Construction information transmitted by the Illinois Tollway for display on the Edens Spur EB, I-90 EB, I-90 WB, I-94 EB, I-94 WB, I-294 NB, I-294 SB, I-355 NB, I-355 SB, Jane Addams Memorial (Northwest) EB, Jane Addams Memorial (Northwest) WB, Tri-State NB/WB, Tri-State SB/EB, Veterans (North-South) NB and Veterans (North-South) SB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.
Chicago Skyway WB (Illinois)
| Ramp from NWB I-90 (Chicago Skwy) to Dan Ryan Express
|
|
Medium |
All lanes and shoulders closed |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
Entrance to Dan Ryan Express Lanes from Chicago Skyway closed - all traffic diverted to Local Lanes. **Long Term Closure** |
Dan Ryan Express NB (Illinois)
| 63rd St to Pershing Rd (39th St)
|
58.7 to 55.6 |
Medium |
Left express lane closed, two or three express lanes open |
06/18/13 08:00 PM to 06/19/13 05:00 AM |
IDOT |
Express Lane |
| 63rd St to Pershing Rd (39th ST)
|
58.7 to 55.6 |
Major |
Left two express lanes closed, one or two express lanes open |
06/18/13 10:00 PM to 06/19/13 05:00 AM |
IDOT |
Express Lanes |
Dan Ryan Express SB (Illinois)
| 18th St to 35th St
|
54.1 to 55.2 |
Medium |
Left express lane closed, one to three express lanes open |
06/18/13 11:59 PM to 06/19/13 05:00 AM |
IDOT |
Express Lane |
| 18th St to 35th St
|
54.1 to 55.2 |
Major |
All lanes and shoulders closed |
06/19/13 01:00 AM to 05:00 AM |
IDOT |
Express lanes |
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
| 51st St to 71st St
|
57.2 to 59.7 |
Medium |
Left express lane closed, two to four express lanes open |
06/18/13 09:00 PM to 06/19/13 06:00 AM |
IDOT |
Express Lane |
| 51st St to 71st St
|
57.2 to 59.7 |
Major |
Left two express lanes closed, one to three express lanes open |
06/18/13 11:00 PM to 06/19/13 06:00 AM |
IDOT |
Express Lanes |
Dan Ryan Local NB (Illinois)
| I-57 to 71st St
|
62.9 to 59.8 |
Medium |
Left lane closed, four lanes open |
06/18/13 08:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| 93rd St to 71st St
|
62.5 to 59.8 |
Medium |
Left two lanes closed, three lanes open |
06/18/13 10:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| Marquette Rd to 63rd St
|
59.3 to 58.7 |
Minor |
Left shoulder closed, all lanes open |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure in locals*** |
Dan Ryan Local SB (Illinois)
| Augusta Blvd to I-290
|
49.7 to 51.6 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation |
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
| 51st St to 71st St
|
57.2 to 59.7 |
Medium |
Left express lane closed, two to four express lanes open |
06/18/13 09:00 PM to 06/19/13 06:00 AM |
IDOT |
Express Lane |
| 51st St to 71st St
|
57.2 to 59.7 |
Major |
Left two express lanes closed, one to three express lanes open |
06/18/13 11:00 PM to 06/19/13 06:00 AM |
IDOT |
Express Lanes |
| 79th St to 95th St
|
60.8 to 62.8 |
Medium |
Left lane closed, four lanes open |
06/18/13 09:00 PM to 06/19/13 06:00 AM |
IDOT |
|
| 79th St to 95th St
|
60.8 to 62.8 |
Major |
Left two lanes closed, three lanes open |
06/18/13 11:00 PM to 06/19/13 06:00 AM |
IDOT |
|
| 95th St (US-12) to Dr Martin L King Jr Dr
|
62.8 to 63.7 |
Medium |
Left lane closed, one to four lanes open |
06/18/13 11:59 PM to 06/19/13 06:00 AM |
IDOT |
|
Edens NB (Illinois)
| Exit to WB Touhy Ave
|
39.8 |
Medium |
All lanes and shoulders closed |
06/03/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure ** |
Edens SB (Illinois)
| Clavey Rd to Kennedy Jct
|
25.3 to 43.0 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 02:00 PM |
IDOT |
Moving Operation |
| Exit to EB Touhy Ave
|
39.8 |
Medium |
All lanes and shoulders closed |
06/03/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure** |
Edens Spur EB (Illinois)
| Clavey Rd to Kennedy Jct
|
25.3 to 43.0 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 02:00 PM |
IDOT |
Moving Operation |
Eisenhower EB (Illinois)
| St Charles Rd to 25th Ave
|
14.7 to 18.6 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation |
| Ashland Ave to Wells St
|
28.8 to 30.5 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation, including Circle Ramps |
| Entrance from WB I-90
|
30.0 |
None |
Ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
|
Eisenhower WB (Illinois)
| Wells St to Ashland Ave
|
30.5 to 28.8 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation, including Circle Ramps |
| 25th Ave to St Charles Rd
|
18.5 to 14.7 |
Minor |
All lanes and shoulders open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation |
Elgin O'Hare EB (Illinois)
| Lake St (US-20) to Meacham Rd
|
6.0 to 11.3 |
Medium |
Left lane closed, one lane open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
3 miles at a time |
Elgin O'Hare WB (Illinois)
| Meacham Rd to Lake St (US-20)
|
11.3 to 6.0 |
Medium |
Left lane closed, one to three lanes open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
3 miles at a time |
I-39 NB (Illinois)
| at I-88
|
97.1 |
Medium |
Various lanes closed |
05/09/13 06:00 AM to 06/28/13 11:59 PM |
IDOT |
Max width 12' 6" starting 5/28/13
|
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
I-39 SB (Illinois)
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
| at I-88
|
97.0 |
Medium |
Various lanes closed |
05/09/13 06:00 AM to 06/28/13 11:59 PM |
IDOT |
Max width 12' 6" starting 5/28/13
|
| Entrance from WB I-88
|
96.9 |
Major |
All lanes and shoulders closed |
05/28/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Ramp closed |
I-55 NB (Illinois)
| at River Rd
|
241.0 |
Medium |
Left lane closed, one lane open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| Entrance from SB I-355
|
270.1 |
Minor |
Ramp work, possible width reduction |
05/24/13 07:00 AM to 07/12/13 11:59 PM |
Illinois Tollway |
Right Side Ramp Closed; Pavement Striping; Traffic Control; ***Long Term Closure***
|
| Exit to NB I-294
|
276.7 |
None |
Ramp work, possible width reduction |
06/17/13 07:00 AM to 09/20/13 11:59 PM |
IDOT |
** Long Term Closure ** |
| Exit to Hinsdale Oasis
|
276.7 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp Construction; Left Side Ramp Closed; **Long Term Closure** |
| at NB I-294
|
278.1 |
Minor |
Right shoulder closed, all lanes open |
06/17/13 07:00 AM to 10/04/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Entrance from NB I-294
|
278.5 |
Minor |
Ramp work, possible width reduction |
06/17/13 07:00 AM to 10/04/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Entrance from NB I-294
|
278.5 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp Construction; Left Side Ramp Closed; **Long Term Closure** |
| Harlem Ave/IL-43 to Central Ave
|
283.5 to 285.6 |
Medium |
Left two lanes closed, one lane open |
06/18/13 11:59 PM to 06/19/13 05:00 AM |
IDOT |
***Full Stops w/ISP Assist 1AM-4AM*** |
| Harlem Ave to Central Ave
|
283.5 to 285.6 |
Medium |
Left lane closed, two lanes open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| Entrance from Harlem Ave
|
282.8 |
Minor |
Ramp work, possible width reduction |
04/01/13 07:00 AM to 06/30/13 11:59 PM |
IDOT |
** Long term closure ** |
| Exit to Central Ave
|
285.2 |
Medium |
All lanes and shoulders closed |
12/13/12 08:00 PM to 10/31/13 11:59 PM |
IDOT |
Detour to Cicero; ***Long Term Closure*** |
| at Central Ave
|
285.7 |
Minor |
Both shoulders closed, all lanes open |
04/15/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Narrow shoulders, narrow lanes, traffic shift ***Long Term Closure*** |
| Damen Ave to Lake Shore Drive
|
290.5 to 293.8 |
None |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation including I-94 interchange |
I-55 SB (Illinois)
| Lake Shore Drive to Damen Ave
|
293.8 to 290.5 |
None |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation including I-94 interchange |
| Cicero Ave to Central Ave
|
286.8 to 285.7 |
Medium |
Left lane closed, two lanes open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| Cicero Ave to Central Ave
|
286.8 to 285.7 |
Medium |
Left two lanes closed, one lane open |
06/18/13 11:59 PM to 06/19/13 05:00 AM |
IDOT |
***Full stops w/ ISP assist @ 1-4am*** |
| at Central Ave
|
285.7 |
Minor |
Both shoulders closed, all lanes open |
04/15/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Narrow shoulders, narrow lanes, traffic shift ***Long Term Closure*** |
| Entrance from Central Ave
|
286.0 |
Medium |
All lanes and shoulders closed |
12/13/12 08:00 PM to 10/31/13 11:59 PM |
IDOT |
Detour to Cicero; ***Long Term Closure*** |
| at I-294
|
277.7 |
Minor |
Right shoulder closed, all lanes open |
06/17/13 07:00 AM to 09/23/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Entrance from NB I-294
|
277.5 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp construction; Left Side of Ramp Closed; ***Long Term Closure*** |
| Entrance from NB I-294
|
277.5 |
Minor |
Ramp work, possible width reduction |
06/17/13 07:00 AM to 09/23/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Exit to Hinsdale Oasis
|
276.7 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp Construction; Left Side Ramp Closed; **Long Term Closure** |
| at NB I-355 Exit Ramp
|
270.1 |
Minor |
Right shoulder closed, all lanes open |
05/13/13 07:00 AM to 06/24/13 11:59 PM |
IDOT |
|
| Exit to NB I-355
|
270.2 |
Medium |
Right lane closed, one lane open |
05/13/13 06:00 AM to 06/24/13 11:59 PM |
IDOT |
Pavement Repair; ***Long Term Closure*** |
| Entrance from SB I-355
|
268.5 |
Minor |
Ramp work, possible width reduction |
05/13/13 05:00 AM to 06/24/13 11:59 PM |
IDOT |
Right Side of Ramp Closed; Pavement Repair;***Long Term Closure*** |
| at River Rd
|
241.0 |
Medium |
Left lane closed, one lane open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| Exit to IL-129
|
238.7 |
Minor |
All lanes and shoulders closed |
10/01/11 06:00 AM to 12/31/13 11:59 PM |
IDOT |
Ramp closed permanently |
I-57 NB (Illinois)
| at Stuenkel Rd
|
337.1 |
Minor |
Left shoulder closed, all lanes open |
04/23/13 07:00 AM to 08/31/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| Steger Rd to Halsted St
|
338.1 to 357.3 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
06/19/13 09:00 AM to 02:30 PM |
IDOT |
Moving operation |
| Steger Rd to 99th St
|
338.1 to 357.8 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation |
| 159th (US-6) to I-294
|
348.0 to 349.6 |
Minor |
All lanes shifted and both shoulders closed with ramp work, possible width reduction |
04/01/13 07:00 AM to 12/01/13 11:59 PM |
IDOT |
Narrow lanes shifted to left/shoulders closed. ***Long Term Closure*** |
| Halsted St to Dan Ryan Expy
|
357.3 to 357.9 |
Medium |
Left lane closed, two or three lanes open |
06/18/13 08:00 PM to 06/19/13 05:00 AM |
IDOT |
|
I-57 SB (Illinois)
| 99th St to Steger Rd
|
357.8 to 338.1 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation |
| Halsted St to Steger Rd
|
357.3 to 338.1 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
06/19/13 09:00 AM to 02:30 PM |
IDOT |
Moving operation |
| at s/o 127th St
|
353.1 |
Minor |
Right shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| 147th St to 159th St
|
350.1 to 348.0 |
Medium |
Right lane closed, two lanes open |
06/18/13 10:00 PM to 06/19/13 06:00 AM |
IDOT |
|
| 147th St to 159th St
|
350.1 to 348.0 |
Major |
Right two lanes closed, one lane open |
06/18/13 11:59 PM to 06/19/13 06:00 AM |
IDOT |
|
| 147th St to 159th St
|
349.9 to 348.0 |
Minor |
All lanes shifted and both shoulders closed with ramp work, possible width reduction |
05/11/13 07:00 AM to 11/01/13 11:59 PM |
IDOT |
Narrow lanes::shifted to left ***Long Term Closure*** |
| at Stuenkel Rd
|
337.1 |
Minor |
Left shoulder closed, all lanes open |
04/23/13 07:00 AM to 08/31/13 11:59 PM |
IDOT |
***Long Term Closure*** |
I-74 EB (Illinois)
| at Iowa State Line
|
0.8 |
None |
All lanes and shoulders open |
01/31/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Oversize and overweight loads restricted. Max height: 22 ft 0 in; max width: 16 ft 0 in |
| at Weigh Station
|
19.2 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
02/08/13 07:00 AM to 07/17/13 11:59 PM |
IDOT |
Ramp to Scale closed. |
| Exit to SB I-74
|
23.0 |
Minor |
All lanes and shoulders open |
05/28/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Max width: 12' 0 " |
I-74 WB (Illinois)
| Entrance from SB I-80
|
26.8 |
Minor |
All lanes and shoulders open |
05/28/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Max width: 12' 0 " |
| Entrance from SB I-80
|
26.8 |
Minor |
Various lanes closed |
05/28/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Max width 12 ft 0 in |
| at Moline Weigh Station
|
21.0 |
Minor |
All lanes and shoulders open |
09/27/12 07:00 AM to 07/17/13 11:59 PM |
IDOT |
Weigh station closed, including for parking. Ramps closed. |
| at Iowa State Line
|
0.8 |
None |
All lanes and shoulders open |
01/31/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Oversize and overweight loads restricted. Max height: 22 ft 0 in; max width: 16 ft 0 in |
I-80 EB (Illinois)
| at Over the Mississippi River
|
0.2 |
Medium |
Various lanes closed |
03/04/13 06:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic lane will be reduced to one lane in each direction::
12'-0" - Maximum Width - Eastbound Only - Effective 03/18/2013 through 04/12/2013
12'-0" - Maximum Width - Westbound Only - Expires 03/29/2013
|
| at Over the Mississippi River
|
0.2 |
Medium |
Various lanes closed |
04/08/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic will be reduced to one lane in each direction due to maintenance::12'-0" - Maximum Width - Effective 04/08/2013 through 04/26/2013 |
| Exit to WB I-280
|
9.4 |
Minor |
All lanes and shoulders open |
05/28/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Max width: 12' 0 " |
| Exit to WB I-280
|
9.4 |
Minor |
Various lanes closed |
05/28/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Max width 12 ft 0 in |
| Backbone Rd (+0.4 miles) to 2400 St (+0.6 miles)
|
55.0 to 61.0 |
Medium |
Various lanes closed |
03/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Max width 15 feet 6 inches. One lane closed. |
| at Shepley Rd
|
123.4 |
Minor |
Left shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| at River Rd
|
125.2 |
Minor |
Left shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| Exit to US-30
|
137.4 |
Minor |
Ramp work, possible width reduction |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| at US-30
|
137.7 |
Minor |
Both shoulders closed, all lanes open |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| Entrance from US-30
|
137.4 |
Minor |
Ramp work, possible width reduction |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| at w/o Harlem Ave
|
148.3 |
Minor |
Right shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| Will County Line to I-294
|
148.8 to 154.5 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
I-80 WB (Illinois)
| I-294 to Will County Line
|
154.4 to 148.8 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| Cicero Ave to Harlem Ave
|
152.2 to 148.8 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| at US-30
|
137.7 |
Minor |
Both shoulders closed, all lanes open |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| Exit to US-30
|
137.7 |
Minor |
Ramp work, possible width reduction |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| Entrance from US-30
|
137.7 |
Minor |
Ramp work, possible width reduction |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| at Larkin Ave
|
130.6 |
Minor |
Left shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| at River Rd
|
125.2 |
Minor |
Left shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| at Shepley Rd
|
123.4 |
Minor |
Left shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| 2400 St (-0.6 miles) to Backbone Rd (-0.4 miles)
|
61.0 to 55.0 |
Medium |
Various lanes closed |
03/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Max width 15 feet 6 inches. One lane closed. |
| at Over the Mississippi River
|
0.2 |
Medium |
Various lanes closed |
03/04/13 06:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic lane will be reduced to one lane in each direction::
12'-0" - Maximum Width - Eastbound Only - Effective 03/18/2013 through 04/12/2013
12'-0" - Maximum Width - Westbound Only - Expires 03/29/2013
|
| at Over the Mississippi River
|
0.2 |
Medium |
Various lanes closed |
04/08/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic will be reduced to one lane in each direction due to maintenance::12'-0" - Maximum Width - Effective 04/08/2013 through 04/26/2013 |
I-88 EB (Illinois)
| Robbins Rd to Hoyle Rd
|
51.5 to 59.7 |
Medium |
Right lane closed, one to four lanes open |
06/13/13 04:00 AM to 06/20/13 11:59 PM |
Illinois Tollway |
Pavement Repair; ***Long Term Closure*** |
| Entrance from SB I-355
|
133.9 |
Minor |
Ramp work, possible width reduction |
06/14/13 05:00 AM to 08/01/13 11:59 PM |
Illinois Tollway |
Bridge Work; Left Side Ramp Closed; ***Long Term Closure*** |
| Exit to York Rd
|
138.5 |
Minor |
Left lane closed, up to one lanes open |
06/17/13 07:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp construction |
I-88 WB (Illinois)
| Entrance from SB I-355
|
132.2 |
Minor |
Ramp work, possible width reduction |
06/14/13 05:00 AM to 08/01/13 11:59 PM |
Illinois Tollway |
Bridge Work; Left Side Ramp Closed; ***Long Term Closure*** |
| Exit to Winfield Rd
|
125.7 |
Minor |
Ramp work, possible width reduction |
06/18/13 08:00 PM to 06/19/13 12:00 AM |
Illinois Tollway |
Pavement Testing; Left Side Ramp Closed; Moving Operation |
| Exit to NB IL-59
|
123.8 |
Minor |
Ramp work, possible width reduction |
06/19/13 12:00 AM to 04:00 AM |
Illinois Tollway |
Pavement Testing; Left Side Ramp Closed; Moving Operation |
| Exit to SB I-39
|
78.6 |
Major |
All lanes and shoulders closed |
05/28/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Ramp closed |
| Meridian Rd to Whitney Rd
|
70.5 to 62.7 |
Medium |
Right lane closed, one lane open |
06/14/13 04:00 AM to 06/19/13 04:00 PM |
Illinois Tollway |
|
| Reynolds Rd to IL-26
|
64.5 to 53.9 |
Medium |
Left lane closed, one to four lanes open |
06/19/13 04:00 PM to 06/20/13 12:00 AM |
Illinois Tollway |
Pavement Repair; ***Long Term Closure*** |
I-90 EB (Illinois)
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
| Exit to Genoa Rd
|
25.2 |
Minor |
Ramp work, possible width reduction |
04/15/13 07:00 AM to 10/06/13 11:59 AM |
Illinois Tollway |
Shoulder Widening; Right Side Ramp Closed; ***Long Term Closure*** |
| Entrance from Genoa Rd
|
25.2 |
Minor |
Ramp work, possible width reduction |
04/15/13 07:00 AM to 10/06/13 11:59 AM |
Illinois Tollway |
Shoulder Widening; Right Side Ramp Closed; ***Long Term Closure*** |
| Exit to US-20
|
41.7 |
Medium |
Ramp work, possible width reduction |
04/25/13 06:00 AM to 07/20/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Pavement Reconstruction; ***Long Term Closure*** |
| Entrance from US-20
|
41.7 |
Medium |
Ramp work, possible width reduction |
04/25/13 06:00 AM to 07/20/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Pavement Reconstruction; ***Long Term Closure*** |
| Powers Rd to IL-72
|
47.5 to 49.7 |
Medium |
Left lane closed, one lane open |
06/18/13 08:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Pavement Repair |
| Entrance from NB I-294
|
78.3 |
Minor |
Various lanes closed |
06/19/13 03:00 PM to 07/18/13 11:59 PM |
Illinois Tollway |
Pavement Repair; Shoulder Work; Right Cash, Right IPO Lanes Closed; ***Long Term Closure*** |
| Entrance from NB I-294
|
78.3 |
Medium |
Various lanes closed |
06/19/13 09:00 AM to 03:00 PM |
Illinois Tollway |
Pavement Striping; Left Cash, Left IPO Lane Closed |
| Augusta Blvd to I-290
|
