Construction Report
Select Location
  
Updated: 4/28/17 6:34 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

Construction information transmitted by the Illinois Tollway for display on the I-90 EB, I-90 WB, I-94 EB, I-94 WB, Jane Addams Memorial (Northwest) EB and Jane Addams Memorial (Northwest) WB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

I-39 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from WB I-90 to E Riverside 12.4 to 12.3 Medium All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left IPO Lane Closed; Left Side of Ramp Closed; *** Long Term Closure ***
Ramp from E Riverside to WB I90 12.4 to 12.3 None All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left Side of Ramp Closed; *** Long Term Closure ***

I-39 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Colley Rd (+0.3 miles) to Stateline Rd Minor Left shoulder closed, all lanes open 4/18/17 12:00 AM to 8/20/17 11:45 PM WisDOT Construction - Illinois State Line - Madison | Stateline Rd Bridge B-53-0325 | I 39 | ROCK
Colley Rd (+0.3 miles) to Stateline Rd Medium Left lane closed, one lane open 4/28/17 10:00 PM to 4/29/17 7:00 AM WisDOT Construction - Illinois State Line - Madison | Stateline Rd Bridge B-53-0325 | I 39 | ROCK
Ramp from E Riverside to EB I-90 12.3 to 12.4 Medium All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left IPO Lane Closed, Left Side of Ramp Closed***Long Term Closure ***
Ramp from EB I-90 to E Riverside 12.3 to 12.4 None All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left Side of Ramp Closed; *** Long Term Closure ***
Exit to EB I-90 (Jane Addams Memorial Tollway) 17.3 to 18.7 Medium Right lane closed, one or two lanes open 4/28/17 9:00 AM to 2:00 PM Illinois Tollway
Exit ramp to WB I-88 97.8 Major All lanes closed 4/10/17 12:00 AM to 5/30/17 11:59 PM IDOT Ramp closed. Detour using 3 ramps

I-55 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Mississippi River to IL-3 0.1 to 2.8 Medium Left lane closed, one to three lanes open 4/3/17 7:00 AM to 5/31/17 6:00 PM IDOT
I-64 to Exchange Ave 2.6 to 3.1 Medium Various lanes closed 3/20/17 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
n/o Adlai Stevenson Dr (+0.4 miles) to n/o I-72 (+0.5 miles) 94.8 to 98.0 Medium Various lanes closed 4/26/17 7:00 PM to 10/1/17 6:00 AM IDOT Pavement patching and resurfacing project. Work will take place during nighttime hours from 7 p.m. to 6 a.m. Mondays through Thursdays. Construction will begin in the southbound lanes. One lane will be closed at a time. Once southbound lanes are completed, work will begin on the northbound lanes. Expected to be completed by early fall.
I-155 (-0.3 miles) to Old Route 121 (-0.6 miles) 126.4 to 127.9 Medium One lane closed, one to three lanes open 9/19/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
at 2350th St 139.8 Medium One lane closed, one lane open 4/18/17 12:00 AM to 6/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
Entrance from WB I-74 160.0 to 160.0 Medium Various lanes closed 4/3/17 7:00 AM to 7/31/17 6:00 PM IDOT Bridge deck repairs
Reed Rd to Lorenzo Rd 233.5 to 240.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 8:30 AM to 3:00 PM IDOT Moving Operation
Reed Rd to Weigh Station 233.5 to 265.6 Medium Left lane and left shoulder closed, one or two lanes open 4/28/17 10:00 AM to 2:00 PM IDOT Moving Operation
Reed Rd to I-355 233.5 to 269.4 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 3:00 PM IDOT Moving Operation
Reed Rd to Lake Shore Dr (US-41) 233.5 to 293.7 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 2:30 PM IDOT Moving Operation
Lorenzo Rd to I-80 240.5 to 250.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 9:00 AM to 2:00 PM IDOT Moving Operation
I-80 to Weber Rd 250.3 to 263.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 9:00 AM to 2:30 PM IDOT Moving Operation
Weber Rd to 0.5 miles north of Willow Springs Rd 263.5 to 278.4 Minor Both shoulders closed, all lanes open 4/17/17 12:00 AM to 10/1/17 11:59 PM IDOT Various locations rough grooved surface, work zone speed limit 55mph. Daily night time lane closures.; Long Term Closure
Weber Rd to Canal St 263.5 to 292.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 10:00 AM to 2:00 PM IDOT Moving Operation
Entrance ramp from NB IL-83 274.8 None Partial closure 4/28/17 9:00 AM to 3:00 PM IDOT
County Line Rd to Lake Shore Dr (US-41) 276.4 to 293.7 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from Cicero Ave 286.4 None Partial closure 4/28/17 9:00 AM to 3:00 PM IDOT
Canal St to Lake Shore Dr (US-41) 292.6 to 293.8 Medium Right lane and right shoulder closed, one to three lanes open 10/22/15 12:00 AM to 8/1/17 11:59 PM IDOT Traffic lanes weaved; Long Term Closure
Exit ramp to NB Lake Shore Dr 293.7 None Partial closure 12/22/16 12:00 AM to 8/1/17 11:59 PM IDOT Ramp reduced to 1 lane; Long Term Closure
Exit ramp to SB US-41 293.7 None Partial closure 10/22/15 12:00 AM to 8/1/17 11:59 PM IDOT Shoulders closed. 11' width restriction.; Long Term Closure

I-55 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from NB Lake Shore Dr 293.8 None Partial closure 6/11/15 12:00 AM to 7/14/17 11:59 PM IDOT Lane shifted and width reduction (11') ***Long Term Closure***
Lake Shore Dr (US-41) to State St 293.9 to 293.2 Medium Left lane and left shoulder closed, one to three lanes open 6/11/15 12:00 AM to 7/14/17 11:59 PM IDOT Narrow Lanes; Long Term Closure
Lake Shore Dr (US-41) to Reed Rd 293.8 to 233.6 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from SB US-41 293.8 Minor All lanes and shoulders open 6/11/15 12:00 AM to 7/14/17 11:59 PM IDOT Left lane closed.; Long Term Closure
State St to Dan Ryan Expy (I-90/94) 293.2 to 292.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 10:30 AM to 1:30 PM IDOT Moving Operation
Dan Ryan Expy (I-90/94) to Weber Rd 292.4 to 263.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 9:00 AM to 1:00 PM IDOT Moving Operation
Archer Ave to 0.5 miles south of Archer Ave 292.0 to 291.5 Minor Right shoulder closed, all lanes open 4/28/17 9:00 AM to 3:00 PM IDOT
0.5 miles south of Pulaski Rd to Cicero Ave (IL-50) 287.3 to 286.7 Minor Left shoulder closed, all lanes open 4/28/17 9:00 AM to 3:00 PM IDOT
Wolf Rd to Weber Rd 277.4 to 263.5 Minor Both shoulders closed, all lanes open 4/17/17 12:00 AM to 10/1/17 11:59 PM IDOT Various locations rough grooved surface, work zone speed limit 55mph. Daily night time lane closures.; Long Term Closure
County Line Rd to Kingery Hwy (IL-83) 276.4 to 274.6 Minor Right shoulder closed, all lanes open 4/28/17 9:00 AM to 3:00 PM IDOT
Entrance ramp from NB Lemont Rd 271.0 None Partial closure 4/28/17 9:00 AM to 3:00 PM IDOT
Weber Rd to I-80 263.5 to 250.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 10:00 AM to 2:00 PM IDOT Moving Operation
Weber Rd to Reed Rd 263.5 to 233.6 Medium Left lane and left shoulder closed, one or two lanes open 4/28/17 9:00 AM to 1:30 PM IDOT Moving Operation
Exit ramp to US-30 257.7 None Partial closure 6/29/15 12:00 AM to 6/30/17 11:59 PM IDOT 2nd Right turn lane closed ***Long Term Closure***
I-80 to Lorenzo Rd 250.3 to 240.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 8:30 AM to 1:30 PM IDOT Moving Operation
Lorenzo Rd to Reed Rd 240.5 to 233.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 8:30 AM to 3:00 PM IDOT Moving Operation
Exit to EB I-74 160.0 to 160.0 Medium Various lanes closed 4/3/17 7:00 AM to 7/31/17 6:00 PM IDOT Bridge deck repairs
at 2350th St 139.9 Medium One lane closed, one lane open 4/18/17 12:00 AM to 6/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
Old Route 121 (+0.7 miles) to I-155 (+0.4 miles) 128.0 to 126.3 Medium One lane closed, one or two lanes open 9/19/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
n/o I-72 (-0.5 miles) to n/o Adlai Stevenson Dr (-0.4 miles) 98.0 to 94.8 Medium Various lanes closed 4/26/17 7:00 PM to 10/1/17 6:00 AM IDOT Pavement patching and resurfacing project. Work will take place during nighttime hours from 7 p.m. to 6 a.m. Mondays through Thursdays. Construction will begin in the southbound lanes. One lane will be closed at a time. Once southbound lanes are completed, work will begin on the northbound lanes. Expected to be completed by early fall.
Dr Martin Luther King Jr Mem Brg (-0.3 miles) to 4th St 1.9 to 1.2 Medium One lane closed, one or two lanes open 6/10/15 12:00 AM to 6/1/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6".
3rd St to Tudor St 1.8 to 0.8 Medium Various lanes closed 4/19/17 9:15 AM to 8/31/17 7:00 PM IDOT Traffic will be switched from the left two lanes to the right two lanes. One lane will remain open at all times during this transition. The two right lanes are anticipated to be open by 7:00 PM. The lane closures are expected to continue through the summer.
River Park Dr to Trendley Ave (+0.1 miles) 1.5 to 0.8 Major Left two lanes closed, up to one lanes open 4/20/17 7:00 AM to 8/31/17 6:00 PM IDOT

I-57 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
IL-146 (-0.2 miles) to IL-146 (+0.2 miles) 29.8 to 30.2 Medium 0 lanes closed, two lanes open 4/3/17 12:00 AM to 11/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 19' 6".
1900th Ave (+0.1 miles) to 1900th Ave (+0.5 miles) 166.2 to 166.5 Medium Various lanes closed 2/20/17 12:00 AM to 6/15/17 11:59 PM IDOT Rest area closed.
County Road 600 (-0.4 miles) to Curtis Rd (+0.5 miles) 224.1 to 232.0 Medium One lane closed, one lane open 4/3/17 12:00 AM to 12/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
County Road 600 to Olympian Dr (+0.3 miles) 224.5 to 238.6 Medium Various lanes closed 4/3/17 7:00 AM to 11/30/17 11:59 PM IDOT Resurfacing; One lane of traffic in both directions
at County Road 800 (-0.7 miles) 225.8 Medium One lane closed, one lane open 4/3/17 12:00 AM to 12/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
100N Rd (-1.1 miles) to 200N (-1.6 miles) 257.1 to 264.0 Medium One lane closed, one lane open 3/10/17 12:00 AM to 9/10/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 15' 6".
6000N Rd (-0.3 miles) to 6000N Rd (+0.3 miles) 318.3 to 318.8 Minor Left or right shoulder closed, all lanes open 9/14/15 12:00 AM to 9/25/17 11:59 PM IDOT Shoulder work.
6000N Rd to 6000N Rd 318.5 to 318.6 Medium One lane closed, one lane open 3/23/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
Halsted St (IL-1) to Dan Ryan Expy (I-94) 357.3 to 357.9 Medium Left lane and left shoulder closed, three lanes open 3/19/17 12:00 AM to 11/22/17 11:59 PM IDOT Long Term Closure

I-57 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from NB Bishop Ford 358.0 Minor Right shoulder closed, all lanes open 4/17/17 12:00 AM to 7/1/17 11:59 PM IDOT Long Term Closure
6000N Rd (-0.3 miles) to 6000N Rd (+0.3 miles) 318.8 to 318.3 Minor Left or right shoulder closed, all lanes open 9/14/15 12:00 AM to 9/25/17 11:59 PM IDOT Shoulder work.
6000N Rd to 6000N Rd 318.6 to 318.5 Medium One lane closed, one lane open 3/23/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
200N (+1.6 miles) to 100N Rd (+1.1 miles) 264.0 to 257.1 Medium One lane closed, one lane open 3/10/17 12:00 AM to 9/10/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 15' 6".
Olympian Dr (-0.3 miles) to County Road 600 238.6 to 224.5 Medium Various lanes closed 4/3/17 7:00 AM to 11/30/17 11:59 PM IDOT Resurfacing; One lane of traffic in both directions
Curtis Rd (-0.5 miles) to County Road 600 (+0.4 miles) 232.0 to 224.1 Medium One lane closed, one lane open 4/3/17 12:00 AM to 12/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
at County Road 800 (+0.7 miles) 225.8 Medium One lane closed, one lane open 4/3/17 12:00 AM to 12/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
Grassy Rd to Pulleys Mill Rd (-0.3 miles) 47.1 to 43.1 Medium One lane closed, one lane open 4/17/17 12:00 AM to 6/2/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 18'.
IL-146 (-0.2 miles) to IL-146 (+0.2 miles) 30.2 to 29.9 Medium One lane closed, one lane open 4/3/17 12:00 AM to 11/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 14' 6".

I-64 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit to NB I-55 0.1 to 2.8 Medium Left lane closed, one to three lanes open 4/3/17 7:00 AM to 5/31/17 6:00 PM IDOT
Exit to NB I-55 2.6 to 3.1 Medium Various lanes closed 3/20/17 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
Green Mount Rd (+0.3 miles) to IL-4 (+1.3 miles) 16.1 to 24.1 Medium One lane closed, one lane open 9/10/14 12:00 AM to 8/1/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
Lincoln Ave (+0.2 miles) to IL-158 (+0.4 miles) 17.1 to 19.1 Medium Right lane closed, one lane open 10/4/16 12:00 AM to 7/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 6".
at Rieder Rd 20.4 Medium One lane closed, one lane open 6/10/16 12:00 AM to 8/1/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.
Exit ramp to SB IL-127 49.6 Medium All lanes and shoulders open 4/24/17 6:00 AM to 5/1/17 8:00 PM IDOT
Entrance ramp from SB IL-127 50.2 Medium Various lanes closed 4/24/17 6:00 AM to 5/1/17 8:00 PM IDOT

I-64 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
2140 East Rd (+0.1 miles) to 2140 East Rd (+0.3 miles) 129.8 to 129.6 Medium Various lanes closed 8/12/16 12:00 AM to 11/30/17 11:59 PM IDOT Rest area closed.
IL-4 (-1.3 miles) to Green Mount Rd (-0.3 miles) 24.0 to 16.0 Medium One lane closed, one lane open 9/10/14 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
at Rieder Rd (-0.1 miles) 20.3 Medium One lane closed, one lane open 6/10/16 12:00 AM to 8/1/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.
IL-158 (-0.4 miles) to Lincoln Ave (-0.2 miles) 19.0 to 17.0 Medium One lane closed, one lane open 10/4/16 12:00 AM to 7/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 6".
Dr Martin Luther King Jr Mem Brg (-0.3 miles) to 4th St 1.9 to 1.2 Medium One lane closed, one or two lanes open 6/10/15 12:00 AM to 6/1/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6".
3rd St to Tudor St 1.8 to 0.8 Medium Various lanes closed 4/19/17 9:15 AM to 8/31/17 7:00 PM IDOT Traffic will be switched from the left two lanes to the right two lanes. One lane will remain open at all times during this transition. The two right lanes are anticipated to be open by 7:00 PM. The lane closures are expected to continue through the summer.
River Park Dr to Trendley Ave (+0.1 miles) 1.5 to 0.8 Major Left two lanes closed, up to one lanes open 4/20/17 7:00 AM to 8/31/17 6:00 PM IDOT

I-70 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Prairie Rd (-0.1 miles) to US-40 (-0.6 miles) 25.9 to 36.9 Medium 0 lanes closed, two lanes open 2/15/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
Prairie Rd to Baumann Rd (+0.8 miles) 26.0 to 33.0 Medium Various lanes closed 4/3/17 7:00 AM to 10/31/17 6:00 PM IDOT
Prairie Rd (+0.1 miles) to Prairie Rd (+0.4 miles) 26.0 to 26.4 Medium Various lanes closed 4/3/17 12:00 AM to 6/1/17 11:59 PM IDOT Rest area closed.
at Prairie Rd (+0.6 miles) 26.5 Medium 0 lanes closed, two lanes open 2/15/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
Spring Creek Rd to 1225 East Rd (+0.5 miles) 105.3 to 113.9 Medium One lane closed, one lane open 3/20/17 12:00 AM to 11/7/17 11:59 PM IDOT Expect delays with lane restrictions for patching, milling and resurfacing. Vehicle width restricted to 12' 6".

I-70 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
1225 East Rd (-0.5 miles) to Spring Creek Rd 113.8 to 105.2 Medium One lane closed, one lane open 3/20/17 12:00 AM to 11/7/17 11:59 PM IDOT Expect delays with lane restrictions for patching, milling and resurfacing. Vehicle width restricted to 12' 6".
US-40 (+0.6 miles) to Prairie Rd (+0.1 miles) 36.6 to 25.6 Medium 0 lanes closed, two lanes open 2/15/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
Sugar Loaf Rd (+5.6 miles) to Prairie Rd (-0.1 miles) 33.0 to 25.7 Medium Various lanes closed 4/3/17 7:00 AM to 10/31/17 6:00 PM IDOT
IL-160 (+0.6 miles) to Prairie Rd (-0.8 miles) 27.0 to 26.5 Medium One lane closed, one lane open 4/3/17 12:00 AM to 6/1/17 11:59 PM IDOT Rest area closed.
at Prairie Rd (-0.6 miles) 26.3 Medium 0 lanes closed, two lanes open 2/15/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.

I-72 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Hickory Ln (-0.7 miles) to Gregory Rd (-0.5 miles) 48.7 to 53.7 Medium One lane closed, one lane open 4/10/17 12:00 AM to 5/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
n/o Adlai Stevenson Dr (+0.4 miles) to n/o I-72 (+0.5 miles) 94.8 to 98.0 Medium Various lanes closed 4/26/17 7:00 PM to 10/1/17 6:00 AM IDOT Pavement patching and resurfacing project. Work will take place during nighttime hours from 7 p.m. to 6 a.m. Mondays through Thursdays. Construction will begin in the southbound lanes. One lane will be closed at a time. Once southbound lanes are completed, work will begin on the northbound lanes. Expected to be completed by early fall.

I-72 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
n/o I-72 (-0.5 miles) to n/o Adlai Stevenson Dr (-0.4 miles) 98.0 to 94.8 Medium Various lanes closed 4/26/17 7:00 PM to 10/1/17 6:00 AM IDOT Pavement patching and resurfacing project. Work will take place during nighttime hours from 7 p.m. to 6 a.m. Mondays through Thursdays. Construction will begin in the southbound lanes. One lane will be closed at a time. Once southbound lanes are completed, work will begin on the northbound lanes. Expected to be completed by early fall.
Gregory Rd (+0.5 miles) to Hickory Ln (+0.7 miles) 48.4 to 43.5 Medium One lane closed, one lane open 4/10/17 12:00 AM to 5/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

I-74 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Gilbert St to River Dr 5.0 to 1.2 Medium Various lanes closed 4/17/17 8:00 PM to 7/3/17 6:00 AM IowaDOT intermittent lane closure
600th Ave (+0.1 miles) to 600th Ave (+0.4 miles) 28.1 to 28.5 Medium Various lanes closed 12/13/16 12:00 AM to 6/30/17 11:59 PM IDOT Rest area closed.
Knox Highway 40 (-0.3 miles) to Knox Highway 40 (+0.2 miles) 46.1 to 46.6 Medium One lane closed, one lane open 3/1/17 12:00 AM to 11/15/18 11:59 PM IDOT Expect lane restrictions for roadway improvement.
at Knox Highway 40 46.4 Medium One lane closed, one lane open 3/21/17 12:00 AM to 7/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
at Fremont St (-0.2 miles) 47.0 Medium Various lanes closed 4/19/17 7:00 AM to 5/16/17 11:59 PM IDOT One lane will be closed in both directions of I-74 at mile marker 47 in Galesburg until mid-May for a bridge replacement project . Beginning in mid-May and continuing until the end of November, all traffic will use the eastbound lanes - one lane in each direction, separated by barrier wall. The westbound bridge will be replaced this year; the eastbound bridge will be replaced in 2018.
Knox Highway 9 (-0.1 miles) to Knox Highway 9 (+0.1 miles) 50.9 to 51.1 Medium Various lanes closed 5/15/16 12:00 AM to 10/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
at Knox Highway 9 51.0 Medium Various lanes closed 3/6/17 12:00 AM to 10/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 1".
IL-97 (-0.2 miles) to Sterling Ave 53.5 to 88.9 Medium One lane closed, one lane open 2/14/17 12:00 AM to 10/10/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
IL-97 (-0.2 miles) to Sterling Ave 53.5 to 88.9 Medium One lane closed, one lane open 3/6/17 12:00 AM to 10/10/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 6".
Frontage Rd (-0.1 miles) to IL-78 (+0.7 miles) 61.0 to 70.0 Medium Various lanes closed 4/19/17 7:00 AM to 11/30/17 11:59 PM IDOT Resurfacing project
at IL-78 69.3 Medium Various lanes closed 4/19/17 7:00 AM to 8/15/17 11:59 PM IDOT Bridge painting project . Intermittent lane closures in both directions of I-74 . The lane closures will be in effect at one location at a time.
IL-9 (-0.3 miles) to IL-54 (+1.0 miles) 160.0 to 160.0 Medium Various lanes closed 4/3/17 7:00 AM to 7/31/17 6:00 PM IDOT Bridge deck repairs
2600 East Rd (-0.2 miles) to Old Principal Rd (-1.0 miles) 149.0 to 154.0 Medium Various lanes closed 4/3/17 7:00 AM to 10/31/17 6:00 PM IDOT Patching, milling and resurfacing
2600 East Rd (+0.2 miles) to US-150 (-0.7 miles) 149.4 to 156.4 Medium One lane closed, one lane open 4/3/17 12:00 AM to 8/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
IL-54 to IL-54 (+1.2 miles) 159.0 to 160.2 Medium One lane closed, one lane open 4/1/17 12:00 AM to 6/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
at IL-54 (+0.4 miles) 159.4 Medium One lane closed, one lane open 4/1/17 12:00 AM to 6/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 9".
County Road 175 (-0.1 miles) to Prairie View Rd (+0.3 miles) 170.0 to 174.0 Medium Various lanes closed 4/3/17 7:00 AM to 9/30/17 6:00 PM IDOT New bridge deck overlay
IL-47 (-0.1 miles) to IL-47 (+0.1 miles) 171.6 to 171.9 Medium One lane closed, one lane open 4/1/17 12:00 AM to 9/14/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 3".
Perrysville Rd (-0.2 miles) to Perrysville Rd (-0.1 miles) 215.5 to 215.6 Medium Various lanes closed 4/17/17 7:00 AM to 11/30/17 6:00 PM IDOT Bridge repair : The width restriction will be 11 feet for the open lane.

