Construction Report
Select Location
  
Updated: 5/6/16 3:32 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

Boone County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB Tripp Rd from I-90 to I-90 Medium All lanes and shoulders closed 3/7/16 7:00 AM to 12/31/16 11:45 PM Illinois Tollway Construction on the Tripp Road Bridge is scheduled to begin on Monday, March 7, with closure of the bridge in both directions. Electronic message signs will be put in place in advance to alert drivers to the closure. No detour route will be posted.
SB Tripp Rd from I-90 to I-90 Medium All lanes and shoulders closed 3/7/16 7:00 AM to 12/31/16 11:45 PM Illinois Tollway Construction on the Tripp Road Bridge is scheduled to begin on Monday, March 7, with closure of the bridge in both directions. Electronic message signs will be put in place in advance to alert drivers to the closure. No detour route will be posted.

Bureau County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-89 from Bottom Rd (+0.4 miles) to Illinois St (-0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
SB IL-89 from Illinois St (+0.3 miles) to Bottom Rd (-0.4 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.

Carroll County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-84 from Clay St to IL-64 Medium Various lanes closed 4/21/16 8:00 AM to 11/30/16 5:00 PM IDOT
SB IL-84 from IL-64 to Clay St Medium Various lanes closed 4/21/16 8:00 AM to 11/30/16 5:00 PM IDOT

Cass County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-67 from 6th St (+0.2 miles) to IL-103 (-0.6 miles) Medium Various lanes closed 11/14/14 12:00 AM to 12/31/16 11:59 PM IDOT Traffic restricted to max weight 15 tons.
SB US-67 from IL-103 (+0.6 miles) to 6th St (-0.2 miles) Medium Various lanes closed 11/14/14 12:00 AM to 12/31/16 11:59 PM IDOT Traffic restricted to max weight 15 tons.

Champaign County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-45 from Lincoln St to Holden St Medium Various lanes closed 4/4/16 7:00 AM to 8/15/16 11:59 AM IDOT Resurfacing
SB US-45 from Holden St to Lincoln St Medium Various lanes closed 4/4/16 7:00 AM to 8/15/16 11:59 AM IDOT Resurfacing
EB US-136 from 4200 East Rd to County Road 800 Medium Various lanes closed 5/2/16 7:00 AM to 7/31/16 11:59 PM IDOT milling and resurfacing as well as adding new HMA shoulders
WB US-136 from County Road 800 to 4200 East Rd Medium Various lanes closed 5/2/16 7:00 AM to 7/31/16 11:59 PM IDOT milling and resurfacing as well as adding new HMA shoulders

Cook County (City of Chicago) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-19 at IL-43 Medium Various lanes closed 4/27/16 7:00 AM to 11/1/16 11:59 PM IDOT traffic signal modernization
WB IL-19 at IL-43 Medium Various lanes closed 4/27/16 7:00 AM to 11/1/16 11:59 PM IDOT traffic signal modernization
EB IL-64 from IL-50 to Kostner Ave Major All lanes and shoulders closed 4/4/16 8:00 AM to 11/22/16 6:00 PM Chicago DOT Rail bridge repairs / Eastbound North Avenue traffic will be detoured to Northbound Cicero Avenue, to Eastbound Grand Avenue, and back to Eastbound North Avenue. The detour for Westbound North Avenue will be the reverse.
WB Adams St at South Branch of Chicago River Medium All lanes and shoulders closed 1/25/16 8:00 PM to 2/25/17 11:59 PM Chicago DOT After evening rush hour, no vehicle traffic. Pedestrian Access allowed.
NB East River Rd from I-190 to I-90 Medium All lanes and shoulders closed 4/21/16 7:00 AM to 9/21/16 11:59 PM IDOT A posted detour will direct northbound traffic on East River Road to go east on Bryn Mawr Avenue, north on Cumberland Avenue and west on Higgins Road (Illinois 72) to meet back on East River Road. Southbound traffic on East River Road will take the reverse route.
SB East River Rd from I-90 to I-190 Medium All lanes and shoulders closed 4/21/16 7:00 AM to 9/21/16 11:59 PM IDOT A posted detour will direct northbound traffic on East River Road to go east on Bryn Mawr Avenue, north on Cumberland Avenue and west on Higgins Road (Illinois 72) to meet back on East River Road. Southbound traffic on East River Road will take the reverse route.
EB Madison St from Austin Blvd to Waller Ave Medium All lanes and shoulders closed 3/14/16 7:00 AM to 5/20/16 11:59 PM Chicago DOT Sewer Main Installation; Detour: Eastbound Madison Street to Southbound Austin Boulevard, to Eastbound Jackson Boulevard, to Northbound Central Avenue, and back to Eastbound Madison Street. Detour: truck traffic on Eastbound Madison Street to Southbound Ridgeland Avenue, to Eastbound Roosevelt Road, to Northbound Central Avenue, and back to Eastbound Madison Street.
NB Torrence Ave at Grand Calumet River (~139th) Medium All lanes and shoulders closed 11/1/15 6:00 AM to 12/31/16 2:00 PM IDOT Bridge Replacement: DETOUR:::Northbound traffic is detoured east on Sibley Boulevard, north on Burnham Avenue, northwest on Brainard Avenue and west on 130th Street to reconnect with Torrence Avenue. Southbound traffic is following the reverse route.
More information