49.7 to 51.6 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation |
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
I-90 Express EB (Illinois)
| 18th St to 35th St
|
54.1 to 55.2 |
Medium |
Left express lane closed, one to three express lanes open |
06/18/13 11:59 PM to 06/19/13 05:00 AM |
IDOT |
Express Lane |
| 18th St to 35th St
|
54.1 to 55.2 |
Major |
All lanes and shoulders closed |
06/19/13 01:00 AM to 05:00 AM |
IDOT |
Express lanes |
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
| 51st St to 71st St
|
57.2 to 59.7 |
Medium |
Left express lane closed, two to four express lanes open |
06/18/13 09:00 PM to 06/19/13 06:00 AM |
IDOT |
Express Lane |
| 51st St to 71st St
|
57.2 to 59.7 |
Major |
Left two express lanes closed, one to three express lanes open |
06/18/13 11:00 PM to 06/19/13 06:00 AM |
IDOT |
Express Lanes |
I-90 Express WB (Illinois)
| 63rd St to Pershing Rd (39th St)
|
58.7 to 55.6 |
Medium |
Left express lane closed, two or three express lanes open |
06/18/13 08:00 PM to 06/19/13 05:00 AM |
IDOT |
Express Lane |
| 63rd St to Pershing Rd (39th ST)
|
58.7 to 55.6 |
Major |
Left two express lanes closed, one or two express lanes open |
06/18/13 10:00 PM to 06/19/13 05:00 AM |
IDOT |
Express Lanes |
I-90 WB (Illinois)
| Ramp from NWB I-90 (Chicago Skwy) to Dan Ryan Express
|
|
Medium |
All lanes and shoulders closed |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
Entrance to Dan Ryan Express Lanes from Chicago Skyway closed - all traffic diverted to Local Lanes. **Long Term Closure** |
| Marquette Rd to 63rd St
|
59.3 to 58.7 |
Minor |
Left shoulder closed, all lanes open |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure in locals*** |
| I-290 to Augusta Blvd
|
51.6 to 49.7 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation |
| Cumberland Ave (IL-171) to East River Rd
|
79.6 to 79.2 |
Medium |
Right lane closed, three lanes open |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| IL-72 to Powers Rd
|
49.7 to 47.2 |
Minor |
Right lane closed, one lane open |
06/18/13 10:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Pavement Repair |
| IL-72 to Powers Rd
|
49.7 to 47.2 |
Medium |
Right lane closed, one lane open |
06/19/13 05:00 AM to 06:00 AM |
Illinois Tollway |
Pavement Repair |
| Powers Rd to IL-47
|
47.2 to 46.4 |
Medium |
Right lane closed, one lane open |
06/18/13 08:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Barrier Wall Relocate |
| Powers Rd to IL-47
|
47.2 to 46.4 |
Medium |
Right lane closed, one lane open |
06/19/13 05:00 AM to 06:00 AM |
Illinois Tollway |
Barrier Wall Relocate |
| US-20 Ramps to IL-23
|
41.5 to 36.0 |
Medium |
Right lane closed, one lane open |
06/19/13 05:00 AM to 11:00 AM |
Illinois Tollway |
Landscaping; Moving Operation |
| Exit to Genoa Rd
|
25.6 |
Minor |
Ramp work, possible width reduction |
04/09/13 07:00 AM to 10/06/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Landscaping; Material Storage; ***Long Term Closure*** |
| Entrance from Genoa Rd
|
25.6 |
Minor |
Ramp work, possible width reduction |
04/09/13 07:00 AM to 10/06/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Landscaping; Material Storage; ***Long Term Closure*** |
| Irene Rd to Mill Rd
|
20.8 to 17.7 |
Medium |
Right lane closed, one lane open |
04/17/13 05:00 PM to 10/06/13 11:59 PM |
Illinois Tollway |
Pavement Widening; Trqffic Shift; ***Long Term Closure*** |
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
I-94 EB (Illinois)
| Old US-41 to IL-173
|
1.2 to 3.0 |
Medium |
Right two lanes closed, one or two lanes open |
06/18/13 09:00 PM to 06/19/13 12:01 AM |
Illinois Tollway |
Attenuator Work; Pavement Repair |
| Entrance from IL-173
|
2.8 |
Medium |
All lanes and shoulders closed |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Sewer Work |
| Clavey Rd to Kennedy Jct
|
25.3 to 43.0 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 02:00 PM |
IDOT |
Moving Operation |
| Exit to EB Touhy Ave
|
39.8 |
Medium |
All lanes and shoulders closed |
06/03/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Augusta Blvd to I-290
|
49.7 to 51.6 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation |
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
| 51st St to 71st St
|
57.2 to 59.7 |
Medium |
Left express lane closed, two to four express lanes open |
06/18/13 09:00 PM to 06/19/13 06:00 AM |
IDOT |
Express Lane |
| 51st St to 71st St
|
57.2 to 59.7 |
Major |
Left two express lanes closed, one to three express lanes open |
06/18/13 11:00 PM to 06/19/13 06:00 AM |
IDOT |
Express Lanes |
| 79th St to 95th St
|
60.8 to 62.8 |
Medium |
Left lane closed, four lanes open |
06/18/13 09:00 PM to 06/19/13 06:00 AM |
IDOT |
|
| 79th St to 95th St
|
60.8 to 62.8 |
Major |
Left two lanes closed, three lanes open |
06/18/13 11:00 PM to 06/19/13 06:00 AM |
IDOT |
|
| 95th St (US-12) to Dr Martin L King Jr Dr
|
62.8 to 63.7 |
Medium |
Left lane closed, one to four lanes open |
06/18/13 11:59 PM to 06/19/13 06:00 AM |
IDOT |
|
I-94 Express EB (Illinois)
| 18th St to 35th St
|
54.1 to 55.2 |
Medium |
Left express lane closed, one to three express lanes open |
06/18/13 11:59 PM to 06/19/13 05:00 AM |
IDOT |
Express Lane |
| 18th St to 35th St
|
54.1 to 55.2 |
Major |
All lanes and shoulders closed |
06/19/13 01:00 AM to 05:00 AM |
IDOT |
Express lanes |
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
| 51st St to 71st St
|
57.2 to 59.7 |
Medium |
Left express lane closed, two to four express lanes open |
06/18/13 09:00 PM to 06/19/13 06:00 AM |
IDOT |
Express Lane |
| 51st St to 71st St
|
57.2 to 59.7 |
Major |
Left two express lanes closed, one to three express lanes open |
06/18/13 11:00 PM to 06/19/13 06:00 AM |
IDOT |
Express Lanes |
I-94 Express WB (Illinois)
| 63rd St to Pershing Rd (39th St)
|
58.7 to 55.6 |
Medium |
Left express lane closed, two or three express lanes open |
06/18/13 08:00 PM to 06/19/13 05:00 AM |
IDOT |
Express Lane |
| 63rd St to Pershing Rd (39th ST)
|
58.7 to 55.6 |
Major |
Left two express lanes closed, one or two express lanes open |
06/18/13 10:00 PM to 06/19/13 05:00 AM |
IDOT |
Express Lanes |
I-94 WB (Illinois)
| 159th St to IL-83 (Sibley Blvd)
|
72.9 to 71.3 |
Medium |
Left lane closed, two lanes open |
06/18/13 10:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| I-57 to 71st St
|
62.9 to 59.8 |
Medium |
Left lane closed, four lanes open |
06/18/13 08:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| 93rd St to 71st St
|
62.5 to 59.8 |
Medium |
Left two lanes closed, three lanes open |
06/18/13 10:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| Marquette Rd to 63rd St
|
59.3 to 58.7 |
Minor |
Left shoulder closed, all lanes open |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure in locals*** |
| I-290 to Augusta Blvd
|
51.6 to 49.7 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation |
| Exit to WB Touhy Ave
|
39.8 |
Medium |
All lanes and shoulders closed |
06/03/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure ** |
| Old US-41 to Russell Rd
|
1.2 to 0.5 |
Medium |
Left two lanes closed, one lane open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Pavement Striping |
I-190 EB (Illinois)
| Bessie Coleman Dr to East River Rd
|
0.9 to 3.0 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
04/15/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure ** Closed shoulder, traffic on milled surface. |
I-190 WB (Illinois)
| East River Rd to I-294
|
79.1 to 77.9 |
Minor |
Right lane closed, one or two lanes open |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| East River Rd to Bessie Coleman Dr
|
79.1 to 77.0 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
04/15/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure ** Closed shoulder, traffic on milled surface. |
| Entrance from NB I-294
|
78.1 |
Minor |
Various lanes closed |
06/19/13 03:00 PM to 07/18/13 11:59 PM |
Illinois Tollway |
Pavement Repair; Shoulder Work; Right Cash, Right IPO Lanes Closed; ***Long Term Closure*** |
| Entrance from NB I-294
|
78.1 |
Medium |
Various lanes closed |
06/19/13 09:00 AM to 03:00 PM |
Illinois Tollway |
Pavement Striping; Left Cash, Left IPO Lane Closed |
| Entrance from NB I-294
|
78.1 |
Minor |
Right lane closed, one lane open |
06/16/13 12:00 AM to 07/18/13 12:00 AM |
Illinois Tollway |
Ramp Reconstruction |
| I-294 to Bessie Coleman Dr
|
77.9 to 77.0 |
Medium |
Right two lanes and right shoulder closed, up to one lanes open |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
IDOT |
|
I-280 EB (Illinois)
| at Weigh Station
|
19.2 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
02/08/13 07:00 AM to 07/17/13 11:59 PM |
IDOT |
Ramp to Scale closed. |
| Exit to SB I-74
|
23.0 |
Minor |
All lanes and shoulders open |
05/28/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Max width: 12' 0 " |
I-280 WB (Illinois)
| Entrance from SB I-80
|
26.8 |
Minor |
All lanes and shoulders open |
05/28/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Max width: 12' 0 " |
| Entrance from SB I-80
|
26.8 |
Minor |
Various lanes closed |
05/28/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Max width 12 ft 0 in |
| at Moline Weigh Station
|
21.0 |
Minor |
All lanes and shoulders open |
09/27/12 07:00 AM to 07/17/13 11:59 PM |
IDOT |
Weigh station closed, including for parking. Ramps closed. |
I-290 EB (Illinois)
| at Irving Park Rd (IL-19)
|
6.0 |
Minor |
Right shoulder closed, all lanes open |
06/03/13 07:00 AM to 06/30/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| St Charles Rd to 25th Ave
|
14.7 to 18.6 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation |
| Ashland Ave to Wells St
|
28.8 to 30.5 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation, including Circle Ramps |
| Entrance from WB I-90
|
30.0 |
None |
Ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
|
I-290 WB (Illinois)
| Wells St to Ashland Ave
|
30.5 to 28.8 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation, including Circle Ramps |
| 25th Ave to St Charles Rd
|
18.5 to 14.7 |
Minor |
All lanes and shoulders open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation |
I-294 NB (Illinois)
| 159th St to I-57
|
6.4 to 7.6 |
Medium |
Right lane closed, three lanes open |
05/30/13 05:00 AM to 12/02/13 11:59 PM |
Illinois Tollway |
Ramp Construction; ***Long Term Closure*** |
| I-57 to Kedzie Ave
|
7.6 to 8.8 |
Medium |
Right lane closed, three lanes open |
06/03/13 08:30 PM to 12/02/13 08:30 PM |
Illinois Tollway |
Ramp Construction; ***Long Term Closure*** |
| Exit to NB I-55
|
22.5 |
Minor |
Ramp work, possible width reduction |
06/17/13 07:00 AM to 10/04/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Exit to NB I-55
|
22.5 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp Construction; Left Side Ramp Closed; **Long Term Closure** |
| Exit to SB I-55
|
23.1 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp construction; Left Side of Ramp Closed; ***Long Term Closure*** |
| Entrance from NB I-55
|
24.8 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp Construction; Left Side Ramp Closed; **Long Term Closure** |
| Lawrence Ave to Oakton St
|
39.0 to 43.0 |
Medium |
Left lane closed, three to 7 lanes open |
06/18/13 08:00 PM to 10:00 PM |
Illinois Tollway |
Pavement Striping |
| Lawrence Ave to Oakton St
|
39.0 to 43.0 |
Medium |
Left two lanes closed, two to six lanes open |
06/18/13 10:00 PM to 06/19/13 04:00 AM |
Illinois Tollway |
Pavement Striping |
| Balmoral Ave to O'Hare Interchange
|
39.7 to 40.0 |
Medium |
Right lane closed, three or four lanes open |
06/06/13 12:00 AM to 07/18/13 12:00 AM |
Illinois Tollway |
Pavement Repair; Shoulder Work; Right Auxiliary Lane Closed; ***Long Term Closure*** |
| Exit to WB I-190
|
39.8 |
Minor |
Various lanes closed |
06/19/13 03:00 PM to 07/18/13 11:59 PM |
Illinois Tollway |
Pavement Repair; Shoulder Work; Right Cash, Right IPO Lanes Closed; ***Long Term Closure*** |
| Exit to WB I-190 O'Hare
|
39.8 |
Medium |
Various lanes closed |
06/19/13 09:00 AM to 03:00 PM |
Illinois Tollway |
Pavement Striping; Left Cash, Left IPO Lane Closed |
| Ramp from Plaza 32 to River Rd
|
40.5 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/19/13 09:00 AM to 03:00 PM |
Illinois Tollway |
Pavement Striping; Left Side Ramp Closed |
| Ramp from Plaza 32 to River Rd
|
40.5 to 40.6 |
Medium |
Right lane closed, one lane open |
06/19/13 03:00 PM to 07/18/13 11:59 PM |
Illinois Tollway |
Pavement Repair; Shoulder Work; ***Long Term Closure*** |
| at Touhy Ave
|
41.6 |
Minor |
Various lanes closed |
06/19/13 12:00 AM to 05:00 AM |
Illinois Tollway |
ETC Work; All ORT Lanes Closed |
I-294 SB (Illinois)
| Kedzie Ave to I-57
|
9.0 to 7.8 |
Medium |
Right lane closed, three lanes open |
05/14/13 05:00 AM to 11/15/13 11:59 PM |
Illinois Tollway |
Traffic Control; ***Long Term Closure*** |
I-355 NB (Illinois)
| 127th St to International Parkway
|
9.5 to 11.0 |
Medium |
Right lane closed, two lanes open |
06/19/13 12:30 PM to 04:30 PM |
Illinois Tollway |
Bridge Inspection |
| I-55 to Boughton Plaza
|
12.3 to 14.2 |
Medium |
Left lane and left shoulder closed, two to six lanes shifted |
05/15/13 09:00 AM to 06/24/13 11:59 PM |
Illinois Tollway |
Pavement Repair; ***Long Term Closure*** |
| Entrance from SB I-55
|
13.1 |
Medium |
Right lane closed, one lane open |
05/13/13 06:00 AM to 06/24/13 11:59 PM |
IDOT |
Pavement Repair; ***Long Term Closure*** |
| Exit to 75th St (Plaza 32)
|
15.2 |
Minor |
Various lanes closed |
06/18/13 05:00 AM to 06/25/13 11:59 PM |
Illinois Tollway |
Guardrail Repair; Pavement Repair; Right IPO Lane Closed ***Long Term Closure*** |
| Warrenville Rd to Finley Rd Underpass
|
19.9 to 20.9 |
Medium |
Left two lanes closed, one lane open |
06/18/13 10:00 PM to 06/19/13 04:00 AM |
Illinois Tollway |
Bridge Work |
| Warrenville Rd to Finley Rd Underpass
|
19.9 to 20.9 |
Medium |
Left lane closed, two lanes open |
06/18/13 07:00 PM to 10:00 PM, 06/19/13 04:00 AM to 05:00 AM |
Illinois Tollway |
Bridge Work |
| Butterfield Rd to 22nd St
|
22.0 to 23.0 |
Minor |
All lanes shifted |
06/19/13 05:00 AM to 07/15/13 11:59 PM |
Illinois Tollway |
Traffic Shifted Left on CD Road to Butterfield Rd; Drainage System Repair; ***Long Term Closure*** |
| Butterfield Rd to 22nd St
|
22.3 to 23.0 |
Minor |
All lanes shifted |
06/18/13 07:00 PM to 09:00 PM |
Illinois Tollway |
Pavement Marking Removal; Pavement Striping; Traffic Control; Traffic Shifted to the Right on CD Road to Butterfield Rd |
| Butterfield Rd to 22nd St
|
22.3 to 23.0 |
Minor |
All lanes shifted |
06/18/13 09:00 PM to 11:00 PM |
Illinois Tollway |
Pavement Marking Removal; Pavement Striping; Traffic Control; Traffic Shifted to the Left on CD Road to Butterfield Rd |
| Entrance from Butterfield Rd
|
23.3 |
Minor |
Ramp work, possible width reduction |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Right Side of Ramp Closed; Pavement Marking Removal; Pavement Striping; Traffic Control |
| Entrance from Butterfield Rd
|
23.3 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 07/15/13 11:59 PM |
Illinois Tollway |
Drainage System Repair; Left Side Ramp Closed;*** Long Term Closure*** |
| Exit to North Ave (Plaza 75)
|
27.5 |
Minor |
Various lanes closed |
06/18/13 05:00 AM to 06/25/13 11:59 PM |
Illinois Tollway |
Guardrail Repair; Pavement Repair; Right IPO Lane Closed |
| Army Trail Plaza to Army Trail Rd
|
29.2 to 29.8 |
Medium |
Right lane closed, four to 7 lanes open |
06/18/13 06:00 PM to 07/15/13 12:00 AM |
Illinois Tollway |
Concrete Pour; Drainage System Repair; Pavement Removal; Sawcutting; ***Long Term Closure*** |
| Exit to Army Trail Rd
|
29.3 |
None |
Ramp work, possible width reduction |
06/18/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Exit to Army Trail Rd
|
29.3 |
Minor |
Ramp work, possible width reduction |
06/18/13 06:00 PM to 07/15/13 12:00 AM |
Illinois Tollway |
Concrete Pour; Drainage System Repair; Pavement Removal; Sawcutting; ***Long Term Closure*** |
| Entrance from EB Army Trail Rd
|
29.8 |
Minor |
Ramp work, possible width reduction |
06/18/13 06:00 PM to 06/29/13 12:00 AM |
Illinois Tollway |
Concrete Pour; Drainage System Repair; Pavement Removal; Sawcutting; ***Long Term Closure***; Right Side Ramp Closed; ***Long Term Closure*** |
| Entrance from EB Army Trail Rd
|
29.8 |
None |
Ramp work, possible width reduction |
06/18/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
**Long Term Closure** |
I-355 SB (Illinois)
| at Army Trail Rd
|
29.8 |
Minor |
Left shoulder closed, all lanes open |
05/21/13 07:00 AM to 06/24/13 11:59 PM |
IDOT |
***Long term closure*** |
| Entrance from North Ave
|
27.4 |
Minor |
Various lanes closed |
06/18/13 05:00 AM to 06/25/13 11:59 PM |
Illinois Tollway |
Guardrail Repair; Pavement Repair; Right IPO Lane Closed |
| Exit to EB I-88
|
23.3 |
Minor |
Ramp work, possible width reduction |
06/14/13 05:00 AM to 08/01/13 11:59 PM |
Illinois Tollway |
Bridge Work; Left Side Ramp Closed; ***Long Term Closure*** |
| 22nd St to Butterfield Rd
|
23.1 to 22.0 |
Medium |
Left lane closed, two lanes open |
05/16/13 05:00 AM to 06/24/13 11:59 PM |
Illinois Tollway |
Left Lane of CD Road to Butterfield Rd Closed; Pavement Repair; ***Long Term Closure*** |
| Entrance from 75th St
|
16.6 |
Minor |
Various lanes closed |
06/18/13 05:00 AM to 06/25/13 11:59 PM |
Illinois Tollway |
Guardrail Repair; Pavement Repair; Right IPO Lane Closed |
| Boughton Plaza to I-55
|
14.3 to 12.4 |
Medium |
Left lane and left shoulder closed, two to 8 lanes open |
05/14/13 05:00 AM to 06/24/13 11:59 PM |
Illinois Tollway |
Pavement Repair: ***Long Term Closure*** |
| Exit to NB I-55
|
13.2 |
Minor |
Ramp work, possible width reduction |
05/24/13 07:00 AM to 07/12/13 11:59 PM |
Illinois Tollway |
Right Side Ramp Closed; Pavement Striping; Traffic Control; ***Long Term Closure***
|
| Exit to SB I-55
|
12.8 |
Minor |
Ramp work, possible width reduction |
05/13/13 05:00 AM to 06/24/13 11:59 PM |
IDOT |
Right Side of Ramp Closed; Pavement Repair;***Long Term Closure*** |
| International Parkway to 127th St
|
11.0 to 9.5 |
Medium |
Right lane closed, two lanes open |
06/19/13 08:00 AM to 12:00 PM |
Illinois Tollway |
Bridge Inspection |
| 127th St to Fraction Run Creek
|
8.5 to 3.5 |
Medium |
Right two lanes closed, one to four lanes open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Pavement Striping |
Jane Addams Memorial (Northwest) EB (Illinois)
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
| Exit to Genoa Rd
|
25.2 |
Minor |
Ramp work, possible width reduction |
04/15/13 07:00 AM to 10/06/13 11:59 AM |
Illinois Tollway |
Shoulder Widening; Right Side Ramp Closed; ***Long Term Closure*** |
| Entrance from Genoa Rd
|
25.2 |
Minor |
Ramp work, possible width reduction |
04/15/13 07:00 AM to 10/06/13 11:59 AM |
Illinois Tollway |
Shoulder Widening; Right Side Ramp Closed; ***Long Term Closure*** |
| Exit to US-20
|
41.7 |
Medium |
Ramp work, possible width reduction |
04/25/13 06:00 AM to 07/20/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Pavement Reconstruction; ***Long Term Closure*** |
| Entrance from US-20
|
41.7 |
Medium |
Ramp work, possible width reduction |
04/25/13 06:00 AM to 07/20/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Pavement Reconstruction; ***Long Term Closure*** |
| Powers Rd to IL-72
|
47.5 to 49.7 |
Medium |
Left lane closed, one lane open |
06/18/13 08:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Pavement Repair |
| Entrance from NB I-294
|
78.3 |
Minor |
Various lanes closed |
06/19/13 03:00 PM to 07/18/13 11:59 PM |
Illinois Tollway |
Pavement Repair; Shoulder Work; Right Cash, Right IPO Lanes Closed; ***Long Term Closure*** |
