|
Updated: 09/02/10 09:35 AM
Use the links below to view other reports for the selected location:
travel times /
incidents /
construction /
special events /
congestion /
dynamic message signs /
cameras /
detectors
NOTE: You may place the mouse over a location to see its municipality and county,
or click on the location to see a map of the event.
| Bishop Ford NB (Illinois) |
| Sauk Trl to I-80
|
80.8 to 74.5 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
Moving operation |
| Steger Rd to Bishop Ford Fwy
|
82.0 to 73.6 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:30 PM |
IDOT |
Moving operation |
| at 115th St
|
66.7 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| I-80/I-294 to Dan Ryan Expy
|
74.0 to 62.9 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Bishop Ford SB (Illinois) |
| 31st St to Halsted St
|
54.5 to 62.9 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
Local lanes |
| Dan Ryan Expy to I-80/I-294
|
62.9 to 73.6 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| at 130th St
|
68.5 |
Medium |
Left lane closed, two lanes open |
09/02/10 09:00 AM |
09/02/10 11:59 AM |
IDOT |
|
| Exit to 137th St (Beaubien Woods)
|
68.7 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Bishop Ford Fwy to Steger Rd
|
74.1 to 81.9 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:30 PM |
IDOT |
Moving operation |
| I-80 to Sauk Trl
|
74.5 to 80.8 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
Moving operation |
| Edens NB (Illinois) |
| Entrance from NB Skokie Rd
|
33.9 |
Minor |
Ramp work, possible width reduction |
09/02/10 07:00 AM |
09/02/10 03:30 PM |
IDOT |
|
| Dundee Rd to Tollway Spur
|
30.1 to 29.9 |
Medium |
Right lane closed, two or three lanes open |
07/07/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
One lane open on spur |
| Edens SB (Illinois) |
| Exit to SB Skokie Rd
|
33.8 |
Minor |
Ramp work, possible width reduction |
09/02/10 07:00 AM |
09/02/10 03:30 PM |
IDOT |
|
| Entrance from WB Dempster
|
37.3 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Edens Spur EB (Illinois) |
| Deerfield Rd to Edens Spur Ramp
|
25.1 to 25.3 |
Medium |
Left lane closed, three lanes open |
07/12/10 08:00 PM |
12/12/10 10:00 PM |
Illinois Tollway |
Pavement repair |
| Edens Spur Ramp to C&nw Rr
|
25.5 to 29.3 |
Medium |
Left lane closed, up to one lanes open |
08/01/10 10:30 PM |
09/06/10 09:00 PM |
Illinois Tollway |
There will be a weave from Left Lane to Right Lane at milepost 29.3 |
| Skokie Blvd to US-41
|
29.3 to 29.7 |
Medium |
Right lane closed, one lane open |
08/01/10 10:30 PM |
09/06/10 11:00 PM |
Illinois Tollway |
|
| C&nw Rr to Edens Expy
|
29.3 to 29.6 |
Medium |
Right lane closed, one lane open |
06/28/10 12:00 AM |
09/06/10 07:00 PM |
Illinois Tollway |
|
| Edens Spur WB (Illinois) |
| Dundee Rd to Tollway Spur
|
30.1 to 29.9 |
Medium |
Right lane closed, two or three lanes open |
07/07/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
One lane open on spur |
| Edens Expy to C&nw Rr
|
29.6 to 29.3 |
Medium |
Right lane closed, one lane open |
06/28/10 12:00 AM |
09/06/10 07:00 PM |
Illinois Tollway |
|
| C&nw Rr to Edens Spur Ramp
|
29.3 to 25.5 |
Medium |
Left lane closed, one lane open |
08/01/10 10:30 PM |
09/06/10 09:00 PM |
Illinois Tollway |
There will be a weave from Left Lane to Right Lane at milepost 29.3 |
| C & Nw Rr to Lake Cook Rd
|
27.7 to 25.2 |
Medium |
Left lane closed, one lane open |
07/06/10 08:00 PM |
09/06/10 11:59 PM |
Illinois Tollway |
|
| Eisenhower EB (Illinois) |
| I-355 to Church Rd
|
6.6 to 11.4 |
Major |
Left two lanes and both shoulders closed, up to two lanes shifted |
04/07/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Two lanes open, lane shifts |
| Church Rd to Butterfield Rd (IL-56)
|
11.4 to 15.9 |
Medium |
Left lane and both shoulders closed, one or two lanes shifted |
04/12/10 06:00 AM |
09/30/10 11:59 PM |
IDOT |
|
| Entrance from EB US-20
|
12.6 |
Minor |
Ramp work, possible width reduction |
04/12/10 06:00 AM |
09/30/10 11:59 PM |
IDOT |
|
| Pulaski Rd to Sacramento Blvd
|
25.7 to 27.0 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| I-88 to Morgan St
|
16.5 to 29.5 |
Minor |
Right shoulder closed, all lanes open |
06/28/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Long term closure until 10/31 |
| Entrance from EB I-90
|
30.0 |
Minor |
All lanes and shoulders closed |
04/01/10 06:00 AM |
10/31/10 11:59 PM |
IDOT |
Detour to Ohio; Long Term Closure until 10/31/10 |
| Halsted St to Wells St
|
29.8 to 30.3 |
Medium |
Right lane closed, two or three lanes open |
04/20/10 06:00 AM |
10/31/10 11:59 PM |
IDOT |
Lanes 1 & 2 crossed over to WB lanes. |
| Entrance from WB Dan Ryan
|
30.0 |
Minor |
All lanes and shoulders closed |
04/02/10 11:59 PM |
10/31/10 11:59 PM |
IDOT |
**Closed until 10/31/10**; Detour I-55 nb to LSD |
| Chicago River Bridge to The Old Post Office
|
|
Medium |
Various lanes closed |
03/01/10 11:59 PM |
10/31/11 06:00 AM |
IDOT |
Bridge painting and repairs |
| I-90/94 to Wells St
|
|
Medium |
Right two lanes and right shoulder closed, one or two lanes open |
04/22/10 05:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
**Long Term Closure until 10/31** |
| Post Office to Wells St
|
|
Minor |
Right lane closed, two or three lanes open |
09/02/10 10:00 AM |
09/02/10 02:00 PM |
IDOT |
|
| Exit to Wacker Dr
|
|
Medium |
All lanes and shoulders closed |
04/01/10 08:00 PM |
11/01/12 11:59 PM |
IDOT |
|
| Exit to Franklin St
|
|
Medium |
All lanes and shoulders closed |
06/18/10 09:00 PM |
10/31/12 11:59 PM |
IDOT |
*Long Term Closure until 10/31/12* |
| Eisenhower WB (Illinois) |
| Clark St to Post Office
|
|
Medium |
Left three lanes and both shoulders closed, one lane open |
04/01/10 06:00 AM |
10/31/10 11:59 PM |
IDOT |
|
| Entrance from Franklin St
|
|
Minor |
All lanes and shoulders closed |
04/01/10 07:00 PM |
12/31/11 12:00 AM |
IDOT |
*Closed Forever and Decomissioned** |
| Entrance from Wacker Dr
|
|
Medium |
All lanes and shoulders closed |
04/01/10 07:00 PM |
11/01/10 11:59 PM |
IDOT |
Ramp Closed until 11/1/2010 |
| Wells St to Canal
|
|
Medium |
Right three lanes closed, one lane open |
04/05/10 12:01 AM |
10/31/10 11:59 PM |
Chicago DOT |
Pace Traffic. Lanes 1-2-3 closed until 10/31 |
| Morgan St to I-88
|
29.5 to 16.4 |
Minor |
Right shoulder closed, all lanes open |
06/28/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Long term closure until 10/31 |
| Butterfield Rd to Church Rd
|
15.9 to 11.4 |
Minor |
All lanes shifted and both shoulders closed |
04/18/10 06:00 AM |
09/30/10 11:59 PM |
IDOT |
Two lanes open, lanes shift, lanes split at North Ave (IL-64) |
| Entrance from North / Wb US-20
|
14.0 |
Minor |
Ramp work, possible width reduction |
04/13/10 09:00 AM |
09/30/10 11:59 PM |
IDOT |
*Long term term closure* |
| Exit to WB North Ave
|
13.6 |
Minor |
All lanes and shoulders closed |
09/01/10 08:00 PM |
09/30/10 11:59 PM |
IDOT |
** Long Term Closuer until 9/30 ** |
| Church Rd to I-355
|
11.4 to 6.6 |
Major |
Left two lanes and both shoulders closed, up to one lanes shifted |
04/07/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Two lanes open, lane shifts |
| I-39 NB (Illinois) |
| US-34 to I-88
|
71.8 to 97.1 |
Medium |
Various lanes closed |
05/03/10 06:00 AM |
11/24/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements. Max Wid 10 Ft |
| I-39 SB (Illinois) |
| I-88 to US-34
|
97.0 to 71.7 |
Medium |
Various lanes closed |
05/03/10 06:00 AM |
11/24/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements. Max Wid 10 Ft |
| I-55 NB (Illinois) |
| IL-113 to County Line Rd
|
235.7 to 276.4 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Lorenzo Rd to N River Rd
|
240.5 to 241.0 |
Medium |
Left lane closed, one lane open |
07/23/10 07:00 AM |
11/15/10 11:59 PM |
IDOT |
Left lane closed at Kankakee River. All traffic into cross-over. More information |
| at Kankakee River Bridge
|
240.8 |
Medium |
Left lane closed, one lane open |
07/22/10 06:00 AM |
11/01/10 11:59 PM |
IDOT |
**Long Term Closure until November** More information |
| US-6 to South Of I-80
|
248.2 to 250.3 |
Medium |
All lanes shifted and both shoulders closed |
08/26/10 07:00 PM |
09/30/10 11:59 PM |
IDOT |
Permanent until 09/30 Narrrow lanes,lane shifts More information |
| I-80 to IL-59
|
250.3 to 251.7 |
Minor |
Right shoulder closed, all lanes open |
07/06/10 06:00 AM |
09/17/10 11:59 PM |
IDOT |
Long Term Closure until 9/17 More information |
| US-30 to Renwick Rd
|
257.5 to 258.3 |
Minor |
Right shoulder closed, all lanes open |
06/21/10 09:00 AM |
12/31/10 11:30 PM |
IDOT |
*Permanent closure* More information |
| US-30 to Renwick Rd
|
257.5 to 258.3 |
Medium |
Right lane closed, two lanes open |
07/26/10 06:00 AM |
11/01/10 11:59 PM |
IDOT |
** Long Term Closure until November 1, 2010 ** More information |
| US-30 to IL-126
|
257.5 to 261.2 |
Medium |
Right lane closed, two lanes open |
07/26/10 05:00 AM |
11/15/10 11:59 PM |
IDOT |
Permanent Closure until 11/15 More information |
| Lockport Rd to IL-126
|
259.3 to 261.1 |
Minor |
Right shoulder closed, all lanes open |
06/28/10 09:00 AM |
12/31/10 09:00 PM |
IDOT |
*Permanent closure* More information |
| I-80 to County Line Rd
|
250.3 to 276.4 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:30 PM |
IDOT |
Moving Operation |
| County Line Rd to Lake Shore Dr
|
276.4 to 293.8 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Dan Ryan Expy to Lake Shore Dr
|
292.5 to 293.8 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| I-55 SB (Illinois) |
| Lake Shore Dr to Dan Ryan Expy
|
293.9 to 292.5 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Lake Shore Dr to County Line Rd
|
293.9 to 276.4 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Entrance from SB I-294
|
277.5 |
Medium |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Right ramp lane closed |
| County Line Rd to I-80
|
276.4 to 250.3 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:30 PM |
IDOT |
Moving Operation |
| County Line Rd to IL-113
|
276.4 to 235.7 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| at Exit To Bolingbrook Weigh Station
|
265.0 |
Minor |
All lanes and shoulders open |
08/30/10 07:00 AM |
10/15/10 11:59 AM |
IDOT |
Exit to weigh station closed |
| US-30 to Caton Farm Rd
|
257.4 to 255.9 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| IL-59 to I-80
|
251.7 to 250.3 |
Minor |
Right shoulder closed, all lanes open |
07/06/10 06:00 AM |
09/17/10 11:59 PM |
IDOT |
Long Term Closure until 9/17 More information |
| N River Rd to Lorenzo Rd
|
241.0 to 240.5 |
Medium |
All lanes shifted |
07/22/10 07:00 AM |
11/15/10 11:59 PM |
IDOT |
Lanes shifted at Kankakee River More information |
| I-57 NB (Illinois) |
| at Wilmington-Peotone Rd
|
327.1 |
Minor |
Left lane and both shoulders closed, one lane shifted |
08/16/10 07:00 AM |
10/31/10 11:59 AM |
IDOT |
Long term until 10/31, Left lane closed, lane shifts, narrow lane |
| Exit to Monee Manhattan Rd
|
334.4 |
Minor |
Ramp work, possible width reduction |
04/02/10 09:00 AM |
09/05/10 11:59 PM |
IDOT |
Long term closure until 9/05/10 |
| Entrance from Monee Manhattan Rd
|
334.4 |
Minor |
Ramp work, possible width reduction |
04/02/10 09:00 AM |
09/05/10 11:59 PM |
IDOT |
Long term closure until 9/05/10 |
| at 119th St
|
354.2 |
Minor |
Left shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| at 111th St
|
355.2 |
Minor |
Both shoulders closed, all lanes open |
04/27/10 09:00 AM |
10/31/10 09:00 PM |
IDOT |
|
| I-57 SB (Illinois) |
| at 111th St
|
355.2 |
Minor |
Both shoulders closed, all lanes open |
04/27/10 09:00 AM |
10/31/10 09:00 PM |
IDOT |
|
| Entrance from Monee Manhattan Rd
|
335.6 |
Minor |
Ramp work, possible width reduction |
04/02/10 09:00 AM |
09/05/10 11:59 PM |
IDOT |
Long term closure until 9/05/10 |
| Exit to Monee Manhattan Rd
|
335.6 |
Minor |
Ramp work, possible width reduction |
04/02/10 09:00 AM |
09/05/10 11:59 PM |
IDOT |
Long term closure until 9/05/10 |
| at Wilmington-Peotone Rd
|
327.1 |
Minor |
Left lane and both shoulders closed, one lane shifted |
08/16/10 07:00 AM |
10/31/10 11:59 AM |
IDOT |
Long term until 10/31, Left lane closed, lane shifts, narrow lane |
| I-74 EB (Illinois) |
| Mississippi River to IL-5
|
|
Medium |
Various lanes closed |
05/11/09 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Traffic reduced to one lane in each direction. Use alternate route. 27th over I-74 Max Wid 10 Ft 6 ", various IL-5 and 27th St Ramps will be shut down for 11-day periods. EB I-74 Max Wid 13 Ft through 11/24/10
|
| IL-81 to IL-17
|
24.1 to 32.0 |
Medium |
Various lanes closed |
03/29/10 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements, max wid 14 Ft 6 In 4/5 to 4/14 then 11 Ft 6 In |
| I-74 WB (Illinois) |
| IL-17 to IL-81
|
32.0 to 24.1 |
Medium |
Various lanes closed |
03/29/10 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements, max wid 14 Ft 6 In 4/5 to 4/14 then 11 Ft 6 In |
| IL-5 to Mississippi River
|
|
Medium |
Various lanes closed |
05/11/09 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Traffic reduced to one lane in each direction. Use alternate route. 27th over I-74 Max Wid 10 Ft 6 ", various IL-5 and 27th St Ramps will be shut down for 11-day periods. EB I-74 Max Wid 13 Ft through 11/24/10
|
| Exit to Avenue Of The Cities
|
3.7 |
Major |
All lanes and shoulders closed |
08/23/10 07:00 AM |
09/03/10 11:59 PM |
IDOT |
|
| Entrance from Ave Of The Cities
|
2.1 |
Medium |
All lanes and shoulders closed |
08/30/10 07:00 AM |
09/10/10 11:59 PM |
IDOT |
|
| I-80 EB (Illinois) |
| Entrance from NB IL-84
|
0.2 |
Medium |
All lanes and shoulders closed |
08/25/09 07:00 AM |
11/24/10 11:59 PM |
IDOT |
|
| Exit to NB IL-84
|
0.2 |
Medium |
All lanes and shoulders closed |
08/25/09 07:00 AM |
11/29/10 11:59 PM |
IDOT |
|
| at Mississippi River
|
0.2 |
Medium |
Various lanes closed |
03/01/10 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Traffic head to head on EB pavement starting 6/11 |
| US-67(Iowa) to I-88
|
0.3 to 3.4 |
Medium |
Various lanes closed |
04/13/09 07:00 AM |
11/24/10 11:59 PM |
IDOT |
I-80 over Mississippi Rivr closed -no permit - through 10/29/10. Traffic is head-to-head on WB pavement beginning 4/5/10, one lane in each direction. |
| IL-84 to I-88
|
0.3 to 3.4 |
Medium |
Various lanes closed |
04/13/09 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Traffic is head-to-head on WB pavement beginning 4/5/10, one lane in each direction. |
| at IL-84
|
2.0 |
Minor |
All lanes and shoulders open |
03/15/10 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Scales Closed |
| I-180 to IL-89
|
61.0 to 69.8 |
Medium |
Various lanes closed |
03/01/10 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements. Max Wid 12 Ft 6 In |
| 6th Rd to 9th Rd
|
80.0 to 82.0 |
Minor |
Various lanes closed |
08/23/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Expect lane restrictions for intersection work. IL-178 during the daytime and I-80 during the nighttime. |
| 24th Rd to Seneca Rd
|
97.0 to 105.0 |
Medium |
Various lanes closed |
06/21/10 07:00 AM |
06/15/11 11:59 PM |
IDOT |
Lane restrictions for patching, milling, resurfacing |
| at Des Plaines River Bridge
|
132.3 |
Medium |
Right lane closed, two lanes open |
09/02/10 08:30 AM |
09/02/10 02:30 PM |
IDOT |
|
| Halsted St to Union Pacific Rr
|
2.7 to 2.7 |
Medium |
Right lane closed, two to five lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| IL-394 to Indiana State Line
|
|
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| I-80 WB (Illinois) |
| Indiana State Line to IL-394
|
|
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| at Harlem Ave
|
148.8 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| at Briggs St
|
134.9 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| at W/o I-55
|
125.4 |
Minor |
Left shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Seneca Rd to 24th Rd
|
105.0 to 97.0 |
Medium |
Various lanes closed |
06/21/10 07:00 AM |
06/15/11 11:59 PM |
IDOT |
Lane restrictions for patching, milling, resurfacing |
| 9th Rd to 6th Rd
|
82.0 to 80.0 |
Minor |
Various lanes closed |
08/23/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Expect lane restrictions for intersection work. IL-178 during the daytime and I-80 during the nighttime. |
| IL-89 to I-180
|
70.1 to 61.0 |
Medium |
Various lanes closed |
03/01/10 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements. Max Wid 12 Ft 6 In |
| at I-88
|
2.0 |
Minor |
All lanes and shoulders open |
03/15/10 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Scales Closed |
| I-88 to IL-84
|
3.4 to 0.3 |
Medium |
Various lanes closed |
04/13/09 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Traffic is head-to-head on WB pavement beginning 4/5/10, one lane in each direction. |
| Entrance from IL-84
|
0.9 |
Medium |
All lanes and shoulders closed |
08/25/09 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Closed no permit thorugh 10/29/10 |
| I-88 to US-67 (Iowa)
|
3.5 to 0.3 |
Medium |
Various lanes closed |
04/13/09 07:00 AM |
11/24/10 11:59 PM |
IDOT |
I-80 over Mississippi Rivr closed -no permit - through 10/29/10. Traffic is head-to-head on WB pavement beginning 4/5/10, one lane in each direction. |
| at Mississippi River
|
0.2 |
Medium |
Various lanes closed |
03/01/10 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Traffic head to head on EB pavement starting 6/11 |
| I-88 EB (Illinois) |
| Entrance from NB & Sb IL-53
|
130.0 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 08:00 AM |
09/02/10 12:00 PM |
Illinois Tollway |
|
| at E/o IL-83
|
137.2 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| Exit to SB I-294
|
138.5 |
Minor |
Left lane closed, one lane open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| York Rd to I-294 Tri-Level Bridge
|
138.9 to 140.0 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 06:00 AM |
09/02/10 06:00 PM |
Illinois Tollway |
Material delivery |
| I-88 WB (Illinois) |
| I-294 Tri-Level Bridge to York Rd
|
140.0 to 139.0 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 06:00 AM |
09/02/10 06:00 PM |
Illinois Tollway |
Material delivery |
| Exit to SB I-355
|
133.3 |
Medium |
Right lane closed, one lane open |
09/02/10 08:30 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Finley Rd To I-355 Nb Overpass to EB I-88
|
132.4 to 132.0 |
Minor |
Right shoulder closed, all lanes open |
08/16/10 10:00 PM |
09/03/10 11:59 PM |
Illinois Tollway |
Barrier Wall Repair |
| Exit to NB Farnsworth Ave
|
120.3 |
Minor |
Ramp work, possible width reduction |
09/02/10 08:00 AM |
09/02/10 04:00 PM |
Illinois Tollway |
Right side of ramp closed |
| at Dixon Plaza
|
56.4 |
Medium |
Various lanes closed |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
All ORT lanes closed, all cash lanes open. |
| I-90 EB (Illinois) |
| Entrance from US-20
|
37.4 |
Minor |
Ramp work, possible width reduction |
09/02/10 08:30 AM |
09/02/10 01:30 PM |
Illinois Tollway |
Left side of ramp closed.