Cook County (Suburban) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-30 from IL-83 to Illinois-Indiana Border Major All lanes and shoulders closed 3/21/16 7:00 AM to 9/1/16 11:59 PM IDOT
WB US-30 from Illinois-Indiana Border to IL-83 Major All lanes and shoulders closed 3/21/16 7:00 AM to 9/1/16 11:59 PM IDOT
NB IL-1 from 187th St to 183rd St Medium Various lanes closed 4/11/16 9:00 AM to 11/30/16 11:59 PM IDOT improvements to the intersections and install sidewalk on Halsted Street.
SB IL-1 from 183rd St to 187th St Medium Various lanes closed 4/11/16 9:00 AM to 11/30/16 11:59 PM IDOT improvements to the intersections and install sidewalk on Halsted Street.
NB IL-21 at Greenwood Ave Medium Various lanes closed 2/11/16 7:00 AM to 9/21/16 11:59 PM IDOT Intersections improvement
SB IL-21 at Greenwood Ave Medium Various lanes closed 2/11/16 7:00 AM to 9/21/16 11:59 PM IDOT Intersections improvement
SB IL-43 at 151st St Medium Various lanes closed 1/27/16 5:00 AM to 9/1/16 5:00 PM IDOT Intersection Improvement
More information
EB IL-58 from Michael Mnr to Michael Mnr Medium Various lanes closed 2/11/16 7:00 AM to 9/21/16 11:59 PM IDOT Traffic Signal Reconstruction
EB IL-58 from Washington Rd to Washington St Medium Various lanes closed 2/11/16 7:00 AM to 9/21/16 11:59 PM IDOT Traffic Signal Reconstruction
WB IL-58 from Washington St to Washington Rd Medium Various lanes closed 2/11/16 7:00 AM to 9/21/16 11:59 PM IDOT Traffic Signal Reconstruction
WB IL-58 from Michael Mnr to Michael Mnr Medium Various lanes closed 2/11/16 7:00 AM to 9/21/16 11:59 PM IDOT Traffic Signal Reconstruction
NWB IL-62 at Barrington Rd Medium Various lanes closed 9/21/15 7:00 AM to 5/30/16 11:59 PM IDOT pavement patching
SEB IL-62 at Barrington Rd Medium Various lanes closed 9/21/15 7:00 AM to 5/30/16 11:59 PM IDOT pavement patching
EB IL-68 at Wilke Rd Medium Various lanes closed 2/15/16 7:00 AM to 7/31/17 11:59 PM IDOT The project will add a right turn lane from eastbound Dundee Road to N. Wilke Road and from eastbound Dundee Road to Kennicott Avenue.The overall improvements to the intersections will modernize traffic signals, improve pedestrian safety and ease traffic congestion coming off of Illinois 53.
EB IL-68 from Wilke Rd to Kennicott Ave Medium Various lanes closed 4/4/16 7:00 AM to 8/31/16 3:30 PM IDOT Intersection improvements of Dundee Road (Illinois 68) at N. Wilke Road and Dundee Road (Illinois 68) at Kennicott Avenue; majority of closures b/w 7AM-3:30pm.
EB IL-68 at Kennicott Ave Medium Various lanes closed 2/15/16 7:00 AM to 7/31/17 11:59 PM IDOT The project will add a right turn lane from eastbound Dundee Road to N. Wilke Road and from eastbound Dundee Road to Kennicott Avenue.The overall improvements to the intersections will modernize traffic signals, improve pedestrian safety and ease traffic congestion coming off of Illinois 53.
EB IL-68 at IL-83 Medium Various lanes closed 4/18/16 7:00 AM to 11/1/16 11:59 PM IDOT improvements to the intersection
WB IL-68 at IL-83 Medium Various lanes closed 4/18/16 7:00 AM to 11/1/16 11:59 PM IDOT improvements to the intersection
WB IL-68 from Kennicott Ave to Wilke Rd Medium Various lanes closed 4/4/16 7:00 AM to 8/31/16 3:30 PM IDOT Intersection improvements of Dundee Road (Illinois 68) at N. Wilke Road and Dundee Road (Illinois 68) at Kennicott Avenue; majority of closures b/w 7AM-3:30pm.
NWB IL-83 at Ridge Rd Medium Various lanes closed 4/14/16 6:00 AM to 9/1/16 11:59 PM IDOT intersection reconstruction
SEB IL-83 at Ridge Rd Medium Various lanes closed 4/14/16 6:00 AM to 9/1/16 11:59 PM IDOT intersection reconstruction
NB IL-171 from Archer Ave to 47th St Medium Various lanes closed 3/24/16 7:00 AM to 11/1/16 11:59 PM IDOT Reduced to one lane in each direction; Rehabilitation and widening of eight bridges along northbound Illinois 171 between 47th Street and 55th Street. It also will include bridge replacement of northbound Illinois 171 over Interstate 55. In addition, the improvements will feature ramp modification, wall repairs, asphalt resurfacing, pavement markings, landscaping, and replacements of signs, roadway lighting, high mast light towers and drainage structures.
SB IL-171 from 47th St to Archer Ave Medium All lanes and shoulders open 3/24/16 7:00 AM to 11/1/16 11:59 PM IDOT Reduced to one lane in each direction; Rehabilitation and widening of eight bridges along northbound Illinois 171 between 47th Street and 55th Street. It also will include bridge replacement of northbound Illinois 171 over Interstate 55. In addition, the improvements will feature ramp modification, wall repairs, asphalt resurfacing, pavement markings, landscaping, and replacements of signs, roadway lighting, high mast light towers and drainage structures.
EB 144th Pl from Jefferson Ave to US-45 Minor All lanes and shoulders open 4/11/16 7:00 AM to 5/31/16 11:59 PM IDOT intersection reconstruction ::Expect delays and should allow extra travel time::DETOURs posted
WB 144th Pl from US-45 to Jefferson Ave Minor All lanes and shoulders open 4/11/16 7:00 AM to 5/31/16 11:59 PM IDOT intersection reconstruction ::Expect delays and should allow extra travel time::DETOURs posted
EB 147th St from Ravinia Ave to US-45 Medium All lanes and shoulders closed 5/2/16 5:00 AM to 5/31/16 11:59 PM IDOT Improvements to LaGrange Road from 131st Street to 179th Street.
WB 147th St from US-45 to Ravinia Ave Medium All lanes and shoulders closed 5/2/16 5:00 AM to 5/31/16 11:59 PM IDOT Improvements to LaGrange Road from 131st Street to 179th Street.
EB 149th St from Ravinia Ave to US-45 Minor Various lanes closed 4/11/16 7:00 AM to 5/31/16 11:59 PM IDOT intersection reconstruction ::Expect delays and should allow extra travel time::DETOURs posted
WB 149th St from US-45 to Ravinia Ave Minor All lanes and shoulders open 4/11/16 7:00 AM to 5/31/16 11:59 PM IDOT intersection reconstruction ::Expect delays and should allow extra travel time::DETOURs posted
EB 151st St from Ravinia Ave to US-45 Medium All lanes and shoulders closed 5/2/16 5:00 AM to 5/31/16 11:59 PM IDOT Improvements to LaGrange Road from 131st Street to 179th Street.
WB 151st St from US-45 to Ravinia Ave Medium All lanes and shoulders closed 5/2/16 5:00 AM to 5/31/16 11:59 PM IDOT Improvements to LaGrange Road from 131st Street to 179th Street.
EB 153rd St from Ravinia Pl to US-45 Minor All lanes and shoulders open 4/11/16 7:00 AM to 5/31/16 11:59 PM IDOT intersection reconstruction ::Expect delays and should allow extra travel time::DETOURs posted
WB 153rd St from US-45 to Ravinia Pl Minor All lanes and shoulders open 4/11/16 7:00 AM to 5/31/16 11:59 PM IDOT intersection reconstruction ::Expect delays and should allow extra travel time::DETOURs posted
WB 156th St from US-45 to Ravinia Ave Medium All lanes and shoulders closed 5/2/16 5:00 AM to 5/31/16 11:59 PM IDOT Improvements to LaGrange Road from 131st Street to 179th Street.
NB Busse Rd at I-90 Minor Various lanes closed 2/29/16 7:00 PM to 5/15/16 11:59 PM Illinois Tollway Bridge Construction
SB Busse Rd at I-90 Minor Various lanes closed 2/29/16 7:00 PM to 5/15/16 11:59 PM Illinois Tollway Bridge Construction
EB Creek Rd from Pebble Rd to US-45 Minor Various lanes closed 4/18/16 5:45 AM to 5/31/16 11:59 PM IDOT Part of the ongoing improvements to LaGrange Road from 131st Street to 179th Street::modernizing traffic signals and widening the road to provide three lanes in each direction
WB Creek Rd from US-45 to Pebble Rd Minor Various lanes closed 4/18/16 5:45 AM to 5/31/16 11:59 PM IDOT Part of the ongoing improvements to LaGrange Road from 131st Street to 179th Street::modernizing traffic signals and widening the road to provide three lanes in each direction
NEB Joliet Rd at Willow Springs Rd Minor Various lanes closed 11/18/15 7:00 AM to 6/22/16 11:59 PM IDOT
SWB Joliet Rd at Willow Springs Rd Minor Various lanes closed 11/18/15 7:00 AM to 6/22/16 11:59 PM IDOT
EB Madison St from Austin Blvd to Waller Ave Medium All lanes and shoulders closed 3/14/16 7:00 AM to 5/20/16 11:59 PM Chicago DOT Sewer Main Installation; Detour: Eastbound Madison Street to Southbound Austin Boulevard, to Eastbound Jackson Boulevard, to Northbound Central Avenue, and back to Eastbound Madison Street. Detour: truck traffic on Eastbound Madison Street to Southbound Ridgeland Avenue, to Eastbound Roosevelt Road, to Northbound Central Avenue, and back to Eastbound Madison Street.
NB Torrence Ave at Grand Calumet River (~139th) Medium All lanes and shoulders closed 11/1/15 6:00 AM to 12/31/16 2:00 PM IDOT Bridge Replacement: DETOUR:::Northbound traffic is detoured east on Sibley Boulevard, north on Burnham Avenue, northwest on Brainard Avenue and west on 130th Street to reconnect with Torrence Avenue. Southbound traffic is following the reverse route.
More information

DeWitt County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB IL-48 from Water St (+0.1 miles) to Rainbow Rd (-0.4 miles) Medium Various lanes closed 5/2/16 7:00 AM to 6/30/16 11:59 PM IDOT Complete removal and replacement of the existing box culverts, associated earthwork and pavement replacement.; IL 48 will be down to one lane at these locations while construction is ongoing and will be restricted to 10 feet 6 inches in width.
SWB IL-48 from Rainbow Rd (+0.4 miles) to Water St (-0.1 miles) Medium Various lanes closed 5/2/16 7:00 AM to 6/30/16 11:59 PM IDOT Complete removal and replacement of the existing box culverts, associated earthwork and pavement replacement.; IL 48 will be down to one lane at these locations while construction is ongoing and will be restricted to 10 feet 6 inches in width.

