Construction Report
Select Location
  
Updated: 2/23/17 7:49 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

Construction information transmitted by the Illinois Tollway for display on the I-90 EB, I-90 WB, I-94 EB, I-94 WB, I-294 NB, I-294 SB, Edens Spur WB, Jane Addams Memorial (Northwest) EB, Jane Addams Memorial (Northwest) WB, Tri-State NB/WB and Tri-State SB/EB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

I-55 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-155 (-0.3 miles) to Old Route 121 (-0.6 miles) 126.4 to 127.9 Medium One lane closed, one to three lanes open 9/19/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
Reed Rd to I-355 233.5 to 269.4 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
I-355 to Lake Shore Dr (US-41) 269.4 to 293.8 Minor Left shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
County Line Rd to Lake Shore Dr (US-41) 276.4 to 293.8 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Canal St to Lake Shore Dr (US-41) 292.6 to 293.8 Medium Right lane and right shoulder closed, two or three lanes open 10/22/15 12:00 AM to 4/1/17 11:59 PM IDOT Traffic lanes weaved; Long Term Closure
Exit ramp to NB Lake Shore Dr 293.8 None Partial closure 12/22/16 12:00 AM to 4/1/17 11:59 PM IDOT Ramp reduced to 1 lane; Long Term Closure
Exit ramp to SB Lake Shore Dr 293.8 None Partial closure 10/22/15 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed. 11' width restriction.; Long Term Closure

I-55 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from NB Lake Shore Dr 293.9 None Partial closure 6/11/15 12:00 AM to 4/1/17 11:59 PM IDOT Lane shifted and width reduction (11') ***Long Term Closure***
Entrance ramp from SB Lake Shore Dr 293.9 Minor Left lane closed, one lane open with partial ramp closures 6/11/15 12:00 AM to 4/1/17 11:59 PM IDOT Left lane closed.; Long Term Closure
Lake Shore Dr (US-41) to County Line Rd 293.9 to 276.4 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Lake Shore Dr (US-41) to I-355 293.9 to 269.4 Minor Left shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
I-355 to Reed Rd 269.4 to 233.6 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to US-30 257.7 None Partial closure 6/29/15 12:00 AM to 6/30/17 11:59 PM IDOT 2nd Right turn lane closed ***Long Term Closure***
Old Route 121 (+0.7 miles) to I-155 (+0.4 miles) 128.0 to 126.3 Medium One lane closed, one or two lanes open 9/19/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
Dr Martin Luther King Jr Mem Brg (-0.3 miles) to 4th St 1.9 to 1.2 Medium One lane closed, one or two lanes open 6/10/15 12:00 AM to 6/1/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6".
3rd St to Tudor Ave 1.4 to 0.8 Medium Various lanes closed 2/29/16 7:00 AM to 3/21/17 11:59 PM IDOT One lane of traffic will be closed at all times. The initial stage of work will require a closure of the right lane through November of 2016 and will be followed immediately by the next stage of work, which will require a closure of the left lane until Spring of 2017. Motorists are urged to plan accordingly and use alternate routes including the I-70 Stan Musial Veterans Memorial Bridge or the Martin Luther King Bridge.

I-57 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
1900th Ave (+0.1 miles) to 1900th Ave (+0.5 miles) 166.2 to 166.5 Medium Various lanes closed 2/20/17 12:00 AM to 6/15/17 11:59 PM IDOT Rest area closed.
6000N Rd (-0.3 miles) to 6000N Rd (+0.3 miles) 318.3 to 318.8 Minor Left or right shoulder closed, all lanes open 9/14/15 12:00 AM to 9/25/17 11:59 PM IDOT Shoulder work.
Steger Rd to Dan Ryan Expy (I-94) 338.1 to 357.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 2:00 PM IDOT Moving Operation

I-57 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Dan Ryan Expy (I-94) to I-80 358.0 to 344.8 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:00 AM to 1:00 PM IDOT Moving Operation
I-80 to Steger Rd 344.8 to 338.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 8:30 AM to 12:30 PM IDOT Moving Operation
6000N Rd (-0.3 miles) to 6000N Rd (+0.3 miles) 318.8 to 318.3 Minor Left or right shoulder closed, all lanes open 9/14/15 12:00 AM to 9/25/17 11:59 PM IDOT Shoulder work.

I-64 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Green Mount Rd (+0.3 miles) to IL-4 (+1.3 miles) 16.1 to 24.1 Medium One lane closed, one lane open 9/10/14 12:00 AM to 8/1/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
Lincoln Ave (+0.2 miles) to IL-158 (+0.4 miles) 17.1 to 19.1 Medium Right lane closed, one lane open 10/4/16 12:00 AM to 7/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 6".
at Rieder Rd 20.4 Medium One lane closed, one lane open 6/10/16 12:00 AM to 8/1/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.

I-64 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
2140 East Rd (+0.1 miles) to 2140 East Rd (+0.3 miles) 129.8 to 129.6 Medium Various lanes closed 8/12/16 12:00 AM to 11/30/17 11:59 PM IDOT Rest area closed.
IL-4 (-1.3 miles) to Green Mount Rd (-0.3 miles) 24.0 to 16.0 Medium One lane closed, one lane open 9/10/14 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
at Rieder Rd (-0.1 miles) 20.3 Medium One lane closed, one lane open 6/10/16 12:00 AM to 8/1/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.
IL-158 (-0.4 miles) to Lincoln Ave (-0.2 miles) 19.0 to 17.0 Medium One lane closed, one lane open 10/4/16 12:00 AM to 7/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 6".
Dr Martin Luther King Jr Mem Brg (-0.3 miles) to 4th St 1.9 to 1.2 Medium One lane closed, one or two lanes open 6/10/15 12:00 AM to 6/1/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6".
3rd St to Tudor Ave 1.4 to 0.8 Medium Various lanes closed 2/29/16 7:00 AM to 3/21/17 11:59 PM IDOT One lane of traffic will be closed at all times. The initial stage of work will require a closure of the right lane through November of 2016 and will be followed immediately by the next stage of work, which will require a closure of the left lane until Spring of 2017. Motorists are urged to plan accordingly and use alternate routes including the I-70 Stan Musial Veterans Memorial Bridge or the Martin Luther King Bridge.

I-70 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Prairie Rd (-0.1 miles) to US-40 (-0.6 miles) 25.9 to 36.9 Medium 0 lanes closed, two lanes open 2/15/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
at Prairie Rd (+0.6 miles) 26.5 Medium 0 lanes closed, two lanes open 2/15/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.

I-70 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-40 (+0.6 miles) to Prairie Rd (+0.1 miles) 36.6 to 25.6 Medium 0 lanes closed, two lanes open 2/15/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
at Prairie Rd (-0.6 miles) 26.3 Medium 0 lanes closed, two lanes open 2/15/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.

I-74 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
600th Ave (+0.1 miles) to 600th Ave (+0.4 miles) 28.1 to 28.5 Medium Various lanes closed 12/13/16 12:00 AM to 6/30/17 11:59 PM IDOT Rest area closed.
Knox Highway 9 (-0.1 miles) to Knox Highway 9 (+0.1 miles) 50.9 to 51.1 Medium Various lanes closed 5/15/16 12:00 AM to 10/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
IL-97 (-0.2 miles) to Sterling Ave 53.5 to 88.9 Medium One lane closed, one or two lanes open 2/14/17 12:00 AM to 10/10/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

I-74 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Sterling Ave to IL-97 (+0.2 miles) 88.8 to 53.4 Medium One lane closed, one lane open 2/14/17 12:00 AM to 10/10/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
Knox Highway 9 (-0.1 miles) to Knox Highway 9 (+0.1 miles) 51.0 to 50.9 Medium Various lanes closed 5/15/16 12:00 AM to 10/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
Rest Area to 600th Ave (-1.4 miles) 29.9 to 29.5 Medium Various lanes closed 2/1/17 12:00 AM to 4/1/17 11:59 PM IDOT Rest area closed.

I-80 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Larkin Ave (IL-7) to Lincoln Hwy (US-30) 130.6 to 137.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation
Lincoln Hwy (US-30) to Tri-State Twy (I-294) 137.7 to 4.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation

I-80 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Tri-State Twy (I-294) to Lincoln Hwy (US-30) 4.5 to 137.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Lincoln Hwy (US-30) to Larkin Ave (IL-7) 137.7 to 130.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation

I-88 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from WB Eisenhower / I-290 to SB I-294 16.4 to 15.9 Minor Left shoulder closed, all lanes open 2/23/17 9:00 AM to 11:59 AM IDOT Moving Operation
Somonauk Rd to IL-23 95.8 to 92.5 Medium Left lane closed, one lane open 2/23/17 9:00 AM to 2:00 PM Illinois Tollway Moving Operation; Maintenance

I-90 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Harmony Rd (+0.3 miles) to IL-23 (+0.1 miles) 35.6 to 36.2 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Arlington Heights Rd (+0.8 miles) to Elmhurst Rd (-0.3 miles) 71.6 to 73.3 Medium Right lane closed, two lanes open 12/24/16 12:00 AM to 4/28/17 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***
Entrance from EB I-190 2.3 to 3.0 Minor Left shoulder closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT Long Term Closure
Entrance from EB I-190 2.3 to 79.6 Minor Right shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation

I-90 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to Eisenhower Expy (I-290) 54.1 to 51.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 8/12/16 12:00 AM to 10/31/18 11:59 PM IDOT Work includes bridge demolition, bridge construction, pavement, roadway lighting, pavement marking and signage. Detour: Exit northbound I90/94 at Roosevelt Rd., right on Roosevelt Rd to State St
Exit ramp to EB I-290 52.3 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 11:00 AM to 2:00 PM IDOT Moving Operation
Exit to NB Edens Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation
Barrington Rd (+0.4 miles) to IL-72 61.8 to 61.3 Medium Right lane closed, three lanes open 2/23/17 7:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst
IL-23 (-0.4 miles) to IL-23 (+0.1 miles) 36.5 to 36.0 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***

I-94 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
IL-132 (+0.6 miles) to Atkinson Rd (-0.2 miles) 9.0 to 15.0 Medium Right lane closed, three lanes open 2/23/17 9:00 AM to 1:30 PM Illinois Tollway Moving Operation; Crack Sealing
Entrance from SB Edens 28.4 to 43.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 2:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor Left shoulder closed, all lanes open 9/6/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 foot wide lanes; Long Term Closure
Exit to SB Bishop Ford 62.9 to 74.4 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
115th St to 130th St 66.6 to 68.5 Minor Right shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT

I-94 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance from NB Bishop Ford 74.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
I-57 / Bishop Ford (I-94) to 91st St 62.9 to 62.3 Minor Left shoulder closed, all lanes open 11/21/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 foot wide lanes; Long Term Closure
26th St to Eisenhower Expy (I-290) 54.1 to 51.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 8/12/16 12:00 AM to 10/31/18 11:59 PM IDOT Work includes bridge demolition, bridge construction, pavement, roadway lighting, pavement marking and signage. Detour: Exit northbound I90/94 at Roosevelt Rd., right on Roosevelt Rd to State St
Exit ramp to EB I-290 52.3 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 11:00 AM to 2:00 PM IDOT Moving Operation
Exit to NB Edens Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation
Atkinson Rd (+0.2 miles) to IL-132 (-0.6 miles) 15.0 to 9.0 Medium Right lane closed, three lanes open 2/23/17 9:00 AM to 1:30 PM Illinois Tollway Moving Operation; Crack Sealing

I-155 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-55 to 1850th St (+0.4 miles) 0.0 to 1.4 Medium One lane closed, one lane open 9/19/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

I-155 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
1850th St (-0.4 miles) to I-55 1.4 to 0.0 Medium One lane closed, up to one lanes open 9/19/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

I-190 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
River Rd to East River Rd 2.3 to 3.0 Minor Left shoulder closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT Long Term Closure
River Rd to East River Rd 2.3 to 3.0 Minor Right shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT

I-290 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB Thorndale Ave 3.6 Minor Right shoulder closed, all lanes open 11/28/16 12:00 AM to 4/1/17 11:59 PM IDOT Long Term Closure
Halsted St to Canal St 29.8 to 30.2 Major Left lane and left shoulder closed, two or three lanes open 10/10/16 7:00 AM to 6/30/17 11:59 PM IDOT *** Long Term Closure ***
Entrance ramp from SEB Kennedy Local 29.9 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Entrance ramp from NB Dan Ryan Elevated 30.0 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Entrance ramp from WB I-90 30.0 Major All lanes and shoulders closed 8/12/16 12:00 AM to 10/31/18 11:59 PM IDOT Work includes bridge demolition, bridge construction, pavement, roadway lighting, pavement marking and signage. Detour: Exit northbound I90/94 at Roosevelt Rd., right on Roosevelt Rd to State St
Entrance ramp from NB Dan Ryan Elevated 30.0 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***

I-290 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wells St to Halsted St 30.5 to 29.8 Major Left two lanes and left shoulder closed, one or two lanes open 10/10/16 7:00 AM to 6/30/17 11:59 PM IDOT *** Long Term Closure ***
Entrance ramp from SB Canal St 30.1 Medium All lanes and shoulders closed 10/10/16 7:00 AM to 8/31/18 11:59 PM IDOT *** Long Term Closure ***
Entrance ramp from NB Dan Ryan Elevated 29.7 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Dan Ryan Elevated 29.7 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Entrance ramp from SEB Kennedy Local 29.7 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to Morgan St 29.7 Medium All lanes and shoulders closed 12/10/15 12:00 AM to 6/1/17 11:59 PM IDOT *** Long Term Closure ***
Peoria St to Racine Ave 29.7 to 29.3 Medium Right lane and both shoulders closed, three lanes open 10/29/15 12:00 AM to 12/31/17 11:59 PM IDOT Lanes Weaved. NW/SW Ramp LN 3. WB Congress LNs 1&2.; *** Long Term Closure ***
Exit ramp to SB I-294 16.4 to 15.9 Minor Left shoulder closed, all lanes open 2/23/17 9:00 AM to 11:59 AM IDOT Moving Operation
0.5 miles west of Wood Dale Rd to Addison Rd 9.6 to 9.1 Minor Right shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT

I-294 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit to WB I-80 4.5 to 137.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Ridgeland Ave (-0.1 miles) to 107th St (-0.2 miles) 14.5 to 15.5 Medium Right lane closed, three lanes open 2/23/17 9:00 AM to 2:00 PM Illinois Tollway

I-294 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Northwest Hwy (+0.1 miles) to Wolf Rd (-0.2 miles) 44.0 to 36.5 Medium Left lane closed, two to five lanes open 2/23/17 10:30 AM to 1:30 PM Illinois Tollway
Entrance from EB I-80 137.7 to 4.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation

US-41 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Junction to Clavey Rd Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation

US-41 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Clavey Rd to Wilson Ave 28.4 to 43.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 2:00 PM IDOT Moving Operation

IL-53 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB Thorndale Ave 3.6 Minor Right shoulder closed, all lanes open 11/28/16 12:00 AM to 4/1/17 11:59 PM IDOT Long Term Closure

IL-394 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Sauk Trail to I-80 80.8 to 74.5 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation

IL-394 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Dan Ryan Expy (I-94) / I-57 to Sauk Trail 62.9 to 80.8 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation

Bishop Ford NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Sauk Trail to Dan Ryan Expy (I-94) / I-57 80.8 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation

Bishop Ford SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Dan Ryan Expy (I-94) / I-57 to Sauk Trail 62.9 to 80.8 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
115th St to 130th St 66.6 to 68.5 Minor Right shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT

Dan Ryan Local NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-57 / Bishop Ford (I-94) to 91st St 62.9 to 62.3 Minor Left shoulder closed, all lanes open 11/21/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 foot wide lanes; Long Term Closure
26th St to Eisenhower Expy (I-290) 54.1 to 51.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 8/12/16 12:00 AM to 10/31/18 11:59 PM IDOT Work includes bridge demolition, bridge construction, pavement, roadway lighting, pavement marking and signage. Detour: Exit northbound I90/94 at Roosevelt Rd., right on Roosevelt Rd to State St
Exit ramp to EB I-290 52.3 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***

Dan Ryan Local SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor Left shoulder closed, all lanes open 9/6/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 foot wide lanes; Long Term Closure

Edens NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Junction to Clavey Rd Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation

Edens SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Clavey Rd to Wilson Ave 28.4 to 43.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 2:00 PM IDOT Moving Operation

Edens Spur WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit to NB Edens Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation

Eisenhower EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Halsted St to Canal St 29.8 to 30.2 Major Left lane and left shoulder closed, two or three lanes open 10/10/16 7:00 AM to 6/30/17 11:59 PM IDOT *** Long Term Closure ***
Entrance ramp from SEB Kennedy Local 29.9 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Entrance ramp from NB Dan Ryan Elevated 30.0 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Entrance ramp from WB I-90 30.0 Major All lanes and shoulders closed 8/12/16 12:00 AM to 10/31/18 11:59 PM IDOT Work includes bridge demolition, bridge construction, pavement, roadway lighting, pavement marking and signage. Detour: Exit northbound I90/94 at Roosevelt Rd., right on Roosevelt Rd to State St
Entrance ramp from NB Dan Ryan Elevated 30.0 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***

Eisenhower WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wells St to Halsted St 30.5 to 29.8 Major Left two lanes and left shoulder closed, one or two lanes open 10/10/16 7:00 AM to 6/30/17 11:59 PM IDOT *** Long Term Closure ***
Entrance ramp from SB Canal St 30.1 Medium All lanes and shoulders closed 10/10/16 7:00 AM to 8/31/18 11:59 PM IDOT *** Long Term Closure ***
Entrance ramp from NB Dan Ryan Elevated 29.7 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Dan Ryan Elevated 29.7 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Entrance ramp from SEB Kennedy Local 29.7 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to Morgan St 29.7 Medium All lanes and shoulders closed 12/10/15 12:00 AM to 6/1/17 11:59 PM IDOT *** Long Term Closure ***
Peoria St to Racine Ave 29.7 to 29.3 Medium Right lane and both shoulders closed, three lanes open 10/29/15 12:00 AM to 12/31/17 11:59 PM IDOT Lanes Weaved. NW/SW Ramp LN 3. WB Congress LNs 1&2.; *** Long Term Closure ***
Exit ramp to SB I-294 16.4 to 15.9 Minor Left shoulder closed, all lanes open 2/23/17 9:00 AM to 11:59 AM IDOT Moving Operation
0.5 miles west of Wood Dale Rd to Addison Rd 9.6 to 9.1 Minor Right shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT

Jane Addams Memorial (Northwest) EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Harmony Rd (+0.3 miles) to IL-23 (+0.1 miles) 35.6 to 36.2 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Arlington Heights Rd (+0.8 miles) to Elmhurst Rd (-0.3 miles) 71.6 to 73.3 Medium Right lane closed, two lanes open 12/24/16 12:00 AM to 4/28/17 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***