I-74 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Prairie View Rd (-0.5 miles) to County Road 175 174.0 to 170.0 Medium Various lanes closed 4/3/17 7:00 AM to 9/30/17 6:00 PM IDOT New bridge deck overlay
IL-47 (-0.1 miles) to IL-47 (+0.1 miles) 171.8 to 171.5 Medium One lane closed, one lane open 4/1/17 12:00 AM to 9/14/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 3".
IL-54 (-1.2 miles) to IL-54 160.1 to 158.9 Medium One lane closed, one lane open 4/1/17 12:00 AM to 6/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
IL-54 (-1.1 miles) to IL-9 (+0.3 miles) 160.0 to 160.0 Medium Various lanes closed 4/3/17 7:00 AM to 7/31/17 6:00 PM IDOT Bridge deck repairs
at IL-54 (-0.4 miles) 159.2 Medium One lane closed, one lane open 4/1/17 12:00 AM to 6/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 9".
US-150 (+0.7 miles) to 2600 East Rd (-0.1 miles) 156.3 to 149.3 Medium One lane closed, one lane open 4/3/17 12:00 AM to 8/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
Old Principal Rd (+0.9 miles) to 2600 East Rd (+0.1 miles) 154.0 to 149.0 Medium Various lanes closed 4/3/17 7:00 AM to 10/31/17 6:00 PM IDOT Patching, milling and resurfacing
Sterling Ave to IL-97 (+0.2 miles) 88.8 to 53.4 Medium One lane closed, one lane open 2/14/17 12:00 AM to 10/10/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
Sterling Ave to IL-97 (+0.2 miles) 88.8 to 53.4 Medium One lane closed, one lane open 3/6/17 12:00 AM to 10/10/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 6".
IL-78 (-0.7 miles) to Frontage Rd 70.0 to 61.0 Medium Various lanes closed 4/19/17 7:00 AM to 11/30/17 11:59 PM IDOT Resurfacing project
at IL-78 69.3 Medium Various lanes closed 4/19/17 7:00 AM to 8/15/17 11:59 PM IDOT Bridge painting project . Intermittent lane closures in both directions of I-74 . The lane closures will be in effect at one location at a time.
Knox Highway 9 (-0.1 miles) to Knox Highway 9 (+0.1 miles) 51.0 to 50.9 Medium Various lanes closed 5/15/16 12:00 AM to 10/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
at Knox Highway 9 50.9 Medium Various lanes closed 3/6/17 12:00 AM to 10/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 1".
at Fremont St (+0.1 miles) 47.0 Medium Various lanes closed 4/19/17 7:00 AM to 5/16/17 11:59 PM IDOT One lane will be closed in both directions of I-74 at mile marker 47 in Galesburg until mid-May for a bridge replacement project . Beginning in mid-May and continuing until the end of November, all traffic will use the eastbound lanes - one lane in each direction, separated by barrier wall. The westbound bridge will be replaced this year; the eastbound bridge will be replaced in 2018.
Knox Highway 40 (-0.2 miles) to Knox Highway 40 (+0.2 miles) 46.6 to 46.1 Medium One lane closed, one lane open 3/1/17 12:00 AM to 11/15/18 11:59 PM IDOT Expect lane restrictions for roadway improvement.
at Knox Highway 40 46.4 Medium One lane closed, one lane open 3/21/17 12:00 AM to 7/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
Exit ramp to EB IL-5 4.5 Major All lanes closed 3/27/17 12:00 AM to 12/1/17 11:59 PM IDOT Ramp closed.
River Dr to Gilbert St 1.2 to 5.0 Medium Various lanes closed 4/17/17 8:00 PM to 7/3/17 6:00 AM IowaDOT intermittent lane closure

I-80 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-88 (+0.1 miles) to US-6 (-0.3 miles) 3.6 to 8.8 Medium One lane closed, one lane open 3/1/17 12:00 AM to 11/22/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
I-88 (+0.1 miles) to US-6 (-0.3 miles) 3.6 to 8.8 Medium One lane closed, one lane open 3/13/17 12:00 AM to 10/3/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 14'.
Entrance ramp from Cleveland Rd 6.9 Medium All lanes and shoulders closed 3/20/17 12:00 AM to 10/6/17 11:59 PM IDOT Ramp closed.
at 3rd Rd (+0.9 miles) 76.9 Medium One lane closed, one lane open 4/10/17 12:00 AM to 5/12/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 6".
Briggs St to I-55 126.2 to 134.9 Medium Various lanes; lane unknown, left shoulder, closed; lane unknown, right shoulder, closed 4/18/17 12:00 AM to 6/30/17 11:59 PM IDOT 78 miles of shoulder repair improvements at various locations in Romeoville, Monee, Peotone,Plainfield,Shorewood,Channahon,Rockdale,Manhattan,Joliet & Cresthill.

I-80 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Francis Rd 138.5 Minor Right shoulder closed, all lanes open 4/28/17 9:00 AM to 2:00 PM IDOT
I-55 to Briggs St 134.9 to 126.2 Medium Various lanes; lane unknown, left shoulder, closed; lane unknown, right shoulder, closed 4/18/17 12:00 AM to 6/30/17 11:59 PM IDOT 78 miles of shoulder repair improvements at various locations in Romeoville, Monee, Peotone,Plainfield,Shorewood,Channahon,Rockdale,Manhattan,Joliet & Cresthill.
US-6 (+0.2 miles) to I-88 (-0.1 miles) 1.7 to 3.6 Medium One lane closed, one lane open 3/1/17 12:00 AM to 11/22/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
US-6 (+0.2 miles) to I-88 (-0.1 miles) 1.7 to 3.5 Medium One lane closed, one lane open 3/13/17 12:00 AM to 10/3/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 14'.

I-88 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-30 (Rock Falls) to US-52 (Chicago Ave) (+0.9 miles) 44.2 to 55.9 Medium Right lane closed, one lane open 4/3/17 7:00 AM to 5/15/17 11:59 PM Illinois Tollway Rdwy/Bridge Rehabilitation; ***Long Term Closure ***
Mitchell Rd (-0.1 miles) to Farnsworth Ave (-0.1 miles) 118.2 to 119.2 Medium Left lane closed, two lanes open 4/28/17 9:00 AM to 7:00 PM Illinois Tollway Bridge Reconst

I-88 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Locust Rd (+0.7 miles) to I-39 (US-51) (+1.3 miles) 80.0 to 77.2 Medium Right lane closed, one lane open 4/17/17 7:00 AM to 5/16/17 11:59 PM Illinois Tollway Ramp Reconst; *** Long Term Closure ***
Entrance ramp from SB I-39 78.2 Major All lanes closed 4/10/17 12:00 AM to 5/30/17 11:59 PM IDOT Ramp closed. Detour using 3 ramps

I-90 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Colley Rd (+0.3 miles) to Stateline Rd Minor Left shoulder closed, all lanes open 4/18/17 12:00 AM to 8/20/17 11:45 PM WisDOT Construction - Illinois State Line - Madison | Stateline Rd Bridge B-53-0325 | I 39 | ROCK
Colley Rd (+0.3 miles) to Stateline Rd Medium Left lane closed, one lane open 4/28/17 10:00 PM to 4/29/17 7:00 AM WisDOT Construction - Illinois State Line - Madison | Stateline Rd Bridge B-53-0325 | I 39 | ROCK
Ramp from E Riverside to EB I-90 12.3 to 12.4 Medium All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left IPO Lane Closed, Left Side of Ramp Closed***Long Term Closure ***
Ramp from EB I-90 to E Riverside 12.3 to 12.4 None All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left Side of Ramp Closed; *** Long Term Closure ***
Newburg Rd (+0.3 miles) to Mill Rd (+1.0 miles) 17.3 to 18.7 Medium Right lane closed, one or two lanes open 4/28/17 9:00 AM to 2:00 PM Illinois Tollway
Harmony Rd (+0.3 miles) to IL-23 (+0.1 miles) 35.6 to 36.2 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Arlington Heights Rd (+0.8 miles) to Elmhurst Rd (-0.3 miles) 71.6 to 73.3 Medium Right lane closed, two lanes open 12/24/16 12:00 AM to 8/1/17 12:00 AM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***
River Rd to Harlem (IL-43) 79.1 to 81.1 Minor Both shoulders closed, all lanes open 4/1/17 12:00 AM to 6/2/17 11:59 PM IDOT Closed Shoulders, Narrow Lanes, Lanes Shifted to Right, Work Zone Speed Limit 45MPH; Long Term Closure
Entrance from EB I-190 0.9 to 3.0 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 9:30 AM to 1:00 PM IDOT Moving Operation
Entrance from EB I-190 2.3 to 3.0 Minor Both shoulders closed, all lanes open 4/3/17 12:00 AM to 7/31/17 11:59 PM IDOT Closed Shoulders, Narrow Lanes, Lanes shifted to left, Work Zone Speed Limit 45; Long Term Closure
Entrance ramp from WB Ohio Feeder 50.5 None Partial closure 4/3/17 12:00 AM to 7/20/17 11:59 PM IDOT Long Term Closure
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure

I-90 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Exit ramp to EB Ohio Feeder 50.5 None Partial closure 4/3/17 12:00 AM to 7/20/17 11:59 PM IDOT Long Term Closure
Exit to WB I-190 79.1 to 77.0 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 9:30 AM to 1:00 PM IDOT Moving Operation
Meacham Rd (-0.4 miles) to Meacham Rd (+0.1 miles) 67.8 to 67.3 Medium Right lane closed, two or three lanes open 4/28/17 9:00 AM to 12:01 PM Illinois Tollway Rdwy Widening and Reconst
Roselle Rd (-0.1 miles) to Roselle Rd (+0.4 miles) 65.7 to 65.2 Medium Right lane closed, three lanes open 4/28/17 6:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst
Roselle Rd to Roselle Rd (+0.1 miles) 65.6 to 65.5 Medium Right lane closed, three lanes open 4/28/17 9:00 AM to 3:00 PM Illinois Tollway Bridge Reconst
IL-25 (+0.1 miles) to Airport Rd (+0.3 miles) 56.0 to 55.3 Medium Right lane closed, three lanes open 4/28/17 6:00 AM to 2:00 PM Illinois Tollway Bridge Widening and Reconst
IL-23 (-0.4 miles) to IL-23 (+0.1 miles) 36.5 to 36.0 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Ramp from WB I-90 to E Riverside 12.4 to 12.3 Medium All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left IPO Lane Closed; Left Side of Ramp Closed; *** Long Term Closure ***
Ramp from E Riverside to WB I90 12.4 to 12.3 None All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left Side of Ramp Closed; *** Long Term Closure ***

I-94 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB Ohio Feeder 50.5 None Partial closure 4/3/17 12:00 AM to 7/20/17 11:59 PM IDOT Long Term Closure
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure

I-94 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SB I-57 63.7 Minor Right shoulder closed, all lanes open 4/17/17 12:00 AM to 7/1/17 11:59 PM IDOT Long Term Closure
I-57 / Bishop Ford (I-94) to 91st St 62.9 to 62.3 Medium Left lane and left shoulder closed, four lanes open 3/19/17 12:00 AM to 11/22/17 11:59 PM IDOT Narrow Lanes; Long Term Closure
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Exit ramp to EB Ohio Feeder 50.5 None Partial closure 4/3/17 12:00 AM to 7/20/17 11:59 PM IDOT Long Term Closure

I-155 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-55 to 1850th St (+0.4 miles) 0.0 to 1.4 Medium One lane closed, one lane open 9/19/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

I-155 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
1850th St (-0.4 miles) to I-55 1.4 to 0.0 Medium One lane closed, up to one lanes open 9/19/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

I-190 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Bessie Coleman Dr to East River Rd 0.9 to 3.0 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 9:30 AM to 1:00 PM IDOT Moving Operation
River Rd to East River Rd 2.3 to 3.0 Minor Both shoulders closed, all lanes open 4/3/17 12:00 AM to 7/31/17 11:59 PM IDOT Closed Shoulders, Narrow Lanes, Lanes shifted to left, Work Zone Speed Limit 45; Long Term Closure

I-190 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Expy (I-90) to Bessie Coleman Dr 79.1 to 77.0 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 9:30 AM to 1:00 PM IDOT Moving Operation

I-255 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Mousette Ln to Lake Dr (-0.2 miles) 14.9 to 17.7 Medium Various lanes closed 4/6/17 12:00 AM to 3/1/18 11:59 PM IDOT Expect lane restrictions for roadway improvement.
IL-15 to State St 16.5 to 18.4 Medium Left lane closed, two lanes open 4/18/17 5:30 AM to 5/5/17 4:00 PM IDOT To place concrete light foundations. Motorists are urged to seek alternate routes, obey all traffic control signage and allow extra time when travelling in the area.

I-255 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
State St to IL-15 18.3 to 16.4 Medium Left lane closed, two lanes open 4/18/17 5:30 AM to 5/5/17 4:00 PM IDOT To place concrete light foundations. Motorists are urged to seek alternate routes, obey all traffic control signage and allow extra time when travelling in the area.

I-270 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
IL-159 to I-55/70 11.9 to 14.6 Medium Various lanes closed 3/20/17 7:00 AM to 10/31/17 6:00 PM IDOT This lane restriction is necessary to perform electrical work

I-290 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Jane Addams Twy (I-90) to Wells St 0.0 to 30.4 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to SEB Thorndale Ave 4.5 Minor Right shoulder closed, all lanes open 11/28/16 12:00 AM to 7/31/17 11:59 PM IDOT Long Term Closure
Entrance ramp from EB IL-390 5.3 None Partial closure 4/28/17 9:00 AM to 3:00 PM Illinois Tollway Interchange Reconstruction; Right Side of Ramp Closed
Halsted St to Canal St 29.8 to 30.2 Major Left lane and left shoulder closed, two or three lanes open 10/10/16 7:00 AM to 6/30/17 11:59 PM IDOT *** Long Term Closure ***

I-290 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wells St to Halsted St 30.5 to 29.8 Major Left two lanes and left shoulder closed, up to two lanes open 10/10/16 7:00 AM to 6/30/17 11:59 PM IDOT *** Long Term Closure ***
Wells St to Jane Addams Twy (I-90) 30.5 to 0.1 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from SB Canal St 30.1 Medium All lanes and shoulders closed 10/10/16 7:00 AM to 8/31/18 11:59 PM IDOT *** Long Term Closure ***
Halsted St to Peoria St 29.8 to 29.6 Major Left two lanes and left shoulder closed, one or two lanes open 3/17/17 12:00 AM to 10/1/17 11:59 PM IDOT Weave RT to LT; Long Term Closure
Exit ramp to Morgan St 29.6 Medium All lanes and shoulders closed 12/10/15 12:00 AM to 6/1/17 11:59 PM IDOT *** Long Term Closure ***
Peoria St to Racine Ave 29.7 to 29.3 Medium Right lane and both shoulders closed, three lanes open 10/29/15 12:00 AM to 12/31/17 11:59 PM IDOT Lanes Weaved. NW/SW Ramp LN 3. WB Congress LNs 1&2.; *** Long Term Closure ***
Entrance ramp from EB IL-390 5.2 None Partial closure 4/28/17 9:00 AM to 3:00 PM Illinois Tollway Interchange Reconstruction; Right Side of Ramp Closed

I-474 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wesley Rd (-0.3 miles) to Wesley Rd (-0.1 miles) 8.1 to 8.3 Medium One lane closed, one lane open 4/8/17 12:00 AM to 11/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 1".

I-474 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
IL-29 (-0.2 miles) to Wesley Rd (+0.3 miles) 9.0 to 8.0 Medium One lane closed, one lane open 4/16/17 12:00 AM to 11/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16' 1".

IL-53 NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wells St to Jane Addams Twy (I-90) 30.5 to 0.1 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 3:00 PM IDOT Moving Operation

IL-53 SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Jane Addams Twy (I-90) to Wells St 0.0 to 30.4 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 3:00 PM IDOT Moving Operation

IL-390 (Elgin O'Hare) EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SEB I-290 12.3 None Partial closure 4/28/17 9:00 AM to 3:00 PM Illinois Tollway Interchange Reconstruction; Right Side of Ramp Closed
Exit ramp to NWB I-290 12.6 None Partial closure 4/28/17 9:00 AM to 3:00 PM Illinois Tollway Interchange Reconstruction; Right Side of Ramp Closed

Bishop Ford NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SB I-57 63.7 Minor Right shoulder closed, all lanes open 4/17/17 12:00 AM to 7/1/17 11:59 PM IDOT Long Term Closure

Dan Ryan Local NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-57 / Bishop Ford (I-94) to 91st St 62.9 to 62.3 Medium Left lane and left shoulder closed, four lanes open 3/19/17 12:00 AM to 11/22/17 11:59 PM IDOT Narrow Lanes; Long Term Closure

Eisenhower EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Jane Addams Twy (I-90) to Wells St 0.0 to 30.4 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 3:00 PM IDOT Moving Operation
Halsted St to Canal St 29.8 to 30.2 Major Left lane and left shoulder closed, two or three lanes open 10/10/16 7:00 AM to 6/30/17 11:59 PM IDOT *** Long Term Closure ***

Eisenhower WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wells St to Halsted St 30.5 to 29.8 Major Left two lanes and left shoulder closed, up to two lanes open 10/10/16 7:00 AM to 6/30/17 11:59 PM IDOT *** Long Term Closure ***
Wells St to Jane Addams Twy (I-90) 30.5 to 0.1 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from SB Canal St 30.1 Medium All lanes and shoulders closed 10/10/16 7:00 AM to 8/31/18 11:59 PM IDOT *** Long Term Closure ***
Halsted St to Peoria St 29.8 to 29.6 Major Left two lanes and left shoulder closed, one or two lanes open 3/17/17 12:00 AM to 10/1/17 11:59 PM IDOT Weave RT to LT; Long Term Closure
Exit ramp to Morgan St 29.6 Medium All lanes and shoulders closed 12/10/15 12:00 AM to 6/1/17 11:59 PM IDOT *** Long Term Closure ***
Peoria St to Racine Ave 29.7 to 29.3 Medium Right lane and both shoulders closed, three lanes open 10/29/15 12:00 AM to 12/31/17 11:59 PM IDOT Lanes Weaved. NW/SW Ramp LN 3. WB Congress LNs 1&2.; *** Long Term Closure ***

Jane Addams Memorial (Northwest) EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from E Riverside to EB I-90 12.3 to 12.4 Medium All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left IPO Lane Closed, Left Side of Ramp Closed***Long Term Closure ***
Ramp from EB I-90 to E Riverside 12.3 to 12.4 None All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left Side of Ramp Closed; *** Long Term Closure ***
Newburg Rd (+0.3 miles) to Mill Rd (+1.0 miles) 17.3 to 18.7 Medium Right lane closed, one or two lanes open 4/28/17 9:00 AM to 2:00 PM Illinois Tollway
Harmony Rd (+0.3 miles) to IL-23 (+0.1 miles) 35.6 to 36.2 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Arlington Heights Rd (+0.8 miles) to Elmhurst Rd (-0.3 miles) 71.6 to 73.3 Medium Right lane closed, two lanes open 12/24/16 12:00 AM to 8/1/17 12:00 AM Illinois Tollway Rdwy/Bridge Reconst; *** Long Term Closure ***

Jane Addams Memorial (Northwest) WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Meacham Rd (-0.4 miles) to Meacham Rd (+0.1 miles) 67.8 to 67.3 Medium Right lane closed, two or three lanes open 4/28/17 9:00 AM to 12:01 PM Illinois Tollway Rdwy Widening and Reconst
Roselle Rd (-0.1 miles) to Roselle Rd (+0.4 miles) 65.7 to 65.2 Medium Right lane closed, three lanes open 4/28/17 6:00 AM to 2:00 PM Illinois Tollway Rdwy Widening and Reconst
Roselle Rd to Roselle Rd (+0.1 miles) 65.6 to 65.5 Medium Right lane closed, three lanes open 4/28/17 9:00 AM to 3:00 PM Illinois Tollway Bridge Reconst
IL-25 (+0.1 miles) to Airport Rd (+0.3 miles) 56.0 to 55.3 Medium Right lane closed, three lanes open 4/28/17 6:00 AM to 2:00 PM Illinois Tollway Bridge Widening and Reconst
IL-23 (-0.4 miles) to IL-23 (+0.1 miles) 36.5 to 36.0 Medium Left lane and right shoulder closed, one lane open 2/13/17 7:00 AM to 10/3/17 11:59 PM Illinois Tollway Bridge Widening and Reconst; *** Long Term Closure ***
Ramp from WB I-90 to E Riverside 12.4 to 12.3 Medium All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left IPO Lane Closed; Left Side of Ramp Closed; *** Long Term Closure ***
Ramp from E Riverside to WB I90 12.4 to 12.3 None All lanes and shoulders open with partial ramp closures 4/3/17 7:00 AM to 5/6/17 11:59 PM Illinois Tollway Bridge Deck Patching; Left Side of Ramp Closed; *** Long Term Closure ***