Douglas County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-49 at 2350 (-0.1 miles) Medium Various lanes closed 4/4/16 7:00 AM to 8/9/16 11:59 AM IDOT Bridge Rehabilitation; One Lane of Traffic; The remaining lane will be restricted to 11' in width.

DuPage County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-20 from Bear Flag Dr to Greenbrook Blvd Medium Various lanes closed 9/28/15 7:00 AM to 5/30/16 11:59 PM IDOT traffic signal improvement, the addition of turn lanes, entrance ramp improvement, pavement patching and storm sewer replacement
WB US-20 from Greenbrook Blvd to Ontarioville Rd Medium Various lanes closed 9/28/15 7:00 AM to 5/30/16 11:59 PM IDOT traffic signal improvement, the addition of turn lanes, entrance ramp improvement, pavement patching and storm sewer replacement
EB US-34 at Frontenac St (-0.2 miles) Medium Various lanes closed 2/8/16 7:00 AM to 11/15/16 11:59 PM IDOT One Lane Closed in each diriection
WB US-34 at Frontenac St (+0.2 miles) Medium Various lanes closed 2/8/16 7:00 AM to 11/15/16 11:59 PM IDOT One Lane Closed in each diriection
EB IL-19 at Wood Dale Rd Medium Various lanes closed 11/30/15 9:00 AM to 11/30/16 11:59 PM IDOT intersection reconstruction
EB IL-19 from IL-83 to South Access Rd Medium Various lanes closed 3/7/16 7:00 AM to 11/30/17 11:59 PM IDOT Intersection improvement of IL-19 and York Rd. Traffic reduced to one lane in both directions of Irving Park Rd between Church Rd and South Access Rd.
EB IL-19 at York Rd Medium Various lanes closed 7/13/15 7:00 AM to 12/31/16 11:59 PM IDOT Reconstruct Intersection
WB IL-19 from South Access Rd to IL-83 Medium Various lanes closed 3/7/16 7:00 AM to 11/30/17 11:59 PM IDOT Intersection improvement of IL-19 and York Rd. Traffic reduced to one lane in both directions of Irving Park Rd between Church Rd and South Access Rd.
WB IL-19 at York Rd Medium Various lanes closed 7/13/15 7:00 AM to 12/31/16 11:59 PM IDOT Reconstruct Intersection
WB IL-19 at Wood Dale Rd Medium Various lanes closed 11/30/15 9:00 AM to 11/30/16 11:59 PM IDOT intersection reconstruction
EB IL-38 at York Rd Medium Various lanes closed 2/15/16 7:00 AM to 9/1/16 11:59 PM IDOT Improvements to the bridge on York Street over Roosevelt Road
WB IL-38 at York Rd Medium Various lanes closed 2/15/16 7:00 AM to 9/1/16 11:59 PM IDOT Improvements to the bridge on York Street over Roosevelt Road
NB IL-59 from Browning Way to Dayton Ave Medium Various lanes closed 9/28/15 9:00 AM to 5/31/16 11:59 PM IDOT temporary, daytime lane closuresf or various improvements::Pay close attention to flaggers and signs in the work zones.
SB IL-59 from Dayton Ave to Browning Way Medium Various lanes closed 9/28/15 9:00 AM to 5/31/16 11:59 PM IDOT temporary, daytime lane closuresf or various improvements::Pay close attention to flaggers and signs in the work zones.
NB IL-83 from Industrial Dr to Mark St Minor All lanes shifted 5/2/16 7:00 AM to 11/1/16 11:59 PM Illinois Tollway Traffic in both directions on Illinois Route 83 between Mark Street and Industrial Drive is scheduled to shift into the southbound lanes, to allow for the reconstruction of the northbound lanes of Illinois Route 83 and installation of storm sewers and water mains. During this time, no left-turns will be allowed from northbound and southbound Illinois Route 83 to Bryn Mawr Avenue. Detours will be posted.
SB IL-83 from Mark St to Mark St (+0.1 miles) Minor All lanes shifted 5/2/16 7:00 AM to 11/1/16 11:59 PM Illinois Tollway Traffic in both directions on Illinois Route 83 between Mark Street and Industrial Drive is scheduled to shift into the southbound lanes, to allow for the reconstruction of the northbound lanes of Illinois Route 83 and installation of storm sewers and water mains. During this time, no left-turns will be allowed from northbound and southbound Illinois Route 83 to Bryn Mawr Avenue. Detours will be posted.
SB IL-83 from Mark St (+0.1 miles) to Bryn Mawr Ave (+0.2 miles) Minor All lanes shifted 5/2/16 7:00 AM to 11/1/16 11:59 PM Illinois Tollway Traffic in both directions on Illinois Route 83 between Mark Street and Industrial Drive is scheduled to shift into the southbound lanes, to allow for the reconstruction of the northbound lanes of Illinois Route 83 and installation of storm sewers and water mains. During this time, no left-turns will be allowed from northbound and southbound Illinois Route 83 to Bryn Mawr Avenue. Detours will be posted.
NB Prospect Ave from Granville Ave to Pierce Rd Minor Various lanes closed 4/11/16 7:00 AM to 7/29/16 11:59 PM Illinois Tollway
SB Prospect Ave from Pierce Rd to Granville Ave Minor Various lanes closed 4/11/16 7:00 AM to 7/29/16 11:59 PM Illinois Tollway

Edgar County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB US-150 from 1200th Rd to US-36 None All lanes and shoulders open 8/24/15 12:00 AM to 6/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NWB US-150 at 1700th Rd (+0.2 miles) None All lanes and shoulders open 10/19/15 12:00 AM to 6/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
NWB US-150 at Grapevine Rd (+0.1 miles) None All lanes and shoulders open 10/19/15 12:00 AM to 6/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
SEB US-150 from US-36 to 1200th Rd None All lanes and shoulders open 8/24/15 12:00 AM to 6/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SEB US-150 at Grapevine Rd (-0.1 miles) None All lanes and shoulders open 10/19/15 12:00 AM to 6/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
SEB US-150 at 1700th Rd (-0.2 miles) None All lanes and shoulders open 10/19/15 12:00 AM to 6/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
SB IL-49 at 2350 (+0.1 miles) Medium Various lanes closed 4/4/16 7:00 AM to 8/9/16 11:59 AM IDOT Bridge Rehabilitation; One Lane of Traffic; The remaining lane will be restricted to 11' in width.

