Construction information transmitted by the Illinois Tollway for display on the I-90 EB, I-90 WB, I-94 EB, I-94 WB, I-355 NB, I-355 SB, Edens Spur EB, Edens Spur WB, Jane Addams Memorial (Northwest) EB, Jane Addams Memorial (Northwest) WB, Tri-State NB/WB, Veterans (North-South) NB and Veterans (North-South) SB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

I-55 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Reed Rd to Lake Shore Dr (US-41) 233.5 to 293.7 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Coal City Rd (IL-113) to 1.5 miles north of Coal City Rd (IL-113) 235.7 to 237.2 Minor Right shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT
0.5 miles south of Joliet Rd to 0.5 miles north of Joliet Rd 276.2 to 277.2 Minor Left shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT
Entrance ramp from SB County Line Rd 276.3 Minor Partial closure 3/3/15 9:00 AM to 3:00 PM IDOT
Joliet Rd to Dan Ryan Expy (I-94) 276.7 to 292.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 2:00 PM IDOT Moving Operation
Exit ramp to NB La Grange Rd 279.0 Minor Partial closure 3/3/15 9:00 AM to 3:00 PM IDOT
0.5 miles south of Cicero Ave (IL-50) to 0.5 miles north of Cicero Ave (IL-50) 286.2 to 287.2 Minor Right shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT

I-55 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake Shore Dr (US-41) to Reed Rd 293.8 to 233.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Dan Ryan Expy (I-90/94) to Joliet Rd 292.4 to 276.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:00 AM to 1:00 PM IDOT Moving Operation
0.5 miles north of Pulaski Rd to 0.5 miles south of Pulaski Rd 288.3 to 287.3 Minor Right shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT
Exit ramp to SB IL-171 282.8 None All lanes and shoulders open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT

I-57 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kankakee County Line to Dan Ryan Expy (I-94) 325.0 to 357.9 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Steger Rd to Dan Ryan Expy (I-94) 338.1 to 357.8 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 2:00 PM IDOT Moving Operation
Exit ramp to 147th St 349.9 Minor Partial closure 9/4/13 12:00 AM to 3/31/15 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from 147th St 349.9 Minor Partial closure 9/4/13 5:00 AM to 3/31/15 11:59 PM IDOT ***Long Term Closure***

I-57 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Dan Ryan Expy (I-94) to I-80 358.0 to 344.8 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:00 AM to 1:00 PM IDOT Moving Operation
Dan Ryan Expy (I-94) to Kankakee County Line 358.0 to 325.0 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to 147th St 350.4 Minor Partial closure 9/4/13 12:00 AM to 3/31/15 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from 147th St 350.4 Minor Partial closure 9/4/13 12:00 AM to 3/31/15 11:59 PM IDOT ***Long Term Closure***
I-80 to Steger Rd 344.8 to 338.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 8:30 AM to 12:30 PM IDOT Moving Operation

I-80 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-55 to Harlem Ave (IL-43) 126.2 to 148.8 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Briggs St to Cherry Hill Rd 134.9 to 135.9 Minor Left shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT
Exit ramp to NB Harlem Ave 148.9 Minor Partial closure 3/31/14 12:00 AM to 3/31/15 11:59 PM IDOT ***Long Term Closure***
Bishop Ford Fwy (IL-394) to IN State Line Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:00 AM to 2:00 PM IDOT Moving Operation

I-80 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
IN State Line to Bishop Ford Fwy (IL-394) Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:30 AM to 2:30 PM IDOT Moving Operation
Harlem Ave (IL-43) to I-55 148.8 to 126.2 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

I-88 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to IL-59 123.7 Minor Partial closure 12/16/14 7:00 AM to 6/1/15 11:59 PM Illinois Tollway Right Side Ramp closed; ***Long Term Closure***

I-90 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from Beverly Rd 58.6 Minor Partial closure 4/28/14 9:00 AM to 3/31/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***
Entrance ramp from NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***
Ramp from EB I-90 to Cumberland Ave / IL-171 79.3 Minor Partial closure 11/25/14 7:00 AM to 4/30/15 11:59 PM IDOT ***Long Term Closure***
0.5 miles east of East River Rd to Montrose Ave 79.6 to 43.5 Medium Left lane and left shoulder closed, four lanes open with partial ramp closures 3/3/15 11:00 AM to 2:00 PM IDOT Moving Operation
0.5 miles east of East River Rd to Eisenhower Expy (I-290) 79.6 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Edens Expy (I-94) to Jackson Blvd 43.3 to 51.5 Minor Both shoulders closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 3/3/15 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***

I-90 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Harrison St to Eisenhower Expy (I-290) 51.7 to 51.7 Minor Right shoulder closed, all lanes open 10/13/14 12:00 AM to 3/15/15 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 3/3/15 9:30 AM to 1:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to I-190 51.7 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane and left shoulder closed, three to five lanes open with partial ramp closures 3/3/15 11:00 AM to 2:00 PM IDOT Moving Operation
Edens Expy (I-94) to I-190 43.5 to 79.1 Medium Left lane and left shoulder closed, two or three lanes open with partial ramp closures 3/3/15 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***
Exit ramp to Roselle Rd 66.0 Minor Partial closure 6/17/14 5:00 AM to 3/15/15 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed

I-94 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Park Ave West to Kennedy Junction 23.1 to 43.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 1:00 PM IDOT Moving Operation
Edens Expy (I-94) to Jackson Blvd 43.3 to 51.5 Minor Both shoulders closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
0.5 miles east of East River Rd to Eisenhower Expy (I-290) 79.6 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 3/3/15 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor All lanes shifted and both shoulders closed 9/9/14 12:00 AM to 3/31/15 11:59 PM IDOT Lanes narrowed and shifted to the left ***Long Term Closure***
Dan Ryan Expy (I-94) / I-57 to SB Stony Island Feeder Entrance 62.9 to 65.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:00 AM to 11:59 AM IDOT Moving Operation
Dan Ryan Expy (I-94) / I-57 to I-80 62.9 to 74.4 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
SB Stony Island Feeder Entrance to I-80 65.6 to 74.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 8:30 AM to 12:30 PM IDOT Moving Operation
Bishop Ford Fwy (IL-394) to IN State Line Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:00 AM to 2:00 PM IDOT Moving Operation

I-94 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
IN State Line to Bishop Ford Fwy (IL-394) Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:30 AM to 2:30 PM IDOT Moving Operation
I-80 to NB Stony Island Feeder Exit 74.5 to 65.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 2:00 PM IDOT Moving Operation
I-80 to Dan Ryan Expy (I-94) / I-57 74.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
NB Stony Island Feeder Exit to Dan Ryan Expy (I-94) / I-57 65.7 to 62.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:30 AM to 1:00 PM IDOT Moving Operation
Harrison St to Eisenhower Expy (I-290) 51.7 to 51.7 Minor Right shoulder closed, all lanes open 10/13/14 12:00 AM to 3/15/15 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 3/3/15 9:30 AM to 1:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to I-190 51.7 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane and left shoulder closed, three to five lanes open with partial ramp closures 3/3/15 11:00 AM to 2:00 PM IDOT Moving Operation
Kennedy Junction to Park Ave West 43.5 to 23.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB IL-132 8.6 Major All lanes and shoulders closed 2/27/15 7:00 AM to 5/19/15 11:59 PM Illinois Tollway Entrance Ramp Closed; *** Long Term Closure ***