| Entrance from NB I-294
|
78.3 |
Medium |
Various lanes closed |
06/19/13 09:00 AM to 03:00 PM |
Illinois Tollway |
Pavement Striping; Left Cash, Left IPO Lane Closed |
Jane Addams Memorial (Northwest) WB (Illinois)
| IL-72 to Powers Rd
|
49.7 to 47.2 |
Minor |
Right lane closed, one lane open |
06/18/13 10:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Pavement Repair |
| IL-72 to Powers Rd
|
49.7 to 47.2 |
Medium |
Right lane closed, one lane open |
06/19/13 05:00 AM to 06:00 AM |
Illinois Tollway |
Pavement Repair |
| Powers Rd to IL-47
|
47.2 to 46.4 |
Medium |
Right lane closed, one lane open |
06/18/13 08:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Barrier Wall Relocate |
| Powers Rd to IL-47
|
47.2 to 46.4 |
Medium |
Right lane closed, one lane open |
06/19/13 05:00 AM to 06:00 AM |
Illinois Tollway |
Barrier Wall Relocate |
| US-20 Ramps to IL-23
|
41.5 to 36.0 |
Medium |
Right lane closed, one lane open |
06/19/13 05:00 AM to 11:00 AM |
Illinois Tollway |
Landscaping; Moving Operation |
| Exit to Genoa Rd
|
25.6 |
Minor |
Ramp work, possible width reduction |
04/09/13 07:00 AM to 10/06/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Landscaping; Material Storage; ***Long Term Closure*** |
| Entrance from Genoa Rd
|
25.6 |
Minor |
Ramp work, possible width reduction |
04/09/13 07:00 AM to 10/06/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Landscaping; Material Storage; ***Long Term Closure*** |
| Irene Rd to Mill Rd
|
20.8 to 17.7 |
Medium |
Right lane closed, one lane open |
04/17/13 05:00 PM to 10/06/13 11:59 PM |
Illinois Tollway |
Pavement Widening; Trqffic Shift; ***Long Term Closure*** |
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
Kennedy Local EB (Illinois)
| Bessie Coleman Dr to East River Rd
|
0.9 to 3.0 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
04/15/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure ** Closed shoulder, traffic on milled surface. |
| Augusta Blvd to I-290
|
49.7 to 51.6 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation |
Kennedy Local WB (Illinois)
| I-290 to Augusta Blvd
|
51.6 to 49.7 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation |
| Cumberland Ave (IL-171) to East River Rd
|
79.6 to 79.2 |
Medium |
Right lane closed, three lanes open |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| East River Rd to I-294
|
79.1 to 77.9 |
Minor |
Right lane closed, one or two lanes open |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| East River Rd to Bessie Coleman Dr
|
79.1 to 77.0 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
04/15/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure ** Closed shoulder, traffic on milled surface. |
| Entrance from NB I-294
|
78.1 |
Minor |
Various lanes closed |
06/19/13 03:00 PM to 07/18/13 11:59 PM |
Illinois Tollway |
Pavement Repair; Shoulder Work; Right Cash, Right IPO Lanes Closed; ***Long Term Closure*** |
| Entrance from NB I-294
|
78.1 |
Medium |
Various lanes closed |
06/19/13 09:00 AM to 03:00 PM |
Illinois Tollway |
Pavement Striping; Left Cash, Left IPO Lane Closed |
| Entrance from NB I-294
|
78.1 |
Minor |
Right lane closed, one lane open |
06/16/13 12:00 AM to 07/18/13 12:00 AM |
Illinois Tollway |
Ramp Reconstruction |
| I-294 to Bessie Coleman Dr
|
77.9 to 77.0 |
Medium |
Right two lanes and right shoulder closed, up to one lanes open |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
IDOT |
|
Reagan Memorial EB (Illinois)
| Robbins Rd to Hoyle Rd
|
51.5 to 59.7 |
Medium |
Right lane closed, one to four lanes open |
06/13/13 04:00 AM to 06/20/13 11:59 PM |
Illinois Tollway |
Pavement Repair; ***Long Term Closure*** |
| Entrance from SB I-355
|
133.9 |
Minor |
Ramp work, possible width reduction |
06/14/13 05:00 AM to 08/01/13 11:59 PM |
Illinois Tollway |
Bridge Work; Left Side Ramp Closed; ***Long Term Closure*** |
| Exit to York Rd
|
138.5 |
Minor |
Left lane closed, up to one lanes open |
06/17/13 07:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp construction |
Reagan Memorial WB (Illinois)
| Entrance from SB I-355
|
132.2 |
Minor |
Ramp work, possible width reduction |
06/14/13 05:00 AM to 08/01/13 11:59 PM |
Illinois Tollway |
Bridge Work; Left Side Ramp Closed; ***Long Term Closure*** |
| Exit to Winfield Rd
|
125.7 |
Minor |
Ramp work, possible width reduction |
06/18/13 08:00 PM to 06/19/13 12:00 AM |
Illinois Tollway |
Pavement Testing; Left Side Ramp Closed; Moving Operation |
| Exit to NB IL-59
|
123.8 |
Minor |
Ramp work, possible width reduction |
06/19/13 12:00 AM to 04:00 AM |
Illinois Tollway |
Pavement Testing; Left Side Ramp Closed; Moving Operation |
| Exit to SB I-39
|
78.6 |
Major |
All lanes and shoulders closed |
05/28/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Ramp closed |
| Meridian Rd to Whitney Rd
|
70.5 to 62.7 |
Medium |
Right lane closed, one lane open |
06/14/13 04:00 AM to 06/19/13 04:00 PM |
Illinois Tollway |
|
| Reynolds Rd to IL-26
|
64.5 to 53.9 |
Medium |
Left lane closed, one to four lanes open |
06/19/13 04:00 PM to 06/20/13 12:00 AM |
Illinois Tollway |
Pavement Repair; ***Long Term Closure*** |
Stevenson NB (Illinois)
| Exit to NB I-294
|
276.7 |
None |
Ramp work, possible width reduction |
06/17/13 07:00 AM to 09/20/13 11:59 PM |
IDOT |
** Long Term Closure ** |
| Exit to Hinsdale Oasis
|
276.7 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp Construction; Left Side Ramp Closed; **Long Term Closure** |
| at NB I-294
|
278.1 |
Minor |
Right shoulder closed, all lanes open |
06/17/13 07:00 AM to 10/04/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Entrance from NB I-294
|
278.5 |
Minor |
Ramp work, possible width reduction |
06/17/13 07:00 AM to 10/04/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Entrance from NB I-294
|
278.5 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp Construction; Left Side Ramp Closed; **Long Term Closure** |
| Harlem Ave/IL-43 to Central Ave
|
283.5 to 285.6 |
Medium |
Left two lanes closed, one lane open |
06/18/13 11:59 PM to 06/19/13 05:00 AM |
IDOT |
***Full Stops w/ISP Assist 1AM-4AM*** |
| Harlem Ave to Central Ave
|
283.5 to 285.6 |
Medium |
Left lane closed, two lanes open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| Entrance from Harlem Ave
|
282.8 |
Minor |
Ramp work, possible width reduction |
04/01/13 07:00 AM to 06/30/13 11:59 PM |
IDOT |
** Long term closure ** |
| Exit to Central Ave
|
285.2 |
Medium |
All lanes and shoulders closed |
12/13/12 08:00 PM to 10/31/13 11:59 PM |
IDOT |
Detour to Cicero; ***Long Term Closure*** |
| at Central Ave
|
285.7 |
Minor |
Both shoulders closed, all lanes open |
04/15/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Narrow shoulders, narrow lanes, traffic shift ***Long Term Closure*** |
| Damen Ave to Lake Shore Drive
|
290.5 to 293.8 |
None |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation including I-94 interchange |
Stevenson SB (Illinois)
| Lake Shore Drive to Damen Ave
|
293.8 to 290.5 |
None |
All lanes and shoulders open with ramp work, possible width reduction |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
Moving operation including I-94 interchange |
| Cicero Ave to Central Ave
|
286.8 to 285.7 |
Medium |
Left lane closed, two lanes open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| Cicero Ave to Central Ave
|
286.8 to 285.7 |
Medium |
Left two lanes closed, one lane open |
06/18/13 11:59 PM to 06/19/13 05:00 AM |
IDOT |
***Full stops w/ ISP assist @ 1-4am*** |
| at Central Ave
|
285.7 |
Minor |
Both shoulders closed, all lanes open |
04/15/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Narrow shoulders, narrow lanes, traffic shift ***Long Term Closure*** |
| Entrance from Central Ave
|
286.0 |
Medium |
All lanes and shoulders closed |
12/13/12 08:00 PM to 10/31/13 11:59 PM |
IDOT |
Detour to Cicero; ***Long Term Closure*** |
| at I-294
|
277.7 |
Minor |
Right shoulder closed, all lanes open |
06/17/13 07:00 AM to 09/23/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Entrance from NB I-294
|
277.5 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp construction; Left Side of Ramp Closed; ***Long Term Closure*** |
| Entrance from NB I-294
|
277.5 |
Minor |
Ramp work, possible width reduction |
06/17/13 07:00 AM to 09/23/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Exit to Hinsdale Oasis
|
276.7 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp Construction; Left Side Ramp Closed; **Long Term Closure** |
Tri-State NB/WB (Illinois)
| 159th St to I-57
|
6.4 to 7.6 |
Medium |
Right lane closed, three lanes open |
05/30/13 05:00 AM to 12/02/13 11:59 PM |
Illinois Tollway |
Ramp Construction; ***Long Term Closure*** |
| I-57 to Kedzie Ave
|
7.6 to 8.8 |
Medium |
Right lane closed, three lanes open |
06/03/13 08:30 PM to 12/02/13 08:30 PM |
Illinois Tollway |
Ramp Construction; ***Long Term Closure*** |
| Exit to NB I-55
|
22.5 |
Minor |
Ramp work, possible width reduction |
06/17/13 07:00 AM to 10/04/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Exit to NB I-55
|
22.5 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp Construction; Left Side Ramp Closed; **Long Term Closure** |
| Exit to SB I-55
|
23.1 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp construction; Left Side of Ramp Closed; ***Long Term Closure*** |
| Entrance from NB I-55
|
24.8 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 06/28/13 11:59 PM |
Illinois Tollway |
Ramp Construction; Left Side Ramp Closed; **Long Term Closure** |
| Lawrence Ave to Oakton St
|
39.0 to 43.0 |
Medium |
Left lane closed, three to 7 lanes open |
06/18/13 08:00 PM to 10:00 PM |
Illinois Tollway |
Pavement Striping |
| Lawrence Ave to Oakton St
|
39.0 to 43.0 |
Medium |
Left two lanes closed, two to six lanes open |
06/18/13 10:00 PM to 06/19/13 04:00 AM |
Illinois Tollway |
Pavement Striping |
| Balmoral Ave to O'Hare Interchange
|
39.7 to 40.0 |
Medium |
Right lane closed, three or four lanes open |
06/06/13 12:00 AM to 07/18/13 12:00 AM |
Illinois Tollway |
Pavement Repair; Shoulder Work; Right Auxiliary Lane Closed; ***Long Term Closure*** |
| Exit to WB I-190
|
39.8 |
Minor |
Various lanes closed |
06/19/13 03:00 PM to 07/18/13 11:59 PM |
Illinois Tollway |
Pavement Repair; Shoulder Work; Right Cash, Right IPO Lanes Closed; ***Long Term Closure*** |
| Exit to WB I-190 O'Hare
|
39.8 |
Medium |
Various lanes closed |
06/19/13 09:00 AM to 03:00 PM |
Illinois Tollway |
Pavement Striping; Left Cash, Left IPO Lane Closed |
| Ramp from Plaza 32 to River Rd
|
40.5 |
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
06/19/13 09:00 AM to 03:00 PM |
Illinois Tollway |
Pavement Striping; Left Side Ramp Closed |
| Ramp from Plaza 32 to River Rd
|
40.5 to 40.6 |
Medium |
Right lane closed, one lane open |
06/19/13 03:00 PM to 07/18/13 11:59 PM |
Illinois Tollway |
Pavement Repair; Shoulder Work; ***Long Term Closure*** |
| at Touhy Ave
|
41.6 |
Minor |
Various lanes closed |
06/19/13 12:00 AM to 05:00 AM |
Illinois Tollway |
ETC Work; All ORT Lanes Closed |
| Old US-41 to Russell Rd
|
1.2 to 0.5 |
Medium |
Left two lanes closed, one lane open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Pavement Striping |
Tri-State SB/EB (Illinois)
| Old US-41 to IL-173
|
1.2 to 3.0 |
Medium |
Right two lanes closed, one or two lanes open |
06/18/13 09:00 PM to 06/19/13 12:01 AM |
Illinois Tollway |
Attenuator Work; Pavement Repair |
| Entrance from IL-173
|
2.8 |
Medium |
All lanes and shoulders closed |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Sewer Work |
| Kedzie Ave to I-57
|
9.0 to 7.8 |
Medium |
Right lane closed, three lanes open |
05/14/13 05:00 AM to 11/15/13 11:59 PM |
Illinois Tollway |
Traffic Control; ***Long Term Closure*** |
US-41 NB (Illinois)
| at Deerpath Rd
|
18.5 |
Medium |
Various lanes closed |
06/03/13 07:00 AM to 08/30/13 11:59 AM |
IDOT |
Bridge joint and approach repairs. |
| Old US-41 to Russell Rd
|
1.2 to 0.5 |
Medium |
Left two lanes closed, one lane open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Pavement Striping |
US-41 SB (Illinois)
| at Deerpath Rd
|
18.5 |
Medium |
Various lanes closed |
06/03/13 07:00 AM to 08/30/13 11:59 AM |
IDOT |
Bridge joint and approach repairs. |
| Clavey Rd to Kennedy Jct
|
25.3 to 43.0 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 02:00 PM |
IDOT |
Moving Operation |
Veterans (North-South) NB (Illinois)
| 127th St to International Parkway
|
9.5 to 11.0 |
Medium |
Right lane closed, two lanes open |
06/19/13 12:30 PM to 04:30 PM |
Illinois Tollway |
Bridge Inspection |
| I-55 to Boughton Plaza
|
12.3 to 14.2 |
Medium |
Left lane and left shoulder closed, two to six lanes shifted |
05/15/13 09:00 AM to 06/24/13 11:59 PM |
Illinois Tollway |
Pavement Repair; ***Long Term Closure*** |
| Entrance from SB I-55
|
13.1 |
Medium |
Right lane closed, one lane open |
05/13/13 06:00 AM to 06/24/13 11:59 PM |
IDOT |
Pavement Repair; ***Long Term Closure*** |
| Exit to 75th St (Plaza 32)
|
15.2 |
Minor |
Various lanes closed |
06/18/13 05:00 AM to 06/25/13 11:59 PM |
Illinois Tollway |
Guardrail Repair; Pavement Repair; Right IPO Lane Closed ***Long Term Closure*** |
| Warrenville Rd to Finley Rd Underpass
|
19.9 to 20.9 |
Medium |
Left two lanes closed, one lane open |
06/18/13 10:00 PM to 06/19/13 04:00 AM |
Illinois Tollway |
Bridge Work |
| Warrenville Rd to Finley Rd Underpass
|
19.9 to 20.9 |
Medium |
Left lane closed, two lanes open |
06/18/13 07:00 PM to 10:00 PM, 06/19/13 04:00 AM to 05:00 AM |
Illinois Tollway |
Bridge Work |
| Butterfield Rd to 22nd St
|
22.0 to 23.0 |
Minor |
All lanes shifted |
06/19/13 05:00 AM to 07/15/13 11:59 PM |
Illinois Tollway |
Traffic Shifted Left on CD Road to Butterfield Rd; Drainage System Repair; ***Long Term Closure*** |
| Butterfield Rd to 22nd St
|
22.3 to 23.0 |
Minor |
All lanes shifted |
06/18/13 07:00 PM to 09:00 PM |
Illinois Tollway |
Pavement Marking Removal; Pavement Striping; Traffic Control; Traffic Shifted to the Right on CD Road to Butterfield Rd |
| Butterfield Rd to 22nd St
|
22.3 to 23.0 |
Minor |
All lanes shifted |
06/18/13 09:00 PM to 11:00 PM |
Illinois Tollway |
Pavement Marking Removal; Pavement Striping; Traffic Control; Traffic Shifted to the Left on CD Road to Butterfield Rd |
| Entrance from Butterfield Rd
|
23.3 |
Minor |
Ramp work, possible width reduction |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Right Side of Ramp Closed; Pavement Marking Removal; Pavement Striping; Traffic Control |
| Entrance from Butterfield Rd
|
23.3 |
Minor |
Ramp work, possible width reduction |
06/19/13 05:00 AM to 07/15/13 11:59 PM |
Illinois Tollway |
Drainage System Repair; Left Side Ramp Closed;*** Long Term Closure*** |
| Exit to North Ave (Plaza 75)
|
27.5 |
Minor |
Various lanes closed |
06/18/13 05:00 AM to 06/25/13 11:59 PM |
Illinois Tollway |
Guardrail Repair; Pavement Repair; Right IPO Lane Closed |
| Army Trail Plaza to Army Trail Rd
|
29.2 to 29.8 |
Medium |
Right lane closed, four to 7 lanes open |
06/18/13 06:00 PM to 07/15/13 12:00 AM |
Illinois Tollway |
Concrete Pour; Drainage System Repair; Pavement Removal; Sawcutting; ***Long Term Closure*** |
| Exit to Army Trail Rd
|
29.3 |
None |
Ramp work, possible width reduction |
06/18/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Exit to Army Trail Rd
|
29.3 |
Minor |
Ramp work, possible width reduction |
06/18/13 06:00 PM to 07/15/13 12:00 AM |
Illinois Tollway |
Concrete Pour; Drainage System Repair; Pavement Removal; Sawcutting; ***Long Term Closure*** |
| Entrance from EB Army Trail Rd
|
29.8 |
Minor |
Ramp work, possible width reduction |
06/18/13 06:00 PM to 06/29/13 12:00 AM |
Illinois Tollway |
Concrete Pour; Drainage System Repair; Pavement Removal; Sawcutting; ***Long Term Closure***; Right Side Ramp Closed; ***Long Term Closure*** |
| Entrance from EB Army Trail Rd
|
29.8 |
None |
Ramp work, possible width reduction |
06/18/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
**Long Term Closure** |
Veterans (North-South) SB (Illinois)
| at Army Trail Rd
|
29.8 |
Minor |
Left shoulder closed, all lanes open |
05/21/13 07:00 AM to 06/24/13 11:59 PM |
IDOT |
***Long term closure*** |
| Entrance from North Ave
|
27.4 |
Minor |
Various lanes closed |
06/18/13 05:00 AM to 06/25/13 11:59 PM |
Illinois Tollway |
Guardrail Repair; Pavement Repair; Right IPO Lane Closed |
| Exit to EB I-88
|
23.3 |
Minor |
Ramp work, possible width reduction |
06/14/13 05:00 AM to 08/01/13 11:59 PM |
Illinois Tollway |
Bridge Work; Left Side Ramp Closed; ***Long Term Closure*** |
| 22nd St to Butterfield Rd
|
23.1 to 22.0 |
Medium |
Left lane closed, two lanes open |
05/16/13 05:00 AM to 06/24/13 11:59 PM |
Illinois Tollway |
Left Lane of CD Road to Butterfield Rd Closed; Pavement Repair; ***Long Term Closure*** |
| Entrance from 75th St
|
16.6 |
Minor |
Various lanes closed |
06/18/13 05:00 AM to 06/25/13 11:59 PM |
Illinois Tollway |
Guardrail Repair; Pavement Repair; Right IPO Lane Closed |
| Boughton Plaza to I-55
|
14.3 to 12.4 |
Medium |
Left lane and left shoulder closed, two to 8 lanes open |
05/14/13 05:00 AM to 06/24/13 11:59 PM |
Illinois Tollway |
Pavement Repair: ***Long Term Closure*** |
| Exit to NB I-55
|
13.2 |
Minor |
Ramp work, possible width reduction |
05/24/13 07:00 AM to 07/12/13 11:59 PM |
Illinois Tollway |
Right Side Ramp Closed; Pavement Striping; Traffic Control; ***Long Term Closure***
|
| Exit to SB I-55
|
12.8 |
Minor |
Ramp work, possible width reduction |
05/13/13 05:00 AM to 06/24/13 11:59 PM |
IDOT |
Right Side of Ramp Closed; Pavement Repair;***Long Term Closure*** |
| International Parkway to 127th St
|
11.0 to 9.5 |
Medium |
Right lane closed, two lanes open |
06/19/13 08:00 AM to 12:00 PM |
Illinois Tollway |
Bridge Inspection |
| 127th St to Fraction Run Creek
|
8.5 to 3.5 |
Medium |
Right two lanes closed, one to four lanes open |
06/18/13 09:00 PM to 06/19/13 05:00 AM |
Illinois Tollway |
Pavement Striping |
Cook County (City of Chicago) (Illinois)
| EB US-12 (Mannheim Rd) at Balmoral Flyunder Ramp
|
|
Medium |
Various lanes closed |
01/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Beam and bearing fabrication |
| WB US-12 (Mannheim Rd) at Balmoral Flyunder Ramp
|
|
Medium |
Various lanes closed |
01/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Beam and bearing fabrication |
| NWB US-14 from Ridge Ave to IL-50
|
|
Medium |
Various lanes closed |
06/03/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Two lanes closed. |
| NWB US-14 at North Shore Channel
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Bridge repair |
| SEB US-14 from IL-50 to Ridge Ave
|
|
Medium |
Various lanes closed |
06/03/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Two lanes closed. |
| SEB US-14 at North Shore Channel
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Bridge repair |
| SEB US-45 (Mannheim Rd) from IL-72 to I-190
|
|
Medium |
Various lanes closed |
05/13/13 07:00 AM to 08/29/14 11:59 PM |
IDOT |
Roadway reconstruction, lighting, and traffic signals. |
| WB US-45 (Mannheim Rd) from I-190 to IL-72
|
|
Medium |
Various lanes closed |
05/13/13 07:00 AM to 08/29/14 11:59 PM |
IDOT |
Roadway reconstruction, lighting, and traffic signals. |
| NB IL-43 from 26th St to Cullom Ave
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing |
| SB IL-43 from Cullom Ave to 26th St
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing |
| EB 79th St from US-41 to Brandon Ave
|
|
Medium |
All lanes and shoulders closed |
10/26/12 07:00 AM to 11/21/13 11:59 PM |
Chicago DOT |
Detour EB 79th Street As Follows: SB US Route 41 (S. South Shore Drive), To EB 80th Street, to NB Brandon.
