|
Updated: 09/02/10 10:07 AM
Use the links below to view other reports for the selected location:
travel times /
incidents /
construction /
special events /
congestion /
dynamic message signs /
cameras /
detectors
NOTE: You may place the mouse over a location to see its municipality and county,
or click on the location to see a map of the event.
| Stevenson NB (Illinois) |
| County Line Rd to Lake Shore Dr
|
276.4 to 293.8 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Dan Ryan Expy to Lake Shore Dr
|
292.5 to 293.8 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Stevenson SB (Illinois) |
| Lake Shore Dr to Dan Ryan Expy
|
293.9 to 292.5 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Lake Shore Dr to County Line Rd
|
293.9 to 276.4 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
| Entrance from SB I-294
|
277.5 |
Medium |
Ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:00 PM |
Illinois Tollway |
Right ramp lane closed |
| County Line Rd to I-80
|
276.4 to 250.3 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 02:30 PM |
IDOT |
Moving Operation |
| County Line Rd to IL-113
|
276.4 to 235.7 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
09/02/10 09:00 AM |
09/02/10 03:00 PM |
IDOT |
|
|