I-290 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake Cook Rd to Jane Addams Twy (I-90) Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Jane Addams Twy (I-90) to Wells St 0.0 to 30.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
IL-53 to I-290 / IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to EB Thorndale Ave 4.7 Minor Partial closure 3/31/14 7:00 AM to 3/31/15 11:59 PM IDOT ***Long Term Closure***
Exit ramp to WB Thorndale Ave 4.7 Minor Partial closure 3/31/14 7:00 AM to 3/31/15 11:59 PM IDOT Ramp traffic to go through signalized intersection ***Long Term Closure***
Thorndale Ave to Irving Park Rd (IL-19) 5.0 to 6.0 Minor Left shoulder closed, all lanes open 12/12/14 12:00 AM to 3/31/15 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from EB Thorndale Ave 5.3 Minor Partial closure 3/31/14 7:00 AM to 3/31/15 11:59 PM IDOT ***Long Term Closure***
Morgan St to Peoria St 29.5 to 29.6 Minor All lanes shifted and both shoulders closed 11/15/14 12:00 AM to 12/1/15 11:59 PM IDOT Narrow Lanes; Weave Traffic to Left ***Long Term Closure***
Exit ramp to WB I-90/94 29.7 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 5/1/15 11:59 PM IDOT 11 ' Width ***Long Term Closure***
Exit ramp to EB I-90/94 29.7 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***

I-290 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wells St to Jane Addams Twy (I-90) 30.5 to 0.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Canal St to Peoria St 30.2 to 29.7 Medium Left lane and both shoulders closed, two or three lanes shifted 12/1/14 12:00 AM to 12/1/15 11:59 PM IDOT Weave traffic Left to Right ***Long Term Closure***
Exit ramp to EB I-90 30.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from EB Kennedy Local 29.7 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Exit ramp to Morgan St 29.7 Medium All lanes and shoulders closed 12/1/14 12:00 AM to 12/1/15 11:59 PM IDOT ***Long Term Closure***
Irving Park Rd (IL-19) to Thorndale Ave 6.0 to 5.1 Minor Left shoulder closed, all lanes open 12/12/14 12:00 AM to 3/31/15 11:59 PM IDOT ***Long Term Closure***
Exit ramp to Thorndale Ave 5.5 Minor Partial closure 3/31/14 7:00 AM to 4/1/15 11:59 PM IDOT ***Long Term Closure***
I-290 / IL-53 to IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Jane Addams Twy (I-90) to Lake Cook Rd Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

I-355 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Army Trail Rd to Eisenhower Expy (I-290) 29.9 to 32.2 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

I-355 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Eisenhower Expy (I-290) to Army Trail Rd 32.7 to 29.9 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

US-41 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Junction to Park Ave West 43.5 to 23.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

US-41 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Park Ave West to Kennedy Junction 23.1 to 43.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

IL-53 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wells St to Jane Addams Twy (I-90) 30.5 to 0.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Jane Addams Twy (I-90) to Lake Cook Rd Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
I-290 / IL-53 to IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

IL-53 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake Cook Rd to Jane Addams Twy (I-90) Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Jane Addams Twy (I-90) to Wells St 0.0 to 30.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
IL-53 to I-290 / IL-53 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

IL-390 (Elgin O'Hare) EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake St (US-20) to Irving Park Rd (IL-19) 6.0 to 7.6 Minor Left shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT
0.5 miles east of Wright Blvd to N Roselle Rd 8.8 to 9.5 Minor Left shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT

IL-390 (Elgin O'Hare) WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
at 0.5 miles east of Roselle Rd 10.0 Minor Right shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT
Entrance ramp from Springinsguth Rd 7.9 Minor Partial closure 3/3/15 9:00 AM to 3:00 PM IDOT
at Lake St (US-20) 6.0 Minor Right shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

IL-394 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Sauk Trail to I-80 80.8 to 74.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 3:00 PM IDOT Moving Operation
Glenwood Lansing Rd to Thornton-Lansing Rd 76.9 to 75.0 Minor Left shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT

IL-394 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
SB Stony Island Feeder Entrance to I-80 65.6 to 74.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 8:30 AM to 12:30 PM IDOT Moving Operation
Dan Ryan Expy (I-94) / I-57 to I-80 62.9 to 74.4 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
I-80 to Sauk Trail 74.4 to 80.8 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 8:30 AM to 2:00 PM IDOT Moving Operation

Bishop Ford NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Sauk Trail to I-80 80.8 to 74.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 3:00 PM IDOT Moving Operation
Glenwood Lansing Rd to Thornton-Lansing Rd 76.9 to 75.0 Minor Left shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT
I-80 to NB Stony Island Feeder Exit 74.5 to 65.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 2:00 PM IDOT Moving Operation
I-80 to Dan Ryan Expy (I-94) / I-57 74.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
NB Stony Island Feeder Exit to Dan Ryan Expy (I-94) / I-57 65.7 to 62.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:30 AM to 1:00 PM IDOT Moving Operation

Bishop Ford SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Dan Ryan Expy (I-94) / I-57 to SB Stony Island Feeder Entrance 62.9 to 65.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:00 AM to 11:59 AM IDOT Moving Operation
Dan Ryan Expy (I-94) / I-57 to I-80 62.9 to 74.4 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
SB Stony Island Feeder Entrance to I-80 65.6 to 74.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 8:30 AM to 12:30 PM IDOT Moving Operation
I-80 to Sauk Trail 74.4 to 80.8 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 8:30 AM to 2:00 PM IDOT Moving Operation

Dan Ryan Local NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Harrison St to Eisenhower Expy (I-290) 51.7 to 51.7 Minor Right shoulder closed, all lanes open 10/13/14 12:00 AM to 3/15/15 11:59 PM IDOT ***Long Term Closure***

Dan Ryan Local SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor All lanes shifted and both shoulders closed 9/9/14 12:00 AM to 3/31/15 11:59 PM IDOT Lanes narrowed and shifted to the left ***Long Term Closure***

Edens NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Junction to Park Ave West 43.5 to 23.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

Edens SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Park Ave West to Kennedy Junction 23.1 to 43.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

Edens Spur EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Park Ave West to Kennedy Junction 23.1 to 43.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

Edens Spur WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Junction to Park Ave West 43.5 to 23.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

Eisenhower EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Jane Addams Twy (I-90) to Wells St 0.0 to 30.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Morgan St to Peoria St 29.5 to 29.6 Minor All lanes shifted and both shoulders closed 11/15/14 12:00 AM to 12/1/15 11:59 PM IDOT Narrow Lanes; Weave Traffic to Left ***Long Term Closure***
Exit ramp to WB I-90/94 29.7 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 5/1/15 11:59 PM IDOT 11 ' Width ***Long Term Closure***
Exit ramp to EB I-90/94 29.7 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***

Eisenhower WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wells St to Jane Addams Twy (I-90) 30.5 to 0.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Canal St to Peoria St 30.2 to 29.7 Medium Left lane and both shoulders closed, two or three lanes shifted 12/1/14 12:00 AM to 12/1/15 11:59 PM IDOT Weave traffic Left to Right ***Long Term Closure***
Exit ramp to EB I-90 30.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from EB Kennedy Local 29.7 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Exit ramp to Morgan St 29.7 Medium All lanes and shoulders closed 12/1/14 12:00 AM to 12/1/15 11:59 PM IDOT ***Long Term Closure***