**Detour WB 79th Street as Follows: SB Brandon, To WB 81st Street, to NB US Route 41 (S. South Shore Drive). |
| WB 79th St from Brandon Ave to US-41
|
|
Medium |
All lanes and shoulders closed |
10/26/12 07:00 AM to 11/21/13 11:59 PM |
Chicago DOT |
Detour EB 79th Street As Follows: SB US Route 41 (S. South Shore Drive), To EB 80th Street, to NB Brandon.
**Detour WB 79th Street as Follows: SB Brandon, To WB 81st Street, to NB US Route 41 (S. South Shore Drive). |
| WB Dickens Ave from Fremont St to Sheffield Ave
|
|
Medium |
All lanes and shoulders closed |
06/19/13 09:00 AM to 04:00 PM, 06/20/13 09:00 AM to 04:00 PM, 06/21/13 09:00 AM to 04:00 PM, 06/24/13 09:00 AM to 04:00 PM, ... more, ending on 07/12/13 |
Chicago DOT |
|
| EB Division St from 100 to 148
|
|
Medium |
All lanes and shoulders closed |
02/28/13 07:00 AM to 10/01/13 11:59 PM |
Chicago DOT |
CTA subway construction:::Detour:: EB Division to SB La Salle to EB Chicago to NB Dearborn to EB Divison AND WB Divison to SB Clark to WB Chicago to NB La Salle to WB Divison |
| WB Division St from 100 to 119 W. Divison
|
|
Medium |
Various lanes closed |
02/28/13 07:00 AM to 10/01/13 11:59 PM |
Chicago DOT |
maintain one lane of traffic::CTA subway reconstruction |
| WB Division St from 100 to 148
|
|
Medium |
All lanes and shoulders closed |
02/28/13 07:00 AM to 10/01/13 11:59 PM |
Chicago DOT |
CTA subway construction:::Detour:: EB Division to SB La Salle to EB Chicago to NB Dearborn to EB Divison AND WB Divison to SB Clark to WB Chicago to NB La Salle to WB Divison |
| NB Doty Ave at 110th St
|
|
Minor |
Various lanes closed |
01/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Rehabilitation of existing IDOT pumping station |
| SEB Ewing Ave from 100th St (-0.1 miles) to 100th St
|
|
Major |
All lanes and shoulders closed |
04/01/13 12:00 AM to 08/08/13 11:59 PM |
Chicago DOT |
Railroad Viaduct Maintenance; SB closure for 3 weeks. DETOUR::SB US Route 41/Mackinaw Avenue/Avenue O, SB Harbor Avenue, SB South Chicago Ave, WB 95th Street, SB Commercial Ave, EB 100th St, SB Indianapolis Ave/Ewing Ave |
| NB Kedzie Ave at 44th St
|
|
Minor |
Various lanes closed |
04/05/13 07:00 AM to 08/15/13 11:59 PM |
Chicago DOT |
|
| SB Kedzie Ave at 44th St
|
|
Minor |
Various lanes closed |
04/05/13 07:00 AM to 08/15/13 11:59 PM |
Chicago DOT |
|
| SB Kedzie Avenue Bridge at Sanitary & Ship Canal (3400 South)
|
|
Minor |
Various lanes closed |
06/09/13 07:00 AM to 07/06/13 11:59 PM |
Chicago DOT |
***Long Term Closure***; Closure of 2 southbound lanes until June 17th. |
| EB Lawrence Ave at Ravenswood Ave
|
|
Medium |
All lanes and shoulders closed |
06/19/13 09:00 AM to 06/21/13 04:00 PM |
Chicago DOT |
Posted detour will be Lawrence-Damen-Montrose-Ashland-Lawrence. |
| WB Lawrence Ave at Ravenswood Ave
|
|
Medium |
All lanes and shoulders closed |
06/19/13 09:00 AM to 06/21/13 04:00 PM |
Chicago DOT |
Posted detour will be Lawrence-Damen-Montrose-Ashland-Lawrence. |
| EB Leland Ave at Ravenswood Ave
|
|
Medium |
All lanes and shoulders closed |
03/01/13 08:00 AM to 06/28/13 05:00 PM |
Chicago DOT |
Detour EB Leland Avenue Traffic as Follows: EB Leland, to SB Wolcott, to EB Wilson, to NB Ravenswood (East of the Metra Tracks) to Leland Avenue. |
| EB Mannheim Rd (US-12/45) from I-190 to IL-19
|
|
Medium |
Various lanes closed |
05/14/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Roadway reconstruction and widening |
| NWB Mannheim Rd (US-12/45) from IL-19 to I-190
|
|
Medium |
Various lanes closed |
05/14/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Roadway reconstruction and widening |
| SB Michigan Ave at Walton St
|
|
Medium |
Various lanes closed |
06/19/13 07:00 AM to 07:00 PM daily until 06/21/13 |
Chicago DOT |
Emergency Sewer Repair; Maintain all NB Michigan through lanes, and prohibit NB Left turns onto Walton St. Maintain at least 2 SB Michigan Ave thru Lanes at all times. The major issue is WB traffic where right-turns and thru traffic are sharing 1 lane. Right-turning traffic is delayed due to heavy pedestrian traffic and this backs up thru traffic into the lobby entrance of the Drake Hotel. A flagger should direct traffic through the intersection to keep the queue length at a minimum. During non-work hours there should be 1 WB thru lane and 1 WB exclusive right-turn lane open for Walton traffic. |
| NB Milwaukee Ave (IL-21) from Birchwood Ave to Monroe St
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Streetscape, landscaping, and traffic signals |
| SB Milwaukee Ave (IL-21) from Monroe St to Birchwood Ave
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Streetscape, landscaping, and traffic signals |
| EB Montrose Ave at Kildare Ave
|
|
Minor |
Various lanes closed |
04/05/13 07:00 AM to 08/15/13 11:59 PM |
Chicago DOT |
|
| WB Montrose Ave at Kildare Ave
|
|
Minor |
Various lanes closed |
04/05/13 07:00 AM to 08/15/13 11:59 PM |
Chicago DOT |
|
| EB Ogden Ave at Over I-290
|
|
Minor |
Various lanes closed |
08/01/12 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Bridge deck patching and sidewalk replacement |
| WB Ogden Ave at Over I-290
|
|
Minor |
Various lanes closed |
08/01/12 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Bridge deck patching and sidewalk replacement |
| NB Pulaski Rd from 123rd St to 115th St
|
|
Minor |
Various lanes closed |
11/05/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Street lighting |
| SB Sheffield Ave from Fullerton Ave to Webster Ave
|
|
Medium |
All lanes and shoulders closed |
06/19/13 07:00 AM to 04:00 PM daily until 07/03/13 |
Chicago DOT |
Water main installation; Maintain emergency and pedestrian access at all times. Posted detour will be Sheffield-Armitage-Halsted-Fullerton-Sheffield. |
| SB South Shore Dr/US-41 from 78th St to Cheltenham Pl
|
|
Medium |
All lanes and shoulders closed |
06/10/13 10:00 AM to 06/19/13 05:00 PM |
Chicago DOT |
Detour NB South Shore Dr as Follows: NB South Shore Dr, to WB 79th St, to NB Exchange Ave, to EB 75th St, to NB South Shore Dr. Reverse for SB South Shore Dr. |
| NB Torrence Ave from 136th St to 130th St
|
|
Medium |
All lanes and shoulders closed |
03/20/13 07:00 AM to 06/01/14 11:59 PM |
IDOT |
Closed for crossing improvement. |
| SB Torrence Ave from 130th St to 136th St
|
|
Medium |
All lanes and shoulders closed |
03/20/13 07:00 AM to 06/01/14 11:59 PM |
IDOT |
Closed for crossing improvement. |
| SB Wells St Bridge at Chicago River
|
|
Medium |
All lanes and shoulders closed |
03/15/13 06:00 AM to 12/01/13 11:59 PM |
Chicago DOT |
**Long term closure**::DETOUR::SB Wells St, to EB Kinzie St, to SB Clark St |
Cook County (Suburban) (Illinois)
| Ramp from NB I-294 to River Rd
|
|
Minor |
Right lane closed, one lane open |
06/16/13 12:00 AM to 07/18/13 12:00 AM |
Illinois Tollway |
Ramp Reconstruction |
| NWB US-14 from Waterman Ave to Arthur Ave
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Traffic signals modifications, resurfacing and widening. |
| SEB US-14 from Arthur Ave to Waterman Ave
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Traffic signals modifications, resurfacing and widening. |
| EB US-30 at Central Ave
|
|
Minor |
All lanes and shoulders open |
09/03/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Channelization and traffic signal modernization. |
| EB US-30 from IL-1 to State St
|
|
Medium |
Various lanes closed |
03/22/13 07:00 AM to 08/01/13 11:59 PM |
IDOT |
Fiber optic cable installation, intersection work |
| WB US-30 from State St to IL-1
|
|
Medium |
Various lanes closed |
03/22/13 07:00 AM to 08/01/13 11:59 PM |
IDOT |
Fiber optic cable installation, intersection work |
| WB US-30 at Central Ave
|
|
Minor |
All lanes and shoulders open |
09/03/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Channelization and traffic signal modernization. |
| NB US-45 from 175th St to US-6
|
|
Medium |
Various lanes closed |
05/01/13 06:00 AM to 08/02/13 11:59 PM |
IDOT |
One lane closed. |
| NB US-45 from US-6 to 131st St
|
|
Medium |
Various lanes closed |
05/01/13 06:00 AM to 08/02/13 11:59 PM |
IDOT |
One lane closed. |
| NB US-45 from 159th St (US-6) to 131st St
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Tearing down for future improvements. |
| SB US-45 from 131st St to US-6
|
|
Medium |
Various lanes closed |
05/01/13 06:00 AM to 08/02/13 11:59 PM |
IDOT |
One lane closed. |
| SB US-45 from 131st St to 159th ST (US-6)
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Tearing down for future improvements. |
| SB US-45 from US-6 to 179th St
|
|
Medium |
Various lanes closed |
05/01/13 06:00 AM to 08/02/13 11:59 PM |
IDOT |
One lane closed. |
| WB US-45 (Mannheim Rd) from I-190 to IL-72
|
|
Medium |
Various lanes closed |
05/13/13 07:00 AM to 08/29/14 11:59 PM |
IDOT |
Roadway reconstruction, lighting, and traffic signals. |
| NB IL-1 at Abandoned IC Tracks
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Bridge rehabilitation |
| SB IL-1 at Abandoned IC Tracks
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Bridge rehabilitation |
| EB IL-19 from E/O York Rd to Division St (+0.2 miles)
|
|
Medium |
Various lanes closed |
05/01/13 06:00 AM to 09/30/13 11:59 PM |
IDOT |
Grade separation, bridge and retaining wall construction, culvert work. |
| WB IL-19 from Division St (-0.2 miles) to E/O York Rd
|
|
Medium |
Various lanes closed |
05/01/13 06:00 AM to 09/30/13 11:59 PM |
IDOT |
Grade separation, bridge and retaining wall construction, culvert work. |
| NB IL-43 from 127th St to College Dr
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Replacing lighting system |
| NB IL-43 from 26th St to Cullom Ave
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing |
| SB IL-43 from Cullom Ave to 26th St
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing |
| SB IL-43 from College Dr to 127th St
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Replacing lighting system |
| NB IL-50 from Pershing Rd to 34th St
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Safety project |
| SB IL-50 from 34th St to Pershing Rd
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Safety project |
| EB IL-58 at Shales Pkwy/Countryfield Ln
|
|
Major |
Various lanes closed |
04/15/13 07:00 AM to 07/12/13 11:59 PM |
IDOT |
Intersection improvement |
| EB IL-58 at Dee Rd
|
|
Medium |
Various lanes closed |
10/01/12 07:00 AM to 06/28/13 11:59 AM |
IDOT |
Traffic signal modernization |
| EB IL-58 at Western Ave
|
|
Medium |
Various lanes closed |
10/01/12 07:00 AM to 06/28/13 11:59 AM |
IDOT |
Traffic signal modernization |
| WB IL-58 at Western Ave
|
|
Medium |
Various lanes closed |
10/01/12 07:00 AM to 06/28/13 11:59 AM |
IDOT |
Traffic signal modernization |
| WB IL-58 at Dee Rd
|
|
Medium |
Various lanes closed |
10/01/12 07:00 AM to 06/28/13 11:59 AM |
IDOT |
Traffic signal modernization |
| WB IL-58 at Shales Pkwy/Countryfield Ln
|
|
Major |
Various lanes closed |
04/15/13 07:00 AM to 07/12/13 11:59 PM |
IDOT |
Intersection improvement |
| NB IL-59 at Shoe Factory Rd
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing, roadway lighting, and storm sewers. |
| SB IL-59 at Shoe Factory Rd
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing, roadway lighting, and storm sewers. |
| EB IL-68 from Ridge Ave to Huntington Ln
|
|
Medium |
Various lanes closed |
05/13/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Sidewalk, driveway paving, and landscaping. |
| WB IL-68 from Huntington Ln to Ridge Ave
|
|
Medium |
Various lanes closed |
05/13/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Sidewalk, driveway paving, and landscaping. |
| NWB IL-83 from Western Ave to Kedzie Ave
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Roadway reconstruction, lighting and traffic signals. |
| SEB IL-83 from Kedzie Ave to Western Ave
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Roadway reconstruction, lighting and traffic signals. |
| SB IL-171 from 44th St to I-55
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing and drainage |
| SB IL-171 from I-55 to 44th St
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing and drainage |
| EB 127th St from Ashland Ave to Carpenter St
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing |
| WB 127th St from Carpenter St to Ashland Ave
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing |
| WB 135th St at IL-171
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 06/30/13 11:59 PM |
Other |
Widening, new bridge, and reconstruction; ***Long Term Closure*** |
| EB 167th St from Cherry Hill Ave to 80th Ave
|
|
Medium |
Various lanes closed |
07/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Pavement patching and sidewalk repair |
| WB 167th St from 80th Ave to Cherry Hill Ave
|
|
Medium |
Various lanes closed |
07/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Pavement patching and sidewalk repair |
| EB 183rd St from Sacramento Ave to Riegel Rd
|
|
Minor |
Various lanes closed |
08/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing, sidewalk repair. |
| WB 183rd St from Riegel Rd to Sacramento Ave
|
|
Minor |
Various lanes closed |
08/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing, sidewalk repair. |
| EB 223rd St from Nichols Dr to Murphy Ave
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Resurfacing, patching, and sidewalk. |
| WB 223rd St from Murphy Ave to Nichols Dr
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Resurfacing, patching, and sidewalk. |
| NB 25th Ave from Chestnut Ave to N/O King St
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing, parkway restoration, and pedestrian buttons. |
| SB 25th Ave from N/O King St to Chestnut Ave
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing, parkway restoration, and pedestrian buttons. |
| EB 71st St from 78th Ave to Beloit Ave
|
|
Minor |
Various lanes closed |
07/02/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Construction of grade separation underpass |
| WB 71st St from Beloit Ave to 78th Ave
|
|
Minor |
Various lanes closed |
07/02/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Construction of grade separation underpass |
| NB 76th Ave from 131st St to 127th St
|
|
Medium |
All lanes and shoulders closed |
05/01/13 07:00 AM to 12/01/13 11:59 PM |
IDOT |
Storm sewers, resurfacing. |
| SB 76th Ave from 127th St to 131st St
|
|
Medium |
All lanes and shoulders closed |
05/01/13 07:00 AM to 12/01/13 11:59 PM |
IDOT |
Storm sewers, resurfacing. |
| NB Archer Ave at Derby Rd
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| NB Archer Ave at Mccarthy Rd
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| SB Archer Ave at Mccarthy Rd
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| SB Archer Ave at Derby Rd
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| NB Ashland Ave from Thornton Rd to Broadway St
|
|
Minor |
Various lanes closed |
05/29/12 07:00 AM to 06/30/13 11:59 AM |
IDOT |
Resurfacing, guardrail, traffic signals. Traffic restricted to one lane and controlled by temporary traffic signals. Max width 8 feet 6 inches from Thornton to 138th St. |
| SB Ashland Ave from Broadway St to Thornton Rd
|
|
Minor |
Various lanes closed |
05/29/12 07:00 AM to 06/30/13 11:59 AM |
IDOT |
Resurfacing, guardrail, traffic signals. Traffic restricted to one lane and controlled by temporary traffic signals. Max width 8 feet 6 inches from Thornton to 138th St. |
| NB Barrington Rd at Schaumburg Rd
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, sewers, lighting and traffic signals. |
| SB Barrington Rd at Schaumburg Rd
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, sewers, lighting and traffic signals. |
| NWB Blackhawk Dr from Monee Rd to Sauk Trl
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Bridge replacement and resurfacing |
| SEB Blackhawk Dr from Sauk Trl to Monee Rd
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Bridge replacement and resurfacing |
| NB Burnham Ave at River Oaks Dr
|
|
Minor |
Various lanes closed |
06/19/13 07:00 AM to 03:00 PM, 06/20/13 07:00 AM to 03:00 PM, 06/21/13 07:00 AM to 03:00 PM, 06/24/13 07:00 AM to 03:00 PM, ... more, ending on 07/12/13 |
IDOT |
Channelization and traffic signal modernization. |
| SB Burnham Ave at River Oaks Dr
|
|
Minor |
Various lanes closed |
06/19/13 07:00 AM to 03:00 PM, 06/20/13 07:00 AM to 03:00 PM, 06/21/13 07:00 AM to 03:00 PM, 06/24/13 07:00 AM to 03:00 PM, ... more, ending on 07/12/13 |
IDOT |
Channelization and traffic signal modernization. |
| NB Central Ave at US-30
|
|
Minor |
Various lanes closed |
09/03/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Channelization and traffic signal modernization. |
| NB Central Ave from 122nd St to 115th St
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Lighting installation |
| NB Central Ave at I-55
|
|
Minor |
Various lanes closed |
09/12/11 07:00 AM to 08/23/13 11:59 PM |
IDOT |
One lane closed. |
| SB Central Ave at I-55
|
|
Minor |
Various lanes closed |
09/12/11 07:00 AM to 08/23/13 11:59 PM |
IDOT |
One lane closed. |
| SB Central Ave from 115th St to 122nd St
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Lighting installation |
| SB Central Ave at US-30
|
|
Minor |
All lanes and shoulders open |
09/03/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Channelization and traffic signal modernization. |
| EB Chestnut Ave at Waukegan Rd (IL-43)
|
|
Medium |
All lanes and shoulders open |
05/01/13 07:00 AM to 06/30/14 11:59 PM |
IDOT |
Roadway widening, lighting, and resurfacing at intersection |
| WB Chestnut Ave at Waukegan Rd (IL-43)
|
|
Medium |
All lanes and shoulders open |
05/01/13 07:00 AM to 06/30/14 11:59 PM |
IDOT |
Roadway widening, lighting, and resurfacing at intersection |
| NEB Claire Blvd from Kedzie Ave to Francisco Ave
|
|
Minor |
Various lanes closed |
09/03/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing and parkway restoration |
| SWB Claire Blvd from Francisco Ave to Kedzie Ave
|
|
Minor |
Various lanes closed |
09/03/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing and parkway restoration |
| NB Dee Rd at IL-58
|
|
Medium |
Various lanes closed |
10/01/12 07:00 AM to 06/28/13 11:59 AM |
IDOT |
Traffic signal modernization |
| SB Dee Rd at IL-58
|
|
Medium |
Various lanes closed |
10/01/12 07:00 AM to 06/28/13 11:59 AM |
IDOT |
Traffic signal modernization |
| NB Derby Rd at Archer Ave
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| NB Derby Rd from IL-171 to Mccarthy Rd
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Two lanes closed. |
| NB Derby Rd at Mccarthy Rd
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| SB Derby Rd at Mccarthy Rd
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| SB Derby Rd from Mccarthy Rd to IL-171
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Two lanes closed. |
| SB Derby Rd at Archer Ave
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| EB Division St from 25th Ave to 9th Ave
|
|
Minor |
Various lanes closed |
07/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Landscape medians with irrigation system and curb and sidewalk. |
| WB Division St from 9th Ave to 25th Ave
|
|
Minor |
Various lanes closed |
07/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Landscape medians with irrigation system and curb and sidewalk. |
| NB East Ave from 67th St to Joliet Rd
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 08/08/13 11:59 PM |
IDOT |
Resurfacing, One lane closed. |
| SB East Ave from Joliet Rd to 67th St
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 08/08/13 11:59 PM |
IDOT |
Resurfacing, One lane closed. |
| EB Franklin Ave from 1500 ft E/O County Line Rd to Williams Dr
|
|
Minor |
Various lanes closed |
04/24/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Resurfacing, drainage, and curb and gutter. |
| WB Franklin Ave from Williams Dr to 1500 ft E/O County Line Rd
|
|
Minor |
Various lanes closed |
04/24/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Resurfacing, drainage, and curb and gutter. |
| Grand Ave at IHB tracks
|
|
Medium |
All lanes and shoulders closed |