Edwards County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-130 at 575 North Rd None All lanes and shoulders open 1/4/16 12:00 AM to 10/15/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
NB IL-130 at 575 North Rd None All lanes and shoulders open 12/17/15 12:00 AM to 10/15/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB IL-130 at 750 North Rd (-0.1 miles) None All lanes and shoulders open 1/4/16 12:00 AM to 10/15/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
NB IL-130 at 750 North Rd (-0.1 miles) None All lanes and shoulders open 12/17/15 12:00 AM to 10/15/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-130 at 750 North Rd (+0.1 miles) None All lanes and shoulders open 12/17/15 12:00 AM to 10/15/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-130 at 750 North Rd (+0.1 miles) None All lanes and shoulders open 1/4/16 12:00 AM to 10/15/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SB IL-130 at 575 North Rd None All lanes and shoulders open 12/17/15 12:00 AM to 10/15/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-130 at 575 North Rd None All lanes and shoulders open 1/4/16 12:00 AM to 10/15/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".

Grundy County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-47 from Gore Rd to Sherrill Rd (+0.2 miles) None All lanes and shoulders open 7/7/14 12:00 AM to 8/19/16 11:59 PM IDOT Expect lane restrictions for roadway improvement with flaggers directing traffic. Vehicle width restricted to 11' 6".
SB IL-47 from Sherrill Rd (-0.2 miles) to Gore Rd None All lanes and shoulders open 7/7/14 12:00 AM to 8/19/16 11:59 PM IDOT Expect lane restrictions for roadway improvement with flaggers directing traffic. Vehicle width restricted to 11' 6".

Hardin County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-1 at Lamb Rd (+0.2 miles) None All lanes and shoulders open 5/11/15 12:00 AM to 6/1/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
NB IL-1 at 1005 North Rd (+0.3 miles) None All lanes and shoulders open 5/11/15 12:00 AM to 6/1/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SB IL-1 at 1005 North Rd (-0.3 miles) None All lanes and shoulders open 5/11/15 12:00 AM to 6/1/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SB IL-1 at Lamb Rd (-0.2 miles) None All lanes and shoulders open 5/11/15 12:00 AM to 6/1/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".

Henderson County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-116 from East St to IL-110 None All lanes and shoulders open 9/2/15 12:00 AM to 8/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-116 from IL-110 to East St None All lanes and shoulders open 9/2/15 12:00 AM to 8/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Henry County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-81 at Railroad St Major All lanes and shoulders closed 3/28/16 7:00 AM to 11/23/16 11:59 PM IDOT Road closed to replace bridge over BNSF Railroad in Lynn Center.; Detour Route: I-74 south to exit 32 (IL 17) IL 17 west to 150 150 north to IL 81.
WB IL-81 at Railroad St Major All lanes and shoulders closed 3/28/16 7:00 AM to 11/23/16 11:59 PM IDOT Road closed to replace bridge over BNSF Railroad in Lynn Center.; Detour Route: I-74 south to exit 32 (IL 17) IL 17 west to 150 150 north to IL 81.
NB IL-82 from IL-17 to 200th Ave Medium Various lanes closed 4/18/16 7:00 AM to 6/10/16 11:59 PM IDOT One lane of traffic will be maintained during construction using flaggers. Max width signs will be posted for 8'-6". Contractor will start work on 4/18/2016 and must allow wide load permits to get through until 4/25/2016. Starting 4/25/2016 no wide load permits will be issued.
SB IL-82 from 200th Ave to IL-17 Medium Various lanes closed 4/18/16 7:00 AM to 6/10/16 11:59 PM IDOT One lane of traffic will be maintained during construction using flaggers. Max width signs will be posted for 8'-6". Contractor will start work on 4/18/2016 and must allow wide load permits to get through until 4/25/2016. Starting 4/25/2016 no wide load permits will be issued.

Iroquois County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-1 at 1950 North Rd (-0.1 miles) None All lanes and shoulders open 4/27/15 12:00 AM to 7/15/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals, Expect very narrow lanes. Vehicle width restricted to 12' 6".
SB IL-1 at 1950 North Rd (+0.1 miles) None All lanes and shoulders open 4/27/15 12:00 AM to 7/15/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals, Expect very narrow lanes. Vehicle width restricted to 12' 6".

Jackson County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-127 at Lightfoot Rd (-0.4 miles) Minor Left or right shoulder closed, all lanes open 6/15/15 12:00 AM to 11/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-127 at Lightfoot Rd (+0.4 miles) Minor Left or right shoulder closed, all lanes open 6/15/15 12:00 AM to 11/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Jersey County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
SEB IL-3 from Grafton Hills Dr to IL-109 None All lanes and shoulders open 3/15/15 12:00 AM to 12/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SEB IL-3 from Grafton Hills Dr to IL-109 None All lanes and shoulders open 3/15/15 12:00 AM to 12/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".

