various lanes closed 6/23/14 6:00 AM to 10/1/14 11:59 PM IDOT Traffic will be reduced to one lane during off-peak working hours::From July 28th through September 6th the road will be closed to all traffic:::9'-6" - Max Width - Effective June 2 through July 5, 2014::Road Closed - No Permits - Effective July 6 through September 6, 2014::9'-6" - Max Width - Effective September 6 through October 1, 2014 From July 28th through September 6th the road will be closed to all traffic
SB US-67 at Over Mississippi River Medium Various lanes closed 6/23/14 6:00 AM to 10/1/14 11:59 PM IDOT Traffic will be reduced to one lane during off-peak working hours::From July 28th through September 6th the road will be closed to all traffic:::9'-6" - Max Width - Effective June 2 through July 5, 2014::Road Closed - No Permits - Effective July 6 through September 6, 2014::9'-6" - Max Width - Effective September 6 through October 1, 2014 From July 28th through September 6th the road will be closed to all traffic
EB IL-5 from I-74 to 41st St Medium Various lanes closed 2/24/14 7:00 AM to 11/21/14 11:59 PM IDOT Work is mostly off the roadway during the day. There are some nighttime lane closures. There is work and lane closures on Coaltown Road, 38th Street, and various other sideroads in the area.
WB IL-5 from 41st St to I-74 Medium Various lanes closed 2/24/14 7:00 AM to 11/21/14 11:59 PM IDOT Work is mostly off the roadway during the day. There are some nighttime lane closures. There is work and lane closures on Coaltown Road, 38th Street, and various other sideroads in the area.
NB IL-84 at 157th Ave (-0.2 miles) Medium Various lanes closed 4/1/13 7:00 AM to 8/30/14 11:59 PM IDOT Traffic will be restricted to one lane and controlled by temporary traffic signals. ** Max width 11 feet 6 inches Effective 04/08/2013 through 08/30/2013.
SB IL-84 at 157th Ave (+0.2 miles) Medium Various lanes closed 4/1/13 7:00 AM to 8/30/14 11:59 PM IDOT Traffic will be restricted to one lane and controlled by temporary traffic signals. ** Max width 11 feet 6 inches Effective 04/08/2013 through 08/30/2013.
EB IL-92 at 99th Ave (-0.1 miles) Major All lanes and shoulders closed 5/7/14 8:00 AM to 8/29/14 5:00 PM IDOT Follow marked detour; No Permits 05/07/2014 through 08/15/2014
EB IL-92 from Big Branch Creek to 1.5 miles n/o IL-192 Major All lanes and shoulders closed 5/7/14 7:00 AM to 10/7/14 11:59 PM IDOT Road Closed
EB IL-92 from 115th Ave to Loud Thunder Rd Medium Various lanes closed 3/31/14 8:00 AM to 8/29/14 5:00 PM IDOT ***Long Term Closure***; Traffic will be reduced to one lane and regulated by flaggers; Max Width - 8'-6" - Effective 04/03/2014 through 11/25/2014
EB IL-92 from Turkey Hollow Creek to Turkey Hollow Rd Medium Various lanes closed 7/8/14 6:00 AM to 9/30/14 11:59 PM IDOT Traffic will be reduced to one lane, separated from the work by barrier wall, and regulated with temporary traffic signals.:::MAX WIDTH - 14'-6" - Effective July 8 through September 30, 2014
WB IL-92 from Turkey Hollow Rd to Turkey Hollow Creek Medium Various lanes closed 7/8/14 6:00 AM to 9/30/14 11:59 PM IDOT Traffic will be reduced to one lane, separated from the work by barrier wall, and regulated with temporary traffic signals.:::MAX WIDTH - 14'-6" - Effective July 8 through September 30, 2014
WB IL-92 from Loud Thunder Rd to 115th Ave Medium Various lanes closed 3/31/14 8:00 AM to 8/29/14 5:00 PM IDOT ***Long Term Closure***; Traffic will be reduced to one lane and regulated by flaggers; Max Width - 8'-6" - Effective 04/03/2014 through 11/25/2014
WB IL-92 from 1.5 miles n/o IL-192 to Big Branch Creek Major All lanes and shoulders closed 5/7/14 7:00 AM to 10/7/14 11:59 PM IDOT Road Closed
WB IL-92 at 99th Ave (+0.1 miles) Major All lanes and shoulders closed 5/7/14 8:00 AM to 8/29/14 5:00 PM IDOT Follow marked detour; No Permits 05/07/2014 through 08/15/2014
EB River Dr from 19th St to 23rd St Medium All lanes and shoulders closed 8/27/14 6:00 AM to 12/5/14 11:59 PM IDOT Follow Marker Detour; No Permits - Effective September 8th through December 5, 2014
WB River Dr from 23rd St to 19th St Medium All lanes and shoulders closed 8/27/14 6:00 AM to 12/5/14 11:59 PM IDOT Follow Marker Detour; No Permits - Effective September 8th through December 5, 2014