01/01/10 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Road closed at railroad. |
| NB Halsted (IL-1) from 183rd St to Ridge Rd
|
|
Medium |
Various lanes closed |
02/14/13 07:00 AM to 10/15/13 11:59 PM |
IDOT |
One lane closed. |
| SB Halsted (IL-1) from Ridge Rd to 183rd St
|
|
Medium |
Various lanes closed |
02/14/13 07:00 AM to 10/15/13 11:59 PM |
IDOT |
One lane closed. |
| NB Harlem Ave (IL-43) at Sanitary & Ship Canal
|
|
Medium |
Various lanes closed |
06/03/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Bridge painting |
| SB Harlem Ave (IL-43) at Sanitary & Ship Canal
|
|
Medium |
Various lanes closed |
06/03/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Bridge painting |
| EB Hassell Rd from Barrington Rd to Fairway Ct
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 05/30/14 11:59 PM |
IDOT |
Roadway reconstruction, culvert, and traffic signal modification. |
| WB Hassell Rd from Fairway Ct to Barrington Rd
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 05/30/14 11:59 PM |
IDOT |
Roadway reconstruction, culvert, and traffic signal modification. |
| NB Haven Ave from 163rd St to 159th St (US-6)
|
|
Medium |
All lanes and shoulders closed |
04/29/13 07:00 AM to 08/09/13 11:59 PM |
IDOT |
Resurfacing, and storm sewer |
| SB Haven Ave from 159th St (US-6) to 163rd St
|
|
Medium |
All lanes and shoulders closed |
04/29/13 07:00 AM to 08/09/13 11:59 PM |
IDOT |
Resurfacing, and storm sewer |
| NEB Joliet Rd at Lenzi Ave
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Intersection improvements |
| SWB Joliet Rd at Lenzi Ave
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Intersection improvements |
| EB Kensington Rd from Forest Ave to IL-83
|
|
Minor |
Various lanes closed |
04/09/13 07:00 AM to 11/15/13 11:59 PM |
IDOT |
Road reconstruction, one lane closed. |
| WB Kensington Rd from IL-83 to Forest Ave
|
|
Minor |
Various lanes closed |
04/09/13 07:00 AM to 11/15/13 11:59 PM |
IDOT |
Road reconstruction, one lane closed. |
| EB Lake St at Addison Creek
|
|
Minor |
Various lanes closed |
01/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Box culvert replacement, roadway reconstruction |
| EB Lake Ave from Pfingsten Rd to Pickwick Ln
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Sidewalk and parkway restoration |
| WB Lake Ave from Pickwick Ln to Pfingsten Rd
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Sidewalk and parkway restoration |
| WB Lake St at Addison Creek
|
|
Minor |
Various lanes closed |
01/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Box culvert replacement, roadway reconstruction |
| NB Lenzi Ave at Joliet Rd
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Intersection improvements |
| SB Lenzi Ave at Joliet Rd
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Intersection improvements |
| NB Longmeadow Ln at West Branch DuPage River
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Removal and replacement of the existing bridge |
| SB Longmeadow Ln at West Branch DuPage River
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Removal and replacement of the existing bridge |
| EB Mannheim Rd (US-12/45) from I-190 to IL-19
|
|
Medium |
Various lanes closed |
05/14/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Roadway reconstruction and widening |
| NWB Mannheim Rd (US-12/45) from IL-19 to I-190
|
|
Medium |
Various lanes closed |
05/14/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Roadway reconstruction and widening |
| NB Maple Ave from 47th St to Burlington Ave
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, driveways, patching and sewer. |
| SB Maple Ave from Burlington Ave to 47th St
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, driveways, patching and sewer. |
| EB Margaret St from Ridge Rd to Schwab St
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 07/03/13 11:59 PM |
IDOT |
Resurfacing. Max width 10 feet 6 inches |
| WB Margaret St from Schwab St to Ridge Rd
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 07/03/13 11:59 PM |
IDOT |
Resurfacing. Max width 10 feet 6 inches |
| NB Marion St from South Blvd to North Blvd
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Architectural enhancements and streetscape and lighting improvements. |
| SB Marion St from North Blvd to South Blvd
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Architectural enhancements and streetscape and lighting improvements. |
| EB Mccarthy Rd at Walker Rd
|
|
Medium |
All lanes and shoulders open |
05/06/13 07:00 AM to 08/15/13 11:59 PM |
IDOT |
Channelization and traffic signal modernization. Max width 10 feet 5 inches. |
| EB Mccarthy Rd at Derby Rd
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| EB Mccarthy Rd at Archer Ave
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| WB Mccarthy Rd at Archer Ave
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| WB Mccarthy Rd at Derby Rd
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Widening and resurfacing, traffic signal installation |
| WB Mccarthy Rd at Walker Rd
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 08/15/13 11:59 PM |
IDOT |
Channelization and traffic signal modernization. Max width 10 feet 5 inches. |
| NB Milwaukee Ave (IL-21) from Birchwood Ave to Monroe St
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Streetscape, landscaping, and traffic signals |
| SB Milwaukee Ave (IL-21) from Monroe St to Birchwood Ave
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Streetscape, landscaping, and traffic signals |
| NB Oak Park Ave from Ogden Ave to 34th St
|
|
Medium |
Various lanes closed |
12/03/12 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Street lighting, and sidewalk replacement |
| SB Oak Park Ave from 34th St to Ogden Ave
|
|
Medium |
Various lanes closed |
12/03/12 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Street lighting, and sidewalk replacement |
| EB Oakton St from US-41 (Skokie Blvd) to Lowell Ave
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Sidewalk, street lights, landscaping |
| WB Oakton St from Lowell Ave to US-41 (Skokie Blvd)
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Sidewalk, street lights, landscaping |
| NB Orchard Dr from Sauk Trl to US-30
|
|
Minor |
Various lanes closed |
04/02/12 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Traffic signal replacement, drainage |
| SB Orchard Dr from US-30 to Sauk Trl
|
|
Minor |
Various lanes closed |
04/02/12 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Traffic signal replacement, drainage |
| EB Palatine Rd from Huntington Blvd to Haman Rd
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Widening to add center median-left turn lanes and traffic signals |
| WB Palatine Rd from Haman Rd to Huntington Blvd
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Widening to add center median-left turn lanes and traffic signals |
| NB Park Ave at Cal-Union Ditch
|
|
Minor |
Various lanes closed |
05/01/13 05:00 AM to 07/15/13 11:59 PM |
IDOT |
Bridge replacement, 2 lanes closed: Detour route will be 159th to Dixie Hwy to 171st St More information |
| SB Park Ave at Cal-Union Ditch
|
|
Minor |
Various lanes closed |
05/01/13 05:00 AM to 07/15/13 11:59 PM |
IDOT |
Bridge replacement, 2 lanes closed: Detour route will be 159th to Dixie Hwy to 171st St More information |
| NB Pulaski Rd from 123rd St to 115th St
|
|
Minor |
Various lanes closed |
11/05/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Street lighting |
| SB Pulaski Rd from 115th St to 123rd St
|
|
Minor |
Various lanes closed |
11/05/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Street lighting |
| EB Ridge Rd from Halsted St (IL-1) to Margaret St
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 07/03/13 11:59 PM |
IDOT |
Resurfacing. Max width 10 feet 6 inches |
| WB Ridge Rd from Margaret St to Halsted St (IL-1)
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 07/03/13 11:59 PM |
IDOT |
Resurfacing. Max width 10 feet 6 inches |
| NB Ridgeland Ave from South Blvd to North Blvd
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Architectural enhancements and streetscape and lighting improvements. |
| SB Ridgeland Ave from North Blvd to South Blvd
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Architectural enhancements and streetscape and lighting improvements. |
| EB River Oaks Dr at Burnham Ave
|
|
Minor |
Various lanes closed |
06/19/13 07:00 AM to 03:00 PM, 06/20/13 07:00 AM to 03:00 PM, 06/21/13 07:00 AM to 03:00 PM, 06/24/13 07:00 AM to 03:00 PM, ... more, ending on 07/12/13 |
IDOT |
Channelization and traffic signal modernization. |
| WB River Oaks Dr at Burnham Ave
|
|
Minor |
Various lanes closed |
06/19/13 07:00 AM to 03:00 PM, 06/20/13 07:00 AM to 03:00 PM, 06/21/13 07:00 AM to 03:00 PM, 06/24/13 07:00 AM to 03:00 PM, ... more, ending on 07/12/13 |
IDOT |
Channelization and traffic signal modernization. |
| EB Schaumburg Rd at Barrington Rd
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, sewers, lighting and traffic signals. |
| WB Schaumburg Rd at Barrington Rd
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, sewers, lighting and traffic signals. |
| NB Schoenbeck Rd from Marion St to Palatine Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Parkway restoration and drainage improvements |
| SB Schoenbeck Rd from Palatine Rd to Marion St
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Parkway restoration and drainage improvements |
| NB Shales Pkwy/Countryfield Ln at IL-58
|
|
Major |
Various lanes closed |
04/15/13 07:00 AM to 07/12/13 11:59 PM |
IDOT |
Intersection improvement |
| SB Shales Pkwy/Countryfield Ln at IL-58
|
|
Major |
Various lanes closed |
04/15/13 07:00 AM to 07/12/13 11:59 PM |
IDOT |
Intersection improvement |
| NB Shermer Rd at Harvard Ct (-0.1 miles)
|
|
Medium |
All lanes and shoulders closed |
07/04/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Road closed due to train derailment and bridge collapse. |
| SB Shermer Rd at Harvard Ct (+0.1 miles)
|
|
Medium |
All lanes and shoulders closed |
07/04/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Road closed due to train derailment and bridge collapse. |
| EB Shoe Factory Rd at IL-59
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing, roadway lighting, and storm sewers. |
| WB Shoe Factory Rd at IL-59
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing, roadway lighting, and storm sewers. |
| NEB Southwest Hwy (IL-7) from 117th St to Cal-Sag Channel
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Sidewalk, seeding, sodding, and traffic signals |
| SWB Southwest Hwy (IL-7) from Cal-Sag Channel to 117th St
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Sidewalk, seeding, sodding, and traffic signals |
| NB Torrence Ave from Steger Rd to Glenwood Dyer Rd (IL-83)
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/15/13 11:59 PM |
IDOT |
Resurfacing |
| SB Torrence Ave from Glenwood Dyer Rd (IL-83) to Steger Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/15/13 11:59 PM |
IDOT |
Resurfacing |
| EB Touhy Ave from Leclaire Ave to Keating Ave
|
|
Minor |
Various lanes closed |
05/06/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
Bridge Rehabilitation Project |
| EB Touhy Ave at I-94
|
|
Medium |
Various lanes closed |
09/05/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Bridge reconstruction; Max width 11 feet 6 inches. |
| WB Touhy Ave from Keating Ave to Leclaire Ave
|
|
Minor |
Various lanes closed |
05/06/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
Bridge Rehabilitation Project |
| WB Touhy Ave at I-94
|
|
Medium |
Various lanes closed |
09/05/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Bridge reconstruction; Max width 11 feet 6 inches. |
| NB Walker Rd at Mccarthy Rd
|
|
Medium |
All lanes and shoulders open |
05/06/13 07:00 AM to 08/15/13 11:59 PM |
IDOT |
Channelization and traffic signal modernization. Max width 10 feet 5 inches. |
| SB Walker Rd at Mccarthy Rd
|
|
Medium |
All lanes and shoulders open |
05/06/13 07:00 AM to 08/15/13 11:59 PM |
IDOT |
Channelization and traffic signal modernization. Max width 10 feet 5 inches. |
| NB Walnut Ln from Bode Rd to Golf Rd (IL-58)
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Storm sewers, curb and gutter, parking lane and lighting. |
| SB Walnut Ln from Golf Rd (IL-58) to Bode Rd
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Storm sewers, curb and gutter, parking lane and lighting. |
| EB Walter Zimny Dr from Cleveland Ave to Western Ave
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, patching, curb and gutter. |
| WB Walter Zimny Dr from Western Ave to Cleveland Ave
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, patching, curb and gutter. |
| NB Waukegan Rd (IL-43) at Chestnut Ave
|
|
Medium |
All lanes and shoulders open |
05/01/13 07:00 AM to 06/30/14 11:59 PM |
IDOT |
Roadway widening, lighting, and resurfacing at intersection |
| SB Waukegan Rd (IL-43) at Chestnut Ave
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 06/30/14 11:59 PM |
IDOT |
Roadway widening, lighting, and resurfacing at intersection |
| NB Western Ave at IL-58
|
|
Medium |
Various lanes closed |
10/01/12 07:00 AM to 06/28/13 11:59 AM |
IDOT |
Traffic signal modernization |
| SB Western Ave at IL-58
|
|
Medium |
Various lanes closed |
10/01/12 07:00 AM to 06/28/13 11:59 AM |
IDOT |
Traffic signal modernization |
| EB Willow Rd at Des Plaines River
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Scour countermeasures. |
| EB Willow Rd from Shermer Rd to Patriot Blvd
|
|
Minor |
Various lanes closed |
05/08/13 07:00 AM to 09/27/13 11:59 PM |
IDOT |
Removal and replacement of two box culverts; Expect delays; seek alternate routes More information |
| EB Willow Rd at 1.4 miles W/O IL-43
|
|
Minor |
Various lanes closed |
05/08/13 07:00 AM to 09/27/13 11:59 PM |
IDOT |
One lane closed. Max width: 9 ft |
| EB Willow Rd from Waukegan Rd to I-94
|
|
Minor |
Various lanes closed |
03/28/13 06:00 AM to 10/31/13 11:59 PM |
IDOT |
Road widening; ***Long Term Closure*** |
| EB Willow Rd from Waukegan Rd (IL-43) to I-94
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 10/31/14 11:59 PM |
IDOT |
Roadway reconstruction, adding lanes, bridge, lighting and drainage. Max width 9 feet 6 inches. |
| WB Willow Rd from I-94 to Waukegan Rd
|
|
Minor |
Various lanes closed |
03/28/13 06:00 AM to 10/31/13 11:59 PM |
IDOT |
Road widening; ***Long Term Closure*** |
| WB Willow Rd from I-94 to Waukegan Rd (IL-43)
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 10/31/14 11:59 PM |
IDOT |
Roadway reconstruction, adding lanes, bridge, lighting and drainage. Max width 9 feet 6 inches. |
| WB Willow Rd from Patriot Blvd to Shermer Rd
|
|
Minor |
Various lanes closed |
05/08/13 07:00 AM to 09/27/13 11:59 PM |
IDOT |
Removal and replacement of two box culverts; Expect delays; seek alternate routes More information |
| WB Willow Rd at 1.4 miles W/O IL-43
|
|
Minor |
Various lanes closed |
05/08/13 07:00 AM to 09/27/13 11:59 PM |
IDOT |
One lane closed. Max width: 9 ft |
| WB Willow Rd at Des Plaines River
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Scour countermeasures. |
DuPage County (Illinois)
| NWB US-20 (Lake St) from York Rd to Walnut St
|
|
Medium |
Various lanes closed |
01/01/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Interchange reconstruction, traffic signals & lighting. |
| NWB US-20 at E/O Bloomingdale Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Drainage corrections |
| SEB US-20 at E/O Bloomingdale Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Drainage corrections |
| SEB US-20 (Lake St) from Walnut St to York Rd
|
|
Medium |
Various lanes closed |
01/01/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Interchange reconstruction, traffic signals & lighting. |
| EB IL-19 from Walnut St to South Access Rd
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 09/12/13 11:59 PM |
IDOT |
One lane closed. More information |
| EB IL-19 at York Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 09/28/13 11:59 PM |
IDOT |
Grade separation and erosion control |
| EB IL-19 from E/O York Rd to Division St (+0.2 miles)
|
|
Medium |
Various lanes closed |
05/01/13 06:00 AM to 09/30/13 11:59 PM |
IDOT |
Grade separation, bridge and retaining wall construction, culvert work. |
| WB IL-19 from Division St (-0.2 miles) to E/O York Rd
|
|
Medium |
Various lanes closed |
05/01/13 06:00 AM to 09/30/13 11:59 PM |
IDOT |
Grade separation, bridge and retaining wall construction, culvert work. |
| WB IL-19 from South Access Rd to Walnut St
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 09/12/13 11:59 PM |
IDOT |
One lane closed. More information |
| WB IL-19 at York Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 09/28/13 11:59 PM |
IDOT |
Grade separation and erosion control |
| EB IL-38 from Kirk Rd to Kress Rd
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 08/31/13 11:59 PM |
IDOT |
Max width 10 feet 6 inches. One lane closed. |
| EB IL-38 from Kautz Rd to Kautz Rd (+0.1 miles)
|
|
Medium |
Various lanes closed |
11/01/12 07:00 AM to 10/31/13 11:59 AM |
IDOT |
Grade separation, roadway reconstruction, drainage, traffic signals. |
| EB IL-38 (Roosevelt Rd) at I-355
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Traffic signal modernization |
| WB IL-38 (Roosevelt Rd) at I-355
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Traffic signal modernization |
| WB IL-38 from Kress Rd to Kirk Rd
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 08/31/13 11:59 PM |
IDOT |
Max width 10 feet 6 inches. One lane closed. |
| WB IL-38 from Kautz Rd (-0.1 miles) to Kautz Rd
|
|
Medium |
Various lanes closed |
11/01/12 07:00 AM to 10/31/13 11:59 AM |
IDOT |
Grade separation, roadway reconstruction, drainage, traffic signals. |
| NB IL-53 at St Joseph Creek
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 08/02/13 11:59 PM |
IDOT |
Max width 11 ft 0 in; two lanes closed |
| NB IL-53 from Army Trail Blvd to Elgin-O'Hare Expy
|
|
Medium |
Various lanes closed |
11/21/12 07:00 AM to 10/25/13 11:59 PM |
IDOT |
Reconstruction of additional lanes, bridge, and traffic signals. Max width 12' 6" Army Trail to US-20. Two lanes closed. |
| SB IL-53 from Elgin-O'Hare Expy to Army Trail Blvd
|
|
Medium |
Various lanes closed |
11/21/12 07:00 AM to 10/25/13 11:59 PM |
IDOT |
Reconstruction of additional lanes, bridge, and traffic signals. Max width 12' 6" Army Trail to US-20. Two lanes closed. |
| SB IL-53 at St Joseph Creek
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 08/02/13 11:59 PM |
IDOT |
Max width 11 ft 0 in; two lanes closed |
| EB IL-56 from W/O IL-59 to E/O Winfield Rd
|
|
Medium |
Various lanes closed |
05/16/11 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Roadway reconstruction, widening, resurfacing. Max Width: 10' 6" |
| EB IL-56 (Butterfield Rd) from E/O Winfield Rd to W/O Naperville Rd
|
|
Major |
Various lanes closed |
05/01/13 06:00 AM to 07/31/13 11:59 PM |
IDOT |
Roadway reconstruction and widening. |
| EB IL-56 at Commonwealth Ln
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Roadway resurfacing and widening. Traffic signals and lighting. |
| WB IL-56 at Commonwealth Ln
|
|
Medium |
All lanes and shoulders open |
05/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Roadway resurfacing and widening. Traffic signals and lighting. |
| WB IL-56 (Butterfield Rd) from W/O Naperville Rd to E/O Winfield Rd
|
|
Major |
Various lanes closed |
05/01/13 06:00 AM to 07/31/13 11:59 PM |
IDOT |
Roadway reconstruction and widening. |
| WB IL-56 from E/O Winfield Rd to W/O IL-59
|
|
Medium |
Various lanes closed |
05/16/11 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Roadway reconstruction, widening, resurfacing. Max Width: 10' 6" |
| NB IL-59 from Liberty St to Aurora Rd
|
|
Medium |
Various lanes closed |
11/30/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. Max width 16 feet 6 inches. |
| SB IL-59 from Aurora Rd to Liberty St
|
|
Medium |
Various lanes closed |