Jane Addams Memorial (Northwest) EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from Beverly Rd 58.6 Minor Partial closure 4/28/14 9:00 AM to 3/31/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***
Entrance ramp from NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***

Jane Addams Memorial (Northwest) WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***
Exit ramp to Roselle Rd 66.0 Minor Partial closure 6/17/14 5:00 AM to 3/15/15 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed

Kennedy Local EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from EB I-90 to Cumberland Ave / IL-171 79.3 Minor Partial closure 11/25/14 7:00 AM to 4/30/15 11:59 PM IDOT ***Long Term Closure***
0.5 miles east of East River Rd to Montrose Ave 79.6 to 43.5 Medium Left lane and left shoulder closed, four lanes open with partial ramp closures 3/3/15 11:00 AM to 2:00 PM IDOT Moving Operation
0.5 miles east of East River Rd to Eisenhower Expy (I-290) 79.6 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Edens Expy (I-94) to Jackson Blvd 43.3 to 51.5 Minor Both shoulders closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 3/3/15 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***

Kennedy Local WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 3/3/15 9:30 AM to 1:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to I-190 51.7 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane and left shoulder closed, three to five lanes open with partial ramp closures 3/3/15 11:00 AM to 2:00 PM IDOT Moving Operation
Edens Expy (I-94) to I-190 43.5 to 79.1 Medium Left lane and left shoulder closed, two or three lanes open with partial ramp closures 3/3/15 10:00 AM to 1:00 PM IDOT Moving Operation

Kingery EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Bishop Ford Fwy (IL-394) to IN State Line Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:00 AM to 2:00 PM IDOT Moving Operation

Kingery WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
IN State Line to Bishop Ford Fwy (IL-394) Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:30 AM to 2:30 PM IDOT Moving Operation

Reagan Memorial WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to IL-59 123.7 Minor Partial closure 12/16/14 7:00 AM to 6/1/15 11:59 PM Illinois Tollway Right Side Ramp closed; ***Long Term Closure***

Stevenson NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from SB County Line Rd 276.3 Minor Partial closure 3/3/15 9:00 AM to 3:00 PM IDOT
0.5 miles south of Joliet Rd to 0.5 miles north of Joliet Rd 276.2 to 277.2 Minor Left shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT
Reed Rd to Lake Shore Dr (US-41) 233.5 to 293.7 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Joliet Rd to Dan Ryan Expy (I-94) 276.7 to 292.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 2:00 PM IDOT Moving Operation
Exit ramp to NB La Grange Rd 279.0 Minor Partial closure 3/3/15 9:00 AM to 3:00 PM IDOT
0.5 miles south of Cicero Ave (IL-50) to 0.5 miles north of Cicero Ave (IL-50) 286.2 to 287.2 Minor Right shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT

Stevenson SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake Shore Dr (US-41) to Reed Rd 293.8 to 233.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Dan Ryan Expy (I-90/94) to Joliet Rd 292.4 to 276.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:00 AM to 1:00 PM IDOT Moving Operation
0.5 miles north of Pulaski Rd to 0.5 miles south of Pulaski Rd 288.3 to 287.3 Minor Right shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT
Exit ramp to SB IL-171 282.8 None All lanes and shoulders open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT

Tri-State NB/WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from EB IL-132 8.6 Major All lanes and shoulders closed 2/27/15 7:00 AM to 5/19/15 11:59 PM Illinois Tollway Entrance Ramp Closed; *** Long Term Closure ***

Veterans (North-South) NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Army Trail Rd to Eisenhower Expy (I-290) 29.9 to 32.2 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

Veterans (North-South) SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Eisenhower Expy (I-290) to Army Trail Rd 32.7 to 29.9 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