Jane Addams Memorial (Northwest) WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Barrington Rd (+0.4 miles) to IL-72 61.8 to 61.3 Medium Right lane closed, three lanes open 2/23/17 7:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst
IL-23 (-0.4 miles) to IL-23 (+0.1 miles) 36.5 to 36.0 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***

Kennedy Local EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
River Rd to East River Rd 2.3 to 3.0 Minor Left shoulder closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT Long Term Closure
River Rd to Cumberland Ave (IL-171) 2.3 to 79.6 Minor Right shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation

Kennedy Local WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 11:00 AM to 2:00 PM IDOT Moving Operation
Exit to NB Edens Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation

Lake Shore Drive NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SB Stevenson / I-55 None Partial closure 6/11/15 12:00 AM to 4/1/17 11:59 PM IDOT Lane shifted and width reduction (11') ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 None Partial closure 12/22/16 12:00 AM to 4/1/17 11:59 PM IDOT Ramp reduced to 1 lane; Long Term Closure

Lake Shore Drive SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SB Stevenson / I-55 Minor Left lane closed, one lane open with partial ramp closures 6/11/15 12:00 AM to 4/1/17 11:59 PM IDOT Left lane closed.; Long Term Closure
Entrance ramp from NB Stevenson / I-55 None Partial closure 10/22/15 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed. 11' width restriction.; Long Term Closure

Reagan Memorial WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from WB Eisenhower / I-290 to SB I-294 16.4 to 15.9 Minor Left shoulder closed, all lanes open 2/23/17 9:00 AM to 11:59 AM IDOT Moving Operation
Somonauk Rd to IL-23 95.8 to 92.5 Medium Left lane closed, one lane open 2/23/17 9:00 AM to 2:00 PM Illinois Tollway Moving Operation; Maintenance

Stevenson NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-355 to Lake Shore Dr (US-41) 269.4 to 293.8 Minor Left shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
County Line Rd to Lake Shore Dr (US-41) 276.4 to 293.8 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Canal St to Lake Shore Dr (US-41) 292.6 to 293.8 Medium Right lane and right shoulder closed, two or three lanes open 10/22/15 12:00 AM to 4/1/17 11:59 PM IDOT Traffic lanes weaved; Long Term Closure
Exit ramp to NB Lake Shore Dr 293.8 None Partial closure 12/22/16 12:00 AM to 4/1/17 11:59 PM IDOT Ramp reduced to 1 lane; Long Term Closure
Exit ramp to SB Lake Shore Dr 293.8 None Partial closure 10/22/15 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed. 11' width restriction.; Long Term Closure

Stevenson SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from NB Lake Shore Dr 293.9 None Partial closure 6/11/15 12:00 AM to 4/1/17 11:59 PM IDOT Lane shifted and width reduction (11') ***Long Term Closure***
Entrance ramp from SB Lake Shore Dr 293.9 Minor Left lane closed, one lane open with partial ramp closures 6/11/15 12:00 AM to 4/1/17 11:59 PM IDOT Left lane closed.; Long Term Closure
Lake Shore Dr (US-41) to County Line Rd 293.9 to 276.4 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Lake Shore Dr (US-41) to I-355 293.9 to 269.4 Minor Left shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation

Tri-State NB/WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit to WB I-80 4.5 to 137.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Ridgeland Ave (-0.1 miles) to 107th St (-0.2 miles) 14.5 to 15.5 Medium Right lane closed, three lanes open 2/23/17 9:00 AM to 2:00 PM Illinois Tollway
Atkinson Rd (+0.2 miles) to IL-132 (-0.6 miles) 15.0 to 9.0 Medium Right lane closed, three lanes open 2/23/17 9:00 AM to 1:30 PM Illinois Tollway Moving Operation; Crack Sealing

Tri-State SB/EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
IL-132 (+0.6 miles) to Atkinson Rd (-0.2 miles) 9.0 to 15.0 Medium Right lane closed, three lanes open 2/23/17 9:00 AM to 1:30 PM Illinois Tollway Moving Operation; Crack Sealing
Northwest Hwy (+0.1 miles) to Wolf Rd (-0.2 miles) 44.0 to 36.5 Medium Left lane closed, two to five lanes open 2/23/17 10:30 AM to 1:30 PM Illinois Tollway
Entrance from EB I-80 137.7 to 4.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation

Bond County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-40 from I-70 to Shawnee Rd Major All lanes closed 2/20/17 12:00 AM to 8/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB US-40 from Shawnee Rd to I-70 Major All lanes closed 2/20/17 12:00 AM to 8/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Bureau County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-26 from I-80 (-0.1 miles) to 1835 Ave None All lanes and shoulders open 4/18/16 12:00 AM to 8/1/17 12:00 AM IDOT Expect daytime lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-26 at IL-92 (-0.2 miles) Medium Various lanes closed 10/20/16 12:00 AM to 6/30/17 11:59 PM IDOT The movement of oversize and overweight loads is prohibited.
SB IL-26 at IL-92 (+0.2 miles) Medium Various lanes closed 10/20/16 12:00 AM to 6/30/17 11:59 PM IDOT The movement of oversize and overweight loads is prohibited.
SB IL-26 from 1835 Ave to I-80 (+0.1 miles) None All lanes and shoulders open 4/18/16 12:00 AM to 8/1/17 12:00 AM IDOT Expect daytime lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-89 from Bottom Rd (+0.4 miles) to Illinois St (-0.3 miles) None All lanes and shoulders open 4/15/16 12:00 AM to 8/2/18 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".
NB IL-89 from Bottom Rd (+0.4 miles) to Illinois St (-0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
SB IL-89 from Illinois St (+0.3 miles) to Bottom Rd (-0.4 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
SB IL-89 from Illinois St (+0.3 miles) to Bottom Rd (-0.4 miles) None All lanes and shoulders open 4/15/16 12:00 AM to 8/2/18 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".

Cook County (City of Chicago) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB 115th St at Pulaski Rd None Various lanes closed 6/1/16 12:00 AM to 5/5/17 11:59 PM IDOT Widening lanes and adding turn lanes to EB and WB 115th St. Upgrading traffic signals at all four corners of the intersection. Sidewalk construction and storm water drainage improvements at intersection.
EB 115th St from Front Ave to Front Ave Medium All lanes and shoulders closed 2/9/17 8:30 AM to 3/8/17 5:00 PM Chicago DOT
WB 115th St from Front Ave to Front Ave Medium All lanes and shoulders closed 2/9/17 8:30 AM to 3/8/17 5:00 PM Chicago DOT
EB 83rd St at Cregier Ave Medium All lanes and shoulders closed 12/1/16 7:00 AM to 2/28/17 11:59 PM Chicago DOT Sewer Main Installation
WB 83rd St at Cregier Ave Medium All lanes and shoulders closed 12/1/16 7:00 AM to 2/28/17 11:59 PM Chicago DOT Sewer Main Installation
WB Adams St at South Branch of Chicago River Medium All lanes and shoulders closed 1/25/16 8:00 PM to 2/25/17 11:59 PM Chicago DOT After evening rush hour, no vehicle traffic. Pedestrian Access allowed.
EB Armitage Ave at Rockwell St Medium All lanes and shoulders closed 1/3/17 7:00 AM to 3/1/17 11:59 PM Chicago DOT Sewer Main Installation; Detour Eastbound Armitage Avenue to Southbound California Avenue, to Eastbound North Avenue, to Northbound Western Avenue, and back to Eastbound Armitage Avenue. Reverse for Westbound Armitage Avenue.
WB Armitage Ave at Rockwell St Medium All lanes and shoulders closed 1/3/17 7:00 AM to 3/1/17 11:59 PM Chicago DOT Sewer Main Installation; Detour Eastbound Armitage Avenue to Southbound California Avenue, to Eastbound North Avenue, to Northbound Western Avenue, and back to Eastbound Armitage Avenue. Reverse for Westbound Armitage Avenue.
NB Avenue L from 110th St to 107th St Minor Various lanes closed 1/30/17 7:00 AM to 3/31/17 11:59 PM Chicago DOT Sewer Main Installation; Detour Southbound Avenue L to eastbound 106th Street, to Southbound Ewing Avenue, to Westbound 112th Street, and back to Southbound Avenue L. Reverse for Northbound Avenue L.
SB Avenue L from 107th St to 110th St Minor Various lanes closed 1/30/17 7:00 AM to 3/31/17 11:59 PM Chicago DOT Sewer Main Installation; Detour Southbound Avenue L to eastbound 106th Street, to Southbound Ewing Avenue, to Westbound 112th Street, and back to Southbound Avenue L. Reverse for Northbound Avenue L.
EB Belmont Ave from Forest Preserve Ave to Thatcher Ave (IL-171) Minor Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
NB Broadway St from Clifton Ave to Clifton Ave Medium All lanes and shoulders closed 2/23/17 7:00 PM to 2/24/17 6:00 AM,
2/26/17 7:00 PM to 2/27/17 6:00 AM,
2/27/17 7:00 PM to 2/28/17 6:00 AM,
2/28/17 7:00 PM to 3/1/17 6:00 AM,
... more, ending on 3/3/17
Chicago DOT
SB Broadway St from Clifton Ave to Clifton Ave Medium All lanes and shoulders closed 2/23/17 7:00 PM to 2/24/17 6:00 AM,
2/26/17 7:00 PM to 2/27/17 6:00 AM,
2/27/17 7:00 PM to 2/28/17 6:00 AM,
2/28/17 7:00 PM to 3/1/17 6:00 AM,
... more, ending on 3/3/17
Chicago DOT
NWB Des Plaines River Rd from IL-171 (Cumberland Ave) to Oakton St Minor Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
SB Des Plaines River Rd from Oakton St to IL-171 (Cumberland Ave) Minor Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
EB Diversey Ave from Laramie Ave to Laramie Ave Medium All lanes and shoulders closed 12/19/16 7:00 AM to 3/15/17 11:59 PM Chicago DOT Sewer Main Installation; Detour Eastbound Diversey Avenue to Southbound Central Avenue, to Eastbound Fullerton Avenue, to Northbound Cicero Avenue, and back to Eastbound Central Avenue. Reverse for Westbound Diversey Avenue. Reverse for Westbound Diversey Avenue. Detour Northbound Laramie Avenue to Eastbound Fullerton Avenue, to Northbound Cicero Avenue, to Westbound Belmont Avenue, and back to Northbound Laramie Avenue.
WB Diversey Ave from Laramie Ave to Laramie Ave Medium All lanes and shoulders closed 12/19/16 7:00 AM to 3/15/17 11:59 PM Chicago DOT Sewer Main Installation; Detour Eastbound Diversey Avenue to Southbound Central Avenue, to Eastbound Fullerton Avenue, to Northbound Cicero Avenue, and back to Eastbound Central Avenue. Reverse for Westbound Diversey Avenue. Reverse for Westbound Diversey Avenue. Detour Northbound Laramie Avenue to Eastbound Fullerton Avenue, to Northbound Cicero Avenue, to Westbound Belmont Avenue, and back to Northbound Laramie Avenue.
NB Front Ave from 115th St to 115th St Medium All lanes and shoulders closed 2/9/17 8:30 AM to 3/8/17 5:00 PM Chicago DOT
NB Front Ave from 115th St to 115th St Medium All lanes and shoulders closed 2/9/17 8:30 AM to 3/8/17 5:00 PM Chicago DOT
SB Front Ave at 115th St Medium All lanes and shoulders closed 2/9/17 8:30 AM to 3/8/17 5:00 PM Chicago DOT
SB Front Ave from 115th St to 115th St Medium All lanes and shoulders closed 2/9/17 8:30 AM to 3/8/17 5:00 PM Chicago DOT
EB Irving Park Rd (IL-19) from Des Plaines River Rd to Cumberland Ave (IL-171) Medium Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
WB Irving Park Rd (IL-19) from Cumberland Ave (IL-171) to Des Plaines River Rd Medium Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
NB Laramie Ave from Diversey Ave to Diversey Ave Medium All lanes and shoulders closed 12/19/16 7:00 AM to 3/15/17 11:59 PM Chicago DOT Sewer Main Installation; Detour Eastbound Diversey Avenue to Southbound Central Avenue, to Eastbound Fullerton Avenue, to Northbound Cicero Avenue, and back to Eastbound Central Avenue. Reverse for Westbound Diversey Avenue. Reverse for Westbound Diversey Avenue. Detour Northbound Laramie Avenue to Eastbound Fullerton Avenue, to Northbound Cicero Avenue, to Westbound Belmont Avenue, and back to Northbound Laramie Avenue.
NB Pulaski Rd from Washington Blvd to Washington Blvd None All lanes and shoulders open with partial ramp closures 2/8/17 8:30 AM to 3/8/17 5:00 PM Chicago DOT
SB Pulaski Rd from Washington Blvd to Washington Blvd None All lanes and shoulders open with partial ramp closures 2/8/17 8:30 AM to 3/8/17 5:00 PM Chicago DOT
NB Torrence Ave from 139th St to 136th St Medium All lanes and shoulders closed 11/30/15 12:00 AM to 8/25/17 11:59 PM IDOT This project consists of the bridge replacement at Torrence Avenue over the Grand Calument River, roadway widening, construction of storm sewer and drainage structures, retaining walls, street lighting and landscaping. Detour: S. Brainard Ave., to Burnham Ave., to Sibley Blvd.
SB Torrence Ave from 136th St to 139th St Medium All lanes and shoulders closed 11/30/15 12:00 AM to 8/25/17 11:59 PM IDOT This project consists of the bridge replacement at Torrence Avenue over the Grand Calument River, roadway widening, construction of storm sewer and drainage structures, retaining walls, street lighting and landscaping. Detour: S. Brainard Ave., to Burnham Ave., to Sibley Blvd.
EB Washington Blvd from Pulaski Rd to Pulaski Rd None All lanes and shoulders open with partial ramp closures 2/8/17 8:30 AM to 3/8/17 5:00 PM Chicago DOT
WB Washington Blvd from Pulaski Rd to Pulaski Rd None All lanes and shoulders open with partial ramp closures 2/8/17 8:30 AM to 3/8/17 5:00 PM Chicago DOT

Cook County (Suburban) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB IL-7 (159th St) from Gougar Rd to Will Cook Rd Medium Various lanes closed 5/1/15 12:00 AM to 8/15/17 11:59 PM IDOT The improvement consists of roadway reconstruction and widening of IL Route 7 and roadway reconstruction and roadway widening of related cross roads. The improvement includes the installation of proposed storm sewer, pipe culverts, precast box culverts, (3) retaining walls, (2) pile-supported embankments, traffic signals, and collateral work necessary to complete the project as shown in the plans. Detour: Oak Valley Trail will be closed for approximately 15 days. A detour will be along S. Bell Rd.
SWB IL-7 (159th St) from Will Cook Rd to Gougar Rd Medium Various lanes closed 5/1/15 12:00 AM to 8/15/17 11:59 PM IDOT The improvement consists of roadway reconstruction and widening of IL Route 7 and roadway reconstruction and roadway widening of related cross roads. The improvement includes the installation of proposed storm sewer, pipe culverts, precast box culverts, (3) retaining walls, (2) pile-supported embankments, traffic signals, and collateral work necessary to complete the project as shown in the plans. Detour: Oak Valley Trail will be closed for approximately 15 days. A detour will be along S. Bell Rd.
EB IL-68 at Wilke Rd Medium Various lanes closed 2/15/16 7:00 AM to 7/31/17 11:59 PM IDOT The project will add a right turn lane from eastbound Dundee Road to N. Wilke Road and from eastbound Dundee Road to Kennicott Avenue.The overall improvements to the intersections will modernize traffic signals, improve pedestrian safety and ease traffic congestion coming off of Illinois 53.
EB IL-68 at Kennicott Ave Medium Various lanes closed 2/15/16 7:00 AM to 7/31/17 11:59 PM IDOT The project will add a right turn lane from eastbound Dundee Road to N. Wilke Road and from eastbound Dundee Road to Kennicott Avenue.The overall improvements to the intersections will modernize traffic signals, improve pedestrian safety and ease traffic congestion coming off of Illinois 53.
NEB IL-171 from Cokes Rd to State St Medium Various lanes closed 8/16/16 7:00 AM to 11/1/17 11:59 PM IDOT
SWB IL-171 from State St to Cokes Rd Medium Various lanes closed 8/16/16 7:00 AM to 11/1/17 11:59 PM IDOT
WB 115th St at Pulaski Rd None Various lanes closed 6/1/16 12:00 AM to 5/5/17 11:59 PM IDOT Widening lanes and adding turn lanes to EB and WB 115th St. Upgrading traffic signals at all four corners of the intersection. Sidewalk construction and storm water drainage improvements at intersection.
EB 159th St from Will Cook Rd to Ravinia Ave Medium Various lanes closed 4/23/15 12:00 AM to 8/15/17 11:59 PM IDOT Reconstruction and add lanes, drainage improvement, shared-use path, sidewalk, traffic signals, and other related work on 2.53 miles of US Route 6/IL Route 7 (159th St.) from Will-Cook Road to Ravinia Ave located in Orland Park and Orland Township. Detour: 104th Ave Detour: 104th Ave closed at 159th St. NB & SB 104th Ave traffic to use the following detour routes: Use 167th St west to 108th Ave; follow 108th Ave north to 159th St. Use 167th St east to US-45; follow US-45 north to 159th St.
WB 159th St from Ravinia Ave to Will Cook Rd Medium Various lanes closed 4/23/15 12:00 AM to 8/15/17 11:59 PM IDOT Reconstruction and add lanes, drainage improvement, shared-use path, sidewalk, traffic signals, and other related work on 2.53 miles of US Route 6/IL Route 7 (159th St.) from Will-Cook Road to Ravinia Ave located in Orland Park and Orland Township. Detour: 104th Ave Detour: 104th Ave closed at 159th St. NB & SB 104th Ave traffic to use the following detour routes: Use 167th St west to 108th Ave; follow 108th Ave north to 159th St. Use 167th St east to US-45; follow US-45 north to 159th St.
NB 25th Ave from St Charles Rd to Lake St Medium All lanes and shoulders closed 1/1/15 7:18 AM to 5/31/17 7:18 AM Gateway 25th Ave over the RR tracks; Long term closure.
SB 25th Ave from Lake St to St Charles Rd Medium All lanes and shoulders closed 1/1/15 7:18 AM to 5/31/17 7:18 AM Gateway 25th Ave over the RR tracks; Long term closure.
WB Belmont Ave from Thatcher Ave (IL-171) to Forest Preserve Ave Minor Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
EB Chicago Ave from IL-171 to Thatcher Ave Minor Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
WB Chicago Ave from Thatcher Ave to IL-171 Minor Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
NWB Des Plaines River Rd from IL-171 (Cumberland Ave) to Oakton St Minor Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
SB Des Plaines River Rd from Oakton St to IL-171 (Cumberland Ave) Minor Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
EB Higgins Rd (IL-72) from Lexington Dr to I-290 Expressway (I-290) Medium Various lanes closed 7/22/16 12:00 AM to 6/30/17 11:59 PM IDOT Intersection Improvement and traffic signal modernization on IL-72 from Lexington Dr. to I-290 east ramps in Schaumburg.
WB Higgins Rd (IL-72) from I-290 Expressway (I-290) to Lexington Dr Medium Various lanes closed 7/22/16 12:00 AM to 6/30/17 11:59 PM IDOT Intersection Improvement and traffic signal modernization on IL-72 from Lexington Dr. to I-290 east ramps in Schaumburg.
EB Irving Park Rd (IL-19) from Des Plaines River Rd to Cumberland Ave (IL-171) Medium Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
WB Irving Park Rd (IL-19) from Cumberland Ave (IL-171) to Des Plaines River Rd Medium Various lanes closed 2/7/17 8:00 AM to 3/1/17 11:59 PM IDOT Tree Removal; Traffic will be reduced to one lane with flaggers while work is taking place. There will be intermittent traffic stops to allow trees to be safety lowered into the roadway. The overall improvements will enhance motorist and pedestrian safety by removing hazardous trees and clearing sight lines.
NB Torrence Ave from 139th St to 136th St Medium All lanes and shoulders closed 11/30/15 12:00 AM to 8/25/17 11:59 PM IDOT This project consists of the bridge replacement at Torrence Avenue over the Grand Calument River, roadway widening, construction of storm sewer and drainage structures, retaining walls, street lighting and landscaping. Detour: S. Brainard Ave., to Burnham Ave., to Sibley Blvd.
SB Torrence Ave from 136th St to 139th St Medium All lanes and shoulders closed 11/30/15 12:00 AM to 8/25/17 11:59 PM IDOT This project consists of the bridge replacement at Torrence Avenue over the Grand Calument River, roadway widening, construction of storm sewer and drainage structures, retaining walls, street lighting and landscaping. Detour: S. Brainard Ave., to Burnham Ave., to Sibley Blvd.