Kane County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-31 from Wildrose Springs Dr (-0.1 miles) to Crane Rd (-0.1 miles) Medium Various lanes closed 1/25/16 7:00 AM to 6/21/17 11:59 PM IDOT The first stage of construction will shift traffic to one lane on the west side of the bridge to allow work on the east side of the bridge. A temporary traffic signal will allow each direction of traffic to proceed separately across the bridge.
NB IL-31 at Silver Glen Rd Medium Various lanes closed 3/1/16 7:00 AM to 8/1/16 11:59 PM IDOT Intermittent lane closures; Resurfacing and widening of the roadway, storm sewer construction and a new traffic signal.
SB IL-31 at Silver Glen Rd Medium Various lanes closed 3/1/16 7:00 AM to 8/1/16 11:59 PM IDOT Intermittent lane closures; Resurfacing and widening of the roadway, storm sewer construction and a new traffic signal.
SB IL-31 from Crane Rd (+0.1 miles) to Wildrose Springs Dr (+0.1 miles) Medium Various lanes closed 1/25/16 7:00 AM to 6/21/17 11:59 PM IDOT The first stage of construction will shift traffic to one lane on the west side of the bridge to allow work on the east side of the bridge. A temporary traffic signal will allow each direction of traffic to proceed separately across the bridge.
NB IL-47 at Burlington Rd Medium Various lanes closed 4/11/16 4:00 AM to 11/30/16 11:59 PM IDOT Maintain One Lane in each direction.
SB IL-47 at Burlington Rd Medium Various lanes closed 4/11/16 4:00 AM to 11/30/16 11:59 PM IDOT Maintain One Lane in each direction.
EB IL-72 at Big Timber Rd Medium Various lanes closed 4/1/16 7:00 AM to 11/30/16 11:59 PM IDOT Intersection improvement::intermittent, daytime lane closures; watch for flaggers; allow extra time for travel
WB IL-72 at Big Timber Rd Medium Various lanes closed 4/1/16 7:00 AM to 11/30/16 11:59 PM IDOT Intersection improvement::intermittent, daytime lane closures; watch for flaggers; allow extra time for travel
EB Allen Rd from County Line Rd to 750 ft w/o Wild Prairie Pt Minor Various lanes closed 4/18/16 7:00 AM to 11/1/16 11:59 PM Gateway
NWB Burlington Rd from Dittman Rd to Plato Rd Medium All lanes and shoulders closed 4/6/16 7:00 AM to 10/31/16 11:59 PM Gateway A posted detour route will direct traffic around the closure using US Route 64, Dittman Road and Plato Road. Local traffic only will be permitted within the road closure.
NWB Burlington Rd from Dittman Rd to Plato Rd Medium All lanes and shoulders closed 5/6/16 7:00 AM to 5:00 PM,
5/7/16 7:00 AM to 5:00 PM,
5/9/16 7:00 AM to 5:00 PM,
5/10/16 7:00 AM to 5:00 PM,
... more, ending on 10/29/16
Gateway
SEB Burlington Rd from Plato Rd to Dittman Rd Medium All lanes and shoulders closed 4/6/16 7:00 AM to 10/31/16 11:59 PM Gateway A posted detour route will direct traffic around the closure using US Route 64, Dittman Road and Plato Road. Local traffic only will be permitted within the road closure.
SEB Burlington Rd from Plato Rd to Dittman Rd Medium All lanes and shoulders closed 5/6/16 7:00 AM to 5:00 PM,
5/7/16 7:00 AM to 5:00 PM,
5/9/16 7:00 AM to 5:00 PM,
5/10/16 7:00 AM to 5:00 PM,
... more, ending on 10/29/16
Gateway
NB Coombs Rd at Plank Rd (+0.4 miles) Medium All lanes and shoulders closed 4/22/16 7:00 AM to 8/31/16 11:59 PM Gateway A posted detour route will direct traffic around the bridge closure using Highland Avenue, Randall Road and Big Timber Road.
SB Coombs Rd at Plank Rd (-0.4 miles) Medium All lanes and shoulders closed 4/22/16 7:00 AM to 8/31/16 11:59 PM Gateway A posted detour route will direct traffic around the bridge closure using Highland Avenue, Randall Road and Big Timber Road.
NB Dauberman Rd from US-30 to Scott Rd Medium All lanes and shoulders closed 3/11/16 8:00 AM to 7/31/16 11:59 PM Gateway Bridge construction; A posted detour route will direct traffic around the closure using US Route 30, Davis Road and Scott Road. Local traffic only will be permitted within the road closure. Motorists should be advised to follow the posted detour route around the project and to expect increase travel times.
NB Dauberman Rd from US-30 to Keslinger Rd Minor Various lanes closed 4/18/16 7:00 AM to 11/1/16 11:59 PM Gateway Milling and asphalt resurfacing
SB Dauberman Rd from Keslinger Rd to US-30 Minor Various lanes closed 4/18/16 7:00 AM to 11/1/16 11:59 PM Gateway Milling and asphalt resurfacing
SB Dauberman Rd from Scott Rd to US-30 Medium All lanes and shoulders closed 3/11/16 8:00 AM to 7/31/16 11:59 PM Gateway Bridge construction; A posted detour route will direct traffic around the closure using US Route 30, Davis Road and Scott Road. Local traffic only will be permitted within the road closure. Motorists should be advised to follow the posted detour route around the project and to expect increase travel times.
EB Jericho Rd from Jones Rd (-0.2 miles) to Jones Rd (+0.1 miles) Minor Various lanes closed 4/18/16 7:00 AM to 11/1/16 11:59 PM Gateway Milling and asphalt resurfacing
EB Lees Rd from Sauber Rd to IL-47 Minor Various lanes closed 5/6/16 7:00 AM to 4:00 PM,
5/9/16 7:00 AM to 4:00 PM,
5/10/16 7:00 AM to 4:00 PM,
5/11/16 7:00 AM to 4:00 PM,
... more, ending on 5/20/16
Gateway Milling and asphalt resurfacing
WB Lees Rd from IL-47 to Sauber Rd Minor Various lanes closed 5/6/16 7:00 AM to 4:00 PM,
5/9/16 7:00 AM to 4:00 PM,
5/10/16 7:00 AM to 4:00 PM,
5/11/16 7:00 AM to 4:00 PM,
... more, ending on 5/20/16
Gateway Milling and asphalt resurfacing
NB Meredith Rd from McNulty Rd to IC Trail Minor Various lanes closed 4/18/16 7:00 AM to 11/1/16 11:59 PM Gateway

Kankakee County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-45 from 6000N Rd (-0.1 miles) to 6000N Rd (+0.1 miles) Minor Left or right shoulder closed, all lanes open 9/14/15 12:00 AM to 9/25/17 11:59 PM IDOT Expect lane restrictions for intersection work.
SB US-45 from 6000N Rd (-0.1 miles) to 6000N Rd (+0.1 miles) Minor Left or right shoulder closed, all lanes open 9/14/15 12:00 AM to 9/25/17 11:59 PM IDOT Expect lane restrictions for intersection work.
NWB IL-102 at 6000W Rd (-0.5 miles) Major All lanes closed 3/1/16 12:00 AM to 9/1/16 11:59 PM IDOT Bridge closed.
SEB IL-102 at 6000W Rd (+0.5 miles) Major All lanes closed 3/1/16 12:00 AM to 9/1/16 11:59 PM IDOT Bridge closed.
WB County Line Rd from IL-1 to Center Rd Medium Various lanes closed 4/1/16 12:00 AM to 5/31/16 11:59 PM Gateway

Kendall County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB US-34 from IL-47 to Orchard Rd None All lanes and shoulders open 1/21/16 12:00 AM to 12/31/18 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SWB US-34 from Orchard Rd to IL-47 None All lanes and shoulders open 1/21/16 12:00 AM to 12/31/18 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB IL-47 from Gore Rd to Sherrill Rd (+0.2 miles) None All lanes and shoulders open 7/7/14 12:00 AM to 8/19/16 11:59 PM IDOT Expect lane restrictions for roadway improvement with flaggers directing traffic. Vehicle width restricted to 11' 6".
SB IL-47 from Sherrill Rd (-0.2 miles) to Gore Rd None All lanes and shoulders open 7/7/14 12:00 AM to 8/19/16 11:59 PM IDOT Expect lane restrictions for roadway improvement with flaggers directing traffic. Vehicle width restricted to 11' 6".
NEB IL-71 from Orchard Rd to US-34 Medium Various lanes closed 5/1/14 12:00 AM to 10/1/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
SWB IL-71 from US-34 to Orchard Rd Medium Various lanes closed 5/1/14 12:00 AM to 10/1/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".

Lake County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-22 at Old Barrington Rd Medium Various lanes closed 11/2/15 6:00 AM to 7/31/16 11:59 PM IDOT intersection work; expect reductions and lane closures
WB IL-22 at Old Barrington Rd Medium Various lanes closed 11/2/15 6:00 AM to 7/31/16 11:59 PM IDOT intersection work; expect reductions and lane closures
WB US-12 at Molidor Rd Medium Various lanes closed 8/24/15 7:00 AM to 6/30/16 12:00 PM IDOT Intersection improvements and the installation of new traffic signals
EB US-12 at Sullivan Lake Rd Medium Various lanes closed 8/24/15 7:00 AM to 6/30/16 12:00 PM IDOT Intersection improvements and the installation of new traffic signals
EB IL-176 at Brown St Medium Various lanes closed 4/11/16 7:00 AM to 8/1/16 11:59 PM IDOT Single Lane Closure; Roadway resurfacing and traffic signal installation
WB IL-176 at Brown St Medium Various lanes closed 4/11/16 7:00 AM to 8/1/16 11:59 PM IDOT Single Lane Closure; Roadway resurfacing and traffic signal installation
EB Grand Ave (IL-132) at w/o Fairfield Rd Major All lanes and shoulders closed 9/28/15 8:00 AM to 5/30/16 11:59 PM IDOT Detour Posted: Westbound traffic will be routed to Fairfield Road, Monaville Road, and Illinois 59 to reconnect with Grand Avenue. Eastbound traffic will follow the reverse route.
EB Hawley St at Midlothian Rd Major All lanes and shoulders closed 4/18/16 7:00 AM to 8/31/16 3:00 PM Lake County Reconstruction
EB Hawley St from IL-63 to Chicago Ave Medium All lanes and shoulders closed 4/18/16 6:00 AM to 8/31/16 11:59 PM Lake County Eastbound Detour Route: Hawley Street - Midlothian Road to IL Route 176.
EB Washington St from Hainesville Rd to Lake St Minor Various lanes closed 2/25/15 7:00 AM to 11/25/16 3:00 PM Lake County Reconstruct and widen and construct railroad underpass
EB Washington St from West St to County St Major All lanes and shoulders closed 4/28/15 7:00 AM to 6/1/16 3:00 PM Lake County
SWB Washington St from County St to West St Major All lanes and shoulders closed 4/28/15 7:00 AM to 6/1/16 3:00 PM Lake County
WB Washington St from Lake St to Hainesville Rd Minor Various lanes closed 2/25/15 7:00 AM to 11/25/16 3:00 PM Lake County Reconstruct and widen and construct railroad underpass

Lee County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB Palmyra Rd from Wolverine Rd to IL-2 Minor Various lanes closed 4/25/16 7:00 AM to 5/7/16 11:59 PM IDOT Drivers should be prepared to stop for flaggers who will be directing traffic past the work operations.
WB Palmyra Rd from IL-2 to Wolverine Rd Minor Various lanes closed 4/25/16 7:00 AM to 5/7/16 11:59 PM IDOT Drivers should be prepared to stop for flaggers who will be directing traffic past the work operations.