Cook County (City of Chicago) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB 130th St from Calumet River Bridge to Saginaw Ave Minor Various lanes closed 2/27/15 2:30 PM to 5/1/15 7:00 PM Chicago DOT 1 lane to be maintained in each direction
WB 130th St from Saginaw Ave to Calumet River Bridge Minor Various lanes closed 2/27/15 2:30 PM to 5/1/15 7:00 PM Chicago DOT 1 lane to be maintained in each direction
WB 18th St from Wentworth Ave (+0.1 miles) to Lumber St Medium All lanes and shoulders closed 12/6/14 7:00 PM to 4/1/15 7:00 PM Chicago DOT Detour EB 18th street traffic to SB Canal St, to EB Cermak Rd, to NB Archer Ave, to NB Clark St, and back to EB 18th St. Reverse for WB 18th St.
EB 63rd St at State St None All lanes and shoulders open 1/12/15 7:00 AM to 11/30/15 11:59 PM Chicago DOT Reconstruction of the 63rd Street Bridge over the Dan Ryan:: Detours are as follows: *Westbound 63rd Street traffic will be detoured to NB Wentworth, to WB 59th Street, to SB Yale, and back to WB 63rd Street. Additional wayfinding signage will be posted for the use of Halsted Street. *Eastbound 63rd Street traffic will be detoured to SB Halsted, to EB Marquette (67th Street), to NB State Street, and back to EB 63rd Street. *Vehicles exiting the Dan Ryan at 63rd Street, heading Eastbound, will be detoured to SB Wells/Wentworth, to EB Marquette, to NB State Street, and back to EB 63rd Street. Vehicles exiting the Dan Ryan and traveling Westbound will be unaffected. *Trucks will be redirected to 71st Street via State and Halsted Streets.
WB 63rd St at State St None All lanes and shoulders open 1/12/15 7:00 AM to 11/30/15 11:59 PM Chicago DOT Reconstruction of the 63rd Street Bridge over the Dan Ryan:: Detours are as follows: *Westbound 63rd Street traffic will be detoured to NB Wentworth, to WB 59th Street, to SB Yale, and back to WB 63rd Street. Additional wayfinding signage will be posted for the use of Halsted Street. *Eastbound 63rd Street traffic will be detoured to SB Halsted, to EB Marquette (67th Street), to NB State Street, and back to EB 63rd Street. *Vehicles exiting the Dan Ryan at 63rd Street, heading Eastbound, will be detoured to SB Wells/Wentworth, to EB Marquette, to NB State Street, and back to EB 63rd Street. Vehicles exiting the Dan Ryan and traveling Westbound will be unaffected. *Trucks will be redirected to 71st Street via State and Halsted Streets.
SB Ashland Ave from 36th St to 41st St Minor Various lanes closed 2/27/15 2:30 PM to 5/31/15 7:00 AM Chicago DOT Reconstruction
EB Cortland St from Elston Ave to Clybourn Ave Minor Various lanes closed 3/3/15 9:00 AM to 3/6/15 4:00 PM Chicago DOT Water Main Work:::Eastbound Cortland Street passenger cars will be detoured to NB Ashland, to EB Webster, to SB Clybourn, and back to EB Cortland Street. The WB detour will be the reverse. Additional signage will be posted on Elston Avenue as well. Trucks and oversize/overweight vehicles will be detoured to North Avenue via Elston and Clybourn Avenues, because of weight restrictions on the Webster Avenue Bridge.
EB Cortland St from Elston Ave to Clybourn Ave Medium All lanes and shoulders open 3/3/15 9:00 AM to 3/6/15 4:00 PM Chicago DOT Water Project::DETOUR:: EB Cortland St passenger cars will be detoured to NB Ashland, to EB Webster, to SB Clybourn, and back to EB Cortland Street. The WB detour will be the reverse.**Trucks and oversize/overweight vehicles will take North Avenue via Elston and Clybourn Avenues, because of weight restrictions on the Webster Avenue Bridge.
WB Cortland St from Clybourn Ave to Elston Ave Minor All lanes and shoulders open 3/3/15 9:00 AM to 3/6/15 4:00 PM Chicago DOT Water Main Work:::Eastbound Cortland Street passenger cars will be detoured to NB Ashland, to EB Webster, to SB Clybourn, and back to EB Cortland Street. The WB detour will be the reverse. Additional signage will be posted on Elston Avenue as well. Trucks and oversize/overweight vehicles will be detoured to North Avenue via Elston and Clybourn Avenues, because of weight restrictions on the Webster Avenue Bridge.
WB Cortland St from Clybourn Ave to Elston Ave Medium All lanes and shoulders closed 3/3/15 9:00 AM to 3/6/15 4:00 PM Chicago DOT Water Project::DETOUR:: EB Cortland St passenger cars will be detoured to NB Ashland, to EB Webster, to SB Clybourn, and back to EB Cortland Street. The WB detour will be the reverse.**Trucks and oversize/overweight vehicles will take North Avenue via Elston and Clybourn Avenues, because of weight restrictions on the Webster Avenue Bridge.
NB Damen Ave at 18th St Medium All lanes and shoulders closed 3/2/15 9:00 AM to 4/17/15 4:00 PM Chicago DOT Ongoing Sewer Project:::Damen Avenue will be detoured to Western Avenue via Cermak and Roosevelt, while 18th Street will be detoured to Cermak Road via Ashland and Western Avenues. Local access will be maintained.
SB Damen Ave at 18th St Medium All lanes and shoulders closed 3/2/15 9:00 AM to 4/17/15 4:00 PM Chicago DOT Ongoing Sewer Project:::Damen Avenue will be detoured to Western Avenue via Cermak and Roosevelt, while 18th Street will be detoured to Cermak Road via Ashland and Western Avenues. Local access will be maintained.
SB Kedzie Ave at 48th Pl Medium All lanes and shoulders closed 7/2/14 1:45 PM to 12/31/15 11:59 PM Chicago DOT Viaduct Clearance Improvement Project; Detour SB Kedzie to EB 47th St, to SB California, to WB 51st St, and back to SB Kedzie. Reverse for NB Kedzie Ave
NB Loomis St at Eleanor St (+0.2 miles) Minor Various lanes closed 3/3/15 9:30 AM to 2:30 PM daily until 3/6/15 Chicago DOT Full daily closures of the Loomis Street bridge over the S. Branch Chicago River. Closures are permitted between the hours of 9:30 am and 2:30 pm only. Detour NB Loomis street to NB Archer avenue, to NB Halsted Street, to WB Cermak Road, and back to Loomis. Reverse for SB Loomis Street.
SB Loomis St at Cermak Rd (+0.2 miles) Minor Various lanes closed 3/3/15 9:30 AM to 2:30 PM daily until 3/6/15 Chicago DOT Full daily closures of the Loomis Street bridge over the S. Branch Chicago River. Closures are permitted between the hours of 9:30 am and 2:30 pm only. Detour NB Loomis street to NB Archer avenue, to NB Halsted Street, to WB Cermak Road, and back to Loomis. Reverse for SB Loomis Street.
EB Roosevelt Rd from State St to Columbus Dr Minor Various lanes closed 2/27/15 2:45 PM to 5/31/15 4:00 PM Chicago DOT Intermodal Improvements
NB Torrence Ave from 130th St to 126th St Medium All lanes and shoulders closed 2/27/15 2:45 PM to 7/4/15 7:00 PM Chicago DOT
SB Torrence Ave from 126th St to 130th St Medium All lanes and shoulders closed 2/27/15 2:45 PM to 7/4/15 7:00 PM Chicago DOT
SWB Wacker Dr from State St to Lasalle St Minor Right lane closed, two lanes open 2/27/15 2:30 PM to 5/22/15 3:00 PM Chicago DOT

Cook County (Suburban) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB US-12 from Lake Cook Rd to Wooded Ridge Dr (+0.1 miles) Medium Various lanes closed 10/2/14 8:00 AM to 6/15/15 5:00 PM IDOT Resurfacing; Traffic will be reduced to one lane in each direction with flaggers at various locations in the work zone. The anticipated completion date is June 15.
SEB US-12 from Ela Rd to Lake Cook Rd Medium Various lanes closed 10/2/14 8:00 AM to 6/15/15 5:00 PM IDOT Resurfacing; Traffic will be reduced to one lane in each direction with flaggers at various locations in the work zone. The anticipated completion date is June 15.
EB IL-64 from Lavergne Ave to Roy Ave Medium Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Resurfacing, sewer, and landscaping
WB IL-64 from Roy Ave to Lavergne Ave Medium Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Resurfacing, sewer, and landscaping
NB IL-171 at Willow Springs Rd Medium Various lanes closed 8/10/14 6:00 AM to 6/30/15 11:59 PM IDOT
NB IL-171 at Ridgewood Rd Medium Various lanes closed 8/10/14 6:00 AM to 6/30/15 11:59 PM IDOT Traffic Signal Modernization
SB IL-171 at Ridgewood Rd Medium Various lanes closed 8/10/14 6:00 AM to 6/30/15 11:59 PM IDOT Traffic Signal Modernization
SB IL-171 at 47th St Medium Various lanes closed 3/2/15 7:00 AM to 10/31/15 7:00 PM IDOT Bridge Reconstruction
NB Barrington Rd from Schaumburg Rd to IL-72 Minor Various lanes closed 10/6/14 9:00 AM to 6/10/15 11:59 PM IDOT Resurfacing; flagging operation, reduce speed, allow extra time for travel.Work will be suspended during the winter.
SB Barrington Rd from IL-72 to Schaumburg Rd Minor Various lanes closed 10/6/14 9:00 AM to 6/10/15 11:59 PM IDOT Resurfacing; flagging operation, reduce speed, allow extra time for travel.Work will be suspended during the winter.
EB Wille Rd at Elmhurst Rd (+0.1 miles) Medium All lanes and shoulders closed 10/20/14 6:00 AM to 12/31/15 11:59 PM Illinois Tollway Reconstruct Pavement

DuPage County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-59 from Aurora Rd to Diehl Rd Medium Various lanes closed 8/10/14 6:00 AM to 8/31/15 11:59 PM IDOT Traffic signals, reconstruction
NB IL-59 from Diehl Rd to Ferry Rd Medium Various lanes closed 12/8/14 7:00 AM to 9/30/15 11:59 PM IDOT Lane Reduction
SB IL-59 from Diehl Rd to Aurora Rd Medium Various lanes closed 8/10/14 6:00 AM to 8/31/15 11:59 PM IDOT Traffic signals, reconstruction
NB IL-83 from 3rd Ave to Mark St Medium Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Traffic signal modernization
NB Pleasant Hill Rd from Geneva Rd to St Charles Rd Minor Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Milling and resurfacing
SB Pleasant Hill Rd from St Charles Rd to Geneva Rd Minor Various lanes closed 8/10/14 6:00 AM to 5/31/15 11:59 PM IDOT Milling and resurfacing

Kendall County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-47 from IL-71 to Kennedy Rd Minor All lanes and shoulders open 9/24/14 12:00 AM to 12/31/15 12:00 AM IDOT Expect delays with lane restrictions for milling and resurfacing. Vehicle width restricted to 9' 4".
SB IL-47 from Kennedy Rd to IL-71 Minor All lanes and shoulders open 9/24/14 12:00 AM to 12/31/15 12:00 AM IDOT Expect delays with lane restrictions for milling and resurfacing. Vehicle width restricted to 9' 4".