Cumberland County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-130 at 75 North Rd (+0.2 miles) None All lanes and shoulders open 3/14/16 12:00 AM to 7/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SB IL-130 at 75 North Rd (-0.2 miles) None All lanes and shoulders open 3/14/16 12:00 AM to 7/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".

DeKalb County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB Roosevelt Rd (IL-38) from Nicoll Way to Lincoln Av Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.
WB Roosevelt Rd (IL-38) from Lincoln Av to Nicoll Way Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.

Douglas County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-133 at Oak St Major All lanes closed 2/21/17 12:00 AM to 2/23/17 11:59 PM IDOT Closed for crossing improvements.

DuPage County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-19 from IL-83 to South Access Rd Medium Various lanes closed 3/7/16 7:00 AM to 11/30/17 11:59 PM IDOT Intersection improvement of IL-19 and York Rd. Traffic reduced to one lane in both directions of Irving Park Rd between Church Rd and South Access Rd.
WB IL-19 from South Access Rd to IL-83 Medium Various lanes closed 3/7/16 7:00 AM to 11/30/17 11:59 PM IDOT Intersection improvement of IL-19 and York Rd. Traffic reduced to one lane in both directions of Irving Park Rd between Church Rd and South Access Rd.
NEB Frontage Rd from Oldfield Rd to Cass Ave Minor Various lanes closed 9/26/16 12:00 AM to 5/12/17 11:59 PM IDOT Resurfacing, Pedestrian Ramps and Drainage Improvement.
EB Irving Park Rd (IL-19) at York Rd Medium Various lanes closed 5/1/15 12:00 AM to 9/30/17 11:59 PM IDOT Resurfacing, Intersection improvements, widening, reconstruction and retaining walls at the intersection of York and Irving Park Roads.
WB Irving Park Rd (IL-19) at York Rd Medium Various lanes closed 5/1/15 12:00 AM to 9/30/17 11:59 PM IDOT Resurfacing, Intersection improvements, widening, reconstruction and retaining walls at the intersection of York and Irving Park Roads.
EB Roosevelt Rd (IL-38) from Nicoll Way to Lincoln Av Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.
WB Roosevelt Rd (IL-38) from Lincoln Av to Nicoll Way Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.

Effingham County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-40 from Division St to 900th St None All lanes and shoulders open 8/29/16 12:00 AM to 6/1/17 11:59 PM IDOT Expect delays with lane restrictions for patching, milling and resurfacing.
WB US-40 from 900th St to Division St None All lanes and shoulders open 8/29/16 12:00 AM to 6/1/17 11:59 PM IDOT Expect delays with lane restrictions for patching, milling and resurfacing.
NB US-45 at 1900th Ave (+0.6 miles) None All lanes and shoulders open 7/25/16 12:00 AM to 6/12/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 14'.
SB US-45 at 1900th Ave (-0.6 miles) None All lanes and shoulders open 7/25/16 12:00 AM to 6/12/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 14'.

Fayette County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB Randolph St from 6th St to 4th St Medium All lanes closed 9/26/16 12:00 AM to 6/29/17 11:59 PM IDOT Closed to all traffic.
WB Randolph St from 4th St to 6th St Medium All lanes closed 9/26/16 12:00 AM to 6/29/17 11:59 PM IDOT Closed to all traffic.

Fulton County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB CR-14 from County Highway 2 to Turner Rd Medium All lanes and shoulders closed 8/1/16 12:00 AM to 6/15/17 11:59 PM IDOT Closed to all traffic.

Grundy County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-47 from Gore Rd to Sherrill Rd None All lanes and shoulders open 12/14/16 12:00 AM to 7/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SB IL-47 from Sherrill Rd to Gore Rd None All lanes and shoulders open 12/14/16 12:00 AM to 7/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-53 from Braceville Rd to Center St Major All lanes and shoulders closed 9/26/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Center St traffic East of the UPRR crossing will be detoured North to IL-113 (Main St) or South to Division St
SB IL-53 from Center St to Braceville Rd Major All lanes and shoulders closed 9/26/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Center St traffic East of the UPRR crossing will be detoured North to IL-113 (Main St) or South to Division St
NEB IL-129 from Braceville Rd to Reed St Major All lanes and shoulders closed 9/26/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Center St traffic East of the UPRR crossing will be detoured North to IL-113 (Main St) or South to Division St
SWB IL-129 from Reed St to Braceville Rd Major All lanes and shoulders closed 9/26/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Center St traffic East of the UPRR crossing will be detoured North to IL-113 (Main St) or South to Division St

Henry County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB IL-229 from US-34 to South St Major All lanes closed 2/1/17 12:00 AM to 5/1/17 11:59 PM IDOT Expect lane restrictions. Vehicle weight restricted to 20 tons.
SWB IL-229 from South St to US-34 Major All lanes closed 2/1/17 12:00 AM to 5/1/17 11:59 PM IDOT Expect lane restrictions. Vehicle weight restricted to 20 tons.
EB County Highway 14 from County Highway 16 to IL-78 Medium All lanes and shoulders closed 8/1/16 12:00 AM to 6/15/17 11:59 PM IDOT Closed to all traffic.
NEB Grange Rd from Wolf Rd (-0.5 miles) to IL-92 Medium All lanes closed 2/1/17 12:00 AM to 5/1/17 11:59 PM IDOT Expect lane restrictions. Vehicle weight restricted to 20 tons.
SWB Grange Rd from IL-92 to Wolf Rd (+0.5 miles) Medium All lanes closed 2/1/17 12:00 AM to 5/1/17 11:59 PM IDOT Expect lane restrictions. Vehicle weight restricted to 20 tons.

Iroquois County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-116 at 600 East Rd (+0.4 miles) Major All lanes and shoulders closed 6/15/16 12:00 AM to 7/29/17 11:59 PM IDOT Bridge closed.; The marked detour route includes IL 115, US 24 and I-57.
WB IL-116 at 600 East Rd (-0.4 miles) Major All lanes and shoulders closed 6/15/16 12:00 AM to 7/29/17 11:59 PM IDOT Bridge closed.; The marked detour route includes IL 115, US 24 and I-57.

Jersey County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
SEB IL-3 from Grafton Hills Dr to IL-109 None All lanes and shoulders open 3/15/15 12:00 AM to 12/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SEB IL-3 from Grafton Hills Dr to IL-109 None All lanes and shoulders open 3/15/15 12:00 AM to 12/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
NB IL-267 from Woodgate Ct to Craig Lake Rd None All lanes and shoulders open 8/1/16 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
NB IL-267 from Craig Lake Rd to Ryan Ct None All lanes and shoulders open 8/1/16 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.
SB IL-267 from Ryan Ct to Craig Lake Rd None All lanes and shoulders open 8/1/16 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.
SB IL-267 from Craig Lake Rd to Woodgate Ct None All lanes and shoulders open 8/1/16 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".

Kane County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-31 from Ferson Creek Rd to Crane Rd Medium Various lanes closed 6/16/16 7:00 AM to 6/21/17 11:59 PM IDOT In the new traffic pattern, Illinois 31 will switch back to one lane in each direction from Ferson Creek Road to south of Crane Road. Lane widths will be reduced on Illinois 31 and Wildrose Springs Drive.
NB IL-31 from Wildrose Springs Dr (-0.1 miles) to Crane Rd (-0.1 miles) Medium Various lanes closed 1/25/16 7:00 AM to 6/21/17 11:59 PM IDOT The first stage of construction will shift traffic to one lane on the west side of the bridge to allow work on the east side of the bridge. A temporary traffic signal will allow each direction of traffic to proceed separately across the bridge.
SB IL-31 from Crane Rd to Ferson Creek Rd Medium Various lanes closed 6/16/16 7:00 AM to 6/21/17 11:59 PM IDOT In the new traffic pattern, Illinois 31 will switch back to one lane in each direction from Ferson Creek Road to south of Crane Road. Lane widths will be reduced on Illinois 31 and Wildrose Springs Drive.
SB IL-31 from Crane Rd (+0.1 miles) to Wildrose Springs Dr (+0.1 miles) Medium Various lanes closed 1/25/16 7:00 AM to 6/21/17 11:59 PM IDOT The first stage of construction will shift traffic to one lane on the west side of the bridge to allow work on the east side of the bridge. A temporary traffic signal will allow each direction of traffic to proceed separately across the bridge.
EB IL-38 from County Line Rd to Peck Rd Medium Various lanes closed 9/19/16 12:00 AM to 5/31/17 11:59 PM IDOT Shoulder repair and milled rumble strips.
WB IL-38 from Peck Rd to County Line Rd Medium Various lanes closed 9/19/16 12:00 AM to 5/31/17 11:59 PM IDOT Shoulder repair and milled rumble strips.
EB IL-64 from County Line Rd to Anderson Rd Medium Various lanes closed 9/19/16 12:00 AM to 5/31/17 11:59 PM IDOT Shoulder repair and milled rumble strips.
WB IL-64 from Anderson Rd to County Line Rd Medium Various lanes closed 9/19/16 12:00 AM to 5/31/17 11:59 PM IDOT Shoulder repair and milled rumble strips.
NB Bliss Rd from Capitol Dr to May Rd (-0.1 miles) Minor Various lanes closed 2/23/17 7:00 AM to 5:00 PM daily until 2/24/17 Gateway Tree Removal Work; Reduced to one lane of travel using temporary daily lane closures.
SB Bliss Rd from May Rd (+0.1 miles) to Capitol Dr Minor Various lanes closed 2/23/17 7:00 AM to 5:00 PM daily until 2/24/17 Gateway Tree Removal Work; Reduced to one lane of travel using temporary daily lane closures.
EB Longmeadow Pkwy from Randall Rd to White Chapel Ln Minor Various lanes closed 2/23/17 7:00 AM to 5:00 PM,
2/24/17 7:00 AM to 5:00 PM,
2/25/17 7:00 AM to 5:00 PM,
2/27/17 7:00 AM to 5:00 PM,
... more, ending on 3/11/17
Gateway Single Lane Closures; Tree Removal
WB Longmeadow Pkwy from White Chapel Ln to Randall Rd Minor Various lanes closed 2/23/17 7:00 AM to 5:00 PM,
2/24/17 7:00 AM to 5:00 PM,
2/25/17 7:00 AM to 5:00 PM,
2/27/17 7:00 AM to 5:00 PM,
... more, ending on 3/11/17
Gateway Single Lane Closures; Tree Removal
EB Roosevelt Rd (IL-38) from Nicoll Way to Lincoln Av Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.
WB Roosevelt Rd (IL-38) from Lincoln Av to Nicoll Way Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.

Kankakee County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-45 from 6000N Rd (-0.1 miles) to 6000N Rd (+0.1 miles) Minor Left or right shoulder closed, all lanes open 6/7/16 12:00 AM to 6/18/17 12:00 AM IDOT Expect lane restrictions for intersection work. Vehicle width restricted to 10'.
NB US-45 from 6000N Rd (-0.1 miles) to 6000N Rd (+0.1 miles) Minor Left or right shoulder closed, all lanes open 9/14/15 12:00 AM to 6/18/17 12:00 AM IDOT Expect lane restrictions for intersection work.
SB US-45 from 6000N Rd (-0.1 miles) to 6000N Rd (+0.1 miles) Minor Left or right shoulder closed, all lanes open 9/14/15 12:00 AM to 6/18/17 12:00 AM IDOT Expect lane restrictions for intersection work.
SB US-45 from 6000N Rd (-0.1 miles) to 6000N Rd (+0.1 miles) Minor Left or right shoulder closed, all lanes open 6/7/16 12:00 AM to 6/18/17 12:00 AM IDOT Expect lane restrictions for intersection work. Vehicle width restricted to 10'.

Kendall County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB US-34 from IL-47 to Orchard Rd None All lanes and shoulders open 1/21/16 12:00 AM to 12/31/18 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SWB US-34 from Orchard Rd to IL-47 None All lanes and shoulders open 1/21/16 12:00 AM to 12/31/18 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB IL-47 from Gore Rd to Sherrill Rd None All lanes and shoulders open 12/14/16 12:00 AM to 7/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SB IL-47 from Sherrill Rd to Gore Rd None All lanes and shoulders open 12/14/16 12:00 AM to 7/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".

Knox County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-97 at Knox Road 900 (+0.2 miles) None All lanes and shoulders open 6/24/16 12:00 AM to 10/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
NB IL-97 at Knox Road 1080 (+0.7 miles) None All lanes and shoulders open 6/24/16 12:00 AM to 10/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
NB IL-97 from Knox Highway 17 (-0.5 miles) to Knox Highway 17 Major All lanes closed 1/30/17 12:00 AM to 2/27/17 11:59 PM IDOT Closed to all traffic.
SB IL-97 from Knox Highway 17 to Knox Highway 17 (+0.5 miles) Major All lanes closed 1/30/17 12:00 AM to 2/27/17 11:59 PM IDOT Closed to all traffic.
SB IL-97 at Knox Road 1080 (-0.7 miles) None All lanes and shoulders open 6/24/16 12:00 AM to 10/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SB IL-97 at Knox Road 900 (-0.2 miles) None All lanes and shoulders open 6/24/16 12:00 AM to 10/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".

Lake County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB Fox Lake Rd (IL-59) from Grand Ave (IL-132) to Highwoods Dr Medium Various lanes closed 2/6/17 12:00 AM to 11/15/17 11:59 PM IDOT Resurfacing, Intersection Reconstruction, & Traffic Signal Install. Detour: Petite Lake Rd will be detoured between June 15, 2017 and August 15, 2017. Traffic will be detoured to Fairfield Rd and Grand Ave.
SB Fox Lake Rd (IL-59) from Highwoods Dr to Grand Ave (IL-132) Medium Various lanes closed 2/6/17 12:00 AM to 11/15/17 11:59 PM IDOT Resurfacing, Intersection Reconstruction, & Traffic Signal Install. Detour: Petite Lake Rd will be detoured between June 15, 2017 and August 15, 2017. Traffic will be detoured to Fairfield Rd and Grand Ave.

Livingston County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-17 from Prairie Ave to Chicago St None All lanes and shoulders open 7/5/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.
WB IL-17 from Chicago St to Prairie Ave None All lanes and shoulders open 7/5/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.
EB Reynolds St at Ladd St Minor Various lanes closed 8/29/16 7:00 AM to 5/15/17 11:59 PM IDOT Work includes installation of storm sewers, new curb and gutters, raising the Ladd Street/Reynolds Street intersection, asphalt surfacing, and signal work at the tracks.
WB Reynolds St at Ladd St Minor Various lanes closed 8/29/16 7:00 AM to 5/15/17 11:59 PM IDOT Work includes installation of storm sewers, new curb and gutters, raising the Ladd Street/Reynolds Street intersection, asphalt surfacing, and signal work at the tracks.

Macon County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-51 from IL-48 to US-36 (-0.1 miles) Medium One lane closed, one lane open 3/1/16 12:00 AM to 11/16/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Traffic reduced to one lane in each direction with a crossover.
NB US-51 at 1000 (+0.7 miles) Major All lanes closed 3/1/16 12:00 AM to 11/16/17 12:00 AM IDOT Bridge closed. Vehicle width restricted to 15' 5".
NB US-51 at 1000 (+0.7 miles) Medium One lane closed, one lane open 9/14/15 12:00 AM to 11/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 15' 5".
SB US-51 from US-36 (+0.1 miles) to IL-48 Medium One lane closed, one lane open 3/1/16 12:00 AM to 11/16/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Traffic reduced to one lane in each direction with a crossover.
SB US-51 at 1000 (-0.7 miles) Medium One lane closed, one lane open 9/14/15 12:00 AM to 11/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 15' 5".
SB US-51 at 1000 (-0.7 miles) Major All lanes closed 3/1/16 12:00 AM to 11/16/17 12:00 AM IDOT Bridge closed. Vehicle width restricted to 15' 5".