Macon County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-105 at Marion St (-0.3 miles) Medium 0 lanes closed, two lanes open 3/16/15 12:00 AM to 6/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 31' 6".
WB IL-105 at Southland Dr (-0.3 miles) Medium 0 lanes closed, two lanes open 3/16/15 12:00 AM to 6/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 31' 6".

Macoupin County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB Frontage Rd at US-66 (-0.2 miles) None All lanes and shoulders open 4/1/15 12:00 AM to 9/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Reduced work zone speed limit 45 mph.
SB Frontage Rd at US-66 (+0.2 miles) None All lanes and shoulders open 4/1/15 12:00 AM to 9/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Reduced work zone speed limit 45 mph.

Madison County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
SWB I-55 at Homestead Rest Area Medium All lanes and shoulders closed 3/18/16 9:00 AM to 7/29/16 11:59 PM IDOT
NB IL-4 at Keck Rd (-0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 11/28/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
NB IL-4 at Keck Rd (-0.2 miles) Medium Various lanes closed 3/1/16 7:00 AM to 12/1/16 11:59 PM IDOT Replace the structure over the East Fork of Silver Creek. Intermittent lane closures will be required during daytime hours; During the week of March 14, 2016, the bridge will be reduced to one-way traffic with width restrictions in place and temporary traffic signals for the remainder of construction, weather permitting.
SB IL-4 at Keck Rd (+0.2 miles) Medium Various lanes closed 3/1/16 7:00 AM to 12/1/16 11:59 PM IDOT Replace the structure over the East Fork of Silver Creek. Intermittent lane closures will be required during daytime hours; During the week of March 14, 2016, the bridge will be reduced to one-way traffic with width restrictions in place and temporary traffic signals for the remainder of construction, weather permitting.
SB IL-4 at Keck Rd (+0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 11/28/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
EB IL-143 from IL-159 to Schwarz St Medium Various lanes closed 6/14/15 12:00 AM to 5/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 5".
WB IL-143 from Schwarz St to IL-159 Medium Various lanes closed 6/14/15 12:00 AM to 5/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 5".
NEB IL-157 from Schwarz St to IL-143 Medium Various lanes closed 6/14/15 12:00 AM to 5/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 5".
SWB IL-157 from IL-143 to Schwarz St Medium Various lanes closed 6/14/15 12:00 AM to 5/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 5".
NB IL-159 from Clay St to Belt Line Rd Medium Various lanes closed 8/5/13 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
SB IL-159 from Belt Line Rd to Clay St Medium Various lanes closed 8/5/13 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
NB IL-255 from IL-140 to Seminary Rd Medium Right lane closed, one lane open 4/25/16 5:00 AM to 7/1/16 5:30 PM IDOT
SB IL-255 from Seminary Rd to IL-140 Medium Right lane closed, one lane open 4/25/16 5:00 AM to 7/1/16 5:30 PM IDOT
NEB at I-55 Homestead Rest Area Medium All lanes and shoulders closed 3/18/16 9:00 AM to 7/29/16 11:59 PM IDOT Rest Area Closed

Marion County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-50 at Peachtree Rd (+0.2 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 10/1/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 9".
WB US-50 at Peachtree Rd (-0.2 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 10/1/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 9".

McDonough County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-110 from 1500th Rd to 1600th Rd Medium Various lanes closed 4/11/16 6:00 AM to 5/31/16 11:59 PM IDOT pavement construction
WB IL-110 from 1600 North Rd to 1500th Rd Medium Various lanes closed 4/11/16 6:00 AM to 5/31/16 11:59 PM IDOT pavement construction

McHenry County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB US-12 at Tryon Grove Rd (+0.2 miles) None All lanes and shoulders open 5/6/16 8:00 PM to 5/7/16 5:00 AM,
5/9/16 8:00 PM to 5/10/16 5:00 AM,
5/10/16 8:00 PM to 5/11/16 5:00 AM,
5/11/16 8:00 PM to 5/12/16 5:00 AM,
... more, ending on 7/16/16
IDOT A posted detour will direct northbound traffic on U.S. 12 west on Tryon Grove Road, north on Keystone Road and east on IL 173 to reconnect with U.S. 12. Southbound traffic on U.S. 12 will take the opposite route.
SEB US-12 at Tryon Grove Rd (-0.2 miles) None All lanes and shoulders open 5/6/16 8:00 PM to 5/7/16 5:00 AM,
5/9/16 8:00 PM to 5/10/16 5:00 AM,
5/10/16 8:00 PM to 5/11/16 5:00 AM,
5/11/16 8:00 PM to 5/12/16 5:00 AM,
... more, ending on 7/16/16
IDOT A posted detour will direct northbound traffic on U.S. 12 west on Tryon Grove Road, north on Keystone Road and east on IL 173 to reconnect with U.S. 12. Southbound traffic on U.S. 12 will take the opposite route.

McLean County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB White Oak Rd from US-150 (-0.1 miles) to US-150 (+0.1 miles) Minor Various lanes closed 4/18/16 7:00 AM to 10/31/16 7:00 PM IDOT White Oaks Road will be down to one lane with concrete barrier wall in place. Temporary traffic signals will be in use to help control traffic in this area. Estimated completion date is October 31, 2013.
SEB White Oak Rd from US-150 (-0.1 miles) to US-150 (+0.1 miles) Minor Various lanes closed 4/18/16 7:00 AM to 10/31/16 7:00 PM IDOT White Oaks Road will be down to one lane with concrete barrier wall in place. Temporary traffic signals will be in use to help control traffic in this area. Estimated completion date is October 31, 2013.