Stephenson County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-20 at Pecatonica River Medium Various lanes closed 8/19/14 6:00 AM to 8/29/14 11:59 PM IDOT Punchlist work
NB IL-26 from Empire St to Galena Ave Medium Various lanes closed 8/25/14 6:00 AM to 10/10/14 6:00 AM IDOT One lane in each direction will be closed and regulated with flaggers; Expect moderate delays; Max Width 14'-6" - Effective August 25th through October 10, 2014
SB IL-26 from Galena Ave to Empire St Medium Various lanes closed 8/25/14 6:00 AM to 10/10/14 6:00 AM IDOT One lane in each direction will be closed and regulated with flaggers; Expect moderate delays; Max Width 14'-6" - Effective August 25th through October 10, 2014

Whiteside County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-30 at Over Mississippi River Medium Various lanes closed 8/27/14 7:00 AM to 9/5/14 11:59 PM IDOT Traffic will be reduced to one lane and regulated with traffic. Expect moderate delays; Max Width - 13'-6" - Effective August 27 through September 5, 2014
WB US-30 at Over Mississippi River Medium Various lanes closed 8/27/14 7:00 AM to 9/5/14 11:59 PM IDOT Traffic will be reduced to one lane and regulated with traffic. Expect moderate delays; Max Width - 13'-6" - Effective August 27 through September 5, 2014
NEB IL-172 at Fargo Rd (+0.8 miles) Major All lanes and shoulders closed 3/24/14 8:00 AM to 9/6/14 5:00 PM IDOT Bridge Work; Traffic will be detoured onto Hahnaman Road from Tampico east to IL 40.

Will County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
WB US-30 at Western Ave Medium All lanes and shoulders open 4/14/14 8:00 AM to 9/30/14 5:00 PM IDOT Intersection Improvement; Expect delays, watch for flaggers and signing. Obey posted speed limits and be on alert for workers and equipment.
EB 143rd St at Lemont Rd Medium Various lanes closed 9/1/13 7:00 AM to 11/30/14 11:59 PM Gateway Widening and Traffic Signals; Intermittent Lane Closures; ***Long Term Closure***
WB 143rd St at Lemont Rd Medium Various lanes closed 9/1/13 7:00 AM to 11/30/14 11:59 PM Gateway Widening and Traffic Signals; Intermittent Lane Closures; ***Long Term Closure***
EB 95th St from Plainfield-Naperville Rd to Boughton Rd Minor Various lanes closed 6/1/13 7:00 AM to 11/30/14 11:59 PM Gateway Widening; New Bridge; Traffic Signals; Intermittent Lane Closures; ***Long Term Closure***
WB 95th St from Boughton Rd to Plainfield-Naperville Rd Minor Various lanes closed 6/1/13 7:00 AM to 11/30/14 11:59 PM Gateway Widening; New Bridge; Traffic Signals; Intermittent Lane Closures; ***Long Term Closure***
EB Caton Farm Rd from County Line Rd to Drauden Rd Medium Various lanes closed 4/1/13 7:00 AM to 11/30/14 11:59 PM Gateway widening and reconstruction, signalization; ***Long Term Closure***
WB Caton Farm Rd from Drauden Rd to County Line Rd Medium Various lanes closed 4/1/13 7:00 AM to 11/30/14 11:59 PM Gateway widening and reconstruction, signalization; ***Long Term Closure***
EB Pauling-Goodenow Rd at over Plum Creek Medium All lanes and shoulders closed 4/1/14 7:00 AM to 11/30/14 11:59 PM Gateway Bridge Replacement; ***Long Term Closure***
WB Pauling-Goodenow Rd at over Plum Creek Medium All lanes and shoulders closed 4/1/14 7:00 AM to 11/30/14 11:59 PM Gateway Bridge Replacement; ***Long Term Closure***