11/30/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. Max width 16 feet 6 inches. |
| NB IL-83 East Frontage Rd (Garden Ave) from Fay Ave to Babcock Ave
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing |
| EB 22nd St from Spring Rd to Salt Creek
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Sidewalks, landscaping and an irrigation system. |
| WB 22nd St from Salt Creek to Spring Rd
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Sidewalks, landscaping and an irrigation system. |
| NWB Batavia Rd from Warrenville Rd to E/O IL-56
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Widening, resurfacing, and landscaping. |
| SEB Batavia Rd from E/O IL-56 to Warrenville Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Widening, resurfacing, and landscaping. |
| NWB Commonwealth Ln at IL-56
|
|
Medium |
All lanes and shoulders open |
05/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Roadway resurfacing and widening. Traffic signals and lighting. |
| SEB Commonwealth Ln at IL-56
|
|
Medium |
All lanes and shoulders open |
05/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Roadway resurfacing and widening. Traffic signals and lighting. |
| EB Fullerton Ave at Salt Creek
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Bridge replacement |
| WB Fullerton Ave at Salt Creek
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Bridge replacement |
| NB Joliet St at Kress Creek
|
|
Medium |
All lanes and shoulders closed |
05/01/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Box culvert replacement. Please follow posted detour. |
| SB Joliet St at Kress Creek
|
|
Medium |
All lanes and shoulders closed |
05/01/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Box culvert replacement. Please follow posted detour. |
| NB Madison St from 91st St to 79th St
|
|
Medium |
Various lanes closed |
05/01/13 06:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing, widening and shoulder repair. |
| SB Madison St from 79th St to 91st St
|
|
Medium |
Various lanes closed |
05/01/13 06:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing, widening and shoulder repair. |
| NB Main St at Prairie Ave
|
|
Minor |
All lanes and shoulders open |
05/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic signal modernization, sidewalk, curb and gutter replacement. |
| SB Main St at Prairie Ave
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic signal modernization, sidewalk, curb and gutter replacement. |
| EB Manchester Rd from Winfield Rd to County Farm Rd
|
|
Minor |
Various lanes closed |
05/01/13 06:00 AM to 08/30/13 11:59 PM |
IDOT |
Milling and resurfacing. |
| WB Manchester Rd from County Farm Rd to Winfield Rd
|
|
Minor |
Various lanes closed |
05/01/13 06:00 AM to 08/30/13 11:59 PM |
IDOT |
Milling and resurfacing. |
| EB Ogden Ave (US-34) at Pasquinelli Dr
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Addition of turn lanes and traffic signals |
| WB Ogden Ave (US-34) at Pasquinelli Dr
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Addition of turn lanes and traffic signals |
| NB Pasquinelli Dr at Ogden Ave (US-34)
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Addition of turn lanes and traffic signals |
| SB Pasquinelli Dr at Ogden Ave (US-34)
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Addition of turn lanes and traffic signals |
| EB Prairie Ave at Main St
|
|
Minor |
All lanes and shoulders open |
05/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic signal modernization, sidewalk, curb and gutter replacement. |
| WB Prairie Ave at Main St
|
|
Minor |
All lanes and shoulders open |
05/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic signal modernization, sidewalk, curb and gutter replacement. |
Henry County (Illinois)
| NB/SB IL-78 at IL-81 (6th St)
|
|
Medium |
Various lanes closed |
10/23/09 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Max length for all turns 90 Ft long |
Jo Daviess County (Illinois)
| EB US-20 from Menominee Rd to IL-84
|
|
Medium |
Various lanes closed |
04/08/13 07:00 AM to 10/31/14 11:59 PM |
IDOT |
Traffic will be reduced to one lane in each direction and separated from the work area by barrier wall.**Max Width - 9'-6" - Westbound over Menominee Road Effective 04/08/2013 through 10/31/2013**
Max Width - 9'-6" - Eastbound over Sinsinawa River - Effective 04/08/2013 through 10/31/2013
|
| WB US-20 from IL-84 (+0.3 miles) to Menominee Rd
|
|
Medium |
Various lanes closed |
04/08/13 07:00 AM to 10/31/14 11:59 PM |
IDOT |
Traffic will be reduced to one lane in each direction and separated from the work area by barrier wall.**Max Width - 9'-6" - Westbound over Menominee Road Effective 04/08/2013 through 10/31/2013**
Max Width - 9'-6" - Eastbound over Sinsinawa River - Effective 04/08/2013 through 10/31/2013
|
Kane County (Illinois)
| NWB US-20 from IL-31 (+0.2 miles) to Randall Rd (-0.5 miles)
|
|
Medium |
Various lanes closed |
02/25/13 07:00 AM to 08/30/14 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| NWB US-20 from Mclean Blvd to Weld Rd
|
|
Medium |
Various lanes closed |
01/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Bridge widening |
| NWB US-20 at Mclean Blvd
|
|
Medium |
Various lanes closed |
06/01/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Interchange reconstruction and lighting |
| SEB US-20 from Weld Rd to Mclean Blvd (+0.4 miles)
|
|
Medium |
Various lanes closed |
01/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Bridge widening |
| SEB US-20 from Randall Rd (+0.5 miles) to IL-31 (-0.2 miles)
|
|
Medium |
Various lanes closed |
02/25/13 07:00 AM to 08/30/14 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| SEB US-20 at Mclean Blvd
|
|
Medium |
Various lanes closed |
06/01/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Interchange reconstruction and lighting |
| EB US-30 from Orchard Rd to US-34
|
|
Medium |
Various lanes closed |
04/24/13 07:00 AM to 08/31/14 11:59 PM |
IDOT |
Roadway reconstruction, adding lanes, bridge replacement and signals. Max width 9 feet 6 inches. |
| EB US-30 from IL-31 to Railroad St
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 10/31/14 11:59 PM |
IDOT |
Roadway reconstruction, widening, bridge rehabilitation, and traffic signals. |
| WB US-30 from US-34 to Orchard Rd
|
|
Medium |
Various lanes closed |
04/24/13 07:00 AM to 08/31/14 11:59 PM |
IDOT |
Roadway reconstruction, adding lanes, bridge replacement and signals. Max width 9 feet 6 inches. |
| WB US-30 from Railroad St to IL-31
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 10/31/14 11:59 PM |
IDOT |
Roadway reconstruction, widening, bridge rehabilitation, and traffic signals. |
| NB IL-25 at Pinelands Rd
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 09/21/13 11:59 PM |
IDOT |
One lane closed. |
| SB IL-25 at Pinelands Rd
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 09/21/13 11:59 PM |
IDOT |
One lane closed. |
| NB IL-31 at Mooseheart Rd
|
|
Minor |
All lanes and shoulders open |
05/13/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Channelization and traffic signal installation. |
| NB IL-31 at Red Gate Rd
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 09/21/13 11:59 PM |
IDOT |
One lane closed. |
| NB IL-31 at Metra RR
|
|
Medium |
Various lanes closed |
02/15/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Max width 9' 6" |
| NB IL-31 at IL-72
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Intersection improvement More information |
| SB IL-31 at IL-72
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Intersection improvement More information |
| SB IL-31 at Metra RR
|
|
Medium |
Various lanes closed |
02/15/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Max width 9' 6" |
| SB IL-31 at Red Gate Rd
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 09/21/13 11:59 PM |
IDOT |
One lane closed. |
| SB IL-31 at Mooseheart Rd
|
|
Minor |
All lanes and shoulders open |
05/13/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Channelization and traffic signal installation. |
| EB IL-38 from Kirk Rd to Kress Rd
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 08/31/13 11:59 PM |
IDOT |
Max width 10 feet 6 inches. One lane closed. |
| WB IL-38 from Kress Rd to Kirk Rd
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 08/31/13 11:59 PM |
IDOT |
Max width 10 feet 6 inches. One lane closed. |
| WB IL-38 from Kautz Rd (-0.1 miles) to Kautz Rd
|
|
Medium |
Various lanes closed |
11/01/12 07:00 AM to 10/31/13 11:59 AM |
IDOT |
Grade separation, roadway reconstruction, drainage, traffic signals. |
| NB IL-47 from Cross St to IL-56
|
|
Minor |
All lanes and shoulders open |
09/17/12 07:00 AM to 10/13/13 11:59 PM |
IDOT |
Lanes narrowed to 10' wide, all lanes open |
| NB IL-47 at Cross St
|
|
Medium |
Various lanes closed |
09/03/12 07:00 AM to 08/30/13 11:59 AM |
IDOT |
Construct right turn lanes, traffic signal, barrier wall |
| NB IL-47 at Virgil Ditch 2 (Silver Glen Rd -0.1 miles)
|
|
Major |
Various lanes closed |
05/13/13 07:00 AM to 10/15/13 11:59 PM |
IDOT |
Bridge replacement. Traffic will be restricted to one lane and controlled by temporary traffic signals. Max width 11 feet 6 inches. |
| SB IL-47 at Virgil Ditch 2 (Silver Glen Rd +0.1 miles)
|
|
Major |
Various lanes closed |
05/13/13 07:00 AM to 10/15/13 11:59 PM |
IDOT |
Bridge replacement. Traffic will be restricted to one lane and controlled by temporary traffic signals. Max width 11 feet 6 inches. |
| SB IL-47 from IL-56 to Cross St
|
|
Minor |
All lanes and shoulders open |
09/17/12 07:00 AM to 10/13/13 11:59 PM |
IDOT |
Lanes narrowed to 10' wide, all lanes open |
| SB IL-47 at Cross St
|
|
Medium |
Various lanes closed |
09/03/12 07:00 AM to 08/30/13 11:59 AM |
IDOT |
Construct right turn lanes, traffic signal, barrier wall |
| EB IL-64 at IL-47
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 06/21/13 11:59 PM |
IDOT |
Intersection reconstruction |
| EB IL-64 from 7th St to 7th Ave
|
|
Medium |
Various lanes closed |
07/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Traffic signal upgrade |
| EB IL-64 from 7th Ave to Dunham Rd
|
|
Medium |
Various lanes closed |
04/16/12 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Roadway widening, traffic signals, lighting. One lane closed. Max width 9 feet 6 inches. Expect long delays. |
| WB IL-64 from Dunham Rd to 7th Ave
|
|
Medium |
Various lanes closed |
04/16/12 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Roadway widening, traffic signals, lighting. One lane closed. Max width 9 feet 6 inches. Expect long delays. |
| WB IL-64 from 7th Ave to 7th St
|
|
Medium |
Various lanes closed |
07/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Traffic signal upgrade |
| WB IL-64 at IL-47
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 06/21/13 11:59 PM |
IDOT |
Intersection reconstruction |
| EB IL-72 in Hampshire from French Rd to Romke Rd (+0.4 miles)
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Installation of span wire. |
| EB IL-72 from Randall Rd to 2nd St
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Road Widening Project More information |
| EB IL-72 at IL-31
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Intersection improvement More information |
| WB IL-72 from 2nd St to Randall Rd
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Road Widening Project More information |
| WB IL-72 at IL-31
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Intersection improvement More information |
| WB IL-72 in Hampshire from Romke Rd (-0.4 miles) to French Rd
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Installation of span wire. |
| NB CR-11(French Rd) at Burlington Creek
|
|
Minor |
All lanes and shoulders open |
02/23/12 07:00 AM to 12/31/13 11:59 PM |
Other |
Weight restrictions -- Motorists with vehicles that exceed combination of 5 or more axles or 33 tons should find alternate routes. |
| SB CR-11(French Rd) at Burlington Creek
|
|
Minor |
All lanes and shoulders open |
02/23/12 07:00 AM to 12/31/13 11:59 PM |
Other |
Weight restrictions -- Motorists with vehicles that exceed combination of 5 or more axles or 33 tons should find alternate routes. |
| EB CR-41 from County Line Rd to IL-47
|
|
Medium |
Various lanes closed |
06/19/13 07:00 AM to 05:00 PM daily until 07/19/13 |
Other |
|
| WB CR-41 from IL-47 to County Line Rd
|
|
Medium |
Various lanes closed |
06/19/13 07:00 AM to 05:00 PM daily until 07/19/13 |
Other |
|
| NB CR-46 at Allen Rd (-0.2 miles)
|
|
None |
All lanes and shoulders open |
09/24/12 07:00 AM to 12/31/13 11:59 PM |
Other |
Weight restrictions: Single unit - 22 tons; 3 or 4 axles - 29 tons; 5 or more axles - 36 tons |
| SB CR-46 at Allen Rd (+0.2 miles)
|
|
None |
All lanes and shoulders open |
09/24/12 07:00 AM to 12/31/13 11:59 PM |
Other |
Weight restrictions: Single unit - 22 tons; 3 or 4 axles - 29 tons; 5 or more axles - 36 tons |
| NWB Big Timber Rd at Randall Rd
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
East bound right turn lane and traffic signal modernization. |
| SEB Big Timber Rd at Randall Rd
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
East bound right turn lane and traffic signal modernization. |
| EB Galena Blvd at IL-56
|
|
Minor |
Various lanes closed |
04/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
New bridge deck and traffic signal installation. |
| WB Galena Blvd at IL-56
|
|
Minor |
Various lanes closed |
04/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
New bridge deck and traffic signal installation. |
| EB Hinckley Rd at Jericho Rd
|
|
Medium |
All lanes and shoulders closed |
07/02/12 07:00 AM to 08/31/13 07:00 PM |
IDOT |
Rehabilitation of 2 bridges superstructures. Detour posted. |
| WB Hinckley Rd at Jericho Rd
|
|
Medium |
All lanes and shoulders closed |
07/02/12 07:00 AM to 08/31/13 07:00 PM |
IDOT |
Rehabilitation of 2 bridges superstructures. Detour posted. |
| EB Keslinger Rd at Mill Creek
|
|
Minor |
All lanes and shoulders open |
09/24/12 07:00 AM to 12/31/13 11:59 PM |
Other |
All lanes open, weight restrictions in place. Weight limits: single unit - 10 tons; 3 or 4 axles combinations - 15 tons; 5 or more axle combinations - 19 tons |
| WB Keslinger Rd at Mill Creek
|
|
Minor |
All lanes and shoulders open |
09/24/12 07:00 AM to 12/31/13 11:59 PM |
Other |
All lanes open, weight restrictions in place. Weight limits: single unit - 10 tons; 3 or 4 axles combinations - 15 tons; 5 or more axle combinations - 19 tons |
| WB Mcdonald Rd from Robin Glen Ln to Thornwood Way (+0.1 miles)
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing and patching |
| EB Mooseheart Rd at IL-31
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Channelization and traffic signal installation. |
| WB Mooseheart Rd at IL-31
|
|
Minor |
All lanes and shoulders open |
05/13/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Channelization and traffic signal installation. |
| NB Orchard Rd at I-88 Bridge
|
|
Medium |
Various lanes closed |
06/17/13 07:00 AM to 11/01/13 11:59 PM |
Other |
Bridge Deck Repairs; Single Lane Closure |
| SB Orchard Rd at I-88 Bridge
|
|
Medium |
Various lanes closed |
06/17/13 07:00 AM to 11/01/13 11:59 PM |
Other |
Bridge Deck Repairs; Single Lane Closure |
| NB Randall Rd at Keslinger Rd
|
|
Medium |
Various lanes closed |
11/05/12 07:00 AM to 07/31/13 11:59 PM |
Other |
Motorists are advised to exercise caution will traveling through the work zone, pay attention to flaggers, watch for equipment entering and exiting on Keslinger Rd and expect increased travel times. |
| NB Randall Rd from Main St to Dean St
|
|
Minor |
Various lanes closed |
05/02/11 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Fiber optic interconnect cable/traffic signals. |
| NB Randall Rd from s/o College Green Dr to US-20
|
|
Minor |
Various lanes closed |
06/19/13 06:00 AM to 06:00 PM daily until 06/21/13 |
Other |
|
| NB Randall Rd at Big Timber Rd
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
East bound right turn lane and traffic signal modernization. |
| SB Randall Rd from Corporate Pky to IL-72
|
|
Minor |
Various lanes closed |
05/20/13 07:00 AM to 06/28/13 11:59 PM |
Other |
Pavement Resurfacing; Flagging Operation |
| SB Randall Rd at Big Timber Rd
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
East bound right turn lane and traffic signal modernization. |
| SB Randall Rd from US-20 to s/o College Green Dr
|
|
Minor |
Various lanes closed |
06/19/13 06:00 AM to 06:00 PM daily until 06/21/13 |
Other |
|
| SB Randall Rd from Dean St to Main St
|
|
Minor |
Various lanes closed |
05/02/11 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Fiber optic interconnect cable/traffic signals. |
| SB Randall Rd at Kaneville Rd
|
|
Medium |
Various lanes closed |
11/05/12 07:00 AM to 07/31/13 11:59 PM |
Other |
Motorists are advised to exercise caution will traveling through the work zone, pay attention to flaggers, watch for equipment entering and exiting on Keslinger Rd and expect increased travel times. |
| EB Wilson St from Batavia Ave (IL-31) to Island Ave
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Widening and resurfacing. |
| WB Wilson St from Island Ave to Batavia Ave (IL-31)
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Widening and resurfacing. |
Lake County (Illinois)
| NWB US-14 (Northwest Hwy) at Kelsey Rd
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Channelization and traffic signal modernization |
| SEB US-14 (Northwest Hwy) at Kelsey Rd
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Channelization and traffic signal modernization |
| NB IL-21 at Winchester Rd
|
|
Minor |
Various lanes closed |
04/03/13 06:05 AM to 12/01/13 03:00 PM |
Lake County |
|
| NB IL-21 at Winchester Rd
|
|
Minor |
Various lanes closed |
04/03/13 06:05 AM to 12/01/13 03:00 PM |
Lake County |
Maintenance of signals |
| NB IL-21 from IL-137 to IL-120
|
|
Medium |
Various lanes closed |
03/22/12 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Bridge reconstruction, adding lanes and traffic signals |
| SB IL-21 from IL-120 to IL-137
|
|
Medium |
Various lanes closed |
03/22/12 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Bridge reconstruction, adding lanes and traffic signals |
| SB IL-21 at Winchester Rd
|
|
Minor |
Various lanes closed |
04/03/13 06:05 AM to 12/01/13 03:00 PM |
Lake County |
|
| SB IL-21 at Winchester Rd
|
|
Minor |
Various lanes closed |
04/03/13 06:05 AM to 12/01/13 03:00 PM |
Lake County |
Maintenance of signals |
| EB IL-120 at Almond Rd
|
|
Minor |
Various lanes closed |
05/06/13 07:00 AM to 08/31/13 03:00 PM |
Lake County |
Resurfacing |
| EB IL-120 at River Rd
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 08/31/13 03:00 PM |
Lake County |
Repaving |
| EB IL-120 at River Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Widening, resurfacing, and channilization |
| WB IL-120 at River Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Widening, resurfacing, and channilization |
| WB IL-120 at River Rd
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 08/31/13 03:00 PM |
Lake County |
Repaving |
| WB IL-120 at Almond Rd
|
|
Minor |
Various lanes closed |
05/06/13 07:00 AM to 08/31/13 03:00 PM |
Lake County |
Resurfacing |
| NB IL-131 at Wadsworth Rd
|
|
Major |
All lanes and shoulders open |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
Lake County |
Reconstruction & Widening of Intersection; One Lane Open In Each Direction |
| SB IL-131 at Wadsworth Rd
|
|
Major |
Various lanes closed |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
Lake County |
Reconstruction & Widening of Intersection; One Lane Open In Each Direction |
| NEB IL-137 at IL-21
|
|
Medium |
Various lanes closed |
09/12/12 07:00 AM to 12/15/13 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed. Max width: 9' 6" |
| SWB IL-137 at IL-21
|
|
Medium |
Various lanes closed |
09/12/12 07:00 AM to 12/15/13 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed. Max width: 9' 6" |
| NB IL-137 from new Atkinson Rd intersection to IL-83
|
|
Medium |
Various lanes closed |