Lake County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB US-12 from Lake Cook Rd to Wooded Ridge Dr (+0.1 miles) Medium Various lanes closed 10/2/14 8:00 AM to 6/15/15 5:00 PM IDOT Resurfacing; Traffic will be reduced to one lane in each direction with flaggers at various locations in the work zone. The anticipated completion date is June 15.
SEB US-12 at Long Grove Rd Medium Various lanes closed 3/2/15 7:00 AM to 7/31/15 3:00 PM Lake County Pavement Resurfacing
SEB US-12 from Ela Rd to Lake Cook Rd Medium Various lanes closed 10/2/14 8:00 AM to 6/15/15 5:00 PM IDOT Resurfacing; Traffic will be reduced to one lane in each direction with flaggers at various locations in the work zone. The anticipated completion date is June 15.
EB IL-132 at Milwaukee Ave Medium All lanes and shoulders open 7/28/14 7:00 AM to 10/30/15 3:00 PM Lake County Replace and Rehab Bridge over the Des Plaines River
WB IL-132 at Milwaukee Ave Medium All lanes and shoulders open 7/28/14 7:00 AM to 10/30/15 3:00 PM Lake County Replace and Rehab Bridge over the Des Plaines River
EB IL-134 from US-12 to CR-V61 Medium Various lanes closed 9/22/14 7:00 AM to 5/1/15 3:00 PM Lake County Pavement Resurfacing
EB IL-134 from US-12 to CR-V61 Medium Various lanes closed 9/22/14 7:00 AM to 5/1/15 3:00 PM Lake County Pavement Resurfacing
EB IL-134 from US-12 to CR-V61 Medium Various lanes closed 3/2/15 7:00 AM to 5/29/15 3:00 PM Lake County Pavement Resurfacing
WB IL-134 from CR-V61 to US-12 Medium Various lanes closed 9/22/14 7:00 AM to 5/1/15 3:00 PM Lake County Pavement Resurfacing
WB IL-134 from CR-V61 to US-12 Medium Various lanes closed 9/22/14 7:00 AM to 5/1/15 3:00 PM Lake County Pavement Resurfacing
WB IL-134 from CR-V61 to US-12 Medium Various lanes closed 3/2/15 7:00 AM to 5/29/15 3:00 PM Lake County Pavement Resurfacing
EB CR-20 from IL-83 to US-45 Medium All lanes and shoulders closed 3/27/14 7:00 AM to 6/5/15 3:00 PM Lake County Peterson Road Widening
WB CR-20 from US-45 to IL-83 Medium All lanes and shoulders closed 3/27/14 7:00 AM to 6/5/15 3:00 PM Lake County Peterson Road Widening
WB CR-31 from Hook Dr (-0.1 miles) to East End Ave Medium Various lanes closed 8/13/13 8:00 AM to 10/31/15 3:00 PM Lake County Grade Separation of Rollins Rd under the Wisconsin Central Ltd. Railroad
EB CR-45 from Lakeside Dr to Lake St Minor Various lanes closed 2/25/15 7:00 AM to 11/25/16 3:00 PM Lake County Reconstruct and widen and construct railroad underpass
WB CR-45 from Lake St to Lakeside Dr Minor Various lanes closed 2/25/15 7:00 AM to 11/25/16 3:00 PM Lake County Reconstruct and widen and construct railroad underpass
NB CR-4 at Roberts Rd Major All lanes and shoulders closed 8/11/14 7:00 AM to 11/27/15 3:00 PM Lake County Replacing the existing signalized intersection with a multi-late roundabout
SB CR-4 at Roberts Rd Major All lanes and shoulders closed 8/11/14 7:00 AM to 11/27/15 3:00 PM Lake County Replacing the existing signalized intersection with a multi-late roundabout

Lee County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB IL-2 from Everett St (IL-26) to River Rd Medium Various lanes closed 9/15/14 8:00 AM to 10/31/15 11:59 PM IDOT Traffic will be reduced to one lane and regulated by flaggers; Expect minor backups; Max Width - 13'-6" - Effective 09/15/2014 through 10/31/2014.
SWB IL-2 from River Rd to Everett St (IL-26) Medium Various lanes closed 9/15/14 8:00 AM to 10/31/15 11:59 PM IDOT Traffic will be reduced to one lane and regulated by flaggers; Expect minor backups; Max Width - 13'-6" - Effective 09/15/2014 through 10/31/2014.

McHenry County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-31 from Trinity Dr to James R Rakow Rd Medium Various lanes closed 5/27/14 7:00 AM to 6/1/15 11:59 PM IDOT

Rock Island County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-92 from 115th Ave to Loud Thunder Rd Medium Various lanes closed 3/31/14 7:00 AM to 7/1/15 11:59 PM IDOT
WB IL-92 from Loud Thunder Rd to 115th Ave Medium Various lanes closed 3/31/14 7:00 AM to 7/1/15 11:59 PM IDOT

Stephenson County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
WB IL-75 from Pecatonica River to Galena Ave Medium All lanes and shoulders closed 9/15/14 8:00 AM to 6/30/15 11:59 PM IDOT The Road will be closed to traffic; Follow marked detour:: Road Closed - No Permits - Effective 09/29/2014 through 12/15/2014
WB IL-75 from Galena Ave to Pecatonica River Medium All lanes and shoulders closed 9/15/14 8:00 AM to 6/30/15 11:59 PM IDOT The Road will be closed to traffic; Follow marked detour:: Road Closed - No Permits - Effective 09/29/2014 through 12/15/2014
WB IL-75 from Pecatonica River to Galena Ave Medium All lanes and shoulders closed 9/15/14 8:00 AM to 6/30/15 11:59 PM IDOT The Road will be closed to traffic; Follow marked detour:: Road Closed - No Permits - Effective 09/29/2014 through 12/15/2014
EB Pecatonica River from Galena Ave to IL-75 Medium All lanes and shoulders closed 9/15/14 8:00 AM to 6/30/15 11:59 PM IDOT The Road will be closed to traffic; Follow marked detour:: Road Closed - No Permits - Effective 09/29/2014 through 12/15/2014