|
| Exit to WB I-190
|
1.6 |
Medium |
Various lanes closed |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Right cash lane closed |
| Exit to Lawrence Ave
|
83.9 |
Minor |
All lanes and shoulders closed |
06/15/10 11:59 PM |
10/20/10 11:59 PM |
IDOT |
Long Term Closure until 10/20 |
| at Lawrence Ave
|
84.1 |
Minor |
Right shoulder closed, all lanes open |
06/15/10 11:59 PM |
10/20/10 11:59 PM |
IDOT |
Long term closure until 10/20 |
| Exit to Monroe St
|
51.1 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Exit to Adams St
|
51.2 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Exit to Jackson Blvd
|
51.3 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Monroe St to I-290
|
51.3 to 51.7 |
Medium |
Right lane and right shoulder closed, two to four lanes open |
04/01/10 11:59 PM |
10/31/10 11:59 PM |
IDOT |
Long Term Closure until 10/31/10
(Rt lane closed via Exit-Only to Jackson) |
| Exit to Congress Pkwy
|
51.4 |
Minor |
All lanes and shoulders closed |
04/01/10 06:00 AM |
10/31/10 11:59 PM |
IDOT |
Detour to Ohio; Long Term Closure until 10/31/10 |
| Entrance from Cermak Rd At 26th St (On Chinatown Feeder)
|
54.6 |
Minor |
Right shoulder closed, all lanes open |
04/19/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Long term closure until 10/31/10 |
| 31st St to Halsted St
|
54.5 to 62.9 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
Local lanes |
| I-90 WB (Illinois) |
| Exit to Cermak Rd At 26th (On Chinatown Feeder)
|
54.7 |
Minor |
Right shoulder closed, all lanes open |
04/19/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Long term closure until 10/31/2010 |
| Exit to EB Congress Pkway
|
52.4 |
Minor |
All lanes and shoulders closed |
04/02/10 11:59 PM |
10/31/10 11:59 PM |
IDOT |
**Closed until 10/31/10**; Detour I-55 nb to LSD |
| Entrance from Lawrence Ave
|
43.3 |
Minor |
All lanes and shoulders closed |
06/15/10 11:59 PM |
10/20/10 11:59 PM |
IDOT |
** Long Term Closure until 10/20 ** |
| at Lawrence Ave
|
84.2 |
Minor |
Right shoulder closed, all lanes open |
06/15/10 11:59 PM |
10/20/10 11:59 PM |
IDOT |
Long term closure until 10/20 |
| I-94 EB (Illinois) |
| WI-50 to WI-IL State Line
|
|
Medium |
Left lane closed, two lanes open |
03/19/10 07:00 AM |
12/31/10 11:59 PM |
WisDOT |
|
| Exit to EB & Wb IL-132
|
8.3 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Entrance from EB & Wb IL-132
|
8.1 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Exit to (IL-21) Milwaukee Ave
|
9.8 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Entrance from EB & Wb IL-120
|
11.5 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Stearns School Rd to Buckley Rd
|
7.5 to 13.8 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Deerfield Rd to Edens Spur Ramp
|
24.3 to 52.9 |
Medium |
Left lane closed, three lanes open |
07/12/10 08:00 PM |
12/12/10 10:00 PM |
Illinois Tollway |
Pavement repair |
| Edens Spur Ramp to C&nw Rr
|
25.5 to 29.3 |
Medium |
Left lane closed, up to one lanes open |
08/01/10 10:30 PM |
09/06/10 09:00 PM |
Illinois Tollway |
There will be a weave from Left Lane to Right Lane at milepost 29.3 |
| C&nw Rr to Edens Expy
|
29.3 to 29.6 |
Medium |
Right lane closed, one lane open |
06/28/10 12:00 AM |
09/06/10 07:00 PM |
Illinois Tollway |
|
| Skokie Blvd to US-41
|
29.3 to 29.7 |
Medium |
Right lane closed, one lane open |
08/01/10 10:30 PM |
09/06/10 11:00 PM |
Illinois Tollway |
|
| Exit to SB Skokie Rd
|
33.8 |
Minor |
Ramp work, possible width reduction |
09/02/10 07:00 AM |
09/02/10 03:30 PM |
IDOT |
|
| Entrance from WB Dempster
|
37.3 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Exit to Monroe St
|
51.1 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Exit to Adams St
|
51.2 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Exit to Jackson Blvd
|
51.3 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Monroe St to I-290
|
51.3 to 51.7 |
Medium |
Right lane and right shoulder closed, two to four lanes open |
04/01/10 11:59 PM |
10/31/10 11:59 PM |
IDOT |
Long Term Closure until 10/31/10
(Rt lane closed via Exit-Only to Jackson) |
| Exit to Congress Pkwy
|
51.4 |
Minor |
All lanes and shoulders closed |
04/01/10 06:00 AM |
10/31/10 11:59 PM |
IDOT |
Detour to Ohio; Long Term Closure until 10/31/10 |
| Entrance from Cermak Rd At 26th St (On Chinatown Feeder)
|
54.6 |
Minor |
Right shoulder closed, all lanes open |
04/19/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Long term closure until 10/31/10 |
| 31st St to Halsted St
|
54.5 to 62.9 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
Local lanes |
| Dan Ryan Expy to I-80/I-294
|
62.9 to 73.6 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| at 130th St
|
68.5 |
Medium |
Left lane closed, two lanes open |
09/02/10 09:00 AM |
09/02/10 11:59 AM |
IDOT |
|
| Exit to 137th St (Beaubien Woods)
|
68.7 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Halsted St to Union Pacific Rr
|
2.7 to 2.7 |
Medium |
Right lane closed, two to five lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| IL-394 to Indiana State Line
|
|
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| I-94 WB (Illinois) |
| Indiana State Line to IL-394
|
|
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| at 115th St
|
66.7 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| I-80/I-294 to Dan Ryan Expy
|
74.0 to 62.9 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Exit to Cermak Rd At 26th (On Chinatown Feeder)
|
54.7 |
Minor |
Right shoulder closed, all lanes open |
04/19/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Long term closure until 10/31/2010 |
| Exit to EB Congress Pkway
|
52.4 |
Minor |
All lanes and shoulders closed |
04/02/10 11:59 PM |
10/31/10 11:59 PM |
IDOT |
**Closed until 10/31/10**; Detour I-55 nb to LSD |
| Entrance from NB Skokie Rd
|
33.9 |
Minor |
Ramp work, possible width reduction |
09/02/10 07:00 AM |
09/02/10 03:30 PM |
IDOT |
|
| Dundee Rd to Tollway Spur
|
30.1 to 29.9 |
Medium |
Right lane closed, two or three lanes open |
07/07/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
One lane open on spur |
| Edens Expy to C&nw Rr
|
29.6 to 29.3 |
Medium |
Right lane closed, one lane open |
06/28/10 12:00 AM |
09/06/10 07:00 PM |
Illinois Tollway |
|
| C&nw Rr to Edens Spur Ramp
|
29.3 to 25.5 |
Medium |
Left lane closed, one lane open |
08/01/10 10:30 PM |
09/06/10 09:00 PM |
Illinois Tollway |
There will be a weave from Left Lane to Right Lane at milepost 29.3 |
| C & Nw Rr to Lake Cook Rd
|
27.7 to 25.2 |
Medium |
Left lane closed, one lane open |
07/06/10 08:00 PM |
09/06/10 11:59 PM |
Illinois Tollway |
|
| Deerfield Rd to Half Day Rd
|
24.3 to 21.9 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Buckley Rd to Stearns School Rd
|
13.8 to 7.6 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Exit to EB & Wb IL-120
|
11.5 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Entrance from Milwaukee Ave
|
9.7 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Entrance from EB & Wb IL-132
|
8.9 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Exit to EB & Wb IL-132
|
8.4 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| I-190 WB (Illinois) |
| Entrance from SB I-294
|
1.5 |
Medium |
Various lanes closed |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Right cash lane closed |
| I-290 EB (Illinois) |
| IL-68 (Dundee) to Woodfield
|
|
Medium |
Left two lanes closed, one or two lanes shifted |
06/02/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Long term closure until 9/30/10; Lanes shifted left. Two lanes open. |
| Lake Cook Rd to I-90
|
|
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
Moving operation |
| Kirchoff Rd to Woodfield Rd
|
|
Medium |
Left lane closed, two or three lanes shifted |
07/27/10 07:00 AM |
09/18/10 11:59 PM |
IDOT |
Left lane closed into Express, Lane shifts, all local lanes open. |
| Thorndale Ave to I-355
|
5.0 to 6.8 |
Medium |
Left lane and both shoulders closed, one to four lanes shifted |
04/18/10 07:00 AM |
09/08/10 11:59 PM |
IDOT |
All lanes open in 2-lane section. |
| I-355 to Church Rd
|
6.6 to 11.4 |
Major |
Left two lanes and both shoulders closed, up to two lanes shifted |
04/07/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Two lanes open, lane shifts |
| Church Rd to Butterfield Rd (IL-56)
|
11.4 to 15.9 |
Medium |
Left lane and both shoulders closed, one or two lanes shifted |
04/12/10 06:00 AM |
09/30/10 11:59 PM |
IDOT |
|
| Entrance from EB US-20
|
12.6 |
Minor |
Ramp work, possible width reduction |
04/12/10 06:00 AM |
09/30/10 11:59 PM |
IDOT |
|
| Pulaski Rd to Sacramento Blvd
|
25.7 to 27.0 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| I-88 to Morgan St
|
16.5 to 29.5 |
Minor |
Right shoulder closed, all lanes open |
06/28/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Long term closure until 10/31 |
| Entrance from EB I-90
|
30.0 |
Minor |
All lanes and shoulders closed |
04/01/10 06:00 AM |
10/31/10 11:59 PM |
IDOT |
Detour to Ohio; Long Term Closure until 10/31/10 |
| Halsted St to Wells St
|
29.8 to 30.3 |
Medium |
Right lane closed, two or three lanes open |
04/20/10 06:00 AM |
10/31/10 11:59 PM |
IDOT |
Lanes 1 & 2 crossed over to WB lanes. |
| Entrance from WB Dan Ryan
|
30.0 |
Minor |
All lanes and shoulders closed |
04/02/10 11:59 PM |
10/31/10 11:59 PM |
IDOT |
**Closed until 10/31/10**; Detour I-55 nb to LSD |
| I-90/94 to Wells St
|
29.9 to 30.3 |
Medium |
Right two lanes and right shoulder closed, one or two lanes open |
04/22/10 05:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
**Long Term Closure until 10/31** |
| I-290 WB (Illinois) |
| Clark St to Post Office
|
|
Medium |
Left three lanes and both shoulders closed, one lane open |
04/01/10 06:00 AM |
10/31/10 11:59 PM |
IDOT |
|
| Entrance from Franklin St
|
|
Minor |
All lanes and shoulders closed |
04/01/10 07:00 PM |
12/31/11 12:00 AM |
IDOT |
*Closed Forever and Decomissioned** |
| Entrance from Wacker Dr
|
|
Medium |
All lanes and shoulders closed |
04/01/10 07:00 PM |
11/01/10 11:59 PM |
IDOT |
Ramp Closed until 11/1/2010 |
| Wells St to Canal
|
|
Medium |
Right three lanes closed, one lane open |
04/05/10 12:01 AM |
10/31/10 11:59 PM |
Chicago DOT |
Pace Traffic. Lanes 1-2-3 closed until 10/31 |
| Morgan St to I-88
|
29.5 to 16.4 |
Minor |
Right shoulder closed, all lanes open |
06/28/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Long term closure until 10/31 |
| Butterfield Rd to Church Rd
|
15.9 to 11.4 |
Minor |
All lanes shifted and both shoulders closed |
04/18/10 06:00 AM |
09/30/10 11:59 PM |
IDOT |
Two lanes open, lanes shift, lanes split at North Ave (IL-64) |
| Entrance from North / Wb US-20
|
14.0 |
Minor |
Ramp work, possible width reduction |
04/13/10 09:00 AM |
09/30/10 11:59 PM |
IDOT |
*Long term term closure* |
| Exit to WB North Ave
|
13.6 |
Minor |
All lanes and shoulders closed |
09/01/10 08:00 PM |
09/30/10 11:59 PM |
IDOT |
** Long Term Closuer until 9/30 ** |
| Church Rd to I-355
|
11.4 to 6.6 |
Major |
Left two lanes and both shoulders closed, up to one lanes shifted |
04/07/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Two lanes open, lane shifts |
| I-355 to Thorndale Ave
|
6.6 to 5.1 |
Medium |
Left lane and both shoulders closed, three or four lanes shifted |
04/18/10 07:00 AM |
09/08/10 11:59 PM |
IDOT |
All lanes open in 2-lane section. |
| I-90 to Lake Cook Rd
|
|
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
Moving operation |
| I-294 NB (Illinois) |
| I-88 Tri-Level Bridge to Butterfield Rd
|
31.0 to 31.4 |
Major |
Right two lanes closed, two lanes open |
08/01/10 06:00 AM |
09/15/10 10:00 PM |
Illinois Tollway |
|
| I-88 Tri-Level Bridge to Butterfield Rd
|
31.0 to 31.4 |
Minor |
Right shoulder closed, all lanes open |
08/16/10 05:00 AM |
09/29/10 11:59 PM |
Illinois Tollway |
Bridge work; Right side ramp shoulder of CD Road closed leading to Butterfield Rd |
| Rand Rd to Willow Rd
|
44.0 to 48.3 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 06:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
Barrier Wall Repair, Ditch Excavation, Fence Work, Shoulder Work |
| I-294 SB (Illinois) |
| Willow Rd to Rand Rd
|
48.3 to 44.0 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 06:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
Barrier Wall Repair, Ditch Excavation, Fence Work, Shoulder Work |
| Exit to WB I-190
|
40.8 |
Medium |
Various lanes closed |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Right cash lane closed |
| Ramp from SB I-294 to WB IL-19
|
39.1 to 39.0 |
Medium |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Left side of ramp closed |
| Electric Ave to I-88 Tri-Level Bridge
|
31.7 to 31.0 |
Medium |
Center two lanes closed, two lanes open |
08/27/10 05:00 AM |
09/29/10 11:59 PM |
Illinois Tollway |
|
| Entrance from EB I-88
|
28.8 |
Minor |
Left lane closed, one lane open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Mile-Long Bridge to IL-171
|
21.0 to 20.5 |
Medium |
Left lane closed, three lanes open |
09/02/10 08:30 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Halsted St to Union Pacific Rr
|
2.7 to 2.7 |
Medium |
Right lane closed, two to five lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| I-355 NB (Illinois) |
| Ogden Ave to I-88
|
19.6 to 20.1 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Butterfield Rd to 22nd St
|
22.6 to 23.4 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Butterfield Rd to Fullerton Ave
|
22.7 to 28.9 |
Medium |
Left lane closed, two lanes open |
09/02/10 10:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Fullerton Ave to Army Trail Rd
|
28.9 to 29.8 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 04:00 PM |
Illinois Tollway |
|
| Entrance from NWB US-20 (Lake St)
|
31.5 |
Medium |
All lanes and shoulders closed |
06/16/10 07:00 AM |
09/08/10 11:59 PM |
IDOT |
Long Term Closure |
| Army Trail Rd to I-290 Extn
|
29.9 to 32.2 |
Medium |
Left lane and both shoulders closed, two or three lanes shifted |
04/18/10 07:00 AM |
09/08/10 11:59 PM |
IDOT |
|
| I-355 SB (Illinois) |
| I-290 Extn to Army Trail Rd
|
32.2 to 29.9 |
Medium |
Left lane and both shoulders closed, two or three lanes shifted |
04/18/10 07:00 AM |
09/08/10 11:59 PM |
IDOT |
|
| Army Trail Plaza to Roosevelt Rd
|
29.0 to 24.6 |
Medium |
Right lane closed, two lanes open |
06/14/10 05:00 AM |
09/03/10 11:59 PM |
Illinois Tollway |
Pavement Repair
|
| Fullerton Ave to Butterfield Rd
|
28.9 to 22.6 |
Medium |
Center lane closed, two lanes open |
09/01/10 08:00 PM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Butterfield Rd to Ogden Ave
|
22.7 to 19.6 |
Medium |
Right lane closed, two or three lanes open |
09/02/10 08:30 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Entrance from WB I-88
|
20.8 |
Medium |
Right lane closed, one lane open |
09/02/10 08:30 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Ogden Ave to Bnsf Rr
|
19.5 to 19.1 |
Minor |
Left shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| 71st St to 75th St
|
16.1 to 15.5 |
Medium |
Right lane closed, two lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| Entrance from 75th St
|
16.6 |
Minor |
Ramp work, possible width reduction |
09/02/10 06:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
Left side of ramp closed |
| 75th St to Boughton Rd Plaza
|
15.6 to 14.3 |
Major |
Right two lanes closed, two lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| IL-394 NB (Illinois) |
| Sauk Trl to I-80
|
80.8 to 74.5 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
Moving operation |
| at Glenwood Dyer Rd
|
77.6 |
Minor |
Left shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Steger Rd to Bishop Ford Fwy
|
82.0 to 73.6 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:30 PM |
IDOT |
Moving operation |
| IL-394 SB (Illinois) |
| Dan Ryan Expy to I-80/I-294
|
73.6 to 74.4 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Bishop Ford Fwy to Steger Rd
|
74.1 to 81.9 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:30 PM |
IDOT |
Moving operation |
| I-80 to Sauk Trl
|
74.5 to 80.8 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
Moving operation |
| IL-53 NB (Illinois) |
| Palatine Rd to US-12 (Rand Rd)
|
|
Medium |
Left lane closed, two lanes shifted |
06/05/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Long term closure until 9/30/10; Lanes Shifted Left |
| I-90 to Lake Cook Rd
|
|
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
Moving operation |
| IL-53 SB (Illinois) |
| IL-68 (Dundee) to Woodfield
|
|
Medium |
Left two lanes closed, two lanes shifted |
06/02/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Long term closure until 9/30/10; Lanes shifted left. Two lanes open. |
| Lake Cook Rd to I-90
|
|
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
Moving operation |
| Kirchoff Rd to Woodfield Rd
|
|
Medium |
Left lane closed, two or three lanes shifted |
07/27/10 07:00 AM |
09/18/10 11:59 PM |
IDOT |
Left lane closed into Express, Lane shifts, all local lanes open. |
| Jane Addams Memorial (Northwest) EB (Illinois) |
| Entrance from US-20
|
37.4 |
Minor |
Ramp work, possible width reduction |
09/02/10 08:30 AM |
09/02/10 01:30 PM |
Illinois Tollway |
Left side of ramp closed.