10/03/11 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Addition of lane. |
| EB IL-173 from Hunt Club Rd to US-41
|
|
Medium |
Various lanes closed |
02/15/13 07:00 AM to 12/31/13 11:59 PM |
IDOT |
One lane closed. Max width 10' 6" starting 3/25/13 |
| EB IL-173 at I-94
|
|
Medium |
Various lanes closed |
11/01/12 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Bridge removal and reconstruction |
| WB IL-173 from US-41 to Hunt Club Rd
|
|
Medium |
Various lanes closed |
02/15/13 07:00 AM to 12/31/13 11:59 PM |
IDOT |
One lane closed. Max width 10' 6" starting 3/25/13 |
| WB IL-173 at I-94
|
|
Medium |
Various lanes closed |
11/01/12 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Bridge removal and reconstruction |
| EB IL-176 from Darrell Rd to Mack Dr
|
|
Medium |
Various lanes closed |
03/07/13 07:00 AM to 07/05/13 03:00 PM |
Lake County |
Roadway reconstruction and box culvert replacement |
| EB IL-176 from Darrell Rd to Mack Dr
|
|
Medium |
Various lanes closed |
05/15/12 07:00 AM to 08/15/13 11:59 PM |
IDOT |
Flagging operation; Expect delays. Max width 9 ft 6 in |
| EB IL-176 at Fairfield Rd
|
|
Minor |
Various lanes closed |
04/03/13 07:33 AM to 11/29/13 03:00 PM |
Lake County |
Intersection Improvement |
| EB IL-176 at Fairfield Rd
|
|
Minor |
Various lanes closed |
04/04/13 06:36 AM to 12/01/13 03:00 PM |
Lake County |
Advanced Fairfield/Il 176 contract/Pedestrian tunnels |
| WB IL-176 at Fairfield Rd
|
|
Minor |
Various lanes closed |
04/03/13 07:33 AM to 11/29/13 03:00 PM |
Lake County |
Intersection Improvement |
| WB IL-176 at Fairfield Rd
|
|
Minor |
Various lanes closed |
04/04/13 06:36 AM to 12/01/13 03:00 PM |
Lake County |
Advanced Fairfield/Il 176 contract/Pedestrian tunnels |
| WB IL-176 from Mack Dr to Darrell Rd
|
|
Medium |
Various lanes closed |
05/15/12 07:00 AM to 08/15/13 11:59 PM |
IDOT |
Flagging operation; Expect delays. Max width 9 ft 6 in |
| SB CR-5 from Cuba Rd to Long Grove Rd
|
|
Minor |
Various lanes closed |
03/11/13 07:00 AM to 11/01/13 03:00 PM |
Lake County |
Reconstruction |
| WB CR-17 from Delany Rd to US-41
|
|
Minor |
Various lanes closed |
05/06/13 07:00 AM to 09/06/13 03:00 PM |
Lake County |
Widening and Resurfacing |
| EB CR-51 from Fairfield Rd to IL-83
|
|
Minor |
Various lanes closed |
04/04/13 06:37 AM to 12/01/13 03:00 PM |
Lake County |
Petite Lake Road Re-Alignment |
| NB Arlington Heights Rd at Buffalo Creek
|
|
Minor |
Various lanes closed |
03/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Replacement of bridge deck beams, curbs, gutter and sidewalk. |
| SB Arlington Heights Rd from S/O Checker Rd to N/O Lake Cook Rd
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 08/31/13 11:59 PM |
Lake County |
Bridge Deck Replacement; Reduced to One Lane Southbound; ***Long Term Closure*** |
| SB Arlington Heights Rd at Buffalo Creek
|
|
Minor |
Various lanes closed |
03/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Replacement of bridge deck beams, curbs, gutter and sidewalk. |
| NB Atkinson Rd at IL-120
|
|
Minor |
Various lanes closed |
10/03/11 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Extend Atkinson Rd to IL-137 |
| SB Atkinson Rd at IL-120
|
|
Minor |
Various lanes closed |
10/03/11 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Extend Atkinson Rd to IL-137 |
| NB Cedar Lake Rd at IL-60
|
|
Minor |
Various lanes closed |
04/04/13 06:35 AM to 12/01/13 03:00 PM |
Lake County |
Cedar Lake Road Extension |
| NB Cedar Lake Rd at N/O Washington St
|
|
Minor |
Various lanes closed |
06/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Sidewalk Installation. Intermittent Lane Closures. ***Long Term Closure*** |
| NB Cedar Lake Rd at Monaville Rd
|
|
Medium |
All lanes and shoulders closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
Lake County |
Roundabout. Closure with Detour. ***Long Term Closure*** |
| SB Cedar Lake Rd at Monaville Rd
|
|
Medium |
All lanes and shoulders closed |
05/01/13 07:00 AM to 08/30/13 11:59 PM |
Lake County |
Roundabout. Closure with Detour. ***Long Term Closure*** |
| SB Cedar Lake Rd at N/O Washington St
|
|
Minor |
Various lanes closed |
06/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Sidewalk Installation. Intermittent Lane Closures. ***Long Term Closure*** |
| SB Cedar Lake Rd at IL-60
|
|
Minor |
Various lanes closed |
04/04/13 06:35 AM to 12/01/13 03:00 PM |
Lake County |
Cedar Lake Road Extension |
| EB Cuba Rd at Sylvander Dr
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Culvert Replacement. Detour, Others One Lane Daytime Only. ***Long Term Closure*** |
| WB Cuba Rd at Sylvander Dr
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Culvert Replacement. Detour, Others One Lane Daytime Only. ***Long Term Closure*** |
| NB Darrell Rd from Roberts Rd to S/O IL-176
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/31/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| SB Darrell Rd from S/O IL-176 to Roberts Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/31/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| EB Deerfield Rd at Thornmeadow Rd
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Culvert Replacement. Detour, Others One Lane Daytime Only. ***Long Term Closure*** |
| EB Deerfield Rd at East Skokie Ditch
|
|
Minor |
Various lanes closed |
04/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Bridge replacement |
| WB Deerfield Rd at East Skokie Ditch
|
|
Minor |
Various lanes closed |
04/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Bridge replacement |
| WB Deerfield Rd at Thornmeadow Rd
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Culvert Replacement. Detour, Others One Lane Daytime Only. ***Long Term Closure*** |
| NB Delany Rd from Sunset Ave to Yorkhouse Rd
|
|
Medium |
Various lanes closed |
04/01/12 07:00 AM to 08/29/14 11:59 PM |
Lake County |
Reconstruct and Widen to 5 Lanes. One lane open in each direction; Expect heavy delays and watch for flaggers. |
| NB Delany Rd from Yorkhouse Rd to Wadsworth Rd
|
|
Medium |
Various lanes closed |
03/01/12 07:00 AM to 10/31/13 11:59 PM |
Lake County |
Reconstruct & Widen to 5 Lanes. One lane open in each direction. |
| SB Delany Rd from Wadsworth Rd to Yorkhouse Rd
|
|
Medium |
Various lanes closed |
03/01/12 07:00 AM to 10/31/13 11:59 PM |
Lake County |
Reconstruct & Widen to 5 Lanes. One lane open in each direction. |
| SB Delany Rd from Yorkhouse Rd to Sunset Ave
|
|
Medium |
Various lanes closed |
04/01/12 07:00 AM to 08/29/14 11:59 PM |
Lake County |
Reconstruct and Widen to 5 Lanes. One lane open in each direction; Expect heavy delays and watch for flaggers. |
| EB Duffy Ln from West Corporate Limits to Wilmot Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Patching, resurfacing, and landscape restoration. |
| WB Duffy Ln from Wilmot Rd to West Corporate Limits
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Patching, resurfacing, and landscape restoration. |
| NB Ela Rd from S/O US-12 to Il-22
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Sidewalk Installation. Intermittent Lane Closures. ***Long Term Closure*** |
| SB Ela Rd from IL-22 to S/O US-12
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Sidewalk Installation. Intermittent Lane Closures. ***Long Term Closure*** |
| NB Fairfield Rd at IL-176
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/31/14 11:59 PM |
Lake County |
Reconstruction & Widening - Concrete; One Lane Open In Each Direction; ***Long Term Closure*** |
| SB Fairfield Rd at IL-176
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/31/14 11:59 PM |
Lake County |
Reconstruction & Widening - Concrete; One Lane Open In Each Direction; ***Long Term Closure*** |
| NB Fox Lake Rd at Rand Rd (US-12)
|
|
Minor |
Various lanes closed |
06/03/13 07:00 AM to 09/30/13 11:59 AM |
IDOT |
Addition of a right turn lane and realignment of a driveway. |
| SB Fox Lake Rd at Rand Rd (US-12)
|
|
Minor |
Various lanes closed |
06/03/13 07:00 AM to 09/30/13 11:59 AM |
IDOT |
Addition of a right turn lane and realignment of a driveway. |
| EB Golf Rd/Greenwood Ave from Walnut St to Sheridan Rd
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 09/30/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| EB Grand Ave at Millennium Trail
|
|
Medium |
Various lanes closed |
06/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Pedestrian underpass construction. |
| WB Grand Ave at Millennium Trail
|
|
Medium |
Various lanes closed |
06/01/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Pedestrian underpass construction. |
| WB Grass Lake Rd from IL-83 to State Park Rd
|
|
Minor |
Various lanes closed |
06/07/13 08:00 AM to 06/19/13 02:40 PM |
Lake County |
|
| NB Greenleaf Ave from IL-120 to Washington St
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 08/31/13 11:59 PM |
Lake County |
Sidewalk Installation. Intermittent Lane Closures. ***Long Term Closure*** |
| SB Greenleaf Ave from Washington St to IL-120
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 08/31/13 11:59 PM |
Lake County |
Sidewalk Installation. Intermittent Lane Closures. ***Long Term Closure*** |
| WB Greenwood Ave/Golf Rd from Sheridan Rd to Walnut St
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 09/30/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| NB Hart Rd from Lake Cook Rd to S/O US-14
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 08/31/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| SB Hart Rd from S/O US-14 to Lake Cook Rd
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 08/31/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| NB Hunt Club Rd at N/O IL-132
|
|
Minor |
Various lanes closed |
06/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Sidewalk Installation. Intermittent Lane Closures. ***Long Term Closure*** |
| SB Hunt Club Rd at N/O IL-132
|
|
Minor |
Various lanes closed |
06/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Sidewalk Installation. Intermittent Lane Closures. ***Long Term Closure*** |
| NB Kilbourne Rd from Wadsworth Rd to IL-173
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Microsurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| SB Kilbourne Rd from IL-173 to Wadsworth Rd
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Microsurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| EB Long Grove Rd at Rand Rd (US-12)
|
|
Medium |
Various lanes closed |
10/31/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Through lanes and left turn lanes. |
| WB Long Grove Rd at Rand Rd (US-12)
|
|
Medium |
Various lanes closed |
10/31/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Through lanes and left turn lanes. |
| EB Miller Rd at Shoreline Rd
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Culvert Replacement. Detour, Others One Lane Daytime Only. ***Long Term Closure*** |
| EB Miller Rd at E/O IL-59
|
|
Medium |
All lanes and shoulders closed |
05/01/13 07:00 AM to 12/31/13 11:59 PM |
Lake County |
Bridge & Raise Road Out of Floodplain. Closure with Detour. ***Long Term Closure*** |
| WB Miller Rd at E/O IL-59
|
|
Medium |
All lanes and shoulders closed |
05/01/13 07:00 AM to 12/31/13 11:59 PM |
Lake County |
Bridge & Raise Road Out of Floodplain. Closure with Detour. ***Long Term Closure*** |
| WB Miller Rd at Shoreline Rd
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Culvert Replacement. Detour, Others One Lane Daytime Only. ***Long Term Closure*** |
| EB Monaville Rd from E/O Cedar Lake Rd to W/O IL-83
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/31/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Closures. ***Long Term Closure*** |
| WB Monaville Rd from W/O IL-83 to E/O Cedar Lake Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 08/31/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Closures. ***Long Term Closure*** |
| NWB Old McHenry Rd from E/O Lagoon Dr to Quentin Rd
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| SEB Old McHenry Rd from Quentin Rd to E/O Lagoon Dr
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| EB Peterson Rd from W/O IL-83 to W/O US-45
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 11/30/14 11:59 PM |
Lake County |
Reconstruct & Widen 5 Lanes Concrete; One Lane Open In Each Direction; ***Long Term Closure*** |
| WB Peterson Rd from W/O US-45 to W/O IL-83
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 11/30/14 11:59 PM |
Lake County |
Reconstruct & Widen 5 Lanes Concrete; One Lane Open In Each Direction; ***Long Term Closure*** |
| NB Quentin Rd from S/O Long Grove Rd to N/O US-12
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 11/30/13 11:59 PM |
Lake County |
Reconstruction & Widen to 5 Lanes; One Lane Open in Each Direction; ***Long Term Closure*** |
| NB Quentin from S/O Long Grove Rd to Boschome Dr
|
|
Medium |
Various lanes closed |
02/11/13 07:00 AM to 06/01/14 11:59 PM |
IDOT |
|
| NB Quentin Rd from N/O IL-22 to Old McHenry Rd
|
|
Medium |
Various lanes closed |
09/03/12 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Resurfacing. Intermittent lane closures. ***Long Term Closure*** |
| SB Quentin Rd from Old McHenry Rd to N/O IL-22
|
|
Medium |
Various lanes closed |
09/03/12 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Resurfacing. Intermittent lane closures. ***Long Term Closure*** |
| SB Quentin from Boschome Dr to S/O Long Grove Rd
|
|
Medium |
Various lanes closed |
02/11/13 07:00 AM to 06/01/14 11:59 PM |
IDOT |
|
| SB Quentin Rd from N/O US-12 to S/O Long Grove Rd
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 11/30/13 11:59 PM |
Lake County |
Reconstruction & Widen to 5 Lanes; One Lane Open in Each Direction; ***Long Term Closure*** |
| NWB Rand Rd (US-12) at Long Grove Rd
|
|
Medium |
Various lanes closed |
10/31/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Through lanes and left turn lanes. |
| SEB Rand Rd (US-12) at Long Grove Rd
|
|
Medium |
Various lanes closed |
10/31/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Through lanes and left turn lanes. |
| EB Rollins Rd at IL-83
|
|
Minor |
Various lanes closed |
06/01/13 07:00 AM to 11/30/14 11:59 PM |
Lake County |
Grade Separation to Lower the Intersection Below the Railroad. Temporary Roadway to Maintain Traffic / 14-day closure in 2013. ***Long Term Closure*** |
| WB Rollins Rd at IL-83
|
|
Minor |
Various lanes closed |
06/01/13 07:00 AM to 11/30/14 11:59 PM |
Lake County |
Grade Separation to Lower the Intersection Below the Railroad. Temporary Roadway to Maintain Traffic / 14-day closure in 2013. ***Long Term Closure*** |
| EB CR-19 at I-94 / Russell Rd
|
|
Major |
All lanes and shoulders closed |
04/04/13 06:38 AM to 12/01/13 03:00 PM |
Lake County |
Reconstruction |
| WB CR-19 at I-94 / Russell Rd
|
|
Major |
All lanes and shoulders closed |
04/04/13 06:38 AM to 12/01/13 03:00 PM |
Lake County |
Reconstruction |
| EB Slocum Lake Rd at Bangs Lake Drainage Ditch
|
|
Minor |
Various lanes closed |
05/01/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Box culvert replacement |
| WB Slocum Lake Rd at Bangs Lake Drainage Ditch
|
|
Minor |
Various lanes closed |
05/01/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Box culvert replacement |
| EB Sunset Ave from IL-131 to Walnut St
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 09/30/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| WB Sunset Ave from Walnut St to IL-131
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 09/30/13 11:59 PM |
Lake County |
Resurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| EB Wadsworth Rd from W/O Dilleys Rd to E/O US-41
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Microsurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| EB Wadsworth Rd from E/O US-41 to Delany Rd
|
|
Medium |
All lanes and shoulders closed |
02/08/13 07:00 AM to 09/30/13 11:59 PM |
Lake County |
Reconstruct Downtown Wadsworth to 3 Lanes. One Lane Open In Each Direction. ***Long Term Closure*** |
| EB Wadsworth Rd at Cambridge Blvd
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 10/31/14 11:59 PM |
Lake County |
Reconstruction & Widening of Intersection; One Lane Open In Each Direction; ***Long Term Closure*** |
| EB Wadsworth Rd at IL-131
|
|
Major |
All lanes and shoulders open |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
Lake County |
Reconstruction & Widening of Intersection; One Lane Open In Each Direction |
| WB Wadsworth Rd at IL-131
|
|
Major |
All lanes and shoulders open |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
Lake County |
Reconstruction & Widening of Intersection; One Lane Open In Each Direction |
| WB Wadsworth Rd at Cambridge Blvd
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 10/31/14 11:59 PM |
Lake County |
Reconstruction & Widening of Intersection; One Lane Open In Each Direction; ***Long Term Closure*** |
| WB Wadsworth Rd from Delany Rd to E/O US-41
|
|
Medium |
All lanes and shoulders closed |
02/08/13 07:00 AM to 09/30/13 11:59 PM |
Lake County |
Reconstruct Downtown Wadsworth to 3 Lanes. One Lane Open In Each Direction. ***Long Term Closure*** |
| WB Wadsworth Rd from E/O US-41 to W/O Dilleys Rd
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 07/31/13 11:59 PM |
Lake County |
Microsurfacing. Intermittent Lane Closures. ***Long Term Closure*** |
| EB Washington St from Cedar Lake Rd to Hainesville Rd
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 05/31/14 11:59 PM |
Lake County |
Reconstruct & Widen to 3 Lanes; Detour for Westbound Traffic; ***Long Term Closure*** |
| Wb Washington St from Hainesville Rd to Cedar Lake Rd
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 05/31/14 11:59 PM |
Lake County |
Reconstruct & Widen to 3 Lanes; Detour for Westbound Traffic; ***Long Term Closure*** |
| NB Wilson Rd from IL-60 to IL-120
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 06/30/13 11:59 PM |
Lake County |
Drainage Improvements. Intermittent Lane Closures. ***Long Term Closure*** |
| SB Wilson Rd from IL-120 to IL-60
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 06/30/13 11:59 PM |
Lake County |
Drainage Improvements. Intermittent Lane Closures. ***Long Term Closure*** |
| NEB Woodland Dr from Flint Dr to West Ln
|
|
Minor |
Various lanes closed |
03/04/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
One lane closed. |
| NEB Woodland Dr at Flint Creek
|
|
Minor |
Various lanes closed |
01/07/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Bridge replacement. |
| SWB Woodland Dr from West Ln to Flint Dr
|
|
Minor |
Various lanes closed |
03/04/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
One lane closed. |
| SWB Woodland Dr at Flint Creek
|
|
Minor |
Various lanes closed |
01/07/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Bridge replacement. |
Lee County (Illinois)
| EB US-30 from Green River to 1 mile w/o I-39
|
|
Major |
Various lanes closed |
06/03/13 07:00 AM to 08/09/13 11:59 PM |
IDOT |
Traffic will be reduced to one lane and regulated with temporary traffic signals. Max Width 10'-6". |
| EB US-30 from Green River to 0.8 miles w/o I-39
|
|
Medium |
Various lanes closed |
06/03/13 07:00 AM to 08/09/13 11:59 PM |
IDOT |
Traffic will be restricted to one lane and controlled by temporary traffic signals. Max width 10 feet 6 inches. |
| WB US-30 from 0.8 miles w/o I-39 to Green River
|
|
Medium |
Various lanes closed |
06/03/13 07:00 AM to 08/09/13 11:59 PM |
IDOT |
Traffic will be restricted to one lane and controlled by temporary traffic signals. Max width 10 feet 6 inches. |
| WB US-30 from 1 mile w/o I-39 to Green River
|
|
Major |
Various lanes closed |
06/03/13 07:00 AM to 08/09/13 11:59 PM |
IDOT |
Traffic will be reduced to one lane and regulated with temporary traffic signals. Max Width 10'-6". |
| NB IL-26 from 2.5 Mi S/O Amboy Rd to Amboy Rd
|
|
Medium |
Various lanes closed |
04/16/12 06:00 AM to 11/21/13 11:59 PM |
IDOT |
Traffic Will Be Reduced to One Lane and Regulated with Temporary Traffic Lights. Max Width 12'0" - Effective 04/16/2012 through 11/02/2012 |
| SB IL-26 from Amboy Rd to 2.5 Mi S/O Amboy Rd
|
|