Kennedy Local EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Bessie Coleman Dr to East River Rd 0.9 to 3.0 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 9:30 AM to 1:00 PM IDOT Moving Operation
River Rd to East River Rd 2.3 to 3.0 Minor Both shoulders closed, all lanes open 4/3/17 12:00 AM to 7/31/17 11:59 PM IDOT Closed Shoulders, Narrow Lanes, Lanes shifted to left, Work Zone Speed Limit 45; Long Term Closure
Entrance from EB I-90 (Kennedy Expy) 79.1 to 81.1 Minor Both shoulders closed, all lanes open 4/1/17 12:00 AM to 6/2/17 11:59 PM IDOT Closed Shoulders, Narrow Lanes, Lanes Shifted to Right, Work Zone Speed Limit 45MPH; Long Term Closure
Entrance ramp from WB Ohio Feeder 50.5 None Partial closure 4/3/17 12:00 AM to 7/20/17 11:59 PM IDOT Long Term Closure
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Both shoulders closed, all lanes open 11/22/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lanes; Long Term Closure

Kennedy Local WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Eisenhower Expy (I-290) to Van Buren St 51.7 to 51.6 Minor Right shoulder closed, all lanes open 12/1/16 12:00 AM to 8/31/18 11:59 PM IDOT 11 ft wide lane; Long Term Closure
Exit ramp to EB Ohio Feeder 50.5 None Partial closure 4/3/17 12:00 AM to 7/20/17 11:59 PM IDOT Long Term Closure
Kennedy Expy (I-90) to Bessie Coleman Dr 79.1 to 77.0 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 9:30 AM to 1:00 PM IDOT Moving Operation

Lake Shore Drive NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SB Stevenson / I-55 None Partial closure 6/11/15 12:00 AM to 7/14/17 11:59 PM IDOT Lane shifted and width reduction (11') ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 None Partial closure 12/22/16 12:00 AM to 8/1/17 11:59 PM IDOT Ramp reduced to 1 lane; Long Term Closure

Lake Shore Drive SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SB I-55 Minor All lanes and shoulders open 6/11/15 12:00 AM to 7/14/17 11:59 PM IDOT Left lane closed.; Long Term Closure
Entrance ramp from NB I-55 None Partial closure 10/22/15 12:00 AM to 8/1/17 11:59 PM IDOT Shoulders closed. 11' width restriction.; Long Term Closure

Ohio Feeder EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB I-90 None Partial closure 4/3/17 12:00 AM to 7/20/17 11:59 PM IDOT Long Term Closure

Ohio Feeder WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB I-90 None Partial closure 4/3/17 12:00 AM to 7/20/17 11:59 PM IDOT Long Term Closure

Reagan Memorial EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-30 (Rock Falls) to US-52 (Chicago Ave) (+0.9 miles) 44.2 to 55.9 Medium Right lane closed, one lane open 4/3/17 7:00 AM to 5/15/17 11:59 PM Illinois Tollway Rdwy/Bridge Rehabilitation; ***Long Term Closure ***
Mitchell Rd (-0.1 miles) to Farnsworth Ave (-0.1 miles) 118.2 to 119.2 Medium Left lane closed, two lanes open 4/28/17 9:00 AM to 7:00 PM Illinois Tollway Bridge Reconst

Reagan Memorial WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Locust Rd (+0.7 miles) to I-39 (US-51) (+1.3 miles) 80.0 to 77.2 Medium Right lane closed, one lane open 4/17/17 7:00 AM to 5/16/17 11:59 PM Illinois Tollway Ramp Reconst; *** Long Term Closure ***
Entrance ramp from SB I-39 78.2 Major All lanes closed 4/10/17 12:00 AM to 5/30/17 11:59 PM IDOT Ramp closed. Detour using 3 ramps

Stevenson NB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Weber Rd to 0.5 miles north of Willow Springs Rd 263.5 to 278.4 Minor Both shoulders closed, all lanes open 4/17/17 12:00 AM to 10/1/17 11:59 PM IDOT Various locations rough grooved surface, work zone speed limit 55mph. Daily night time lane closures.; Long Term Closure
Weber Rd to Canal St 263.5 to 292.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 10:00 AM to 2:00 PM IDOT Moving Operation
Reed Rd to Lake Shore Dr (US-41) 233.5 to 293.7 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 2:30 PM IDOT Moving Operation
County Line Rd to Lake Shore Dr (US-41) 276.4 to 293.7 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from Cicero Ave 286.4 None Partial closure 4/28/17 9:00 AM to 3:00 PM IDOT
Canal St to Lake Shore Dr (US-41) 292.6 to 293.8 Medium Right lane and right shoulder closed, one to three lanes open 10/22/15 12:00 AM to 8/1/17 11:59 PM IDOT Traffic lanes weaved; Long Term Closure
Exit ramp to NB Lake Shore Dr 293.7 None Partial closure 12/22/16 12:00 AM to 8/1/17 11:59 PM IDOT Ramp reduced to 1 lane; Long Term Closure
Exit ramp to SB US-41 293.7 None Partial closure 10/22/15 12:00 AM to 8/1/17 11:59 PM IDOT Shoulders closed. 11' width restriction.; Long Term Closure

Stevenson SB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from NB Lake Shore Dr 293.8 None Partial closure 6/11/15 12:00 AM to 7/14/17 11:59 PM IDOT Lane shifted and width reduction (11') ***Long Term Closure***
Lake Shore Dr (US-41) to State St 293.9 to 293.2 Medium Left lane and left shoulder closed, one to three lanes open 6/11/15 12:00 AM to 7/14/17 11:59 PM IDOT Narrow Lanes; Long Term Closure
Lake Shore Dr (US-41) to Reed Rd 293.8 to 233.6 Minor Both shoulders closed, all lanes open with partial ramp closures 4/28/17 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from SB US-41 293.8 Minor All lanes and shoulders open 6/11/15 12:00 AM to 7/14/17 11:59 PM IDOT Left lane closed.; Long Term Closure
State St to Dan Ryan Expy (I-90/94) 293.2 to 292.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 10:30 AM to 1:30 PM IDOT Moving Operation
Dan Ryan Expy (I-90/94) to Weber Rd 292.4 to 263.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/28/17 9:00 AM to 1:00 PM IDOT Moving Operation
Archer Ave to 0.5 miles south of Archer Ave 292.0 to 291.5 Minor Right shoulder closed, all lanes open 4/28/17 9:00 AM to 3:00 PM IDOT
0.5 miles south of Pulaski Rd to Cicero Ave (IL-50) 287.3 to 286.7 Minor Left shoulder closed, all lanes open 4/28/17 9:00 AM to 3:00 PM IDOT
Wolf Rd to Weber Rd 277.4 to 263.5 Minor Both shoulders closed, all lanes open 4/17/17 12:00 AM to 10/1/17 11:59 PM IDOT Various locations rough grooved surface, work zone speed limit 55mph. Daily night time lane closures.; Long Term Closure
County Line Rd to Kingery Hwy (IL-83) 276.4 to 274.6 Minor Right shoulder closed, all lanes open 4/28/17 9:00 AM to 3:00 PM IDOT

Alexander County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB IL-3 at Sutton Ln (-0.1 miles) None All lanes and shoulders open 4/3/17 12:00 AM to 9/30/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 14'.
SEB IL-3 at Sutton Ln (+0.1 miles) None All lanes and shoulders open 4/3/17 12:00 AM to 9/30/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 14'.

Bond County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-40 from I-70 to Shawnee Rd Major All lanes closed 2/20/17 12:00 AM to 8/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB US-40 from Shawnee Rd to I-70 Major All lanes closed 2/20/17 12:00 AM to 8/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.

Bureau County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-26 from I-80 (-0.1 miles) to 1835 Ave None All lanes and shoulders open 4/18/16 12:00 AM to 8/1/17 12:00 AM IDOT Expect daytime lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-26 at IL-92 (-0.2 miles) Medium Various lanes closed 10/20/16 12:00 AM to 6/30/17 11:59 PM IDOT The movement of oversize and overweight loads is prohibited.
SB IL-26 at IL-92 (+0.2 miles) Medium Various lanes closed 10/20/16 12:00 AM to 6/30/17 11:59 PM IDOT The movement of oversize and overweight loads is prohibited.
SB IL-26 from 1835 Ave to I-80 (+0.1 miles) None All lanes and shoulders open 4/18/16 12:00 AM to 8/1/17 12:00 AM IDOT Expect daytime lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-89 from Bottom Rd (+0.4 miles) to Illinois St (-0.3 miles) None All lanes and shoulders open 4/15/16 12:00 AM to 8/2/18 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".
NB IL-89 from Bottom Rd (+0.4 miles) to Illinois St (-0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
SB IL-89 from Illinois St (+0.3 miles) to Bottom Rd (-0.4 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
SB IL-89 from Illinois St (+0.3 miles) to Bottom Rd (-0.4 miles) None All lanes and shoulders open 4/15/16 12:00 AM to 8/2/18 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".

Calhoun County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-100 from Maple St (+0.1 miles) to Park St None All lanes and shoulders open 4/1/17 12:00 AM to 9/30/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10'.
NB IL-100 at Joe Page Bridge Medium Various lanes closed 4/3/17 8:00 AM to 9/30/17 11:59 PM IDOT Traffic restricted to one lane. Temporary traffic signals will be installed to maintain two-way traffic through this area. Long delays are expected. This will be especially true when the bridge is raised for river traffic. The Department recommends using alternate routes as much as possible during this time frame. The Department advises the traveling public to be patient, follow all construction signs and drive with caution through the work zones. Completion expected end of Sept 2017.
SB IL-100 at Joe Page Bridge Medium Various lanes closed 4/3/17 8:00 AM to 9/30/17 11:59 PM IDOT Traffic restricted to one lane. Temporary traffic signals will be installed to maintain two-way traffic through this area. Long delays are expected. This will be especially true when the bridge is raised for river traffic. The Department recommends using alternate routes as much as possible during this time frame. The Department advises the traveling public to be patient, follow all construction signs and drive with caution through the work zones. Completion expected end of Sept 2017.
SB IL-100 from Park St to Maple St (-0.1 miles) None All lanes and shoulders open 4/1/17 12:00 AM to 9/30/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10'.

Carroll County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-64 from IL-84 (-0.2 miles) to IL-84 None All lanes and shoulders open 4/17/17 12:00 AM to 11/30/18 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB IL-64 from IL-84 to Clay St None All lanes and shoulders open 4/17/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
WB IL-64 from Clay St to IL-84 None All lanes and shoulders open 4/17/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
WB IL-64 from IL-84 to IL-84 (+0.2 miles) None All lanes and shoulders open 4/17/17 12:00 AM to 11/30/18 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB IL-84 from Clay St to IL-64 (+0.4 miles) None All lanes and shoulders open 4/17/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SB IL-84 from IL-64 (-0.4 miles) to Clay St None All lanes and shoulders open 4/17/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".

Champaign County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB Leverett Rd at Market St (+0.3 miles) Minor Various lanes closed 4/3/17 12:00 AM to 11/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".
WB Leverett Rd at Market St (-0.3 miles) Minor Various lanes closed 4/3/17 12:00 AM to 11/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".

Clay County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-50 at Clay Rd (-1.0 miles) None All lanes and shoulders open 3/1/17 12:00 AM to 12/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".
WB US-50 at Clay Rd (+1.0 miles) None All lanes and shoulders open 3/1/17 12:00 AM to 12/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".

Cook County (City of Chicago) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
SEB US-12 at w/o Ewing Avenue (Railroad Crossing) Major All lanes and shoulders closed 4/24/17 5:00 AM to 5/8/17 11:59 PM IDOT In order to complete the repairs, 95th Street will be fully closed at the South Chicago & Indiana Harbor Railway, just west of Ewing Avenue. A posted detour will direct westbound 95th Street traffic to go north on Ewing Avenue (U.S. 41), north on S. Mackinaw Avenue, west on 87th Street, south on S. Commercial Road and south on South Chicago Avenue to meet back with 95th Street. Eastbound 95th Street traffic should take the reverse route.
EB 115th St at Pulaski Rd None Various lanes closed 3/20/17 12:00 AM to 5/12/17 11:59 PM IDOT Pavement Trenching for electrical conduit and sewer work. Resurfacing Pavement and Upgrading Traffic Signals at all four corners of the intersection. Sidewalk improvements.
NWB 95th St at w/o Ewing Avenue (Railroad Crossing) Major All lanes and shoulders closed 4/24/17 5:00 AM to 5/8/17 11:59 PM IDOT In order to complete the repairs, 95th Street will be fully closed at the South Chicago & Indiana Harbor Railway, just west of Ewing Avenue. A posted detour will direct westbound 95th Street traffic to go north on Ewing Avenue (U.S. 41), north on S. Mackinaw Avenue, west on 87th Street, south on S. Commercial Road and south on South Chicago Avenue to meet back with 95th Street. Eastbound 95th Street traffic should take the reverse route.
WB Adams St from Lower Wacker Dr to Canal St (-0.1 miles) Minor Various lanes closed 2/20/17 7:00 AM to 4/28/17 11:59 PM Chicago DOT Full weekend closure of the Adams Street Bridge, starting at 8:00 PM Friday, March 24 through 5:00 AM Monday, March 27. Detour Westbound Adams Street to Northbound Wacker Drive, to Westbound Madison Street, to Southbound Clinton Street, and back to Westbound Adams Street. Alternate detour route of Southbound Wacker Drive, to Westbound Van Buren Street, to Northbound Jefferson Street, and back to Westbound Adams Street.
NB Ashland Ave at Milwaukee Ave Medium All lanes and shoulders closed 4/29/17 4:02 AM to 4/30/17 6:00 PM Chicago DOT
SB Central Ave at 62nd St Medium All lanes and shoulders closed 4/24/17 7:00 AM to 5/26/17 11:59 PM Chicago DOT Sewer Main Installation; Detour Southbound Central Avenue to Westbound 55th Street, to Southbound Austin Avenue, to Eastbound 63rd Street, and back to Southbound Central Avenue. Maintain Northbound Central Avenue traffic at all times.
NB Clark St from Addison St to Patterson Ave Medium All lanes and shoulders closed 4/28/17 9:30 AM to 3:30 PM Chicago DOT Detour Northbound Clark Street to Westbound Addison Street, to Northbound Racine Avenue, and back to Northbound Clark Street. Reverse for Southbound Clark Street.
SB Clark St from Patterson Ave to Addison St Medium All lanes and shoulders closed 4/28/17 9:30 AM to 3:30 PM Chicago DOT Detour Northbound Clark Street to Westbound Addison Street, to Northbound Racine Avenue, and back to Northbound Clark Street. Reverse for Southbound Clark Street.
EB Foster Ave from Keeler Ave to Pulaski Rd Minor Various lanes closed 4/28/17 7:00 AM to 6:00 PM daily until 8/31/17 Chicago DOT Bridge Painting Project on Foster Avenue Bridge over the North Branch Chicago River
EB Foster Ave from Kedzie Ave to California Ave Minor Various lanes closed 4/11/17 7:00 PM to 7/31/17 11:59 PM IDOT This project consists of painting the bridge (SN 016-0248) spanning Foster Avenue over North Branch Chicago River in the City of Chicago; includes cleaning and painting 1 steel bridge; containment and disposal of lead paint cleaning residues; mobilization; traffic control and protection. (35 Working Days).
WB Foster Ave from California Ave to Kedzie Ave Minor Various lanes closed 4/11/17 7:00 PM to 7/31/17 11:59 PM IDOT This project consists of painting the bridge (SN 016-0248) spanning Foster Avenue over North Branch Chicago River in the City of Chicago; includes cleaning and painting 1 steel bridge; containment and disposal of lead paint cleaning residues; mobilization; traffic control and protection. (35 Working Days).
WB Foster Ave from Pulaski Rd to Keeler Ave Minor Various lanes closed 4/28/17 7:00 AM to 6:00 PM daily until 8/31/17 Chicago DOT Bridge Painting Project on Foster Avenue Bridge over the North Branch Chicago River
WB Harrison St at Jefferson St Minor Various lanes closed 8/12/16 12:00 AM to 10/31/18 11:59 PM IDOT Ramp from Harrison Street (FAI 90/94) to Jefferson Street (FAI 290), Cook Lane Impact: Full closure:::Work includes bridge demolition, bridge construction, pavement, roadway lighting, pavement marking and signage. Detour: Exit northbound I90/94 at Roosevelt Rd., right on Roosevelt Rd to State St
EB Higgins Ave from IL-43 to Nagle Ave Minor Various lanes closed 4/3/17 12:00 AM to 7/15/17 11:59 PM IDOT Resurfacing with Pavement Patching. Work includes Sidewalk Removal & Replacement, Curb & Gutter Removal & Replacement, and new Pavement Markings.
WB Higgins Ave from Nagle Ave to IL-43 Minor All lanes and shoulders open 4/3/17 12:00 AM to 7/15/17 11:59 PM IDOT Resurfacing with Pavement Patching. Work includes Sidewalk Removal & Replacement, Curb & Gutter Removal & Replacement, and new Pavement Markings.
NB Indiana Ave from Roosevelt Rd to 13th St Medium All lanes and shoulders closed 4/26/17 7:00 AM to 4/28/17 11:59 PM Chicago DOT Sewer Tie-ins; Detour Southbound Indiana Avenue to Westbound Roosevelt Road, to Southbound Michigan Avenue, to Eastbound 16th Street, and back to Southbound Indiana Avenue.
NB Laramie Ave from Diversey Ave to Nelson St Medium All lanes and shoulders closed 3/22/17 7:00 AM to 5/7/17 11:59 PM Chicago DOT Sewer Main Installation; Detour Southbound Laramie Avenue to Eastbound Belmont Avenue, to Southbound Cicero Avenue, to Westbound Fullerton Avenue, and back to Southbound Laramie Avenue. Reverse for Northbound Laramie Avenue.
SB Laramie Ave from Nelson St to Diversey Ave Medium All lanes and shoulders closed 3/22/17 7:00 AM to 5/7/17 11:59 PM Chicago DOT Sewer Main Installation; Detour Southbound Laramie Avenue to Eastbound Belmont Avenue, to Southbound Cicero Avenue, to Westbound Fullerton Avenue, and back to Southbound Laramie Avenue. Reverse for Northbound Laramie Avenue.
NB Milwaukee Avenue from Albion Avenue to Elston Avenue Minor Various lanes closed 4/10/17 12:00 AM to 7/31/17 11:59 PM IDOT Hot-Mix Asphalt Resurfacing on Milwaukee Avenue from Albion Avenue to Elston Avenue in the City of Chicago. Detour: None
SB Oriole Ave at Belmont Ave Minor Various lanes closed 4/3/17 12:00 AM to 7/31/17 11:59 PM IDOT Traffic signal installation and ADA sidewalk upgrades at the intersection of Belmont and Oriole Avenues in the City of Chicago and Village of Elmwood Park.
NB Torrence Ave from 139th St to 136th St Medium All lanes and shoulders closed 11/30/15 12:00 AM to 8/25/17 11:59 PM IDOT This project consists of the bridge replacement at Torrence Avenue over the Grand Calument River, roadway widening, construction of storm sewer and drainage structures, retaining walls, street lighting and landscaping. Detour: S. Brainard Ave., to Burnham Ave., to Sibley Blvd.
SB Torrence Ave from 136th St to 139th St Medium All lanes and shoulders closed 11/30/15 12:00 AM to 8/25/17 11:59 PM IDOT This project consists of the bridge replacement at Torrence Avenue over the Grand Calument River, roadway widening, construction of storm sewer and drainage structures, retaining walls, street lighting and landscaping. Detour: S. Brainard Ave., to Burnham Ave., to Sibley Blvd.
EB Warren Blvd from Homan Ave to Kedzie Ave Minor Various lanes closed 4/19/17 7:00 AM to 6/14/17 11:59 PM IDOT Resurfacing, patching, sidewalk, curb and gutter on Warren Ave (Chicago) between Homan Ave and Kedzie Ave.