|
| Exit to WB I-190
|
1.6 |
Medium |
Various lanes closed |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Right cash lane closed |
| Kennedy EB (Illinois) |
| Exit to Lawrence Ave
|
83.9 |
Minor |
All lanes and shoulders closed |
06/15/10 11:59 PM |
10/20/10 11:59 PM |
IDOT |
Long Term Closure until 10/20 |
| at Lawrence Ave
|
84.1 |
Minor |
Right shoulder closed, all lanes open |
06/15/10 11:59 PM |
10/20/10 11:59 PM |
IDOT |
Long term closure until 10/20 |
| Exit to Monroe St
|
51.1 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Exit to Adams St
|
51.2 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Exit to Jackson Blvd
|
51.3 |
Minor |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Monroe St to I-290
|
51.3 to 51.7 |
Medium |
Right lane and right shoulder closed, two to four lanes open |
04/01/10 11:59 PM |
10/31/10 11:59 PM |
IDOT |
Long Term Closure until 10/31/10
(Rt lane closed via Exit-Only to Jackson) |
| Exit to Congress Pkwy
|
51.4 |
Minor |
All lanes and shoulders closed |
04/01/10 06:00 AM |
10/31/10 11:59 PM |
IDOT |
Detour to Ohio; Long Term Closure until 10/31/10 |
| Kennedy WB (Illinois) |
| at Lawrence Ave
|
84.2 |
Minor |
Right shoulder closed, all lanes open |
06/15/10 11:59 PM |
10/20/10 11:59 PM |
IDOT |
Long term closure until 10/20 |
| Entrance from Lawrence Ave
|
43.3 |
Minor |
All lanes and shoulders closed |
06/15/10 11:59 PM |
10/20/10 11:59 PM |
IDOT |
** Long Term Closure until 10/20 ** |
| Entrance from SB I-294
|
1.5 |
Medium |
Various lanes closed |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Right cash lane closed |
| Kingery EB (Illinois) |
| Halsted St to Union Pacific Rr
|
2.7 to 2.7 |
Medium |
Right lane closed, two to five lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| IL-394 to Indiana State Line
|
|
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Kingery WB (Illinois) |
| Indiana State Line to IL-394
|
|
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Ronald Reagan EB (Illinois) |
| Entrance from NB & Sb IL-53
|
130.0 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 08:00 AM |
09/02/10 12:00 PM |
Illinois Tollway |
|
| at E/o IL-83
|
137.2 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| Exit to SB I-294
|
138.5 |
Minor |
Left lane closed, one lane open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| York Rd to I-294 Tri-Level Bridge
|
138.9 to 140.0 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 06:00 AM |
09/02/10 06:00 PM |
Illinois Tollway |
Material delivery |
| Ronald Reagan WB (Illinois) |
| I-294 Tri-Level Bridge to York Rd
|
140.0 to 139.0 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 06:00 AM |
09/02/10 06:00 PM |
Illinois Tollway |
Material delivery |
| Exit to SB I-355
|
133.3 |
Medium |
Right lane closed, one lane open |
09/02/10 08:30 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Finley Rd To I-355 Nb Overpass to EB I-88
|
132.4 to 132.0 |
Minor |
Right shoulder closed, all lanes open |
08/16/10 10:00 PM |
09/03/10 11:59 PM |
Illinois Tollway |
Barrier Wall Repair |
| Exit to NB Farnsworth Ave
|
120.3 |
Minor |
Ramp work, possible width reduction |
09/02/10 08:00 AM |
09/02/10 04:00 PM |
Illinois Tollway |
Right side of ramp closed |
| at Dixon Plaza
|
56.4 |
Medium |
Various lanes closed |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
All ORT lanes closed, all cash lanes open. |
| Stevenson NB (Illinois) |
| County Line Rd to Lake Shore Dr
|
276.4 to 293.8 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Dan Ryan Expy to Lake Shore Dr
|
292.5 to 293.8 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Stevenson SB (Illinois) |
| Lake Shore Dr to Dan Ryan Expy
|
293.9 to 292.5 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Lake Shore Dr to County Line Rd
|
293.9 to 276.4 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Entrance from SB I-294
|
277.5 |
Medium |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Right ramp lane closed |
| County Line Rd to I-80
|
276.4 to 250.3 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:30 PM |
IDOT |
Moving Operation |
| County Line Rd to IL-113
|
276.4 to 235.7 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Tri-State NB/WB (Illinois) |
| I-88 Tri-Level Bridge to Butterfield Rd
|
31.0 to 31.4 |
Major |
Right two lanes closed, two lanes open |
08/01/10 06:00 AM |
09/15/10 10:00 PM |
Illinois Tollway |
|
| I-88 Tri-Level Bridge to Butterfield Rd
|
31.0 to 31.4 |
Minor |
Right shoulder closed, all lanes open |
08/16/10 05:00 AM |
09/29/10 11:59 PM |
Illinois Tollway |
Bridge work; Right side ramp shoulder of CD Road closed leading to Butterfield Rd |
| Rand Rd to Willow Rd
|
44.0 to 48.3 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 06:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
Barrier Wall Repair, Ditch Excavation, Fence Work, Shoulder Work |
| Deerfield Rd to Half Day Rd
|
24.3 to 21.9 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Buckley Rd to Stearns School Rd
|
13.8 to 7.6 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Exit to EB & Wb IL-120
|
11.5 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Entrance from Milwaukee Ave
|
9.7 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Entrance from EB & Wb IL-132
|
8.9 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Exit to EB & Wb IL-132
|
8.4 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Tri-State SB/EB (Illinois) |
| WI-50 to WI-IL State Line
|
|
Medium |
Left lane closed, two lanes open |
03/19/10 07:00 AM |
12/31/10 11:59 PM |
WisDOT |
|
| Exit to EB & Wb IL-132
|
8.3 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Entrance from EB & Wb IL-132
|
8.1 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Exit to (IL-21) Milwaukee Ave
|
9.8 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Entrance from EB & Wb IL-120
|
11.5 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Stearns School Rd to Buckley Rd
|
7.5 to 13.8 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 07:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Deerfield Rd to Edens Spur Ramp
|
24.3 to 52.9 |
Medium |
Left lane closed, three lanes open |
07/12/10 08:00 PM |
12/12/10 10:00 PM |
Illinois Tollway |
Pavement repair |
| Willow Rd to Rand Rd
|
48.3 to 44.0 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 06:00 AM |
09/02/10 05:00 PM |
Illinois Tollway |
Barrier Wall Repair, Ditch Excavation, Fence Work, Shoulder Work |
| Exit to WB I-190
|
40.8 |
Medium |
Various lanes closed |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Right cash lane closed |
| Ramp from SB I-294 to WB IL-19
|
39.1 to 39.0 |
Medium |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Left side of ramp closed |
| Electric Ave to I-88 Tri-Level Bridge
|
31.7 to 31.0 |
Medium |
Center two lanes closed, two lanes open |
08/27/10 05:00 AM |
09/29/10 11:59 PM |
Illinois Tollway |
|
| Entrance from EB I-88
|
28.8 |
Minor |
Left lane closed, one lane open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Mile-Long Bridge to IL-171
|
21.0 to 20.5 |
Medium |
Left lane closed, three lanes open |
09/02/10 08:30 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Halsted St to Union Pacific Rr
|
2.7 to 2.7 |
Medium |
Right lane closed, two to five lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| US-41 NB (Illinois) |
| Entrance from NB Skokie Rd
|
33.9 |
Minor |
Ramp work, possible width reduction |
09/02/10 07:00 AM |
09/02/10 03:30 PM |
IDOT |
|
| Dundee Rd to Tollway Spur
|
30.1 to 29.9 |
Medium |
Right lane closed, two or three lanes open |
07/07/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
One lane open on spur |
| Exit to IL-132
|
10.0 |
Minor |
All lanes and shoulders open |
06/01/10 07:00 AM |
12/31/11 11:59 PM |
IDOT |
Max Length 50 Ft |
| US-41 SB (Illinois) |
| Exit to SB Skokie Rd
|
33.8 |
Minor |
Ramp work, possible width reduction |
09/02/10 07:00 AM |
09/02/10 03:30 PM |
IDOT |
|
| Veterans (North-South) NB (Illinois) |
| Ogden Ave to I-88
|
19.6 to 20.1 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Butterfield Rd to 22nd St
|
22.6 to 23.4 |
Minor |
Both shoulders closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Butterfield Rd to Fullerton Ave
|
22.7 to 28.9 |
Medium |
Left lane closed, two lanes open |
09/02/10 10:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Fullerton Ave to Army Trail Rd
|
28.9 to 29.8 |
Minor |
Right shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 04:00 PM |
Illinois Tollway |
|
| Veterans (North-South) SB (Illinois) |
| Army Trail Plaza to Roosevelt Rd
|
29.0 to 24.6 |
Medium |
Right lane closed, two lanes open |
06/14/10 05:00 AM |
09/03/10 11:59 PM |
Illinois Tollway |
Pavement Repair
|
| Fullerton Ave to Butterfield Rd
|
28.9 to 22.6 |
Medium |
Center lane closed, two lanes open |
09/01/10 08:00 PM |
09/02/10 05:00 PM |
Illinois Tollway |
|
| Butterfield Rd to Ogden Ave
|
22.7 to 19.6 |
Medium |
Right lane closed, two or three lanes open |
09/02/10 08:30 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Entrance from WB I-88
|
20.8 |
Medium |
Right lane closed, one lane open |
09/02/10 08:30 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| Ogden Ave to Bnsf Rr
|
19.5 to 19.1 |
Minor |
Left shoulder closed, all lanes open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
|
| 71st St to 75th St
|
16.1 to 15.5 |
Medium |
Right lane closed, two lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| Entrance from 75th St
|
16.6 |
Minor |
Ramp work, possible width reduction |
09/02/10 06:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
Left side of ramp closed |
| 75th St to Boughton Rd Plaza
|
15.6 to 14.3 |
Major |
Right two lanes closed, two lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| Chicago (Illinois) |
| IL-19 (Irving Park Rd) at Ravenswood Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Repairs |
| IL-19 from Judd Ave to IL-171
|
|
Medium |
Various lanes closed |
09/02/10 07:00 AM |
09/02/10 04:30 PM |
ComCenter |
Lane restrictions for Roadway improvements |
| IL-50 (Cicero Ave) from 46th St to Marquette (67th St)
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Resurfacing, pavement striping |
| WB IL-72 ( Higgins Ave) at I-90 Eb IL-43 Exit
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Bridge deck overlay and joint repair |
| NB & Sb Laramie Ave from Roosevelt Rd to Lexington St
|
|
Medium |
All lanes and shoulders closed |
04/19/10 09:00 AM |
10/31/11 04:00 PM |
Chicago DOT |
REDIRECT ALL TRUCK AND VEHICULAR TRAFFIC VIA LARAMIE,
CENTRAL, HARRISON AND BACK TO LARAMIE. |
| 111th St at I-57
|
|
Medium |
All lanes and shoulders closed |
04/01/10 09:00 AM |
10/31/10 04:00 PM |
Chicago DOT |
Detour: 111th - Haltsed - 115th - Vincennes - 111th |
| 26th St at Bridge Over Franklin Connector
|
|
Medium |
All lanes and shoulders closed |
05/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Removal and replacement of bridge carrying 26th St and I-55 Frontafge Road B over Franklin Connector |
| 97th St at Parnell Ave
|
|
Major |
All lanes and shoulders closed |
08/30/10 06:00 AM |
09/04/10 11:59 PM |
Chicago DOT |
Full closure for rr repair. Detour EB 97th to NB Halsted to EB 10/12 (95th St0 to SB Wentworth back to 97th St. Detour WB 97th to NB Wentworth to WB Us-12/20 (95th) to SB Halsted back to 97th. |
| Addison St at Bosworth
|
|
Medium |
All lanes and shoulders closed |
01/19/10 07:00 AM |
09/30/10 11:59 PM |
ComCenter |
Detour Addison-Clark-Irving Park-Ashland-Addison |
| Ashland Ave from Lake St to Fullerton Ave
|
|
Medium |
Various lanes closed |
05/24/10 07:00 PM |
09/30/10 11:59 PM |
Other |
Traffic signal interconnect |
| Balmoral Ave at Ravenswood Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks stored behind barricades for Metra RR Bridge work, maintian two lanes 4p-8a |
| Balmoral Ave from Winchester Ave to Wolcott Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Repairs |
| Bryn Mawr Ave at Talcott Ave
|
|
Medium |
Right shoulder closed, all lanes open |
04/01/10 06:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Barricade for new construction on Sayre/I-90 bridge |
| SB Canal St from 300 to 360 N Canal
|
|
Medium |
All lanes and shoulders closed |
09/02/10 07:00 PM |
09/03/10 06:00 AM |
Chicago DOT |
DETOUR: SB CANAL TO KINZIE TO CLINTON TO FULTON TO CANAL.
NB CANAL TO FULTON TO CLINTON TO KINZIE. |
| Central Ave from 63rd St to 47th St
|
|
Medium |
Various lanes closed |
08/18/10 06:00 AM |
10/10/10 11:59 PM |
IDOT |
Resurfacing |
| SB Cicero Ave At at 4600 To 4699 S. Cicero Ave
|
|
Medium |
Various lanes closed |
06/01/10 06:00 AM |
11/19/10 11:59 PM |
Chicago DOT |
WILL MAINTAIN AT LEAST TWO LANES OF NORTHBOUND TRAFFIC
FROM 6 AM TO 9 AM AND AT LEAST TWO LANES OF SOUTHBOUND
TRAFFIC FROM 3 PM TO 9 PM.
SUNDAY THRU THURSDAY NIGHT, 9:00 PM TO 6:00 AM,
FRIDAY NIGHT FROM 10:00 PM TO 8:00 AM
SATURDAY NIGHT FROM 7:00 PM TO 8:00 AM,
|
| WB Congress Pky from State St to Wells St
|
|
Medium |
Various lanes closed |
06/22/10 06:00 AM |
10/21/10 06:00 AM |
Chicago DOT |
|
| Ramp from EB Congress Pky to Franklin St
|
|
Medium |
All lanes and shoulders closed |
06/18/10 09:00 PM |
10/31/12 11:59 PM |
IDOT |
*Long Term Closure until 10/31/12* |
| Cottage Grove Ave from 92nd St to 83rd St
|
|
Medium |
Various lanes closed |
06/25/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Expect lane restrictions for patching, milling and resurfacing. One lane closed. |
| WB Devon Ave from Newcastle Ave to Newark Ave
|
|
Minor |
All lanes and shoulders closed |
06/07/10 07:00 AM |
09/07/10 11:59 PM |
Chicago DOT |
One lane EB maintained at all times |
| Devon Ave from US-14 (Caldwell Ave0 to Central Ave
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Patching and resurfacing |
| Eb/wb 130th St at Indiana Ave
|
|
Minor |
All lanes and shoulders open |
06/11/10 07:00 AM |
12/31/11 11:59 PM |
IDOT |
13 Ft - 6 In Max wid, legal length loads only |
| Eb/wb IL-19 (Irving Park Rd) from Ravenswood Ave to US-41 (Nb Lake Shore Dr)
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing |
| Eb/wb Lawrence Ave from Ravenswood Ave to Hermitage Ave
|
|
Medium |
Various lanes closed |
06/25/10 06:00 AM |
09/30/10 06:00 AM |
Chicago DOT |
EB Curb and traffic lanes closed, one lane in each direction maintained at all times. |
| Foster Ave at Wolcott Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Work |
| Franklin St from Harrison St to Van Buren St
|
|
Medium |
All lanes and shoulders closed |
06/18/10 12:01 AM |
12/31/11 11:59 PM |
Chicago OEMC |
Wacker Interchange Project |
| Franklin Street Bridge at Chicago River
|
|
Major |
All lanes and shoulders closed |
09/02/10 09:30 AM |
09/02/10 02:30 PM |
Chicago DOT |
Bridge and sidewalks closedto traffic and pedestrians during anchor column shim pack replacement |
| Grace St at Ravenswood Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Work |
| NB Hermitage Ave from 4459 to 4499 N Hermitage Ave
|
|
Medium |
Various lanes closed |
07/29/10 06:00 AM |
09/30/10 11:59 PM |
Chicago DOT |
One NB Lane will be open during non-work hours |
| Jackson Blvd at Canal St
|
|
Medium |
Various lanes closed |
08/26/10 06:00 AM |
09/24/10 07:00 PM |
Chicago DOT |
On lane EB and one lane NB maintained during sewer work |
| Lake St from Elizabeth St to Ashland Ave
|
|
Medium |
All lanes and shoulders closed |
01/27/10 07:00 AM |
12/31/10 11:59 PM |
Chicago DOT |
EB Detour Lake - Ashland - Washington - Halsted, WB Detour - Lake - Halsted - Randolph - Ashland. WB Detour stays in place for duration of project.-9/2011 |
| Lake St from Halsted St to Ashland Ave
|
|
Medium |
Various lanes closed |
07/05/10 07:00 AM |
12/31/10 11:59 PM |
Chicago DOT |
WB Lake St Closed. One EB lane maintained at all times. |
| Lawrence Ave at I-90
|
|
Medium |
Various lanes closed |
04/01/10 09:00 AM |
10/31/10 04:00 PM |
Chicago DOT |
Reconstruction of Lawrence Ave bridge over I-90. One lane of traffic open in each direction. More information |
| Lawrence Ave at Winchester Ave
|
|
Minor |
All lanes and shoulders closed |
09/02/10 09:00 AM |
09/02/10 04:00 PM |
Chicago DOT |
Bridge rebuilding activities daily. Detour: EB Lawrence-Damen-Wilson-Ashland-Lawrence, WB Lawrence-Ashland-Wilson-Damen-Lawrence |
| Leland Ave at Ravenswood Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Repairs |
| Loomis St from Lake St to Ogden Ave
|
|
Medium |
All lanes and shoulders closed |
01/27/10 07:00 AM |
12/31/10 11:59 PM |
Chicago DOT |
|
| NB Lower Wacker Dr from Van Buren St to Lake St
|
|
Medium |
All lanes and shoulders closed |
04/05/10 06:00 AM |
11/01/10 11:59 PM |
IDOT |
Closed to Thru traffic |
| SB Lower Wacker Dr from Lake St to Van Buren St
|
|
Medium |
All lanes and shoulders closed |
04/05/10 07:00 AM |
11/01/10 11:59 PM |
IDOT |
Long term closure until 11/1/10 |
| Marquette Dr from Stony Island Ave to Richards Dr
|
|
Minor |
Various lanes closed |
06/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Bike path paving and tree planting |
| Montrose Ave at Wolcott Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Work |
| Morgan St from Randolph St to Fulton Market
|
|
Medium |
Various lanes closed |
07/07/10 07:00 AM |
12/31/10 11:59 PM |
Chicago DOT |
One SB lane only |
| NB N Ravenswood Ave from Leland Ave to Lawrence Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction trucks/materials stored behind barricades for Metera RR bridge work. Maintain one lane NB at all times on East side. |
| SB N Ravenswood Ave at Balmoral Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks stored behind barricade on W side of tracks for Metra RR Bridge rebuild |
| NB N Ravenswood Ave at Winnemac Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks sored behind barricades on east side of tracks for Metra RR Bridge work |
| SB N Ravenswood Ave at Sunnyside Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks stored behind barricades on west side of tracks for Metra RR Bridge work |
| NB Nagle Ave from 5700 to 5731 N Nagle Ave
|
|
Major |
All lanes and shoulders closed |
08/23/10 06:00 AM |
09/03/10 06:00 AM |
Chicago DOT |
U.P. RR Grade Crossing Repairs
DETOUR: SB Nagle to S/EB NW Hwy to WB Bryn Mawr to SB Nagle
NB Nagle to EB Bryn Mawr to N/WB NW Hwy to NB Nagle |
| NB Nagle Ave from 5700 to 5718 N. Nagle Ave
|
|
Major |
All lanes and shoulders closed |
08/23/10 06:00 AM |
09/03/10 06:00 AM |
Chicago DOT |
U.P.R.R. GRADE CROSSING REPAIRS
DETOUR: S.B. NAGLE TO S/E.B. NORTHWEST HIGHWAY TO W.B. BRYN
MAWR TO S.B. NAGLE.
N.B. NAGLE TO E.B. BRYN MAWR TO N/W.B. NORTHWEST HWY. TO
N.B. NAGLE.
|
| Nb/sb Humboldt Dr from Division St to IL-64 (North Ave)
|
|
Medium |
Left lane closed, one lane open |
08/23/10 07:00 AM |
10/23/10 11:59 PM |
Chicago DOT |
Traffic calming test. One travel lane in each direction and center pedestrian island/turn lane tested instead of two lanes in each direction |
| Nb/sb Western Ave from 87th St to 91st St
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Drainage improvements, storm sewers |
| Ogden Ave from Lake St to Lake St
|
|
Medium |
Various lanes closed |
01/27/10 07:00 AM |
12/31/10 11:59 PM |
Chicago DOT |
One lane in each direction will be maintained after March 15 |
| Pershing Rd (39th St) from Ashland Ave to Dr Martin L King Jr Dr
|
|
Medium |
Various lanes closed |
05/04/10 07:00 AM |
10/16/10 11:59 PM |
IDOT |
Expect lane restrictions for patching, milling and resurfacing. |
| SB Ravenswood Ave from Lawrence Ave to Leland Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction material/trucks stored behind barricades for Metra RR Bridge work. Maintain one lane NB at all times on West side of tracks. |
| SB S Peoria St from 76th St to 76th St
|
|
Medium |
Various lanes closed |
08/02/10 06:00 AM |
10/01/10 11:59 PM |
Chicago DOT |
PARTIAL ROAD CLOSURE FOR THE PURPOSE OF BRIDGE
STRUCTURE REPAIR WORK.