Madison County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB US-40 from I-70 to I-70 None All lanes and shoulders open 1/30/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SWB US-40 from I-70 to I-70 None All lanes and shoulders open 1/30/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-3 from IL-203 (-0.2 miles) to Levee Rd (-0.1 miles) None All lanes and shoulders open 5/15/16 12:00 AM to 10/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-4 at Keck Rd (-0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 5/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SB IL-4 at Keck Rd (+0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 5/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
WB IL-143 from CPL Chris Belchik Mem Expy to Discovery Pkwy Medium One lane closed, one lane open 1/16/17 12:00 AM to 4/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16'.
NB IL-159 from Clay St to Belt Line Rd Medium Various lanes closed 8/5/13 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
SB IL-159 from Belt Line Rd to Clay St Medium Various lanes closed 8/5/13 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
EB Belt Line Rd from Keebler Rd (-0.1 miles) to Cottage Dr None All lanes and shoulders open 5/1/16 12:00 AM to 5/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10'.
WB Belt Line Rd from Cottage Dr to Keebler Rd (+0.1 miles) None All lanes and shoulders open 5/1/16 12:00 AM to 5/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10'.
EB Hawthorne St from IL-3 to Old St Louis Ave Medium All lanes and shoulders closed 2/13/17 7:30 AM to 4/15/17 5:00 PM IDOT This closure is required to replace a collector manhole for the Wood River Levee District Pump Station. - Signed detours will be in place directing motorists to alternate routes.
WB Hawthorne St from Old St Louis Ave to IL-3 Medium All lanes and shoulders closed 2/13/17 7:30 AM to 4/15/17 5:00 PM IDOT This closure is required to replace a collector manhole for the Wood River Levee District Pump Station. - Signed detours will be in place directing motorists to alternate routes.
NB Old Alton Rd from Oakland Ave (-0.1 miles) to New Poag Rd None All lanes and shoulders open 5/15/16 12:00 AM to 10/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB University Dr from New Poag Rd to Old Alton Edwardsville Rd (+0.2 miles) Minor Various lanes closed 9/14/16 7:00 AM to 11/30/17 11:59 PM IDOT The Illinois Department of Transportation today announced that the southbound lanes of SIU Northern Access Road over Cahokia Creek will be reduced to one lane between IL-143 and New Poag Road beginning on Wednesday, September 14, 2016, weather permitting. This lane closure will be ongoing and will remain in place for approximately one month. At that time, the northbound and southbound lanes will both be reduced to one lane for the remainder of the project. This work is necessary to repair the surfaces of both bridges and is estimated to be completed by late Fall of 2017.
NB University Dr at Old Alton Edwardsville Rd (-0.2 miles) Minor 0 lanes closed, two lanes open 9/12/16 12:00 AM to 2/1/18 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 13' 9".
SB University Dr from Old Alton Edwardsville Rd (-0.2 miles) to New Poag Rd Minor Various lanes closed 9/14/16 7:00 AM to 11/30/17 11:59 PM IDOT The Illinois Department of Transportation today announced that the southbound lanes of SIU Northern Access Road over Cahokia Creek will be reduced to one lane between IL-143 and New Poag Road beginning on Wednesday, September 14, 2016, weather permitting. This lane closure will be ongoing and will remain in place for approximately one month. At that time, the northbound and southbound lanes will both be reduced to one lane for the remainder of the project. This work is necessary to repair the surfaces of both bridges and is estimated to be completed by late Fall of 2017.
SB University Dr at Old Alton Edwardsville Rd (+0.2 miles) Minor 0 lanes closed, two lanes open 9/12/16 12:00 AM to 2/1/18 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 13' 9".

McDonough County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-41 at IL-95 (+0.1 miles) None All lanes and shoulders open 2/1/17 12:00 AM to 7/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10'.
SB IL-41 at IL-95 (-0.1 miles) None All lanes and shoulders open 2/1/17 12:00 AM to 7/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10'.

McHenry County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB US-14 from Lake Shore Dr to Lucas Rd None All lanes and shoulders open 10/6/14 12:00 AM to 5/31/17 11:59 PM IDOT Reconstruction and widening of US Rte 14, PCC Pavement, Storm Sewers, Traffic Signals, Earthwork, Landscaping. All Lanes opened October 2016, Remaining Tree/Shrub Plantings and Punchlist work to be completed by May 2017. Detour: na
SEB US-14 from Lucas Rd to Lake Shore Dr None All lanes and shoulders open 10/6/14 12:00 AM to 5/31/17 11:59 PM IDOT Reconstruction and widening of US Rte 14, PCC Pavement, Storm Sewers, Traffic Signals, Earthwork, Landscaping. All Lanes opened October 2016, Remaining Tree/Shrub Plantings and Punchlist work to be completed by May 2017. Detour: na

McLean County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-9 from Western Ave to Morris Ave Major All lanes closed 2/21/17 12:00 AM to 2/23/17 11:59 PM IDOT Closed to all traffic. Market Street to Lee Street

Morgan County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-104 from Mound Rd to Brooklyn Ave None All lanes and shoulders open 6/15/16 12:00 AM to 9/14/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
EB I-72-BL (Morton Ave) at Lincoln Ave (-0.2 miles) None All lanes and shoulders open 7/5/16 12:00 AM to 9/14/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
EB IL-104 at Blesse Ln (+0.1 miles) None All lanes and shoulders open 9/19/16 12:00 AM to 9/13/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
WB IL-104 from Brooklyn Ave to Mound Rd None All lanes and shoulders open 6/15/16 12:00 AM to 9/14/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
WB IL-104 at Blesse Ln (-0.1 miles) None All lanes and shoulders open 9/19/16 12:00 AM to 9/13/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
WB I-72-BL (Morton Ave) at Lincoln Ave (+0.2 miles) None All lanes and shoulders open 7/5/16 12:00 AM to 9/14/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".

Ogle County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB Roosevelt Rd (IL-38) from Nicoll Way to Lincoln Av Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.
WB Roosevelt Rd (IL-38) from Lincoln Av to Nicoll Way Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.

Pike County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
SB County Highway 14 from 275th Ln (+0.6 miles) to 452nd St Medium All lanes and shoulders closed 8/1/16 12:00 AM to 6/15/17 11:59 PM IDOT Closed to all traffic.

Putnam County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-89 from Bottom Rd (+0.4 miles) to Illinois St (-0.3 miles) None All lanes and shoulders open 4/15/16 12:00 AM to 8/2/18 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".
NB IL-89 from Bottom Rd (+0.4 miles) to Illinois St (-0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
SB IL-89 from Illinois St (+0.3 miles) to Bottom Rd (-0.4 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
SB IL-89 from Illinois St (+0.3 miles) to Bottom Rd (-0.4 miles) None All lanes and shoulders open 4/15/16 12:00 AM to 8/2/18 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".

Richland County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-130 from Elbow Ln (-0.1 miles) to Ebenezer Ln Medium Various lanes closed 10/15/15 12:00 AM to 11/14/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-130 from Ebenezer Ln to Elbow Ln (+0.1 miles) Medium Various lanes closed 10/15/15 12:00 AM to 11/14/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Saline County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-45 at Rock Hole Rd (-0.1 miles) None All lanes and shoulders open 3/21/16 12:00 AM to 6/2/17 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 5".
SB US-45 at Rock Hole Rd (+0.1 miles) None All lanes and shoulders open 3/21/16 12:00 AM to 6/2/17 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 5".
NWB IL-34 at Lambert Rd (-0.1 miles) None All lanes and shoulders open 12/16/16 12:00 AM to 8/23/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 12'.
SEB IL-34 at Lambert Rd (+0.1 miles) None All lanes and shoulders open 12/16/16 12:00 AM to 8/23/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 12'.

Sangamon County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-4 from County Rd to Circle Dr None All lanes and shoulders open 6/14/16 12:00 AM to 5/12/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
SB IL-4 from Circle Dr to County Rd None All lanes and shoulders open 6/14/16 12:00 AM to 5/12/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.

Shelby County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
SEB CR-14 from Oconee Ave to US-51 Medium All lanes and shoulders closed 8/1/16 12:00 AM to 6/15/17 11:59 PM IDOT Closed to all traffic.

St Clair County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from SEB IL-13 to EB IL-15 Major All lanes and shoulders closed 9/8/15 12:00 AM to 7/30/17 11:59 PM IDOT Closed to all traffic.
NB IL-157 from St Clair Ave (-0.1 miles) to St Clair Ave Medium One lane closed, one lane open 1/4/16 12:00 AM to 6/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-157 from St Clair Ave to St Clair Ave (+0.1 miles) Medium One lane closed, one lane open 1/4/16 12:00 AM to 6/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Vermilion County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-136 from IL-119 to Arrowhead Rd Medium Various lanes closed 8/10/15 12:00 AM to 12/31/17 11:59 PM IDOT The movement of oversize and overweight loads is restricted. Vehicle width restricted to 14' 6", weight to 120 tons.
NB IL-1 from Arrowhead Rd to IL-119 Medium Various lanes closed 8/10/15 12:00 AM to 12/31/17 11:59 PM IDOT The movement of oversize and overweight loads is restricted. Vehicle width restricted to 14' 6", weight to 120 tons.

Whiteside County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
WB Garden Plain Rd from US-30 to IL-84 Minor Various lanes closed 2/14/17 12:00 AM to 5/1/17 11:59 PM IDOT Max weight 5 tons.

Will County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-6 from Parker Rd to Timothy Ln Medium Various lanes closed 9/1/16 12:00 AM to 10/31/17 11:59 PM IDOT US 6 and Parker RD Intersection reconstruction with installation of new traffic signals. Detour: n/a
WB US-6 from Timothy Ln to Parker Rd Medium Various lanes closed 9/1/16 12:00 AM to 10/31/17 11:59 PM IDOT US 6 and Parker RD Intersection reconstruction with installation of new traffic signals. Detour: n/a
NEB IL-7 (159th St) from Gougar Rd to Will Cook Rd Medium Various lanes closed 5/1/15 12:00 AM to 8/15/17 11:59 PM IDOT The improvement consists of roadway reconstruction and widening of IL Route 7 and roadway reconstruction and roadway widening of related cross roads. The improvement includes the installation of proposed storm sewer, pipe culverts, precast box culverts, (3) retaining walls, (2) pile-supported embankments, traffic signals, and collateral work necessary to complete the project as shown in the plans. Detour: Oak Valley Trail will be closed for approximately 15 days. A detour will be along S. Bell Rd.
SWB IL-7 (159th St) from Will Cook Rd to Gougar Rd Medium Various lanes closed 5/1/15 12:00 AM to 8/15/17 11:59 PM IDOT The improvement consists of roadway reconstruction and widening of IL Route 7 and roadway reconstruction and roadway widening of related cross roads. The improvement includes the installation of proposed storm sewer, pipe culverts, precast box culverts, (3) retaining walls, (2) pile-supported embankments, traffic signals, and collateral work necessary to complete the project as shown in the plans. Detour: Oak Valley Trail will be closed for approximately 15 days. A detour will be along S. Bell Rd.
NB IL-53 from Braceville Rd to Center St Major All lanes and shoulders closed 9/26/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Center St traffic East of the UPRR crossing will be detoured North to IL-113 (Main St) or South to Division St
NB IL-53 at Center St Medium Various lanes closed 10/6/16 7:00 AM to 7/31/17 11:59 PM IDOT Intersection Improvement
NB IL-53 at Coal City Rd Medium Various lanes closed 10/3/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction and traffic signal installation at IL53 and Strip Mine Rd and IL53 and Coal City Rd
NB IL-53 at Stripmine Rd Medium Various lanes closed 10/3/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction and traffic signal installation at IL53 and Strip Mine Rd and IL53 and Coal City Rd
NB IL-53 from Hoff Rd to Ira Morgan Rd Medium Left lane closed, one lane open 8/15/16 12:00 AM to 5/31/17 11:59 PM IDOT Intersection improvement at IL-53 and Hoff Rd: Installation of a new box culvert and traffic signals. Addition of right and left turn lanes along SB IL-53. Detour: EB Hoff Rd traffic East of IL-53 will be detoured North to Mississippi Ave, East to Chicago Ave and South to Hoff Rd
SB IL-53 from Walter Strawn Dr to Hoff Rd Medium Left lane closed, one lane open 8/15/16 12:00 AM to 5/31/17 11:59 PM IDOT Intersection improvement at IL-53 and Hoff Rd: Installation of a new box culvert and traffic signals. Addition of right and left turn lanes along SB IL-53. Detour: EB Hoff Rd traffic East of IL-53 will be detoured North to Mississippi Ave, East to Chicago Ave and South to Hoff Rd
SB IL-53 at Stripmine Rd Medium Various lanes closed 10/3/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction and traffic signal installation at IL53 and Strip Mine Rd and IL53 and Coal City Rd
SB IL-53 at Coal City Rd Medium Various lanes closed 10/3/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction and traffic signal installation at IL53 and Strip Mine Rd and IL53 and Coal City Rd
SB IL-53 at Center St Medium Various lanes closed 10/6/16 7:00 AM to 7/31/17 11:59 PM IDOT Intersection Improvement
SB IL-53 from Center St to Braceville Rd Major All lanes and shoulders closed 9/26/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Center St traffic East of the UPRR crossing will be detoured North to IL-113 (Main St) or South to Division St
NB IL-102 from John Street to Warner Bridge Road Medium Various lanes closed 9/12/16 12:00 AM to 5/20/17 11:59 PM IDOT Shoulder repair and milled rumble strips. Detour: NA
SB IL-102 from Warner Bridge Road to John Street Medium Various lanes closed 9/12/16 12:00 AM to 5/20/17 11:59 PM IDOT Shoulder repair and milled rumble strips. Detour: NA
NWB IL-113 from Kankakee County Line to Comet Dr Medium Various lanes closed 9/19/16 7:00 AM to 5/19/17 11:59 PM IDOT Safety improvement project. The scope of the project includes guardrail replacement, shoulder repair and installation of rumple strips. The overall project is expected to be completed in Spring 2017. Daily, intermittent lane closures will take place on Illinois 113 between Comet Drive and the Kankakee County Line.
NB IL-113 from Comet Dr to Bauer Rd Medium Various lanes closed 9/12/16 12:00 AM to 5/26/17 11:59 PM IDOT Guardrail, shoulder repair, and rumble strips. Detour: N/A
SB IL-113 from Bauer Rd to Comet Dr Medium Various lanes closed 9/12/16 12:00 AM to 5/26/17 11:59 PM IDOT Guardrail, shoulder repair, and rumble strips. Detour: N/A
SEB IL-113 from Comet Dr to Kankakee County Line Medium Various lanes closed 9/19/16 7:00 AM to 5/19/17 11:59 PM IDOT Safety improvement project. The scope of the project includes guardrail replacement, shoulder repair and installation of rumple strips. The overall project is expected to be completed in Spring 2017. Daily, intermittent lane closures will take place on Illinois 113 between Comet Drive and the Kankakee County Line.
NEB IL-129 from Braceville Rd to Reed St Major All lanes and shoulders closed 9/26/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Center St traffic East of the UPRR crossing will be detoured North to IL-113 (Main St) or South to Division St
SWB IL-129 from Reed St to Braceville Rd Major All lanes and shoulders closed 9/26/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Center St traffic East of the UPRR crossing will be detoured North to IL-113 (Main St) or South to Division St
NEB IL-171 from Cokes Rd to State St Medium Various lanes closed 8/16/16 7:00 AM to 11/1/17 11:59 PM IDOT
SWB IL-171 from State St to Cokes Rd Medium Various lanes closed 8/16/16 7:00 AM to 11/1/17 11:59 PM IDOT
EB 135th St from New Ave to Smith Rd Minor Various lanes closed 5/1/16 6:00 AM to 6/30/18 6:00 PM Gateway Reconstruction; intermittent lane closures
WB 135th St from Smith Rd to New Ave Minor Various lanes closed 5/1/16 6:00 AM to 6/30/18 6:00 PM Gateway Reconstruction; intermittent lane closures
WB 159th St from Ravinia Ave to Will Cook Rd Medium Various lanes closed 4/23/15 12:00 AM to 8/15/17 11:59 PM IDOT Reconstruction and add lanes, drainage improvement, shared-use path, sidewalk, traffic signals, and other related work on 2.53 miles of US Route 6/IL Route 7 (159th St.) from Will-Cook Road to Ravinia Ave located in Orland Park and Orland Township. Detour: 104th Ave Detour: 104th Ave closed at 159th St. NB & SB 104th Ave traffic to use the following detour routes: Use 167th St west to 108th Ave; follow 108th Ave north to 159th St. Use 167th St east to US-45; follow US-45 north to 159th St.
NB Bell Rd from IL-7 to 151st St Minor Various lanes closed 7/1/16 6:00 AM to 9/30/17 6:00 PM Gateway Reconstruction
SB Bell Rd from 151st St to IL-7 Minor Various lanes closed 7/1/16 6:00 AM to 9/30/17 6:00 PM Gateway Reconstruction
NB Brandon Rd from Patterson Rd to US-6 Medium All lanes and shoulders closed 12/28/16 7:00 AM to 3/20/17 11:59 PM IDOT Traffic should use the McDonough Street bridge as an alternate route to cross the Des Plaines River. Southbound Brandon Road traffic should travel north on Railroad Street (U.S. 6), east on McDonough Street (U.S. 6/52), south on Illinois 53 and west on Laraway Road to meet back with Brandon Road. Northbound Brandon Road traffic should take the reverse route.
SB Brandon Rd from US-6 to Patterson Rd Medium All lanes and shoulders closed 12/28/16 7:00 AM to 3/20/17 11:59 PM IDOT Traffic should use the McDonough Street bridge as an alternate route to cross the Des Plaines River. Southbound Brandon Road traffic should travel north on Railroad Street (U.S. 6), east on McDonough Street (U.S. 6/52), south on Illinois 53 and west on Laraway Road to meet back with Brandon Road. Northbound Brandon Road traffic should take the reverse route.
EB Laraway Rd at Cedar Rd Minor Various lanes closed 7/1/16 6:00 AM to 7/31/17 6:00 PM Gateway Intersection Widening/Signalization
WB Laraway Rd at Cedar Rd Minor Various lanes closed 7/1/16 6:00 AM to 7/31/17 6:00 PM Gateway Intersection Widening/Signalization
EB Peotone Rd at W. Branch Forked Creek Minor Various lanes closed 5/1/16 12:00 AM to 7/1/17 11:59 PM Gateway Bridge Replacement; Single Lane closure w/ Temp signals
WB Peotone Rd at W. Branch Forked Creek Minor Various lanes closed 5/1/16 12:00 AM to 7/1/17 11:59 PM Gateway Bridge Replacement; Single Lane closure w/ Temp signals

Williamson County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-13 from Division St (+0.2 miles) to Briggs Rd (+0.2 miles) Medium One lane closed, one lane open 7/7/14 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-13 from Bethesda Clinic Rd (-0.2 miles) to Carterville Colp Rd (-0.2 miles) Medium One lane closed, one lane open 7/7/14 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB Main St from n/o Plaza Dr to Marion St Minor Various lanes closed 2/1/17 7:00 AM to 5/15/17 11:59 PM IDOT Closed to through traffic only. Residents are asked to use caution when traveling through this section of Main St. as construction operations will have traffic reduced to one lane at times and workers and equipment will be present. Access to driveways and mailboxes will be maintained at all times during construction as well. Message boards and signs will be in place to alert traffic of the closure.
SB Main St from Marion St to n/o Plaza Dr Minor Various lanes closed 2/1/17 7:00 AM to 5/15/17 11:59 PM IDOT Closed to through traffic only. Residents are asked to use caution when traveling through this section of Main St. as construction operations will have traffic reduced to one lane at times and workers and equipment will be present. Access to driveways and mailboxes will be maintained at all times during construction as well. Message boards and signs will be in place to alert traffic of the closure.