Cook County (Suburban) (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-45 from Rand Rd to IL-58 Major All lanes and shoulders closed 4/26/17 7:00 AM to 5/2/17 11:59 PM IDOT To make repairs to the railroad crossing . A posted detour will direct northbound traffic on S. River Road to go northeast on Elk Boulevard, northwest on Rand Road and east on Golf Road to reconnect with S. River Road. Southbound U.S. 45 traffic will take the reverse route.
SB US-45 from IL-58 to Rand Rd Major All lanes and shoulders closed 4/26/17 7:00 AM to 5/2/17 11:59 PM IDOT To make repairs to the railroad crossing . A posted detour will direct northbound traffic on S. River Road to go northeast on Elk Boulevard, northwest on Rand Road and east on Golf Road to reconnect with S. River Road. Southbound U.S. 45 traffic will take the reverse route.
NEB IL-7 (159th St) from Gougar Rd to Will Cook Rd Medium Various lanes closed 5/1/15 12:00 AM to 8/15/17 11:59 PM IDOT The improvement consists of roadway reconstruction and widening of IL Route 7 and roadway reconstruction and roadway widening of related cross roads. The improvement includes the installation of proposed storm sewer, pipe culverts, precast box culverts, (3) retaining walls, (2) pile-supported embankments, traffic signals, and collateral work necessary to complete the project as shown in the plans. Detour: Oak Valley Trail will be closed for approximately 15 days. A detour will be along S. Bell Rd.
SWB IL-7 (159th St) from Will Cook Rd to Gougar Rd Medium Various lanes closed 5/1/15 12:00 AM to 8/15/17 11:59 PM IDOT The improvement consists of roadway reconstruction and widening of IL Route 7 and roadway reconstruction and roadway widening of related cross roads. The improvement includes the installation of proposed storm sewer, pipe culverts, precast box culverts, (3) retaining walls, (2) pile-supported embankments, traffic signals, and collateral work necessary to complete the project as shown in the plans. Detour: Oak Valley Trail will be closed for approximately 15 days. A detour will be along S. Bell Rd.
NB IL-59 from IL-72 to Ivanhoe Rd (+0.6 miles) Medium Various lanes closed 4/10/17 7:00 AM to 7/15/17 11:59 PM IDOT Resurfacing Barrington road to IL-72 Higgins Road.
SB IL-59 from Peace Blvd (+0.1 miles) to IL-72 Medium Various lanes closed 4/10/17 7:00 AM to 7/15/17 11:59 PM IDOT Resurfacing
EB IL-68 at Wilke Rd Medium Various lanes closed 2/15/16 7:00 AM to 7/31/17 11:59 PM IDOT The project will add a right turn lane from eastbound Dundee Road to N. Wilke Road and from eastbound Dundee Road to Kennicott Avenue.The overall improvements to the intersections will modernize traffic signals, improve pedestrian safety and ease traffic congestion coming off of Illinois 53.
EB IL-68 at Kennicott Ave Medium Various lanes closed 2/15/16 7:00 AM to 7/31/17 11:59 PM IDOT The project will add a right turn lane from eastbound Dundee Road to N. Wilke Road and from eastbound Dundee Road to Kennicott Avenue.The overall improvements to the intersections will modernize traffic signals, improve pedestrian safety and ease traffic congestion coming off of Illinois 53.
NEB IL-171 from Cokes Rd to State St Medium Various lanes closed 8/16/16 7:00 AM to 11/1/17 11:59 PM IDOT
NEB IL-171 at 104th Ave Medium Various lanes closed 3/2/15 12:00 AM to 6/2/17 11:59 PM IDOT This project consists of HMA resurfacing/overlay, PCC widening, drainage installation, traffic signal installation and retaining wall construction.
SWB IL-171 at 104th Ave Medium Various lanes closed 3/2/15 12:00 AM to 6/2/17 11:59 PM IDOT This project consists of HMA resurfacing/overlay, PCC widening, drainage installation, traffic signal installation and retaining wall construction.
SWB IL-171 from State St to Cokes Rd Medium Various lanes closed 8/16/16 7:00 AM to 11/1/17 11:59 PM IDOT
WB 115th St at Pulaski Rd None Various lanes closed 3/20/17 12:00 AM to 5/12/17 11:59 PM IDOT Pavement Trenching for electrical conduit and sewer work. Resurfacing Pavement and Upgrading Traffic Signals at all four corners of the intersection. Sidewalk improvements.
EB 123rd Pl from McCarthy Rd to 76th Ave Minor Various lanes closed 4/17/17 12:00 AM to 7/31/17 11:59 PM IDOT 3.2 miles of resurfacing with pavement patching, curb & gutter and sidewalk repair.
EB 123rd St from 76th Ave to IL-43 Minor Various lanes closed 4/17/17 12:00 AM to 7/31/17 11:59 PM IDOT 3.2 miles of resurfacing with pavement patching, curb & gutter and sidewalk repair.
WB 123rd St from IL-43 to 76th Ave Minor Various lanes closed 4/17/17 12:00 AM to 7/31/17 11:59 PM IDOT 3.2 miles of resurfacing with pavement patching, curb & gutter and sidewalk repair.
WB 123rd Pl from 76th Ave to McCarthy Rd Minor Various lanes closed 4/17/17 12:00 AM to 7/31/17 11:59 PM IDOT 3.2 miles of resurfacing with pavement patching, curb & gutter and sidewalk repair.
EB 159th St from Will Cook Rd to Ravinia Ave Medium Various lanes closed 4/23/15 12:00 AM to 8/15/17 11:59 PM IDOT Reconstruction and add lanes, drainage improvement, shared-use path, sidewalk, traffic signals, and other related work on 2.53 miles of US Route 6/IL Route 7 (159th St.) from Will-Cook Road to Ravinia Ave located in Orland Park and Orland Township. Detour: 104th Ave Detour: 104th Ave closed at 159th St. NB & SB 104th Ave traffic to use the following detour routes: Use 167th St west to 108th Ave; follow 108th Ave north to 159th St. Use 167th St east to US-45; follow US-45 north to 159th St.
WB 159th St from Ravinia Ave to Will Cook Rd Medium Various lanes closed 4/23/15 12:00 AM to 8/15/17 11:59 PM IDOT Reconstruction and add lanes, drainage improvement, shared-use path, sidewalk, traffic signals, and other related work on 2.53 miles of US Route 6/IL Route 7 (159th St.) from Will-Cook Road to Ravinia Ave located in Orland Park and Orland Township. Detour: 104th Ave Detour: 104th Ave closed at 159th St. NB & SB 104th Ave traffic to use the following detour routes: Use 167th St west to 108th Ave; follow 108th Ave north to 159th St. Use 167th St east to US-45; follow US-45 north to 159th St.
NB 1st Ave (IL-171) at n/o North Ave Medium Various lanes closed 4/18/17 7:00 AM to 10/31/17 11:59 PM IDOT To replace a box culvert that carries Illinois 171 over an equestrian path.
NB 25th Ave from St Charles Rd to Lake St Medium All lanes and shoulders closed 1/1/15 7:18 AM to 5/31/17 7:18 AM Gateway 25th Ave over the RR tracks; Long term closure.
SB 25th Ave from Lake St to St Charles Rd Medium All lanes and shoulders closed 1/1/15 7:18 AM to 5/31/17 7:18 AM Gateway 25th Ave over the RR tracks; Long term closure.
EB Algonquin Rd from Mt Prospect Rd to Wolf Rd Medium All lanes and shoulders closed 4/26/17 7:00 AM to 4/29/17 11:59 PM IDOT Detour will direct eastbound traffic on Algonquin Road to go south on Mount Prospect Road, east on Oakton Street and north on S. Wolf Road to reconnect with Algonquin Road. Westbound traffic will take the reverse route.
WB Algonquin Rd from Wolf Rd to Mt Prospect Rd Medium All lanes and shoulders closed 4/26/17 7:00 AM to 4/29/17 11:59 PM IDOT Detour will direct eastbound traffic on Algonquin Road to go south on Mount Prospect Road, east on Oakton Street and north on S. Wolf Road to reconnect with Algonquin Road. Westbound traffic will take the reverse route.
NEB Archer Rd (IL-171) from 63rd St to 55th Pl Medium Various lanes closed 4/24/17 7:00 AM to 9/1/17 11:59 PM IDOT Resurfacing Project - Daytime lane closures will take place in both directions on Archer Road between 55th Place and 63rd Street.
SWB Archer Rd (IL-171) from 55th Pl to 63rd St Medium Various lanes closed 4/24/17 7:00 AM to 9/1/17 11:59 PM IDOT Resurfacing Project - Daytime lane closures will take place in both directions on Archer Road between 55th Place and 63rd Street.
EB Dundee Rd (IL-68) at Buffalo Grove Rd Medium Various lanes closed 3/13/17 12:00 AM to 9/4/17 11:59 PM IDOT Intersection Improvement on Illinois Route 68 (Dundee Road) at Buffalo Grove Road in the Village of Buffalo Grove.
EB Dundee Rd (IL-68) at McHenry / Wheeling Rd Medium Various lanes closed 8/22/16 12:00 AM to 6/20/17 11:59 PM IDOT Intersection improvement on Illinois Route 68 (Dundee Road) at McHenry/Wheeling Rd in the Village of Wheeling. Adding turn lanes WB IL 68 and SB McHenry Rd. Sidewalk construction,traffic signal and storm water drainage improvements at intersection.
WB Dundee Rd (IL-68) at McHenry / Wheeling Rd Medium Various lanes closed 8/22/16 12:00 AM to 6/20/17 11:59 PM IDOT Intersection improvement on Illinois Route 68 (Dundee Road) at McHenry/Wheeling Rd in the Village of Wheeling. Adding turn lanes WB IL 68 and SB McHenry Rd. Sidewalk construction,traffic signal and storm water drainage improvements at intersection.
WB Dundee Rd (IL-68) at Buffalo Grove Rd Medium Various lanes closed 3/13/17 12:00 AM to 9/4/17 11:59 PM IDOT Intersection Improvement on Illinois Route 68 (Dundee Road) at Buffalo Grove Road in the Village of Buffalo Grove.
NEB Gross Point Rd from US-14 to Croname Rd Minor Various lanes closed 4/10/17 7:00 AM to 9/1/17 11:59 PM IDOT Resurfacing
SWB Gross Point Rd from Croname Rd to US-14 Minor Various lanes closed 4/10/17 7:00 AM to 9/1/17 11:59 PM IDOT Resurfacing
NB Harlem from I-55 to 26th St Medium Various lanes closed 4/24/17 8:00 AM to 11/1/17 11:59 PM IDOT Resurfacing; Reduced to one lane in each direction with flaggers during construction activities. Closures will take place during the day and reopen by the evening.
SB Harlem from 26th St to I-55 Medium Various lanes closed 4/24/17 8:00 AM to 11/1/17 11:59 PM IDOT Resurfacing; Reduced to one lane in each direction with flaggers during construction activities. Closures will take place during the day and reopen by the evening.
SB Harlem Ave (IL-43) from 26th St to I-55 Medium Various lanes closed 4/24/17 9:08 AM to 11/1/17 9:08 AM IDOT Resurfacing; Reduced to one lane in each direction with flaggers during construction activities. Closures will take place during the day and reopen by the evening.
NEB Harts Rd from Milwaukee Ave to US-14 Minor Various lanes closed 4/10/17 7:00 AM to 9/1/17 11:59 PM IDOT Resurfacing
SWB Harts Rd from US-14 to Milwaukee Ave Minor Various lanes closed 4/10/17 7:00 AM to 9/1/17 11:59 PM IDOT Resurfacing
EB Higgins Rd (IL-72) from Lexington Dr to I-290 Expressway (I-290) Medium Various lanes closed 7/22/16 12:00 AM to 6/30/17 11:59 PM IDOT Intersection Improvement and traffic signal modernization on IL-72 from Lexington Dr. to I-290 east ramps in Schaumburg.
WB Higgins Rd (IL-72) from I-290 Expressway (I-290) to Lexington Dr Medium Various lanes closed 7/22/16 12:00 AM to 6/30/17 11:59 PM IDOT Intersection Improvement and traffic signal modernization on IL-72 from Lexington Dr. to I-290 east ramps in Schaumburg.
NB LaGrange Rd (US 12/20/45) at Ogden Ave (US 34) Medium Various lanes closed 4/18/17 12:00 AM to 11/30/17 11:59 PM IDOT Widening and resurfacing of pavement, pavement patching, curb & gutter removal and replacement, traffic signal modernization, lighting, storm sewer, pavement markings and landscaping.
SB LaGrange Rd (US 12/20/45) at Ogden Ave (US 34) Medium Various lanes closed 4/18/17 12:00 AM to 11/30/17 11:59 PM IDOT Widening and resurfacing of pavement, pavement patching, curb & gutter removal and replacement, traffic signal modernization, lighting, storm sewer, pavement markings and landscaping.
EB McCarthy Rd from US-45 to 123rd Pl Minor Various lanes closed 4/17/17 12:00 AM to 7/31/17 11:59 PM IDOT 3.2 miles of resurfacing with pavement patching, curb & gutter and sidewalk repair.
WB McCarthy Rd from 123rd Pl to US-45 Minor Various lanes closed 4/17/17 12:00 AM to 7/31/17 11:59 PM IDOT 3.2 miles of resurfacing with pavement patching, curb & gutter and sidewalk repair.
EB Roosevelt Rd from Des Plaines Ave to IL-43 Minor Various lanes closed 4/1/17 7:30 AM to 10/26/17 6:30 PM IDOT Roadway resurfacing and patching
EB Roosevelt Rd from Des Plaines Ave to IL-43 Minor Various lanes closed 4/1/17 7:30 AM to 10/26/17 6:30 PM Chicago DOT Roadway resurfacing and patching
WB Roosevelt Rd from IL-43 to Des Plaines Ave Minor Various lanes closed 4/1/17 7:30 AM to 10/26/17 6:30 PM IDOT Roadway resurfacing and patching
WB Roosevelt Rd from IL-43 to Des Plaines Ave Minor Various lanes closed 4/1/17 7:30 AM to 10/26/17 6:30 PM Chicago DOT Roadway resurfacing and patching
EB Sauk Trl from Torrence Ave to US-30 Minor Various lanes closed 4/10/17 12:00 AM to 7/31/17 11:59 PM IDOT Intersection widening, resurfacing, guarail and ADA sidewalks. Detour: N/A
EB Sauk Trl from Torrence Ave to US-30 Minor Various lanes closed 4/10/17 7:00 AM to 9/1/17 11:59 PM IDOT
WB Sauk Trl from US-30 to Torrence Ave Minor Various lanes closed 4/10/17 7:00 AM to 9/1/17 11:59 PM IDOT
WB Sauk Trl from US-30 to Torrence Ave Minor Various lanes closed 4/10/17 12:00 AM to 7/31/17 11:59 PM IDOT Intersection widening, resurfacing, guarail and ADA sidewalks. Detour: N/A
NB Sutton Road (IL 59) from North Ave. (IL 64) to Jane Adams Tollway (I-90) Medium Various lanes closed 4/3/17 12:00 AM to 11/3/17 11:59 PM IDOT PCC Pavement patching and left turn lane improvements on IL 59 (Sutton Rd) from north of IL 64 (North Ave) to I-90 (Jane Adams Memorial Tollway).
SB Sutton Road (IL 59) from Jane Adams Tollway (I-90) to North Ave. (IL 64) Medium Various lanes closed 4/3/17 12:00 AM to 11/3/17 11:59 PM IDOT PCC Pavement patching and left turn lane improvements on IL 59 (Sutton Rd) from north of IL 64 (North Ave) to I-90 (Jane Adams Memorial Tollway).
NB Torrence Ave from 139th St to 136th St Medium All lanes and shoulders closed 11/30/15 12:00 AM to 8/25/17 11:59 PM IDOT This project consists of the bridge replacement at Torrence Avenue over the Grand Calument River, roadway widening, construction of storm sewer and drainage structures, retaining walls, street lighting and landscaping. Detour: S. Brainard Ave., to Burnham Ave., to Sibley Blvd.
SB Torrence Ave from 136th St to 139th St Medium All lanes and shoulders closed 11/30/15 12:00 AM to 8/25/17 11:59 PM IDOT This project consists of the bridge replacement at Torrence Avenue over the Grand Calument River, roadway widening, construction of storm sewer and drainage structures, retaining walls, street lighting and landscaping. Detour: S. Brainard Ave., to Burnham Ave., to Sibley Blvd.
EB Touhy Ave from Tri-State Tollway Tollway (I-294) to Talcott Rd Minor Various lanes closed 4/10/17 12:00 AM to 9/29/17 11:59 PM IDOT Bridge Repair on FAP 341 (Touhy Avenue) over the Des Plaines River in the City of Park Ridge. Detour: None
WB Touhy Ave from Talcott Rd to Tri-State Tollway Tollway (I-294) Minor Various lanes closed 4/10/17 12:00 AM to 9/29/17 11:59 PM IDOT Bridge Repair on FAP 341 (Touhy Avenue) over the Des Plaines River in the City of Park Ridge. Detour: None
EB Willow Rd from I-94 to White Oak Ln Minor Various lanes closed 4/10/17 12:00 AM to 6/30/17 11:59 PM IDOT Resurfacing (3P) on Willow Road from I-94 to Provident Av / White Oak Ln. Detour: Lake Avenue on the south; Tower Road on the north . The closures will take place during off-peak traffic hours.
WB Willow Rd from White Oak Ln to I-94 Minor Various lanes closed 4/10/17 12:00 AM to 6/30/17 11:59 PM IDOT Resurfacing (3P) on Willow Road from I-94 to Provident Av / White Oak Ln. Detour: Lake Avenue on the south; Tower Road on the north . The closures will take place during off-peak traffic hours.
NB Wolf Rd from 179th St to US-6 Medium All lanes and shoulders closed 4/19/17 7:00 AM to 4/28/17 6:00 PM IDOT Metra Crossing Repairs Detour will direct NB Wolf Rd traffic to go west on 179th Street and NE on Southwest Highway to meet back with Wolf Road. SB Wolf Rd traffic will take the reverse route.
NB Wolf Rd from Drake Ln (-0.2 miles) to US-12 Minor Various lanes closed 4/10/17 12:00 AM to 5/22/17 11:59 PM IDOT This is a resurfacing project that includes HMA surface removal, pavement patching, PCC curb & gutter removal & replacement, resurfacing with leveling binder & HMA surface courses and placement of thermoplastic pavement markings.
NB Wolf Rd from Drake Ln (-0.1 miles) to US-12 Minor Various lanes closed 4/28/17 9:00 AM to 4:15 PM,
5/1/17 9:00 AM to 4:15 PM,
5/2/17 9:00 AM to 4:15 PM,
5/3/17 9:00 AM to 4:15 PM,
... more, ending on 5/31/17
IDOT Resurfacing
NB Wolf Rd from US-12 to US-12 Minor Various lanes closed 4/10/17 12:00 AM to 5/22/17 11:59 PM IDOT This is a resurfacing project that includes HMA surface removal, pavement patching, PCC curb & gutter removal & replacement, resurfacing with leveling binder & HMA surface courses and placement of thermoplastic pavement markings.
SB Wolf Rd from US-12 to Drake Ln (+0.2 miles) Minor Various lanes closed 4/28/17 9:00 AM to 4:15 PM,
5/1/17 9:00 AM to 4:15 PM,
5/2/17 9:00 AM to 4:15 PM,
5/3/17 9:00 AM to 4:15 PM,
... more, ending on 5/30/17
IDOT Resurfacing
SB Wolf Rd from US-12 to Drake Ln (+0.2 miles) Minor Various lanes closed 4/10/17 12:00 AM to 5/22/17 11:59 PM IDOT This is a resurfacing project that includes HMA surface removal, pavement patching, PCC curb & gutter removal & replacement, resurfacing with leveling binder & HMA surface courses and placement of thermoplastic pavement markings.
SB Wolf Rd from US-6 to 179th St Medium All lanes and shoulders closed 4/19/17 7:00 AM to 4/28/17 6:00 PM IDOT Metra Crossing Repairs Detour will direct NB Wolf Rd traffic to go west on 179th Street and NE on Southwest Highway to meet back with Wolf Road. SB Wolf Rd traffic will take the reverse route.

Cumberland County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-130 at 75 North Rd (+0.2 miles) None All lanes and shoulders open 3/14/16 12:00 AM to 7/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SB IL-130 at 75 North Rd (-0.2 miles) None All lanes and shoulders open 3/14/16 12:00 AM to 7/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".

DeKalb County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-72 from Main St to Stiles St None All lanes and shoulders open 3/15/17 12:00 AM to 10/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB IL-72 at Thurlby Rd (-0.1 miles) None All lanes and shoulders open 3/15/17 12:00 AM to 10/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".
WB IL-72 from Stiles St to Main St None All lanes and shoulders open 3/15/17 12:00 AM to 10/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-72 at Thurlby Rd (+0.1 miles) None All lanes and shoulders open 3/15/17 12:00 AM to 10/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".
EB Roosevelt Rd (IL-38) from Nicoll Way to Lincoln Av Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.
WB Roosevelt Rd (IL-38) from Lincoln Av to Nicoll Way Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.

DuPage County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-19 from IL-83 to South Access Rd Medium Various lanes closed 3/7/16 7:00 AM to 11/30/17 11:59 PM IDOT Intersection improvement of IL-19 and York Rd. Traffic reduced to one lane in both directions of Irving Park Rd between Church Rd and South Access Rd.
WB IL-19 from South Access Rd to IL-83 Medium Various lanes closed 3/7/16 7:00 AM to 11/30/17 11:59 PM IDOT Intersection improvement of IL-19 and York Rd. Traffic reduced to one lane in both directions of Irving Park Rd between Church Rd and South Access Rd.
EB IL-56 from Highland Ave to Highland Ave (+0.1 miles) Medium Various lanes closed 4/28/17 6:00 PM to 4/29/17 6:00 AM daily until 9/1/17 IDOT Bridge painting and cleaning project on the structure
WB IL-56 from Highland Ave to Highland Ave (+0.1 miles) Medium Various lanes closed 4/28/17 6:00 PM to 4/29/17 6:00 AM daily until 9/1/17 IDOT Bridge painting and cleaning project on the structure
NEB Frontage Rd from Oldfield Rd to Cass Ave Minor Various lanes closed 9/26/16 12:00 AM to 5/12/17 11:59 PM IDOT Resurfacing, Pedestrian Ramps and Drainage Improvement.
EB Irving Park Rd (IL-19) at York Rd Medium Various lanes closed 5/1/15 12:00 AM to 9/30/17 11:59 PM IDOT Resurfacing, Intersection improvements, widening, reconstruction and retaining walls at the intersection of York and Irving Park Roads.
WB Irving Park Rd (IL-19) at York Rd Medium Various lanes closed 5/1/15 12:00 AM to 9/30/17 11:59 PM IDOT Resurfacing, Intersection improvements, widening, reconstruction and retaining walls at the intersection of York and Irving Park Roads.
EB Roosevelt Rd (IL-38) from Nicoll Way to Lincoln Av Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.
WB Roosevelt Rd (IL-38) from Lincoln Av to Nicoll Way Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.
NB Sutton Road (IL 59) from North Ave. (IL 64) to Jane Adams Tollway (I-90) Medium Various lanes closed 4/3/17 12:00 AM to 11/3/17 11:59 PM IDOT PCC Pavement patching and left turn lane improvements on IL 59 (Sutton Rd) from north of IL 64 (North Ave) to I-90 (Jane Adams Memorial Tollway).
SB Sutton Road (IL 59) from Jane Adams Tollway (I-90) to North Ave. (IL 64) Medium Various lanes closed 4/3/17 12:00 AM to 11/3/17 11:59 PM IDOT PCC Pavement patching and left turn lane improvements on IL 59 (Sutton Rd) from north of IL 64 (North Ave) to I-90 (Jane Adams Memorial Tollway).

Effingham County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-40 from 1st St (+0.1 miles) to 3rd St Medium Various lanes closed 4/17/17 12:00 AM to 6/27/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB US-40 from 1st St to Main St Medium Various lanes closed 4/17/17 12:00 AM to 6/27/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB US-40 from Division St to 900th St None All lanes and shoulders open 8/29/16 12:00 AM to 6/1/17 11:59 PM IDOT Expect delays with lane restrictions for patching, milling and resurfacing.
WB US-40 from 900th St to Division St None All lanes and shoulders open 8/29/16 12:00 AM to 6/1/17 11:59 PM IDOT Expect delays with lane restrictions for patching, milling and resurfacing.
WB US-40 from 3rd St to 1st St (-0.1 miles) Medium Various lanes closed 4/17/17 12:00 AM to 6/27/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB US-45 at 1900th Ave (+0.6 miles) None All lanes and shoulders open 7/25/16 12:00 AM to 6/12/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 14'.
SB US-45 at 1900th Ave (-0.6 miles) None All lanes and shoulders open 7/25/16 12:00 AM to 6/12/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 14'.