MAINTAIN 1 LANE IN EACH DIRECTION AT ALL TIMES. |
| Sayre Ave at I-90
|
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Bridge superstructure replacement |
| Sunnyside Ave at Winchester Ave
|
|
Medium |
Right lane and right shoulder closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks stored behind barricades to rebuild Metra RR bridge Two way traffic maintained 4p-8a |
| Torrence Ave at Grand Calumet River
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Bridge repair |
| Ramp from EB W Congress Pky to NB S Franklin St
|
|
Medium |
All lanes and shoulders closed |
06/18/10 12:01 AM |
12/31/11 11:59 PM |
Chicago OEMC |
Wacker Inerchange Project |
| EB W Van Buren St at Clinton St
|
|
Medium |
All lanes and shoulders closed |
02/02/10 09:00 AM |
12/31/10 11:59 PM |
Chicago OEMC |
EB Van Buren closed at Clinton until further notice. |
| Washington St at Chicago River
|
|
Medium |
Various lanes closed |
08/10/10 07:00 AM |
11/30/10 11:59 PM |
Chicago DOT |
Enclosure for bridge painting, one lane and sidewalk closed. |
| Wilson Ave at Winchester Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Metra RR Bridge Repair |
| Winnemac Ave at Ravenswood Ave
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
Chicago DOT |
Construction materials/trucks stored behind barricade |
| DuPage County (Illinois) |
| US-34 (Ogden Ave) from Beaumont Dr to Raymond Dr
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
06/30/11 11:59 PM |
IDOT |
Resurfacing, striping |
| US-34 ( Ogden Ave) at Dupage River
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Bridge overlay and joint repair |
| IL-19 ( Irving Park Rd) at Meacham Creek
|
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
09/30/10 11:59 AM |
IDOT |
Premoval of existing structure and replacement |
| IL-56 (Butterfield Rd) from Ej&e Rr to Naperville Rd
|
|
Minor |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Tree removal along roadway |
| IL-56 ( Butterfield Rd) from Kautz Rd to IL-59
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| IL-59 at .66 Mi South Of IL-64 (North Ave)
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Bridge painting |
| IL-59 at North Of IL-38 (Roosevelt Rd0
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Bridge paintine |
| IL-64 from I-290 to IL-83
|
|
Minor |
All lanes and shoulders open |
06/01/10 07:30 AM |
12/31/11 11:59 PM |
IDOT |
Closed as Thru Route |
| IL-83 at Plainfield Rd
|
|
Minor |
Various lanes closed |
06/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Lighting |
| IL-83 from IL-64 to IL-56
|
|
Medium |
Various lanes closed |
06/07/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lane restrictions for patching, milling, and resurfacing |
| IL-83 from IL-64 to Washington St
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Resurfacing |
| IL-83 from Washington St to IL-56
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Resurfacing |
| 22nd St at Jorie Blvd
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
08/31/11 11:59 PM |
IDOT |
Traffic signal modernization |
| 22nd St at Mcdonalds Dr
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
08/31/11 11:59 PM |
IDOT |
Traffic signal modernization |
| EB 71st St at Hudson St (1425 E. 71st St)
|
|
Major |
All lanes and shoulders closed |
08/25/10 08:00 AM |
09/15/10 04:00 PM |
Chicago DOT |
EMERGENCY SEWER REPAIRS;
DETOUR: EB 71ST STREET TO S/EB S. SOUTH CHICAGO TO EB 75TH
STREET TO NB STONEY ISLAND TO EB 71ST STREET. |
| 75th St from Olympus Dr to Oxford Ln
|
|
Medium |
Various lanes closed |
01/02/09 07:00 AM |
06/30/11 11:59 PM |
Other |
Widen to three lanes in each direction |
| 75th St at Washington St
|
|
Medium |
Various lanes closed |
05/01/09 07:00 AM |
05/31/11 11:59 PM |
IDOT |
Reduced from four lanes to one lane in each direction. Expect delays |
| 83rd St from 3132 to 3299 E. 83rd St
|
|
Medium |
Various lanes closed |
07/27/10 06:00 AM |
11/30/10 11:59 PM |
Chicago DOT |
street restrictions (adhering to rush hour restrictions) due to resurfacing. |
| Addison Ave from IL-64 (North Ave) to St Charles Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Resurfacing |
| Army Trail Blvd from US-20 to Mill Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, new water main, sidewalks |
| Batavia Rd from IL-56 to IL-59
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Resurfacing |
| Bloomingdale Rd from Brandon Rd to IL-64 (North Ave)
|
|
Medium |
Various lanes closed |
06/02/10 06:00 AM |
09/10/10 11:59 PM |
Other |
Pavement maintenance |
| Church St at Up Rr
|
|
Medium |
Various lanes closed |
07/01/09 07:00 AM |
05/31/12 11:59 PM |
IDOT |
Pedistrian tunnel |
| Devon Ave from IL-53 (Rohlwing Rd) to IL-83 (Busse Rd)
|
|
Medium |
Various lanes closed |
05/17/10 07:00 AM |
09/15/10 11:59 PM |
Other |
Patch or replace concrete |
| Eb/wb 22nd St from IL-56 to IL-83
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Widening to add additional lanes, traffic signal modernization |
| Garfield Ave from Chicago Ave to 55th St
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
11/30/11 11:59 PM |
IDOT |
Resurfacing, storm sewer |
| Jefferson Ave at Dupage River
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Bridge replacement and roadway reconstruction, landscaping |
| Jewell Rd from Winfield Rd to High Lake Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Crack control treatment, striping |
| Joliet St from IL-59 to Geneva St
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, crack control, detectable warnings |
| Liberty St from Church St to Street End
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Crack control treatment, striping |
| Manchester Rd at Wesley St (Up Rr Bridge)
|
|
Medium |
Various lanes closed |
10/01/09 07:00 AM |
10/31/10 11:59 AM |
IDOT |
New bridge and raodway reconstruction |
| Mill Rd from US-20 to Army Trail Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, new water main, sidewalk |
| Nb/sb Arbor Ave from Washington St to Hawthorne Ln
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
11/30/10 08:55 PM |
IDOT |
Resurfacing and patching |
| Nb/sb IL-59 at IL-38
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Bridge painting |
| Nb/sb Main St from St Charles Rd to IL-64 (North Ave)
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
11/30/10 08:55 PM |
IDOT |
Resurfacing and utlity structure repairs |
| Ogden Ave (US-34) at IL-53
|
|
Medium |
Various lanes closed |
05/03/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. Four lanes closed, expect delays. |
| Powis Rd from IL-64 (North Ave) to Smith Rd
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Surface removal and resurfacing |
| Prospect Ave from Granville Ave to Washington St
|
|
Medium |
Various lanes closed |
06/02/10 06:00 AM |
09/10/10 11:59 PM |
Other |
Pavement Maintenance |
| Riford Rd from Crescent Blvd to St Charles Rd
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Reconstruction, water main |
| Schmale Rd from Willow Wood Dr to IL-64
|
|
Medium |
Various lanes closed |
06/02/10 06:00 AM |
09/10/10 11:59 PM |
Other |
Pavement Maintenance |
| St Charles Rd from Poplar Ave to York St
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Resurfacing |
| St Charles Rd from IL-53 to Grace St
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Pavement patchign, resurfacing, drainage |
| St Charles Rd at Riford Rd
|
|
Minor |
Various lanes closed |
06/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Traffic signal modernization |
| Wesley St at Up Rr
|
|
Medium |
Various lanes closed |
10/01/09 07:00 AM |
10/31/10 11:59 AM |
IDOT |
New bridge and new roadway reconstruction |
| Winfield Rd from Garys Mill Rd to Highlake Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Crack control treatment, striping |
| York Rd at IL-38
|
|
Medium |
Various lanes closed |
07/12/10 07:00 AM |
09/24/10 11:59 PM |
IDOT |
Bridge joint repair (bridge carrying York over IL-38) and concrete deck overlay |
| Henry County (Illinois) |
| IL-78 at IL-81 (6th St)
|
|
Medium |
Various lanes closed |
10/23/09 07:00 AM |
12/31/11 11:59 PM |
IDOT |
Max length for all turns 90 Ft long |
| IL-82 from W.5 Mi N Of US-6 to I&m Canal
|
|
Medium |
Various lanes closed |
04/05/10 07:00 AM |
11/24/10 11:59 AM |
IDOT |
Traffic restricted to one lane, controlled by temporary traffic signals. Max Wid 12 Ft |
| IL-82 from 3 Mi S Of IL-92 to Elks Branch
|
|
Medium |
Various lanes closed |
04/29/10 07:00 AM |
09/30/10 11:59 AM |
IDOT |
Traffic restricted to one lane and controlled by temporary signals, Mas Wid 10 Ft 6 IN 4/5 to 9/24 |
| IL-82 at Elks Branch
|
|
Medium |
Various lanes closed |
03/29/10 07:00 AM |
09/30/10 11:00 PM |
IDOT |
Max Width: 10' 6" effective 4/5/2010 - 9/24/2010; Traffic regulated by temp signals |
| IL-82 at Hennepin Canal
|
|
Minor |
Various lanes closed |
04/05/10 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Traffic reduced to one lane, regulated by temporary traffic signals. Max width 12'0" |
| IL-84 at Rock River
|
|
Medium |
Various lanes closed |
08/23/10 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Traffic reduced to one lane and separated from work by barrier wall, Max Wid 14 Ft |
| Jo Daviess County (Illinois) |
| US-20 from Barge Terminal Rd to Menominee Rd
|
|
Medium |
Various lanes closed |
05/17/10 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Beginning 5/17, lane closures preparatory to closing EB lanes. After 6/1, traffic reduced to one lane in each direction, separated by barrier wall on WB pavement. Local access and temporary signals at Main St., Max Wid 12 Ft 6 In |
| US-20 at Camillus Rd
|
|
Medium |
Various lanes closed |
07/01/10 06:00 AM |
11/24/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements |
| US-20 from Galena Oaks Dr to Logemann Rd
|
|
Medium |
Various lanes closed |
08/12/10 07:00 AM |
10/15/10 11:59 PM |
IDOT |
Milling, pavement repairs and re-surfacing. Traffic directed by flaggers. |
| NB IL-78 from Carroll County Line to US-20
|
|
Medium |
Various lanes closed |
08/10/09 07:00 AM |
11/25/10 11:59 PM |
IDOT |
At one structure traffic regulated with signals and separated from work by barrier wall, other structures regulated by flaggers. Max wid 9 Ft 6 In |
| SB & Nb IL-78 from Meyer Rd to Greenvale Rd
|
|
Medium |
Various lanes closed |
05/03/10 07:00 AM |
09/30/10 07:00 PM |
IDOT |
11'-6" - Maximum Width; Traffic will be reduced to one lane regulated by temporary traffic signals. Traffic will be separated from work with barrier wall. |
| Kane County (Illinois) |
| US-20 from West Union Rd to IL-47
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/11 11:59 PM |
IDOT |
|
| US-20 (Ulysses S Grant Memorial Hwy) from IL-47 to Getty Rd
|
|
Medium |
Various lanes closed |
06/21/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements |
| US-30 from Albright Rd to Kendall County Line
|
|
Medium |
Various lanes closed |
08/02/10 07:00 AM |
09/02/10 11:59 PM |
IDOT |
Patching, milling and resurfacing. |
| US-30 at Welch Creek
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Bridge Deck Overlay. Traffic restricted to one lane and controlled by temporary traffic signals. Max width 10 feet 6 inches. |
| IL-25 from Chicago Central And Pacific Rr to Brewster Creek
|
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
05/31/11 11:59 PM |
IDOT |
Resurfacing |
| IL-25 at Stearns Rd
|
|
Minor |
Various lanes closed |
06/18/09 07:00 AM |
05/30/11 11:59 PM |
IDOT |
Lane restrictions. Max Wid 9 Ft 6 in |
| IL-25 (Broadway) from North Ave to Illinois Ave
|
|
Medium |
Various lanes closed |
07/31/10 11:59 PM |
12/31/10 07:00 AM |
IDOT |
Traffic signal interconnect installation |
| IL-25 from Gilbert St to Dunham Rd
|
|
Medium |
Various lanes closed |
05/05/10 07:00 PM |
11/01/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| IL-25 (5th Ave) at 0.1 Mi North Of IL-64
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Bridge deck overlay and joint repair |
| IL-31 at Mclean Blvd
|
|
Medium |
Various lanes closed |
08/01/09 07:00 PM |
05/31/11 11:59 PM |
IDOT |
Pavement widening, railroad bridge and track, sidewalk, landscaping |
| IL-31 at New Stearns Rd
|
|
Medium |
Various lanes closed |
08/01/09 07:00 PM |
05/31/11 11:59 PM |
IDOT |
Pavement widening, rorailroad bridge and track sidewalk, landscaping |
| IL-31 from Old Indian Trl to Gale St
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Installation of interconnect system |
| IL-31 from IL-56 to New York St
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/11 11:59 PM |
IDOT |
Resurfacing |
| IL-31 at N & S Of Rathbone Ave
|
|
Medium |
All lanes and shoulders closed |
08/16/10 07:00 AM |
09/03/10 11:59 PM |
IDOT |
Road closed for RR crossing repairs |
| IL-64 from Campton Hills Dr to IL-47
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| WB Algonquin Rd from Royal Way to IL-25
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Traffic signals, rumble strips, pavement markings |
| Ash St from Aspen Ln to Robin Rd
|
|
Medium |
All lanes and shoulders closed |
05/10/10 07:00 AM |
11/30/10 11:59 PM |
Other |
Complete roadway reconstruction, closed except local traffic |
| Base Line Rd from Orchard to Existing Baseline Rd
|
|
Medium |
Various lanes closed |
11/01/09 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Extend Baseline Rd from existing Baseline Rd terminaton to Orchard Rd. |
| Damisch Rd at Tyler Creek
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Bridge and guardrail repair |
| Eb/wb IL-72 from French Rd to Dekalb County Line
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| Galena Blvd from IL-31 (Lake St) to Ohio St
|
|
Minor |
Various lanes closed |
06/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Traffic isgnals and interconnect work |
| Galena Blvd from IL-47 to IL-56
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| Helm Rd from IL-25 to Keele Dr
|
|
Medium |
Various lanes closed |
05/17/10 07:00 AM |
09/30/10 11:59 PM |
Other |
|
| Hickory Dr from Birch St to Robin Rd
|
|
Medium |
All lanes and shoulders closed |
05/10/10 07:00 AM |
11/30/10 11:59 PM |
Other |
Complete roadway reconstruction, Roadways closed to all bye local traffic |
| Indian Trl from Church Rd to Farnsworth Ave
|
|
Medium |
Various lanes closed |
11/02/09 07:00 AM |
11/20/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements |
| Nb/sb IL-31 from Horne St to Wildrose Springs Dr
|
|
Medium |
Various lanes closed |
08/23/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
resurfacing |
| New York St from Farnsworth to Lake St
|
|
Medium |
Various lanes closed |
08/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Interconnect system with 8 signalized intersections |
| Stearns Rd from IL-25 to Mclean Blvd
|
|
Minor |
Various lanes closed |
06/01/09 07:00 AM |
05/31/11 11:59 PM |
IDOT |
New Alignment |
| Stearns Rd from Dupage County Line to IL-25
|
|
Minor |
Various lanes closed |
08/01/09 07:00 AM |
05/31/11 11:59 PM |
IDOT |
Construction of new roadway and roadway improvements-realignment of Stearns Rd |
| Lake County (Illinois) |
| US-45 from IL-120 (Belvedere) to IL-137 (Buckley)
|
|
Medium |
Various lanes closed |
07/06/09 07:00 AM |
11/05/10 11:59 PM |
IDOT |
Lane restrictions for patching, milling, resurfacing. Max Wid 9 Ft 6 In |
| US-45 from Washington St to IL-120
|
|
Medium |
Various lanes closed |
08/16/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| US-45 ( Lake St) from Park St to IL-176
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Decorative lighting |
| IL-22 from US-12 to Quentin Rd
|
|
Medium |
Both shoulders closed, all lanes open |
09/01/09 07:00 AM |
05/31/11 11:59 PM |
IDOT |
|
| IL-59 at Squaw Creek
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Bridge deck overlay |
| IL-59 from US-12 to IL-132 (Grand)
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| IL-59 at East Of Grand Ave
|
|
Medium |
Various lanes closed |
07/12/10 07:00 AM |
09/30/10 03:00 PM |
Lake County |
Bridge repair and resurfacing
|
| IL-60/83 from Diamond Lake Rd to IL-63 (Midlothian Rd)
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Resurfacing |
| IL-83 from Petite Lake Rd to The Wisconsin-Illinois Line
|
|
Medium |
Various lanes closed |
09/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, widening, and traffic signals |
| IL-83 from Depot St to North Ave
|
|
Medium |
Various lanes closed |
05/26/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements, Max wid 8 Ft 6 In |
| IL-83 from Rollins Rd to Grand Ave
|
|
Medium |
Various lanes closed |
07/12/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| IL-83 from Rollins Rd to WI-83 (Antioch Rd)
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing |
| IL-83 from Rollins Rd to IL-137
|
|
Medium |
All lanes and shoulders open |
07/26/10 07:00 AM |
11/04/10 03:00 PM |
Lake County |
Resurfacing |
| IL-131 (Green Bay Rd) at Ej&e Rr (1.1 M South Of IL-137)
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Bridge deck overlay, bridge joint repair and superstructure repair |
| IL-131 ( Green Bay Rd) from Sheeler Ave to Sunset Ave
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Milling and resurfacing, intersection work |
| IL-137 at 7th St
|
|
Medium |
Various lanes closed |
04/01/09 07:00 AM |
12/31/10 11:59 PM |
IDOT |
Resurfacing, street lighting, landscaping |
| IL-173 from IL-131 (Green Bay Rd) to I-94
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
08/31/11 11:59 PM |
IDOT |
Resurfacing |
| IL-176 at US-41
|
|
Medium |
Various lanes closed |
03/22/10 07:00 AM |
09/03/10 11:59 AM |
IDOT |
Lane restrictions for roadway improvements over US-41 |
| IL-176 from US-41 to IL-131
|
|
Medium |
Various lanes closed |
08/03/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Expect lane restrictions for patching, milling and resurfacing. One lane closed. |
| Cemetery Rd from Washington St to Tri State Pky
|
|
Medium |
Various lanes closed |
11/01/09 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Resurfacing, traffic signals |
| Deerfield Rd from Thornmeadow Rd to Des Plaines River Trail
|
|
Minor |
Various lanes closed |
06/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Curb and Gutter, path restoration |
| Eb/wb IL-176 from Sheridan Rd to US-41
|
|
Medium |
Various lanes closed |
07/07/10 07:00 AM |
09/30/10 03:00 PM |
Lake County |
Resurfacing |
| Eb/wb Lake Cook Rd from Pfingsten Rd to Wilmot Rd
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
11/15/11 11:59 PM |
Other |
Maintain one way in each direction |
| Everett Rd at Riverwoods Rd
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
12/31/10 11:59 PM |
IDOT |
Widening, reconstruction, resurfacing, pavement markings, lighting on single-lane roundabout |
| Fairfield Rd from IL-176 to Old Mchenry Rd
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Resurfacing |
| King Dr (22nd St) from IL-131 to IL-137
|
|
Medium |
Various lanes closed |
11/01/08 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| Lotus Dr from Long Lake Dr to Golfview Dr
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
storm sewers, markings, handicp acess |
| Nb/sb IL-83 from Buffalo Grove Rd to Lake Cook Rd
|
|
Medium |
Various lanes closed |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Lake County |
Periodic daytime lane closures for roadwork |
| Nb/sb Lake St from Center St to IL-120
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, sidewalk, curb and gutter |
| Oakwood Dr from Fairfield Rd to Cedar Lake Rd
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
storm sewers, markings, handicap access |
| Old Checker Rd from Buffalo Grove Rd to Checker Dr
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, curb and gutter, sidewalk, and drainage repairs |
| Pheasant Ridge Dr from Old Rand Rd to Old Mill Grove Rd
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing, drainage, curb and gutter, patching |
| Rockland Rd from IL-131 to Sheridan Rd
|
|
Medium |
Various lanes closed |
08/03/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Expect lane restrictions for patching, milling and resurfacing. One lane closed. |
| Sheridan Rd at Buckley
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
|
| Sheridan Rd (Amstutz Expy) from IL-137 (Buckley Rd) to Ml King Jr Dr
|
|
Medium |
Various lanes closed |
08/02/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| Tri State Pky from Washington St to Centerpoint Ct