Winnebago County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-251 from Alton Ave to 8th St Medium Various lanes closed 11/11/16 8:00 AM to 3/31/17 3:07 PM IDOT IL 251 will be restricted to one lane of traffic from Alton Street to Harrison Avenue and from 8th Street to east of 11th Street. Traffic will be restricted to 10?-6? lane width.
NB IL-251 from Alton Ave to 8th St Medium One lane closed, one lane open 11/11/16 12:00 AM to 6/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SB IL-251 from 8th St to Alton Ave Medium One lane closed, one lane open 11/11/16 12:00 AM to 6/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SB IL-251 from 8th St to Alton Ave Medium Various lanes closed 11/11/16 8:00 AM to 3/31/17 3:07 PM IDOT IL 251 will be restricted to one lane of traffic from Alton Street to Harrison Avenue and from 8th Street to east of 11th Street. Traffic will be restricted to 10?-6? lane width.
NB Harrison Rd from IL-75 to Mitchell St Medium All lanes and shoulders closed 2/20/17 7:00 AM to 3/9/17 11:59 PM IDOT
NB Harrison Rd from IL-75 to Mitchell St Medium All lanes closed 2/20/17 12:00 AM to 2/23/17 11:59 PM IDOT Closed to all traffic.
SB Harrison Rd from Mitchell St to IL-75 Medium All lanes closed 2/20/17 12:00 AM to 2/23/17 11:59 PM IDOT Closed to all traffic.
SB Harrison Rd from Mitchell St to IL-75 Medium All lanes and shoulders closed 2/20/17 7:00 AM to 3/9/17 11:59 PM IDOT
NB Mitchell St from Harrison Rd to Hartlien Rd Medium All lanes and shoulders closed 2/20/17 7:00 AM to 3/9/17 11:59 PM IDOT
SB Mitchell St from Hartlien Rd to Harrison Rd Medium All lanes and shoulders closed 2/20/17 7:00 AM to 3/9/17 11:59 PM IDOT

I-80 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Left lane closed, up to two lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from Houston Ave 23.6 Unknown All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Enter WB at Portage, Exit at 17 to I-65 South/15th Ave East to I-90 Ramp EB
IN-149 (+0.2 miles) to Meridian Rd (-0.1 miles) 27.0 to 29.8 Minor Right shoulder closed, all lanes open 2/22/17 12:00 AM to 2/24/17 6:00 PM Indiana Toll Road Fiber Install : 24 Hour Continuous Closure
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-35 (+0.5 miles) to Fail Rd (-0.1 miles) 48.0 to 52.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.4 miles) to County Road 600 E (+0.2 miles) 58.2 to 58.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Sycamore Rd (+0.9 miles) 66.9 to 69.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Primrose Rd (+0.5 miles) to Olive Rd (-0.5 miles) 71.0 to 71.2 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Riverside Dr (-0.2 miles) to Juniper Rd (+0.3 miles) 75.6 to 78.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Entrance ramp from WB Douglas Rd 76.3 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure - Detour is: Enter WB 77 Exit at MM 72 to 31 South/Nimtz Parkway Nimtz Parkway East to I-90 EB Entry
County Road 7 (-0.2 miles) to County Road 11 (+0.1 miles) 90.8 to 93.2 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 375 E (-0.5 miles) to County Road 935 E (+0.4 miles) 124.0 to 156.9 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-80 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 935 E (-0.4 miles) to County Road 375 E (+0.5 miles) 156.9 to 124.0 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (-0.1 miles) to County Road 7 (+0.2 miles) 93.2 to 90.8 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Riverside Dr (+0.2 miles) 78.0 to 75.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Bendix Dr (+0.9 miles) to US-31 (-0.5 miles) 73.8 to 72.6 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Quince Rd (+1.0 miles) to Tamarack Rd (+0.2 miles) 69.0 to 66.9 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Fail Rd (+0.1 miles) to US-35 (-0.5 miles) 52.0 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to IN-51 (-0.4 miles) 25.2 to 20.8 Medium Left lane closed, up to one lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to Willowcreek Rd 24.0 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Exit at SR 49 (exit 31) North to I-94 West to 249 South

I-90 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Left lane closed, up to two lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from Houston Ave 23.6 Unknown All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Enter WB at Portage, Exit at 17 to I-65 South/15th Ave East to I-90 Ramp EB
IN-149 (+0.2 miles) to Meridian Rd (-0.1 miles) 27.0 to 29.8 Minor Right shoulder closed, all lanes open 2/22/17 12:00 AM to 2/24/17 6:00 PM Indiana Toll Road Fiber Install : 24 Hour Continuous Closure
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-35 (+0.5 miles) to Fail Rd (-0.1 miles) 48.0 to 52.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.4 miles) to County Road 600 E (+0.2 miles) 58.2 to 58.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Sycamore Rd (+0.9 miles) 66.9 to 69.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Primrose Rd (+0.5 miles) to Olive Rd (-0.5 miles) 71.0 to 71.2 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Riverside Dr (-0.2 miles) to Juniper Rd (+0.3 miles) 75.6 to 78.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Entrance ramp from WB Douglas Rd 76.3 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure - Detour is: Enter WB 77 Exit at MM 72 to 31 South/Nimtz Parkway Nimtz Parkway East to I-90 EB Entry
County Road 7 (-0.2 miles) to County Road 11 (+0.1 miles) 90.8 to 93.2 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 375 E (-0.5 miles) to County Road 935 E (+0.4 miles) 124.0 to 156.9 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-90 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 935 E (-0.4 miles) to County Road 375 E (+0.5 miles) 156.9 to 124.0 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (-0.1 miles) to County Road 7 (+0.2 miles) 93.2 to 90.8 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Riverside Dr (+0.2 miles) 78.0 to 75.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Bendix Dr (+0.9 miles) to US-31 (-0.5 miles) 73.8 to 72.6 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Quince Rd (+1.0 miles) to Tamarack Rd (+0.2 miles) 69.0 to 66.9 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Fail Rd (+0.1 miles) to US-35 (-0.5 miles) 52.0 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to IN-51 (-0.4 miles) 25.2 to 20.8 Medium Left lane closed, up to one lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to Willowcreek Rd 24.0 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Exit at SR 49 (exit 31) North to I-94 West to 249 South

I-94 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work

I-94 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
at I-80 (+0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work

US-31 NB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Johnson Rd (-0.1 miles) to Jackson Rd (+0.1 miles) Medium Right lane closed, one lane open 10/18/16 6:00 AM to 10/13/17 5:00 PM InDOT right lane closed

US-31 SB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Jackson Rd (-0.1 miles) to Johnson Rd (+0.1 miles) Medium Right lane closed, one lane open 10/18/16 6:00 AM to 10/13/17 5:00 PM InDOT right lane closed

Borman EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work

Borman WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
at I-80 (+0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work

Indiana Toll Road (East-West) EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Left lane closed, up to two lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from Houston Ave 23.6 Unknown All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Enter WB at Portage, Exit at 17 to I-65 South/15th Ave East to I-90 Ramp EB
IN-149 (+0.2 miles) to Meridian Rd (-0.1 miles) 27.0 to 29.8 Minor Right shoulder closed, all lanes open 2/22/17 12:00 AM to 2/24/17 6:00 PM Indiana Toll Road Fiber Install : 24 Hour Continuous Closure
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-35 (+0.5 miles) to Fail Rd (-0.1 miles) 48.0 to 52.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.4 miles) to County Road 600 E (+0.2 miles) 58.2 to 58.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Sycamore Rd (+0.9 miles) 66.9 to 69.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Primrose Rd (+0.5 miles) to Olive Rd (-0.5 miles) 71.0 to 71.2 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Riverside Dr (-0.2 miles) to Juniper Rd (+0.3 miles) 75.6 to 78.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Entrance ramp from WB Douglas Rd 76.3 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure - Detour is: Enter WB 77 Exit at MM 72 to 31 South/Nimtz Parkway Nimtz Parkway East to I-90 EB Entry
County Road 7 (-0.2 miles) to County Road 11 (+0.1 miles) 90.8 to 93.2 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 375 E (-0.5 miles) to County Road 935 E (+0.4 miles) 124.0 to 156.9 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

Indiana Toll Road (East-West) WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 935 E (-0.4 miles) to County Road 375 E (+0.5 miles) 156.9 to 124.0 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (-0.1 miles) to County Road 7 (+0.2 miles) 93.2 to 90.8 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Riverside Dr (+0.2 miles) 78.0 to 75.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Bendix Dr (+0.9 miles) to US-31 (-0.5 miles) 73.8 to 72.6 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Quince Rd (+1.0 miles) to Tamarack Rd (+0.2 miles) 69.0 to 66.9 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Fail Rd (+0.1 miles) to US-35 (-0.5 miles) 52.0 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to IN-51 (-0.4 miles) 25.2 to 20.8 Medium Left lane closed, up to one lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to Willowcreek Rd 24.0 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Exit at SR 49 (exit 31) North to I-94 West to 249 South

Elkhart County (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB US-33 at County Road 38 Medium Various lanes closed 1/29/17 11:00 PM to 5/15/17 10:59 PM InDOT utility work
NWB US-33 from Greene Rd to Sunnyside Ave Medium Various lanes closed 2/12/17 11:00 PM to 4/28/17 10:59 PM InDOT utility work
SEB US-33 from Sunnyside Ave to Greene Rd Medium Various lanes closed 2/12/17 11:00 PM to 4/28/17 10:59 PM InDOT utility work
SEB US-33 at County Road 38 Medium Various lanes closed 1/29/17 11:00 PM to 5/15/17 10:59 PM InDOT utility work

Lake County (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-41 from 185th Ave (+0.5 miles) to 173rd Ave Medium Various lanes closed 9/6/16 8:46 AM to 6/26/20 6:06 AM InDOT road maintenance operations
SB US-41 from 173rd Ave to 181st Ave Medium Various lanes closed 9/6/16 8:46 AM to 6/26/20 6:06 AM InDOT road maintenance operations

Porter County (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB IN-2 at Sigler St Medium Left lane closed, one lane open 7/8/16 9:30 AM to 4/27/20 6:50 AM InDOT lane closed
NB IN-149 from Dalke Road to County Road 1000 N Medium Various lanes closed 1/23/17 8:00 AM to 6/23/17 6:00 PM InDOT
NB IN-149 at I-80 Medium Various lanes closed 1/23/17 7:00 AM to 3/31/17 2:00 PM InDOT alternating lane closures
SB IN-149 from County Road 1000 N to Dalke Road Medium Various lanes closed 1/23/17 8:00 AM to 6/23/17 6:00 PM InDOT
SB IN-149 at I-80 Medium Various lanes closed 1/23/17 7:00 AM to 3/31/17 2:00 PM InDOT alternating lane closures

I-69 NB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
Harvey Road to M-19 172.4 to 184.1 Minor Left or right shoulder closed, all lanes open 4/4/16 6:00 AM to 5/26/17 4:30 PM MDOT Expect intermittent shoulder closures for utility work.
M-19 to Taylor Road 184.0 to 194.2 Minor Left or right shoulder closed, all lanes open 7/5/16 6:00 AM to 2/24/17 7:00 PM MDOT Expect intermittent shoulder closures for road construction.

I-69 SB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
M-19 to Taylor Road 194.2 to 184.0 Minor Left or right shoulder closed, all lanes open 7/5/16 6:00 AM to 2/24/17 7:00 PM MDOT Expect intermittent shoulder closures for road construction.
Harvey Road to M-19 184.1 to 172.4 Minor Left or right shoulder closed, all lanes open 4/4/16 6:00 AM to 5/26/17 4:30 PM MDOT Expect intermittent shoulder closures for utility work.
Exit ramp to EB Miller Rd Minor Various lanes closed 12/22/16 2:30 PM to 11/15/17 4:00 PM MDOT One of the left turn lanes to Miller Road will be closed due to the high load hit.

I-75 NB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Gibraltar Rd 28.8 to 28.9 Minor Left or right shoulder closed, all lanes open 2/16/17 6:00 AM to 2/25/17 4:00 PM MDOT The right shoulders are closed for bridge construction.
at West Rd 31.4 to 31.9 Minor Left or right shoulder closed, all lanes open 2/17/17 7:00 PM to 3/31/17 5:00 PM MDOT The left shoulder is closed for bridge construction.
at West Rd 31.5 to 31.9 Minor Left or right shoulder closed, all lanes open 2/18/17 8:00 AM to 3/31/17 5:00 PM MDOT The right shoulder is closed for bridge construction.
Allen Road to Goddard Road 36.8 to 38.8 Minor Left or right shoulder closed, all lanes open 2/4/17 6:00 PM to 11/30/18 6:00 PM MDOT The left shoulder will be closed for road work.
Entrance ramp from NB M-85 Unknown All lanes and shoulders closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
M-85 (Fort St) to Springwells St 43.4 to 45.7 Medium One lane closed, two or three lanes open 2/6/17 4:00 AM to 11/30/18 6:00 PM MDOT The left lane is closed for bridge construction. The three right lanes are open.
11 Mile Road to 12 Mile Road 62.4 to 63.5 Medium 0 lanes closed, three lanes open 2/22/17 8:00 AM to 2/24/17 2:00 PM MDOT The right lane is closed daily for utility work.
Coolidge Highway to Wattle Road 70.4 to 73.4 Minor Left or right shoulder closed, all lanes open 2/1/17 8:00 AM to 3/3/17 2:00 PM MDOT There are daily shoulder closures for survey work.
Exit ramp to EB Miller Rd 92.7 Minor Various lanes closed 12/22/16 2:30 PM to 11/15/17 4:00 PM MDOT One of the left turn lanes to Miller Road will be closed due to the high load hit.

I-75 SB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
Miller Rd to Miller Rd 117.1 to 117.0 Minor 0 lanes closed, three lanes open 12/22/16 2:30 PM to 11/15/17 4:00 PM MDOT Due to high load hit the right lane of westbound Miller Road over I-75 will be closed.::Actual closure is on Miller Road over southbound I-75. The right lane of westbound Miller Road will be closed.; one lane closed
Squirrel Rd to Coolidge Hwy 75.1 to 73.3 Minor Various lanes closed 2/23/17 6:30 AM to 3:00 PM,
2/24/17 6:30 AM to 3:00 PM,
2/25/17 6:30 AM to 3:00 PM,
2/26/17 6:30 AM to 3:00 PM,
... more, ending on 3/17/17
MDOT The right shoulder is closed daily.
Coolidge Highway to Wattle Road 73.2 to 70.3 Minor Left or right shoulder closed, all lanes open 2/1/17 8:00 AM to 3/3/17 2:00 PM MDOT There are daily shoulder closures for survey work.
I-96 to North Line/Allen Rd (exit 37) 49.1 to 37.3 Major All lanes and shoulders closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT SB I-75 is closed for bridge work. Local traffic can use SB I-75 to access the Ambassador Bridge, Clark Ave, Livernois Ave, and M-85/ Springwells St. All traffic will be required to exit at M-85/ Springwells St (exit 45).
Entrance ramp from NWB Ambassador Brg 48.0 None All lanes and shoulders closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The auto ramp is closed for bridge construction. Trucks will be allowed entrance to SB I-75, with access being maintained only to Exit 45 (Springwells St).
Entrance ramp from NEB Vernor Hwy Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Entrance ramp from NWB Clark St Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Entrance ramp from SB Livernois Ave Minor Various lanes closed 2/4/17 6:00 AM to 11/29/18 11:00 PM MDOT The ramp is closed for bridge construction.
Entrance ramp from NWB Springwells St Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Entrance ramp from WB Dearborn St 44.8 Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Exit ramp to NB Schaefer Hwy 43.2 Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Exit ramp to SB Schaefer Hwy 43.1 Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Entrance ramp from NB Schaefer Hwy 42.9 Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Exit ramp to NEB Seaway Dr 42.2 Medium All lanes and shoulders closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Entrance ramp from NWB Outer Dr Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Exit ramp to NB M-39 41.0 Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Entrance ramp from NB M-39 40.9 Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Entrance ramp from SB M-39 40.5 Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Exit ramp to SB Dix Hwy 40.1 Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Entrance ramp from SB Dix Hwy 39.7 Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Exit ramp to WB Northline Rd 37.6 Minor Various lanes closed 2/4/17 6:00 AM to 11/30/18 6:00 PM MDOT The ramp is closed for bridge construction.
Exit ramp to WB West Rd 32.3 Minor Various lanes closed 2/23/17 11:00 AM to 4:00 PM,
2/24/17 11:00 AM to 4:00 PM,
2/25/17 11:00 AM to 4:00 PM,
2/26/17 11:00 AM to 4:00 PM,
... more, ending on 3/31/17
MDOT The left shoulder of the ramp is closed and traffic is shifted to the right.
at West Rd 32.0 to 31.7 Minor Left or right shoulder closed, all lanes open 2/18/17 9:00 AM to 3/31/17 4:00 PM MDOT The left shoulder is closed for bridge construction.
at West Rd 32.0 to 31.7 Minor Left or right shoulder closed, all lanes open 2/20/17 7:00 AM to 3/31/17 4:00 PM MDOT The right shoulder is closed for bridge construction.
at Gibraltar Rd 28.8 to 28.8 Minor Left or right shoulder closed, all lanes open 2/16/17 6:00 AM to 2/25/17 4:00 PM MDOT The right shoulders are closed for bridge construction.

I-94 EB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
70th St (-0.8 miles) to County Road 687 (+0.3 miles) 42.0 to 46.0 Medium Various lanes closed 1/16/17 6:00 AM to 2/24/17 1:00 PM MDOT Intermittent lane closure for tree removal.
Exit ramp to WB I-96 Minor Various lanes closed 2/23/17 9:30 PM to 2/24/17 3:00 AM MDOT The ramp is closed for maintenance.

I-94 WB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to WB I-96 213.8 Minor Various lanes closed 2/23/17 9:30 PM to 2/24/17 3:00 AM MDOT The ramp is closed for maintenance.
at MM 78 78.1 to 77.9 Medium One lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 4:30 AM MDOT Expect single lane closure for concrete repairs.
I-94-BR (-0.3 miles) to I-94-BR (-0.2 miles) 23.6 to 23.5 Medium Various lanes closed 1/3/17 8:00 PM to 3/24/17 6:00 AM MDOT Expect an intermittent double-lane closure for bridge repair.
I-94-BR (-0.3 miles) to I-94-BR (-0.2 miles) 23.6 to 23.5 Medium 0 lanes closed, three lanes open 1/2/17 11:00 PM to 2/23/17 11:00 PM MDOT Expect a single-lane closure for bridge repair.

I-96 EB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from SB M-5 164.4 Minor Left or right shoulder closed, all lanes open 2/23/17 8:00 AM to 2:00 PM MDOT There is a right shoulder closure for maintenance.
Entrance ramp from WB I-94 190.1 Minor Various lanes closed 2/23/17 9:30 PM to 2/24/17 3:00 AM MDOT The ramp is closed for maintenance.

I-96 WB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB I-94 189.5 Minor Various lanes closed 2/23/17 9:30 PM to 2/24/17 3:00 AM MDOT The ramp is closed for maintenance.
at 8 Mile Rd 168.1 Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 4:00 PM MDOT There is a right shoulder closure for maintenance.
Entrance ramp from WB 12 Mile Rd 163.6 Minor Various lanes closed 2/23/17 8:00 AM to 2:00 PM MDOT There is a left lane closure for maintenance.
Meridian Rd (+1.3 miles) to Okemos Rd (-1.3 miles) 112.0 to 111.0 Medium One lane closed, one lane open 2/23/17 8:00 AM to 12:00 PM MDOT Expect left-lane closure for guardrail repair.