Fayette County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-40 from 1st St (+0.1 miles) to 3rd St Medium Various lanes closed 4/17/17 12:00 AM to 6/27/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB US-40 from 3rd St to 1st St (-0.1 miles) Medium Various lanes closed 4/17/17 12:00 AM to 6/27/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB Randolph St from 6th St to 4th St Medium All lanes closed 9/26/16 12:00 AM to 6/29/17 11:59 PM IDOT Closed to all traffic.
WB Randolph St from 4th St to 6th St Medium All lanes closed 9/26/16 12:00 AM to 6/29/17 11:59 PM IDOT Closed to all traffic.

Fulton County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-100 at Maple St None All lanes and shoulders open 3/24/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB IL-100 at Maple St None All lanes and shoulders open 3/20/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-100 at Maple St None All lanes and shoulders open 3/20/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-100 at Maple St None All lanes and shoulders open 3/2/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB IL-97 from Maple St to Maple St None All lanes and shoulders open 3/24/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB IL-97 from Maple St to Maple St None All lanes and shoulders open 3/2/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-97 from Maple St to Maple St None All lanes and shoulders open 3/24/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-100 at Maple St None All lanes and shoulders open 3/24/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-100 at Maple St None All lanes and shoulders open 3/20/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SB IL-100 at Maple St None All lanes and shoulders open 3/20/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SB IL-100 at Maple St None All lanes and shoulders open 3/2/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-97 from Maple St to Maple St None All lanes and shoulders open 3/2/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB CR-14 from County Highway 2 to Turner Rd Medium All lanes and shoulders closed 8/1/16 12:00 AM to 6/15/17 11:59 PM IDOT Closed to all traffic.

Greene County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-100 from Maple St (+0.1 miles) to Park St None All lanes and shoulders open 4/1/17 12:00 AM to 9/30/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10'.
NB IL-100 at Joe Page Bridge Medium Various lanes closed 4/3/17 8:00 AM to 9/30/17 11:59 PM IDOT Traffic restricted to one lane. Temporary traffic signals will be installed to maintain two-way traffic through this area. Long delays are expected. This will be especially true when the bridge is raised for river traffic. The Department recommends using alternate routes as much as possible during this time frame. The Department advises the traveling public to be patient, follow all construction signs and drive with caution through the work zones. Completion expected end of Sept 2017.
SB IL-100 at Joe Page Bridge Medium Various lanes closed 4/3/17 8:00 AM to 9/30/17 11:59 PM IDOT Traffic restricted to one lane. Temporary traffic signals will be installed to maintain two-way traffic through this area. Long delays are expected. This will be especially true when the bridge is raised for river traffic. The Department recommends using alternate routes as much as possible during this time frame. The Department advises the traveling public to be patient, follow all construction signs and drive with caution through the work zones. Completion expected end of Sept 2017.
SB IL-100 from Park St to Maple St (-0.1 miles) None All lanes and shoulders open 4/1/17 12:00 AM to 9/30/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10'.

Grundy County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-47 from Gore Rd to Sherrill Rd None All lanes and shoulders open 12/14/16 12:00 AM to 7/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SB IL-47 from Sherrill Rd to Gore Rd None All lanes and shoulders open 12/14/16 12:00 AM to 7/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-53 from Braceville Rd to Center St Major All lanes and shoulders closed 4/14/17 7:00 AM to 9/21/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Division St traffic East of the UPRR crossing will be detoured along Washington St via IL-113 (Main St) to the North or Kankakee St to the South
SB IL-53 from Center St to Braceville Rd Major All lanes and shoulders closed 4/14/17 7:00 AM to 9/21/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Division St traffic East of the UPRR crossing will be detoured along Washington St via IL-113 (Main St) to the North or Kankakee St to the South
NWB IL-113 from Frontage Rd to McGinty St None All lanes and shoulders open 4/3/17 12:00 AM to 10/13/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by flaggers. Vehicle width restricted to 10' 6".
SEB IL-113 from McGinty St to Frontage Rd None All lanes and shoulders open 4/3/17 12:00 AM to 10/13/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by flaggers. Vehicle width restricted to 10' 6".
NEB IL-129 from Braceville Rd to Reed St Major All lanes and shoulders closed 4/14/17 7:00 AM to 9/21/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Division St traffic East of the UPRR crossing will be detoured along Washington St via IL-113 (Main St) to the North or Kankakee St to the South
SWB IL-129 from Reed St to Braceville Rd Major All lanes and shoulders closed 4/14/17 7:00 AM to 9/21/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Division St traffic East of the UPRR crossing will be detoured along Washington St via IL-113 (Main St) to the North or Kankakee St to the South

Henry County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB IL-229 from US-34 to South St Major All lanes closed 2/1/17 12:00 AM to 5/1/17 11:59 PM IDOT Expect lane restrictions. Vehicle weight restricted to 20 tons.
SWB IL-229 from South St to US-34 Major All lanes closed 2/1/17 12:00 AM to 5/1/17 11:59 PM IDOT Expect lane restrictions. Vehicle weight restricted to 20 tons.
EB County Highway 14 from County Highway 16 to IL-78 Medium All lanes and shoulders closed 8/1/16 12:00 AM to 6/15/17 11:59 PM IDOT Closed to all traffic.
NEB Grange Rd from Wolf Rd (-0.5 miles) to IL-92 Medium All lanes closed 2/1/17 12:00 AM to 5/1/17 11:59 PM IDOT Expect lane restrictions. Vehicle weight restricted to 20 tons.
SWB Grange Rd from IL-92 to Wolf Rd (+0.5 miles) Medium All lanes closed 2/1/17 12:00 AM to 5/1/17 11:59 PM IDOT Expect lane restrictions. Vehicle weight restricted to 20 tons.
NB Green River Rd from US-6 to Exchange St Minor Various lanes closed 4/18/17 7:00 AM to 6/15/17 6:00 PM IDOT Milling off the existing roadway surface, making pavement repairs, and resurfacing the two highways
SB Green River Rd from Exchange St to US-6 Minor Various lanes closed 4/18/17 7:00 AM to 6/15/17 6:00 PM IDOT Milling off the existing roadway surface, making pavement repairs, and resurfacing the two highways
EB Poppy Garden Rd from IL-84 to Green River Rd Minor Various lanes closed 4/18/17 7:00 AM to 6/15/17 6:00 PM IDOT Milling off the existing roadway surface, making pavement repairs, and resurfacing the two highways
WB Poppy Garden Rd from Green River Rd to IL-84 Minor Various lanes closed 4/18/17 7:00 AM to 6/15/17 6:00 PM IDOT Milling off the existing roadway surface, making pavement repairs, and resurfacing the two highways

Iroquois County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-116 at 600 East Rd (+0.4 miles) Major All lanes and shoulders closed 6/15/16 12:00 AM to 7/29/17 11:59 PM IDOT Bridge closed.; The marked detour route includes IL 115, US 24 and I-57.
WB IL-116 at 600 East Rd (-0.4 miles) Major All lanes and shoulders closed 6/15/16 12:00 AM to 7/29/17 11:59 PM IDOT Bridge closed.; The marked detour route includes IL 115, US 24 and I-57.

Jackson County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-51 at Lincoln Ave (-0.1 miles) None All lanes and shoulders open 3/22/17 12:00 AM to 5/26/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 12' 6".
SB US-51 at Lincoln Ave (+0.1 miles) None All lanes and shoulders open 3/22/17 12:00 AM to 5/26/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 12' 6".

Jefferson County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-15 at Old Faithful Ln (+0.4 miles) None All lanes and shoulders open 4/3/17 12:00 AM to 12/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
WB IL-15 at Old Faithful Ln (-0.4 miles) None All lanes and shoulders open 4/3/17 12:00 AM to 12/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
NB IL-37 at Game Farm Rd (+0.5 miles) None All lanes and shoulders open 3/13/17 12:00 AM to 8/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 1".
SB IL-37 at Game Farm Rd (-0.5 miles) None All lanes and shoulders open 3/13/17 12:00 AM to 8/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 1".

Jersey County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
SEB IL-3 from Grafton Hills Dr to IL-109 None All lanes and shoulders open 3/15/15 12:00 AM to 12/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SEB IL-3 from Grafton Hills Dr to IL-109 None All lanes and shoulders open 3/15/15 12:00 AM to 12/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
NB IL-267 from Woodgate Ct to Craig Lake Rd None All lanes and shoulders open 8/1/16 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
NB IL-267 from Craig Lake Rd to Ryan Ct None All lanes and shoulders open 8/1/16 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.
SB IL-267 from Ryan Ct to Craig Lake Rd None All lanes and shoulders open 8/1/16 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.
SB IL-267 from Craig Lake Rd to Woodgate Ct None All lanes and shoulders open 8/1/16 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".

Jo Daviess County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-20 from Ash St to Orange St Medium Various lanes closed 4/25/17 4:00 AM to 6/2/17 6:00 PM IDOT
WB US-20 from Orange St to Ash St Medium Various lanes closed 4/25/17 4:00 AM to 6/2/17 6:00 PM IDOT

Kane County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-31 from Ferson Creek Rd to Crane Rd Medium Various lanes closed 6/16/16 7:00 AM to 6/21/17 11:59 PM IDOT In the new traffic pattern, Illinois 31 will switch back to one lane in each direction from Ferson Creek Road to south of Crane Road. Lane widths will be reduced on Illinois 31 and Wildrose Springs Drive.
NB IL-31 from Wildrose Springs Dr (-0.1 miles) to Crane Rd (-0.1 miles) Medium Various lanes closed 1/25/16 7:00 AM to 6/21/17 11:59 PM IDOT The first stage of construction will shift traffic to one lane on the west side of the bridge to allow work on the east side of the bridge. A temporary traffic signal will allow each direction of traffic to proceed separately across the bridge.
SB IL-31 from Crane Rd to Ferson Creek Rd Medium Various lanes closed 6/16/16 7:00 AM to 6/21/17 11:59 PM IDOT In the new traffic pattern, Illinois 31 will switch back to one lane in each direction from Ferson Creek Road to south of Crane Road. Lane widths will be reduced on Illinois 31 and Wildrose Springs Drive.
SB IL-31 from Crane Rd (+0.1 miles) to Wildrose Springs Dr (+0.1 miles) Medium Various lanes closed 1/25/16 7:00 AM to 6/21/17 11:59 PM IDOT The first stage of construction will shift traffic to one lane on the west side of the bridge to allow work on the east side of the bridge. A temporary traffic signal will allow each direction of traffic to proceed separately across the bridge.
EB IL-38 from County Line Rd to Peck Rd Medium Various lanes closed 9/19/16 12:00 AM to 5/31/17 11:59 PM IDOT Shoulder repair and milled rumble strips.
WB IL-38 from Peck Rd to County Line Rd Medium Various lanes closed 9/19/16 12:00 AM to 5/31/17 11:59 PM IDOT Shoulder repair and milled rumble strips.
EB IL-64 from County Line Rd to Anderson Rd Medium Various lanes closed 9/19/16 12:00 AM to 5/31/17 11:59 PM IDOT Shoulder repair and milled rumble strips.
WB IL-64 from Anderson Rd to County Line Rd Medium Various lanes closed 9/19/16 12:00 AM to 5/31/17 11:59 PM IDOT Shoulder repair and milled rumble strips.
NB Bliss Rd from Capitol Dr to May Rd (-0.1 miles) Minor Various lanes closed 3/27/17 7:00 AM to 10/22/17 5:00 PM Gateway Road and bridge replacement. Possible temporary single lane closures with flaggers directing traffic. Construction work hours will be from 7:00 am till 5:00 pm Monday thru Saturday. This work is to take approximately seven months to complete, weather permitting.
SB Bliss Rd from May Rd (+0.1 miles) to Capitol Dr Minor Various lanes closed 3/27/17 7:00 AM to 10/22/17 5:00 PM Gateway Road and bridge replacement. Possible temporary single lane closures with flaggers directing traffic. Construction work hours will be from 7:00 am till 5:00 pm Monday thru Saturday. This work is to take approximately seven months to complete, weather permitting.
EB Butterfield Rd (IL-56) at Raddant Rd Medium Various lanes closed 4/10/17 12:00 AM to 11/1/17 11:59 PM IDOT Intersection improvement and traffic signal installation.
WB Butterfield Rd (IL-56) at Raddant Rd Medium Various lanes closed 4/10/17 12:00 AM to 11/1/17 11:59 PM IDOT Intersection improvement and traffic signal installation.
EB Ellithorpe Rd from McGough Rd to Chapman Rd Medium Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Resurfacing
WB Ellithorpe Rd from Chapman Rd to McGough Rd Medium Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Resurfacing
EB Fabyan Pkwy from Randall Rd to Randall Rd (+0.2 miles) Medium Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Guardrail Replacement
EB Fabyan Pkwy from Randall Rd (+0.2 miles) to Western Ave Medium Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Guardrail Replacement
EB Fabyan Pkwy from Western Ave to Van Nortwick Ave Minor Various lanes closed 4/28/17 9:00 AM to 3:00 PM,
5/1/17 9:00 AM to 3:00 PM,
5/2/17 9:00 AM to 3:00 PM,
5/3/17 9:00 AM to 3:00 PM,
... more, ending on 5/12/17
Gateway Single Lane Closures
WB Fabyan Pkwy from Western Ave to Bent Tree Dr Medium Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Guardrail Replacement
WB Fabyan Pkwy from Bent Tree Dr to Randall Rd Medium Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Guardrail Replacement
EB Hughes Rd from IL-47 to Fabyan Pkwy Minor Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Guardrail Replacement
WB Hughes Rd from Fabyan Pkwy to IL-47 Minor Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Guardrail Replacement
EB Longmeadow Pkwy from Randall Rd to White Chapel Ln Minor Various lanes closed 4/17/17 7:00 AM to 5/1/17 6:00 PM Gateway Pavement removal and pavement widening work
EB Longmeadow Pkwy at Sleepy Hollow Rd Minor Various lanes closed 4/17/17 7:00 AM to 5/1/17 6:00 PM Gateway Pavement removal and pavement widening work
WB Longmeadow Pkwy from White Chapel Ln to Sleepy Hollow Rd Minor Various lanes closed 4/17/17 7:00 AM to 5/1/17 6:00 PM Gateway Pavement removal and pavement widening work
WB Longmeadow Pkwy from Sleepy Hollow Rd to Randall Rd Minor Various lanes closed 4/17/17 7:00 AM to 5/1/17 6:00 PM Gateway Pavement removal and pavement widening work
NB Peplow Rd from IL-64 to Rolling Oaks Dr Minor Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Resurfacing
SB Peplow Rd from IL-64 to Rolling Oaks Dr Minor Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Resurfacing
NB Randall Rd from Longmeadow Pkwy (-0.1 miles) to Longmeadow Pkwy (-0.1 miles) Minor Various lanes closed 4/17/17 7:00 AM to 5/1/17 6:00 PM Gateway Pavement removal and pavement widening work
NB Randall Rd from Longmeadow Pkwy (-0.1 miles) to Longmeadow Pkwy (+0.1 miles) Minor Various lanes closed 4/17/17 7:00 AM to 5/1/17 6:00 PM Gateway Pavement removal and pavement widening work
SB Randall Rd from Longmeadow Pkwy (-0.1 miles) to Longmeadow Pkwy (+0.1 miles) Minor Various lanes closed 4/17/17 7:00 AM to 5/1/17 6:00 PM Gateway Pavement removal and pavement widening work
SB Randall Rd from Longmeadow Pkwy (+0.1 miles) to Longmeadow Pkwy (+0.1 miles) Minor Various lanes closed 4/17/17 7:00 AM to 5/1/17 6:00 PM Gateway Pavement removal and pavement widening work
EB Roosevelt Rd (IL-38) from Nicoll Way to Lincoln Av Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.
WB Roosevelt Rd (IL-38) from Lincoln Av to Nicoll Way Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.
EB Scott Rd from Swan Rd to Harter Rd Minor Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Resurfacing and Guardrail Replacement
WB Scott Rd from Harter Rd to Deer Ridge Path (-0.5 miles) Minor Various lanes closed 4/28/17 7:00 AM to 4:00 PM,
5/1/17 7:00 AM to 4:00 PM,
5/2/17 7:00 AM to 4:00 PM,
5/3/17 7:00 AM to 4:00 PM,
... more, ending on 8/31/17
Gateway Resurfacing and Guardrail Replacement
NB Sleepy Hollow Rd from Longmeadow Pkwy (-0.1 miles) to Longmeadow Pkwy (+0.1 miles) Minor Various lanes closed 4/17/17 7:00 AM to 5/1/17 6:00 PM Gateway Pavement removal and pavement widening work
SB Sleepy Hollow Rd from Longmeadow Pkwy (-0.1 miles) to Longmeadow Pkwy (+0.1 miles) Minor Various lanes closed 4/17/17 7:00 AM to 5/1/17 6:00 PM Gateway Pavement removal and pavement widening work

Kankakee County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-45 from I-57 (-0.3 miles) to I-57 (-0.1 miles) Medium One lane closed, up to one lanes open 3/13/17 12:00 AM to 10/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
NB US-45 from I-57 (-0.1 miles) to I-57 (+0.1 miles) Medium One lane closed, one lane open 3/13/17 12:00 AM to 10/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
NB US-45 from I-57 (+0.1 miles) to 2740S Rd Medium One lane closed, one lane open 3/13/17 12:00 AM to 10/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
NB US-45 from 6000N Rd (-0.1 miles) to 6000N Rd (+0.1 miles) Minor Left or right shoulder closed, all lanes open 6/7/16 12:00 AM to 6/18/17 12:00 AM IDOT Expect lane restrictions for intersection work. Vehicle width restricted to 10'.
NB US-45 from 6000N Rd (-0.1 miles) to 6000N Rd (+0.1 miles) Minor Left or right shoulder closed, all lanes open 9/14/15 12:00 AM to 6/18/17 12:00 AM IDOT Expect lane restrictions for intersection work.
SB US-45 from 6000N Rd (-0.1 miles) to 6000N Rd (+0.1 miles) Minor Left or right shoulder closed, all lanes open 9/14/15 12:00 AM to 6/18/17 12:00 AM IDOT Expect lane restrictions for intersection work.
SB US-45 from 6000N Rd (-0.1 miles) to 6000N Rd (+0.1 miles) Minor Left or right shoulder closed, all lanes open 6/7/16 12:00 AM to 6/18/17 12:00 AM IDOT Expect lane restrictions for intersection work. Vehicle width restricted to 10'.
SB US-45 from 2740S Rd to I-57 (-0.1 miles) Medium One lane closed, one lane open 3/13/17 12:00 AM to 10/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
SB US-45 from I-57 (-0.1 miles) to I-57 (+0.1 miles) Medium One lane closed, one lane open 3/13/17 12:00 AM to 10/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
SB US-45 from I-57 (+0.1 miles) to I-57 (+0.3 miles) Medium One lane closed, up to one lanes open 3/13/17 12:00 AM to 10/31/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12' 6".
NB IL-50 from 5000N Rd to 7410N Rd (-0.8 miles) Minor Left or right shoulder closed, all lanes open 3/20/17 12:00 AM to 9/30/18 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10'.
SB IL-50 from 7410N Rd (+0.8 miles) to 5000N Rd Minor Left or right shoulder closed, all lanes open 3/20/17 12:00 AM to 9/30/18 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10'.

Kendall County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NWB US-30 from 143rd St to Wolfs Crossing Rd (+0.1 miles) Medium Various lanes closed 4/10/17 8:00 AM to 8/31/17 5:00 PM IDOT Resurfacing and pavement patching, as well as sidewalk improvements
NWB US-30 from Wolf Rd (143rd) to Lincoln Station Dr Medium Various lanes closed 4/10/17 12:00 AM to 7/3/17 11:59 PM IDOT Nighttime: Pavement milling and HMA resurfacing. Daytime: Pavement patching, ADA sidewalk construction, detector loop replacement, aggregate shoulders, placement of permanent pavement stripes. Detour: N/A
SEB US-30 from Lincoln Station Dr to Wolf Rd (143rd) Medium Various lanes closed 4/10/17 12:00 AM to 7/3/17 11:59 PM IDOT Nighttime: Pavement milling and HMA resurfacing. Daytime: Pavement patching, ADA sidewalk construction, detector loop replacement, aggregate shoulders, placement of permanent pavement stripes. Detour: N/A
SEB US-30 from Wolfs Crossing Rd (-0.1 miles) to 143rd St Medium Various lanes closed 4/10/17 8:00 AM to 8/31/17 5:00 PM IDOT Resurfacing and pavement patching, as well as sidewalk improvements
NB IL-47 from Gore Rd to Sherrill Rd None All lanes and shoulders open 12/14/16 12:00 AM to 7/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SB IL-47 from Sherrill Rd to Gore Rd None All lanes and shoulders open 12/14/16 12:00 AM to 7/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".

Knox County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
SEB US-150 from Chambers St to Allens Ave Major All lanes closed 3/1/17 12:00 AM to 11/30/18 11:59 PM IDOT Closed to all traffic.
WB US-150 from Allens Ave to Chambers St Major All lanes closed 3/1/17 12:00 AM to 11/30/18 11:59 PM IDOT Closed to all traffic.
NB IL-97 at Knox Road 900 (+0.2 miles) None All lanes and shoulders open 6/24/16 12:00 AM to 10/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
NB IL-97 at Knox Road 1080 (+0.7 miles) None All lanes and shoulders open 6/24/16 12:00 AM to 10/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SB IL-97 at Knox Road 1080 (-0.7 miles) None All lanes and shoulders open 6/24/16 12:00 AM to 10/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SB IL-97 at Knox Road 900 (-0.2 miles) None All lanes and shoulders open 6/24/16 12:00 AM to 10/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".