|
|
Medium |
Various lanes closed |
02/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Reconstruction of 350 feet of Tri-State Parkway |
| Washington St from Cemetery Rd to IL-21 (Milwaukee Ave)
|
|
Medium |
Various lanes closed |
02/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Widening of Washington St to five lanes, traffic signals and interconnect improvements |
| McHenry County (Illinois) |
| WB US-14 from Pine St to Rockland Rd
|
|
Medium |
Left lane closed, two lanes open |
09/02/10 08:00 PM |
09/03/10 11:59 PM |
ComCenter |
Sewer repair |
| US-14 at East Main
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
05/31/11 11:59 PM |
IDOT |
Installation of right turn lane, surface removal, resurfacin, patching, driveways, curb and gutter, driveways |
| US-20 from West Union Rd to IL-47
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/11 11:59 PM |
IDOT |
|
| US-20 (Ulysses S Grant Memorial Hwy) from Getty Rd to West Union Rd
|
|
Medium |
Various lanes closed |
06/21/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements |
| IL-47 from Kreutzer Rd to Reed Rd
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lane restrictions for patching, milling, and resurfacing, Max wid 9 Ft 6 In |
| IL-120 from Church St to Madison St
|
|
Minor |
All lanes and shoulders open |
10/08/09 06:00 AM |
12/31/10 11:59 PM |
IDOT |
Vehicle length not to exceed 150 feet |
| IL-120 at Church And Madison
|
|
Minor |
All lanes and shoulders open |
06/01/10 07:00 AM |
12/31/11 11:59 PM |
IDOT |
Man Length 150 Ft |
| Alden Rd from 700 Ft S Of IL-173 to 1800 Ft N Of IL-173
|
|
Medium |
Various lanes closed |
02/15/10 07:00 AM |
10/31/10 11:59 AM |
IDOT |
Traffic restricted to one lane controlled by temporary traffic signals. Max Wid 8 Ft 6 In at posted ton limit |
| Armory Rd from Button Rd to WI State Line
|
|
Medium |
All lanes and shoulders closed |
06/19/08 06:00 AM |
12/31/10 11:59 PM |
Other |
Hebron Creek bridge closed. Use alternate Route. |
| Pyott Rd at South Of Rakow Rd
|
|
Medium |
Various lanes closed |
06/01/09 06:00 AM |
12/20/10 11:59 PM |
IDOT |
Temporary road closures with detours posted |
| Raffel Rd from IL-120 to Banford Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing, landscaping |
| Thompson Rd at Nippersink Creek
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Bridge repairs |
| Stephenson County (Illinois) |
| US-20 at C C & P R R
|
|
Medium |
Various lanes closed |
03/29/10 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Lanes narrowed and shifted. 9'-6" Maximum width - effective 05/06/2010 through 11/24/2010 |
| IL-75 from Dakota Rd to East Of IL-70
|
|
Medium |
All lanes and shoulders closed |
03/23/10 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Follow marked detour. IL-75 closed to through traffic, IL-70 closed at intersection |
| Eb/ Wb US-20-Br from Springfield Rd to Armstrong
|
|
Medium |
Various lanes closed |
07/06/10 07:00 AM |
10/08/10 11:59 PM |
IDOT |
One lane closed in each direction |
| Suburban Cook County (Illinois) |
| Ramp from SB I-294 to WB IL-19
|
|
Medium |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Left side of ramp closed |
| US-6 (159th St) from Fisk St to Lexington Ave
|
|
Medium |
Various lanes closed |
10/01/08 07:00 AM |
05/31/11 11:59 PM |
IDOT |
Night time closures prior to 9/30/09 if needed. Full closure 9/30/09 |
| EB US-6 (159th St) from Park Ave to Center Ave
|
|
Medium |
All lanes and shoulders closed |
09/30/08 07:00 AM |
05/31/11 11:59 PM |
IDOT |
Detour posted using IL-1 (Halsted) - Sibley - Dixie |
| US-6 from IL-1 to I-294
|
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
05/31/11 11:59 PM |
IDOT |
Roadway reconstruction, lighting and traffic signal modernization, Max Wid 10 Ft 6 In, Closed Lexington to Fisk, detour between Dixie Hwy and IL-1 (Halsted St) using Sibley Blvd |
| US-6 from State St to Vincennes Rd
|
|
Medium |
Various lanes closed |
06/21/10 07:00 AM |
10/01/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed |
| US-6 (159th St) at Cal Union Ditch
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Bridge rehabilitation |
| US-6 (159th St) from Park Ave to I-294
|
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
11/30/11 11:59 PM |
IDOT |
One lane closed in each direction |
| US-6 ( 159th St) from Center Ave to IL-1 (Halsted)
|
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
11/30/11 11:59 PM |
IDOT |
One lane closed in each direction |
| US-6 (159th St) from IL-83 to I-94
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
09/03/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvement. |
| US-12/45 Mannheim Rd from Franklin Ave to Addison Ave
|
|
Medium |
Various lanes closed |
03/01/10 07:00 AM |
06/01/11 11:59 AM |
IDOT |
Lane restrictions for roadway improvements. |
| US-12/20 (95th St) from 88th Ave to 76th Ave
|
|
Minor |
Various lanes closed |
05/01/09 07:00 AM |
06/01/11 11:59 PM |
IDOT |
Street lighting |
| US-12/45 (Mannheim Rd) from Berteau to US-20(Kaje St)
|
|
Medium |
Various lanes closed |
09/02/10 07:30 AM |
09/02/10 04:30 PM |
IDOT |
Lane rewstrictions for roadway improvements |
| US-12/20/45 ( La Grange Rd) from IL-171(Archer) to I-55
|
|
Medium |
Various lanes closed |
06/21/10 07:00 PM |
10/31/10 11:59 PM |
IDOT |
Lane closures for roadway improvements |
| US-12/20/45 La Grange Rd from Crestwood Ln to 63rd St
|
|
Minor |
All lanes and shoulders open |
06/01/10 07:00 AM |
12/31/11 11:59 PM |
IDOT |
No Truck Traffic |
| US-12/20/45 (Lagrange Rd) at .9 Mi South Of I-55 (Des Plaines River- Cnrr- Im Canal Bridges)
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Bridge rehabilitation |
| US-12/20/45 at Santa Fe Drive
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Bridge rehabilitation (over Sante Fe Drive, various RR and Des Plaines River) |
| US-12/20/45 (95th St) from 88th Ave to 76th Ave
|
|
Medium |
Various lanes closed |
06/14/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Lane restrictions for roadway improvement |
| US-14 ( Caldwell Ave) at North Branch Chicago River
|
|
Medium |
Various lanes closed |
07/01/10 07:00 PM |
09/30/10 11:59 AM |
IDOT |
Bridge deck overlay and joint repair |
| US-14 ( Dempster St) at Creek 0.1 Mi E Of I-294 )
|
|
Medium |
Various lanes closed |
07/01/10 07:00 PM |
09/30/10 11:59 PM |
IDOT |
Bridge deck overlay, bridge joint repair |
| US-30 (Lincoln Hwy) at IL-394 (Bishop Ford Fwy)
|
|
Medium |
Various lanes closed |
03/01/09 06:00 AM |
10/31/10 11:59 PM |
IDOT |
Replacement of superstructure of the bridge and roadway rehabilitation of bridge carrying US-30 over IL-394 |
| US-30 (Lincoln Hwy) at IL-394
|
|
Medium |
Various lanes closed |
05/03/10 07:00 AM |
10/15/10 11:59 AM |
IDOT |
Lane restrictions for roadway improvements, Max wid 8 Ft 6 In |
| US-30 (14th St) from 1.45 M East Of IL-1 to Third Creek
|
|
Medium |
Various lanes closed |
07/19/10 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements |
| US-30 at Thorn Apple Creek
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Bridgesuperstructure replacement |
| US-30 at Butterfield Creek
|
|
Medium |
Various lanes closed |
08/23/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed |
| US-41 (Skokie Blvd) from Main St to Oakton St
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Resurfacing, curb and gutter, sidewalk repair |
| US-41 (Skokie Blvd) from Foster St to Golf Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Roadway reconstruction, lighting, traffic signals, and landscaping |
| IL-1 Halsted St from Vollmer Rd to Holbrook Rd
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| IL-1 (Halsted St) at US-6
|
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
11/30/11 11:59 PM |
IDOT |
One lane closed in each direction at intersection |
| IL-7 at Springs Creek
|
|
Minor |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Culvert rehabilitation |
| IL-19 from Kingsbury Dr to Jensen Blvd(West Of Westview Plaza Drive)
|
|
Medium |
Various lanes closed |
08/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Traffic signal modernization and lighting |
| IL-19 from Schaumburg Rd to Madison Dr
|
|
Medium |
Various lanes closed |
08/06/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Expect lane restrictions for patching, milling and resurfacing. |
| IL-43 (Waukegan Rd) from I-94 (Edens Spur) to Willow Rd
|
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
09/30/10 11:59 AM |
IDOT |
Resurfacing |
| IL-43 (Harlem Ave) from 191st St to US-6 (159th St)
|
|
Medium |
Various lanes closed |
05/01/09 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing and landscaping |
| IL-43 ( Harlem Ave) from 131st St to 119th Pl
|
|
Minor |
Various lanes closed |
05/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Sidewalks, trafic signals, retaining walls |
| IL-43 (Waukegan Rd) from Golf Rd to Willow Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| IL-43 (Harlem Ave) from 79th St to IL-7(Southwest Highway)
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Pavement patching |
| IL-43 from Willow Rd to IL-58
|
|
Medium |
Various lanes closed |
08/23/10 07:00 AM |
11/19/10 11:59 PM |
IDOT |
Lane restrictions for patching, milling and resurfacing. Two lanes closed. |
| IL-43 (Waukegan Rd) from Lake Cook Rd to Chestnut Rd
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
10/15/10 11:59 PM |
IDOT |
Resurfacing |
| IL-53 West Frontage Rd from Palatine Rd to IL-68 (Dundee Rd)
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing and pavement patching |
| IL-53 East Frontage Rd from Palatine Rd to IL-68 (Dundee Rd)
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing and pavement patching |
| IL-58 (Golf Rd) at Poplar Creek
|
|
Medium |
Various lanes closed |
12/01/09 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Precast, prestressed concrete deck beam replacement for bridge carrying IL-58 over Poplar Creek |
| IL-58 ( Golf Rd) from 1.1 Mi W Of IL-59 to Poplar Creek
|
|
Medium |
Various lanes closed |
03/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvemetns. Max Wid 9 Ft 6 IN |
| IL-58 (Dempster St) from Ferris Ave to Central Ave
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
12/31/10 11:59 PM |
IDOT |
Pavement resurfacing, patching, marking, curb and gutter, sidewalk |
| IL-62 (Algonquin Rd) at US-12/45 (Lee St)
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lighting and streetscape |
| IL-62 (Algonquin Rd) from IL-68 (Dundee Rd) to IL-25
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Traffic signals, rumble strips, pavement markings |
| IL-72 Higgins Rd at Des Plaines River
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
10/31/10 11:59 AM |
IDOT |
Bridge deck repair |
| IL-83 (147th St) at Dixie Hwy
|
|
Minor |
Various lanes closed |
07/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Traffic signal modernization |
| IL-83 (IL-50 Cicero Ave) at 127th St
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Traffic signal, extension of left turn lane |
| IL-171 (Archer Ave) from IL-83 to 104th/willow Springs Rd
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Safety improvements |
| Harvard St from Des Plaines Ave to IL-43 (Harlem Ave)
|
|
Minor |
Various lanes closed |
06/01/09 07:00 AM |
12/31/10 11:59 AM |
IDOT |
Resurfacing |
| 104th Ave from 167th St to 163rd Pl
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing, block retaining wall, guardrail, landscaping |
| 127th St from Pulaski Rd to Kedzie Ave
|
|
Medium |
Various lanes closed |
03/29/10 07:00 AM |
10/01/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvemetns. Tentative full closure second weekend in July |
| 135th St at West Of IL-50
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
09/03/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed. |
| 139th St from Crawford Ave to Coopers Grove Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing, patching |
| 147th St at East And West Of IL-50
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
09/03/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed. |
| 170th St from South Park Ave to Cottage Grove Ave
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
11/30/10 11:59 PM |
Other |
4 lane reconstruction with median |
| 55th St from Joliet Rd to East Ave
|
|
Medium |
Various lanes closed |
05/03/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed |
| 55th St from East Ave to Joliet Rd
|
|
Medium |
Various lanes closed |
05/03/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvemetns. |
| 55th St from East Ave to Joliet Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, patching |
| 71st St from Sayre Ave to IL-43 (Harlem Ave)
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Patching and pavement markings |
| 83rd St from IL-43 (Harlem Ave) to IL-50 (Cicero Ave)
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
12/31/10 11:59 PM |
IDOT |
Resurfacing, detector loop repair |
| 88th Ave from 103rd Pl to 87th St
|
|
Medium |
Various lanes closed |
05/24/10 07:00 AM |
09/30/10 11:59 PM |
Other |
2-lane bituminous reconstruction |
| Arlington Heights Rd from University Dr to Lake Cook Rd
|
|
Medium |
Various lanes closed |
05/17/10 03:00 PM |
09/20/10 04:00 PM |
Other |
4 lane reconstruction and patch or replace concrete pavement |
| Ashland Ave from 122nd St to Thornton Rd
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing and patching |
| Austin Blvd from Ogden Ave to 29th St
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Resurfacing, curb and storm sewer |
| Barrington Rd from IL-62 to I-90
|
|
Medium |
Various lanes closed |
06/21/10 11:05 AM |
09/23/10 11:05 AM |
IDOT |
Expect lane restrictions for patching, milling and resurfacing. One lane closed. |
| Bluff Ave from 47th St to Cossitt Ave
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
11/30/11 11:59 PM |
IDOT |
Resurfacing, storm sewer, water main |
| Brainard Ave at Burnham Ave
|
|
Minor |
Various lanes closed |
07/01/09 07:00 PM |
10/31/10 11:59 PM |
IDOT |
Traffic signal modernization |
| Broadway Ave from Park Ave to 151st St
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Roadway lighting system |
| Central Ave from 106th St to Foxwoods Dr
|
|
Medium |
Various lanes closed |
05/03/10 07:00 AM |
09/30/10 11:59 PM |
Other |
Patch or replace concrete pavement |
| Central Ave from 73rd St to 70th Pl
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing, sidewalks, storm sewers and sanitary sewers |
| Central Ave from 26th St to Roosevelt Rd
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
07/01/11 11:59 PM |
IDOT |
Resurfacing, traffic signal modernization |
| Central Ave from Roosevelt Rd to 26th St
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Resurfacing, signal modernization |
| Central Ave from 63rd St to 47th St
|
|
Medium |
Various lanes closed |
08/18/10 06:00 AM |
10/10/10 11:59 PM |
IDOT |
Resurfacing |
| Chicago Heights Glenwood Rd at Holbrook Rd
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Traffic signals |
| County Line Rd from Plainfield Rd to Longwood Dr
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Sidewalk, curb and gutter, drainage, and restoration |
| County Line Rd from 91st St to Ashton Dr
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
07/31/11 11:59 PM |
IDOT |
Sidewalk, curb and gutter, drainage, sod restoration |
| Crawford Ave from Oakton St to Devon Ave
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
11/30/10 11:59 PM |
Other |
4 lane reconstruction with median |
| Crawford Ave from Old Glenview Rd to Glenview Rd
|
|
Medium |
Various lanes closed |
07/01/10 07:00 PM |
09/30/10 11:59 AM |
IDOT |
Resurfacing |
| Crawford Ave from 175th St to US-6
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
09/03/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| Dempster Ave from Busse Rd to IL-83 ( Elmhurst Rd)
|
|
Medium |
Various lanes closed |
05/24/10 07:00 AM |
09/30/10 11:59 PM |
Other |
Reconstruct to existing cross section, 4 lanes with channelization |
| Dempster St at Creek .1 Mi E Of I--294
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Bridge deck overlay, bridge and joint repair |
| Dixie Hwy at Butterfield Creek
|
|
Medium |
Various lanes closed |
01/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Bridge replacement |
| Dixie Hwy from Governors Highway to US-6 (159th St)
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| Dixie Hwy at US-6
|
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
11/30/11 11:59 PM |
IDOT |
One lane closed in each direction at intersection |
| Dixie Hwy from Harwood Ave to Sycamore Dr
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Street hill infill planting, concrete paver bus stop pad, gateway monument, lighting |
| Dixie Hwy from Holbrook Rd to Flossmoor Rd
|
|
Medium |
Various lanes closed |
01/27/10 07:00 AM |
10/31/10 11:59 PM |
InDOT |
Lane restrictions for roadway improvements. Max wid 9 Ft 6 In eff 4-1-10 |
| Dolton Ave from I-94 to 142nd St
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing and patching |
| Dolton Ave from Cottage Grove Ave to I-94
|
|
Medium |
Various lanes closed |
08/09/10 07:00 AM |
09/10/10 11:59 PM |
IDOT |
Expect lane restrictions for patching, milling and resurfacing. One lane closed |
| E/w IL-53 Frontage Rds from IL-62 (Algonquin Rd) to Kirchoff Rd
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing, patching, shoulder work, landscaping, pipe underdrains |
| Eb/wb 127th St from IL-43 (Harlem Ave) to Ridgeland Ave
|
|
Medium |
Various lanes closed |
08/16/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, one lane closed |
| Eb/wb Armitage Ave from Wolf Rd to 300 Ft West Of US-12 (Mannheim Rd)
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, sidewalk, and pavement striping |
| Eb/wb Burlington Ave from Kensington Ave to Brainard Ave
|
|
Medium |
Various lanes closed |
06/01/10 07:00 PM |
06/30/11 11:59 PM |
IDOT |
Resurfacing |
| Eb/wb IL-72 ( Higgins Rd) from Bartlett Rd to Glen Lake Rd
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Resurfacing |
| Eb/wb Lake Cook Rd from Wilmot Rd to Pfingsten Rd
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
11/15/11 11:59 PM |
Other |
Maintain one way in each direction |
| Eb/wb Lake St from IL-171(First Ave) to IL-43 (Harlem Ave)
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing |
| Eb/wb Main St from State St to Illinois St
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, curb and gutter, detector loop repair |
| Eb/wb Roosevelt Rd from Austin Blvd to Harlem Ave (IL-43)
|
|
Medium |
Various lanes closed |
08/01/10 07:00 PM |
10/31/11 11:59 PM |
IDOT |
Resurfacing, street lighting |
| Governors Hwy from 175th St to Pulaski Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| Governors Hwy from US-30 to IL-50
|
|
Medium |
Various lanes closed |
05/10/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| Grand Ave at Ihb Railroad (Willow)
|
|
Medium |
All lanes and shoulders closed |
01/12/08 07:00 AM |
12/31/10 11:00 PM |
IDOT |
Road closed at Railroad |
| Grand Ave from IL-43 (Harlem Ave) to Elm St
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| Green Bay Rd from Scott Ave to 16th St
|
|
Medium |
Various lanes closed |
06/01/10 11:05 AM |
10/31/10 11:05 AM |
IDOT |
Resurfacing |
| Greenwood Ave from Oakton St to US-14 (Dempstr St)
|
|
Medium |
Various lanes closed |
05/24/10 07:00 AM |
09/30/10 11:59 PM |
Other |
Replace concrete pavement |
| Greenwood Ave from Church St to IL-58 (Golf Rd)
|
|
Medium |
Various lanes closed |
05/17/10 07:00 AM |
09/30/10 11:59 PM |
Other |
Patch or replace concrete pavement |
| Jackson Blvd from Des Plaines Ave to IL-43 (Harlem Ave)
|
|
Minor |
Various lanes closed |
06/01/09 07:00 AM |
10/31/10 11:59 AM |
IDOT |
Resuirfacing, storm sewer, lighting |
| Joe Orr Rd from Stoney Island Ave to Torrence Ave
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
11/30/10 11:59 PM |
Other |
Relocate/reconstruct new 4 lane wtih median |
| Joe Orr Rd at Chicago Rd
|
|
Minor |
All lanes and shoulders open |
07/01/09 07:00 PM |
10/31/10 11:59 PM |
IDOT |
Traffic signal modernization |
| Joe Orr Rd at Thorn Creek Bridge
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Bridge deck repairs |
| Joliet Rd from I-294 to IL-43
|
|
Medium |
Various lanes closed |
05/03/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed.