I-196 SB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
M-40 (-0.4 miles) to 56th St (-0.2 miles) 48.7 to 47.1 Medium Various lanes closed 2/22/17 6:30 AM to 2/23/17 12:30 PM MDOT Single daily lane closure for pothole and pavement repairs

I-275 NB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
Palmer Rd (+0.4 miles) to Palmer Rd (+0.5 miles) 23.4 to 23.5 Medium Various lanes closed 2/16/17 1:00 PM to 5/16/17 1:00 PM MDOT The rest area is closed for repairs.
at 8 Mile Rd 168.1 Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 4:00 PM MDOT There is a right shoulder closure for maintenance.

US-23 NB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Summerfield Rd 7.8 to 10.1 Medium One lane closed, one lane open 2/23/17 8:00 AM to 3/3/17 2:00 PM MDOT Expect daily single-lane closures on weekdays from 9 AM to 3 PM.
Pontiac Trl (+0.2 miles) to M-36 (-0.1 miles) 45.0 to 53.7 Minor Both shoulders closed, all lanes open 11/14/16 5:00 AM to 11/13/17 5:00 PM MDOT Expect shoulder closures for road construction.
Lahring Rd to Lahring Rd 82.4 to 82.4 Minor Left or right shoulder closed, all lanes open 6/17/16 7:00 AM to 4/28/17 4:00 PM MDOT The bridge was hit with a high load, once the repair is known the actual opening date can be determined.
Exit ramp to EB Miller Rd 92.7 Minor Various lanes closed 12/22/16 2:30 PM to 11/15/17 4:00 PM MDOT One of the left turn lanes to Miller Road will be closed due to the high load hit.

US-23 SB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
Miller Rd to Miller Rd 117.1 to 117.0 Minor 0 lanes closed, three lanes open 12/22/16 2:30 PM to 11/15/17 4:00 PM MDOT Due to high load hit the right lane of westbound Miller Road over I-75 will be closed.::Actual closure is on Miller Road over southbound I-75. The right lane of westbound Miller Road will be closed.; one lane closed
Lahring Rd to Lahring Rd 82.4 to 82.4 Minor Left or right shoulder closed, all lanes open 6/17/16 7:00 AM to 4/28/17 4:00 PM MDOT The bridge was hit with a high load, once the repair is known the actual opening date can be determined.
M-36 (+0.1 miles) to M-14 (-0.1 miles) 53.8 to 45.0 Minor Both shoulders closed, all lanes open 11/14/16 5:00 AM to 11/13/17 5:00 PM MDOT Expect shoulder closures for road construction.
at Summerfield Rd 10.1 to 7.8 Medium One lane closed, one lane open 2/23/17 8:00 AM to 3/3/17 2:00 PM MDOT Expect daily single-lane closures on weekdays from 9 AM to 3 PM.

US-131 NB (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
at 100th street 72.2 to 72.7 Medium One lane closed, one lane open 2/23/17 8:00 AM to 11:30 AM MDOT Expect a single right lane closure for bridge work

Branch County (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-12 from River Rd to Western Ave Major All lanes closed 2/24/17 6:00 AM to 3/3/17 4:00 PM MDOT Single lane closure for sewer repair. Maximum width is 10 feet and maximum height is 13.5 feet.

Cass County (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB and WB M-60 at Dailey Road Medium Various lanes closed 2/13/17 6:00 AM to 2/28/17 5:00 PM MDOT Expect an intermittent single-lane closure with flagging for tree work.
EB and WB M-60 at Dailey Road Medium Various lanes closed 2/13/17 6:00 AM to 2/28/17 5:00 PM MDOT Expect an intermittent single-lane closure with flagging for tree work.

Ingham County (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
SB I-96-BL (Cedar St) at Shiawassee St Minor Various lanes closed 2/23/17 8:00 AM to 4:00 PM MDOT Has the right lane closed for construction

Kalamazoo County (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB M-43 from Turwill Ln to Harrison St (+0.1 miles) Medium Various lanes closed 12/6/16 6:00 AM to 3/1/17 3:00 PM MDOT Expect intermittent single lane closure for utility work

Monroe County (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB Summerfield Rd at US-23 Medium All lanes and shoulders closed 2/23/17 7:00 AM to 7/28/17 6:00 PM MDOT Expect a total road closure for bridge reconstruction.
SB Summerfield Rd at US-23 Medium All lanes and shoulders closed 2/23/17 7:00 AM to 7/28/17 6:00 PM MDOT Expect a total road closure for bridge reconstruction.

Oakland County (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
WB M-59 from Dequindre Rd to John R Rd Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 4:00 PM MDOT There is a right shoulder closure for maintenance.

St Joseph County (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB and SB US-131 BR between Locust and Water Streets in Constantine at bridge over St. Joseph River Minor 0 lanes closed, two lanes open 1/25/17 7:30 AM to 3/17/17 4:00 PM MDOT Expect a lane closed for bridge repairs over St. Joseph River. Maximum width restriction is 10 feet.
NB and SB US-131 BR between Locust and Water Streets in Constantine at bridge over St. Joseph River Minor 0 lanes closed, two lanes open 1/25/17 7:30 AM to 3/17/17 4:00 PM MDOT Expect a lane closed for bridge repairs over St. Joseph River. Maximum width restriction is 10 feet.

Van Buren County (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB and SB I-196 BL from Blue Star Hwy to Dyckman Ave in South Haven Medium One lane closed, up to one lanes open 2/13/17 6:00 AM to 3/24/17 6:00 PM MDOT Expect single-lane closures for traffic signal replacement.
NB and SB I-196 BL from Blue Star Hwy to Dyckman Ave in South Haven Medium One lane closed, up to one lanes open 2/13/17 6:00 AM to 3/24/17 6:00 PM MDOT Expect single-lane closures for traffic signal replacement.
NB and SB M-40 (N Kalamazoo St) from Elm St to Paw Paw St in Paw Paw Medium Various lanes closed 2/14/17 5:00 PM to 2/24/17 5:00 AM MDOT Expect intermittent double-lane closures with flagging for sanitary storm work.
NB and SB M-40 (N Kalamazoo St) from Elm St to Paw Paw St in Paw Paw Medium Various lanes closed 2/14/17 5:00 PM to 2/24/17 5:00 AM MDOT Expect intermittent double-lane closures with flagging for sanitary storm work.

Wayne County (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-24 from Cherry Hill St to M-153 Medium One lane closed, three lanes open 2/22/17 6:30 AM to 6/15/17 6:00 PM MDOT The left lane is closed for utility work. The 3 right lanes are open.
SB US-24 (Telegraph Rd) from M-153 to Cherry Hill Rd Medium One lane closed, two lanes open 2/22/17 8:00 AM to 6/15/17 2:00 PM MDOT The left lane is closed. The right two lanes are open.
NB M-3 at McDougall St. Medium One lane closed, two lanes open 2/15/17 8:00 AM to 2/28/17 2:00 PM MDOT One right lane and right shoulder closed for emergency utility repairs.
NEB M-3 at Waterman St Medium Various lanes closed 2/23/17 8:00 AM to 2:00 PM daily until 2/24/17 MDOT Right shoulder closed for utility work.
EB Gibraltar Rd from I-75 to I-75 None All lanes and shoulders open 2/6/17 12:00 PM to 2/25/17 4:00 PM MDOT The left lanes are closed for bridge construction. The right lanes are open in each direction.
WB Gibraltar Rd from I-75 to I-75 None All lanes and shoulders open 2/6/17 12:00 PM to 2/25/17 4:00 PM MDOT The left lanes are closed for bridge construction. The right lanes are open in each direction.

I-35 NB (via I-35E) (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance from EB I-694 42.2 to 46.2 Medium Various lanes closed 4/3/16 8:00 PM to 5/15/17 11:59 PM MnDOT long term road construction

I-35 NB (via I-35W) (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
Industrial Blvd to MN-36 (-0.3 miles) 21.6 to 22.3 Medium Various lanes closed 5/31/16 1:53 PM to 3/20/20 11:13 AM MnDOT reduced to one lane
MN-36 to I-694 22.7 to 26.8 Medium Various lanes closed 8/10/16 12:12 PM to 5/30/20 9:32 AM MnDOT reduced to one lane
MN-36 to I-694 22.7 to 26.8 Medium Various lanes closed 8/15/16 2:18 PM to 6/4/20 11:38 AM MnDOT reduced to one lane
County Road D (+0.6 miles) to I-694 25.2 to 26.8 Medium Various lanes closed 6/22/16 9:35 AM to 4/11/20 6:55 AM MnDOT reduced to one lane

I-35 SB (via I-35E) (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit to WB I-694 113.8 to 42.2 Medium Various lanes closed 4/3/16 8:00 PM to 5/15/17 11:59 PM MnDOT long term road construction

I-35 SB (via I-35W) (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-694 to MN-36 (+0.1 miles) 26.8 to 22.7 Medium Various lanes closed 8/10/16 12:14 PM to 5/30/20 9:34 AM MnDOT reduced to one lane
I-694 to MN-36 (+0.1 miles) 26.8 to 22.7 Medium Various lanes closed 8/15/16 2:19 PM to 6/4/20 11:39 AM MnDOT reduced to one lane

I-94 EB (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Prior Ave 237.7 Major All lanes and shoulders closed 1/28/17 2:36 PM to 11/17/20 11:56 AM MnDOT closed to traffic
Lexington Pkwy (-0.1 miles) to Dale St (-0.1 miles) 239.4 to 240.4 Medium Various lanes closed 7/13/16 2:57 PM to 5/2/20 12:17 PM MnDOT reduced to three lanes
Mounds Blvd (+0.1 miles) to MN-120 243.6 to 247.7 Medium Various lanes closed 10/7/16 10:41 AM to 9/29/17 5:00 PM MnDOT major road construction

I-94 WB (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
MN-120 to Mounds Blvd (-0.1 miles) 247.8 to 243.7 Medium Various lanes closed 10/7/16 10:41 AM to 9/29/17 5:00 PM MnDOT major road construction

I-494 WB (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-52 to MN-3 (-0.3 miles) 65.3 to 66.0 Major Right two lanes closed, one lane open 2/12/17 4:54 PM to 12/2/20 2:14 PM MnDOT two right lanes blocked

I-694 EB (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lexington Ave (-0.2 miles) to Edgerton St (-0.1 miles) 42.2 to 46.2 Medium Various lanes closed 4/3/16 8:00 PM to 5/15/17 11:59 PM MnDOT long term road construction

I-694 WB (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
Edgerton St (+0.1 miles) to Lexington Ave (+0.2 miles) 113.8 to 42.2 Medium Various lanes closed 4/3/16 8:00 PM to 5/15/17 11:59 PM MnDOT long term road construction

US-52 SB (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Prior Ave 237.7 Major All lanes and shoulders closed 1/28/17 2:36 PM to 11/17/20 11:56 AM MnDOT closed to traffic
Lexington Pkwy (-0.1 miles) to Dale St (-0.1 miles) 239.4 to 240.4 Medium Various lanes closed 7/13/16 2:57 PM to 5/2/20 12:17 PM MnDOT reduced to three lanes

Anoka County (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB MN-47 from Pleasant St to Bunker Lake Blvd Medium Various lanes closed 2/17/17 9:00 AM to 2/23/17 3:00 PM MnDOT reduced to one lane
SB MN-47 from Bunker Lake Blvd to Pleasant St Medium Various lanes closed 2/17/17 9:00 AM to 2/23/17 3:00 PM MnDOT reduced to one lane
SB MN-65 at 237th Ave (+0.2 miles) Medium Left lane closed, one lane open 9/6/16 8:36 AM to 6/26/20 5:56 AM MnDOT left lane closed

Dakota County (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
WB MN-55 from MN-13 to MN-5 Medium Various lanes closed 2/23/17 9:00 AM to 2:30 PM MnDOT alternating lane closures
NB MN-77 from Diffley Rd (+0.3 miles) to MN-13 Medium Various lanes closed 12/29/16 7:21 AM to 6/1/17 5:00 PM MnDOT construction work

Hennepin County (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-169 from US-212 to 7th St Major All lanes and shoulders closed 1/23/17 2:30 AM to 10/31/17 11:59 PM MnDOT road closure
NB US-169 at Bren Rd Major All lanes and shoulders closed 1/17/17 5:00 AM to 10/7/17 5:00 PM MnDOT closed
SB US-169 from 7th St to US-212 Major All lanes and shoulders closed 1/23/17 2:30 AM to 10/31/17 11:59 PM MnDOT road closure
SB US-169 at Bren Rd Major All lanes and shoulders closed 1/17/17 5:00 AM to 10/7/17 5:00 PM MnDOT closed
WB MN-55 from MN-13 to MN-5 Medium Various lanes closed 2/23/17 9:00 AM to 2:30 PM MnDOT alternating lane closures
NB MN-100 from I-494 to 66th St Medium Various lanes closed 7/12/16 9:31 AM to 5/1/20 6:51 AM MnDOT alternating lane closures

Stearns County (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-71 from County Road 187 to 408th St Major All lanes closed 2/15/17 7:00 AM to 2/27/17 10:30 AM MnDOT lane closed
SB US-71 from 408th St to County Road 187 Major All lanes closed 2/15/17 7:00 AM to 2/27/17 10:30 AM MnDOT lane closed
NB MN-15 at Great River Rd Medium One lane closed, one lane open 6/20/16 9:00 AM to 4/9/20 6:20 AM MnDOT lane closed

Wright County (Minnesota)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB MN-24 at County Road 3 Medium Various lanes closed 2/23/17 7:00 AM to 2/24/17 10:30 AM MnDOT intermittent lane closure
SWB MN-24 at Oliver Ave Medium Various lanes closed 2/23/17 7:00 AM to 2/24/17 10:30 AM MnDOT intermittent lane closure

I-39 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at L-T Town Line Rd 181.1 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 5:00 PM daily until 3/10/17 WisDOT Construction - Soil boring for new location for sign structure S-53-115 at Station 464+20, northbound I-39.
Newville Rd (-0.6 miles) to Goede Rd (+0.3 miles) 165.7 to 162.2 Medium Left lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 5:00 AM WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Cascade Mountain Rd (+0.5 miles) to River Rd (-0.3 miles) 85.8 to 87.8 Minor Left shoulder closed, all lanes open 2/23/17 7:00 AM to 5:00 PM daily until 3/6/17 WisDOT Permit - Left Shoulder closed to place batwing crane in Median to protect I-39 during wreck out and wire pull on ATC Y-16 line.

I-39 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
River Rd (+0.3 miles) to Cascade Mountain Rd (-0.5 miles) 87.8 to 85.8 Minor Left shoulder closed, all lanes open 2/23/17 7:00 AM to 5:00 PM daily until 3/6/17 WisDOT Permit - Left Shoulder closed to place batwing crane in Median to protect I-39 during wreck out and wire pull on ATC Y-16 line.
Entrance ramp from WB WI-33 87.3 Minor Left shoulder closed, all lanes open 2/23/17 7:00 AM to 5:00 PM daily until 3/6/17 WisDOT Permit - Left Shoulder closed to place batwing crane in Median to protect I-39 during wreck out and wire pull on ATC Y-16 line.
Entrance ramp from WB WI-33 87.3 Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 5:00 PM daily until 3/6/17 WisDOT Permit - Right Shoulder closed on ramp from Hwy 33 to 39SB to access existing structure for removal and guarding to protect I-39 during wreck out and wire pull on ATC Y-16 line.
Goede Rd (-0.2 miles) to Newville Rd (-0.7 miles) 161.7 to 163.9 Medium Left lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 5:00 AM WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK

I-69 NB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Harvey Road to M-19 172.4 to 184.1 Minor Left or right shoulder closed, all lanes open 4/4/16 6:00 AM to 5/26/17 4:30 PM MDOT Expect intermittent shoulder closures for utility work.
M-19 to Taylor Road 184.0 to 194.2 Minor Left or right shoulder closed, all lanes open 7/5/16 6:00 AM to 2/24/17 7:00 PM MDOT Expect intermittent shoulder closures for road construction.

I-69 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
M-19 to Taylor Road 194.2 to 184.0 Minor Left or right shoulder closed, all lanes open 7/5/16 6:00 AM to 2/24/17 7:00 PM MDOT Expect intermittent shoulder closures for road construction.
Harvey Road to M-19 184.1 to 172.4 Minor Left or right shoulder closed, all lanes open 4/4/16 6:00 AM to 5/26/17 4:30 PM MDOT Expect intermittent shoulder closures for utility work.
Exit ramp to EB Miller Rd Minor Various lanes closed 12/22/16 2:30 PM to 11/15/17 4:00 PM MDOT One of the left turn lanes to Miller Road will be closed due to the high load hit.