LaSalle County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-178 from IL-71 to Donaldson St None All lanes and shoulders open 3/20/17 12:00 AM to 6/30/19 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB IL-178 at 27th Rd (-0.3 miles) None All lanes and shoulders open 3/20/17 12:00 AM to 6/30/19 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9'.
SB IL-178 from Donaldson St to IL-71 None All lanes and shoulders open 3/20/17 12:00 AM to 6/30/19 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-178 at 27th Rd (+0.3 miles) None All lanes and shoulders open 3/20/17 12:00 AM to 6/30/19 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9'.
NB IL-251 from 2551st Rd to Shooting Park Rd None All lanes and shoulders open 4/13/17 12:00 AM to 5/22/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
SB IL-251 from Shooting Park Rd to 2551st Rd None All lanes and shoulders open 4/13/17 12:00 AM to 5/22/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.

Lake County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-59 from IL-72 to Ivanhoe Rd (+0.6 miles) Medium Various lanes closed 4/10/17 7:00 AM to 7/15/17 11:59 PM IDOT Resurfacing Barrington road to IL-72 Higgins Road.
NB IL-59 at IL-132 Minor All lanes and shoulders open 3/1/17 7:00 AM to 12/31/17 3:00 PM Lake County Resurfacing Work
SB IL-59 at IL-132 Minor All lanes and shoulders open 3/1/17 7:00 AM to 12/31/17 3:00 PM Lake County Resurfacing Work
SB IL-59 from Peace Blvd (+0.1 miles) to IL-72 Medium Various lanes closed 4/10/17 7:00 AM to 7/15/17 11:59 PM IDOT Resurfacing
EB IL-132 from Ferndale St to Estes St Medium Various lanes closed 4/24/17 5:00 AM to 11/30/17 11:59 PM IDOT
WB IL-132 from Estes St to Ferndale St Medium Various lanes closed 4/24/17 5:00 AM to 11/30/17 11:59 PM IDOT
NB Fox Lake Rd (IL-59) from Grand Ave (IL-132) to Highwoods Dr Medium Various lanes closed 2/6/17 12:00 AM to 11/15/17 11:59 PM IDOT Resurfacing, Intersection Reconstruction, & Traffic Signal Install. Detour: Petite Lake Rd will be detoured between June 15, 2017 and August 15, 2017. Traffic will be detoured to Fairfield Rd and Grand Ave.
SB Fox Lake Rd (IL-59) from Highwoods Dr to Grand Ave (IL-132) Medium Various lanes closed 2/6/17 12:00 AM to 11/15/17 11:59 PM IDOT Resurfacing, Intersection Reconstruction, & Traffic Signal Install. Detour: Petite Lake Rd will be detoured between June 15, 2017 and August 15, 2017. Traffic will be detoured to Fairfield Rd and Grand Ave.
EB Grand Ave (IL 132) from Ferndale St to Greenview St Medium Various lanes closed 4/24/17 12:00 AM to 6/12/17 11:59 PM IDOT This is a pavement reconstruction project. Also includes, earth excavation, storm sewer, pavement patching, concrete curb and gutter, temporary pavement and sidewalk.
EB Grand Ave (IL 132) from US 41 to Waveland Ave Medium Right lane closed, one lane open 4/10/17 12:00 AM to 5/24/19 11:59 PM IDOT Remove and replace the UPRR bridge. Also, construction of a temporary shoofly embankment, track and shoofly bridge. Additional improvements include reconstruction, widening and resurfacing of IL 132 and widening of the US 41 SB ramp.
WB Grand Ave (IL 132) from Greenview St to Ferndale St Medium Various lanes closed 4/24/17 12:00 AM to 6/12/17 11:59 PM IDOT This is a pavement reconstruction project. Also includes, earth excavation, storm sewer, pavement patching, concrete curb and gutter, temporary pavement and sidewalk.
WB Grand Ave (IL-132) from Estes St to Ferndale St Medium Various lanes closed 4/24/17 8:00 AM to 10/1/17 5:00 PM IDOT WB traffic on Illinois 132 will be reduced to one lane between Ferndale Street and Estes Street during daytime hours Monday through Friday.
EB Larkin Ln from Wilson Rd to Catherine St Medium All lanes and shoulders closed 4/24/17 8:00 AM to 4/30/17 5:00 PM Lake County Local traffic will take Catherine Street to Big Hollow Road, follow detour signs. Tentatively scheduled to begin April 24, 2017 for 1 week.
WB Larkin Ln from Catherine St to Wilson Rd Medium All lanes and shoulders closed 4/24/17 8:00 AM to 4/30/17 5:00 PM Lake County Local traffic will take Catherine Street to Big Hollow Road, follow detour signs. Tentatively scheduled to begin April 24, 2017 for 1 week.

Lawrence County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-250 at Virginia Rd (-0.1 miles) Major All lanes closed 3/6/17 12:00 AM to 7/3/17 11:59 PM IDOT Bridge closed.
WB IL-250 at Virginia Rd (+0.1 miles) Major All lanes closed 3/6/17 12:00 AM to 7/3/17 11:59 PM IDOT Bridge closed.

Lee County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-26 from 3000 North Ave to Union Rd (+0.3 miles) None All lanes and shoulders open 3/6/17 12:00 AM to 7/28/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6".
NB IL-26 from 3000 North Ave (+0.5 miles) to Union Rd (+0.3 miles) None All lanes and shoulders open 3/6/17 7:00 AM to 7/28/17 11:59 PM IDOT One Lane Closed; Lane restriction will be posted at 11'-6".
SB IL-26 from Union Rd (-0.3 miles) to 3000 North Ave None All lanes and shoulders open 3/6/17 12:00 AM to 7/28/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11' 6".
SB IL-26 from Union Rd (-0.3 miles) to 3000 North Ave (-0.5 miles) None All lanes and shoulders open 3/6/17 7:00 AM to 7/28/17 11:59 PM IDOT One Lane Closed; Lane restriction will be posted at 11'-6".

Livingston County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-17 from Prairie Ave to Chicago St None All lanes and shoulders open 7/5/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.
WB IL-17 from Chicago St to Prairie Ave None All lanes and shoulders open 7/5/16 12:00 AM to 5/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 11'.
EB Reynolds St at Ladd St Minor Various lanes closed 8/29/16 7:00 AM to 5/15/17 11:59 PM IDOT Work includes installation of storm sewers, new curb and gutters, raising the Ladd Street/Reynolds Street intersection, asphalt surfacing, and signal work at the tracks.
WB Reynolds St at Ladd St Minor Various lanes closed 8/29/16 7:00 AM to 5/15/17 11:59 PM IDOT Work includes installation of storm sewers, new curb and gutters, raising the Ladd Street/Reynolds Street intersection, asphalt surfacing, and signal work at the tracks.

Macon County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-51 from IL-48 to US-36 (-0.1 miles) Medium One lane closed, one lane open 3/1/16 12:00 AM to 11/16/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Traffic reduced to one lane in each direction with a crossover.
NB US-51 at 1000 (+0.7 miles) Major All lanes closed 3/1/16 12:00 AM to 11/16/17 12:00 AM IDOT Bridge closed. Vehicle width restricted to 15' 5".
NB US-51 at 1000 (+0.7 miles) Medium One lane closed, one lane open 9/14/15 12:00 AM to 11/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 15' 5".
SB US-51 from US-36 (+0.1 miles) to IL-48 Medium One lane closed, one lane open 3/1/16 12:00 AM to 11/16/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Traffic reduced to one lane in each direction with a crossover.
SB US-51 at 1000 (-0.7 miles) Medium One lane closed, one lane open 9/14/15 12:00 AM to 11/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 15' 5".
SB US-51 at 1000 (-0.7 miles) Major All lanes closed 3/1/16 12:00 AM to 11/16/17 12:00 AM IDOT Bridge closed. Vehicle width restricted to 15' 5".

Macoupin County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-108 at Chism Rd (-0.3 miles) None All lanes and shoulders open 3/20/17 12:00 AM to 9/10/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
WB IL-108 at Chism Rd (+0.3 miles) None All lanes and shoulders open 3/20/17 12:00 AM to 9/10/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".

Madison County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NEB US-40 from I-70 to I-70 None All lanes and shoulders open 1/30/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SWB US-40 from I-70 to I-70 None All lanes and shoulders open 1/30/17 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-3 from IL-203 (-0.2 miles) to Levee Rd (-0.1 miles) None All lanes and shoulders open 5/15/16 12:00 AM to 10/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB IL-4 at Keck Rd (-0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 5/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
SB IL-4 at Keck Rd (+0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 5/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 6".
EB IL-140 from Broadway St to Pine St None All lanes and shoulders open 3/20/17 12:00 AM to 6/19/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-140 from Pine St to Broadway St None All lanes and shoulders open 3/20/17 12:00 AM to 6/19/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-143 from CPL Chris Belchik Mem Expy to Discovery Pkwy Medium One lane closed, one lane open 1/16/17 12:00 AM to 4/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 16'.
NB IL-157 from Caroll Ln (+0.1 miles) to Butternut Ln None All lanes and shoulders open 3/6/17 12:00 AM to 6/5/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 24'.
SB IL-157 from Butternut Ln to Caroll Ln (-0.1 miles) None All lanes and shoulders open 3/6/17 12:00 AM to 6/5/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 24'.
NB IL-159 from Clay St to Belt Line Rd Medium Various lanes closed 8/5/13 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
SB IL-159 from Belt Line Rd to Clay St Medium Various lanes closed 8/5/13 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
EB Belt Line Rd from Keebler Rd (-0.1 miles) to Cottage Dr None All lanes and shoulders open 5/1/16 12:00 AM to 5/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10'.
WB Belt Line Rd from Cottage Dr to Keebler Rd (+0.1 miles) None All lanes and shoulders open 5/1/16 12:00 AM to 5/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10'.
NB Old Alton Rd from Oakland Ave (-0.1 miles) to New Poag Rd None All lanes and shoulders open 5/15/16 12:00 AM to 10/2/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
NB University Dr from New Poag Rd to Old Alton Edwardsville Rd (+0.2 miles) Minor Various lanes closed 9/14/16 7:00 AM to 11/30/17 11:59 PM IDOT The Illinois Department of Transportation today announced that the southbound lanes of SIU Northern Access Road over Cahokia Creek will be reduced to one lane between IL-143 and New Poag Road beginning on Wednesday, September 14, 2016, weather permitting. This lane closure will be ongoing and will remain in place for approximately one month. At that time, the northbound and southbound lanes will both be reduced to one lane for the remainder of the project. This work is necessary to repair the surfaces of both bridges and is estimated to be completed by late Fall of 2017.
NB University Dr at Old Alton Edwardsville Rd (-0.2 miles) Minor 0 lanes closed, two lanes open 9/12/16 12:00 AM to 2/1/18 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 13' 9".
SB University Dr from Old Alton Edwardsville Rd (-0.2 miles) to New Poag Rd Minor Various lanes closed 9/14/16 7:00 AM to 11/30/17 11:59 PM IDOT The Illinois Department of Transportation today announced that the southbound lanes of SIU Northern Access Road over Cahokia Creek will be reduced to one lane between IL-143 and New Poag Road beginning on Wednesday, September 14, 2016, weather permitting. This lane closure will be ongoing and will remain in place for approximately one month. At that time, the northbound and southbound lanes will both be reduced to one lane for the remainder of the project. This work is necessary to repair the surfaces of both bridges and is estimated to be completed by late Fall of 2017.
SB University Dr at Old Alton Edwardsville Rd (+0.2 miles) Minor 0 lanes closed, two lanes open 9/12/16 12:00 AM to 2/1/18 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 13' 9".

Mason County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
SEB IL-97 at Walnut St Medium Various lanes closed 4/24/17 7:00 AM to 5/5/17 11:59 PM IDOT Bridge repair work on the structure carrying eastbound Illinois 97 (Madison Street) over Walnut Street beginning April 24. The work will require closure of two lanes on eastbound Illinois 97.

McDonough County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-41 at IL-95 (+0.1 miles) None All lanes and shoulders open 2/1/17 12:00 AM to 7/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10'.
SB IL-41 at IL-95 (-0.1 miles) None All lanes and shoulders open 2/1/17 12:00 AM to 7/15/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10'.

McHenry County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-14 from Marawood Dr (+0.3 miles) to IL-120 (+0.4 miles) Medium All lanes and shoulders open 4/4/17 12:00 AM to 8/1/17 11:59 PM IDOT Bridge Deck and Joint Repairs, Bridge Approach Pavement Replacement.
NWB US-14 from Lake Shore Dr to Lucas Rd None All lanes and shoulders open 10/6/14 12:00 AM to 5/31/17 11:59 PM IDOT Reconstruction and widening of US Rte 14, PCC Pavement, Storm Sewers, Traffic Signals, Earthwork, Landscaping. All Lanes opened October 2016, Remaining Tree/Shrub Plantings and Punchlist work to be completed by May 2017. Detour: na
NWB US-14 from Kishwaukee Valley Rd (-0.1 miles) to Bunker Hill Rd Medium Various lanes closed 4/4/17 12:00 AM to 8/1/17 11:59 PM IDOT Bridge Deck and Joint Repairs, Bridge Approach Pavement Replacement.
SEB US-14 from Bunker Hill Rd to Marawood Dr (+0.3 miles) Medium All lanes and shoulders open 4/4/17 12:00 AM to 8/1/17 11:59 PM IDOT Bridge Deck and Joint Repairs, Bridge Approach Pavement Replacement.
SEB US-14 from IL-120 (+0.4 miles) to Kishwaukee Valley Rd (+0.1 miles) Medium All lanes and shoulders open 4/4/17 12:00 AM to 8/1/17 11:59 PM IDOT Bridge Deck and Joint Repairs, Bridge Approach Pavement Replacement.
EB US-14 from Lucas Rd to Lake Shore Dr None All lanes and shoulders open 10/6/14 12:00 AM to 5/31/17 11:59 PM IDOT Reconstruction and widening of US Rte 14, PCC Pavement, Storm Sewers, Traffic Signals, Earthwork, Landscaping. All Lanes opened October 2016, Remaining Tree/Shrub Plantings and Punchlist work to be completed by May 2017. Detour: na

McLean County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB I-55-BL (I-55-BL) from Hamilton Rd to Bunn St Minor Various lanes closed 4/3/17 7:00 AM to 10/31/17 6:00 PM IDOT Patching, milling and resurfacing
SB I-55-BL (Veterans Pkwy) from Bunn St to Fox Creek Rd Minor Various lanes closed 4/3/17 7:00 AM to 10/31/17 6:00 PM IDOT Patching, milling and resurfacing

Montgomery County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-16 at Niemeyer Trl (-0.3 miles) Medium Various lanes closed 4/1/17 12:00 AM to 8/8/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11' 3".
WB IL-16 at Niemeyer Trl (+0.3 miles) Medium Various lanes closed 4/1/17 12:00 AM to 8/8/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11' 3".

Morgan County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-104 from Mound Rd to Brooklyn Ave None All lanes and shoulders open 6/15/16 12:00 AM to 9/14/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
EB I-72-BL (Morton Ave) at Lincoln Ave (-0.2 miles) None All lanes and shoulders open 7/5/16 12:00 AM to 9/14/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
EB IL-104 at Blesse Ln (+0.1 miles) None All lanes and shoulders open 9/19/16 12:00 AM to 9/13/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
WB IL-104 from Brooklyn Ave to Mound Rd None All lanes and shoulders open 6/15/16 12:00 AM to 9/14/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
WB IL-104 at Blesse Ln (-0.1 miles) None All lanes and shoulders open 9/19/16 12:00 AM to 9/13/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
WB I-72-BL (Morton Ave) at Lincoln Ave (+0.2 miles) None All lanes and shoulders open 7/5/16 12:00 AM to 9/14/17 12:00 AM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".

Moultrie County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-32 from CR 950N (-0.6 miles) to CR 950N (-0.3 miles) None All lanes and shoulders open 4/3/17 12:00 AM to 5/26/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
SB IL-32 from CR 950N (+0.3 miles) to CR 950N (+0.6 miles) None All lanes and shoulders open 4/3/17 12:00 AM to 5/26/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
NWB IL-121 at CR 490E (-0.3 miles) None All lanes and shoulders open 4/3/17 12:00 AM to 5/26/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.
SEB IL-121 at CR 490E (+0.3 miles) None All lanes and shoulders open 4/3/17 12:00 AM to 5/26/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 12'.

Ogle County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB Roosevelt Rd (IL-38) from Nicoll Way to Lincoln Av Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.
WB Roosevelt Rd (IL-38) from Lincoln Av to Nicoll Way Medium Various lanes closed 8/8/16 12:00 AM to 6/9/17 11:59 PM IDOT Pavement patching at various locations in Cook and DuPage counties.

Peoria County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-150 at IL-6 Medium Various lanes closed 4/26/17 7:00 AM to 5/3/17 11:59 PM IDOT Intermittent daytime lane closures on U.S. 150 (War Memorial Drive) near IL 6 . The lane closures are necessary for pavement patching work to be completed. The patching work has begun in the eastbound lanes and will switch to the westbound lanes
WB US-150 at IL-6 Medium Various lanes closed 4/26/17 7:00 AM to 5/3/17 11:59 PM IDOT Intermittent daytime lane closures on U.S. 150 (War Memorial Drive) near IL 6 . The lane closures are necessary for pavement patching work to be completed. The patching work has begun in the eastbound lanes and will switch to the westbound lanes
EB IL-116 from Carole Ave to Greengold Rd None All lanes and shoulders open 3/6/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB IL-116 from Carole Ave to Greengold Rd None All lanes and shoulders open 4/10/17 12:00 AM to 10/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
WB IL-116 from Greengold Rd to Carole Ave None All lanes and shoulders open 3/6/17 12:00 AM to 11/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-116 from Greengold Rd to Carole Ave None All lanes and shoulders open 4/10/17 12:00 AM to 10/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".

Pike County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-104 at 505th St (+0.1 miles) None All lanes and shoulders open 4/12/17 12:00 AM to 12/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 14'.
WB IL-104 at 505th St (-0.1 miles) None All lanes and shoulders open 4/12/17 12:00 AM to 12/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 14'.
SB County Highway 14 from 275th Ln (+0.6 miles) to 452nd St Medium All lanes and shoulders closed 8/1/16 12:00 AM to 6/15/17 11:59 PM IDOT Closed to all traffic.

Putnam County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-89 from Bottom Rd (+0.4 miles) to Illinois St (-0.3 miles) None All lanes and shoulders open 4/15/16 12:00 AM to 8/2/18 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".
NB IL-89 from Bottom Rd (+0.4 miles) to Illinois St (-0.3 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
SB IL-89 from Illinois St (+0.3 miles) to Bottom Rd (-0.4 miles) None All lanes and shoulders open 3/1/16 12:00 AM to 8/1/18 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
SB IL-89 from Illinois St (+0.3 miles) to Bottom Rd (-0.4 miles) None All lanes and shoulders open 4/15/16 12:00 AM to 8/2/18 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".

Richland County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-50 at Clay Rd (-0.4 miles) None All lanes and shoulders open 3/1/17 12:00 AM to 12/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".
EB US-50 at Elmdale Rd (+0.3 miles) None All lanes and shoulders open 3/13/17 12:00 AM to 8/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9'.
WB US-50 at Elmdale Rd (-0.3 miles) None All lanes and shoulders open 3/13/17 12:00 AM to 8/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9'.
WB US-50 at Clay Rd (+0.4 miles) None All lanes and shoulders open 3/1/17 12:00 AM to 12/1/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 9' 6".
NB IL-130 from Elbow Ln (-0.1 miles) to Ebenezer Ln Medium Various lanes closed 10/15/15 12:00 AM to 11/14/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB IL-130 at Elbow Ln Medium Various lanes closed 3/1/17 12:00 AM to 11/14/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11' 6".
SB IL-130 from Ebenezer Ln to Elbow Ln (+0.1 miles) Medium Various lanes closed 10/15/15 12:00 AM to 11/14/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-130 at Elbow Ln Medium Various lanes closed 3/1/17 12:00 AM to 11/14/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11' 6".

Rock Island County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-5 from I-74 to 60th St Medium One lane closed, one lane open 3/27/17 12:00 AM to 12/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB IL-5 from 60th St to 70th St (+0.9 miles) Medium One lane closed, one lane open 3/27/17 12:00 AM to 12/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB IL-5 from 70th St to 70th St (+0.9 miles) Medium One lane closed, one lane open 3/27/17 12:00 AM to 12/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
WB IL-5 from 70th St (-0.9 miles) to 60th St Medium One lane closed, one lane open 3/27/17 12:00 AM to 12/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-5 from 70th St (-0.9 miles) to 70th St Medium One lane closed, one lane open 3/27/17 12:00 AM to 12/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
WB IL-5 from 60th St to I-74 Medium One lane closed, one lane open 3/27/17 12:00 AM to 12/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB 19th St from 23rd Ave to IL-92 Medium All lanes closed 3/27/17 12:00 AM to 5/5/17 11:59 PM IDOT Closed to all traffic.
SB 19th St from IL-92 to 23rd Ave Medium All lanes closed 3/27/17 12:00 AM to 5/5/17 11:59 PM IDOT Closed to all traffic.

Saline County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB US-45 at Rock Hole Rd (-0.1 miles) None All lanes and shoulders open 3/21/16 12:00 AM to 6/2/17 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 5".
SB US-45 at Rock Hole Rd (+0.1 miles) None All lanes and shoulders open 3/21/16 12:00 AM to 6/2/17 12:00 AM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 5".
NWB IL-34 at Lambert Rd (-0.1 miles) None All lanes and shoulders open 12/16/16 12:00 AM to 8/23/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 12'.
SEB IL-34 at Lambert Rd (+0.1 miles) None All lanes and shoulders open 12/16/16 12:00 AM to 8/23/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 12'.

Sangamon County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-4 from County Rd to Circle Dr None All lanes and shoulders open 6/14/16 12:00 AM to 5/12/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
SB IL-4 from Circle Dr to County Rd None All lanes and shoulders open 6/14/16 12:00 AM to 5/12/17 12:00 AM IDOT Expect lane restrictions for roadway improvement.
SB IL-29 from Hackmore Dr to IL-4 Medium One lane closed, up to one lanes open 2/23/17 12:00 AM to 9/1/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-97 at Walnut St Medium Various lanes closed 4/24/17 7:00 AM to 5/5/17 11:59 PM IDOT Bridge repair work on the structure carrying eastbound Illinois 97 (Madison Street) over Walnut Street beginning April 24. The work will require closure of two lanes on eastbound Illinois 97.