|
| Joliet Rd from IL-43 (Harlem) to I-294
|
|
Medium |
Various lanes closed |
05/03/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvemetns |
| La Grange Rd from I-55 to IL-171
|
|
Medium |
Various lanes closed |
06/21/10 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed |
| SB Laramie Ave at 700 S Laramie Ave
|
|
Medium |
Various lanes closed |
09/01/10 06:00 AM |
12/31/10 11:59 PM |
Chicago OEMC |
LOCATION: LARAMIE AVENUE VIADUCT OVERPASS BETWEEN
ROOSEVELT ROAD AND LEXINGTON STREET - - 1000 S LARAMIE
AVENUE is to be closed to traffic. |
| Lawrence Ave from Forster Ave to River Rd
|
|
Medium |
Various lanes closed |
08/16/10 07:00 PM |
09/30/10 11:59 AM |
IDOT |
Resurfacing |
| Lincoln Ave from Cottage Grove Ave to 138th St
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/28/10 11:59 PM |
IDOT |
Resurfacing |
| Mannheim Rd from Lake St (US-20) to Berteau Ave
|
|
Medium |
Various lanes closed |
06/21/10 07:00 AM |
10/15/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed. |
| Margaret St from Williams St to Thorn Creek
|
|
Medium |
Various lanes closed |
08/02/10 07:00 AM |
09/24/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. Two lanes closed. |
| Michigan City Rd from 154th St to Cottage Grove Ave
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| Miner St from Des Plaines River Rd to US-12 (Graceland)
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lighting and streetscape |
| Narragansett Ave from 87th St to 79th St
|
|
Medium |
Various lanes closed |
05/17/10 07:00 PM |
09/30/10 11:59 PM |
IDOT |
Reconstruct 2 lanes with median and parking lanes, one SB lane maintained with detour via 87th St, Harlem Ave, and 79th St |
| Nb/sb IL-7 (Wolf Rd) from 143rd St to 151st St
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing |
| Nb/sb Broadway Ave (19th Ave) from US-20 (Lake St) to Division St
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Resurfacing |
| Nb/sb Central Ave from Golf Rd to Davis St
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, patching, crack control |
| Nb/sb East Ave from Roosevelt Rd to Garfield St
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Surface removal, surface sourse, pavement patching, sidewalk |
| Nb/sb Gardner Rd from Canterbury St to Roosevelt Rd
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing, sidewalks and patching |
| Nb/sb Torrence Ave from IL-83 to 138th St
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
|
| North Palatine Frontage Rd from Kennicott Ave to IL-53
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing and pavement patching |
| Nwb/seb Vincennes from IL-1 (Halsted) to Thornton Rd
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Resurfacing |
| Oakton St at US-12/45 (Lee St)
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lighting and streetscape |
| Oakton St at Des Plaines River Rd
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lighting and streetscape |
| Oakton St at White St
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lighting and streetscape |
| Palatine Rd from 0.3 Mi W Of IL-83 to Mcdonald Creek
|
|
Medium |
Various lanes closed |
03/15/10 07:00 AM |
10/29/10 11:59 AM |
IDOT |
Lane restrictions for roadway improvements. max wid 9 FT 6 In after 4/1; concrete box culvert replacement |
| Palatine Rd from Smith St to US-14 (Northwest Highway)
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Pavement widening, sidewalk and traffic signal modernization |
| Park Ave at US-6
|
|
Medium |
All lanes and shoulders open |
06/01/09 07:00 AM |
11/30/11 11:59 PM |
IDOT |
One lane closed in each direction at intersection |
| Park Ave from I-80 to US-6
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
09/03/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed. |
| Penny Rd from IL-59 (New Sutton Rd) to Kane County Line
|
|
Medium |
Various lanes closed |
05/24/10 07:00 PM |
09/30/10 11:59 PM |
Other |
Bituminous recycling, channelization and traffic signal modification, local traffic only with ditour via Dundee Rd and New Sutton Rd |
| Ridgeland Ave from Steger Rd to Sauk Trl
|
|
Medium |
Various lanes closed |
05/10/10 07:00 AM |
09/27/10 11:59 PM |
Other |
Re-align intersection and 2-lane biruminous reconstruction with median and traffic signal installation |
| Saint Charles Rd from 5th Ave to 21st Ave
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacingm water main replacement, and landscaping |
| Sauk Trl from East End Ave to State St
|
|
Minor |
Various lanes closed |
04/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Street lights |
| Sayre Ave from 73rd St to 73rd St
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
11/30/10 11:59 PM |
IDOT |
Patching and pavement marking |
| Schaumburg Rd from Roselle Rd to Meacham Rd
|
|
Medium |
Various lanes closed |
05/17/10 03:00 PM |
09/15/10 04:00 PM |
Other |
Patch or replace concrete pavement |
| Southwest Hwy at Ridgeland Ave
|
|
Medium |
Various lanes closed |
10/01/09 06:00 AM |
06/30/11 11:59 PM |
IDOT |
Beam fabrication for struction carrying SW Hwy over the B and O Chicago Terminal Company RR and Stoney Creek |
| Southwest Hwy from 100th St to 103rd St
|
|
Medium |
Various lanes closed |
04/26/10 07:00 AM |
02/15/11 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| Southwest Hwy at Ridgeland Ave
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
06/30/11 11:59 PM |
IDOT |
Bridge replacement |
| Vincennes Rd/state/williams from I-80/I-294 to 170th St
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
11/01/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements |
| Wausau Ave at US-6
|
|
Medium |
Various lanes closed |
03/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Intersection improvements, WB/EB turn lanes, traffic signals |
| Wentworth Ave from Glenwood Lansing Rd to Ridge Rd
|
|
Medium |
Various lanes closed |
05/24/10 07:00 PM |
09/30/10 11:59 PM |
Other |
3 lane bituminous reconstruction, one lane SB traffic maintained wtih detour via Glenwood Lansing Rd, Burnham Ave, and Ridge Rd |
| Western Ave from York St to Vermont St
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Reconstruction, colored sidewalks |
| Western Ave from 127th St to 119th St
|
|
Medium |
All lanes and shoulders open |
06/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| Willow Rd at I-94
|
|
Minor |
Various lanes closed |
07/30/10 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed. |
| Wolf Rd from IL-64 to Grand Ave
|
|
Minor |
All lanes and shoulders open |
06/01/10 07:00 AM |
12/31/11 11:59 PM |
IDOT |
No Permit Loads |
| Wood St from Thornton Rd to IL-83 (Sibley)
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing and patching |
| Wood St at US-6
|
|
Medium |
All lanes and shoulders open |
06/01/09 07:00 AM |
11/30/11 11:59 PM |
IDOT |
One lane closed in each direction at intersection |
| Whiteside County (Illinois) |
| US-30 from IL-78 to Rock Creek
|
|
Medium |
Various lanes closed |
03/01/10 07:00 AM |
11/12/10 11:59 PM |
IDOT |
Traffic restricted to one lane, controlled by temporary signals. Max wid 10 Ft 6 In until 10/29/10 |
| Eb/wb US-30 from IL-84 to IL-78
|
|
Medium |
Various lanes closed |
07/05/10 06:00 AM |
10/31/10 11:59 PM |
IDOT |
LANE REDUCTION: Temporary signals will be located .8 miles east of Illinois Route 136 under the railroad structure. Remaining portion of the job will be regulated by flaggers. OVERSIZE TRUCK PERMIT: 12'-0" Max Width effective 07/05/2010 through 08/06/2010 at the Railroad Structure |
| Garden Plain Rd at US-30 /il-78
|
|
Medium |
All lanes and shoulders closed |
07/06/10 07:00 AM |
11/24/10 11:59 PM |
IDOT |
Use alternate |
| Will County (Illinois) |
| I-55 East Frontage Rd from US-30 to IL-126
|
|
Medium |
Various lanes closed |
12/02/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements |
| US-6 from Clinton to Silver Cross Hospital
|
|
Medium |
Various lanes closed |
07/07/10 07:00 AM |
12/20/10 11:59 PM |
IDOT |
Lane restrictions for patching, milling, resurfacing |
| US-30 (Lincoln Hwy) at IL-59
|
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Intersection reconstruction, new storm sewer, water main, traffic signals |
| US-30 (Lincoln Hwy) from Vancina Ln to Williams
|
|
Medium |
Various lanes closed |
06/01/10 06:00 AM |
10/31/10 11:59 PM |
IDOT |
Lane restrictions for rodway improvements |
| US-30 from Krakar Ave to I-80
|
|
Medium |
Various lanes closed |
08/30/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Lane restrictions for patching, milling and resurfacing. One lane closed. |
| US-30 (Lincoln Hwy) from IL-43 to Williams St
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Tree Removal |
| US-52/IL-53 (Chicago St) from I-80 to Doris Ave (US-52)
|
|
Medium |
Various lanes closed |
07/12/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Expect lane restrictions for patching, milling and resurfacing.. One lane closed |
| IL-1 (Dixie Hwy) at IL-394/IL-1
|
|
Medium |
Various lanes closed |
03/01/10 07:00 PM |
10/31/10 11:59 PM |
IDOT |
Intersection reconstruction, bridge removal, roise barrier |
| IL-1 at Goodenow Rd
|
|
Medium |
Various lanes closed |
03/01/10 07:00 PM |
10/31/10 11:59 PM |
IDOT |
Intersection reconstruction, bridge removal, noise barrier |
| IL-1 (Dixie Hwy) from Church Rd to Goodenow Rd
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Expect lane restrictions for patching, milling and resurfacing. One lane closed. |
| IL-7 from Farrell Rd to Lincoln
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/11 11:59 PM |
IDOT |
Resurfacing |
| IL-53 (Baltimore St) at IL-102
|
|
Minor |
Various lanes closed |
06/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Traffic signal modernization, fiber optic interconnect |
| IL-59 from US-30 to IL-126
|
|
Medium |
All lanes and shoulders open |
10/21/08 07:00 AM |
12/21/10 11:59 PM |
IDOT |
Lane restrictions with narrow lanes and lan shifts from I-55 to US-52, delays up to US-30 |
| IL-59 from Caton Farm Rd to US-30 (Lockport St)
|
|
Medium |
All lanes and shoulders open |
03/01/09 07:00 AM |
10/30/10 11:59 PM |
IDOT |
Lane restrictions |
| IL-59 from US-52 (Jefferson St) to Caton Farm Rd
|
|
Medium |
Various lanes closed |
05/15/09 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Lane restrictions. Max Wid 11 Ft |
| IL-59 from 119th St to 87th St
|
|
Medium |
Various lanes closed |
04/01/10 07:00 AM |
12/31/10 11:59 PM |
IDOT |
Storm sewers, pavement markings, electrical work |
| IL-113 from Center St to Mitchell
|
|
Medium |
All lanes and shoulders open |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Street lighting, light poles and decorative luminaires |
| IL-113 from Washington St to Grant St
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Concrete overlay and bridge repairs |
| IL-126 from Plainfield Rd to US-30
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Resurfacing |
| 191st St from 80th Ave to IL-43 (Harlem Ave)
|
|
Medium |
Various lanes closed |
09/01/10 07:00 AM |
06/30/11 11:59 PM |
IDOT |
Street light installation |
| 95th St from Plainfield-Naperville Rd to IL-59
|
|
Medium |
Various lanes closed |
09/02/10 07:00 AM |
10/28/10 11:59 PM |
IDOT |
Resurfacing, sidewalk, detector loop replacement |
| Black Rd from Prairie Ave to US-30 (Raynor)
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/11 11:59 PM |
IDOT |
Resurfacing |
| Brandon Rd at Des Plaines River
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
11/30/11 11:59 PM |
IDOT |
Bridge deck reconstruction |
| Cedar Rd from US-6 to IL-7
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
Other |
Maintenance overlay |
| Cedar Rd from Spencer Rd to US-52
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
Other |
Maintenance overlay |
| Cedar Rd at Jackson Creek
|
|
Medium |
Various lanes closed |
05/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Replacement of Cedare Rd Bridge |
| NB Division St (IL-59) at North Of Naperville Rd
|
|
Medium |
Various lanes closed |
07/26/10 07:00 AM |
11/19/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| Draper Ave from US-6 to Woodruff Rd
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/11 11:59 PM |
IDOT |
Resurfacing |
| Eb/wb IL-113 from River Rd to .2 Mi South Of Smiley Rd
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing |
| Elevator Rd from US-52 to Walsh Rd
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
Other |
Maintenance OVerlay |
| Exchange St at Independence Blvd
|
|
Medium |
Various lanes closed |
05/01/09 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Pavement widening and traffic signal installation |
| Governors Hwy from IL-50 to US-30
|
|
Medium |
Various lanes closed |
05/10/10 07:00 AM |
09/15/10 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| Kankakee St from Baltimore St to IL-102
|
|
Medium |
Various lanes closed |
08/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Widening five ft each side and resurfacing |
| Laraway Rd at Wolf Rd
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Traffic signals |
| Laraway Rd at Cherry Hill Rd
|
|
Medium |
Various lanes closed |
07/01/10 07:00 AM |
11/30/10 11:59 PM |
Other |
Widening and traffic signal installation |
| Lily Cache Ln from Schmidt Rd to IL-53 (Bolingbrook Dr)
|
|
Medium |
Various lanes closed |
10/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Widening to 2 11 Ft lanes in each direction, left turn lanes |
| Lincoln Hwy from Vancina Ln to Williams
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Temporary pavement and traffic signals |
| Nb/sb IL-1 ( Dixie Hwy) from Church Rd to IL-394
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Resurfacing |
| Raynor Ave from Buell Ave to US-52
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/11 11:59 PM |
IDOT |
Resurfacing |
| Theodore St from River Rd to IL-59
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/11 11:59 PM |
IDOT |
Resurfacing |
| Veterans Parkway from IL-53 to Crossroads Pky
|
|
Medium |
Various lanes closed |
10/01/08 06:00 AM |
11/30/10 11:59 PM |
IDOT |
One lane open in each direction. Temporary lane closures with flagmen |
| Washington St from Ej&e Rr to Briggs St
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/11 11:59 PM |
IDOT |
Resurfacing |
| Western Ave from William St to Raynor Ave
|
|
Medium |
Various lanes closed |
06/01/10 07:00 AM |
09/30/11 11:59 PM |
IDOT |
Resurfacing |
| Borman EB (Indiana) |
| Halsted St to Union Pacific Rr
|
2.7 to 2.7 |
Medium |
Right lane closed, two to five lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| at US-41
|
0.7 |
Medium |
Right lane closed, two lanes open |
09/02/10 08:47 AM |
09/02/10 11:47 PM |
InDOT |
|
| IN-53 to IN-51
|
9.9 to 15.0 |
Medium |
Various lanes closed |
08/01/10 02:00 AM |
06/30/11 11:30 PM |
InDOT |
Continued construction |
| Borman WB (Indiana) |
| IN-51 to IN-53
|
15.0 to 9.9 |
Medium |
Various lanes closed |
08/01/10 02:00 AM |
06/30/11 11:30 PM |
InDOT |
Continued construction |
| I-69 NB (Indiana) |
| IN-4 to US-20
|
140.4 to 148.0 |
Medium |
Various lanes closed |
12/08/09 07:00 AM |
11/24/10 11:59 PM |
InDOT |
Bridge reconstruction work |
| IN-4 to 200
|
140.4 to 150.4 |
Medium |
Various lanes closed |
11/01/09 12:00 AM |
10/15/10 12:00 PM |
InDOT |
Lane restrictions for bridge construction. Max Wid 12 Ft |
| I-69 SB (Indiana) |
| 200 to IN-4
|
150.4 to 140.4 |
Medium |
Various lanes closed |
11/01/09 12:00 AM |
10/15/10 12:00 PM |
InDOT |
Lane restrictions for bridge construction. Max Wid 12 Ft |
| US-20 to IN-4
|
148.0 to 140.4 |
Medium |
Various lanes closed |
12/08/09 07:00 AM |
11/24/10 11:59 PM |
InDOT |
Bridge reconstruction work |
| I-80 EB (Indiana) |
| Halsted St to Union Pacific Rr
|
2.7 to 2.7 |
Medium |
Right lane closed, two to five lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| at US-41
|
0.7 |
Medium |
Right lane closed, two lanes open |
09/02/10 08:47 AM |
09/02/10 11:47 PM |
InDOT |
|
| IN-53 to IN-51
|
9.9 to 15.0 |
Medium |
Various lanes closed |
08/01/10 02:00 AM |
06/30/11 11:30 PM |
InDOT |
Continued construction |
| at County Road 21
|
98.5 |
Medium |
Various lanes closed |
07/07/10 07:00 AM |
09/02/10 11:59 PM |
Indiana Toll Road |
One lane open each direction. Open lanes restricted to widths under 12 Ft for bridge repairs |
| I-80 WB (Indiana) |
| at County Road 21
|
98.5 |
Medium |
Various lanes closed |
07/07/10 07:00 AM |
09/02/10 11:59 PM |
Indiana Toll Road |
One lane open each direction. Open lanes restricted to widths under 12 Ft for bridge repairs |
| IN-51 to IN-53
|
15.0 to 9.9 |
Medium |
Various lanes closed |
08/01/10 02:00 AM |
06/30/11 11:30 PM |
InDOT |
Continued construction |
| I-90 EB (Indiana) |
| at Huehn St
|
4.9 |
Minor |
All lanes and shoulders open |
06/07/10 07:00 AM |
09/03/10 11:59 PM |
Indiana Toll Road |
No lane closures, 80,000 lbs. wt limit |
| at Hoffman St
|
5.7 |
Minor |
All lanes and shoulders open |
06/07/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No Lane Closures-80,000 lbs. weight limit |
| at 150th St
|
6.0 |
Minor |
All lanes and shoulders open |
07/07/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No lane closures, 80,000 lbs weight limit |
| at 149th St
|
5.9 |
Medium |
All lanes and shoulders open |
07/06/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No lane closure - 80,000 weight limit |
| at County Road 21
|
98.5 |
Medium |
Various lanes closed |
07/07/10 07:00 AM |
09/02/10 11:59 PM |
Indiana Toll Road |
One lane open each direction. Open lanes restricted to widths under 12 Ft for bridge repairs |
| I-90 WB (Indiana) |
| at County Road 21
|
98.5 |
Medium |
Various lanes closed |
07/07/10 07:00 AM |
09/02/10 11:59 PM |
Indiana Toll Road |
One lane open each direction. Open lanes restricted to widths under 12 Ft for bridge repairs |
| Exit to Broadway
|
15.6 |
Medium |
All lanes and shoulders closed |
03/08/10 07:00 AM |
09/05/10 11:59 PM |
Indiana Toll Road |
Broadway interchange reconstruction |
| Entrance from Broadway
|
15.6 |
Medium |
All lanes and shoulders closed |
03/08/10 07:00 AM |
09/05/10 11:59 PM |
Indiana Toll Road |
Broadway interchange reconstruction |
| at 150th St
|
6.0 |
Minor |
All lanes and shoulders open |
07/07/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No lane closures, 80,000 lbs weight limit |
| at 149th St
|
5.9 |
Medium |
All lanes and shoulders open |
07/06/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No lane closure - 80,000 weight limit |
| at Hoffman St
|
5.7 |
Minor |
All lanes and shoulders open |
06/07/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No Lane Closures-80,000 lbs. weight limit |
| at Huehn St
|
4.9 |
Minor |
All lanes and shoulders open |
06/07/10 07:00 AM |
09/03/10 11:59 PM |
Indiana Toll Road |
No lane closures, 80,000 lbs. wt limit |
| I-94 EB (Indiana) |
| Halsted St to Union Pacific Rr
|
2.7 to 2.7 |
Medium |
Right lane closed, two to five lanes open |
09/02/10 07:00 AM |
09/02/10 03:00 PM |
Illinois Tollway |
|
| at US-41
|
0.7 |
Medium |
Right lane closed, two lanes open |
09/02/10 08:47 AM |
09/02/10 11:47 PM |
InDOT |
|
| IN-53 to IN-51
|
9.9 to 15.0 |
Medium |
Various lanes closed |
08/01/10 02:00 AM |
06/30/11 11:30 PM |
InDOT |
Continued construction |
| I-94 WB (Indiana) |
| at CR-900N
|
43.3 to 43.3 |
Medium |
All lanes and shoulders open |
03/31/10 12:00 AM |
05/03/11 12:00 AM |
InDOT |
Rest Area closed. |
| IN-51 to IN-53
|
15.0 to 9.9 |
Medium |
Various lanes closed |
08/01/10 02:00 AM |
06/30/11 11:30 PM |
InDOT |
Continued construction |
| Indiana Toll Road (East-West) EB (Indiana) |
| at Huehn St
|
4.9 |
Minor |
All lanes and shoulders open |
06/07/10 07:00 AM |
09/03/10 11:59 PM |
Indiana Toll Road |
No lane closures, 80,000 lbs. wt limit |
| at Hoffman St
|
5.7 |
Minor |
All lanes and shoulders open |
06/07/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No Lane Closures-80,000 lbs. weight limit |
| at 150th St
|
6.0 |
Minor |
All lanes and shoulders open |
07/07/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No lane closures, 80,000 lbs weight limit |
| at 149th St
|
5.9 |
Medium |
All lanes and shoulders open |
07/06/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No lane closure - 80,000 weight limit |
| at County Road 21
|
98.5 |
Medium |
Various lanes closed |
07/07/10 07:00 AM |
09/02/10 11:59 PM |
Indiana Toll Road |
One lane open each direction. Open lanes restricted to widths under 12 Ft for bridge repairs |
| Indiana Toll Road (East-West) WB (Indiana) |
| at County Road 21
|
98.5 |
Medium |
Various lanes closed |
07/07/10 07:00 AM |
09/02/10 11:59 PM |
Indiana Toll Road |
One lane open each direction. Open lanes restricted to widths under 12 Ft for bridge repairs |
| Exit to Broadway
|
15.6 |
Medium |
All lanes and shoulders closed |
03/08/10 07:00 AM |
09/05/10 11:59 PM |
Indiana Toll Road |
Broadway interchange reconstruction |
| Entrance from Broadway
|
15.6 |
Medium |
All lanes and shoulders closed |
03/08/10 07:00 AM |
09/05/10 11:59 PM |
Indiana Toll Road |
Broadway interchange reconstruction |
| at 150th St
|
6.0 |
Minor |
All lanes and shoulders open |
07/07/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No lane closures, 80,000 lbs weight limit |
| at 149th St
|
5.9 |
Medium |
All lanes and shoulders open |
07/06/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No lane closure - 80,000 weight limit |
| at Hoffman St
|
5.7 |
Minor |
All lanes and shoulders open |
06/07/10 07:00 AM |
09/10/10 11:59 PM |
Indiana Toll Road |
No Lane Closures-80,000 lbs. weight limit |
| at Huehn St
|
4.9 |
Minor |
All lanes and shoulders open |
06/07/10 07:00 AM |
09/03/10 11:59 PM |
Indiana Toll Road |
No lane closures, 80,000 lbs. wt limit |
| LaPorte County (Indiana) |
| NEB IN-2 at Boston St
|
|
Medium |
Right lane closed, one lane open |
08/01/10 07:00 AM |
09/07/10 11:59 PM |
InDOT |
Intersection improvements |
| IN-8 at West Of IN-39
|
|
Major |
All lanes and shoulders closed |
08/01/10 07:00 AM |
11/30/11 11:59 PM |
InDOT |
Bridge reconstruction. Detour EB-S on US-421-East on IN-10,N on IN-39 back to IN-8. Detour WB South on IN-49, West on IN-10, north on US-41 back to IN-8 |
| IN-421 from US-6 (Greenway St) to US-30
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
10/15/10 11:59 PM |
InDOT |
Traffic restricted to one lane in each direction during daylight hours controlled by flaggers for asphalt resurfacing |
| Porter County (Indiana) |
| Eb/wb US-20 (Melton Rd) at IN-149
|
|
Medium |
Various lanes closed |
07/06/10 07:00 AM |
09/24/10 11:59 PM |
InDOT |
Restricted to one lane in each direction |
| Nb/sb IN-149 at US-20
|
|
Minor |
Both shoulders closed, all lanes open |
07/05/10 07:00 AM |
09/24/10 11:59 PM |
InDOT |
|
| St. Joseph County (Indiana) |
| IN-23 at IN-331
|
|
Medium |
Various lanes closed |
08/01/10 07:00 AM |
05/01/11 11:59 PM |
InDOT |
Traffic restricted to one lane ineach direction and no dedicated left turn lane |
| Kenilworth Rd at Near New US-31
|
|
Major |
All lanes and shoulders closed |
08/01/10 07:00 AM |
09/17/10 11:59 PM |
InDOT |
Detour Shively to Lake Trail |
| Lake Trl from Kenilworth Rd to Shively Rd
|
|
Major |
All lanes and shoulders closed |
08/01/10 07:00 AM |
11/05/10 11:59 PM |
InDOT |
Detour: Shively - Ironwood - Quinn - Kenilworth. |
| Miller Rd from Miami Rd to US-31
|
|
Major |
All lanes and shoulders closed |
08/01/10 07:00 AM |
11/09/10 11:59 PM |
InDOT |
Detour- US_31 south to New Road, east to Miami |
| Steuben County (Indiana) |
| US-20 at I-69
|
|
Medium |
Various lanes closed |
02/04/10 07:00 AM |
10/15/10 11:59 AM |
InDOT |
Bridge construction |
| I-94 EB (Michigan) |
| Kruger Rd to I-94-Br (Red Arrow Highway)
|
6.0 to 23.0 |
Medium |
Various lanes closed |
04/19/10 07:00 AM |
09/14/10 06:00 PM |
MDOT |
Single lane closures |
| at Britain Ave
|
31.8 |
Medium |
Various lanes closed |
08/02/10 06:00 AM |
10/31/10 10:59 PM |
MDOT |
Two lanes of traffic will be maintained in each direction during bridge replacement |
| at Coloma Rest Area
|
35.7 |
Medium |
All lanes and shoulders open |
01/27/09 06:00 AM |
12/31/10 11:59 PM |
MDOT |
Coloma Rset Area Closed |
| Park Rd to Hennesey Rd
|
37.6 to 39.8 |
Medium |
Various lanes closed |
09/02/10 07:00 AM |
09/02/10 07:00 PM |
MDOT |
Single lane closures for joint and crack filling and guardrail repair |
| Oakland Dr to Lovers Ln
|
74.9 to 76.9 |
Medium |
Various lanes closed |
04/05/10 06:00 AM |
11/30/10 06:00 PM |
MDOT |
Single lane closures |
| Oakland Dr to Lovers Ln
|
74.9 to 76.9 |
Medium |
Various lanes closed |
09/02/10 08:00 PM |
09/03/10 06:00 AM |
MDOT |
Single lane closures for placement of concrete barriers. Motorists are advised to seek an alternate route. |
| Exit to SB S Westnedge Ave
|
75.7 |
Medium |
All lanes and shoulders closed |
04/05/10 06:00 AM |
11/30/10 06:00 PM |
MDOT |
|
| Entrance from NB / Sb Westnedge Ave
|
76.4 |
Medium |
All lanes and shoulders closed |
03/15/10 06:00 AM |
11/30/10 06:00 PM |
MDOT |
|
| Exit to NB S Westnedge Ave
|
76.1 |
Medium |
All lanes and shoulders closed |
04/05/10 06:00 AM |
11/30/10 06:00 PM |
MDOT |
|
| Oakland Dr to Portage St
|
74.9 to 77.8 |
Medium |
Various lanes closed |
06/15/09 06:00 AM |
12/31/10 11:59 PM |
Other |
|
| East Of 40th Ave to 17 Mile Rd/old 27 Mile Rd/brewer St
|
87.6 to 109.9 |
Medium |
Various lanes closed |
04/12/10 07:00 AM |
11/30/10 11:59 PM |
MDOT |
|
| at East Of Helmer Rd
|
95.9 |
Medium |
All lanes and shoulders open |
07/25/10 06:00 PM |
09/30/10 05:30 AM |
MDOT |
Rest area closed |
| Capital Ave to I-194
|
97.0 to 98.0 |
Minor |
Both shoulders closed, all lanes open |
05/24/10 06:45 AM |
06/25/11 11:00 PM |
MDOT |
Shoulder work |
| Michigan Ave to 17 Mile Rd
|
88.0 to 110.0 |
Minor |
Left lane closed, one lane open |
09/02/10 07:00 PM |
09/03/10 05:00 AM |
MDOT |
Moving operation for cable guardrail installation |
| I-94 WB (Michigan) |
| 17 Mile Rd to Michigan Ave
|
110.0 to 88.0 |
Minor |
Left lane closed, one lane open |
09/02/10 07:00 PM |
09/03/10 05:00 AM |
MDOT |
Moving operation for cable guardrail installation |
| 11 Mile Rd to M-66 / I-194
|
103.9 to 98.3 |
Minor |
Various lanes closed |
08/16/10 06:00 AM |
09/27/10 09:00 PM |
MDOT |
There will be 2 lanes of WB traffic open during daytime shoulder work Monday through Friday.