I-80 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Larkin Ave (IL-7) to Lincoln Hwy (US-30) 130.6 to 137.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation
Lincoln Hwy (US-30) to Tri-State Twy (I-294) 137.7 to 4.2 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Left lane closed, up to two lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from Houston Ave 23.6 Unknown All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Enter WB at Portage, Exit at 17 to I-65 South/15th Ave East to I-90 Ramp EB
IN-149 (+0.2 miles) to Meridian Rd (-0.1 miles) 27.0 to 29.8 Minor Right shoulder closed, all lanes open 2/22/17 12:00 AM to 2/24/17 6:00 PM Indiana Toll Road Fiber Install : 24 Hour Continuous Closure
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-35 (+0.5 miles) to Fail Rd (-0.1 miles) 48.0 to 52.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.4 miles) to County Road 600 E (+0.2 miles) 58.2 to 58.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Sycamore Rd (+0.9 miles) 66.9 to 69.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Primrose Rd (+0.5 miles) to Olive Rd (-0.5 miles) 71.0 to 71.2 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Riverside Dr (-0.2 miles) to Juniper Rd (+0.3 miles) 75.6 to 78.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Entrance ramp from WB Douglas Rd 76.3 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure - Detour is: Enter WB 77 Exit at MM 72 to 31 South/Nimtz Parkway Nimtz Parkway East to I-90 EB Entry
County Road 7 (-0.2 miles) to County Road 11 (+0.1 miles) 90.8 to 93.2 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 375 E (-0.5 miles) to County Road 935 E (+0.4 miles) 124.0 to 156.9 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-80 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 935 E (-0.4 miles) to County Road 375 E (+0.5 miles) 156.9 to 124.0 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (-0.1 miles) to County Road 7 (+0.2 miles) 93.2 to 90.8 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Riverside Dr (+0.2 miles) 78.0 to 75.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Bendix Dr (+0.9 miles) to US-31 (-0.5 miles) 73.8 to 72.6 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Quince Rd (+1.0 miles) to Tamarack Rd (+0.2 miles) 69.0 to 66.9 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Fail Rd (+0.1 miles) to US-35 (-0.5 miles) 52.0 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to IN-51 (-0.4 miles) 25.2 to 20.8 Medium Left lane closed, up to one lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to Willowcreek Rd 24.0 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Exit at SR 49 (exit 31) North to I-94 West to 249 South
Tri-State Twy (I-294) to Lincoln Hwy (US-30) 4.5 to 137.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
Lincoln Hwy (US-30) to Larkin Ave (IL-7) 137.7 to 130.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at County Highway M 39.6 Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 4:00 PM daily until 2/24/17 WisDOT Construction - Soil Borings in ROW but off of Roadway
Goede Rd (-0.2 miles) to Newville Rd (-0.7 miles) 161.7 to 163.9 Medium Left lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 5:00 AM WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Harmony Rd (+0.3 miles) to IL-23 (+0.1 miles) 35.6 to 36.2 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Arlington Heights Rd (+0.8 miles) to Elmhurst Rd (-0.3 miles) 71.6 to 73.3 Medium Right lane closed, two lanes open 12/24/16 12:00 AM to 4/28/17 11:59 PM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***
Entrance from EB I-190 2.3 to 3.0 Minor Left shoulder closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT Long Term Closure
Entrance from EB I-190 2.3 to 79.6 Minor Right shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Left lane closed, up to two lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from Houston Ave 23.6 Unknown All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Enter WB at Portage, Exit at 17 to I-65 South/15th Ave East to I-90 Ramp EB
IN-149 (+0.2 miles) to Meridian Rd (-0.1 miles) 27.0 to 29.8 Minor Right shoulder closed, all lanes open 2/22/17 12:00 AM to 2/24/17 6:00 PM Indiana Toll Road Fiber Install : 24 Hour Continuous Closure
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-35 (+0.5 miles) to Fail Rd (-0.1 miles) 48.0 to 52.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.4 miles) to County Road 600 E (+0.2 miles) 58.2 to 58.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Sycamore Rd (+0.9 miles) 66.9 to 69.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Primrose Rd (+0.5 miles) to Olive Rd (-0.5 miles) 71.0 to 71.2 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Riverside Dr (-0.2 miles) to Juniper Rd (+0.3 miles) 75.6 to 78.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Entrance ramp from WB Douglas Rd 76.3 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure - Detour is: Enter WB 77 Exit at MM 72 to 31 South/Nimtz Parkway Nimtz Parkway East to I-90 EB Entry
County Road 7 (-0.2 miles) to County Road 11 (+0.1 miles) 90.8 to 93.2 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 375 E (-0.5 miles) to County Road 935 E (+0.4 miles) 124.0 to 156.9 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 935 E (-0.4 miles) to County Road 375 E (+0.5 miles) 156.9 to 124.0 Medium Various lanes closed 2/23/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching : Moving Operation. Crew will be switching lanes during shift.
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (-0.1 miles) to County Road 7 (+0.2 miles) 93.2 to 90.8 Medium Left lane closed, one lane open 2/18/17 6:00 AM to 4/17/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Riverside Dr (+0.2 miles) 78.0 to 75.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Bendix Dr (+0.9 miles) to US-31 (-0.5 miles) 73.8 to 72.6 Minor Right shoulder closed, all lanes open 2/22/17 7:00 AM to 2/25/17 7:00 AM Indiana Toll Road Sign Foundation : 24 Hour Continuous Shoulder Closure
Quince Rd (+1.0 miles) to Tamarack Rd (+0.2 miles) 69.0 to 66.9 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Fail Rd (+0.1 miles) to US-35 (-0.5 miles) 52.0 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to IN-51 (-0.4 miles) 25.2 to 20.8 Medium Left lane closed, up to one lanes open 2/18/17 6:00 AM to 4/10/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
Exit ramp to Willowcreek Rd 24.0 Medium All lanes and shoulders closed 2/18/17 6:00 AM to 4/10/17 8:00 PM Indiana Toll Road Concrete Pavement - 24 Hour Continuous Closure - Detour Exit at SR 49 (exit 31) North to I-94 West to 249 South
26th St to Eisenhower Expy (I-290) 54.1 to 51.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 8/12/16 12:00 AM to 10/31/18 11:59 PM IDOT Work includes bridge demolition, bridge construction, pavement, roadway lighting, pavement marking and signage. Detour: Exit northbound I90/94 at Roosevelt Rd., right on Roosevelt Rd to State St
Exit ramp to EB I-290 52.3 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 11:00 AM to 2:00 PM IDOT Moving Operation
Exit to NB Edens Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation
Barrington Rd (+0.4 miles) to IL-72 61.8 to 61.3 Medium Right lane closed, three lanes open 2/23/17 7:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst
IL-23 (-0.4 miles) to IL-23 (+0.1 miles) 36.5 to 36.0 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
at L-T Town Line Rd 181.1 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 5:00 PM daily until 3/10/17 WisDOT Construction - Soil boring for new location for sign structure S-53-115 at Station 464+20, northbound I-39.
Newville Rd (-0.6 miles) to Goede Rd (+0.3 miles) 165.7 to 162.2 Medium Left lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 5:00 AM WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Schepp Rd (-2.0 miles) to County Road A (+0.7 miles) 101.8 to 93.9 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 2:30 PM daily until 3/31/17 WisDOT Maintenance - brushing from Columbia/sauk line w/b to mile marker 94 w/b right side. this will be a moving operation on a day to day basis between the dates indicated.
Xanadu Rd (-0.3 miles) to US-12 (-0.6 miles) 90.9 to 86.5 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 2:30 PM daily until 3/31/17 WisDOT Maintenance - brushing between 91.0 w/b to sauk co./Juneau co. line right shoulder. this will be a moving operation on a day to day basis between the dates indicated.
County Highway M to County Highway M 39.6 to 39.6 Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 4:00 PM daily until 2/24/17 WisDOT Construction - Soil Borings in ROW but off of Roadway

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Prior Ave 237.7 Major All lanes and shoulders closed 1/28/17 2:36 PM to 11/17/20 11:56 AM MnDOT closed to traffic
Lexington Pkwy (-0.1 miles) to Dale St (-0.1 miles) 239.4 to 240.4 Medium Various lanes closed 7/13/16 2:57 PM to 5/2/20 12:17 PM MnDOT reduced to three lanes
Mounds Blvd (+0.1 miles) to MN-120 243.6 to 247.7 Medium Various lanes closed 10/7/16 10:41 AM to 9/29/17 5:00 PM MnDOT major road construction
Entrance ramp from WI-100 303.7 Minor Right lane closed, up to two lanes open 3/25/15 12:00 AM to 3/15/17 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Exit ramp to NB I-41 304.3 Major All lanes closed 8/15/16 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: Take I-94 East to the STH 164/CTH J Exit; take STH 164/CTH J North to Capitol Dr/STH 190, Capitol Dr/STH 190 East to the I-41/US 45 North Entrance Ramp; OR, Take I-94 East to the Moorland Rd Exit; take Moorland Rd North to Bluemoun
Entrance ramp from SB I-41 304.7 Unknown All lanes closed 10/1/16 12:00 AM to 6/6/17 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Watertown Plank Rd Exit; take Watertown Plank Rd East to Glenview Ave, Glenview Ave South to Kearney St, Kearney St East to the I-94 East Entrance Ramp; OR, Take I-41/US 45 South to the Bluemound Rd Exit
Exit ramp to SB WI-181 305.1 Major All lanes closed 12/22/16 12:00 AM to 11/22/17 11:45 PM WisDOT Construction - Detour: Take I-94 East to the WIS 100 Exit Ramp; take WIS 100 South to Greenfield Ave, Greenfield Ave East to 84th St; OR, Take I-94 East to the 68th-70th St Exit; take 70th St North to OConnor St, OConnor St West to 84th St
IL-132 (+0.6 miles) to Atkinson Rd (-0.2 miles) 9.0 to 15.0 Medium Right lane closed, three lanes open 2/23/17 9:00 AM to 1:30 PM Illinois Tollway Moving Operation; Crack Sealing
Entrance from SB Edens 28.4 to 43.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 2:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Shoulders closed and traffic weaved; *** Long Term Closure ***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor Left shoulder closed, all lanes open 9/6/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 foot wide lanes; Long Term Closure
Exit to SB Bishop Ford 62.9 to 74.4 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
115th St to 130th St 66.6 to 68.5 Minor Right shoulder closed, all lanes open 2/23/17 9:00 AM to 3:00 PM IDOT
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
70th St (-0.8 miles) to County Road 687 (+0.3 miles) 42.0 to 46.0 Medium Various lanes closed 1/16/17 6:00 AM to 2/24/17 1:00 PM MDOT Intermittent lane closure for tree removal.
Exit ramp to WB I-96 Minor Various lanes closed 2/23/17 9:30 PM to 2/24/17 3:00 AM MDOT The ramp is closed for maintenance.

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to WB I-96 213.8 Minor Various lanes closed 2/23/17 9:30 PM to 2/24/17 3:00 AM MDOT The ramp is closed for maintenance.
at MM 78 78.1 to 77.9 Medium One lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 4:30 AM MDOT Expect single lane closure for concrete repairs.
I-94-BR (-0.3 miles) to I-94-BR (-0.2 miles) 23.6 to 23.5 Medium Various lanes closed 1/3/17 8:00 PM to 3/24/17 6:00 AM MDOT Expect an intermittent double-lane closure for bridge repair.
I-94-BR (-0.3 miles) to I-94-BR (-0.2 miles) 23.6 to 23.5 Medium 0 lanes closed, three lanes open 1/2/17 11:00 PM to 2/23/17 11:00 PM MDOT Expect a single-lane closure for bridge repair.
at I-80 (+0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
Entrance from NB Bishop Ford 74.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 2/23/17 9:00 AM to 3:00 PM IDOT Moving Operation
I-57 / Bishop Ford (I-94) to 91st St 62.9 to 62.3 Minor Left shoulder closed, all lanes open 11/21/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 foot wide lanes; Long Term Closure
26th St to Eisenhower Expy (I-290) 54.1 to 51.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to WB I-290 52.3 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 4/1/17 11:59 PM IDOT Right lane closed. Reduced width.; Long Term Closure
Exit ramp to WB I-290 Minor Both shoulders closed, all lanes open 12/1/16 12:00 AM to 4/1/17 11:59 PM IDOT 11 ft width; Long Term Closure
Exit ramp to EB I-290 52.3 Major All lanes and shoulders closed 8/12/16 12:00 AM to 10/31/18 11:59 PM IDOT Work includes bridge demolition, bridge construction, pavement, roadway lighting, pavement marking and signage. Detour: Exit northbound I90/94 at Roosevelt Rd., right on Roosevelt Rd to State St
Exit ramp to EB I-290 52.3 Minor Left lane and both shoulders closed, up to one lanes open 3/13/15 12:00 AM to 4/1/17 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 4/1/17 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 11:00 AM to 2:00 PM IDOT Moving Operation
Exit to NB Edens Medium Left lane or right lane and both shoulders closed with partial ramp closures 2/23/17 9:30 AM to 1:30 PM IDOT Moving Operation
Atkinson Rd (+0.2 miles) to IL-132 (-0.6 miles) 15.0 to 9.0 Medium Right lane closed, three lanes open 2/23/17 9:00 AM to 1:30 PM Illinois Tollway Moving Operation; Crack Sealing
Exit ramp to EB WI-100 322.9 Major All lanes closed 11/30/15 12:00 AM to 11/15/17 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 84th St Exit; take 84th St South to Greenfield Ave, Greenfield Ave West to Hwy 100; OR, Take I-94 West to the Moorland Rd-South Exit; take Moorland Rd South to Greenfield Ave, Greenfield Ave East to Hwy 100
Holt Ave to Rosedale Ave 314.4 to 313.5 Medium Right lane closed, two lanes open 2/23/17 10:00 AM to 11:00 AM WisDOT Maintenance - Sign Repairs
Entrance ramp from NB 4th St 314.0 Medium All lanes closed 2/23/17 10:00 AM to 11:00 AM WisDOT Maintenance - Detour: Use Alt Route
Exit ramp to SB I-41 305.0 Major All lanes closed 3/9/15 12:00 AM to 5/6/18 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 68th St Exit and proceed straight onto O⿿Connor St; take O⿿Connor St West to 84th St, 84th St South to National Ave; National Ave Southwest to the I-41/894/US 45 South Entrance Ramp; OR, Take I-94 West to t
Entrance ramp from WI-100 303.8 Minor Right lane closed, up to two lanes open 3/25/15 12:00 AM to 3/15/17 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Redford Blvd (-0.2 miles) to Redford Blvd (+0.2 miles) 295.7 to 295.3 Medium Left lane closed, two lanes open 2/23/17 9:00 AM to 2:00 PM daily until 2/24/17 WisDOT Maintenance - Place False Decking
Waterville Rd to CR-P (-0.2 miles) 284.4 to 283.7 Minor Left shoulder closed, all lanes open 1/30/17 12:00 AM to 3/11/17 11:45 PM WisDOT Construction - East West Freeway | Nemahbin Lake Bridge, eb B-67-0069 | I 94 | WAUKESHA
Schepp Rd (-2.0 miles) to County Road A (+0.7 miles) 101.8 to 93.9 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 2:30 PM daily until 3/31/17 WisDOT Maintenance - brushing from Columbia/sauk line w/b to mile marker 94 w/b right side. this will be a moving operation on a day to day basis between the dates indicated.
Xanadu Rd (-0.3 miles) to US-12 (-0.6 miles) 90.9 to 86.5 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 2:30 PM daily until 3/31/17 WisDOT Maintenance - brushing between 91.0 w/b to sauk co./Juneau co. line right shoulder. this will be a moving operation on a day to day basis between the dates indicated.
MN-120 to Mounds Blvd (-0.1 miles) 247.8 to 243.7 Medium Various lanes closed 10/7/16 10:41 AM to 9/29/17 5:00 PM MnDOT major road construction

I-39 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at L-T Town Line Rd 181.1 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 5:00 PM daily until 3/10/17 WisDOT Construction - Soil boring for new location for sign structure S-53-115 at Station 464+20, northbound I-39.
Newville Rd (-0.6 miles) to Goede Rd (+0.3 miles) 165.7 to 162.2 Medium Left lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 5:00 AM WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Cascade Mountain Rd (+0.5 miles) to River Rd (-0.3 miles) 85.8 to 87.8 Minor Left shoulder closed, all lanes open 2/23/17 7:00 AM to 5:00 PM daily until 3/6/17 WisDOT Permit - Left Shoulder closed to place batwing crane in Median to protect I-39 during wreck out and wire pull on ATC Y-16 line.

I-39 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
River Rd (+0.3 miles) to Cascade Mountain Rd (-0.5 miles) 87.8 to 85.8 Minor Left shoulder closed, all lanes open 2/23/17 7:00 AM to 5:00 PM daily until 3/6/17 WisDOT Permit - Left Shoulder closed to place batwing crane in Median to protect I-39 during wreck out and wire pull on ATC Y-16 line.
Entrance ramp from WB WI-33 87.3 Minor Left shoulder closed, all lanes open 2/23/17 7:00 AM to 5:00 PM daily until 3/6/17 WisDOT Permit - Left Shoulder closed to place batwing crane in Median to protect I-39 during wreck out and wire pull on ATC Y-16 line.
Entrance ramp from WB WI-33 87.3 Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 5:00 PM daily until 3/6/17 WisDOT Permit - Right Shoulder closed on ramp from Hwy 33 to 39SB to access existing structure for removal and guarding to protect I-39 during wreck out and wire pull on ATC Y-16 line.
Goede Rd (-0.2 miles) to Newville Rd (-0.7 miles) 161.7 to 163.9 Medium Left lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 5:00 AM WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK

I-41/US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB WI-100 322.9 Major All lanes closed 11/30/15 12:00 AM to 11/15/17 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 84th St Exit; take 84th St South to Greenfield Ave, Greenfield Ave West to Hwy 100; OR, Take I-94 West to the Moorland Rd-South Exit; take Moorland Rd South to Greenfield Ave, Greenfield Ave East to Hwy 100
Entrance ramp from WB Lincoln Ave 1.8 Medium All lanes and shoulders closed 4/16/16 12:00 AM to 9/25/17 11:45 PM WisDOT Construction - Detour: To go North: Take Lincoln Ave West to Hwy 100, Hwy 100 North to Watertown Plank Rd, Watertown Plank Rd East to the I-41/US 45 North Entrance Ramp; To go East: Take Lincoln Ave West to Hwy 100, Hwy 100 North to the I-94 East Entranc
Entrance ramp from EB I-94 0.2 Major All lanes closed 8/15/16 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: Take I-94 East to the STH 164/CTH J Exit; take STH 164/CTH J North to Capitol Dr/STH 190, Capitol Dr/STH 190 East to the I-41/US 45 North Entrance Ramp; OR, Take I-94 East to the Moorland Rd Exit; take Moorland Rd North to Bluemoun
Exit ramp to EB US-18 Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/17 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
Exit ramp to WI-100 Major All lanes and shoulders closed 11/30/15 12:00 AM to 11/15/17 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 84th St Exit; take 84th St North to Bluemound Rd, Bluemound Rd West to Mayfair Rd/Hwy 100; OR, Take I-94 West to the Moorland Rd-North Exit; take Moorland Rd North to Bluemound Rd, Bluemound Rd East to Mayfair
WI-145 to County Line Rd Major Left two lanes closed, one lane open 2/23/17 7:00 PM to 2/24/17 5:00 AM WisDOT Maintenance - Place mastic & Patch pavements
County Road D (-0.3 miles) to County Road D (+0.8 miles) Medium Left lane closed, one lane open 2/23/17 8:00 AM to 3:00 PM WisDOT Construction - Milwaukee - Fond du Lac | Kohlsville River Bridge | I 41 | WASHINGTON