Schuyler County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-101 at White Oak Cemetery Rd (-0.1 miles) None All lanes and shoulders open 4/15/17 12:00 AM to 7/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.
WB IL-101 at White Oak Cemetery Rd (+0.1 miles) None All lanes and shoulders open 4/15/17 12:00 AM to 7/31/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 11'.

Shelby County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB 500 North Rd from Oconee Ave to US-51 Medium All lanes and shoulders closed 8/1/16 12:00 AM to 6/15/17 11:59 PM IDOT Closed to all traffic.

St Clair County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from SEB IL-13 to EB IL-15 Major All lanes and shoulders closed 9/8/15 12:00 AM to 7/30/17 11:59 PM IDOT Closed to all traffic.
NB IL-157 from St Clair Ave (-0.1 miles) to St Clair Ave Medium One lane closed, one lane open 1/4/16 12:00 AM to 6/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
SB IL-157 from St Clair Ave to St Clair Ave (+0.1 miles) Medium One lane closed, one lane open 1/4/16 12:00 AM to 6/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB Wherry Rd from IL-158 to Scott School Rd Medium All lanes and shoulders closed 4/3/17 7:00 AM to 5/15/17 11:59 PM IDOT Motorists are urged to seek alternate routes and allow for extra time when traveling in the area.
WB Wherry Rd from Scott School Rd to IL-158 Medium All lanes and shoulders closed 4/3/17 7:00 AM to 5/15/17 11:59 PM IDOT Motorists are urged to seek alternate routes and allow for extra time when traveling in the area.

Vermilion County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-136 from IL-119 to Arrowhead Rd Medium Various lanes closed 8/10/15 12:00 AM to 12/31/17 11:59 PM IDOT The movement of oversize and overweight loads is restricted. Vehicle width restricted to 14' 6", weight to 120 tons.
NB IL-1 from Arrowhead Rd to IL-119 Medium Various lanes closed 8/10/15 12:00 AM to 12/31/17 11:59 PM IDOT The movement of oversize and overweight loads is restricted. Vehicle width restricted to 14' 6", weight to 120 tons.

Warren County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-110 at 11th St (+0.3 miles) Major All lanes and shoulders closed 3/7/17 7:00 AM to 10/15/17 2:00 PM IDOT Bridge Replacement; A marked detour will direct motorists to Cameron Road and U.S. 34 during this time.
WB IL-110 at 11th St (-0.3 miles) Major All lanes and shoulders closed 3/7/17 7:00 AM to 10/15/17 2:00 PM IDOT Bridge Replacement; A marked detour will direct motorists to Cameron Road and U.S. 34 during this time.
EB IL-164 at 215th Ave (-0.1 miles) Major All lanes closed 3/7/17 12:00 AM to 10/17/17 11:59 PM IDOT Closed to all traffic.
WB IL-164 at 215th Ave (+0.1 miles) Major All lanes closed 3/7/17 12:00 AM to 10/17/17 11:59 PM IDOT Closed to all traffic.

Washington County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-127 from I-64 (-0.1 miles) to Lark Rd (-0.2 miles) Medium Various lanes closed 4/24/17 6:00 AM to 5/1/17 8:00 PM IDOT
SB IL-127 from IL-177 to I-64 (+0.1 miles) Medium Various lanes closed 4/24/17 6:00 AM to 5/1/17 8:00 PM IDOT
EB Oakdale Blacktop Rd (CR-8) from Old Nashville Rd (+0.6 miles) to Rice Rd Minor Various lanes closed 4/28/17 6:00 AM to 8:00 PM daily until 6/30/17 IDOT Resurfacing; intermittent one lane restriction.
WB Oakdale Blacktop Rd (CR-8) from Rice Rd to Old Nashville Rd (-0.6 miles) Minor Various lanes closed 4/28/17 6:00 AM to 8:00 PM daily until 6/30/17 IDOT Resurfacing; intermittent one lane restriction.

Wayne County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-15 at Co Rd 1175 (-0.8 miles) None All lanes and shoulders open 3/1/17 12:00 AM to 10/19/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 1".
WB IL-15 at Co Rd 1175 (+0.8 miles) None All lanes and shoulders open 3/1/17 12:00 AM to 10/19/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by temporary traffic signals. Vehicle width restricted to 10' 1".

Will County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-6 from Parker Rd to Timothy Ln Medium Various lanes closed 9/1/16 12:00 AM to 10/31/17 11:59 PM IDOT US 6 and Parker RD Intersection reconstruction with installation of new traffic signals. Detour: n/a
WB US-6 from Timothy Ln to Parker Rd Medium Various lanes closed 9/1/16 12:00 AM to 10/31/17 11:59 PM IDOT US 6 and Parker RD Intersection reconstruction with installation of new traffic signals. Detour: n/a
EB US-30 from Bluff St to Joliet St Major All lanes and shoulders closed 4/1/17 12:00 AM to 7/31/17 11:59 PM IDOT STRUCTURAL STEEL REPAIRS TO MOVABLE BRIDGE. Detour: EB US30 (Jefferson St.)- Follow US52(Raynor Ave.) south to US52(McDonough St.), east to IL53(Chicago St.), then north of IL53(Chicago St.) to EB US30 (Jefferson St.). Bridge is one-way EB, so there is no WB traffic to reroute
NWB US-30 from 143rd St to Wolfs Crossing Rd (+0.1 miles) Medium Various lanes closed 4/10/17 8:00 AM to 8/31/17 5:00 PM IDOT Resurfacing and pavement patching, as well as sidewalk improvements
SEB US-30 from Wolfs Crossing Rd (-0.1 miles) to 143rd St Medium Various lanes closed 4/10/17 8:00 AM to 8/31/17 5:00 PM IDOT Resurfacing and pavement patching, as well as sidewalk improvements
NEB IL-7 (159th St) from Gougar Rd to Will Cook Rd Medium Various lanes closed 5/1/15 12:00 AM to 8/15/17 11:59 PM IDOT The improvement consists of roadway reconstruction and widening of IL Route 7 and roadway reconstruction and roadway widening of related cross roads. The improvement includes the installation of proposed storm sewer, pipe culverts, precast box culverts, (3) retaining walls, (2) pile-supported embankments, traffic signals, and collateral work necessary to complete the project as shown in the plans. Detour: Oak Valley Trail will be closed for approximately 15 days. A detour will be along S. Bell Rd.
SWB IL-7 (159th St) from Will Cook Rd to Gougar Rd Medium Various lanes closed 5/1/15 12:00 AM to 8/15/17 11:59 PM IDOT The improvement consists of roadway reconstruction and widening of IL Route 7 and roadway reconstruction and roadway widening of related cross roads. The improvement includes the installation of proposed storm sewer, pipe culverts, precast box culverts, (3) retaining walls, (2) pile-supported embankments, traffic signals, and collateral work necessary to complete the project as shown in the plans. Detour: Oak Valley Trail will be closed for approximately 15 days. A detour will be along S. Bell Rd.
NB IL-53 from Braceville Rd to Center St Major All lanes and shoulders closed 4/14/17 7:00 AM to 9/21/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Division St traffic East of the UPRR crossing will be detoured along Washington St via IL-113 (Main St) to the North or Kankakee St to the South
NB IL-53 at Center St Medium Various lanes closed 10/6/16 7:00 AM to 7/31/17 11:59 PM IDOT Intersection Improvement
NB IL-53 at Coal City Rd Medium Various lanes closed 10/3/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction and traffic signal installation at IL53 and Strip Mine Rd and IL53 and Coal City Rd
NB IL-53 at Stripmine Rd Medium Various lanes closed 10/3/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction and traffic signal installation at IL53 and Strip Mine Rd and IL53 and Coal City Rd
NB IL-53 from Hoff Rd to Ira Morgan Rd Medium Left lane closed, one lane open 8/15/16 12:00 AM to 5/31/17 11:59 PM IDOT Intersection improvement at IL-53 and Hoff Rd: Installation of a new box culvert and traffic signals. Addition of right and left turn lanes along SB IL-53. Detour: EB Hoff Rd traffic East of IL-53 will be detoured North to Mississippi Ave, East to Chicago Ave and South to Hoff Rd
NB IL-53 at Bridge over Des Plaines River Medium Various lanes closed 3/27/17 8:00 AM to 8/20/17 11:59 PM IDOT Intermittent, daytime lane closures will take place on the Ruby Street bridge as needed. Vehicular and pedestrian traffic will be maintained for the duration of the project. There also will be no impact to marine traffic. The project is expected to be completed in Summer 2017. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.
SB IL-53 at Ruby St (+0.1 miles) Medium Various lanes closed 3/27/17 12:00 AM to 7/31/17 11:59 PM IDOT STRUCTURAL STEEL REPAIRS TO MOVABLE BRIDGE.
SB IL-53 at Bridge over Des Plaines River Medium All lanes and shoulders open 3/27/17 8:00 AM to 8/20/17 11:59 PM IDOT Intermittent, daytime lane closures will take place on the Ruby Street bridge as needed. Vehicular and pedestrian traffic will be maintained for the duration of the project. There also will be no impact to marine traffic. The project is expected to be completed in Summer 2017. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.
SB IL-53 from Walter Strawn Dr to Hoff Rd Medium Left lane closed, one lane open 8/15/16 12:00 AM to 5/31/17 11:59 PM IDOT Intersection improvement at IL-53 and Hoff Rd: Installation of a new box culvert and traffic signals. Addition of right and left turn lanes along SB IL-53. Detour: EB Hoff Rd traffic East of IL-53 will be detoured North to Mississippi Ave, East to Chicago Ave and South to Hoff Rd
SB IL-53 at Stripmine Rd Medium Various lanes closed 10/3/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction and traffic signal installation at IL53 and Strip Mine Rd and IL53 and Coal City Rd
SB IL-53 at Coal City Rd Medium Various lanes closed 10/3/16 12:00 AM to 8/31/17 11:59 PM IDOT Intersection reconstruction and traffic signal installation at IL53 and Strip Mine Rd and IL53 and Coal City Rd
SB IL-53 at Center St Medium Various lanes closed 10/6/16 7:00 AM to 7/31/17 11:59 PM IDOT Intersection Improvement
SB IL-53 from Center St to Braceville Rd Major All lanes and shoulders closed 4/14/17 7:00 AM to 9/21/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Division St traffic East of the UPRR crossing will be detoured along Washington St via IL-113 (Main St) to the North or Kankakee St to the South
NB IL-102 from John Street to Warner Bridge Road Medium Various lanes closed 9/12/16 12:00 AM to 5/20/17 11:59 PM IDOT Shoulder repair and milled rumble strips. Detour: NA
SB IL-102 from Warner Bridge Road to John Street Medium Various lanes closed 9/12/16 12:00 AM to 5/20/17 11:59 PM IDOT Shoulder repair and milled rumble strips. Detour: NA
NWB IL-113 from Kankakee County Line to Comet Dr Medium Various lanes closed 9/19/16 7:00 AM to 5/19/17 11:59 PM IDOT Safety improvement project. The scope of the project includes guardrail replacement, shoulder repair and installation of rumple strips. The overall project is expected to be completed in Spring 2017. Daily, intermittent lane closures will take place on Illinois 113 between Comet Drive and the Kankakee County Line.
NB IL-113 from Comet Dr to Bauer Rd Medium Various lanes closed 9/12/16 12:00 AM to 5/26/17 11:59 PM IDOT Guardrail, shoulder repair, and rumble strips. Detour: N/A
NWB IL-113 from Frontage Rd to McGinty St None All lanes and shoulders open 4/3/17 12:00 AM to 10/13/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by flaggers. Vehicle width restricted to 10' 6".
SEB IL-113 from McGinty St to Frontage Rd None All lanes and shoulders open 4/3/17 12:00 AM to 10/13/17 11:59 PM IDOT Traffic will be reduced to one lane, controlled by flaggers. Vehicle width restricted to 10' 6".
SB IL-113 from Bauer Rd to Comet Dr Medium Various lanes closed 9/12/16 12:00 AM to 5/26/17 11:59 PM IDOT Guardrail, shoulder repair, and rumble strips. Detour: N/A
SEB IL-113 from Comet Dr to Kankakee County Line Medium Various lanes closed 9/19/16 7:00 AM to 5/19/17 11:59 PM IDOT Safety improvement project. The scope of the project includes guardrail replacement, shoulder repair and installation of rumple strips. The overall project is expected to be completed in Spring 2017. Daily, intermittent lane closures will take place on Illinois 113 between Comet Drive and the Kankakee County Line.
NEB IL-129 from Braceville Rd to Reed St Major All lanes and shoulders closed 4/14/17 7:00 AM to 9/21/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Division St traffic East of the UPRR crossing will be detoured along Washington St via IL-113 (Main St) to the North or Kankakee St to the South
SWB IL-129 from Reed St to Braceville Rd Major All lanes and shoulders closed 4/14/17 7:00 AM to 9/21/17 11:59 PM IDOT Intersection reconstruction with HMA pavement, earthwork excavation, drainage system improvements and channelization. Detour: Front St (IL-53) and Division St traffic East of the UPRR crossing will be detoured along Washington St via IL-113 (Main St) to the North or Kankakee St to the South
NEB IL-171 from Cokes Rd to State St Medium Various lanes closed 8/16/16 7:00 AM to 11/1/17 11:59 PM IDOT
SWB IL-171 from State St to Cokes Rd Medium Various lanes closed 8/16/16 7:00 AM to 11/1/17 11:59 PM IDOT
EB 135th St from New Ave to Smith Rd Minor Various lanes closed 5/1/16 6:00 AM to 6/30/18 6:00 PM Gateway Reconstruction; intermittent lane closures
WB 135th St from Smith Rd to New Ave Minor Various lanes closed 5/1/16 6:00 AM to 6/30/18 6:00 PM Gateway Reconstruction; intermittent lane closures
EB 95th St at Plainfield-Naperville Rd Minor Various lanes closed 4/1/17 7:00 AM to 11/30/17 11:59 PM Gateway Intersection widening/signalization: intermittent lane closures
WB 95th St at Plainfield-Naperville Rd Minor Various lanes closed 4/1/17 7:00 AM to 11/30/17 11:59 PM Gateway Intersection widening/signalization: intermittent lane closures
NB Bell Rd from IL-7 to 151st St Minor Various lanes closed 7/1/16 6:00 AM to 9/30/17 6:00 PM Gateway Reconstruction
SB Bell Rd from 151st St to IL-7 Minor Various lanes closed 7/1/16 6:00 AM to 9/30/17 6:00 PM Gateway Reconstruction
EB Eames St (US-6) at I-55 Expressway (I-55) Medium Various lanes closed 3/1/17 12:00 AM to 7/31/17 11:59 PM IDOT I-55 At Rte 6 in Channahon, Will County. Bridge work completed. All lanes open. Shoulder closures still in place for intermittent work. Detour: N/A
WB Eames St (US-6) at I-55 Expressway (I-55) Medium Various lanes closed 3/1/17 12:00 AM to 7/31/17 11:59 PM IDOT I-55 At Rte 6 in Channahon, Will County. Bridge work completed. All lanes open. Shoulder closures still in place for intermittent work. Detour: N/A
EB Jackson St at Des Plaines River Medium All lanes and shoulders closed 4/24/17 12:00 AM to 5/1/17 11:59 PM IDOT A posted detour will direct westbound Jackson Street traffic to go north on Scott Street (Illinois 53), west on Ruby Street to cross the river and south on Broadway Street to return to Bridge Street (Jackson Street). Eastbound Bridge Street (Jackson Street) traffic should take the reverse route. Marine traffic will not be impacted.***Motorists can expect delays and should allow extra time for trips through this area. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.
WB Jackson St at Des Plaines River Medium All lanes and shoulders closed 4/24/17 12:00 AM to 5/1/17 11:59 PM IDOT A posted detour will direct westbound Jackson Street traffic to go north on Scott Street (Illinois 53), west on Ruby Street to cross the river and south on Broadway Street to return to Bridge Street (Jackson Street). Eastbound Bridge Street (Jackson Street) traffic should take the reverse route. Marine traffic will not be impacted.***Motorists can expect delays and should allow extra time for trips through this area. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.
EB Laraway Rd at Cedar Rd Minor Various lanes closed 7/1/16 6:00 AM to 7/31/17 6:00 PM Gateway Intersection Widening/Signalization
WB Laraway Rd at Cedar Rd Minor Various lanes closed 7/1/16 6:00 AM to 7/31/17 6:00 PM Gateway Intersection Widening/Signalization
NWB Lincoln Hwy from Presidential Ave (-0.1 miles) to US-30 Medium Various lanes closed 4/10/17 8:00 AM to 8/31/17 5:00 PM IDOT Resurfacing and pavement patching, as well as sidewalk improvements
SEB Lincoln Hwy from US-30 to Presidential Ave (+0.1 miles) Medium Various lanes closed 4/10/17 8:00 AM to 8/31/17 5:00 PM IDOT Resurfacing and pavement patching, as well as sidewalk improvements
EB Peotone Rd at W. Branch Forked Creek Minor Various lanes closed 5/1/16 12:00 AM to 7/1/17 11:59 PM Gateway Bridge Replacement; Single Lane closure w/ Temp signals
WB Peotone Rd at W. Branch Forked Creek Minor Various lanes closed 5/1/16 12:00 AM to 7/1/17 11:59 PM Gateway Bridge Replacement; Single Lane closure w/ Temp signals
NB Will Rd at Kankakee River Medium All lanes and shoulders closed 4/1/17 12:00 AM to 11/30/17 11:59 PM Gateway Bridge Deck Replacement; Road closed with a detour.
SB Will Rd at Kankakee River Medium All lanes and shoulders closed 4/1/17 12:00 AM to 11/30/17 11:59 PM Gateway Bridge Deck Replacement; Road closed with a detour.

Williamson County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB IL-13 from Shawnee Trl (+0.2 miles) to Greenbriar Rd (+0.1 miles) Medium Various lanes closed 3/28/17 12:00 AM to 5/12/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
EB IL-13 from Division St (+0.2 miles) to Briggs Rd (+0.2 miles) Medium One lane closed, one lane open 7/7/14 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-13 from Bethesda Clinic Rd (-0.2 miles) to Carterville Colp Rd (-0.2 miles) Medium One lane closed, one lane open 7/7/14 12:00 AM to 9/30/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
WB IL-13 from Greenbriar Rd (-0.1 miles) to Shawnee Trl (-0.2 miles) Medium Various lanes closed 3/28/17 12:00 AM to 5/12/17 11:59 PM IDOT Expect lane restrictions for roadway improvement.
NB Main St from n/o Plaza Dr to Marion St Minor Various lanes closed 2/1/17 7:00 AM to 5/15/17 11:59 PM IDOT Closed to through traffic only. Residents are asked to use caution when traveling through this section of Main St. as construction operations will have traffic reduced to one lane at times and workers and equipment will be present. Access to driveways and mailboxes will be maintained at all times during construction as well. Message boards and signs will be in place to alert traffic of the closure.
SB Main St from Marion St to n/o Plaza Dr Minor Various lanes closed 2/1/17 7:00 AM to 5/15/17 11:59 PM IDOT Closed to through traffic only. Residents are asked to use caution when traveling through this section of Main St. as construction operations will have traffic reduced to one lane at times and workers and equipment will be present. Access to driveways and mailboxes will be maintained at all times during construction as well. Message boards and signs will be in place to alert traffic of the closure.

Winnebago County (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
NB IL-2 from Yonge St (-0.1 miles) to Jonathan Ave Medium One lane closed, one lane open 3/16/17 12:00 AM to 7/28/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
SB IL-2 from Jonathan Ave to Vernon St (+0.1 miles) Medium One lane closed, one lane open 3/16/17 12:00 AM to 7/28/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 9' 6".
NB IL-251 from Alton Ave to 8th St Medium One lane closed, one lane open 11/11/16 12:00 AM to 6/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".
SB IL-251 from 8th St to Alton Ave Medium One lane closed, one lane open 11/11/16 12:00 AM to 6/15/17 11:59 PM IDOT Expect lane restrictions for roadway improvement. Vehicle width restricted to 10' 6".