There will be nighttime lane closures during the week, as well as weekend lane closures from 9 p.m. Friday, Aug. 20, to 6 a.m. Monday, Aug. 23, for bridge and concrete repairs. |
| I-194 to Capital Ave
|
98.0 to 97.0 |
Minor |
Both shoulders closed, all lanes open |
05/24/10 06:45 AM |
06/25/11 11:00 PM |
MDOT |
Shoulder work |
| 17 Mile Rd /old 27 Mile Rd/ Brewer St to East Of 40th St
|
109.9 to 87.6 |
Medium |
Various lanes closed |
04/12/10 07:00 AM |
11/30/10 11:59 PM |
MDOT |
|
| Entrance from SB Portage St
|
77.5 |
Medium |
All lanes and shoulders closed |
04/05/10 06:00 PM |
11/30/10 05:00 PM |
MDOT |
Detour: NB Portage Rd to WB I-94 on ramp |
| Portage St to Oakland Dr
|
77.8 to 74.9 |
Medium |
Various lanes closed |
06/15/09 06:00 AM |
12/31/10 11:59 PM |
Other |
|
| Exit to SB S Westnedge Ave
|
76.2 |
Medium |
All lanes and shoulders closed |
04/05/10 06:00 AM |
11/30/10 06:00 PM |
MDOT |
|
| Lovers Ln to Oakland Dr
|
76.9 to 74.9 |
Medium |
Various lanes closed |
04/05/10 06:00 AM |
11/30/10 06:00 PM |
MDOT |
Single lane closures |
| Hennesey Rd to Park Rd
|
39.8 to 37.6 |
Medium |
Various lanes closed |
09/02/10 07:00 AM |
09/02/10 07:00 PM |
MDOT |
Single lane closures for joint and crack filling and guardrail repair |
| at Britain Ave
|
31.8 |
Medium |
Various lanes closed |
08/02/10 06:00 AM |
10/31/10 10:59 PM |
MDOT |
Two lanes of traffic will be maintained in each direction during bridge replacement |
| I-94-Br (Red Arrow Highway) to Krueger Rd
|
23.0 to 6.0 |
Medium |
Various lanes closed |
04/19/10 07:00 AM |
09/14/10 06:00 PM |
MDOT |
Single lane closures |
| I-196 NB (Michigan) |
| at Glenn Rest Area
|
27.1 to 27.1 |
Medium |
All lanes and shoulders open |
01/27/09 06:00 AM |
12/31/10 05:00 PM |
MDOT |
Glenn Rest Area cloed until further notice |
| 118th Ave to 130th Ave
|
30.4 to 37.1 |
Minor |
All lanes and shoulders open |
07/20/10 07:00 PM |
12/31/10 11:59 PM |
MDOT |
Permits restricted to 12 Ft Wide |
| 118th Ave to Wiley Rd (130th)
|
30.4 to 37.1 |
Medium |
Various lanes closed |
06/15/10 07:00 AM |
11/18/10 05:00 PM |
MDOT |
Single lane closures |
| US-31 Split to 60th St
|
43.3 to 44.2 |
Medium |
Various lanes closed |
08/16/10 06:00 AM |
09/03/10 04:00 PM |
MDOT |
Single lane closure for paving |
| I-196 SB (Michigan) |
| 130th Ave to 118th Ave
|
37.1 to 30.5 |
Minor |
All lanes and shoulders open |
07/20/10 07:00 PM |
12/31/10 11:59 PM |
MDOT |
Permits restricted to 12 Ft Wide |
| Wiley Rd (130th) to 118th Ave
|
37.1 to 30.5 |
Medium |
Various lanes closed |
06/15/10 07:00 AM |
11/18/10 05:00 PM |
MDOT |
Single lane closures |
| US-31 NB (Michigan) |
| M-139 to Napier Ave
|
|
Medium |
Various lanes closed |
09/02/10 07:00 AM |
09/02/10 07:00 PM |
MDOT |
Traffic will be reduced to one lane in each direction during daytime work, Monday through Friday. |
| US-31 SB (Michigan) |
| Napier Ave to M-139
|
|
Medium |
Various lanes closed |
09/02/10 07:00 AM |
09/02/10 07:00 PM |
MDOT |
Traffic will be reduced to one lane in each direction during daytime work, Monday through Friday. |
| Allegan County (Michigan) |
| SB US-131 from 106th Ave to Allegan St
|
|
Medium |
Various lanes closed |
08/24/10 07:00 AM |
09/23/10 04:00 PM |
MDOT |
Single lane closures at the railroad tracks 1/2 mile north of plainwell for bridge deck repair |
| Kalamazoo County (Michigan) |
| M-96 (King Hwy) at Kalamazoo River
|
|
Minor |
All lanes and shoulders open |
04/15/10 07:00 AM |
12/31/10 11:59 PM |
MDOT |
Max Wid 10 Ft wide/ No Overweight over Kalamazoo River Bridge |
| M-96 from Water St to Webster St
|
|
Medium |
Various lanes closed |
05/03/10 06:45 AM |
10/31/10 11:59 PM |
MDOT |
Single lane closures over Mill Race, Max Wid 12 Ft, No Overweight permits |
| St Joseph County (Michigan) |
| M-86 from Farrand Rd to State St
|
|
Medium |
All lanes and shoulders closed |
07/06/10 07:00 AM |
10/29/10 11:59 PM |
MDOT |
No permits on M-66 during replacement of bridge over Matteson Creek. No Permits allowed on detour route eff 7/6/10 Traffic detoured on Farrand Rd - Division Rd - Babcock Rd. |
| I-43 NB (Wisconsin) |
| 27th St Off Ramp to 20th St
|
9.2 to 9.8 |
Minor |
Right lane closed, two lanes open |
09/02/10 09:30 PM |
09/03/10 04:30 AM |
WisDOT |
|
| Entrance from 27th St
|
9.1 |
Medium |
All lanes and shoulders closed |
09/02/10 09:00 PM |
09/03/10 05:00 AM |
WisDOT |
Detour: 27th north to Howard, east to NB I-43 ramp OR 27th south to College, east to EB I-94 ramp |
| Exit to EB I-94
|
9.8 |
Major |
All lanes and shoulders closed |
09/02/10 11:00 PM |
09/03/10 04:30 AM |
WisDOT |
DETOUR: EXIT AT 27TH ST, SOUTH ON 27TH TO COLLEGE, EAST ON COLLEGE TO I-94 E ENTRANCE RAMP.
|
| at Plainfield Curve
|
10.1 |
Medium |
All lanes closed and both shoulders open |
03/08/10 12:00 AM |
12/17/10 11:45 PM |
WisDOT |
|
| Exit to Howard Ave & Holt Ave
|
11.2 |
Minor |
All lanes and shoulders closed |
05/20/10 05:00 AM |
12/17/10 05:00 AM |
WisDOT |
THE HOWARD AVE EXIT RAMP FROM I-43 N/I-94 W WILL REMAIN OPEN DURING THIS TIME. TRAFFIC WILL NOT BE ABLE TO ACCESS THE HOLT AVE EXIT RAMP FROM I-43 N/I-94 W.
DETOUR: EXIT AT HOWARD AVE, CONTINUE STRAIGHT ONTO HOWARD AVE ENTRANCE RAMP TO I-94 W, EXIT AT HOLT AVE. |
| Cnw Rr to Port Washington Rd
|
78.8 to 93.3 |
Medium |
Left lane closed, one lane open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
WisDOT |
|
| I-94 EB (Wisconsin) |
| Entrance from SEB High Crossing Blvd
|
136.4 |
Minor |
All lanes and shoulders closed |
07/08/10 06:00 AM |
09/17/10 11:59 PM |
WisDOT |
|
| High Crossing Blvd to WI-38
|
136.0 to 137.4 |
Minor |
Left shoulder closed, all lanes open |
07/08/10 06:00 AM |
09/17/10 11:59 PM |
WisDOT |
|
| Hillside Dr to Jefferson - Waukesha Co Line
|
272.7 to 278.0 |
Medium |
Right lane closed, one lane open |
09/02/10 07:00 PM |
09/03/10 01:00 AM |
WisDOT |
|
| Exit to CR-F
|
275.0 |
Medium |
All lanes and shoulders closed |
09/01/10 07:00 PM |
09/02/10 11:00 AM |
WisDOT |
|
| Exit to 70th St
|
305.5 |
Minor |
All lanes and shoulders closed |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
WisDOT |
|
| S 13th St To Sb I-43/EB I-94 to EB I-94 (N-S Mitchell)
|
|
Minor |
Left lane closed, one or two lanes open |
09/02/10 09:30 PM |
09/03/10 04:30 AM |
WisDOT |
|
| SB I-43 / Eb I-94 to EB I-94
|
316.3 to 316.5 |
Minor |
All lanes and shoulders closed |
09/02/10 11:00 PM |
09/03/10 04:30 AM |
WisDOT |
|
| SB I-43 to EB I-94
|
316.3 to 316.5 |
Major |
All lanes and shoulders closed |
09/02/10 11:00 PM |
09/03/10 04:30 AM |
WisDOT |
DETOUR: EXIT AT HOWARD, EAST ON HOWARD TO HOWELL, SOUTH ON HOWELL TO COLLEGE, WEST ON COLLEGE TO
I-94 E ENTRANCE RAMP |
| Entrance from NB I-43/ Eb I-894
|
316.9 |
Major |
All lanes and shoulders closed |
09/02/10 11:00 PM |
09/03/10 04:30 AM |
WisDOT |
DETOUR: EXIT AT 27TH ST, SOUTH ON 27TH TO COLLEGE, EAST ON COLLEGE TO I-94 E ENTRANCE RAMP.
|
| 13th St to EB I-94
|
|
Minor |
Left lane closed, one or two lanes open |
09/02/10 09:30 PM |
09/03/10 04:30 AM |
WisDOT |
|
| Entrance from Layton
|
317.0 |
Minor |
All lanes and shoulders closed |
04/27/10 06:00 AM |
10/08/10 11:59 PM |
WisDOT |
|
| Exit to Layton Ave
|
316.6 |
Medium |
All lanes and shoulders closed |
02/17/10 07:00 AM |
12/03/12 11:45 PM |
WisDOT |
Detour: EXIT I-43 S/I-94 E AT HOWARD AVE, HOWARD TO EITHER 27TH ST OR HOWELL AVE, 27TH ST OR HOWELL SOUTH TO LAYTON AVE |
| Exit to NB S 20th St
|
316.6 |
Medium |
All lanes and shoulders closed |
02/17/10 12:00 AM |
12/03/12 11:45 PM |
WisDOT |
N-S FREEWAY / COLLEGE AVE - HOWARD AVE | COLLECTOR DISTRIBUTOR RDS/LAYTON IC | I 43/94/894 | MILWAUKEE Detour: Exit I-43 S/I-94 E at Howard Ave, Howard to either 27th St or Howell Ave, 27th St or Howell south to Layton Ave. |
| Exit to S 20th St
|
316.6 |
Minor |
All lanes closed and both shoulders open |
09/02/10 09:30 PM |
09/03/10 04:30 AM |
WisDOT |
|
| Edgerton Ave to College Ave
|
317.2 to 318.5 |
Medium |
Right lane closed, two or three lanes open |
06/02/10 12:00 AM |
12/17/10 11:45 PM |
WisDOT |
|
| Exit to Weigh Station Exit Ramp At CR-G
|
|
Minor |
All lanes and shoulders closed |
05/12/10 06:00 AM |
09/30/10 11:59 PM |
WisDOT |
|
| WI-50 to WI-IL State Line
|
|
Medium |
Left lane closed, two lanes open |
03/19/10 07:00 AM |
12/31/10 11:59 PM |
WisDOT |
|
| Exit to CR-C
|
|
Medium |
All lanes and shoulders closed |
06/05/10 09:30 PM |
12/31/10 11:59 PM |
WisDOT |
closed until December |
| Entrance from CR-C
|
346.5 |
Medium |
All lanes and shoulders closed |
08/30/10 09:30 AM |
12/31/10 11:00 PM |
WisDOT |
|
| I-94 WB (Wisconsin) |
| WI-IL State Line to WI-50
|
349.0 to 344.0 |
Medium |
Left lane closed, two lanes open |
04/09/10 06:00 AM |
12/31/10 11:59 PM |
WisDOT |
|
| Exit to CR-C
|
|
Medium |
All lanes and shoulders closed |
06/05/10 09:30 PM |
12/31/10 11:59 PM |
WisDOT |
Closed until December |
| Entrance from CR-C
|
344.4 |
Medium |
All lanes and shoulders closed |
06/05/10 09:30 PM |
12/31/10 11:59 PM |
WisDOT |
Closed until December |
| at CR-G
|
327.4 |
Medium |
Right lane closed, two lanes open |
04/10/10 06:00 AM |
09/30/10 11:59 PM |
WisDOT |
Long-Term; Crossover and reduction of lanes |
| Entrance from Rawson Ave
|
319.0 |
Medium |
All lanes and shoulders closed |
09/02/10 09:00 PM |
09/03/10 05:00 AM |
WisDOT |
Detour: Rawson east to Howell, north on Howell to Howard, west to I-43 N/ I-94 W entrance ramp OR Rawson west to 27th, north on 27th to I-43 S/I-894 W entrance ramp |
| Rawson Ave Off Ramp to W College Aveon Ramp
|
319.7 to 318.7 |
Medium |
Left two lanes closed, one lane open |
09/02/10 09:30 PM |
09/03/10 04:30 AM |
WisDOT |
|
| Entrance from College Ave
|
319.0 |
Minor |
Left lane closed, one lane open |
04/09/10 12:00 AM |
11/19/10 11:45 PM |
WisDOT |
Construction - COLLECTOR DISTRIBUTOR RDS/LAYTON IC |
| Entrance from College Ave
|
319.0 |
Medium |
All lanes and shoulders closed |
09/02/10 09:00 PM |
09/03/10 05:00 AM |
WisDOT |
Detour: college east to Howell, north to Howard, west to I-43 NB entrance OR College west to 27th, north to I-43 SB entrance |
| Entrance from College Ave
|
319.0 |
Medium |
All lanes and shoulders closed |
08/30/10 11:00 PM |
09/03/10 04:30 AM |
WisDOT |
Detour: Exit at College, East on College to Howell, North on Howell to Howard, West on Howard to I-43 N/I-94 W Entrance ramp or College west to 27th North to I-43 s/i-894 W entrance ramp. |
| Exit to Howard Ave & Holt Ave
|
11.2 |
Minor |
All lanes and shoulders closed |
05/20/10 05:00 AM |
12/17/10 05:00 AM |
WisDOT |
THE HOWARD AVE EXIT RAMP FROM I-43 N/I-94 W WILL REMAIN OPEN DURING THIS TIME. TRAFFIC WILL NOT BE ABLE TO ACCESS THE HOLT AVE EXIT RAMP FROM I-43 N/I-94 W.