Medium |
Various lanes closed |
04/16/12 06:00 AM to 11/21/13 11:59 PM |
IDOT |
Traffic Will Be Reduced to One Lane and Regulated with Temporary Traffic Lights. Max Width 12'0" - Effective 04/16/2012 through 11/02/2012 |
Rock Island County (Illinois)
| NB IL-84 at s/o 157th Ave
|
|
Major |
Various lanes closed |
03/18/13 05:00 AM to 07/26/13 11:59 PM |
IDOT |
***Long Term Closure***; One Way Traffic: Traffic will be reduced to just one lane and regulated with temporary signals |
| NB IL-84 at 157th Ave (-0.2 miles)
|
|
Major |
Various lanes closed |
04/01/13 07:00 AM to 08/30/14 11:59 PM |
IDOT |
Traffic will be restricted to one lane and controlled by temporary traffic signals. ** Max width 11 feet 6 inches Effective 04/08/2013 through 08/30/2013. |
| SB IL-84 at 157th Ave (+0.2 miles)
|
|
Major |
Various lanes closed |
04/01/13 07:00 AM to 08/30/14 11:59 PM |
IDOT |
Traffic will be restricted to one lane and controlled by temporary traffic signals. ** Max width 11 feet 6 inches Effective 04/08/2013 through 08/30/2013. |
| SB IL-84 at s/o157th Ave
|
|
Major |
Various lanes closed |
03/18/13 05:00 AM to 07/26/13 11:59 PM |
IDOT |
***Long Term Closure***; One Way Traffic: Traffic will be reduced to just one lane and regulated with temporary signals |
| EB IL-94 from IL-192 to CR-LL
|
|
Medium |
Various lanes closed |
03/15/12 07:00 AM to 08/31/13 11:59 PM |
IDOT |
Traffic will be reduced to one lane and regulated with flaggers; Max Width 9'-6" - Effective March 15th through May 28th and July 1 through 09/28/2012 from Reynolds to CH 11 / IL 94 (S) |
| WB IL-94 from CR-LL to IL-192
|
|
Medium |
Various lanes closed |
03/15/12 07:00 AM to 08/31/13 11:59 PM |
IDOT |
Traffic will be reduced to one lane and regulated with flaggers; Max Width 9'-6" - Effective March 15th through May 28th and July 1 through 09/28/2012 from Reynolds to CH 11 / IL 94 (S) |
Will County (Illinois)
| EB US-30 from Jefferson St to Cass St
|
|
Medium |
Various lanes closed |
04/22/13 07:00 AM to 06/25/13 11:59 PM |
IDOT |
One lane closed. |
| EB US-30 from Jefferson St to Collins St
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing |
| EB US-30 from I-80 to Church St
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, one lane closed. |
| EB US-30 from Williams St to US-45
|
|
Medium |
Various lanes closed |
05/02/11 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, widening, storm sewers, and traffic signals |
| WB US-30 from US-45 to Williams St
|
|
Medium |
Various lanes closed |
05/02/11 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, widening, storm sewers, and traffic signals |
| WB US-30 from Church St to I-80
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Resurfacing, one lane closed. |
| WB US-30 from Collins St to Western Ave
|
|
Medium |
Various lanes closed |
04/22/13 07:00 AM to 06/25/13 11:59 PM |
IDOT |
One lane closed. |
| NB IL-53 at Laraway Rd
|
|
Medium |
All lanes and shoulders open |
06/03/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Traffic signal modernization . |
| NB IL-53 (Ruby St) at Des Plaines River
|
|
Medium |
Various lanes closed |
01/01/12 07:00 AM to 06/30/13 11:59 AM |
IDOT |
Repairs to IL-53 (Ruby Street) over the Des Plaines River. |
| NB IL-53 from Remington Blvd to Royce Rd
|
|
Medium |
Various lanes closed |
05/20/13 07:00 AM to 10/10/13 11:59 PM |
IDOT |
Addition of landscape median, and retaining walls. |
| SB IL-53 from Royce Rd to Remington Blvd
|
|
Medium |
Various lanes closed |
05/20/13 07:00 AM to 10/10/13 11:59 PM |
IDOT |
Addition of landscape median, and retaining walls. |
| SB IL-53 (Ruby St) at Des Plaines River
|
|
Medium |
Various lanes closed |
01/01/12 07:00 AM to 06/30/13 11:59 AM |
IDOT |
Repairs to IL-53 (Ruby Street) over the Des Plaines River. |
| SB IL-53 at Laraway Rd
|
|
Medium |
All lanes and shoulders open |
06/03/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Traffic signal modernization . |
| EB IL-113 from W/O Will Rd to 1500 ft E/O Will Rd
|
|
Medium |
Various lanes closed |
09/24/12 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed. |
| WB IL-113 from 1500 ft E/O Will Rd to W/O Will Rd
|
|
Medium |
Various lanes closed |
09/24/12 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. One lane closed. |
| NB CR-14 at Rodeo Dr
|
|
Medium |
Various lanes closed |
07/02/12 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Complete reconstruction and widening of intersection. |
| SB CR-14 at Rodeo Dr
|
|
Medium |
Various lanes closed |
07/02/12 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Complete reconstruction and widening of intersection. |
| NB Plainfield -Naperville Rd at 119th St
|
|
Medium |
Various lanes closed |
04/01/13 08:00 AM to 11/30/13 06:00 PM |
IDOT |
Widening and turn lanes, traffic signalization.; ***Long Term Closure*** |
| EB 135th St at IL-171
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 06/30/13 11:59 PM |
Other |
Widening, new bridge, and reconstruction; ***Long Term Closure*** |
| EB 143rd St from I-355 to Lemont Rd
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening and reconstruction; ***Long Term Closure*** |
| EB 143rd St from I-355 to Lemont Rd
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Pavement widening and drainage. |
| EB 143rd St from Bell Rd to Will Cook Rd
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening; Signalization; Intermittent Lane Closures; ***Long Term Closure*** |
| WB 143rd St from Will Cook Rd to Bell Rd
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening; Signalization; Intermittent Lane Closures; ***Long Term Closure*** |
| WB 143rd St from Lemont Rd to I-355
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening and reconstruction; ***Long Term Closure*** |
| WB 143rd St from Lemont Rd to I-355
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Pavement widening and drainage. |
| EB 95th St from Plainfield-Naperville Rd to Boughton Rd
|
|
Minor |
Various lanes closed |
06/01/13 07:00 AM to 11/30/14 11:59 PM |
Other |
Widening; New Bridge; Traffic Signals; Intermittent Lane Closures; ***Long Term Closure*** |
| WB 95th St from Boughton Rd to Plainfield-Naperville Rd
|
|
Minor |
Various lanes closed |
06/01/13 07:00 AM to 11/30/14 11:59 PM |
Other |
Widening; New Bridge; Traffic Signals; Intermittent Lane Closures; ***Long Term Closure*** |
| NB Baltimore St (IL-53) from Kankakee St to Forked Creek
|
|
Major |
Various lanes closed |
05/06/13 07:00 AM to 08/01/13 11:59 PM |
IDOT |
Resurfacing |
| SB Baltimore St (IL-53) from Forked Creek to Kankakee St
|
|
Major |
Various lanes closed |
05/06/13 07:00 AM to 08/01/13 11:59 PM |
IDOT |
Resurfacing |
| WB Broadway St at Des Plaines River
|
|
Medium |
Various lanes closed |
09/05/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Bridge repairs |
| EB Caton Farm Rd from County Line Rd to Drauden Rd
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 11/30/14 11:59 PM |
Other |
widening and reconstruction, signalization; ***Long Term Closure*** |
| WB Caton Farm Rd from Drauden Rd to County Line Rd
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 11/30/14 11:59 PM |
Other |
widening and reconstruction, signalization; ***Long Term Closure*** |
| NB Cherry Hill Rd from US-52 to S/O Laraway Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
Other |
Maintenance Overlay. Intermittent Lane Closures. ***Long Term Closures*** |
| SB Cherry Hill Rd from S/O Laraway Rd to US-52
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
Other |
Maintenance Overlay. Intermittent Lane Closures. ***Long Term Closures*** |
| NB Cicero Ave (IL-50) from Governors Hwy to Steger Rd
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/01/13 11:59 PM |
IDOT |
Resurfacing |
| SB Cicero Ave (IL-50) from Steger Rd to Governors Hwy
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/01/13 11:59 PM |
IDOT |
Resurfacing |
| EB DeSelm (Manteno Rd) from Old Chicago Rd to Warner Bridge Rd
|
|
Medium |
Various lanes closed |
04/01/13 08:00 AM to 11/30/13 05:00 PM |
IDOT |
Widening and reconstruction; ***Long Term Closure*** |
| WB DeSelm (Manteno Rd) from Warner Bridge Rd to Old Chicago Rd
|
|
Medium |
Various lanes closed |
04/01/13 08:00 AM to 11/30/13 05:00 PM |
IDOT |
Widening and reconstruction; ***Long Term Closure*** |
| NB Gougar Rd at US-30
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 12/31/13 11:59 PM |
Other |
Signalization; Intermittent lane closures |
| SB Gougar Rd at US-30
|
|
Medium |
Various lanes closed |
05/01/12 07:00 AM to 12/31/13 11:59 PM |
Other |
Signalization; Intermittent lane closures |
| EB Indiana Ave from W/O Ashland Ave to IL-1
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 08/31/13 11:59 PM |
Other |
Maintenance Overlay. Intermittent Lane Closures. ***Long Term Closures*** |
| WB Indiana Ave from IL-1 to W/O Ashland Ave
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 08/31/13 11:59 PM |
Other |
Maintenance Overlay. Intermittent Lane Closures. ***Long Term Closures*** |
| EB Jackson St at Des Plaines River
|
|
Medium |
Various lanes closed |
09/05/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Bridge repairs |
| WB Jackson St at Des Plaines River
|
|
Medium |
Various lanes closed |
09/05/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Bridge repairs |
| EB Jefferson St at Des Plaines River
|
|
Medium |
Various lanes closed |
09/05/12 07:00 AM to 07/31/13 11:59 PM |
IDOT |
Bridge repairs |
| EB Laraway Rd from US-52 to Harlem Ave
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
Other |
Maintenance Overlay. Intermittent Lane Closures. ***Long Term Closures*** |
| WB Laraway Rd from Harlem Ave to US-52
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 07/31/13 11:59 PM |
Other |
Maintenance Overlay. Intermittent Lane Closures. ***Long Term Closures*** |
| WB Laraway Rd at IL-53
|
|
Medium |
Various lanes closed |
06/03/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Traffic signal modernization . |
| EB Laraway Rd at IL-53
|
|
Medium |
All lanes and shoulders open |
06/03/13 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Traffic signal modernization . |
| EB Manhattan Monee Rd at 88th Ave
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening and turn lanes; ***Long Term Closure*** |
| WB Manhattan Monee Rd at 88th Ave
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening and turn lanes; ***Long Term Closure*** |
| EB Manhattan-Monee Rd from Center Rd to W/O Devonshire Ln
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 09/30/13 11:59 PM |
Other |
Maintenance Overlay. Intermittent Lane Closures. ***Long Term Closures*** |
| WB Manhattan-Monee Rd from W/O Devenshire Ln to Center Rd
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 09/30/13 11:59 PM |
Other |
Maintenance Overlay. Intermittent Lane Closures. ***Long Term Closures*** |
| EB McDonough St from Houbolt Rd to 129th Infantry Dr
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening and Reconstruction; One-Way Traffic; ***Long Term Closure*** |
| WB McDonough St from 129th Infantry Dr to Houbolt Rd
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening and Reconstruction; One-Way Traffic; ***Long Term Closure*** |
| NB Old Chicago Rd at Over Jordan Creek
|
|
Medium |
All lanes and shoulders closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Bridge Replacement; ***Long Term Closure*** |
| SB Old Chicago Rd at Over Jordan Creek
|
|
Medium |
All lanes and shoulders closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Bridge Replacement; ***Long Term Closure*** |
| EB Pauling-Goodenow Rd from Western Ave to IL-394
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 08/31/13 11:59 PM |
Other |
Maintenance Overlay. Intermittent Lane Closures. ***Long Term Closures*** |
| WB Pauling-Goodenow Rd from IL-394 to Western Ave
|
|
Medium |
Various lanes closed |
06/01/13 07:00 AM to 08/31/13 11:59 PM |
Other |
Maintenance Overlay. Intermittent Lane Closures. ***Long Term Closures*** |
| EB Pauling-Manhattan Rd at Over Jackson Creek
|
|
Medium |
All lanes and shoulders closed |
04/01/13 07:00 AM to 09/30/13 11:59 PM |
Other |
Bridge Replacement; ***Long Term Closure*** |
| WB Pauling-Manhattan Rd at Over Jackson Creek
|
|
Medium |
All lanes and shoulders closed |
04/01/13 07:00 AM to 09/30/13 11:59 PM |
Other |
Bridge Replacement; ***Long Term Closure*** |
| SB Plainfield -Naperville Rd at 119th St
|
|
Medium |
Various lanes closed |
04/01/13 08:00 AM to 11/30/13 06:00 PM |
IDOT |
Widening and turn lanes, traffic signalization.; ***Long Term Closure*** |
| NB Plainfield-Naperville Rd at 119th St
|
|
Medium |
Various lanes closed |
06/11/12 09:00 AM to 08/01/13 03:00 PM |
Other |
Two lanes closed. |
| SB Plainfield-Naperville Rd at 119th St
|
|
Medium |
Various lanes closed |
06/11/12 09:00 AM to 08/01/13 03:00 PM |
Other |
Two lanes closed. |
| EB Renwick Rd at Des Plaines River
|
|
Medium |
Various lanes closed |
10/11/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
One lane closed. Expect lane restrictions for roadway improvement. |
| WB Renwick Rd at Des Plaines River
|
|
Medium |
Various lanes closed |
10/11/11 07:00 AM to 12/31/13 11:59 PM |
IDOT |
One lane closed. Expect lane restrictions for roadway improvement. |
| EB Rodeo Dr at Naperville Rd
|
|
Medium |
Various lanes closed |
07/02/12 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Complete reconstruction and widening of intersection. |
| WB Rodeo Dr at Naperville Rd
|
|
Medium |
Various lanes closed |
07/02/12 07:00 AM to 08/30/13 11:59 PM |
IDOT |
Complete reconstruction and widening of intersection. |
| EB Stuenkel Rd from w/o Harlem Ave to w/o Ridgeland Ave
|
|
Major |
All lanes and shoulders open |
05/20/13 05:00 AM to 10/01/13 11:59 PM |
IDOT |
***Long Term Closure*** The project will require the Stuenkel Road intersection at Harlem Avenue to close, with local access allowed in Northbound direction only. A detour of Harlem northbound to eastbound Dralle to northbound Ridgeland to westbound Steger back to Harlem and Harlem southbound to eastbound Steger to southbound Ridgeland to westbound Dralle back to Harlem, will be posted for motorists to use during construction activities. More information |
| EB Stuenkel Rd from E/O Ridgeland Ave to W/O Central Ave
|
|
Medium |
All lanes and shoulders closed |
10/01/12 07:00 AM to 10/01/13 11:59 PM |
IDOT |
Bridge reconstruction, road closed, use alernate route. |
| WB Stuenkel Rd from W/O Central Ave to E/O Ridgeland Ave
|
|
Medium |
All lanes and shoulders closed |
10/01/12 07:00 AM to 10/01/13 11:59 PM |
IDOT |
Bridge reconstruction, road closed, use alernate route. |
| WB Stuenkel Rd from w/o Ridgeland Ave to w/o Harlem Ave
|
|
Major |
All lanes and shoulders open |
05/20/13 05:00 AM to 10/01/13 11:59 PM |
IDOT |
***Long Term Closure*** The project will require the Stuenkel Road intersection at Harlem Avenue to close, with local access allowed in Northbound direction only. A detour of Harlem northbound to eastbound Dralle to northbound Ridgeland to westbound Steger back to Harlem and Harlem southbound to eastbound Steger to southbound Ridgeland to westbound Dralle back to Harlem, will be posted for motorists to use during construction activities. More information |
| EB Taylor Rd from Weber Rd to Independence Blvd (IL-53)
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Resurfacing |
| WB Taylor Rd from Independence Blvd (IL-53) to Weber Rd
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Resurfacing |
| NWB Thorn Creek Dr at Thorn Creek
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Bridge replacement |
| SEB Thorn Creek Dr at Thorn Creek
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Bridge replacement |
| NB Weber Rd at Renwick Rd
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening; ***Long Term Closure*** |
| NB Weber Rd at Renwick Rd
|
|
Minor |
Various lanes closed |
06/01/12 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Curb, gutter, traffic signals, landscaping |
| NB Weber Rd at Gaskin Dr
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening and traffic signals; ***Long Term Closure*** |
| SB Weber Rd at Gaskin Dr
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening and traffic signals; ***Long Term Closure*** |
| SB Weber Rd at Renwick Rd
|
|
Minor |
Various lanes closed |
04/01/13 07:00 AM to 11/30/13 11:59 PM |
Other |
Widening; ***Long Term Closure*** |
| SB Weber Rd at Renwick Rd
|
|
Minor |
Various lanes closed |
06/01/12 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Curb, gutter, traffic signals, landscaping |
I-65 NB (Indiana)
| at 153rd Ave (+0.5 miles)
|
244.0 |
Medium |
Right lane closed, one lane open |
06/18/13 07:36 PM to 06/19/13 10:36 AM |
InDOT |
Construction work |
I-80 EB (Indiana)
| Exit to I-90
|
15.2 |
Medium |
All lanes and shoulders open |
03/14/11 07:00 PM to 01/06/14 11:59 PM |
Indiana Toll Road |
Lake Station - EB Exit from 80/94 to ITR Bridge: No lanes closed, 14 ft width restriction |
| I-94 (-0.1 miles) to Mccool Rd (+0.4 miles)
|
21.2 to 26.2 |
Medium |
Right lane closed, one lane open |
06/18/13 08:00 PM to 06/19/13 01:00 PM |
Indiana Toll Road |
Mill and Fill |
| Ramp from EB I-80/90 (Indiana Toll Road) to Travel Plaza 1
|
21.5 |
None |
Ramp work, possible width reduction |
06/18/13 08:00 PM to 06/19/13 01:00 PM |
Indiana Toll Road |
Mill and Fill; Exit/Entry lanes reduced |
| Ramp from Travel Plaza 1 to EB I-80/90 (Indiana Toll Road)
|
21.8 |
None |
Ramp work, possible width reduction |
06/18/13 08:00 PM to 06/19/13 01:00 PM |
Indiana Toll Road |
Mill and Fill; Exit/Entry lanes reduced |
| Exit to US-31
|
72.1 |
None |
Ramp work, possible width reduction |
06/18/13 12:00 AM to 06/19/13 06:00 AM |
Indiana Toll Road |
Reduced Lane near Toll Plaza; MIll and Fill |
I-80 WB (Indiana)
| Van Guilder Rd (+0.1 miles) to Van Guilder Rd (+0.3 miles)
|
144.6 to 144.4 |
Medium |
Right lane closed, one lane open |
06/18/13 07:00 AM to 06/19/13 07:00 AM |
Indiana Toll Road |
Deep Patching |
| Exit to US-31
|
72.9 |
None |
Ramp work, possible width reduction |
06/18/13 12:00 AM to 06/19/13 06:00 AM |
Indiana Toll Road |
Reduced Lane near Toll Plaza; MIll and Fill |
| Primrose Rd to Sycamore Rd
|
70.3 to 68.0 |
Medium |
Right lane closed, one lane open |
06/17/13 12:00 AM to 06/20/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| Hamilton Trl (-1.0 miles) to Timothy Rd (+0.1 miles)
|
64.7 to 62.7 |
Medium |
Right lane closed, one lane open |
06/18/13 06:00 PM to 06/20/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| Exit to EB I-94
|
21.1 |
Medium |
All lanes and shoulders open |
01/03/11 07:00 AM to 01/06/14 11:59 PM |
Indiana Toll Road |
No lanes closed, Exit 21 WB 12 ft width restriction |
I-90 WB (Indiana)
| Van Guilder Rd (+0.1 miles) to Van Guilder Rd (+0.3 miles)
|
144.6 to 144.4 |
Medium |
Right lane closed, one lane open |
06/18/13 07:00 AM to 06/19/13 07:00 AM |
Indiana Toll Road |
Deep Patching |
| Exit to US-31
|
72.9 |
None |
Ramp work, possible width reduction |
06/18/13 12:00 AM to 06/19/13 06:00 AM |
Indiana Toll Road |
Reduced Lane near Toll Plaza; MIll and Fill |
| Primrose Rd to Sycamore Rd
|
70.3 to 68.0 |
Medium |
Right lane closed, one lane open |
06/17/13 12:00 AM to 06/20/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| Hamilton Trl (-1.0 miles) to Timothy Rd (+0.1 miles)
|
64.7 to 62.7 |
Medium |
Right lane closed, one lane open |
06/18/13 06:00 PM to 06/20/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| Exit to EB I-94
|
21.1 |
Medium |
All lanes and shoulders open |
01/03/11 07:00 AM to 01/06/14 11:59 PM |
Indiana Toll Road |
No lanes closed, Exit 21 WB 12 ft width restriction |
| IN-51 (-0.3 miles) to IN-51
|
20.7 to 20.4 |
Medium |
Various lanes closed |
06/18/13 09:00 AM to 10/15/13 09:00 PM |
Indiana Toll Road |
Bridge Work; 2 lanes open at all times |
| Entrance from EB I-80
|
20.4 |
Medium |
All lanes and shoulders open |
03/14/11 07:00 PM to 01/06/14 11:59 PM |
Indiana Toll Road |
Lake Station - EB Exit from 80/94 to ITR Bridge: No lanes closed, 14 ft width restriction |
|