I-65 NB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-80 (+0.2 miles) to 15th Ave (-0.1 miles) 260.0 to 261.2 Medium Left lane closed, one lane open 4/24/17 3:35 PM to 5/15/17 3:35 PM InDOT road construction
I-80 (+0.2 miles) to US-20 260.0 to 262.0 Medium Various lanes closed 4/17/17 7:00 AM to 5/15/17 11:59 PM InDOT Resurfacing
Exit ramp to WB 15th Ave 261.3 Medium All lanes and shoulders closed 4/4/17 7:00 AM to 5/15/17 11:59 PM InDOT Resurfacing

I-65 SB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-20 to I-80 (-0.2 miles) 262.0 to 260.0 Medium Various lanes closed 4/17/17 7:00 AM to 5/15/17 11:59 PM InDOT Resurfacing
Entrance ramp from EB 15th Ave 261.1 Medium All lanes and shoulders closed 4/4/17 7:00 AM to 5/15/17 11:59 PM InDOT Resurfacing

I-80 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Ave to I-65 3.3 to 11.7 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/18/17 5:46 AM to 5/18/17 10:11 AM InDOT Construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/26/17 7:50 AM to 5/26/17 7:50 AM InDOT Construction work
Exit ramp to WB I-90 15.3 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Right lane closed, one to five lanes open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Exit ramp to EB I-80 15.3 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-421 (-0.2 miles) to US-421 (+0.2 miles) 38.8 to 39.2 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
US-35 (+0.5 miles) to US-20 (-0.2 miles) 48.0 to 52.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.4 to 58.7 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/8/17 6:00 PM InDOT right lane closed
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.5 to 58.8 Medium Right lane closed, one lane open 3/2/17 7:00 AM to 5/8/17 7:00 PM Indiana Toll Road Bridge Work/Fiber Install : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Juniper Rd (+0.3 miles) 66.9 to 78.0 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Cleveland Rd (-0.1 miles) to Beech Rd (-0.1 miles) 82.0 to 86.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 7 to County Road 11 (-0.1 miles) 91.0 to 93.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Exit ramp to NB IN-19 91.5 Major All lanes and shoulders closed 4/25/17 8:00 AM to 5/8/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at MM 83 (331 South) to US-20 to SR-19 North to I-80/90
County Road 250 E (+0.3 miles) to US-20 (+0.1 miles) 123.3 to 156.0 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-80 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-20 (-0.1 miles) to County Road 250 E (-0.3 miles) 156.0 to 123.3 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (+0.1 miles) to County Road 7 93.0 to 91.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 11 (+0.1 miles) to Beech Rd (+0.1 miles) 93.0 to 86.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 5/1/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Beech Rd (+0.1 miles) to Cleveland Rd (+0.1 miles) 86.0 to 82.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Tamarack Rd (+0.2 miles) 78.0 to 66.9 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.7 to 58.1 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/25/17 6:00 PM InDOT right lane closed
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-20 (+0.2 miles) to US-35 (-0.5 miles) 52.6 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
Holmesville Rd to US-421 (+0.2 miles) 40.0 to 38.8 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to Old Hobart Rd (+0.2 miles) 25.2 to 19.8 Medium Right lane closed, one to 8 lanes open 3/8/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
I-65 to Kennedy Ave 11.7 to 3.3 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at I-65 (+0.2 miles) 11.5 Medium Left lane closed, three lanes open 4/26/17 10:14 AM to 5/26/17 10:14 AM InDOT Construction work

I-90 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Right lane closed, one to five lanes open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from WB I-94 20.9 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-421 (-0.2 miles) to US-421 (+0.2 miles) 38.8 to 39.2 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
US-35 (+0.5 miles) to US-20 (-0.2 miles) 48.0 to 52.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.4 to 58.7 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/8/17 6:00 PM InDOT right lane closed
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.5 to 58.8 Medium Right lane closed, one lane open 3/2/17 7:00 AM to 5/8/17 7:00 PM Indiana Toll Road Bridge Work/Fiber Install : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Juniper Rd (+0.3 miles) 66.9 to 78.0 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Cleveland Rd (-0.1 miles) to Beech Rd (-0.1 miles) 82.0 to 86.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 7 to County Road 11 (-0.1 miles) 91.0 to 93.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Exit ramp to NB IN-19 91.5 Major All lanes and shoulders closed 4/25/17 8:00 AM to 5/8/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at MM 83 (331 South) to US-20 to SR-19 North to I-80/90
County Road 250 E (+0.3 miles) to US-20 (+0.1 miles) 123.3 to 156.0 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

I-90 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-20 (-0.1 miles) to County Road 250 E (-0.3 miles) 156.0 to 123.3 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (+0.1 miles) to County Road 7 93.0 to 91.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 11 (+0.1 miles) to Beech Rd (+0.1 miles) 93.0 to 86.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 5/1/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Beech Rd (+0.1 miles) to Cleveland Rd (+0.1 miles) 86.0 to 82.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Tamarack Rd (+0.2 miles) 78.0 to 66.9 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.7 to 58.1 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/25/17 6:00 PM InDOT right lane closed
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-20 (+0.2 miles) to US-35 (-0.5 miles) 52.6 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
Holmesville Rd to US-421 (+0.2 miles) 40.0 to 38.8 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to Old Hobart Rd (+0.2 miles) 25.2 to 19.8 Medium Right lane closed, one to 8 lanes open 3/8/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
Entrance ramp from WB I-94 20.4 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90

I-94 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Ave to I-65 3.3 to 11.7 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/18/17 5:46 AM to 5/18/17 10:11 AM InDOT Construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/26/17 7:50 AM to 5/26/17 7:50 AM InDOT Construction work
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 4/26/17 9:15 AM to 5/26/17 9:15 AM InDOT Construction work
I-80 (-0.2 miles) to US-20 (-0.1 miles) 15.8 to 16.3 Medium Various lanes closed 4/17/17 7:00 AM to 11/15/17 11:59 PM InDOT Replace Bridge Deck
at I-80 16.0 Minor Left or right shoulder closed, all lanes open 3/21/17 5:00 AM to 5/26/17 11:00 AM InDOT shoulder closed
Exit ramp to EB US-20 39.4 Major All lanes and shoulders closed 4/3/17 7:00 AM to 7/3/17 11:59 PM InDOT
US-20 (-0.3 miles) to County Road 1000 N (+0.9 miles) 39.4 to 45.6 Minor Left shoulder closed, all lanes open 4/25/17 8:00 PM to 6/22/17 4:29 AM InDOT left shoulder closed

I-94 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 1000 N (-0.9 miles) to US-20 (+0.3 miles) 45.6 to 39.4 Minor Left shoulder closed, all lanes open 4/25/17 8:00 PM to 6/22/17 4:29 AM InDOT left shoulder closed
IN-249 to I-80 (+0.5 miles) 18.8 to 15.5 Medium Left lane closed, two lanes open 4/19/17 11:00 PM to 5/17/17 11:00 PM InDOT construction work
US-20 (+0.1 miles) to I-80 (+0.2 miles) 16.3 to 15.8 Medium Various lanes closed 4/17/17 7:00 AM to 11/15/17 11:59 PM InDOT Replace Bridge Deck
at I-80 16.0 Minor Left or right shoulder closed, all lanes open 3/21/17 5:00 AM to 5/26/17 11:00 AM InDOT shoulder closed
at I-80 (+0.1 miles) 15.8 Medium Various lanes closed 4/26/17 10:17 AM to 5/26/17 10:17 AM InDOT Construction work
Exit ramp to EB I-80 15.8 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
Exit ramp to WB I-90 15.8 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
at I-80 (+0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
I-65 to Kennedy Ave 11.7 to 3.3 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at I-65 (+0.2 miles) 11.5 Medium Left lane closed, three lanes open 4/26/17 10:14 AM to 5/26/17 10:14 AM InDOT Construction work

US-20 EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-33 to County Road 17 Medium Various lanes closed 3/20/17 8:00 PM to 10/31/17 5:00 AM InDOT bridge maintenance operations
County Road 18 to County Road 19 Medium Various lanes closed 3/20/17 6:00 AM to 10/31/17 3:00 PM InDOT bridge maintenance operations

US-20 WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 19 to County Road 18 Medium Various lanes closed 3/20/17 6:00 AM to 10/31/17 3:00 PM InDOT bridge maintenance operations
County Road 17 to US-33 Medium Various lanes closed 3/20/17 8:00 PM to 10/31/17 5:00 AM InDOT bridge maintenance operations

Borman EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Kennedy Ave to I-65 3.3 to 11.7 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/18/17 5:46 AM to 5/18/17 10:11 AM InDOT Construction work
at IN-51 15.0 Medium Left lane closed, two lanes open 4/26/17 7:50 AM to 5/26/17 7:50 AM InDOT Construction work
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
at I-80 (-0.5 miles) 15.5 Medium Various lanes closed 4/26/17 9:15 AM to 5/26/17 9:15 AM InDOT Construction work
I-80 (-0.2 miles) to US-20 (-0.1 miles) 15.8 to 16.3 Medium Various lanes closed 4/17/17 7:00 AM to 11/15/17 11:59 PM InDOT Replace Bridge Deck
at I-80 16.0 Minor Left or right shoulder closed, all lanes open 3/21/17 5:00 AM to 5/26/17 11:00 AM InDOT shoulder closed

Borman WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-20 (+0.1 miles) to I-80 (+0.2 miles) 16.3 to 15.8 Medium Various lanes closed 4/17/17 7:00 AM to 11/15/17 11:59 PM InDOT Replace Bridge Deck
IN-249 to I-80 (+0.5 miles) 18.8 to 15.5 Medium Left lane closed, two lanes open 4/19/17 11:00 PM to 5/17/17 11:00 PM InDOT construction work
at I-80 16.0 Minor Left or right shoulder closed, all lanes open 3/21/17 5:00 AM to 5/26/17 11:00 AM InDOT shoulder closed
at I-80 (+0.1 miles) 15.8 Medium Various lanes closed 4/26/17 10:17 AM to 5/26/17 10:17 AM InDOT Construction work
Exit ramp to EB I-80 15.8 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
Exit ramp to WB I-90 15.8 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
at I-80 (+0.5 miles) 15.5 Medium Various lanes closed 5/31/16 6:00 AM to 3/20/20 3:20 AM InDOT construction work
I-65 to Kennedy Ave 11.7 to 3.3 Medium Various lanes closed 3/27/17 8:00 PM to 9/12/17 8:00 PM InDOT construction work
at I-65 (+0.2 miles) 11.5 Medium Left lane closed, three lanes open 4/26/17 10:14 AM to 5/26/17 10:14 AM InDOT Construction work

Indiana Toll Road (East-West) EB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
Old Hobart Rd (-0.2 miles) to County Road 450 W (-0.1 miles) 19.8 to 25.2 Medium Right lane closed, one to five lanes open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Old Hobart Rd to County Road 17 (-0.1 miles) 20.0 to 96.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
Entrance ramp from WB I-94 20.9 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
Meridian Rd (-0.1 miles) to County Road 400 E (+0.2 miles) 29.8 to 34.2 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
US-421 (-0.2 miles) to US-421 (+0.2 miles) 38.8 to 39.2 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
US-35 (+0.5 miles) to US-20 (-0.2 miles) 48.0 to 52.6 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.4 to 58.7 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/8/17 6:00 PM InDOT right lane closed
County Road 425 E (+0.2 miles) to County Road 600 E (+0.2 miles) 56.5 to 58.8 Medium Right lane closed, one lane open 3/2/17 7:00 AM to 5/8/17 7:00 PM Indiana Toll Road Bridge Work/Fiber Install : 24 Hour Continuous Closure
Tamarack Rd (-0.2 miles) to Juniper Rd (+0.3 miles) 66.9 to 78.0 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Cleveland Rd (-0.1 miles) to Beech Rd (-0.1 miles) 82.0 to 86.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 7 to County Road 11 (-0.1 miles) 91.0 to 93.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Exit ramp to NB IN-19 91.5 Major All lanes and shoulders closed 4/25/17 8:00 AM to 5/8/17 8:00 PM Indiana Toll Road Ramp Paving - 24 Hour Continuous Closure - Detour: Exit at MM 83 (331 South) to US-20 to SR-19 North to I-80/90
County Road 250 E (+0.3 miles) to US-20 (+0.1 miles) 123.3 to 156.0 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
at County Road 700 E (+0.3 miles) 153.0 Medium Various lanes closed 5/23/16 12:17 PM to 3/12/20 9:37 AM InDOT planned roadwork

Indiana Toll Road (East-West) WB (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-20 (-0.1 miles) to County Road 250 E (-0.3 miles) 156.0 to 123.3 Medium Various lanes closed 4/28/17 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching - Roadway - Moving Operation -- Note: Crew will be switching lanes during shift
County Road 17 (+0.1 miles) to Old Hobart Rd 96.0 to 20.0 None All lanes and shoulders open 2/18/17 6:00 AM to 7/4/17 7:00 AM Indiana Toll Road 10 ' Width Restriction - 24 Hour Continuous Restriction
County Road 11 (+0.1 miles) to County Road 7 93.0 to 91.0 Medium Left lane closed, one lane open 4/22/17 12:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 11 (+0.1 miles) to Beech Rd (+0.1 miles) 93.0 to 86.0 Medium Left lane closed, one lane open 3/20/17 7:00 AM to 5/1/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
Beech Rd (+0.1 miles) to Cleveland Rd (+0.1 miles) 86.0 to 82.0 Medium Right lane closed, one lane open 4/24/17 8:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
Juniper Rd (-0.3 miles) to Tamarack Rd (+0.2 miles) 78.0 to 66.9 Medium Right lane closed, one lane open 3/27/17 6:00 AM to 5/1/17 7:00 PM Indiana Toll Road Bridge Work / Paving - 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.8 to 58.2 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 600 E (-0.2 miles) to County Road 600 E (+0.4 miles) 58.7 to 58.1 Medium Right lane closed, one lane open 2/18/17 5:00 AM to 5/25/17 6:00 PM InDOT right lane closed
US-20 (+0.2 miles) to US-35 (-0.5 miles) 52.6 to 48.0 Medium Right lane closed, one lane open 2/18/17 6:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Painting : 24 Hour Continuous Closure
Holmesville Rd to US-421 (+0.2 miles) 40.0 to 38.8 Medium Right lane closed, one lane open 4/17/17 6:00 AM to 5/1/17 6:00 PM Indiana Toll Road Bridge Painting - 24 Hour Continuous Closure
County Road 400 E (-0.2 miles) to Meridian Rd (+0.1 miles) 34.2 to 29.8 Medium Right lane closed, one lane open 3/31/17 6:00 AM to 5/25/17 7:00 PM Indiana Toll Road Bridge Work : 24 Hour Continuous Closure
County Road 450 W (+0.1 miles) to Old Hobart Rd (+0.2 miles) 25.2 to 19.8 Medium Right lane closed, one to 8 lanes open 3/8/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Bridge Work / Paving : 24 Hour Continuous Closure
at I-94 21.3 Minor Both shoulders closed, all lanes open 4/27/17 12:00 AM to 4/28/17 7:00 PM Indiana Toll Road Overhead Bridge Demolition
Entrance ramp from WB I-94 20.4 Major All lanes and shoulders closed 4/25/17 7:00 AM to 5/25/17 8:00 PM Indiana Toll Road Ramp reconstruction 24 Hour Continuous Closure Detour in place I-65 N to I-90

Elkhart County (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-6 from County Road 17 (+0.2 miles) to Adam St (-0.1 miles) Major All lanes and shoulders closed 3/20/17 8:00 PM to 10/31/17 5:00 AM InDOT bridge is closed
WB US-6 from Adam St (+0.1 miles) to County Road 17 (-0.2 miles) Major All lanes and shoulders closed 3/20/17 8:00 PM to 10/31/17 5:00 AM InDOT bridge is closed
NWB US-33 at County Road 38 Medium Various lanes closed 1/29/17 11:00 PM to 5/15/17 10:59 PM InDOT utility work
NWB US-33 from 2nd St to Chicago Ave Major All lanes and shoulders closed 4/2/17 11:00 PM to 7/14/17 5:00 PM InDOT road construction
NWB US-33 from Greene Rd to Sunnyside Ave Medium Various lanes closed 2/12/17 11:00 PM to 4/28/17 10:59 PM InDOT utility work
SEB US-33 from Sunnyside Ave to Greene Rd Medium Various lanes closed 2/12/17 11:00 PM to 4/28/17 10:59 PM InDOT utility work
SEB US-33 from Chicago Ave to 2nd St Major All lanes and shoulders closed 4/2/17 11:00 PM to 7/14/17 5:00 PM InDOT road construction
SEB US-33 at County Road 38 Medium Various lanes closed 1/29/17 11:00 PM to 5/15/17 10:59 PM InDOT utility work
NB IN-19 from County Road 26 to County Road 24 Medium Various lanes closed 3/20/17 6:00 AM to 10/31/17 3:00 PM InDOT bridge maintenance operations
SB IN-19 from County Road 24 to County Road 26 Medium Various lanes closed 3/20/17 6:00 AM to 10/31/17 3:00 PM InDOT bridge maintenance operations

LaGrange County (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-20 from 1200 (+0.1 miles) to IN-5 (+0.1 miles) Medium Various lanes closed 4/13/17 7:00 AM to 2/2/21 10:34 PM InDOT construction work
NB IN-9 from North St to County Road 750 N (+0.1 miles) Medium Various lanes closed 4/10/17 7:00 AM to 10/20/17 2:03 AM InDOT construction work

LaPorte County (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-20 from County Road 600 W to US-35 Medium Right lane closed, one lane open 4/3/17 12:00 AM to 6/30/17 11:59 PM InDOT long term road construction
NB US-421 at Bailey Rd Major All lanes and shoulders closed 3/6/17 7:00 AM to 6/15/17 11:59 PM InDOT Bridge Deck Replacement. DETOUR: Drivers traveling north on U.S. 421 will be detoured east on State Road 8, north on State Road 39, west on U.S. 30 and back to U.S. 421. Drivers traveling south on U.S. 421 will be detoured east on U.S. 30, south on State Road 39, west on State Road 8 and back to U.S. 421.
NB US-421 at US-30 Medium Various lanes closed 4/17/17 7:00 AM to 5/31/17 11:59 PM InDOT Crews will remove all of the old asphalt, one lane at a time and replace it with concrete as part of an intersection restoration project. During the project, U.S. 30 will be open to all through traffic, but restricted to one lane in both directions. U.S. 421 will be closed. State road detours must be along state-maintained roadways only. Drivers travelling north on U.S. 421 will be detoured east on State Road 7, north on State Road 39, west on U.S. 6, and back to U.S. 421. Drivers travelling south on U.S. 421 will be detoured east on U.S. 6, south on State Road 39, west on State Road 8, and back to U.S. 421.
SB US-421 at US-30 Medium Various lanes closed 4/17/17 7:00 AM to 5/31/17 11:59 PM InDOT Crews will remove all of the old asphalt, one lane at a time and replace it with concrete as part of an intersection restoration project. During the project, U.S. 30 will be open to all through traffic, but restricted to one lane in both directions. U.S. 421 will be closed. State road detours must be along state-maintained roadways only. Drivers travelling north on U.S. 421 will be detoured east on State Road 7, north on State Road 39, west on U.S. 6, and back to U.S. 421. Drivers travelling south on U.S. 421 will be detoured east on U.S. 6, south on State Road 39, west on State Road 8, and back to U.S. 421.
SB US-421 at Bailey Rd Major All lanes and shoulders closed 3/6/17 7:00 AM to 6/15/17 11:59 PM InDOT Bridge Deck Replacement. DETOUR: Drivers traveling north on U.S. 421 will be detoured east on State Road 8, north on State Road 39, west on U.S. 30 and back to U.S. 421. Drivers traveling south on U.S. 421 will be detoured east on U.S. 30, south on State Road 39, west on State Road 8 and back to U.S. 421.

Lake County (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-6 from Union St to Willowcreek Rd Medium Various lanes closed 4/25/17 9:36 AM to 2/12/21 5:56 AM InDOT road maintenance operations
WB US-6 from Willowcreek Rd to Union St Medium Various lanes closed 4/25/17 9:36 AM to 2/12/21 5:56 AM InDOT road maintenance operations
NB US-41 from 185th Ave (+0.5 miles) to 173rd Ave Medium Various lanes closed 9/6/16 8:46 AM to 6/26/20 6:06 AM InDOT road maintenance operations
SB US-41 from 173rd Ave to 181st Ave Medium Various lanes closed 9/6/16 8:46 AM to 6/26/20 6:06 AM InDOT road maintenance operations
NEB IN-2 from Castle St to Viant St Medium Various lanes closed 4/6/17 11:00 PM to 1/24/21 7:20 PM InDOT utility work
SWB IN-2 from Viant St to Castle St Medium Various lanes closed 4/6/17 11:00 PM to 1/24/21 7:20 PM InDOT utility work

Porter County (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-6 from Union St to Willowcreek Rd Medium Various lanes closed 4/25/17 9:36 AM to 2/12/21 5:56 AM InDOT road maintenance operations
WB US-6 from Willowcreek Rd to Union St Medium Various lanes closed 4/25/17 9:36 AM to 2/12/21 5:56 AM InDOT road maintenance operations
NEB IN-2 at Sigler St Medium Left lane closed, one lane open 7/8/16 9:30 AM to 4/27/20 6:50 AM InDOT lane closed
NB IN-49 from US-30 (+0.1 miles) to Calumet Ave Medium Various lanes closed 4/24/17 7:00 AM to 8/31/17 11:59 PM InDOT Resurfacing
SB IN-49 from County Road 950 N to US-30 (-0.1 miles) Medium Various lanes closed 4/24/17 7:00 AM to 8/31/17 11:59 PM InDOT Resurfacing
NB IN-149 from Dalke Road to County Road 1000 N Medium Various lanes closed 1/23/17 8:00 AM to 6/23/17 6:00 PM InDOT
SB IN-149 from County Road 1000 N to Dalke Road Medium Various lanes closed 1/23/17 8:00 AM to 6/23/17 6:00 PM InDOT

St. Joseph County (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB Jackson Rd from US-31 to US-31 Minor Various lanes closed 4/13/17 7:00 AM to 5/16/17 11:59 PM InDOT Intermittent lane closures
WB Jackson Rd from US-31 to US-31 Minor Various lanes closed 4/13/17 7:00 AM to 5/16/17 11:59 PM InDOT Intermittent lane closures
EB Johnson Rd from US-31 to US-31 Minor Various lanes closed 4/13/17 7:00 AM to 5/16/17 11:59 PM InDOT Intermittent lane closures
WB Johnson Rd from US-31 to US-31 Minor Various lanes closed 4/13/17 7:00 AM to 5/16/17 11:59 PM InDOT Intermittent lane closures

Steuben County (Indiana)
Location Mile Marker Severity Closure Details Time Periods Source Description
EB US-20 at County Road 620 W Medium Various lanes closed 4/24/17 5:00 AM to 9/15/17 8:00 PM InDOT bridge construction
WB US-20 at County Road 620 W Medium Various lanes closed 4/24/17 5:00 AM to 9/15/17 8:00 PM InDOT bridge construction

I-35 NB (Iowa)
Location Mile Marker Severity Closure Details Time Periods Source Description
University Ave to IA-28 124.1 to 131.5 Minor Left or right shoulder closed 4/26/17 8:30 AM to 4/28/17 2:30 PM IowaDOT shoulder closed
IA-141 (+0.1 miles) to 86th St (-0.5 miles) 127.6 to 129.0 Minor Left or right shoulder closed 3/10/17 1:00 PM to 11/23/17 11:59 PM IowaDOT shoulder closed
Beaver Dr (-0.1 miles) to 26th St (-0.4 miles) 132.3 to 133.5 Minor Left or right shoulder closed 2/20/17 7:00 AM to 5/27/17 8:00 PM IowaDOT shoulder closed

I-35 SB (Iowa)
Location