Monroe County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB IL-3 from IL-154 to Vandebrook Dr (-0.4 miles) None All lanes and shoulders open 10/19/15 12:00 AM to 7/1/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 14'.
NWB IL-3 from Vandebrook Dr (-0.4 miles) to Country Club Ln None All lanes and shoulders open 9/8/15 12:00 AM to 7/1/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SEB IL-3 from Country Club Ln to Vandebrook Dr (+0.4 miles) None All lanes and shoulders open 9/8/15 12:00 AM to 7/1/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SEB IL-3 from Vandebrook Dr (+0.4 miles) to IL-154 None All lanes and shoulders open 10/19/15 12:00 AM to 7/1/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 14'.
EB IL-156 from Paula Dr to IL-3 None All lanes and shoulders open 8/26/13 12:00 AM to 12/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-156 from IL-3 to Paula Dr None All lanes and shoulders open 8/26/13 12:00 AM to 12/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Peoria County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-150 at Koerner Rd Medium Various lanes closed 4/8/16 7:00 AM to 10/28/16 11:59 PM IDOT
WB US-150 at Trigger Rd Medium Various lanes closed 4/8/16 7:00 AM to 10/28/16 11:59 PM IDOT
EB IL-8 at Taylor Rd (-0.4 miles) None All lanes and shoulders open 4/1/15 12:00 AM to 5/20/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-8 at Taylor Rd (+0.4 miles) None All lanes and shoulders open 4/1/15 12:00 AM to 5/20/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NWB IL-91 from Copperfield Dr to Hickory St (+0.1 miles) None All lanes and shoulders open 6/9/15 12:00 AM to 6/15/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SEB IL-91 from Hickory St (-0.1 miles) to Copperfield Dr None All lanes and shoulders open 6/9/15 12:00 AM to 6/15/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Perry County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB IL-13 from Iowa St (-0.2 miles) to IL-154 None All lanes and shoulders open 9/22/15 12:00 AM to 6/1/16 11:59 PM IDOT Expect lane restrictions for intersection work.
SEB IL-13 from IL-154 to Iowa St (+0.2 miles) None All lanes and shoulders open 9/22/15 12:00 AM to 6/1/16 11:59 PM IDOT Expect lane restrictions for intersection work.
EB IL-154 from Water St to IL-13 None All lanes and shoulders open 9/22/15 12:00 AM to 6/1/16 11:59 PM IDOT Expect lane restrictions for intersection work.
EB IL-154 from Water St to IL-13 None All lanes and shoulders open 9/22/15 12:00 AM to 6/1/16 11:59 PM IDOT Expect lane restrictions for intersection work.
WB IL-154 from IL-13 to Water St None All lanes and shoulders open 9/22/15 12:00 AM to 6/1/16 11:59 PM IDOT Expect lane restrictions for intersection work.
WB IL-154 from IL-13 to Water St None All lanes and shoulders open 9/22/15 12:00 AM to 6/1/16 11:59 PM IDOT Expect lane restrictions for intersection work.

Putnam County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-89 from Bottom Rd (+0.4 miles) to Illinois St (-0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
SB IL-89 from Illinois St (+0.3 miles) to Bottom Rd (-0.4 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.

Randolph County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB IL-3 from IL-154 to Vandebrook Dr (-0.4 miles) None All lanes and shoulders open 10/19/15 12:00 AM to 7/1/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 14'.
SEB IL-3 from Vandebrook Dr (+0.4 miles) to IL-154 None All lanes and shoulders open 10/19/15 12:00 AM to 7/1/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 14'.

Richland County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-130 from Elbow Ln (-0.1 miles) to Ebenezer Ln Medium Various lanes closed 10/15/15 12:00 AM to 11/14/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-130 from Ebenezer Ln to Elbow Ln (+0.1 miles) Medium Various lanes closed 10/15/15 12:00 AM to 11/14/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Saline County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB IL-142 at Massey Rd (+0.4 miles) None All lanes and shoulders open 9/14/15 12:00 AM to 9/14/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 10".
SEB IL-142 at Massey Rd (-0.4 miles) None All lanes and shoulders open 9/14/15 12:00 AM to 9/14/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 10".

Sangamon County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB Wabash Ave from Robbins Rd to White Oaks Dr None All lanes and shoulders open 10/15/15 12:00 AM to 5/16/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB Wabash Ave from White Oaks Dr to Robbins Rd None All lanes and shoulders open 10/15/15 12:00 AM to 5/16/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Schuyler County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-67 from 6th St (+0.2 miles) to IL-103 (-0.6 miles) Medium Various lanes closed 11/14/14 12:00 AM to 12/31/16 11:59 PM IDOT Traffic restricted to max weight 15 tons.
SB US-67 from IL-103 (+0.6 miles) to 6th St (-0.2 miles) Medium Various lanes closed 11/14/14 12:00 AM to 12/31/16 11:59 PM IDOT Traffic restricted to max weight 15 tons.

St Clair County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from EB IL-13 to EB IL-15 Major All lanes and shoulders closed 9/8/15 12:00 AM to 5/30/16 11:59 PM IDOT Closed to all traffic.
EB IL-15 from IL-159 to Green Mount Rd Medium Various lanes closed 3/5/13 12:00 AM to 5/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB IL-15 at IL-13 Medium Right lane closed, one lane open 3/5/13 12:00 AM to 5/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
WB IL-15 from Green Mount Rd to IL-159 Medium Various lanes closed 3/5/13 12:00 AM to 5/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
Ramp from WB IL-15 to WB IL-13 Major All lanes and shoulders closed 9/8/15 12:00 AM to 5/30/16 11:59 PM IDOT Ramp closed.
WB IL-15 at IL-13 Medium One lane closed, one lane open 3/5/13 12:00 AM to 5/30/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
Ramp from WB IL-15 to SB IL-13 Major All lanes and shoulders closed 9/8/15 12:00 AM to 5/30/16 11:59 PM IDOT Ramp closed.
SB IL-111 from north of St Clair Ave to State St Medium Various lanes closed 4/18/16 7:00 AM to 6/17/16 7:00 PM IDOT Lane restrictions for pavement repairs and resurfacing. Work on the project is expected to be completed by mid-June 2016, weather permitting.
EB IL-156 from IL-159 to IL-13 Medium Various lanes closed 5/4/16 9:00 AM to 6/17/16 11:59 PM IDOT pavement repairs and resurfacing:::Motorists are urged to be patient, reduce speed, obey all warning signs and allow extra time when traveling through the work zone. Flaggers will be utilized to move traffic through the work zone. The contractor on this project is The Killian Corporatio
WB IL-156 from IL-13 to IL-159 Medium Various lanes closed 5/4/16 9:00 AM to 6/17/16 11:59 PM IDOT pavement repairs and resurfacing:::Motorists are urged to be patient, reduce speed, obey all warning signs and allow extra time when traveling through the work zone. Flaggers will be utilized to move traffic through the work zone. The contractor on this project is The Killian Corporatio
NB IL-157 at St Clair Ave Major All lanes and shoulders closed 1/4/16 12:00 AM to 9/30/16 11:59 PM IDOT Bridge closed.
SB IL-157 at St Clair Ave Major All lanes and shoulders closed 1/4/16 12:00 AM to 9/30/16 11:59 PM IDOT Bridge closed.
NB IL-159 from A St to G St (+0.1 miles) None All lanes and shoulders open 9/8/15 12:00 AM to 12/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 22'.
SB IL-159 from G St (-0.1 miles) to A St None All lanes and shoulders open 9/8/15 12:00 AM to 12/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 22'.

Tazewell County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-8 from Summit Dr to Legion Rd Medium Various lanes closed 4/4/16 7:00 AM to 5/16/16 11:59 PM IDOT Intermittent Single Lane Closures; Sidewalk and driveway repair work

Union County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB at I-57 Trail of Tears Rest Area Medium All lanes and shoulders closed 3/19/16 8:00 AM to 11/15/16 8:00 AM IDOT Expected reopening will be November 15, 2016, weather permitting.
SWB at I-57 Trail of Tears Rest Area Medium All lanes and shoulders closed 3/19/16 8:00 AM to 11/15/16 8:00 AM IDOT Expected reopening will be November 15, 2016, weather permitting.

Vermilion County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-1 from Arrowhead Rd to IL-119 Medium Various lanes closed 8/10/15 12:00 AM to 12/31/16 11:59 PM IDOT The movement of oversize and overweight loads is restricted. Vehicle width restricted to 14' 6", weight to 120 tons.
EB US-136 from IL-119 to Arrowhead Rd Medium Various lanes closed 8/10/15 12:00 AM to 12/31/16 11:59 PM IDOT The movement of oversize and overweight loads is restricted. Vehicle width restricted to 14' 6", weight to 120 tons.