Winnebago County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-20 from IL-2 to IL-251 Medium Various lanes closed 3/1/15 7:00 AM to 11/24/15 11:59 PM IDOT Traffic will be head to head separated by barrier wall. Expect moderate delays during rush hour and weekends* NB IL 2 to EB US 20 will be closed. There is a temporary connection so that NB will use the SB IL 2 to EB US 20 ramp (without going under the structures).* The EB US 20 to NB IL 2 ramp is closed. They will use the EB US 20 to SB IL 2 ramp (with signals).* The WB US 20 to NB IL 2 ramp is closed. They will use the WB US 20 to SB IL 2 ramp (with signals).* 12'-6" - Max. Width - Effective 03/01/2015 through 11/24/2015* IL 2 northbound to US 20 eastbound Ramp Closed - Effective 03/01/2015 through 11/24/2015* US 20 eastbound to IL 2 northbound Ramp Closed - Effective 03/01/2015 through 11/24/2015* US 20 Westbound to IL 2 northbound Ramp Closed - Effective 03/01/2015 through 11/24/2015
WB US-20 from IL-251 to IL-2 Medium Various lanes closed 3/1/15 7:00 AM to 11/24/15 11:59 PM IDOT Traffic will be head to head separated by barrier wall. Expect moderate delays during rush hour and weekends* NB IL 2 to EB US 20 will be closed. There is a temporary connection so that NB will use the SB IL 2 to EB US 20 ramp (without going under the structures).* The EB US 20 to NB IL 2 ramp is closed. They will use the EB US 20 to SB IL 2 ramp (with signals).* The WB US 20 to NB IL 2 ramp is closed. They will use the WB US 20 to SB IL 2 ramp (with signals).* 12'-6" - Max. Width - Effective 03/01/2015 through 11/24/2015* IL 2 northbound to US 20 eastbound Ramp Closed - Effective 03/01/2015 through 11/24/2015* US 20 eastbound to IL 2 northbound Ramp Closed - Effective 03/01/2015 through 11/24/2015* US 20 Westbound to IL 2 northbound Ramp Closed - Effective 03/01/2015 through 11/24/2015
NEB IL-2 from US-20 to Clifton Ave Medium Various lanes closed 5/5/14 7:00 AM to 7/1/15 11:59 PM IDOT Traffic will be reduced to one lane in each direction until December 5th, 2014.
SWB IL-2 from Clifton Ave to US-20 Medium Various lanes closed 5/5/14 7:00 AM to 7/1/15 11:59 PM IDOT Traffic will be reduced to one lane in each direction until December 5th, 2014.
EB IL-173 from Alpine Rd to I-39/90 Medium Various lanes closed 3/17/14 7:00 AM to 11/6/15 11:59 PM IDOT 9'-6" - Max Width - Effective 03/17/2014 through 12/12/2014
WB IL-173 from I-39/90 to Alpine Rd Medium Various lanes closed 3/17/14 7:00 AM to 11/6/15 11:59 PM IDOT 9'-6" - Max Width - Effective 03/17/2014 through 12/12/2014

I-80 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Feather Valley Rd (+0.4 miles) to IN-827 (+0.5 miles) 147.0 to 148.0 Medium Left lane closed, one lane open 3/3/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair

I-80 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 131 (-0.1 miles) to County Road 29 (+0.1 miles) 103.0 to 101.5 Medium Left lane closed, one lane open 3/3/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***

I-90 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Feather Valley Rd (+0.4 miles) to IN-827 (+0.5 miles) 147.0 to 148.0 Medium Left lane closed, one lane open 3/3/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair

I-90 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 131 (-0.1 miles) to County Road 29 (+0.1 miles) 103.0 to 101.5 Medium Left lane closed, one lane open 3/3/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***

I-94 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***

Borman WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***

Indiana Toll Road (East-West) EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Feather Valley Rd (+0.4 miles) to IN-827 (+0.5 miles) 147.0 to 148.0 Medium Left lane closed, one lane open 3/3/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair

Indiana Toll Road (East-West) WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 131 (-0.1 miles) to County Road 29 (+0.1 miles) 103.0 to 101.5 Medium Left lane closed, one lane open 3/3/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***

Allegan County (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB M-222 at US-131 Medium All lanes and shoulders closed 2/9/15 7:00 AM to 7/9/15 11:59 PM MDOT Bridge Replacement; Traffic will follow the posted detours on US-131 and M-89; Nightime Lane Closures on US-131.
WB M-222 at US-131 Medium All lanes and shoulders closed 2/9/15 7:00 AM to 7/9/15 11:59 PM MDOT Bridge Replacement; Traffic will follow the posted detours on US-131 and M-89; Nightime Lane Closures on US-131.

Berrien County (Michigan)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB M-139 at Niles Main St Bridge Medium All lanes and shoulders closed 10/13/14 6:00 AM to 11/15/15 11:59 PM MDOT During construction, traffic will be detoured on Lincoln Avenue, Grant Street, Broadway Street, North 5th Street, M-51, and Wayne Street.
SB M-139 at Niles Main St Bridge Medium All lanes and shoulders closed 10/13/14 6:00 AM to 11/15/15 11:59 PM MDOT During construction, traffic will be detoured on Lincoln Avenue, Grant Street, Broadway Street, North 5th Street, M-51, and Wayne Street.

I-39 SB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Ellendale Rd (+0.2 miles) 163.7 Medium Right lane closed, one lane open 3/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Beam Guard Repair

I-80 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-55 to Harlem Ave (IL-43) 126.2 to 148.8 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Briggs St to Cherry Hill Rd 134.9 to 135.9 Minor Left shoulder closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT
Exit ramp to NB Harlem Ave 148.9 Minor Partial closure 3/31/14 12:00 AM to 3/31/15 11:59 PM IDOT ***Long Term Closure***
Bishop Ford Fwy (IL-394) to IN State Line Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:00 AM to 2:00 PM IDOT Moving Operation
Feather Valley Rd (+0.4 miles) to IN-827 (+0.5 miles) 147.0 to 148.0 Medium Left lane closed, one lane open 3/3/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair

I-80 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 131 (-0.1 miles) to County Road 29 (+0.1 miles) 103.0 to 101.5 Medium Left lane closed, one lane open 3/3/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***
IN State Line to Bishop Ford Fwy (IL-394) Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:30 AM to 2:30 PM IDOT Moving Operation
Harlem Ave (IL-43) to I-55 148.8 to 126.2 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Ellendale Rd (+0.2 miles) 163.7 Medium Right lane closed, one lane open 3/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Beam Guard Repair
Entrance ramp from Beverly Rd 58.6 Minor Partial closure 4/28/14 9:00 AM to 3/31/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***
Entrance ramp from NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***
Ramp from EB I-90 to Cumberland Ave / IL-171 79.3 Minor Partial closure 11/25/14 7:00 AM to 4/30/15 11:59 PM IDOT ***Long Term Closure***
0.5 miles east of East River Rd to Montrose Ave 79.6 to 43.5 Medium Left lane and left shoulder closed, four lanes open with partial ramp closures 3/3/15 11:00 AM to 2:00 PM IDOT Moving Operation
0.5 miles east of East River Rd to Eisenhower Expy (I-290) 79.6 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Edens Expy (I-94) to Jackson Blvd 43.3 to 51.5 Minor Both shoulders closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 3/3/15 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Feather Valley Rd (+0.4 miles) to IN-827 (+0.5 miles) 147.0 to 148.0 Medium Left lane closed, one lane open 3/3/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 131 (-0.1 miles) to County Road 29 (+0.1 miles) 103.0 to 101.5 Medium Left lane closed, one lane open 3/3/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***
Harrison St to Eisenhower Expy (I-290) 51.7 to 51.7 Minor Right shoulder closed, all lanes open 10/13/14 12:00 AM to 3/15/15 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 3/3/15 9:30 AM to 1:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to I-190 51.7 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane and left shoulder closed, three to five lanes open with partial ramp closures 3/3/15 11:00 AM to 2:00 PM IDOT Moving Operation
Edens Expy (I-94) to I-190 43.5 to 79.1 Medium Left lane and left shoulder closed, two or three lanes open with partial ramp closures 3/3/15 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***
Exit ramp to Roselle Rd 66.0 Minor Partial closure 6/17/14 5:00 AM to 3/15/15 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - Detour: Use alt route (Howard Ave entrance ramp)
Oklahoma Ave (+0.1 miles) to Howard Ave 314.3 to 315.0 Major Left two lanes closed, one lane open 3/3/15 9:30 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from EB Holt Ave 314.2 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - Detour: Use alt route (Howard Ave entrance ramp)
Park Ave West to Kennedy Junction 23.1 to 43.5 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 1:00 PM IDOT Moving Operation
Edens Expy (I-94) to Jackson Blvd 43.3 to 51.5 Minor Both shoulders closed, all lanes open 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
0.5 miles east of East River Rd to Eisenhower Expy (I-290) 79.6 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 3/3/15 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor All lanes shifted and both shoulders closed 9/9/14 12:00 AM to 3/31/15 11:59 PM IDOT Lanes narrowed and shifted to the left ***Long Term Closure***
Dan Ryan Expy (I-94) / I-57 to SB Stony Island Feeder Entrance 62.9 to 65.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:00 AM to 11:59 AM IDOT Moving Operation
Dan Ryan Expy (I-94) / I-57 to I-80 62.9 to 74.4 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
SB Stony Island Feeder Entrance to I-80 65.6 to 74.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 8:30 AM to 12:30 PM IDOT Moving Operation
Bishop Ford Fwy (IL-394) to IN State Line Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:00 AM to 2:00 PM IDOT Moving Operation