Winnebago County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-20 from IL-2 to IL-251 Medium Various lanes closed 3/17/14 7:00 AM to 11/26/14 11:59 PM IDOT Lane Reduction; 12'-6" - Max. Width - Effective 03/17/2014 through November 30, 2014; Traffic will be reduced one lane in each direction. Beginning in late May, traffic will be head to head separated by barrier wall. Expect moderate delays during rush hour and weekends. The Northbound IL-2 to Eastbound US-20 will be closed. There will be a temporary connection so that northbound will use southbound IL-2 to eastbound US-20 ramp (without going under the structures).
EB US-20-Br/State St from Fairview Ave to Mid America Dr Medium Various lanes closed 8/27/14 8:00 PM to 8/28/14 11:00 AM daily until 8/31/14 IDOT Resurfacing
WB US-20 from IL-251 to IL-2 Medium Various lanes closed 3/17/14 7:00 AM to 11/26/14 11:59 PM IDOT Lane Reduction; 12'-6" - Max. Width - Effective 03/17/2014 through November 30, 2014; Traffic will be reduced one lane in each direction. Beginning in late May, traffic will be head to head separated by barrier wall. Expect moderate delays during rush hour and weekends. The Northbound IL-2 to Eastbound US-20 will be closed. There will be a temporary connection so that northbound will use southbound IL-2 to eastbound US-20 ramp (without going under the structures).
WB US-20-BR (State St) from IL-70 (Kilburn Ave) to Sunset Ave Minor Various lanes closed 4/29/13 7:00 AM to 8/30/14 11:59 PM IDOT One lane will be closed in each direction; Max Length - 80'-0"-Westbound only-from IL-70 to Avon St - effective asap through 8/30/2014.
NEB IL-2 from Clifton Ave to Cedar St Medium Various lanes closed 6/7/14 7:00 AM to 11/30/14 11:59 PM IDOT Traffic will be reduced to one lane in each direction; 8'-6" Max Width - Effective 04/7/2104 through 11/25/2014
NEB IL-2 from US-20 to Clifton Ave Medium Various lanes closed 5/5/14 7:00 AM to 10/31/14 11:59 PM IDOT Traffic will be reduced to one lane in each direction::Expect minor :::05/08 through 05/23 the road will be closed to all traffic
SWB IL-2 from Cedar St to Clifton Ave Medium Various lanes closed 6/7/14 7:00 AM to 11/30/14 11:59 PM IDOT Traffic will be reduced to one lane in each direction; 8'-6" Max Width - Effective 04/7/2104 through 11/25/2014
SWB IL-2 from Clifton Ave to US-20 Medium Various lanes closed 5/5/14 7:00 AM to 10/31/14 11:59 PM IDOT Traffic will be reduced to one lane in each direction::Expect minor :::05/08 through 05/23 the road will be closed to all traffic
EB IL-173 from Alpine Rd to I-39/90 Medium Various lanes closed 3/17/14 7:00 AM to 11/6/15 11:59 PM IDOT Lane Reduction; 9'-6" - Max Width - Effective 03/17/2014 through 11/07/2014; Watch for flaggers, one lane in each direction is maintained. Expect some additional delays
WB IL-173 from I-39/90 to Alpine Rd Medium Various lanes closed 3/17/14 7:00 AM to 11/6/15 11:59 PM IDOT Lane Reduction; 9'-6" - Max Width - Effective 03/17/2014 through 11/07/2014; Watch for flaggers, one lane in each direction is maintained. Expect some additional delays
NWB Jefferson St at 3rd St Minor Various lanes closed 8/25/14 6:00 AM to 9/15/14 11:59 PM IDOT Traffic Signal Improvements weather permitting
NWB Jefferson St at 2nd St Minor Various lanes closed 8/25/14 6:00 AM to 9/15/14 11:59 PM IDOT Traffic Signal Improvements weather permitting
NWB Jefferson St at 1st St Minor Various lanes closed 8/25/14 6:00 AM to 9/15/14 11:59 PM IDOT Traffic Signal Improvements weather permitting
NWB Jefferson St at Wyman St Minor Various lanes closed 8/25/14 6:00 AM to 9/15/14 11:59 PM IDOT Traffic Signal Improvements weather permitting
NWB Jefferson St at Main St Minor Various lanes closed 8/25/14 6:00 AM to 9/15/14 11:59 PM IDOT Traffic Signal Improvements weather permitting
EB State St from Sunset Ave to IL-70 (Kilburn Ave) Minor Various lanes closed 4/29/13 7:00 AM to 8/30/14 11:59 PM IDOT One lane will be closed in each direction; Max Length - 80'-0"-Westbound only-from IL-70 to Avon St - effective asap through 8/30/2014.

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Thu Aug 28 04:04:28 CDT 2014