I-41/US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Mohawk Rd (+2.3 miles) to Mohawk Rd (+2.3 miles) None All lanes open with restriction 9/20/16 12:00 AM to 4/1/17 11:45 PM WisDOT Construction - Milwaukee - Fond du Lac | Kohlsville River Bridge | I 41 | WASHINGTON
Mohawk Rd (+2.3 miles) to Mohawk Rd (+2.3 miles) Medium Left lane closed, one lane open 2/23/17 9:00 AM to 3:00 PM WisDOT Construction - Milwaukee - Fond du Lac | Kohlsville River Bridge | I 41 | WASHINGTON
County Line Rd to WI-145 Major Left two lanes closed, up to one lanes open 2/23/17 7:00 PM to 2/24/17 5:00 AM WisDOT Maintenance - Place mastic & Patch pavements
Florist Ave to Carmen Ave (+0.1 miles) Medium Right lane closed, two lanes open 2/23/17 9:00 AM to 12:00 PM WisDOT Maintenance - Guard Rail Repair
Entrance ramp from EB North Ave Medium All lanes closed 2/23/17 9:00 AM to 10:00 AM WisDOT Maintenance - Detour: Use alternate route
Exit ramp to Wisconsin Ave Medium All lanes and shoulders closed 10/15/14 12:00 AM to 12/31/17 11:45 PM WisDOT Construction - Detour: USH 45 to North Ave to HWY 100 to Wisconsin
Exit ramp to EB I-94 Unknown All lanes closed 10/1/16 12:00 AM to 6/6/17 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Watertown Plank Rd Exit; take Watertown Plank Rd East to Glenview Ave, Glenview Ave South to Kearney St, Kearney St East to the I-94 East Entrance Ramp; OR, Take I-41/US 45 South to the Bluemound Rd Exit
Entrance ramp from WB I-94 0.3 Major All lanes closed 3/9/15 12:00 AM to 5/6/18 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 68th St Exit and proceed straight onto O⿿Connor St; take O⿿Connor St West to 84th St, 84th St South to National Ave; National Ave Southwest to the I-41/894/US 45 South Entrance Ramp; OR, Take I-94 West to t
Exit ramp to WB WI-59 0.9 Major All lanes closed 11/12/16 12:00 AM to 6/15/18 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Bluemound Rd Exit; take Bluemound Rd West to Mayfair Rd/Hwy 100, Mayfair Rd/Hwy 100 South to Greenfield Ave; OR, Take I-41/894/US 45 South to the National Ave Exit; take National Ave West to Hwy 100, Hwy
Entrance ramp from EB WI-59 1.3 Major All lanes closed 11/12/16 12:00 AM to 10/15/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Ave West to Hwy 100, Hwy 100 South to National Ave, National Ave East to the I-41/894/US 45 South Entrance Ramp; OR, Take Greenfield Ave West to Hwy 100, Hwy 100 South to Beloit Rd, Beloit Rd East to the I-41/894/US
Exit ramp to WB Lincoln Ave 1.8 Medium All lanes closed 11/12/16 12:00 AM to 6/15/18 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Bluemound Rd Exit; take Bluemound Rd West to Mayfair Rd/Hwy 100, Mayfair Rd/Hwy 100 South to Lincoln Ave; OR, Take I-41/894/US 45 South to the National Ave Exit; take National Ave West to Hwy 100, Hwy 10

I-43 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at WI-67 25.2 Minor Left shoulder closed, all lanes open 2/23/17 12:00 AM to 11:00 PM daily until 4/1/17 WisDOT Permit - RUNNING MAIN ALONG STH 67 AND CROSSING I 43
at WI-67 25.2 Minor Right shoulder closed, all lanes open 2/23/17 12:00 AM to 11:00 PM daily until 4/1/17 WisDOT Permit - RUNNING MAIN ALONG STH 67 AND CROSSING I 43
Holt Ave to Rosedale Ave 314.4 to 313.5 Medium Right lane closed, two lanes open 2/23/17 10:00 AM to 11:00 AM WisDOT Maintenance - Sign Repairs
Entrance ramp from NB 4th St 314.0 Medium All lanes closed 2/23/17 10:00 AM to 11:00 AM WisDOT Maintenance - Detour: Use Alt Route

I-43 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to NB WI-67 25.7 Minor Right shoulder closed, all lanes open 2/23/17 12:00 AM to 11:45 PM daily until 4/1/17 WisDOT Permit - Running gas main along STH 67 from Deere Rd south to Commerce. Crossing I43
at WI-67 25.3 Minor Right shoulder closed, all lanes open 2/23/17 12:00 AM to 11:00 PM daily until 4/1/17 WisDOT Permit - RUNNING MAIN ALONG STH 67 AND CROSSING 1 43
at WI-67 25.3 Minor Left shoulder closed, all lanes open 2/23/17 12:00 AM to 11:00 PM daily until 4/1/17 WisDOT Permit - RUNNING MAIN ALONG STH 67 AND CROSSING 1 43

I-90 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at County Highway M 39.6 Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 4:00 PM daily until 2/24/17 WisDOT Construction - Soil Borings in ROW but off of Roadway
Goede Rd (-0.2 miles) to Newville Rd (-0.7 miles) 161.7 to 163.9 Medium Left lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 5:00 AM WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK

I-90 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at L-T Town Line Rd 181.1 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 5:00 PM daily until 3/10/17 WisDOT Construction - Soil boring for new location for sign structure S-53-115 at Station 464+20, northbound I-39.
Newville Rd (-0.6 miles) to Goede Rd (+0.3 miles) 165.7 to 162.2 Medium Left lane closed, one lane open 2/23/17 8:00 PM to 2/24/17 5:00 AM WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
Schepp Rd (-2.0 miles) to County Road A (+0.7 miles) 101.8 to 93.9 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 2:30 PM daily until 3/31/17 WisDOT Maintenance - brushing from Columbia/sauk line w/b to mile marker 94 w/b right side. this will be a moving operation on a day to day basis between the dates indicated.
Xanadu Rd (-0.3 miles) to US-12 (-0.6 miles) 90.9 to 86.5 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 2:30 PM daily until 3/31/17 WisDOT Maintenance - brushing between 91.0 w/b to sauk co./Juneau co. line right shoulder. this will be a moving operation on a day to day basis between the dates indicated.
County Highway M to County Highway M 39.6 to 39.6 Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 4:00 PM daily until 2/24/17 WisDOT Construction - Soil Borings in ROW but off of Roadway

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WI-100 303.7 Minor Right lane closed, up to two lanes open 3/25/15 12:00 AM to 3/15/17 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Exit ramp to NB I-41 304.3 Major All lanes closed 8/15/16 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: Take I-94 East to the STH 164/CTH J Exit; take STH 164/CTH J North to Capitol Dr/STH 190, Capitol Dr/STH 190 East to the I-41/US 45 North Entrance Ramp; OR, Take I-94 East to the Moorland Rd Exit; take Moorland Rd North to Bluemoun
Entrance ramp from SB I-41 304.7 Unknown All lanes closed 10/1/16 12:00 AM to 6/6/17 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Watertown Plank Rd Exit; take Watertown Plank Rd East to Glenview Ave, Glenview Ave South to Kearney St, Kearney St East to the I-94 East Entrance Ramp; OR, Take I-41/US 45 South to the Bluemound Rd Exit
Exit ramp to SB WI-181 305.1 Major All lanes closed 12/22/16 12:00 AM to 11/22/17 11:45 PM WisDOT Construction - Detour: Take I-94 East to the WIS 100 Exit Ramp; take WIS 100 South to Greenfield Ave, Greenfield Ave East to 84th St; OR, Take I-94 East to the 68th-70th St Exit; take 70th St North to OConnor St, OConnor St West to 84th St

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB WI-100 322.9 Major All lanes closed 11/30/15 12:00 AM to 11/15/17 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 84th St Exit; take 84th St South to Greenfield Ave, Greenfield Ave West to Hwy 100; OR, Take I-94 West to the Moorland Rd-South Exit; take Moorland Rd South to Greenfield Ave, Greenfield Ave East to Hwy 100
Holt Ave to Rosedale Ave 314.4 to 313.5 Medium Right lane closed, two lanes open 2/23/17 10:00 AM to 11:00 AM WisDOT Maintenance - Sign Repairs
Entrance ramp from NB 4th St 314.0 Medium All lanes closed 2/23/17 10:00 AM to 11:00 AM WisDOT Maintenance - Detour: Use Alt Route
Exit ramp to SB I-41 305.0 Major All lanes closed 3/9/15 12:00 AM to 5/6/18 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 68th St Exit and proceed straight onto O⿿Connor St; take O⿿Connor St West to 84th St, 84th St South to National Ave; National Ave Southwest to the I-41/894/US 45 South Entrance Ramp; OR, Take I-94 West to t
Entrance ramp from WI-100 303.8 Minor Right lane closed, up to two lanes open 3/25/15 12:00 AM to 3/15/17 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Redford Blvd (-0.2 miles) to Redford Blvd (+0.2 miles) 295.7 to 295.3 Medium Left lane closed, two lanes open 2/23/17 9:00 AM to 2:00 PM daily until 2/24/17 WisDOT Maintenance - Place False Decking
Waterville Rd to CR-P (-0.2 miles) 284.4 to 283.7 Minor Left shoulder closed, all lanes open 1/30/17 12:00 AM to 3/11/17 11:45 PM WisDOT Construction - East West Freeway | Nemahbin Lake Bridge, eb B-67-0069 | I 94 | WAUKESHA
Schepp Rd (-2.0 miles) to County Road A (+0.7 miles) 101.8 to 93.9 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 2:30 PM daily until 3/31/17 WisDOT Maintenance - brushing from Columbia/sauk line w/b to mile marker 94 w/b right side. this will be a moving operation on a day to day basis between the dates indicated.
Xanadu Rd (-0.3 miles) to US-12 (-0.6 miles) 90.9 to 86.5 Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 2:30 PM daily until 3/31/17 WisDOT Maintenance - brushing between 91.0 w/b to sauk co./Juneau co. line right shoulder. this will be a moving operation on a day to day basis between the dates indicated.

I-894 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to WB WI-59 0.9 Major All lanes closed 11/12/16 12:00 AM to 6/15/18 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Bluemound Rd Exit; take Bluemound Rd West to Mayfair Rd/Hwy 100, Mayfair Rd/Hwy 100 South to Greenfield Ave; OR, Take I-41/894/US 45 South to the National Ave Exit; take National Ave West to Hwy 100, Hwy
Entrance ramp from EB WI-59 1.3 Major All lanes closed 11/12/16 12:00 AM to 10/15/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Ave West to Hwy 100, Hwy 100 South to National Ave, National Ave East to the I-41/894/US 45 South Entrance Ramp; OR, Take Greenfield Ave West to Hwy 100, Hwy 100 South to Beloit Rd, Beloit Rd East to the I-41/894/US
Exit ramp to WB Lincoln Ave 1.8 Medium All lanes closed 11/12/16 12:00 AM to 6/15/18 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Bluemound Rd Exit; take Bluemound Rd West to Mayfair Rd/Hwy 100, Mayfair Rd/Hwy 100 South to Lincoln Ave; OR, Take I-41/894/US 45 South to the National Ave Exit; take National Ave West to Hwy 100, Hwy 10

I-894 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB Lincoln Ave 1.8 Medium All lanes and shoulders closed 4/16/16 12:00 AM to 9/25/17 11:45 PM WisDOT Construction - Detour: To go North: Take Lincoln Ave West to Hwy 100, Hwy 100 North to Watertown Plank Rd, Watertown Plank Rd East to the I-41/US 45 North Entrance Ramp; To go East: Take Lincoln Ave West to Hwy 100, Hwy 100 North to the I-94 East Entranc

US-12 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Mineral Point Rd (-0.1 miles) to High Point Rd Medium Right lane closed, one lane open 2/23/17 9:00 AM to 3:00 PM daily until 2/27/17 WisDOT Construction - West Madison Beltline High Point Structure & Apprs | USH 12 Dane County | DANE

US-45 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB Lincoln Ave 1.8 Medium All lanes and shoulders closed 4/16/16 12:00 AM to 9/25/17 11:45 PM WisDOT Construction - Detour: To go North: Take Lincoln Ave West to Hwy 100, Hwy 100 North to Watertown Plank Rd, Watertown Plank Rd East to the I-41/US 45 North Entrance Ramp; To go East: Take Lincoln Ave West to Hwy 100, Hwy 100 North to the I-94 East Entranc
Entrance ramp from EB I-94 0.2 Major All lanes closed 8/15/16 12:00 AM to 5/26/17 11:45 PM WisDOT Construction - Detour: Take I-94 East to the STH 164/CTH J Exit; take STH 164/CTH J North to Capitol Dr/STH 190, Capitol Dr/STH 190 East to the I-41/US 45 North Entrance Ramp; OR, Take I-94 East to the Moorland Rd Exit; take Moorland Rd North to Bluemoun
Exit ramp to EB US-18 Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/17 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
Exit ramp to WI-100 Major All lanes and shoulders closed 11/30/15 12:00 AM to 11/15/17 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 84th St Exit; take 84th St North to Bluemound Rd, Bluemound Rd West to Mayfair Rd/Hwy 100; OR, Take I-94 West to the Moorland Rd-North Exit; take Moorland Rd North to Bluemound Rd, Bluemound Rd East to Mayfair
WI-145 to County Line Rd Major Left two lanes closed, one lane open 2/23/17 7:00 PM to 2/24/17 5:00 AM WisDOT Maintenance - Place mastic & Patch pavements

US-45 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Line Rd to WI-145 Major Left two lanes closed, up to one lanes open 2/23/17 7:00 PM to 2/24/17 5:00 AM WisDOT Maintenance - Place mastic & Patch pavements
Florist Ave to Carmen Ave (+0.1 miles) Medium Right lane closed, two lanes open 2/23/17 9:00 AM to 12:00 PM WisDOT Maintenance - Guard Rail Repair
Entrance ramp from EB North Ave Medium All lanes closed 2/23/17 9:00 AM to 10:00 AM WisDOT Maintenance - Detour: Use alternate route
Exit ramp to Wisconsin Ave Medium All lanes and shoulders closed 10/15/14 12:00 AM to 12/31/17 11:45 PM WisDOT Construction - Detour: USH 45 to North Ave to HWY 100 to Wisconsin
Exit ramp to EB I-94 Unknown All lanes closed 10/1/16 12:00 AM to 6/6/17 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Watertown Plank Rd Exit; take Watertown Plank Rd East to Glenview Ave, Glenview Ave South to Kearney St, Kearney St East to the I-94 East Entrance Ramp; OR, Take I-41/US 45 South to the Bluemound Rd Exit
Entrance ramp from WB I-94 0.3 Major All lanes closed 3/9/15 12:00 AM to 5/6/18 11:45 PM WisDOT Construction - Detour: Take I-94 West to the 68th St Exit and proceed straight onto O⿿Connor St; take O⿿Connor St West to 84th St, 84th St South to National Ave; National Ave Southwest to the I-41/894/US 45 South Entrance Ramp; OR, Take I-94 West to t
Exit ramp to WB WI-59 0.9 Major All lanes closed 11/12/16 12:00 AM to 6/15/18 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Bluemound Rd Exit; take Bluemound Rd West to Mayfair Rd/Hwy 100, Mayfair Rd/Hwy 100 South to Greenfield Ave; OR, Take I-41/894/US 45 South to the National Ave Exit; take National Ave West to Hwy 100, Hwy
Entrance ramp from EB WI-59 1.3 Major All lanes closed 11/12/16 12:00 AM to 10/15/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Ave West to Hwy 100, Hwy 100 South to National Ave, National Ave East to the I-41/894/US 45 South Entrance Ramp; OR, Take Greenfield Ave West to Hwy 100, Hwy 100 South to Beloit Rd, Beloit Rd East to the I-41/894/US
Exit ramp to WB Lincoln Ave 1.8 Medium All lanes closed 11/12/16 12:00 AM to 6/15/18 11:45 PM WisDOT Construction - Detour: Take I-41/US 45 South to the Bluemound Rd Exit; take Bluemound Rd West to Mayfair Rd/Hwy 100, Mayfair Rd/Hwy 100 South to Lincoln Ave; OR, Take I-41/894/US 45 South to the National Ave Exit; take National Ave West to Hwy 100, Hwy 10

Columbia County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WB WI-33 from Caledonia St to County Road U Minor Right shoulder closed, all lanes open 2/23/17 7:00 AM to 5:00 PM daily until 3/6/17 WisDOT Permit - Right Shoulder on Hwy 33WB closed to place batwing crane or bucket on the shoulder to protect Hwy 33 during wreck out and wire pull on ATC Y-16 line.
EB WI-60 from I-39 (-0.1 miles) to I-39 (+0.1 miles) Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 2/24/17 4:00 AM WisDOT Construction - Right shoulder closure to unload timber mats for ATC's new power line.

Jefferson County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB WI-19 from Canal Rd to Schultz St None All lanes open with restriction 2/23/17 7:30 AM to 4:00 PM daily until 4/1/17 WisDOT Permit - Gas main installation (distribution pressure- 60psig)

Kenosha County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB WI-32 from 97th St to 92nd Pl Minor Right shoulder closed, all lanes open 2/23/17 8:00 AM to 4:00 PM daily until 2/24/17 WisDOT Construction - Hydrant removal & installation.
EB WI-50 from 117th Ave (+0.1 miles) to 104th Ave Medium One lane closed, one lane open 2/23/17 8:00 AM to 2:00 PM daily until 2/24/17 WisDOT Maintenance - Crackfilling
WB WI-50 from 104th Ave to 117th Ave (-0.1 miles) Medium One lane closed, one lane open 2/23/17 8:00 AM to 2:00 PM daily until 2/24/17 WisDOT Maintenance - Crack Filling
EB WI-165 from 120th Ave to 114th Ave Medium One lane closed, one lane open 12/9/16 12:00 AM to 3/13/17 11:45 PM WisDOT Construction - 104th St, Village Pleasant Prairie | Corporate Dr - E of 88th Dr | STH 165 | KENOSHA
WB WI-165 from 88th Ave (+0.3 miles) to 88th Dr Medium One lane closed, one lane open 12/9/16 12:00 AM to 3/13/17 11:45 PM WisDOT Construction - 104th St, Village Pleasant Prairie | Corporate Dr - E of 88th Dr | STH 165 | KENOSHA

Milwaukee County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB WI-181 from Sheridan Ave (-0.1 miles) to Carmen Ave Major All lanes closed and both shoulders open 2/20/17 12:00 AM to 10/8/17 11:45 PM WisDOT Construction - N 76th St, City Milwaukee | Grantosa Dr - Florist Ave | STH 181 | MILWAUKEE
SB WI-181 from Carmen Ave to Leon Ter Major All lanes closed and both shoulders open 2/20/17 12:00 AM to 10/8/17 11:45 PM WisDOT Construction - N 76th St, City Milwaukee | Grantosa Dr - Florist Ave | STH 181 | MILWAUKEE

Racine County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
SB WI-75 from Church Rd to WI-11 None All lanes open with restriction 2/23/17 7:30 AM to 3:00 PM daily until 2/24/17 WisDOT Maintenance - Crackfilling

St. Croix County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB WI-35 at 150th Ave None All lanes open with restriction 10/9/15 12:00 AM to 12/31/17 11:45 PM WisDOT Construction - Stillwater - Somerset | St Croix River - 150th Ave | STH 64 | ST. CROIX
SB WI-35 at 7th St (-0.6 miles) None All lanes open with restriction 10/9/15 12:00 AM to 12/31/17 11:45 PM WisDOT Construction - Stillwater - Somerset | St Croix River - 150th Ave | STH 64 | ST. CROIX

Walworth County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB WI-67 at Deere Rd Minor Right shoulder closed, all lanes open 1/27/17 12:00 AM to 3/31/17 11:45 PM WisDOT Permit - Running gas main along STH 67 from Deere Rd south to Commerce. Crossing I43

Waukesha County (Wisconsin)
Location Mile Marker