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/15/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***
IN State Line to Bishop Ford Fwy (IL-394) Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 9:30 AM to 2:30 PM IDOT Moving Operation
I-80 to NB Stony Island Feeder Exit 74.5 to 65.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:00 AM to 2:00 PM IDOT Moving Operation
I-80 to Dan Ryan Expy (I-94) / I-57 74.5 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
NB Stony Island Feeder Exit to Dan Ryan Expy (I-94) / I-57 65.7 to 62.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/3/15 10:30 AM to 1:00 PM IDOT Moving Operation
Harrison St to Eisenhower Expy (I-290) 51.7 to 51.7 Minor Right shoulder closed, all lanes open 10/13/14 12:00 AM to 3/15/15 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 3/3/15 9:30 AM to 1:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to I-190 51.7 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane and left shoulder closed, three to five lanes open with partial ramp closures 3/3/15 11:00 AM to 2:00 PM IDOT Moving Operation
Kennedy Junction to Park Ave West 43.5 to 23.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/3/15 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB IL-132 8.6 Major All lanes and shoulders closed 2/27/15 7:00 AM to 5/19/15 11:59 PM Illinois Tollway Entrance Ramp Closed; *** Long Term Closure ***
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Lincoln Ave to Greenfield Ave 312.9 to 312.0 Major Right two lanes closed, one or two lanes open 3/3/15 9:30 PM to 3/4/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Use alt route (6th & Mineral entrance)
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Use alt route (6th & Mineral entrance)
Entrance ramp from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Take Bluemound to 70th to Greenfield to HWY 100 to the I-94 West Ramp
Entrance ramp from SB Hawley Rd 306.8 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Take Hawley to Greenfield to HWY 100 to the I-94 West Ramp
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
68th St (-0.1 miles) to WI-100 (+0.1 miles) 306.4 to 303.6 Major All lanes and shoulders closed 3/3/15 10:00 PM to 3/4/15 5:00 AM WisDOT Construction - Detour: I-94 WB to 70th to Greenfield to I-894/US 45 South or to HWY 100 to I-94 West. And I-94 WB to Oâ¿¿Connor to 76th to Bluemound to Glenview to Watertown Plank to US45 North.
Exit ramp to WB Oconnor St 305.5 Medium All lanes and shoulders closed 10/13/14 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take 68th-70th st exit, continue W on O'Conner, North on 76th st, West on Bluemound to 84th st (North 84th st Detour). Take 68th-70th exit, Continue West, South on 70th, West on Greenfield to 84th st. (South 84th st Detour).
Entrance ramp from SB US-45 304.2 Major All lanes and shoulders closed 3/3/15 10:00 PM to 3/4/15 5:00 AM WisDOT Construction - Detour: Take US45 South to Watertown Plank to HWY 100 to the I-94 West Ramp. OR US45 South to Greenfield to HWY 100 to the I94 West Ramp.

I-39 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Ellendale Rd (+0.2 miles) 163.7 Medium Right lane closed, one lane open 3/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Beam Guard Repair

I-43 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Lincoln Ave to Greenfield Ave 312.9 to 312.0 Major Right two lanes closed, one or two lanes open 3/3/15 9:30 PM to 3/4/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Use alt route (6th & Mineral entrance)
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Use alt route (6th & Mineral entrance)

I-43 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - Detour: Use alt route (Howard Ave entrance ramp)
Oklahoma Ave (+0.1 miles) to Howard Ave 314.3 to 315.0 Major Left two lanes closed, one lane open 3/3/15 9:30 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from EB Holt Ave 314.2 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - Detour: Use alt route (Howard Ave entrance ramp)

I-90 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Ellendale Rd (+0.2 miles) 163.7 Medium Right lane closed, one lane open 3/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Beam Guard Repair

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - Detour: Use alt route (Howard Ave entrance ramp)
Oklahoma Ave (+0.1 miles) to Howard Ave 314.3 to 315.0 Major Left two lanes closed, one lane open 3/3/15 9:30 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from EB Holt Ave 314.2 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - Detour: Use alt route (Howard Ave entrance ramp)

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Lincoln Ave to Greenfield Ave 312.9 to 312.0 Major Right two lanes closed, one or two lanes open 3/3/15 9:30 PM to 3/4/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Use alt route (6th & Mineral entrance)
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Use alt route (6th & Mineral entrance)
Entrance ramp from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Take Bluemound to 70th to Greenfield to HWY 100 to the I-94 West Ramp
Entrance ramp from SB Hawley Rd 306.8 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Take Hawley to Greenfield to HWY 100 to the I-94 West Ramp
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
68th St (-0.1 miles) to WI-100 (+0.1 miles) 306.4 to 303.6 Major All lanes and shoulders closed 3/3/15 10:00 PM to 3/4/15 5:00 AM WisDOT Construction - Detour: I-94 WB to 70th to Greenfield to I-894/US 45 South or to HWY 100 to I-94 West. And I-94 WB to Oâ¿¿Connor to 76th to Bluemound to Glenview to Watertown Plank to US45 North.
Exit ramp to WB Oconnor St 305.5 Medium All lanes and shoulders closed 10/13/14 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take 68th-70th st exit, continue W on O'Conner, North on 76th st, West on Bluemound to 84th st (North 84th st Detour). Take 68th-70th exit, Continue West, South on 70th, West on Greenfield to 84th st. (South 84th st Detour).
Entrance ramp from SB US-45 304.2 Major All lanes and shoulders closed 3/3/15 10:00 PM to 3/4/15 5:00 AM WisDOT Construction - Detour: Take US45 South to Watertown Plank to HWY 100 to the I-94 West Ramp. OR US45 South to Greenfield to HWY 100 to the I94 West Ramp.