DETOUR: EXIT AT HOWARD AVE, CONTINUE STRAIGHT ONTO HOWARD AVE ENTRANCE RAMP TO I-94 W, EXIT AT HOLT AVE. |
| Entrance from Layton Ave
|
316.4 |
Medium |
All lanes and shoulders closed |
02/17/10 07:00 AM |
12/03/12 07:00 PM |
WisDOT |
DETOUR: LAYTON EAST TO HOWELL, HOWELL NORTH TO HOWARD, HOWARD WEST TO I-43 N/I-94 W ENTRANCE RAMP OR LAYTON WEST TO 27TH ST, 27TH ST NORTH TO I-43 N/I-894 E ENTRANCE RAMP |
| Entrance from SB I-43
|
309.6 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 10:00 AM |
09/02/10 12:00 PM |
WisDOT |
|
| Jefferson - Waukesha Co Line to Hillside Rd
|
278.0 to 272.8 |
Medium |
Right lane closed, one lane open |
09/02/10 07:00 PM |
09/03/10 07:00 AM |
WisDOT |
|
| Baxter Rd to 240
|
|
None |
All lanes and shoulders closed |
03/12/10 12:00 AM |
11/24/10 12:00 PM |
WisDOT |
Construction - I 90 - CTH N |
| Mm 240.6 to Koshkonong Creek
|
240.9 to 240.3 |
Medium |
Various lanes closed |
03/12/10 12:00 AM |
11/24/10 12:00 PM |
WisDOT |
|
| WB I-94 On Ramp to High Crossing Blvd
|
137.2 to 135.8 |
Medium |
Left shoulder closed, all lanes open |
07/12/10 06:00 AM |
09/03/10 11:59 PM |
WisDOT |
|
| Mm 105.0 to Mm 90.0
|
105.6 to 101.8 |
Medium |
Left lane closed, one lane open |
09/01/10 07:00 PM |
09/02/10 10:00 AM |
WisDOT |
|
| I-894 EB (Wisconsin) |
| 27th St Off Ramp to 20th St
|
9.2 to 9.8 |
Minor |
Right lane closed, two lanes open |
09/02/10 09:30 PM |
09/03/10 04:30 AM |
WisDOT |
|
| US-41 NB (Wisconsin) |
| WI-IL State Line to WI-50
|
349.0 to 344.0 |
Medium |
Left lane closed, two lanes open |
04/09/10 06:00 AM |
12/31/10 11:59 PM |
WisDOT |
|
| Exit to CR-C
|
|
Medium |
All lanes and shoulders closed |
06/05/10 09:30 PM |
12/31/10 11:59 PM |
WisDOT |
Closed until December |
| Entrance from CR-C
|
344.4 |
Medium |
All lanes and shoulders closed |
06/05/10 09:30 PM |
12/31/10 11:59 PM |
WisDOT |
Closed until December |
| at CR-G
|
327.4 |
Medium |
Right lane closed, two lanes open |
04/10/10 06:00 AM |
09/30/10 11:59 PM |
WisDOT |
Long-Term; Crossover and reduction of lanes |
| Entrance from Rawson Ave
|
319.0 |
Medium |
All lanes and shoulders closed |
09/02/10 09:00 PM |
09/03/10 05:00 AM |
WisDOT |
Detour: Rawson east to Howell, north on Howell to Howard, west to I-43 N/ I-94 W entrance ramp OR Rawson west to 27th, north on 27th to I-43 S/I-894 W entrance ramp |
| Rawson Ave Off Ramp to W College Aveon Ramp
|
319.7 to 318.7 |
Medium |
Left two lanes closed, one lane open |
09/02/10 09:30 PM |
09/03/10 04:30 AM |
WisDOT |
|
| Entrance from College Ave
|
319.0 |
Minor |
Left lane closed, one lane open |
04/09/10 12:00 AM |
11/19/10 11:45 PM |
WisDOT |
Construction - COLLECTOR DISTRIBUTOR RDS/LAYTON IC |
| Entrance from College Ave
|
319.0 |
Medium |
All lanes and shoulders closed |
09/02/10 09:00 PM |
09/03/10 05:00 AM |
WisDOT |
Detour: college east to Howell, north to Howard, west to I-43 NB entrance OR College west to 27th, north to I-43 SB entrance |
| Entrance from College Ave
|
319.0 |
Medium |
All lanes and shoulders closed |
08/30/10 11:00 PM |
09/03/10 04:30 AM |
WisDOT |
Detour: Exit at College, East on College to Howell, North on Howell to Howard, West on Howard to I-43 N/I-94 W Entrance ramp or College west to 27th North to I-43 s/i-894 W entrance ramp. |
| Entrance from Layton Ave
|
316.4 |
Medium |
All lanes and shoulders closed |
02/17/10 07:00 AM |
12/03/12 07:00 PM |
WisDOT |
DETOUR: LAYTON EAST TO HOWELL, HOWELL NORTH TO HOWARD, HOWARD WEST TO I-43 N/I-94 W ENTRANCE RAMP OR LAYTON WEST TO 27TH ST, 27TH ST NORTH TO I-43 N/I-894 E ENTRANCE RAMP |
| Exit to Howard Ave & Holt Ave
|
11.2 |
Minor |
All lanes and shoulders closed |
05/20/10 05:00 AM |
12/17/10 05:00 AM |
WisDOT |
THE HOWARD AVE EXIT RAMP FROM I-43 N/I-94 W WILL REMAIN OPEN DURING THIS TIME. TRAFFIC WILL NOT BE ABLE TO ACCESS THE HOLT AVE EXIT RAMP FROM I-43 N/I-94 W.
DETOUR: EXIT AT HOWARD AVE, CONTINUE STRAIGHT ONTO HOWARD AVE ENTRANCE RAMP TO I-94 W, EXIT AT HOLT AVE. |
| Entrance from SB I-43
|
309.6 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 10:00 AM |
09/02/10 12:00 PM |
WisDOT |
|
| US-41 SB (Wisconsin) |
| S 13th St To Sb I-43/EB I-94 to EB I-94 (N-S Mitchell)
|
|
Minor |
Left lane closed, one or two lanes open |
09/02/10 09:30 PM |
09/03/10 04:30 AM |
WisDOT |
|
| 13th St to EB I-94
|
|
Minor |
Left lane closed, one or two lanes open |
09/02/10 09:30 PM |
09/03/10 04:30 AM |
WisDOT |
|
| SB I-43 / Eb I-94 to EB I-94
|
316.3 to 316.5 |
Minor |
All lanes and shoulders closed |
09/02/10 11:00 PM |
09/03/10 04:30 AM |
WisDOT |
|
| SB I-43 to EB I-94
|
316.3 to 316.5 |
Major |
All lanes and shoulders closed |
09/02/10 11:00 PM |
09/03/10 04:30 AM |
WisDOT |
DETOUR: EXIT AT HOWARD, EAST ON HOWARD TO HOWELL, SOUTH ON HOWELL TO COLLEGE, WEST ON COLLEGE TO
I-94 E ENTRANCE RAMP |
| Entrance from NB I-43/ Eb I-894
|
316.9 |
Major |
All lanes and shoulders closed |
09/02/10 11:00 PM |
09/03/10 04:30 AM |
WisDOT |
DETOUR: EXIT AT 27TH ST, SOUTH ON 27TH TO COLLEGE, EAST ON COLLEGE TO I-94 E ENTRANCE RAMP.
|
| Exit to Layton Ave
|
316.6 |
Medium |
All lanes and shoulders closed |
02/17/10 07:00 AM |
12/03/12 11:45 PM |
WisDOT |
Detour: EXIT I-43 S/I-94 E AT HOWARD AVE, HOWARD TO EITHER 27TH ST OR HOWELL AVE, 27TH ST OR HOWELL SOUTH TO LAYTON AVE |
| Exit to NB S 20th St
|
316.6 |
Medium |
All lanes and shoulders closed |
02/17/10 12:00 AM |
12/03/12 11:45 PM |
WisDOT |
N-S FREEWAY / COLLEGE AVE - HOWARD AVE | COLLECTOR DISTRIBUTOR RDS/LAYTON IC | I 43/94/894 | MILWAUKEE Detour: Exit I-43 S/I-94 E at Howard Ave, Howard to either 27th St or Howell Ave, 27th St or Howell south to Layton Ave. |
| Exit to S 20th St
|
316.6 |
Minor |
All lanes closed and both shoulders open |
09/02/10 09:30 PM |
09/03/10 04:30 AM |
WisDOT |
|
| Entrance from Layton
|
317.0 |
Minor |
All lanes and shoulders closed |
04/27/10 06:00 AM |
10/08/10 11:59 PM |
WisDOT |
|
| Edgerton Ave to College Ave
|
317.2 to 318.5 |
Medium |
Right lane closed, two or three lanes open |
06/02/10 12:00 AM |
12/17/10 11:45 PM |
WisDOT |
|
| Exit to Weigh Station Exit Ramp At CR-G
|
|
Minor |
All lanes and shoulders closed |
05/12/10 06:00 AM |
09/30/10 11:59 PM |
WisDOT |
|
| WI-50 to WI-IL State Line
|
|
Medium |
Left lane closed, two lanes open |
03/19/10 07:00 AM |
12/31/10 11:59 PM |
WisDOT |
|
| Exit to CR-C
|
|
Medium |
All lanes and shoulders closed |
06/05/10 09:30 PM |
12/31/10 11:59 PM |
WisDOT |
closed until December |
| Entrance from CR-C
|
346.5 |
Medium |
All lanes and shoulders closed |
08/30/10 09:30 AM |
12/31/10 11:00 PM |
WisDOT |
|
| WI-119 EB (Wisconsin) |
| WI-38 to WI-38
|
|
Medium |
Right lane closed, one lane open |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
WisDOT |
|
| WI-119 WB (Wisconsin) |
| WI-38/HOWELL to EB I-94
|
|
Medium |
All lanes and shoulders closed |
09/02/10 10:30 PM |
09/03/10 05:00 AM |
WisDOT |
DETOUR: HOWELL NORTH TO HOWARD, WEST ON HOWARD TO I-43 N/I-94 W ENTRANCE RAMP OR HOWELL SOUTH TO
COLLEGE, WEST ON COLLEGE TO I-94 E ENTRANCE RAMP |
| 13th St to EB I-94 Off Ramp
|
|
Medium |
Left lane closed, one lane open |
03/13/10 05:00 AM |
11/19/10 11:00 PM |
WisDOT |
|
| Columbia County (Wisconsin) |
| EB WI-16 from Otsego Rd to WI-60
|
|
Medium |
Various lanes closed |
09/02/10 07:00 AM |
09/02/10 07:00 PM |
WisDOT |
|
| Farnham St from Waterloo St to WI-73
|
|
Minor |
All lanes and shoulders closed |
07/06/10 06:00 AM |
09/03/10 11:59 PM |
WisDOT |
Full Closure both direction:
NB DETOUR: TAKE STH 19 WEST IN WATERLOO; RIGHT (NORTH) ON STH 73 FOR APPROX. 14 MILES TO STH 89.
SB DETOUR: RIGHT (SOUTH) ON STH 73 (APPRX 14 MILES); LEFT (EAST) ON STH 19 TO STH 89. |
| Green County (Wisconsin) |
| WB WI-11 at Skinner Creek
|
|
Medium |
Various lanes closed |
07/19/10 07:00 PM |
09/02/10 10:00 PM |
WisDOT |
Timed traffic lights will control |
| Milwaukee County (Wisconsin) |
| Ramp from WB I-94 to WB Layton Ave
|
|
Medium |
All lanes and shoulders closed |
02/16/10 07:00 AM |
11/01/10 07:00 PM |
WisDOT |
DETOUR: EXIT AT COLLEGE AVE, WEST ON COLLEGE AVE TO 27TH ST, NORTH ON 27TH ST TO LAYTON AVE |
| SB WI-38 (Howell Ave) from Oakwood Rd to Caddy Ln
|
|
Medium |
All lanes and shoulders closed |
05/03/10 12:00 AM |
11/01/10 11:45 PM |
WisDOT |
Construction - CTH K - OAKWOOD RD Roadway will be closed to thru traffic. Detour: WIS 100, WIS 32, WIS 31 |
| NB WI-38 (Howell Ave) from Caddy Ln to Oakwood Rd
|
|
Medium |
All lanes and shoulders closed |
05/03/10 12:00 AM |
11/01/10 11:45 PM |
WisDOT |
Construction - CTH K - OAKWOOD RD Roadway will be closed to thru traffic. Detour: WIS 31, WIS 32, WIS 100 |
| SB WI-100 from 91st St to 124th St
|
|
Medium |
Left two lanes closed, one lane open |
09/02/10 07:00 PM |
09/03/10 06:00 AM |
WisDOT |
|
| SB WI-100 from 91st St to NB WI-145
|
|
Medium |
Left two lanes closed, one lane open |
09/02/10 09:00 AM |
09/02/10 04:00 PM |
WisDOT |
|
| Ramp from WI-119 to WI-38
|
|
Minor |
All lanes and shoulders closed |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
WisDOT |
|
| WB & Eb Layton Ave from 13th St to 20th St
|
|
Medium |
All lanes and shoulders closed |
02/17/10 07:00 AM |
09/03/10 07:00 PM |
WisDOT |
EB DETOUR: 27TH ST SOUTH TO COLLEGE AVE, COLLEGE EAST TO HOWELL AVE, HOWELL NORTH TO LAYTON AVE
WB DETOUR: HOWELL AVE SOUTH TO COLLEGE AVE, COLLEGE WEST TO 27TH ST, 27TH ST NORTH TO LAYTON AVE |
| NB Howell Ave from 0.1 Mi N Of WI-38 Sb to 0.1 Mi S Of Oakwood Rd
|
|
Minor |
All lanes and shoulders closed |
05/03/10 06:00 AM |
11/11/10 11:59 PM |
WisDOT |
|
| SB Howell Ave from Oakwood Rd to 0.1 Mi N Of WI-38
|
|
Minor |
All lanes and shoulders closed |
05/03/10 06:00 AM |
11/11/10 11:59 PM |
WisDOT |
Detour: Wi-100, Wi-32, WI-31 |
| EB Silver Spring Dr from 90th St to 68th St
|
|
Medium |
Various lanes closed |
08/30/10 12:00 PM |
09/10/10 12:00 PM |
WisDOT |
|
| WB W Greenfield Ave from 106th St to 107th St
|
|
Medium |
Right lane closed, one lane open |
09/02/10 08:00 AM |
09/02/10 03:00 PM |
WisDOT |
|
| Whitaker Ave from 15th St to 14th St
|
|
Medium |
All lanes and shoulders closed |
04/08/10 07:00 AM |
11/12/10 11:59 PM |
WisDOT |
DETOUR: USE VAN NORMAN ST TO ACCESS 14TH ST AND 15TH ST. |
| Racine County (Wisconsin) |
| SB WI-38 from Caddy Ln to River Rd
|
|
Medium |
All lanes and shoulders closed |
05/03/10 12:00 AM |
11/01/10 11:45 PM |
WisDOT |
Construction - CTH K - OAKWOOD RD Roadway will be closed to thru traffic. Detour: WIS 100, WIS 32, WIS 31 |
| NB WI-38 from Taurus Dr to Caddy Ln
|
|
Medium |
All lanes and shoulders closed |
05/03/10 12:00 AM |
11/01/10 11:45 PM |
WisDOT |
Construction - CTH K - OAKWOOD RD Roadway will be closed to thru traffic. Detour: WIS 31, WIS 32, WIS 100 |
| NB & Sb East Frontage Rd from WI-50 to CR-C
|
|
Medium |
Left lane or right lane and both shoulders closed |
08/01/10 11:45 AM |
11/01/10 11:45 PM |
WisDOT |
|
| EB & Wb WI-20 from I-43 to Miller Rd
|
|
Medium |
All lanes and shoulders closed |
06/21/10 12:00 AM |
10/13/10 11:45 PM |
WisDOT |
Detour: WIS 20 WB to WIS 83 NB; WIS 83 NB to IH-43 SB; IH-43 SB to WIS 20 WB. |
| NEB Milwaukee Ave at Browns Lake Dr
|
|
Medium |
All lanes and shoulders closed |
06/08/10 12:00 AM |
10/01/10 11:45 PM |
WisDOT |
Detour: Detour CTH D to STH 36/83 Bypass to CTH A |
| NB Raynor Ave at WI-20
|
|
Medium |
All lanes and shoulders closed |
09/02/10 06:00 AM |
09/02/10 07:00 PM |
WisDOT |
Detour: STH 75 to STH 11 to IH94 |
| Rock County (Wisconsin) |
| NB & Sb US-51 from 0.1 Mi N Of Emerson St to 0.1 Mi N Of Henry Ave
|
|
Medium |
All lanes and shoulders closed |
09/02/10 07:00 AM |
09/02/10 12:00 PM |
WisDOT |
Detour: The US-51 NB detour will start at the intersection of Pleasant and Broad Streets in Beloit, Continue on Broad street west to STH 213, then STH 213 North and West to CR-D, Then CR-D North to CR-Q, then CR-Q east to US-51. Detour Southbound US-51 traffic using the same route in reverse. |
| Walworth County (Wisconsin) |
| WB WI-11 from Mormon Rd to Lyons Rd
|
|
Medium |
All lanes and shoulders closed |
04/26/10 12:00 AM |
11/01/10 11:45 PM |
WisDOT |
Detour: STH 36 and STH 11 intersection downtown Burlington southwest on STH 36 8 miles to STH 120 - north 4 miles on STH 120 to STH 11. |
| EB WI-11 from CR-DD to Mormon Rd
|
|
Medium |
All lanes and shoulders closed |
04/26/10 12:00 AM |
11/01/10 11:45 PM |
WisDOT |
Detour: STH 11 and STH 120 intersection go south 4 miles to STH 36 - east on STH 36 8 miles to STH 36 and STH 11 intersection. |
| EB WI-59 from Rock- Walworth Co Line to WI-89
|
|
Medium |
All lanes and shoulders closed |
07/26/10 06:00 AM |
09/07/10 11:00 PM |
WisDOT |
Detour: WI-59 east to WI-26 north to CR-N east to US-12 east to WI-89 north to reconnect to WI-59 east. |
| EB & Wb WI-20 from Miller Rd to I-43
|
|
Medium |
All lanes and shoulders closed |
06/21/10 12:00 AM |
10/13/10 11:45 PM |
WisDOT |
Detour: WIS 20 WB to WIS 83 NB; WIS 83 NB to IH-43 SB; IH-43 SB to WIS 20 WB. |
| Washington County (Wisconsin) |
| WI-60 from Center St to Jackson Dr
|
|
Medium |
All lanes and shoulders closed |
08/30/10 05:00 AM |
09/03/10 08:00 PM |
WisDOT |
Detour: EB -- CR-P north to CR-NN east to CR-G south to WI-60; WB -- north on CR-G, west on CR-nn, south on CR-P |
| WB Mequon Rd from WI-181 to Pilgrim Rd
|
|
Medium |
Various lanes closed |
08/12/10 06:00 AM |
09/22/10 11:59 PM |
WisDOT |
|
| Waukesha County (Wisconsin) |
| EB WI-16 from CR-KE to CR-KF
|
|
Medium |
Various lanes closed |
09/02/10 09:00 AM |
09/02/10 05:00 PM |
WisDOT |
|
| WB WI-16 from CR-KF to CR-KE
|
|
Medium |
Various lanes closed |
09/02/10 07:00 AM |
09/02/10 02:00 PM |
WisDOT |
|
| NB WI-67 from WI-16 to Waukesha- Dodge Co Line
|
|
Medium |
All lanes and shoulders closed |
07/12/10 07:00 AM |
10/08/10 11:59 PM |
WisDOT |
DETOUR: WIS 67 FROM OCONOMOWOC TAKE CTH K EB AND WIS 16 EB TAKE WIS 67 SB TO CTH K EB, AT CTH P SMALL VEHICLES TAKE CTH P NB TO CTH O WB TO WIS 67 NB AND DUE TO VERTICAL CLEARANCE LIMITATIONS ON CTH P TRUCKS TAKE CTH K EB TO WIS 83 NB TO CTH O WB TO WIS 67 NB; WIS 16 WB TAKE CTH P NB AT CTH K SMALL VEHICLES CONTINUE CTH P NB TO CTH O WB TO WIS 67 NB AND DUE TO VERTICAL CLEARANCE LIMITATIONS ON CTH P TRUCKS TAKE CTH K EB TO WIS 83 NB TO CTH O WB TO WIS 67 NB |
| SB WI-67 from Waukesha- Dodge Co Line to WI-16
|
|
Medium |
All lanes and shoulders closed |
07/12/10 07:00 AM |
10/08/10 11:59 PM |
WisDOT |
DETOUR: WIS 67 SB TAKE CTH O EB TO CTH P, SMALL VECHILES TAKE CTH P SB TO CTH O WB TO WIS 67 SB OR CONTINUE ON CTH P SB TO WIS 16 EB AND DUE TO VERTICAL CLEARANCE LIMITATIONS ON CTH P TRUCKS CONTINUE ON CTH O TO WIS 83 SB TO CTH K EB TO WIS 67 SB AND SHOULD STAY ON WIS 83 SB TO CONNECT WITH WIS 16 EB |
| SB WI-164 from CR-ES to NB I-43 On Ramp
|
|
Medium |
Left lane closed, one lane open |
05/11/10 06:00 AM |
09/24/10 11:59 PM |
WisDOT |
|
| NB WI-164 from Park & Ride Lot Entrance to SB I-43 Off Ramp
|
|
Medium |
Left lane closed, one lane open |
05/11/10 06:00 AM |
09/24/10 11:59 PM |
WisDOT |
|
| SB WI-164 from National Ave to I-43
|
|
Medium |
Left lane closed, one lane open |
05/11/10 12:00 AM |
09/24/10 11:45 PM |
WisDOT |
Construction - STH 164 INTERCHANGE |
| NB Big Bend Dr from Woodland Ln to I-43
|
|
Medium |
Left lane closed, one lane open |
05/11/10 12:00 AM |
09/24/10 11:45 PM |
WisDOT |
Construction - STH 164 INTERCHANGE |
|