Wabash County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-1 at 1690 Blvd (-0.4 miles) None All lanes and shoulders open 12/1/14 12:00 AM to 6/15/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-1 at 1690 Blvd (+0.4 miles) None All lanes and shoulders open 12/1/14 12:00 AM to 6/15/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Warren County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-116 from East St to IL-110 None All lanes and shoulders open 9/2/15 12:00 AM to 8/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-116 from IL-110 to East St None All lanes and shoulders open 9/2/15 12:00 AM to 8/31/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Washington County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB East Main St from Weigh St to 0.5 miles w/o Pleasant Hill Rd Minor Various lanes closed 5/6/16 6:00 AM to 8:00 PM daily until 9/18/16 IDOT Lane restrictions to construct a new asphalt overlay on this route. This work is expected to be completed by the end of the summer of this year.

Wayne County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-242 at Co Rd 690 (+0.5 miles) None All lanes and shoulders open 5/18/15 12:00 AM to 5/15/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals.
SB IL-242 at Co Rd 690 (-0.5 miles) None All lanes and shoulders open 5/18/15 12:00 AM to 5/15/16 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals.

Whiteside County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-40 from I-88 (+0.1 miles) to US-30 Medium Various lanes closed 3/30/16 12:00 AM to 11/30/16 11:59 PM IDOT 12'-6" Max width restriction
SB IL-40 from US-30 to I-88 (-0.1 miles) Medium Various lanes closed 3/30/16 12:00 AM to 11/30/16 11:59 PM IDOT 12'-6" Max width restriction

Will County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-30 from Bluff St to Desplaines St Major All lanes and shoulders closed 4/4/16 7:00 AM to 7/29/16 11:59 PM IDOT Closed for bridge painting work; DETOUR::EB US-30 to EB Jefferson St to Raynor Ave, South to McDonough St, east over the river to Chicago St (IL-53) and back to US-30.
EB 135th St from New Ave to Smith Rd Minor Various lanes closed 5/1/16 6:00 AM to 6/30/17 6:00 PM Gateway Reconstruction
WB 135th St from Smith Rd to New Ave Minor Various lanes closed 5/1/16 6:00 AM to 6/30/17 6:00 PM Gateway Reconstruction
EB 95th St at Plainfield-Naperville Rd Minor Various lanes closed 5/1/16 6:00 AM to 11/30/16 6:00 PM Gateway Intersection Widening/Signalization
WB 95th St at Plainfield-Naperville Rd Minor Various lanes closed 5/1/16 6:00 AM to 11/30/16 6:00 PM Gateway Intersection Widening/Signalization
NB Cedar Rd from Peotone Rd to US-52 Minor Various lanes closed 4/1/16 6:00 AM to 5/31/16 6:00 PM Gateway Maintenance Overlay
NB Cedar Rd at Chicago Bloomington Trl (+0.1 miles) Minor Various lanes closed 5/1/16 6:00 AM to 9/30/16 6:00 PM Gateway Bridge Replacement (over Spring Creek)
SB Cedar Rd at Chicago Bloomington Trl (-0.1 miles) Minor Various lanes closed 5/1/16 6:00 AM to 9/30/16 6:00 PM Gateway Bridge Replacement (over Spring Creek)
SB Cedar Rd from US-52 to Peotone Rd Minor Various lanes closed 4/1/16 6:00 AM to 5/31/16 6:00 PM Gateway Maintenance Overlay
EB County Line Rd from Center Rd to IL-1 Medium Various lanes closed 4/1/16 12:00 AM to 5/31/16 11:59 PM Gateway
NB Frontage Rd at Blodgett Rd (+0.7 miles) Minor Left lane closed, two lanes open 5/1/16 6:00 AM to 8/31/16 6:00 PM Gateway Bridge Replacement (over Grant Creek)
SB Frontage Rd at Blodgett Rd (-0.7 miles) Minor Left lane closed, two lanes open 5/1/16 6:00 AM to 8/31/16 6:00 PM Gateway Bridge Replacement (over Grant Creek)
EB Goodenow Rd at IL-394 (-0.1 miles) Medium All lanes and shoulders closed 5/1/16 6:00 AM to 10/30/16 6:00 PM Gateway Bridge Replacement (over Plum Creek)
WB Goodenow Rd at IL-394 (+0.1 miles) Medium All lanes and shoulders closed 5/1/16 6:00 AM to 10/30/16 6:00 PM Gateway Bridge Replacement (over Plum Creek)
EB McEvilly Rd from Timberwood Dr (-0.1 miles) to Timberwood Dr (-0.1 miles) Minor Various lanes closed 5/1/16 6:00 AM to 6/30/16 6:00 PM Gateway Bridge Desk Repair (over DuPage River)
WB McEvilly Rd from Timberwood Dr (+0.1 miles) to Timberwood Dr (+0.1 miles) Minor Various lanes closed 5/1/16 6:00 AM to 6/30/16 6:00 PM Gateway Bridge Desk Repair (over DuPage River)
EB Peotone Rd at Seltzer Rd (-0.1 miles) Minor Various lanes closed 5/1/16 6:00 AM to 9/30/16 6:00 PM Gateway Bridge Replacement (over W. Branch Forked Creek)
WB Peotone Rd at Seltzer Rd (+0.1 miles) Minor Various lanes closed 5/1/16 6:00 AM to 9/30/16 6:00 PM Gateway Bridge Replacement (over W. Branch Forked Creek)

Williamson County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-13 from Division St (+0.2 miles) to Briggs Rd (+0.2 miles) Medium One lane closed, one lane open 7/7/14 12:00 AM to 5/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-13 from Bethesda Clinic Rd (-0.2 miles) to Carterville Colp Rd (-0.2 miles) Medium One lane closed, one lane open 7/7/14 12:00 AM to 5/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Winnebago County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-20 at Meridian Rd (-0.2 miles) Medium Various lanes closed 4/4/16 7:00 AM to 7/8/16 11:59 PM IDOT Road will be restricted to one lane in each direction. Max Width signs posted at 9'-6". Stage 1 traffic will be in the WB lanes. Stage 2 traffic will be in the EB lanes.
SEB US-20-BR at Rock River Medium All lanes and shoulders closed 3/17/16 7:00 AM to 5/12/16 11:59 PM IDOT Bridge Closed; Follow marked detour route
Ramp from WB US-20 to NB Alpine Rd Major All lanes and shoulders closed 5/2/16 9:00 AM to 6/2/16 11:59 PM IDOT I-39 (NB) to US 20 (EB) ramp will be closed for Deck Patching, wearing surface, and expansion joint replacement on SN 101-0140 over Linden Road located 0.3 mile south of US 20. This ramp will be closed from 5/02/2016 to 6/02/2016.DETOUR:::traffic will be detoured west on US 20 to the IL 251 interchange where they can turn to go back east on US 20.
WB US-20 at Meridian Rd (+0.2 miles) Medium Various lanes closed 4/4/16 7:00 AM to 7/8/16 11:59 PM IDOT Road will be restricted to one lane in each direction. Max Width signs posted at 9'-6". Stage 1 traffic will be in the WB lanes. Stage 2 traffic will be in the EB lanes.
NEB IL-2 from Clifton Ave to Morgan St Medium 0 lanes closed, two lanes open 4/14/14 12:00 AM to 11/22/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NEB IL-2 from Clifton Ave to Cedar St Major Various lanes closed 3/31/16 7:00 AM to 11/30/16 11:59 PM IDOT 8'-6" Max Width northbound. southbound closed to all traffic from 3/31/16 - 11/30/16
SWB IL-2 from Mill St to Marchesano Dr Major All lanes and shoulders closed 3/31/16 7:00 AM to 11/30/16 11:59 PM IDOT 8'-6" Max Width northbound. southbound closed to all traffic from 3/31/16 - 11/30/16
SWB IL-2 from Morgan St to Clifton Ave Medium 0 lanes closed, two lanes open 4/14/14 12:00 AM to 11/22/16 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Fri May 06 2016 15:33:15 CDT