I-794 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from 4th St to EB I-794 0.4 Medium Right lane closed, two lanes open 3/2/15 12:00 AM to 3/22/15 11:45 PM WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
4th St to Lincoln Memorial Dr 0.4 to 3.1 Medium Right lane closed, two lanes open 12/11/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Exit ramp to SB Jackson St 0.8 Medium All lanes and shoulders closed 12/5/14 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Traffic uses Plankinton or St. Paul James Lovell

I-794 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Carferry Dr to Harbor Dr 11.1 to 13.2 Major All lanes and shoulders closed 3/3/15 10:00 PM to 3/4/15 5:00 AM daily until 3/7/15 WisDOT Construction - Detour: Detour Becher St. to I-43 NB
Entrance ramp from NWB Carferry Dr 11.3 Medium All lanes and shoulders closed 3/3/15 10:00 PM to 3/4/15 5:00 AM daily until 3/7/15 WisDOT Construction - Detour: Detour Becher St. to I-43 NB
Polk St (-0.4 miles) to Harbor Dr 12.5 to 13.2 Medium Right lane closed, two lanes open 3/3/15 7:30 PM to 3/4/15 6:00 AM daily until 3/7/15 WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Exit ramp to NB Milwaukee ST 13.5 Medium All lanes and shoulders closed 12/21/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - Detour: Downtown Traffic to Exit at Lincoln Memorial Drive

I-894 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)

US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Lincoln Ave to Greenfield Ave 312.9 to 312.0 Major Right two lanes closed, one or two lanes open 3/3/15 9:30 PM to 3/4/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Use alt route (6th & Mineral entrance)
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Use alt route (6th & Mineral entrance)
Entrance ramp from NWB WI-145 Major All lanes and shoulders closed 3/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Detour: Use alternate route

US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - Detour: Use alt route (Howard Ave entrance ramp)
Oklahoma Ave (+0.1 miles) to Howard Ave 314.3 to 315.0 Major Left two lanes closed, one lane open 3/3/15 9:30 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from EB Holt Ave 314.2 Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM daily until 3/5/15 WisDOT Construction - Detour: Use alt route (Howard Ave entrance ramp)

US-45 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)
Exit ramp to WB I-94 0.5 Major All lanes and shoulders closed 3/3/15 10:00 PM to 3/4/15 5:00 AM WisDOT Construction - Detour: Take I-894/US45 North to Greenfield to HWY 100 to the I-94 West Ramp. OR Take I-894/US45 North to Watertown Plank to HWY 100 to the I-94 West Ramp
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
Entrance ramp from NWB WI-145 Major All lanes and shoulders closed 3/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Detour: Use alternate route

US-45 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SB 94th St Medium All lanes and shoulders closed 10/15/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: USH 45 to North Ave to HWY 100 to Wisconsin
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 11/19/14 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: Take HWY 100 to Watertown Plank to the US45 SB Entrance Ramp. OR Take Glenview to Watertown Plank to the US45 SB Entrance Ramp
Exit ramp to WB I-94 0.1 Major All lanes and shoulders closed 3/3/15 10:00 PM to 3/4/15 5:00 AM WisDOT Construction - Detour: Take US45 South to Watertown Plank to HWY 100 to the I-94 West Ramp. OR US45 South to Greenfield to HWY 100 to the I94 West Ramp.

WI-16 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-JK (-0.1 miles) to CR-JK (+0.3 miles) Medium Right lane closed, two lanes open 3/4/15 9:00 AM to 4:00 PM daily until 3/5/15 WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA

WI-16 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-JK (-0.3 miles) to CR-JK (+0.3 miles) Medium Right lane closed, two lanes open 3/4/15 6:30 AM to 2:00 PM daily until 3/6/15 WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA

Dane County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-151 from Raymond Rd (-0.1 miles) to Beltline Medium Various lanes closed 6/25/13 7:00 AM to 10/1/15 11:59 PM Gateway More information on the project.
SB US-151 from Beltline to Raymond Rd (+0.1 miles) Medium Various lanes closed 6/25/13 7:00 AM to 10/1/15 11:59 PM Gateway More information on the project.

Milwaukee County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-18 from 97th St to 95th St Medium All lanes and shoulders closed 10/16/14 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take 108th st SB to Greenfield, Greenfield EB to 84th st, 84th NB to Kearney, Kearney EB to 76th st, 76th NB to Bluemound.
WB US-18 from 95th St to 97th St Medium All lanes and shoulders closed 10/16/14 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take 84th st NB to WTP, WTP WB to 108th st, 108th st SB to Bluemound.
NB WI-38 from Oakwood Rd to Joseph M Hutsteiner Dr Medium Various lanes closed 3/2/15 11:00 PM to 3/3/15 11:00 PM daily until 7/4/15 WisDOT Construction - Detour: For nighttime ramp work by the airport TBD.
SB WI-38 from Joseph M Hutsteiner Dr to Oakwood Rd Medium Various lanes closed 3/2/15 11:00 PM to 3/3/15 11:00 PM daily until 7/4/15 WisDOT Construction - Detour: For nighttime ramp work by the airport TBD
EB WI-59 at 92nd St Medium Various lanes closed 3/3/15 8:00 AM to 2:00 PM daily until 3/31/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
EB WI-59 at WI-181 Medium Various lanes closed 3/3/15 8:00 AM to 2:00 PM daily until 3/31/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
WB WI-59 at WI-181 Medium Various lanes closed 3/3/15 8:00 AM to 2:00 PM daily until 3/31/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
WB WI-59 at 92nd St Medium Various lanes closed 3/3/15 8:00 AM to 2:00 PM daily until 3/31/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NWB WI-100 from Mitchell St to WI-59 Medium Various lanes closed 3/3/15 9:00 AM to 3:00 PM daily until 5/29/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NWB WI-100 at Theodore Trecker Way Medium Various lanes closed 3/3/15 8:00 AM to 2:00 PM daily until 3/31/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
SEB WI-100 at Theodore Trecker Way Medium Various lanes closed 3/3/15 8:00 AM to 2:00 PM daily until 3/31/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
SEB WI-100 from WI-59 to Mitchell St Medium Various lanes closed 3/3/15 9:00 AM to 3:00 PM daily until 5/29/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NB WI-181 at WI-59 Medium Various lanes closed 3/3/15 8:00 AM to 2:00 PM daily until 3/31/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NB WI-181 at Schlinger Ave Medium Various lanes closed 3/3/15 8:00 AM to 2:00 PM daily until 3/31/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
NB WI-181 from I-94 to Oconnor St Medium Various lanes closed 2/2/15 12:00 AM to 12/14/15 11:45 PM WisDOT Single Lane Closure; Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
SB WI-181 from Honey Creek Pky (+0.1 miles) to I-94 Medium Various lanes closed 2/2/15 12:00 AM to 12/14/15 11:45 PM WisDOT Single Lane Closure; Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
SB WI-181 at Schlinger Ave Medium Various lanes closed 3/3/15 8:00 AM to 2:00 PM daily until 3/31/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
SB WI-181 at WI-59 Medium Various lanes closed 3/3/15 8:00 AM to 2:00 PM daily until 3/31/15 WisDOT Construction - ZOO IC, 2014 TMP PROJECTS | VARIOUS LOCATIONS | VARIOUS HWY | MILWAUKEE
WB O Connor St at 70th St Medium All lanes and shoulders closed 3/3/15 9:00 PM to 3/4/15 5:30 AM WisDOT Construction - Detour: Take 70th to Greenfield to HWY 100 to the I-94 West Ramp

Waukesha County (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WB US-18 from Woelfel Rd to Brookfield Rd Major Left lane closed, two lanes open 3/2/15 8:00 AM to 3/5/15 3:00 PM WisDOT Permit - Manhole adjustments

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Tue Mar 03 10:31:40 CST 2015